Home

bedienungsanleitung (english) - Tecno-Gaz

image

Contents

1. 15 3 2 Wall versioninstall ation sense meer 16 3 2 1 Wall plate instal anon sure een 16 3 2 2 Horizontal arm installation sss 16 323 Cupola installation iaia 16 3 9 Mobile esi j aa dipana 17 3 3 1 Installing pipe on mobile base sss 17 3 3 2 Installation of oscillating arm sss 17 3 3 3 G polainstalatio s kaa a a it 17 3 4 Connecting to electrical plant nn nn 18 3 5 11151 51811111021 a ai 19 3 6 Installation verification and Product testing operations before use m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 5 di 20 Product CAUTION CAUTION CAUTION CAUTION CAUTION 1 General information IMPORTANT The ME Medical Electrical EQUIPMENT to which this manual refers is a LAMP for Operating Theatre or SYSTEM of LAMPS for Operating Theatre For easier description such ME EQUIPMENT will be indicated in this manual with the name of Product This manual is an integral part of the Product as required by European directive 93 42 EEC and 2007 47 EC Always keep this installation manual close to the lamp The Product is not suitable for use in explosion risk areas The Product is not suitable for use in the presence of inflammable mixtures of anaesthetics with air oxygen or NO laughing gas TECNO GAZ disclaims all liability for any injur
2. Rev 4 Pag 16 di 20 CAUTION See drawing 1 See drawing 2 See drawing 3 See drawing 4 CAUTION See drawing 114 NATTENTION 3 2 Wall version installation 3 2 1 Wall plate installation Incorrect levelling of the plate might cause the horizontal arm of the Product to make an unwanted move when passing from the non balance condition to the balance one By means of a spirit level 4 position the template sheet drawing 11 2 on the wall 1 fixing it with adhesive tape 3 Make the 6 holes following what is specified in paragraph 2 1 After making the holes 3 on the wall 1 fix the plate 2 to the wall by means of bolts 4 always using the spirit level 5 Make sure that the power supply socket 6 of the Product can reach a power supply point of the room without creating interferences with the movements of the same and the operators 3 2 2 Horizontal arm installation Align the arm 1 with the pin of the box 2 Then connect the terminals of the electric cables 3 with 4 among each other respecting the polarity Insert the arm into the pin so as to make the 3 holes at 120 of the arm fit with the 3 holes of the pin ring nut Screw in one at a time the 3 screws M5x12 DIN7991 1 using a 3 Allen key 2 Tighten the clutch 3 using a screwdriver 4 taking care to maintain the clutch well aligned with the threaded hole of the tube so that this will screw without forcing Rotate the slot of the
3. m y y TECNO GAZ Installation manual MI_007_GB 17 12 13 Rev 4 Pag 1 di 20 Installation manual for surgical light system ORION 40 ORION 40DS ORION 40 Mobile LC001LRA ORION 40 Wall LCOO2LRA ORION 40 Single Ceiling LCOO3LRA Double Ceiling ORION 40 ORION 40 LC004LRA ORION 40DS Wall LC001LRD ORION 40DS Ceiling LC002LRD ORION 40DS Mobile LC003LRD Double Ceiling ORION 40DS ORION 40DS LC004LRD m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 2 di 20 Introduction Mark Conformity Validity of manual Customer service Copyright Dear user You are kindly invited to read this manual carefully before proceeding to use the Product in order to safeguard yourself and other people from any injuries This appliance is a Class 1 medical device pursuant to European Directives on medical devices MDD 93 42 EEC Annex IX and 2007 47 EC The manufacturer declares that this product is in compliance with Annex essential requirements of Directive 93 42 EEC and certifies such conformity by affixing the CE mark The Product is classified in risk group 1 according to IEC 62471 standard Photobiological Safety of Lamps This operator s manual refers to the following products e ORION 40 40 DS single and double ceiling version e ORION 40 40 DS wall e ORION 40 40 DS mobile The customer service is at your disposal in case of
4. of the flanges with the 3 3 holes at 120 of the pipe e Point to all 6 screws DIN7991 with hexagonal key N 3 e Screw tightly ONLY two screws in a vertical side with each other 4 e Then complete the remaining tightening This will prevent loosening over time during the continuous rotation of the Product 3 1 3 Oscillating arm just for double lamp Align the oscillating arm pin 1 with the tube of horizontal arm 2 After connecting the plugs of the electric cables 3 with 4 among each other insert the pin of the oscillating arm into the pipe of the horizontal arm and fix it by tight the three screws M5x12 DIN7991 5 by use of hexagon key 6 N3 To help the insertion of connectors pull the cables from the slot located on the top of the arm Make a S bend to the cables and close they inside the tube using the bent plate 7 Close it screwing the two screws 8 3 1 4 Cupola installation satellite option Align the oscillating arm 2 with the pin of the cupola fork 1 After connecting the terminals of the electric cables 3 with 4 among each other insert the pin of the fork into the pipe of the arm and screw in the three screws M4x8 DIN7991 6 Fix the fork to oscillating arm positioning upwards the hole 5 that houses the friction regulating dowel In case of double lamp with satellite install it following the steps above m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual
5. Product details information concerning its use identification of spare parts being required and for any other queries you might have concerning the appliance for ordering spares and for matters relating to assistance and warranty e TECNO GAZ e Strada Cavalli 4 e 20060 Sala Baganza Parma e T l 39 0521 83 39 26 e Fax 39 0521 83 33 91 e mail info tecnogaz com The contents of this Manual may be amended by TECNO GAZ without prior notice or any further obligations in order to make changes and improvements The reproduction including partial or translation of any part of this manual is forbidden without the written permission of TECNO GAZ m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 3 di 20 Right to make changes TECNO GAZ reserves the right to change cancel or otherwise amend the Translations IMPORTANT data contained in this document at any time and for any reason without prior notice inasmuch as TECNO GAZ is constantly seeking new solutions which lead to product evolution TECNO GAZ therefore reserves the right to make changes to the supplied Product in terms of shape fittings technology and performances With regard to translations into languages other than Italian reference shall always be made to the Italian edition of this operator s manual Please find attached a warranty coupon to be filled in and sent back to TECNO GAZ Such coupon c
6. deem himself responsible for the safety reliability and performance of the device if the installation additions settings repairs are not carried out by people authorized in advance by TECNO GAZ the electrical system of the installation site does not comply with the norms CEI 64 8 norms for electrical systems in sites used as medical premises and similar norms the equipment is not used in accordance with the instructions for use 2 Mechanical and electrical arrangement of the site The building and electrical arrangement works for the installation of the product are the responsibility of the Final Customer 2 1 Mechanical arrangement of the site The building slab arrangement works to install the product must be carried out in a solid and safe way according to the standards by qualified personnel m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 11 di 20 DANGER CAUTION Fixing positions Reinforced concrete By qualified personnel we mean including but not limited to the following professionals Building Engineer Surveyor Building Contractor duly registered with the Professional Register In case of improper dfrilling e g drilling of a piece of iron of the reinforced concrete the technician responsible for the construction will have to be informed for safety reasons since the statics of the premises might be compromised The ceiling must have a capacit
7. mm mm HSL 3 G M 16 25 24 125 100 163 80 24 25 HSL 3 G M 6 12 12 60 45 50 10 10 10 do Nominal diameter of the point Mt Closing torsion moment t Minimum depth of drilling Sw Opening of the spanner hs Minimum depth of insertion x Fixing height Length of anchor tie rods 1 Using the paper template attached to this manual mark all the 6 fixing holes of the chosen point of the ceiling 2 Make the first hole according to the safety anchor diameter REY RUN 3 By means of a pump or vacuum cleaner with pipe terminal remove the dust and the small drilling fragments from the hole 4 The anchor tie rod must be inserted into the hole keeping it to axis and using a hammer Attention Consider the insertion depth m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 13 di 20 Clay cement mix DANGER DANGER 5 By the hexagonal dynamometrical spanner tighten with spanner adjusted at the value specified by the constructor of the anchors opening the anchor The anchor tie rod will immediately take the weight 6 Make the remaining 5 holes and insert the anchor tie rods as in previous points 2 5 7 After one hour tighten the anchor tie rods again with the tightening torque prescribed Chemical anchorage fix the anchoring tube with 6 chemical injection anchors mod Hilti HIT HY 150 with HAS following the directions given by
8. screw clockwise to increase the friction effect and anticlockwise to reduce it 3 2 3 Cupola installation Align the oscillating arm 1 with the pin of the head fork 2 After connecting the terminals of the electric cables 3 with 4 among each other insert the pin of the fork into the pipe of the arm and screw in the three screws M4x8 DIN7991 5 Fix the fork to oscillating arm positioning upwards the hole 6 that houses the friction regulating dowel tallati MI 007 GB 17 12 13 TECNO GAZ n lon man bild eMe non Manua Rev 4 Pag 17 di 20 3 3 Mobile version 3 3 1 Installing pipe on mobile base See drawing 148 Remove the bolt 2 and washer 3 from the stand bottom 1 Mechanical connection Position the stand 1 on the base 4 fitting and inserting its pawl 5 into the plate seat 6 use the bolt and washer previously unscrewed to join the stand to the base and tighten thoroughly Insert the cover 7 from the stand top and the relevant connecting clip 8 WARNING Instability and falling danger Failure to insert the detent into the appropriate seat present on the basement plate implies the risk of instability and the possible fall of the structure Joint 3 poles connector of the stem and 6 poles connector of the switch to the related connectors located on the electrical panel Then re position base cover and ring and fix it tightening M4 screw located in the electrical board b
9. arged to the customer 2 put on T position the bipolar switch of the floor base cover and on the wall box only on floor and wall versions 3 press the I O keyboard on the side of the fork 3 6 Installation verification and Product testing operations before use The following notes are to be considered compulsory during verification of the installation since they prove the correct verification of all the points set out For such reason it is necessary to tick each point when it is treated 1 Verify the suitability of the ceiling wall on installation of the Product 2 By means of a spirit level verify the perpendicularity of the anchoring tube wall plate O 3 Put medium thread delay Loctite 243 on the six screws that fix the Product to the anchoring tube and check the tightness as instructed D 4 Check the cupola light emission glass If the light emission glass is damaged or broken glass splinters may fall The Product must be turned off immediately and no longer used until the failure is removed 5 Make sure that the movement mechanics work properly Check the mechanical working of the Product through direction and rotation movements O 6 After starting the Product must give light from the cupola Seal and signature of the installer Up TECNO GAZ Installation manual MI_007_GB 17 12 13 Rev 4 Pag 20 di 20 Note CEILING PLATE SHEET TEMPLATE SCALE1 1 Sheet f
10. ase 3 3 2 Installation of oscillating arm See drawing 149 Align the pivot 2 of the oscillating arm with the hole of the tube 1 and join the electrical connectors 3 with 4 respecting the colours of the electrical cables Insert the pivot 2 of the arm into the hole of the stem 1 until you are able to align the hole 5 of the screw M6x45 DIN912 with the hole 6 of the pivot Screw down the screw 7 with a mechanical key and act on screw 8 to regulate the semi rotation Place the cover 9 as showed and lock it screw down the screw 10 with a hexagon key of n 2 3 3 3 Cupola installation See drawing 130 SEE POINT 3 1 4 m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual ui FE 3 4 Connecting to electrical plant A DANGER Danger of electric shock Before carrying out the electrical connections check that the power line is NOT under tension in order to proceed with the montage safely The group of the Product power support plate transformer terminal block as explained above is designed to be fixed on the anchoring tube for the ceiling version or it is located inside wall box for wall version or enclosed inside mobile base cover for mobile version For ceiling version to connect the line F N T to the cables of the Product T follow as written in the specific circuit diagram attached and as indicated from the labels placed on the elect
11. corresponds with the M6 threaded hole 6 of the anchoring tube Then secure the electrical panel to the tube by tight the M6x16 DIN912 screw 7 and relative serrated washer 8 If you need to fix the electrical panel to another location along the anchoring tube place it at the desired position and anchor it by tight the two M6x16 DIN912 screws 3 and relative serrated washers 4 with a 5 drill 9 make an hole on the anchoring tube in correspondence of the slot of electrical panel clamping frame and with an M6 tap 10 thread the hole itself m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 15 di 20 CAUTION See drawing 112 See drawing 113 See drawing 130 Finally secure the electrical panel to the tube by tight the M6x16 DIN912 screw 7 and relative serrated washer 8 Depending on the type of ceiling with false ceiling or less place first the flat cover 11 or high 12 If the cover is in two pieces you can install it later but remember to previously insert the silicone ring 13 of the ceiling cover before to proceed with the installation of the lamp structure 3 1 2 Installation horizontal arm to anchoring tube Align the pivot of the horizontal arm structure 1 with the anchoring tube 2 Insert the power cables 3 along the tube and bring them out from the hole for the connection to the source Insert the pin into the tube up to combine the 3 3 holes at 120
12. faced Electric shock Mechanical danger due to hanging masses quick release of a suspension arm m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual ui TTT x Bi KE IF e E m gt i 1 4 Graphic symbols used on the package The symbols present on the boxes of the packages are listed below High side of the package Maximum number of packages stackable Breakable package Humidity suffering package Do not overlap packages with pallet Weight of the package 1 5 Other graphic symbols used on the Product The symbols present on the Product are listed below B Type device Indicates the level of protection against direct and indirect contact Graphic symbol proving the CE marking of the product Symbol indicating the manufacture date month and year Fuses used by the device m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 9 di 20 Cover on the product Starting date of the warranty Transport Document Date Repairs Standard wear Exclusion Replacement Improper use Use stop Loss of warranty Technical interventions Replacing components 1 6 Warranty Certificate 1 The product is covered for a period of 12 months including electric parts 2 The warranty becomes effective from the lamp installation date at the customer s premises exclusively if the installation is carr
13. h repaired or modified by the buyer or third parties not authorized by TECNO GAZ 12 For the interventions the buyer must apply to the retailer only or the service centers as recommended by TECNO GAZ 13 The components replaced under guarantee must be returned to TECNO GAZ carriage free m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 10 di 20 Non return Returns Repairs 14 The non return implies the charge of the cost of the part to the applicant 15 The non return implies the charge of the cost of the part to the applicant 16 TECNO GAZ does not accept returns by final users 17 Only the retailer or the after sales assistance centre chosen by the user will be admitted to sent back to TECNO GAZ the components to be repaired according to the commercial procedure CM P 003 called MANAGEMENT OF REQUEST FOR RESTITUTION REPAIRING REPLACEMENT OF TECNO GAZ EQUIPMENT AND CLIENT COMPLAINTS Authorization for returns 18 The returns to TECNO GAZ must be documented and authorized as per Technical documents Return dispatch Non responsibility NOTE DANGER internal procedures 19 The products returning to TECNO GAZ must be attached with the return authorization documents and a document describing the failure 20 All products under repair must be sent to TECNO GAZ carriage free and suitably packaged it is compulsory to use the original package 21 The constructor does not
14. ied out by TECNO GAZ personnel In any other case the warranty becomes effective from the lamp dispatch date from TECNO GAZ warehouse to the customer s premises 3 In case of contention the date specified on the Transport Document given with the goods is considered valid 4 Repair or replacement under guarantee of a part is carried out for well assessed manufacture reasons and at the unchallengeable discretion of TECNO GAZ The warranty includes personnel s travels packaging and transport charges 5 The warranty does not include components subject to normal wear and tear including but not limited to halogen lamps fuses relays bearings etc 6 The warranty does not include failure and faults due to improper installation failure or defects caused by carelessness negligence abnormal use of the device or other causes not attributable to the constructor interventions due to presumed defects or convenient inspections 7 The right to replace the whole Lamp is not acknowledged 8 The warranty does not grant any indemnity for direct or indirect damage of any nature to people or things due to the inefficiency of the lamp 9 TECNO GAZ can not be held responsible for failure or damage caused by improper use of the product non maintenance or neglect of the basic principles of good maintenance negligence 10 No indemnity is acknowledged for Lamp stop 11 The warranty is lost automatically if the lamp is tampered wit
15. ies to persons or damage to things caused by the installation maintenance or use of the Product by unqualified operators By qualified operator is meant whosoever has attended a course relating to the installation maintenance and use of the product organised by TECNO GAZ or alternatively whosoever has carefully read this installation manual The only party responsible for Product installation is the buyer s customer itself no cost or responsibility relating to installation and or commissioning of the Product shall therefore be traced back and or in any case attributed to TECNO GAZ The masonry works involving the preparation of the ceiling or wall for Products to be installed on the ceiling or wall respectively and the electric works for preparing the power supply system for the Product shall be of a sturdy and safe nature and completed in a workmanlike manner by suitably trained personnel By way of example only without limitation the following professional figures are deemed adequately trained gt Building Engineer Draughtsman Building firm duly registered in the professional Register for masonry works gt Electro technician qualified to exercise the profession of electrician for the electrical works m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 6 di 20 CAUTION CAUTION Operator qualification Installation Use Routine maintenance Special maintenance Assista
16. nce Cleaning Demolition Packaging Transport Electrical installation must be made in compliance with the IEC 60364 7 710 standard and any national regulations and must contemplate protection with fuses or thermal magnetic disconnection switch and the fitting of a master switch able to ensure the complete interruption of the power supply to the Product The Product is a ME EQUIPMENT and consequently falls within the field of application of the EN 62353 standard Consequently any operation performed on the Product must be carried out in compliance with the EN 62353 standard where applicable 1 1 Qualification of operators This paragraph describes the requirements and qualifications which the operators involved in the various stages of Product life and use must possess the Product must be installed by a qualified Installer and or Technician Professional medical personnel Qualified technician in possession of professional technical requirements Qualified technician in possession of professional technical requirements Dealer who has attended a technical course on the Product organised by the manufacturer Properly trained medical and paramedical personnel at the end of the Product life cycle dispose of the used Product in an environment friendly way and in compliance with the national directives applicable to waste disposal 1 2 Packaging transport storage and characteristics of the installation site Boxes containing the wh
17. ole structure with installation instruction manual and user s manual Transport is carried out by any road haulage contractor as long as they respect the following characteristics Temperature C 15 60 Humidity 10 75 Yo Atmospheric pressure h Pa 500 1060 m Up TECNO GAZ MI 007 GB 17 12 13 Rev 4 Pag 7 di 20 Installation manual Storage Installation site The devices packaged must be stored warehoused in a dry place and at the following temperature Temperature C 15 60 Humidity 10 75 Atmospheric pressure h Pa 500 1060 The site appointed for the installation of the equipment must have the following characteristics Temperature C 10 40 Humidity 30 75 96 Atmospheric pressure h Pa 700 1060 1 3 Graphic symbols used in the installation manual In this installation manual and on the Product important directions are marked by means of symbols and identifying words Identifying words such as DANGER WARNING or CAUTION indicate the classification of the risk of damage DANGER signals an immediately dangerous situation which might cause death or serious damage WARNING signals a potentially dangerous situation which might cause death or serious damage CAUTION signals a potentially dangerous situation which might cause moderate or slight damage The following triangular symbol coupled with a side explanation indicates which danger is being
18. ompletes e the traceability of the medical device as required by the MDD e the Cover on the Product e the confirmation of the complete reading of the manual by the installer as a necessary and sufficient clause so that he she is declared FIT for the installation of the equipment having all the necessary information for the installation through this manual m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 4 di 20 Table of Contents 1 General information ee 5 1 1 Qualification OF operators pp 6 1 2 Packaging transport storage and characteristics of the Installation SHe assrabalabonallalibia la banabanalanalgng 6 1 3 Graphic symbols used in the installation manual 7 1 4 Graphic symbols used on the package ppp 8 1 5 Other graphic symbols used on the Product 8 1 6 Warranty Certificate coo Sco sense 9 2 Mechanical and electrical arrangement of the site 10 2 1 Mechanical arrangement of the Site pp 10 2 2 Electrical arrangement of the Site pp 13 3 Product installation ee 14 3 1 Ceiling version single and double 14 3 1 1 Ceiling plate installation pp 14 3 1 2 Installation horizontal arm to anchoring tube 15 3 1 3 Oscillating arm just for double lamp 15 3 1 4 Cupola installation satellite option
19. ormat A3 n x O18 holes Drawing code Pol Drawing code 3 4
20. rical panel itself in the case of mobile version connect electrical cable with three pins from bent tube to base and electrical cable with six pins from cover to base then you just need to connect the power cable plug to the network line in the case of wall version you only need to connect the power cable plug to network line CAUTION Irreparable damage to the Product Fuses Fuse protection at the terminals of the electrical panel must be insert ONLY AFTER you have made all the mechanical and electrical assembly of the Product Any listing early can cause irreparable damage to the source of light For long periods of non use of the product to remove the fuses FOR MODEL ORION 40 40 DS n 2 T1A primary and n 1 T6 3A secondary for 230Vac supply n 2 T2A primary and n 1 T6 3A secondary for 100Vac supply FOR MODEL ORION 40 40 DS ORION 40 40 DS n 4 T1A primary and n 2 T6 3A secondary for 230Vac supply n 4 T2A primary and n 2 T6 3A secondary for 100Vac supply FOR MODEL ORION 40 40 DS BATTERY n 2 T2A primary and n 1 T10A secondary for both supply tensions m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 19 di 20 CAUTION CAUTION 3 5 First starting It is now possible to power the Product to check its starting with light emission To do so it is necessary to 1 close the circuit through the network switch upstream of the wiring ch
21. the conformity certificate the verification of the grounding circuit must be certified as required by the norms in force 3 Product installation Before installing the Product make sure that all the packages are present and in good condition without any transport related damage and that the contents correspond to what is specified above Claims will be considered only if the seller or the forwarder are informed immediately Each claim must be in writing Goods are always carried at the buyer s risk Keep the original package in case the lamp must be sent back 3 1 Ceiling version single and double 3 1 1 Ceiling plate installation Incorrect levelling of the plate might cause the horizontal arm of the Product to make an unwanted move when passing from the non balance condition to the balance one Place the sheet template drawing 12 2 to the ceiling 1 fixing it with adhesive tape 3 Run the following 6 holes as prescribed in paragraph 2 1 After making the holes 3 to the ceiling 1 set the plate 2 to the ceiling through the use of bolts 4 by always using the spirit level 5 Make sure the power wires to the Product 1 reach the frame of the lamp power without creating interference with the anchoring tube Insert the electrical panel 2 on the Tiges tube and anchor it by tight the two M6x16 DIN912 screws 3 and relative serrated washers 4 Place the electrical panel so that the slot 5 of the clamping frame
22. the manufacturer Hilti scrupulously After arranging the chemical anchors to the CEILING WALL fix the anchoring tube with nuts and lock nuts for each tie rod and tightening with the hexagonal dynamometrical spanner you will tighten with spanner adjusted at the value specified by the constructor of the anchors In this case it is compulsory to enclose the slab sandwich like by the Product plate and the counter plate Plate and counter plate must be enclosed to each other with M16 M6 for wall version steel threaded bars each blocked at the upper and lower ends by respective washers nuts and lock nuts 2 2 Electrical arrangement of the site The electrical system arrangement works of the site used as medical premises to power the Product must be carried out in a safe way according to the standards by qualified personnel By qualified personnel we mean including but not limited to the following professionals Electro technician licensed to practise as electrician Before installing the Product check the following conditions the electrical system of the installation site must comply with the national laws and or regulations in force for electrical systems in sites used as medical premises m Up TECNO GAZ MI_007_GB 17 12 13 Installation manual Rev 4 Pag 14 di 20 CAUTION See drawing 13 See drawing 14 See drawing 127 the electrical system must be certified by an electrician licensed to issue
23. y of at least 300 Kg m and a thickness of at least 250 mm The installation site must be declared fit for use After making sure that the site used as medical premises complies with the requisites required above proceed to the mechanical anchorage of the ceiling plate determining the type of ceiling for the anchorage and acting accordingly The installer assumes all responsibility technical civil and legal related to the correct and suitable arrangement of the anchorage and installation of the Product which must be carried out according to the standards The Product is supplied complete with anchoring tube tiges Its length varies in relation to the height of the premises in which the Product is to be installed The tiges is calculated to install the Product at a finished height from the floor to the cupola of the Product with the oscillating arm in a horizontal position of about 190 200 cm save a different request from the client As a non exhaustive example we list some of the types of slab Mechanical anchorage fix the ceiling wall plate by means of 6 screw anchors Hilti HSL 3 G M16 25 M6 12 for wall version following the directions given by the insert manufacturer scrupulously and listed below for information MI_007_GB 17 12 13 p TECNO GAZ Installation manual y Stallatio anua Rev 4 Pag 12 di 20 do do t hs Mt SW x Anchor tie rod mm mm mm mm Nm

Download Pdf Manuals

image

Related Search

Related Contents

トラブルシューティングガイド  User Manual  取扱説明書  GP902 ベルトサング】取扱説明書  General International EX-16 Use and Care Manual  INSTRUCTIONS  Sony VPL-VW40 Projector User Manual  Deutsch Produkthandbuch, Synchron Servomotoren English  

Copyright © All rights reserved.
Failed to retrieve file