Home

MCMe3.0

image

Contents

1. Cia gt name MCTOM a Adding is successful 5 4 Copying of Node in Structure Tree Drag a unit node with mouse on the structure tree to copy or to move see figure Example below shows how to MOVE the first workspace to under the second plant by drag it with the mouse You can COPY a node by holding the Ctrl key at the time of mouse drag Tree View Route Schedule Tree iew Route Schedule E Company Ee First Plant Ee Ss Workspace I Unscheduled Heaswment sO Revision B 13 of 13 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 5 5 Block Copying MCMs3 provides block copying capability for points and measurements with identical contents The steps of operation are as follows gt Choose the point or measurement data to be copy and click the Copy point Copy measurement shortcut button gt Choose the destination equipment or choose the destination point on the structure tree gt Choose Insert point or Insert measurement with the shortcut button For example follow the following steps to add all measurement data of the point FJ2 1 to FJ2 4 7 7 a 15 6 13 amp 5 3 7 3 7 Fa 10 3 7 6 4 24 2 7 1 35 24 17 13 4 1 3 12 15 1 7 oO 1 2 1 2 7 1 3 5 1 3 5 amp 3 1 wl 7 F 4 1 1 hs Revision B 14 of 14 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 5 6 Search and Sort Dat
2. User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD Pa HAR fale Pree Flere gy eS ee i _ a an Bie ts ee ae eee eat Poe ap eT Pa ee Cobatkir MJ The nerd ote LOW Aeska Wonton da et Section 4 Data Analysis 4 1 Spectrum Analysis E Plotting of the Alarm Spectrum wa bij irae iya he hee elf ei all For each point there are three basic spectral curves the reference curve the alarm threshold curve and the dangerous threshold aja ila i Pnt m elewo Fregi PE Aamiin 202 m Standard bpd mmi E Cure ine a curve that have to be plotted prior to the spectral analysis The steps are choose Analysis and Draw alarm spectrum then the spectrum plotting window as illustrated below will pop out First choose a point in the pull down box at the top left corner Then select a measured spectrum reference spectrum in the pull down box at the bottom left corner Fill ma i E 4 z3 le beininlon minia LENI BT Led a z a Co oe w TO i me io tit iat haal gn i afa Teenie eatin Sag a A etter Gel tum See e in relevant values in the Auto spectrum column Click the Create spectrum button to automatically generate the dangerous and the alarm spectrum If you are not satisfied with the spectral curves automatically generated you can click the Draw alarm spec or t
3. from the menu CAreaeiited Bilt Scheduled scheduled os Choose a route and click the Measurement Info button The following test information window will appear as illustrated below Different colors are used in the figure to indicate the test information of test points for the current month Revision B 6 of 6 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 3 3 Point Status in the Route There might be some points in the route that will not be used for a period of time In this case set such points to Suspended The steps are as follows Choose a route from the items in the left part of the main window Then select the route you want to change Choose the points you want to change in the point s column on the right and change their status to Suspended see the following figure If you want to use the points again change their status to In use MEI viran Dabe EEMS alt 2s Se eae Pee ee l x siy Alla ale rip 3 4 Data Upload Measured data can be uploaded from collector to computer E Upload of Overall value Power on data collector and connect it with the serial port of the computer After the display of the data collector is in stable condition choose from the main menu Collection then Overall value from collector The system will upload the overall data see figure right The upper part of the dialog box displays the data t
4. selected database to the current system database 5 10 3 View a saved database all select a Choose Database gt Browse Database in the Default database C New database main menu and then select the database you want to view ens note for backup database and system database only The Pathu pE default database is system database Mc ait 1 If you choose new database click the file folder icon in the new database column After choosing the database the path for the database will appear in the path dialog box Click OR 2 If you choose the default database click the OK button to restore the original system database Note This function is only for the purpose of viewing The next time you restart the MCMe3 program the system database will be used but not the database you opened here 5 10 4 Upgrade of Database from MCM1 to MCM3 Follow the following steps to upgrade database of MCM1 software previously used Choose Database maintenance gt From MCM1 to MCM3 in the main men and choose the subdirectory DBFS under the MCM1 installation directory in the dialog box popping out see the following figure celest ECHL O DRFs Folder Ec BNWGLI J REFORTS Fath of file ct DBFs Yesi Raiti Revision B 19 of 19 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD Click the OK button to pop out th
5. technology for machinery condition monitoring and diagnosis Single user to networking configuration both C S and B S mode Clear view of the machinery alarm health condition in form of alarm tree Full functionality route management Rich vibration analysis capabilities for time domain and frequency domain diagnosis Machinery picture management capability enables user to define and see more clearly the measurement location in workshop and equipment All statistical data can be output in the form of MS Office documents for report generation modify and save Statistical data are classified into the following e Status reports of all equipment e Latest measurement reports e Most recent measurement reports e Route status and schedule report e Current condition report Windows 98 ME 2000 compatible 3 levels threshold setting Automatic fault detection by overall and hundred band spectrum Trending of overall and spectrum with selectable start amp end date Multi level user authorization Easily communicate with other department through ERP or asset management systems Section 1 System Installation 1 System Requirements CPU Pentium MMX200 or higher RAM no small than 32MB Operating System Windows 98 ME 2000 XP Revision B 2 of 2 06 4 10 User s manual of MCMe3 0 www sendig com 2 Installation 1 Double click the file setup exe instalishield Wizard ea si E Preparing to Install HCME Setup a p
6. www sendig com Beijing SENDIG Technology Co LTD 3 Confirm alarm event Click Confirm to change all unconfirmed alarm records to be confirmed 4 Printing Click Print to print selected records to Excel 5 10 Database maintenance 5 10 1 Backup and Restore Database Backup of the Current Database Choose Database gt Backup database in the main menu Choose backup option in the window popping out Choose Al to save all Choose a Time Period for a period of time and then select the time period Click OR Database Restoring Choose Database gt Recover Database in the main menu and the database to be recovered in the dialog box popping out Click Open to restore the database 5 10 2 Delete Data from the current Database i x Database Cloir Tome Farisi Frak EGE oe T HIE J 7 Farnitg Dade Sone come back after finish i Date isar Salect datathace 3 Erpisin Paints af salected daiebate riil be appended da prema dadebeca Append Delete data from the current database Choose a time period and then click Clear button to clear all measurement data within the period Cleared data cannot be undeleted Therefore be careful in use Revision B 18 of 18 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD Append data Choose the database you want to append Click Append to append all measurement data in the
7. User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD BEIJING SENDIG TECHNOLOGY LID USER S MANUAL For the MCMe3 0 Machinery Condition Monitoring And Diagnosis Software System The information that provided in this Manual is believed to be reliable However Sendig Technology assumes no responsibility for inaccuracies or omissions Sendig Technology assumes no responsibility for the use of this information and all use of such information shall be entirely at the user s own risk Specifications are subject to change without notice No patent rights or licences to any of the functions described are implied or granted to any third party Sendig Technology does not authorise or warrant any Sendig Technology product for use in life support devices or systems E mail _sales sendig com sendigbj yahoo com cn Fax 86 10 82895320 Telephone 86 10 82895321 Address International Science and Technology Chuang Ye Garden ShangDi Beijing P R China Post code 100085 http www sendig com Revision B 1 of 1 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD General MCMs3 is a Windows based application software released by Beijing Sendig Technology Co for Sendig 900 series portable data collectors and online machinery condition monitoring systems Features Integrated software for portable data collector and online monitoring system Integrated most current
8. a gt As illustrated in the following figure search can be Search node or Search point PALS 4dd Poin carol Search Wode Search Point Search Mode Route Sel Ege First Plant Search node Search point Search Mode 42 Search Point Query gt Sorting of measurement data You can use data sorting to view measurement data within a period of time of all points in the point column by clicking the shortcut button Filter The following dialog box will pop out l t Filter Revision B 15 of 15 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD Click the OK button and all data in the period of time will be listed in the measurement column 5 7 Management of Units and Equipment Pictures Click a node in the structure diagram in the main window and you will see the picture of the node below the structure tree Click Picture button and the Image Management dialog box will pop out nags Sanayi O aljaj EPt br toe im ome rat omte coe If you want to add or modify a picture they click the Locate button to find the picture to be added and then save it into the database In Config you may select a drawing tool e g Paint PhotoShop The new tool will also be used in printing of trend analysis and 3 D spectral analysis Draw to modify the current pic
9. e User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 3 Restart the computer if required and re run the installation program if an error occurs during installation If the installation is still unsuccessful please contact us 4 A shortcut will be shown for MCM3 on both the Windows desktop and in the Start Menu following successful installation Double click the MCM icon on the desktop to enter the system Section 2 User Management 2 1 System Administrator There will be a highest priority user named System Administrator for maintaining of the system after successful installation The password is blank Please remember to change the password the first time you use the system 2 2 Add Delete a User User Management Zon E X User Password l Confirm Power ADD Delete Modify Cancel Click System S from the main menu and choose User Administration A user administration sub window illustrated in the following figure will pop out You can add lower level users change the passwords of lower level users or delete lower level users here To add a new user enter an account for the new user in the pull down box of Username choose a lower level entity in the pull down box of Level of Authority and click the Add button after entering a password To delete a user choose a lower level user in the pull down box of Username and click the De
10. e following cat dialog box Click Choosing node type to choose z i the node type for import of data Choose ep workshop on the left and the node on the structure ri tree Then click Import data to finish database Fi upgrade ify Bilari mamy mai ei 5 10 5 Upgrade Database from im liari TEG ia ir E MCM2 to MCM3 Piai INpul uier and passen ti MEMI Jer po Poors snort P MCM2 Click the OK button and the dialog box me gf auia on the right will appear Choose the installation directory of MCM2 when the file USER PAS appears in the top right column Enter the username and password for In the below figure the left column is the workshop of the MCM2 system and on the right is the structure of the MCM3 system Choose the workshop and destination MCM3 node to import and click the Add data button to finish see the following figure ee E g a i oe Revision B 20 of 20 06 4 10
11. he Draw dangerous spec button in the Manual Spectrum column and plot your desired alarm curve or dangerous curve in the plotting region in the window by moving the left key of the mouse Save your plotting results after you finish And you will be able to perform the spectral analysis Revision B of 9 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD E Analysis The user can enter the 100 line spectral analysis tool by choosing Analysis gt Spectrum Analysis from the menu or by clicking the ie button on the toolbar Displayed in the upper part of the window are the current frequency and vibration values of the cursor You can add spectral curves of other dates by clicking the Add button in the left bottom corner You can also select the displaying harmonic cursor in the bottom to display the 10 harmonic cursor lines and the window of frequency and vibration value J mnn a mm a a Besides you can change the curve to the current color the far left color on the color palette by clicking the color box indicating color of El the spectral curve To change the scale of the axes by clicking the ll and buttons 4 2 Trend Analysis MCMs3 can plot the trend curve of equipment based on the measurements Users can view the health condition of equipment in a straightforward way and calculate the remaining lifetime As illustrated in the righ
12. hnology Co LTD Choose the Setup Route and Collector sub window There will be four buttons in the far left column for route management a Pont Mao Are Dobilo iobep 2 Second Plant adfa Ede Rows Rinse Pest Dele isto There ee peter ey Dee ee Ps bere Thi ses r E Pai Paati oF aia haad bka 26 3 2 1 Editing and Changing Route First select test points to be put in the route into the select column with the above method Click the Editing route button or Change route button and the route property dialog box will appear Fill in information and click the OK button to finish Se Raute Be hii wll Hed Mea Date Ee literal J4 F 3 2 2 Route Report Click the Route report button and the route report dialog box as illustrated in the following figure will appear the yellow color indicates that it is already Sep 2003 beyond the test date The following dialog box will san a a a Tha a pop out upon system starting up if there is an alarm k _ T o 9 10 11 12 13 route You can close reminding messages at starting oe sk l4 15 16 417 18 19 20 up by choosing System gt Close Route Schedule 21 22 23 94 95 OB 27 Prompt from the menu You can activate the o Schedule Date f E oj xj ae 26 29 reminding dialog box when you want to see it by EE choosing System gt Open Route Schedule MeasuredAs Schedule 000 Prompt
13. lete button Revision B 4 of 4 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD If a lower level user has forgotten his password and you have to re set the password first choose the user then fill in a new password and click the Modify button to finish 2 3 Changing Password Change Password E x New password Confirm concel_ To ensure security users should change their passwords when using MCM The steps are as follows a Click System S from the main menu after entering the system and choose Change Password R and the following dialog box will pop out b Fill in a new password here and click the OK button A user who has forgotten his password can contact the System Administrator and ask him to help re set the password Section 3 Setting Route and the Collectors 3 1 Selecting Collector Click Collector Selection s in the main menu of the system and choose the correct model number e Edit Collector Selections Database sere Poi S030 Older Version 90 906 Older Version olz 311 3 2 Route Management MCM3 provides powerful route management capabilities to provide convenience for users to manage data Route is a set of test points with some same properties Route makes it much easier for users to use the MCM system Revision B 5 of 5 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Tec
14. o be uploaded and in the large list box is the point icon under upload You can see its color meaning by clicking the Help button in the top right corner The following dialog box is a report for data upload Data should be stored into the database after upload Otherwise the data will be lost Revision B 7 of 7 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD D 3 Eel Pesci FIl 1 i IG IE 13 g Pret Besar FIl 2 te IG TE l l Emel Fesil FIl i iG TE 155 Ewi Fergil FJi 4 i IG TE L El Bengal Fll 5 Print Ta Ford Eel Pesci FIH at bet Pesci FIL ad 4 F 2002 11 15 Dela Colledion Hinnar gt has collected 10 poinis bee are 10 pons nie imhding 4 meseredponm FH 1 FH 2 F N 3 FIT 4 mhding 5 new poss H aFITe FILA Fe Fe HE beean 0 mescured pirk misii DE ee deh DW e283 le of Accelero Vaid Saeed Peataue oon Peak Yahi Higi Freg Comment H i 104 ODS 14 RLF OK aci Weasamert 7 F a 15 i Mase 4 io ponte rpd wartport a o E i E Upload of waveform data Choose from the main menu Collection then Waveform from collector you can see the following figure Select a saved waveform from the left list hold the left key of the mouse and pull to the waveform display window on the right Waveform files are stored in the Wave File sub directory under the installation directory of MCM3 Revision B 8 of 8 06 4 10
15. reparing the lta habi iad whech eal guide you oah the poyan rep pocer Peace Hat Conan Amin Iralak Cia 2 Follow the following steps until completion of installation Read the agreement carefully Choose Yes to accept the agreement Go to the next step and select your installation directory Deval all Seid irar E Instalei ar o honne Destinstion Location Piaae mead tee haiei borie spaarent cardui Selec kikk where Setup wal milal ike Press the PAGE WH key b ree the rest of the agreement Sate il Intel MICH bs ths kinih folder Tomta to this folder click lest To retell toa dieran folder cbck Brovere and relect e Foobar tT LISER ULCEHSE AGREEMENT FORMS TALL MCHE DO SOF Te Salar Lee Aprener AGREEMENT Ceara enia aris madia w a single eiF be refered to in this AGREE REEMEMT AS pear Fara SERING aver n griept tia Leeper iat _ poche kiri belur hihih ii pahaa ae aries aretha cerry Or PRODUCT Ths conas Feoduet aloe PEERS ony soles ve dion conpenens web vevices andon upplenerts th MEME O nay provide ta Voute e PE o a pled re tree deeper choose Ho the Fass cd EALA Vall cicek Te wisi KICIA pr inal ECAC hae coed E O Prognamn Fies Sereig MC Me Broere Beijing SENDIG Technology Co LTD EET a aa aal i Ee ay Ae as sie ve o b al nita i thick Wis ard ni ue InstallShield Wired Complete Setup has Grithed inctalireg HEME on your computes Aleck Revision B A a
16. t figure you can Select inthe merem as four pull down boxes the period of analysis forecast FF a a a n mode and which parameter for forecast pyr You can change the vertical axe and the horizontal BI axe by making adjustments with and ll You can also click the Add button to add or delete curves Click color blocks in the color palette to change the current color Then you can change the color of the Se jaiii curve by changing the color blocks that indicate the curves Click the Print button to print the analytical diagrams onto the painting tool Revision B 10 of 10 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 4 3 3 Dimension Spectral Analysis MCMs3 provides three dimensional spectral waterfall curves arranged according to dates for the Same measurement point see the following figure Displayed in the middle of the curve in the window is a 3D spectral waterfall figure On the right mang alDal Duma Vartan cam Cre er J Ss SS is the vibration value and corresponding date to the spectral curve Displayed in the upper part is the frequency and amplitude of the cursor position Besides the system also provides blanking capability to provide users with more convenience for viewing of waterfall curves Users can change the slope vertical spacing spectral curve height spectral curve width etc of the waterfall wpmp pmp i Kk F
17. tructure in the main screen represent units of all levels If an alarm tree is used for display there may be other icons to show the condition of all machinery under each unit The icons shown in the right figure are defaults of the system You can change them by choosing System gt Set Node Icon from the menu Then in the dialog box popping out you may edit the node icons Ada Delete 5 3 Edit the Structure Tree ae Level To add and delete of a node the first step is to choose the node in the tree structure tree Then right click the mouse and choose the desired operation from the menu popping out You can also execute corresponding operation from the sub menu of Editing from the main menu see figure right The figure below shows the adding process of a boiler workshop in the first steel workshop Revision B 12 of 12 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD A Compary ia Adj Company Hide Se Fia Plan First Workspace Made Type yP ilani 3P ilang by Second Workspace 3 Flan 1 Machine a i Choose node type FP flanz Ad Node T flana Delete Node W Unscheduled hez Product line EA Compay Ey Fuzi Plani SSE Fra Wokpaca w Add Company Node 3 fant Ye flare ede io Node Type ProduetLin Mode Name 3 Y Flan mt ira Comel da SA Dik Cancel Ye flani m Click the Yes button after filling in the node
18. ture by the drawing tool Revision B 16 of 16 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 5 8 Unscheduled Measurement 1 ta l fas Points not set in the route but measured on Eb Se linet site are called unscheduled points Their opr l ee Fengli measurements are put under the 58 Machined Unscheduled Measurement of the eB Machined Ale Lin structure tree temporarily because they have no corresponding points to put after ths Unecheduled Measurment 2002 8 25 uploading from collector enr 2002 8 24 Data of unscheduled points should be stored under respective test points after uploading from collector The steps are as follows Need English Choose a point Right click on an unscheduled measurement to pop out a menu Adding finish 5 9 Alarm History 1 View alarm event record Choose alarm type and the time period Click the Refresh button to view alarm records within the time period If the box on the left of the timeframe is not chosen all records within the time period will be displayed 2 Delete history records Alarm Type Confirmed p Unconfirmed yyy Refresh Delete Choose alarm type and click the a Delete button to delete all records trom 2039 5 te 2035 ee Ea selected note undelete is not possible as so be careful Revision B 17 of 17 06 4 10 User s manual of MCMe3 0
19. w o e o m ho curve via at the lower line of the window They Sy SS Ss sss fon can also select measurement point names and date ranges etc through the pull down box Click Date Vibration curve at the upper of the window to pop out the date and amplitude window see the following figure Date Yibrantion Curve Ee x 2001 9 29 2002 7 25 4 3 Point Status Indicated by Color In the point window at up right the color red TEETE o ail indicates that the recent measurement data has ere ia Ti A E E ETA i exceeded the dangerous threshold The color yellow indicates that the recent measurement data exceeds the alarm threshold And the color white indicates that it is normal see figure on the right Section 5 Data Management Revision B 11 of 1l 06 4 10 User s manual of MCMe3 0 www sendig com Beijing SENDIG Technology Co LTD 5 1 Manually Input Measurement Find Point Add Point Dilete Point add Point Tree View EA Com Biy First Plan MCM3 supports manual input of measurements Choose equipment on the structure tree and click Add point to add age First Workspace a new point in the points column In the same way choose a a a point and click the Add measurement shortcut button to be a add a measurement data You may manually input its value Ys Doia G arrid Flait after finishing adding 5 2 Node Icon in the Structure Tree Icons on the tree s

Download Pdf Manuals

image

Related Search

MCMe3.0 msme 3.0 login msme 3.0 msme 3.0 results msme 3.0 hackathon msme 3.0 registration mcm 3.0 litre mcm 3.0 litre mercruiser manual mcm 3.0 litre mercruiser owners manual mcm 3.0 oil filter mcm 3.0 litre mercruiser mcom 3.0 mcm a300bn mcm301 mcm301 handouts mcm301 final term past papers

Related Contents

Targus THZ167US holder  Agilent 1200 Series High Performance Autosamplers & Micro Well    Singer 14SH644 User's Manual  Microsoft FAST Search Server for SharePoint, GOV, SA, OLP-NL  Manuale tecnico    Samsung 171B, 171S, 181B, 171T, 171Q Computer Monitor User Manual  installation manual manuel d`installation - Pioneer Europe  

Copyright © All rights reserved.
Failed to retrieve file