Contents

1. 45 11 1 Press Machine to be used for swaging cccccccsseccccessecccassececceeeceeeeeseceseueeeceneceseuaeceesenseeets 45 11 2 Pressing tong and die to be used for SWABING ccccsesecccessececccesecceeesececauseceeeeecessuaeeeeeegeeens 45 11 3 Safety warnings for all swaging in the system eese enne 45 11 4 Swaging ROCESS ionni Oda oMide Or I OBI E UR OH p o op ORO E I UM IMPIIS DUM NU IU UU 46 12 Installation of the system at different heights of ballast material eesssseese 47 USE IU ES CUIR RR 47 11 User WAI Al MR tmm 47 13 2 Numiber OT permitted US CNS enerne 48 133 General terms OT USE aa NETT 48 14 General safety instructionS essseseseesesrersssrrresrrresrrrressreressrerssreressrrrssereserereserresrrereseereserrereseeree 50 14 1 Danger zones on flat and low pitch rOOFs ccccccessccccessecececeececceesececseeeceseeeeceseusecessegeceesees 50 14 2 Basic safety when working on flat roofs cccccccssscccceesecceceesececeeeseceeeenececeeceesausecetseneceesees 50 15 DiaSafe System Maintenance cccccccsssccsssccsssecessccesecesscceasecsasecesecesseceuecesaussesatesensasesaees 50 Uc MEE dieto ecc 50 15 2 Field inspection before usage by USEF ccscccccssscccceesececceeeceeeeesececsuneceseeeceesenecetseneceesees 51 15 3 Regular inspecti
2. sees 16 4 3 System type COMDINATIONS TTE TEE 16 4 4 Functioning principle as fall protection system cccccescccccssssccceeesececeeeceeeeeececseneceeeeneceesees 17 4 5 Maximum deflection and forces permitted cccccccsssececeessceccceeseceeeeeceeeeeeceeeesecesseneceesees 18 5 DiaSafe System Plannin saicscissndceveiiordavonsecsessavdvosseduiaticwsutendsonsbyovossetawonebevaveuovdelieaebelewnewovonaseats 20 5 1 zi isinia deiqiarele IEEE TT 20 5 2 Vertical and horizontal measures and CiStANCeS cccccccccceeeeeeeeeeeeesesesseseeeeeeeeeeeeeaaaeeeeeeeees 20 5 3 zer Keligs Te do RN EE UT 20 5 4 Distance from edge of hazard se hicwscsnscessGensedadncacsssanouwsvatnawacssvoncdsassonvesadnendiovtadesnetoctsencaoedvandioats 21 5 5 Building structure and UNCErlay cccccsssccccesseccccesececcessscceeeescceseuneceeeeeecessuseceesenecessunceesenes 22 5 6 Baa E l3 OV a E E reueecssumcueesooececeus 22 9 7 Ballast iBP SULTODO aieo epi pecoteecesa tenn ve ETEA EE EE EO EEEE eMe Ie E UU eue 22 5 8 Thickness of the ballasting layer cc cecccccssececceseccceeeescceeeeseceeeeseceeeeeeseeeesecessuneceseugeceeseees 23 6 DiaSafe System Installation instructions c ccccccescccssscesssccesseccssecesecessseceasecessececsasecesasenss 24 7 DiaSafe Single System Solo Duo specification esses 25 7 1 Tools needed for the installation lsseeeeeeeeeeee e
3. ao sxafo fo nose bo ps se Gx7 1050 pe mese e fs DiaSafe Line System Multi can be used by several users at a time Maximum 1 user can be attached to one section leaving at least one section free between two users The min ballasting weight to be applied onto the damping mat in case of a standard 3 x 3 m size mat is 80 kg m 720 kg in total MULTI 35 9 DiaSafe Line System Glide Solo Duo specification 9 1 Tools needed for the installation cutter 13 mm wrench 19 mm wrench 8 m tape measure torque wrench 19 mm torque wrench bit wire cutter swaging tool shovel 9 2 System components Name Photo Pictogram DS Single Glide anchor post Damping plate with integrated damping mat Glider post head Swaged square end c E Swaged turn buckle FGL 50 Anchoring wire J DiaGlider 36 9 3 Steps of installation Step 1 Lay a protective geotextile under the DiaSafe system onto the upper roof surface which is generally some waterproof insulation bitumen PVC laminated rubber etc or a technical layer which constitutes a part of the roof structure Step 2 On the protective geotextile position the System posts at the exact location detailed in the plan Step 3 Place the Damping plate with integrated damping mat onto the
4. 43 DIADEM online registration After the completion of the installation the installer shall undertake the responsibility to register the system at the manufacturer www diasafe com The aim of the online registration system is the monitoring of the status of the installed systems and to help the owner facility manager organize the regular technical inspections of those due within 12 months after system delivery Should this inspection fail to be accomplished permission to use the system shall terminate and guarantee is also considered void The online registration system sends messages to the installer and to the owner facility manager in the following cases e after the registration of the installed fall protection system regarding the 12 months operating license e 2 months before the termination of the operating license e 1 month before the termination of the operating license e atthe time of the termination of the operating license e after the technical inspection of the system regarding the grant or refusal of the next operating license Professionals having the manufacturer s certificate are authorized to use the online registration system The registration is based on the serial number that is indicated on the control label or the documentation folder During registration it is required to give the serial numbers and the exact position of the installed systems the date of the installation and the contact of the con
5. 2 1 Relevant norms and guidelines All relevant EU standards and directives must be taken into consideration These standards are in particular m EN361 2002 Personal protective equipment against falls from a height Full body harness EN362 1992 Personal protective equipment against falls from a height Connectors m EN363 2008 Personal fall protection equipment Personal fall protection systems EN364 1992 Personal protective equipment against falls from a height Test methods EN365 2004 Personal protective equipment against falls from a height General requirements for instructions for use maintenance periodic examination repair marking and packaging EN795 2012 Protection against falls from height Anchoring devices PPE Directive 89 686 EEC on personal protective equipment 21 December 1989 Hungarian equivalent is SzMM decree 18 2008 XII 3 m PrSV PrSG product safety regulation official product safety regulations Switzerland 09001 2008 Quality management systems Requirements CEN TS 16415 2013 Personal fall protection equipment Recommendations for anchor devices for use by more than one person m FLL Guidelines for the Planning Construction and Maintenance of Green Roofing D A CH S expert group recommendations Warning Standards and directives cited above not only apply to the manufacturer of this anchoring system they apply to the system owner facility manager and other entities contracted fo
6. DIADEM TECHNICAL MANUAL Product Name DIADEM DiaSafe System Anchoring points as per standards EN795 2012 and CEN TS 16415 2013 z DiaSafe DiaSafe Single System Solo DiaSafe Single System Duo DiaSafe Line System Multi DiaSafe Line System Glide Solo DiaSafe Line System Glide Duo www diadem com BA 130013 02 LS Version 1 0 24 09 2014 TABLE OF CONTENTS 1 Introduction General GESCrIPTION cccceecccccseccceessececsueececceecceeeeseceseusseeeeneceeseeceeseusecetsueness 5 2 Regu lations Legal DACKSLOUNG usiesssesuss exerce soupsd Isa ihn qu Quid toe aus dsd ES Uk nau soo usd uris C SE pU DU usos PERO A LEPE Te EPER E 6 244 Relevant norms and guidelines ccccceseccccesseccceeseccceeeccecceuecceceesececseneceececesseuecessusecessungess 6 2 2 EMI a m 6 2 3 Manufacturer s responsibility cccccccessccccessececeeseccceeeeccceeescceeeesececsunsecseneceeseesecessuaecessueness 7 3 DiaSafe System Product GeSCIiPtiOn csssccsocccosescssercesssesesoressencssreronsesoseronenccesensasorerencatere 7 3a BE OCU GVO PRICE OT EE TEE m 7 3 2 Components of the DiaSafe Systems c ccccccsssccesseccssecessesesssecsessecesecessseceasesessecenseseseeeeataes 8 3 3 Documentation io 9 TEE E E DO m OT 14 A Diasafe E RES nee MR E EEE 15 4 1 Fall arrest and restraint system two in One nennen enne 15 4 2 Combination of fall arrest and restraint systems
7. m EINMM T M M MM MM aa 5 5 ao ed Nl HM ao o 720 exo fo mings foo ps aso xojo s mese les ids aw ursa e mese ao 5e ae ess ps mese os Jo s x6 500 pe mese e ps DiaSafe Single System Duo Total NR Layer thickness Layer thickness Layer thickness WiBIBhE gravel sand soil soil 6 B y 1600 kg m y 1000 kg m y 800 kg m EM M M MM MEM ce a e e oOo ism M jw Ne aw assum seo s me ae 5x5 2000 m mese s fo au Gre m e mese foo ps ase Gen mm e mese ss ss au exa 3200 e mese meses ao 28 DiaSafe Single System Solo can be used by only one person at a time The min ballasting weight to be applied onto the damping mat in case of a standard 3 x 3 m size mat is 80 kg m 720 kg in total SOLO DiaSafe Single System Duo can be used by two persons simultaneously The min ballasting weight to be applied onto the damping mat in case of a standard 3 x 3 m size mat is 200 kg m 1800 kg in total DUO Warning Installation of DiaSafe Single Solo System and DiaSafe Single Duo System anchoring points are practically identical the only difference is the weight of the ballasting layer The damping mat can be smaller than the standard size if the ballasting layer becomes proportionally thicker b
8. 4 4 Functioning principle as fall protection system The fiberglass and steel reinforced damping plate with the laminated geotextile damping mat is designed to concentrate the ballasting weight on the anchoring posts The pulling force generated by the fall is transferred to the damping plate and the laminated damping mat which is stabilized and stopped by the frictional force resulting from the load imposed upon it Reinforced damping plate F pulling force DiaSafe anchoring post Protective geotextile spread DiaSafe system structure on the roof applies to Line and Single systems alike not to scale DiaSafe systems provide an active life saving solution when used in combination with proper and system compatible personal protective equipment o EE ao A a gU Md i i i f Peta L m a In built snap lines on a cone The DiaSafe anchoring posts absorb primary energy acting on a falling human body by breaking through the stiffening cone and bending down There are vertical built in snap lines along the cone and a horizontal one at the base of the cone in order to ensure the appropriate deformation of the post The line system absorbs additional energies through the elongation of the wire rope In order to ensure additional energy absorption during the use of DiaSafe single system posts these are provided with an absorption spring which elongates due to the action of the falling force absorbing addi
9. 1000 kg m y 800 kg m memp LM M MM _ ee e ao mank p p woo 20 xa 720 e mings fo s 1s xojo s fmm fs feo aw aes o fao mese fo fo ae exf s mese s fo sw sxafo pe mese e fs 41 O DiaSafe Line System Glide Duo two users Total urtica Layer thickness Layer thickness Layer thickness Weiske weicht gravel sand soil soil 5 5 y 1600 kg m y 1000 kg m y 800 kg m E E Hd E en iae MN ese N aw assum s so s ne ae 5x5 2000 e mese s fo mecepe je frnso f0 ps o 6x7 2500 feo mwso iss s o 5 8 3200 je ws mese dso Anchoring max 1 user simultaneously the min ballasting weight to be applied onto the damping mat in case of a standard 3 x 3 m size mat is 80 kg m 720 kg in total GLIDE Solo Anchoring max 2 users simultaneously the min ballasting weight to be applied onto the damping mat in case of a standard 3 x 3 m size mat is 200 kg m 1800 kg in total GLIDE Duo Warning DiaSafe Line System Glide may be used by one Solo or either two persons Duo at a time Required ballasting surface weight applied on the damping mat may vary depending on the number of system users 42 10 Completion of the installation control label for Line System Multi control label for Single System contro
10. The maximum lifetime of the DiaSafe systems in case of adequate and professional use without visible deterioration and under optimal conditions is 20 years from the date of the professional installation The lifetime significantly depends on the way of use and the regular inspections Periodic inspections are to be accomplished in every 12 months at least If a DiaSafe system has been used to arrest a fall it is prohibited to use the system again Under extreme like weather conditions the system may be damaged in the period between the regular inspections If such a case occurs the use of the DiaSafe system is prohibited For this reason the inspection of the system is necessary before and after every use 54 16 Certification 16 1 Manufacturer research investigation and testing Before the Diadem DiaSafe system was commercialised we had conducted several tests with our test equipment which is set up in accordance with the relevant EN795 and CEN TS 16415 2013 standards These tests confirmed that the system operates flawlessly and safely providing the installation has been accomplished in line with the relevant instructions These tests have been documented with reports photos and videos Relevant expert summaries have also been attached DiaSafe system was tested and certified by TUV Austria TUV AUSTRIA SERVICES GMBH Headquarter Deutschstrafse 12 1230 Wien Maschinen Hebe und Fordertechnik Institut fur F
11. console bent and welded from a circular sectioned steel rod Rod diameter 8 0 mm Base diameter 250mm Height 300 mm Custom sizes up to 1400 mm can be ordered from the manufacturer Damping plate with integrated damping mat Product No 100302 The damping plate is made from fiberglass and steel reinforced laminated polyester resin The cone is designed to hold a force equivalent to 70 kg and allow energy absorbing movements at higher loads Mat material polypropylene Size Length x Width 3 0 x 3 0 m Height extension damping plate Product No 100304 Designed to hold long anchoring posts in place and ensure equal look to all de post ends Required whenever custom built long anchoring posts are installed in compliance with the layer thickness of roof ballasting material Made of fiberglass reinforced polyester resin FGM 1 0 Fixing head Product No 100318 A stainless steel bayonet mount attaches the wire on the top of the anchor post The attachment is fixed with a setscrew that has to be tightened to at least 4 Nm and no more than 6 Nm Material 1 4404 steel Size 28x60 mm diameter x height Setscrew M10x25 A2 DIN 912 5mm Allen Clamp ring Product No 100319 This high grade stainless steel ring prevents the bottom part of the fixing head from opening while the setscrew is being tightened Material 1 4404 steel Diameter internal external 28 5 31 5 mm Height 23 0 mm Materi
12. head of the anchoring post to the upper surface of the ballast The lag of the Line System wire must always be less than 5 cm At bigger layer thicknesses the system has to be installed using a unique size anchoring post and a height extension damping plate The height of the unique anchoring post is maximized to 140 cm The post and the standard damping plate with the integrated damping mat is always placed at the bottom level of the ballast while the height extension damping plate is placed on the plane level situated 30 cm below the head of the post In this way the distance of its base to the head of the post is same as in case of the 30 cm standard post There is no damping mat integrated into the extension plate as its only function is to hold the upper part of the anchoring post This applies to Line Systems and Single Systems alike 13 DiaSafe System Use 13 1 User manual DiaSafe Single Systems and Line System users are obliged to carefully read this manual prior to using the system and shall closely follow all relevant safety regulations during use Should any question arise in terms of a fall protection system its components or its use or an already purchased system is in a condition that its safe use is questionable or for any general queries please address the manufacturer directly 47 DIADEM 13 2 Number of permitted users DiaSafe Single System Solo allows anchoring one user while DiaSafe Single Syste
13. indicate the use of an Accessory damping mat cut a 10 12 cm round hole in the center place it over the damping plate and smooth 26 DBADADDHDDADADAHE X X XX EX X IX JE JexX EX Kx p wap rep dp d s eoveve Step 5 Spread the ballasting material in a way to keep the damping mat smooth You must ensure that the ballasting layer thickness is as required with special attention to the required ballasting of Duo systems see Chapter 7 4 BSB BS BS INESSE SI BS BE BB EB EERE BAS MOUSE EBS REESE AS eI LPS IS eI e Pg el Pee Pg Pe Pe Pg Pe Pe A MRA RE P Se P Pe P S EOSOSCBOSOSCBOBCECBOHOECBSCROSCSCROSOEOROGSOEOROCECR BOSCB BOSCBCBOSCECOROECBOSECBEGECSCHOSCOECROSOSORO DA IA DIA DIA IA DA DNA NAA AC DAC AC DIAC DAC DNA DIAC DAC DAC AA AC DNA SAC AC AC DAC 2 wEeovevevevevaevevaevaeveuvevevaevaeu vaevau evevaevevevwevaet 2 08S OS OS OS OS 0S SOS OS SOS PFOSOSO GS POCO SOSOCGOSO OS OS OS OS OGOS OS OGOSOSZOSOGCOUOCT 5020 0 0 0 0 0 0 0 0 0 0 9 0 020 0 02020500 O505050505050505050 5050505 ex SAS SAS S AY S AY SSeS SaaS SS OSS ASS EE Yd S amp S St S Finally the professional installer completes and attaches the control label as well as the circular validation sticker onto the cone 27 DIADEM 7 4 Ballasting surface DiaSafe Single System Solo Total Surtace Layer thickness Layer thickness Layer thickness weizht deihi gravel sand soil soil B 6 y 1600 kg m y 1000 kg m y 800 kg
14. mass without wire 2m knotted test rope 80 kg m2 ballasting gt EN795 2012 Dynamic strength Complete line system 100 kg test mass and integrity test one user 2 6 m dropping height 2m knotted test rope 200 kg test mass increase 200 kg m2 ballasting CEN TS Dynamic strength Complete line system 200 kg test mass 16415 2013 and integrity test two users 1 6 m dropping height 1m sewn test rope 400 kg test mass increase 600 kg 3 EN795 2012 Static strength Complete single and line 19 kN hydraulic pulling 19 kN test system force Static model for maximum wire forces and deflections one 8 m span System length length of the wire before loading L 8 00 m end post 2 end post 1 wire deflection System 1 one span with L 8 00 m F 3 6 kN Static model for maximum wire forces and deflections three 8 m spans Total length of the wire before loading L 3x8 00m span length L 8 00 m span length L 8 00m span length L 8 00m m WO Fy F 2 3 kN ui S Q7 T c 9 E F 4 7 kN D oO g E System 2 three spans with 3 x L je 8 00 m total length L 24 00 m DIADEM 5 DiaSafe System Planning 5 1 Planning principles The fall protection system shall be designed by the manufacturer taking into consideration building characteristics and local conditions The system shall operate as a restraint system or as a fall arrest system Planning should favor restraint systems in all
15. mm Threaded diameter 9mm DiaGlider with steel karabiner Product No 100350 Easy to attach at any point of the DiaSafe Line system it provides an anchor point that slides freely along all properly installed wires and anchor posts It gives to a person working on heights a safe anchoring while it provides free movement without having to constantly reattach DIADEM 3 3 Documentation folder qu ae 4 A3 aSafe DiaSafe Line System Multi DiaSafe Single System Solo Duo DOKUMENTATION FOLDER 1451563 Documentation folders for the four DiaSafe systems are similar and they all contain the following items Technical manual Control label self adhesive sticker Validating sticker self adhesive sticker A copy of the certificate Handover protocol Declaration of Performance DoP Content of the documentation folder except for the control label and validating sticker is available for download at www diasafe com The owner must keep system documentation in a secure place make documentation available to system users when necessary and provide proper classroom and field training The owner or operator of the system may provide the user with a usage plan after consulting with the manufacturer Experts installing the system shall hand over documentation folder to the owner and ensure that the system has been properly registered The sticker shall be affixed to the appro
16. of the ballasting layer The ballasting layer is usually designed to be of uniform thickness It must be ensured that the minimum layer thickness is always achieved for example Hmin 3 cm for a 40 0 m damping mat In order to ensure proper mobility for the carabiner of the personal protective equipment the head of the Single System post must be at least 10 cm above the ballasting layer surface The Line System wire must always remain at least 5 0 2 cm above the surface of the ballasting layer measured at the biggest deflection point ee ee Taare Ee RES gov i X zw EEE EEE KK NYNNN JK KK Ki o0WCCD KKK AS wiis 3j Mes j ack P s VN M 23 DIADEM Varying thickness of the ballasting layer It is permissible to form small mounds around system posts This is usually taken into consideration during planning and has no effect on minimum layer thickness which is equally distributed along the entire surface in a depth to ensure 80 kg m surface weight 6 DiaSafe System Installation instructions e precondition of starting installation works on a roof is the presence of the following proper installation plan materials and components of the given system professional installer with certificate adequate tools for installation e System installation must be carried out by trained staff who has the expertise and responsible approach to install safe systems preferably trained by the manufacturer Installatio
17. posts The base of the high grade steel post should be fitted to the center of the damping plate into the projecting section at the bottom of the cone Step 4 Unfold the damping mat to its entire area Smooth the mat starting from the center with radial movements toward the corners If the plans indicate the use of an accessory damping mat cut a 10 12 cm round hole in the center place it over the damping plate and smooth 37 Step 5 Spread the ballasting material in a way to keep the damping mat smooth You must ensure that the ballasting layer thickness is as required see Chapter 9 4 l TE Glider post head DS Single Glide anchor post Damping plate Step 6 Place the Glider post head over the end post head and fix it to it by the set screw Tighten the setscrew to 5 6Nm Swaged square end rj VA Fab Anchoring wire J H P Step 7 Push the end of the wire rope through the tube of the Glider post head The wire rope end must extend beyond the tube with 10 cm at least Pull the Swaged square end over the end of the wire rope and swage the tube in 4 positions along the tube at equal distances from each other Set the last swaging at a distance of 8 12 mm from the end of the tube 38 Safety note For all swaging in the system 1 Make sure the wire rope is fully inserted into the a swaging tube The wire rope must be well visible at both DIADEM p
18. rope throughout the years are considered in above tolerances however in case of having an unexpectedly too big elongation in a span it is necessary to install a turn buckle to ensure necessary tension 39 DIADEM Warning An excessive lagging will result in a longer Miis Mi idi l deflection of the system in case of a fall Turnbuckles ae WIE are not essential to the system but help to maintain Q Q DE post head the tightness of the spans The wire rope can be tensioned by hand throughout the installation when H 2 the length allows to hold the wire In the very last span at the end of the wire rope it is recommended to install a turnbuckle to provide enough tightness to the last span In the event of having a span considered to be tightened it is always possible to install a turnbuckle It is not recommended to install more than one turnbuckle per span Step 9 At the end post repeat the process explained in Step 6 and Step 7 except that here the Swaged turn buckle has to be inserted in front of the Glider post head Swage the tubes of the Swaged turn buckle on both sides as described in Step 8 The turn buckle will make possible to tension the wire in the last section and will provide additional adjustment during the annual inspection Step 10 Finally the certified installer completes and attach
19. should thoroughly check the operability of the personal protective equipment prior to use gt gt see Section 14 2 of this Manual The fall protection system must be installed on a solid and stable foundation in line with the plan approved by the manufacturer Checks to be completed before using the DiaSafe system shall include measuring bulk density and surface weight of material spread to stabilise the system When in doubt always contact the manufacturer If the user has any concerns or questions in relation to the applicable anchoring point personal protective equipment or building structure the user should immediately contact the manufacturer A fall protection system can only be used with a complete body harness Safety of system user requires that the building is high enough for reliable system operation and users should make sure that in case a fall occurs they will not slam against any projecting parts or building sections or the ground DiaSafe systems can be used as a restraint system for all building heights Where the required building height is available it can be used as a fall arrest system as well We recommend the use of DiaSafe fall protection systems combined with proper personal protective equipment Example of required free fall height calculation H elongation of the anchoring system deflection user shoulder height length of stretched personal protective equipment PPE 100 cm safety distance E
20. 20317 If necessary this mat can be used to increase the ballasting area In such cases the load per m can be decreased after discussions with the manufacturer As an additional advantage the mat will also serve as a filtering layer Material polypropylene 11 Glider post head Product No 100349 Made to fit over the DS Single anchoring post and accommodate the FGL 50 anchoring wire in such way that the DiaGlider will run through it With this solution it s possible to freely work on the roof without having to reattach the personal protective equipment at the posts Casted from 1 4404 stainless steel Swaged square end Product No 100354 The fastest way to attach the FGL 50 anchoring wire to the end posts is to swage this square ring to the wire and simply fix it to the head of the DS Line anchor post The fixing is done with the FGM 1 0 fixing head and the clamp ring Made out of stainless steel 1 4404 Swaged square end turn buckle Product No 100355 Used during wire installation at the last Line system post to achieve the necessary tension or provide additional tension Fixed as well to the DS Line anchor post Material high grade steel 1 4404 Adjustment length 290 415 mm Threaded diameter 2 12 mm Swaged turn buckle Product No 100356 Stainless steel turnbuckle for tensioning the wire rope with swaging rings on end Material high grade steel 1 4404 Adjustment length 325 400
21. 5 7 Ballasting surface Standard ballasting surface size for DiaSafe anchoring points is 9 0 m This size is achieved by the standard damping mat of 3 0 x 3 0 m laminated into the damping plate This is then covered by a minimum of 80 kg m surface load this applies for the Line System Multi with one user in every other section the Line System Glide Solo with one user or the Single System Solo with one user Should system structure and objective require this figure may be higher This means that the total weight for one post is at least 720 kg Ballasting surface size is determined by the required load and type of ballasting material Ballasting material can be spread on the surface in varying thicknesses It is crucial to always ensure the minimum ballast layer thickness stipulated in the table above Damping mat sizes and related minimum ballasting layer thicknesses of some common ballasting materials are shown in tables in the chapters of specification of each system Chapters 7 8 9 22 Height markings on the side of the laminated cone will help you control the on site ballasting layer thickness Ballasting layer thickness should reach the minimum figures indicated in the documentation Ballasting material data sheets including actual weight data shall always be available for annual checks As an example for informational purposes only the example below shows the specific weight of the ballasting material related to th
22. Mount the FGM 1 0 Fixing head as described in Step 6 Push the end of the anchoring wire into the tube of the Swaged square end turned buckle and swage the tube as described in Step 7 The turn buckle will make possible to tension the wire in the last section and will provide additional adjustment during the annual inspection Step 10 Finally the certified installer completes and attaches the control label as well as the circular validation sticker onto one cone of the line system 34 wn Forming corners DIADEM Similar to the intermediate posts the wire rope A square ring can be installed at the corner to is simply lead through the head of the corner attach the wire In a closed formation system post and fixed by the fixing head This solution this is the only solution as the starting post also may not be applied in any cases serves as the end post Manufacturer s plans should always be taken The square ring installed at the corner provides into consideration an option for wire extension as well 8 4 Ballasting surface DiaSafe Line System Multi Total surface Layer thickness Layer thickness Layer thickness weight weight gravel sand soil soil B 6 y 1600 kg m y 1000 kg m y 800 kg m meme e fom MEM MEM MM a kee e e ssas 4 b s W 20 xa 720 e mes foo s 1e xojo s mss les se aw aes a e mese ao so zo xs 75 ps mese s fo
23. ainst fall from heights Warning If a DiaSafe system has been used to arrest a fall it is prohibited to use the system again In such a case relevant system components must be overhauled The original documentation was prepared in English In the event of any discrepancies between the other language versions the English language description should be regarded as authoritative We assume no responsibility for any discrepancies resulting from the translation DiaSafe product manufacturer and distributor APP Kft APP Dachgarten GmbH H 9028 Gy r Jurastrasse 21 Feh rv ri t 75 D 85049 Ingolstadt Phone 36 96 512 910 Phone 49 841 370 9496 Fax 36 96 512 914 Fax 49 841 370 9498 info diadem com info grundach com www diadem com www diadem com 57
24. al thickness 1 5mm FGSH 2 0 Square ring Product No 100317 Used to fix wire ends connect the wire to the first the end or the corner posts Material high grade steel 1 4404 Size 57 5x87 5mm 08mm Material thickness 8 mm FGKa 1 0 Cable thimble Product No 100279 Used in the connection of the wire to the square ring or the turn buckle The cable thimble helps to keeps the required wire loop shape Material 1 4404 stainless steel Size 58 x 38 mm Groove width 28mm FGSR 12 ES Turn buckle Product No 100259 Used during wire installation at the last Line system post to achieve the necessary tension or provide additional tension Material 1 4404 stainless steel Adjustment length 290 415 mm Thread M12 The design of turn buckle positions shall take system and section lengths into consideration especially change in length due to thermal expansion Manufacturer s plans shall always be followed FGBD ES 08 Nut clamp Product No 100352 Used to form the wire end terminations of the DiaSafe system Fixes the fold back end of the wire to the tensioned part next to the cable thimble screws must be tightened by applying a 7 Nm torque Material Galvanised steel Wire diameter 8 mm FGL 50 Anchoring wire Product No 100268 Material high grade steel WNr 1 4404 Diameter 8 mm 7 x 19 threads Tensile strength F 33 4 kN FGT 180 Accessory damping mat Product No 3
25. are separated herein the following installation guide Step 1 Lay a protective geotextile under the DiaSafe system onto the upper roof surface which is generally some waterproof insulation bitumen PVC laminated rubber etc or a technical layer which constitutes a part of the roof structure Step 2 On the protective geotextile position the Line System posts at the exact location detailed in the plan Step 3 Place the Damping plate with integrated damping mat onto the posts The base of the high grade steel post should be fitted to the center of the damping plate into the projecting section at the bottom of the cone 31 DIADEM Step 4 Unfold the damping mat to its entire area Smooth the mat starting from the center with radial movements toward the corners If the plans indicate the use of an accessory damping mat cut a 10 12 cm round hole in the center place it over the damping plate and smooth Step 5 Spread the ballasting material in a way to keep the damping mat smooth You must ensure that the ballasting layer thickness is as required see Chapter 8 4 FGM 1 0 Fixing head FGM 1 0 Fixing head pie ius anchor post Ela sts anchor post up Square ring p noe square end Type a Type b Step 6 type a Step 6 type b Place the Clamp ring over the anchor post Place the Clamp ring over the anchor post head t
26. as any errors uncovered by the previous check been rectified as necessary Are all components of the fall protection equipment intact and free of damage especially the anchoring wire the carabiner the fall protection device the energy absorber and screws The personal protective equipment must be thoroughly checked for errors and malfunction before each and every use s there a technical manual for the personal protective equipment published in the country s language Has the user been informed on how to operate the system s there immediate rescue available after a fall All components of the fall protection system and the personal protective equipment are from the same manufacturer and are not combined with products from other manufacturers 51 DIADEM DIADEM Are the fall protection system and the personal protective equipment compatible with each other Has the DiaSafe system manufacturer approved the use of the given personal protective equipment Has the maximum length of the restraint system ropes been checked Have the anchoring points been used are they located in the system in line with the plan Have all the maintenance and preservation operation been completed as per the schedule please see the control label s the system s control label filled out as per the current status Missing or damaged control labels and validating stickers should be replaced and new ones should be ordered from the manufa
27. cases because to ensure that the user cannot even reach the danger zone Should building plans change during fall protection system design and commissioning system manufacturer shall approve the change in due time 5 2 Vertical and horizontal measures and distances max 8 0m max 8 0 m meters away from each other Spans shall have idu to be negotiated with DiaSafe system manufacturer in all cases The manufacturer Shall take all static requirements into consideration and incorporate the necessary Wire posts can be spaced at a maximum 8 00 sed min 1 5 m 7 min 1 5 m T m in 1 5 m 5 max 8 f m figures into the installation plan Posts should be at least 1 50 meters away from each other in case of a standard size damping mats The max distance of the posts from the edge of hazard is 8 50 meters min 1 5 m max 8 0 m Warning If the Line System is routed around the corner of the building care must be taken to ensure at least 1 5 meters from roof edge to anchoring point axes in all directions This rule applies to Single System anchoring points as well Relevant local regulations must be taken into consideration as well Recommendations of AUVA Planungsgrundlagen von Anschlageinrichtungen auf D chern are to be taken into consideration 5 3 Potential fall directions DiaSafe fall protection systems are designed to protect the us
28. corrosion on Single System anchoring lugs nor on Line System components Should corrosion be observed the affected component must be replaced Closing and mounting wire terminations at corner and end posts It needs to be checked whether wire mountings corners and end posts are in line with manufacturer s regulations Installation Guide Are anchoring rings free of corrosion Do they hold the wire properly Is a turn buckle installed at required locations Does turn buckle work as needed or does it need to be adjusted Verifying ballasting layer thickness Does the actual thickness of the ballasting layer reach the minimum values set forth by the manufacturer in each anchoring point damping area Periodical technical inspections shall check ballasting layer thickness and compare it with figures indicated in tables in the documentation in terms of specific weight of the material in question Product data sheet shall be kept in the documentation folder Furthermore it must be checked whether there is enough ballasting surface area covered with damping mat at every post to bear the prescribed load length x width x layer thickness x bulk weight 53 DIADEM DIADEM Control label and inspection report downloadable from www diasafe com before inspection During post installation technical inspection one shall register the date the serial number the material and height of the ballast and the surface weight of it onto the control lab
29. ction system You should always contact the manufacturer in such cases Physical and health conditions of the user should allow them to properly utilize the fall protection system without risking his her own personal safety Fall protection systems can only be used by individuals who have received proper training and have learnt to use the system safely Prior to working all system users shall ensure that an evacuation plan to be used in all emergency situations is accessible No modifications or additions can be made to the system without the prior approval of the manufacturer received in writing Failure to receive such approval shall result in permission to use being rendered null and void All restoration operations must be carried out in line with manufacturer s regulations The personal protective equipment and the fall protection system can only be used in conditions listed in the manual The systems can be used solely for their designated purposes System users should make sure to receive along with personal protective equipment all instructions for safe system use During the assembly of a fall arrest or restraint system the user should make sure that components fit each other properly and that all components are from the same manufacturer Should components from a different manufacturer have been installed this can prove to be dangerous for the user as such components can negatively influence safe system operation The user
30. cturer Remarks and data from previous tests should be checked Can all anchoring points and related wire sections be used freely are the points in high growing plants or flowers Can the personal protective equipment carabiner move freely in all sections Does the actual thickness of the ballasting layer for all fields around anchoring points correspond to the minimum thickness set forth by the manufacturer Ballasting layer thickness must be measured before each and every use and compared with figures indicated in tables in the documentation in terms of specific weight of the material in question Is the correctly sized ballasting area damping mat surface guaranteed at every post length x width x layer thickness x bulk weight Is the Line System wire properly tightened is it not damaged some threads torn broken etc Are fixing heads tightly fitted to the top of posts with setscrews Are the fixing square rings properly built into DiaSafe system posts Are turn buckles and wire nut clamps properly tightened 15 3 Regular inspection and maintenance of the system by manufacturer DiaSafe fall protection systems described herein consist of fixed and mobile anchoring points which were constructed to be used with personal protective equipment manufactured as per standard EN363 Standards EN795 and EN365 and work safety regulations require periodic inspections to be carried out on anchoring points every 12 months In o
31. dditional requirements as set forth by 89 686 EEC or other EU directives 15 4 Manufacturer directions for system inspection Periodic technical inspections carried out by the authorized service representative shall be properly documented and reports shall be kept until at least the following technical inspection It falls into the scope of the building owner or building operator to carry out annual checks of the fall protection anchoring system in due time A completed test shall be marked on the control label as well A copy of the inspection report duly signed by the field service engineer shall be given to property owner operator together with photos or videos documenting system status before and after inspection The video should introduce the DiaSafe system in its entirety Periodical technical inspections should check the following items Checking wire condition and tension Maximum wire lag cannot exceed 5 centimeters fixing heads should close tightly setscrews should be properly tightened the wire and its threads should be free of any damage otherwise the affected wire section must be replaced in line with manufacturer s instructions Fixing heads anchoring tabs on DiaSafe post heads Line System wire must be routed along the planned path driven through fixing head slots and fixed tightly into the heads with setscrews All components must be in working order at their proposed position there can be absolutely no
32. e marking lines for a standard mat of 3x3 m and a surface weight of 80kg m Upper height line 800 kg m Centre height line 1000 kg m Lower height line 1350 kg m Plans for custom mat sizes are always made by the manufacturer and an additional ballasting mat shall be installed in such cases which shall simply be placed on the top of the default mat A round opening must be cut in the additional mat at the appropriate position This opening must be big enough for the anchoring point s cone to go through it Warning Since ballasting layer thickness is subject to change due to being walked upon wind or rain erosion etc actual layer thickness should always be inspected prior to each and every use Layer thickness must always completely cover the damping mat The green color of the mat will contrast most ballast materials thus in case of a too thin ballast layer the mat will be easily visible Whenever the mat is visible indicates that the ballast layer thickness is not enough for safe operation A non visible mat is not a guarantee that the ballast layer is enough for safe operation If layer thickness is insufficient it must be replenished to achieve the necessary thickness Several types of ballasting materials growing media concrete slabs gravel etc can be combined in a single system however such solutions require a specific plan prepared by the manufacturer 5 8 Thickness of the ballasting layer Uniform thickness
33. el and the label shall be affixed to a visible location on the system Besides system data type model manufacturer serial number installation date installation location owner s representative the inspection report should incorporate all other relevant data such as the basis for inspection report what damage or issues were identified all completed operations and tasks name of the person carry out the inspection and due date of the following technical inspection Handing over technical inspection documentation to the relevant staff members Owner operator of a building equipped with a DiaSafe system shall receive a copy of the technical inspection report and related annexes These documents are to be retained see above Warning Should any concern arise concerning system safety or error free operation IT IS PROHIBITED TO USE THE SYSTEM ANY LONGER System use can only be resumed once errors have been rectified or an official inspection confirms that the system is free of any errors Any system malfunction or inadequacy must immediately be reported to the manufacturer or the authorised company in writing After a fall the DiaSafe fall protection system and related personal protective equipment cannot be used unless the manufacturer or a person authorised by the manufacturer examines the system and issues a permission in writing In such a case used system components are likely to be replaced 15 5 Lifetime of the systems
34. end of the tube parallel while tightening the screws Screws must be tightened turn by turn alternating them If one screw is over tightened compared to the other one it will bend and break Clamp screws should be tightened to 7 Nm Step 8 Drive the wire through the following post tighten it and fix it with FGM 1 0 Fixing head as described in Step 6 This operation can easily be carried out by two individuals one of them tightens the wire while the other places the fixing heads onto the posts These steps should be repeated until you reach a corner post or the end post When tensioning the wire you should ensure that lagging Bmax shall not exceed 5 0 2 cm To measure the lagging you may measure the height of the wire rope at the post and the height of the wire rope at the middle of the span must be 5 2 cm below this measure In addition you should also make sure that the distance Hmin between the ballasting material and the wire is at least 5 0 2 cm In case the wire rope gets too close to the ballasting material it may happen that the carabiner glider will not run smoothly through the wire rope Elongation of the wire rope due to heat expansion given by the seasons and the eventual stretching of the rope throughout the years are considered in above tolerances however in case of having an unexpectedly too big elongation in a span it is necessary to install a turn buckle to ensure necessary tens
35. er in all fall directions indicated in the manufacturer s plans This indispensable plan should contain all necessary anchoring points along roof edges or corners in a way that takes static and geometric system movements into consideration 20 Actual location of the fall protection system depends on manufacturer s installation plans System installation obviously takes location specific characteristics into KA JA consideration Potential fall directions 5 4 Distance from edge of hazard Ballast Minimum distance of the system from edge of Fall direction e o hazard considering the recommendations of 21 50 AUVA Planungsgrundlagen von Anschlageinrichtungen auf D chern L L L Standard 3x3 m damping mat 1 width of parapet wall x cm xcm 1 5m 2 without parapet wall 2 0 m from edge Reduced 2x2 m damping mat 1 width of parapet wall x cm x cm 1 0 m 2 without parapet wall 1 5 m from edge K Personal protective equipment rope Roof surface The figure shows the max permitted positive and negative angle deflection of the personal protective equipment rope This helps us determine the distance necessary from the parapet wall or if the distance from the roof edge is already provided the permitted parapet height can be determined 21 DIADEM 5 5 Building structure and underlay DiaSafe systems have been tested and certified on a whole variety of surface types and base struc
36. ere nnne nnne nnne 25 7 2 System components ccccsccsccsccsecssceesesecescesecessssecesecesstsecesetseceestsecessasetsecasctseceseesecaseeasees 25 Des StepserinstallgtioBiussmsentdteetem tes Leiden c rDVn dd Faster luces U Rid Id ond Duomo SN dexLa E PU eU E 25 FUMER III Sm 28 8 DiaSate Line System Multi specification insit rer nere RES bna esae EE eun Pe EROR E E Eutr o TRUE 29 8 1 Tools needed for the installation ccccccccccccccccceeeeeeaeeseeeesssssseeeeeeeeeeeeesseueesesseseseeeeeeeeeeeees 29 D SUSLIOHPPCOInDOHGDHES vosevoxebeutdet quum etie e HEEREDON EEdEL Kev Erud gu Peut eQUPEU ERE eU S HI UN PO OREL VEEIRODevU UE DE 30 8 2 Steps OFIBSEdIIBEIDD severos esit baterias aulatusmit subest Ead tase cnt dees A 31 54 Ballastie S E cm ne ore eee en ener ene sam i re ene near eee 35 9 DiaSafe Line System Glide Solo Duo SpeCIFICATION cccccccceceeeececcccceeeeeeeeeeeeeeeeeeeeeeeeeess 36 S l Toolsneeded TOF the Insta llablOFi ceca sciet done cdet a Cd daa xo a 36 9 2 System COMPONENTS qisoccetriseuo urhe NOU PRN EN XIUF OU UU PITE NUEFDI C RIPER ONU MEME 36 93 SUC SOT Mis Gall QUO ecaneecaceecoveccaeceaeese s E PNE M Per nUSDU T HMM eB 37 94 Ballastng SUITg6Buuaieers cies t Te cisenee ne creete fons icu asta etna Seu EISE Nerius M MEUM UU Meo n I rq UE 41 IO Comipletion OF ihe InstellallODlsc cecus cre deuvouu ep UR DEN L4UP ETUR Uv CEU SUP URS Ord De CHE WIVEQ SE Vke Sev DEOS qst o ESI Ee IVRSdE 43 UNES cl c
37. erforations of the tube to be swaged 2 Make sure the preset swaging force is delivered by the swaging machine The swaging machine must click when the preset force is reached If the battery is low in charge the failure indication light turns on or there is any other doubt the swaging must be considered as inadequate and must be discarded EOREOEECECECECECECECECECECE Step 8 Place the Glider post heads over the intermediate post heads and fix them then drive the wire through the tube of the Glider post heads Swage the tube in 4 positions according to the figure below Set the last swaging at a distance of 8 12 mm from the ends of the tube Glider post heads on the intermediate posts of a system may be swaged only in 2 positions one on each side of the tube When tensioning the wire you should ensure that lagging Bmax shall not exceed 5 0 2 cm To measure the lagging you may measure the height of the wire rope at the post and the height of the wire rope at the middle of the span must be 5 2 cm below this measure In addition you should also make sure that the distance Hmin between the ballasting material and the wire is at least 5 0 2 cm In case the wire rope gets too close to the ballasting material it may happen that the carabiner glider will not run smoothly through the wire rope Elongation of the wire rope due to heat expansion given by the seasons and the eventual stretching of the
38. es the control label as well as the circular validation sticker onto one cone of the line system Forming the corners The type of the corner anchoring posts is the same as that of the intermediate posts Lead the wire rope through the glider post head and form the angle of the corner needed by the wire rope This corner formation will provide free traversability for the glider In case of wire rope extension a turn buckle should be built in the line 40 damping mat surface to fold parapet wall 0 38 m2 DIADEM i The corner post of the Glide system thus Te A the damping plate and standard size mat ae See belonging to it has to be installed rotated 27 compared to the rest of the posts that is running with the bisector of the corner wire rope angle ex rotated by 45 in case of a right Z angled corner This implies that a certain B surface area of the damping mat A il depending on the distance of the system Z from the edge has to be folded max 0 76 m2 In spite of the reduced sized damping mat at the corner the system provides a safe use of the system 9 4 Ballasting surface DiaSafe Line System Glide Solo one user Total sudaa Layer thickness Layer thickness Layer thickness sand soil soil h h gravel WEIEN WEIRIN y 1600 kg m y
39. hen place the Square anchoring ring into head then place the Swaged square end into the post head slot Mount the FGM 1 0 Fixing the post head slot Mount the FGM 1 0 Fixing head Unscrew the setscrew on the fixing head head Unscrew the setscrew on the fixing head until its almost out place it onto the post head until its almost out place it onto the post head in such a way that the square ring aligns into in such a way that the square ring aligns into the slot Turn the head clockwise and liftitup the slot Turn the head clockwise and lift it up Tighten the setscrew to 5 6Nm Tighten the setscrew to 5 6Nm 32 FGKa 1 0 Cable thimble FGL 50 Anchoring wire FGL 50 Anchoring wire a DIADEM e gt E D P n e EZ pn Nut clamp h O Type a Type b Step 7 type a Step 7 type b Drive the Anchoring wire end through the Push the end of the Anchoring wire into the square ring and a Cable thimble and then fold tube of the Swaged square end The wire rope the end back with at least 150 mm t end must remain within the tube but as close overreach Threads at the clipped end of the as possible to the end Swage the tube in 4 wire must be protected by a shrink tube Fix the positions at equal distances from each other wire end with the Nut clamp It is very Set the last swaging at a distance of 8 12 mm important that the Nut clamp must keep from the
40. ion 33 DIADEM Warning An excessive lagging will result in a longer deflection of the system in case of a fall FGSH 2 0 Square rin FGKa 1 0 Cable thimbl g i ae H ii E Turnbuckles are not essential to the system but FGSR T2 ES Tum buckle Da MAS help to maintain the tightness of the spans The o mi gt wire rope can be tensioned by hand E E Nut clamp throughout the installation when the length allows to hold the wire In the very last span at the end of the wire rope it is recommended to install a turnbuckle to provide enough tightness to the last span In the event of having a span considered to be tightened it is always possible to install a turnbuckle It is not recommended to install more than one turnbuckle per span an a Step 9 type At the end post repeat the process explained in Step 6 Build in the FGSR 12 ES Turn buckle into the wire line between the Square ring and Cable thimble The turn buckle will make possible to tension the wire in the last section and will provide additional adjustment during the annual inspection Step 9 type b Place the Clamp ring over the anchor post head then place the Swaged square end turn buckle into the post head slot
41. l label for Line System Glide After system installation the self adhesive validation label shall be filled out as per the sample and the label shall be attached to the side of the laminated cone on one of the posts validating sticker Following a successful inspection the validating sticker shall be attached by the inspector The validating sticker shall be punched at the suitable date and the sticker shall be attached onto the control label The validating sticker shows the date of the next inspection handover protocol Handover protocol System delivery and reception are accurately registered in a comprehensive protocol based on the template in the document folder This protocol is to be signed by the installer It is advisable that all relevant parties are to receive a copy of the protocol shall be sent to the manufacturer It is advisable to upload it during the online registration of the systems This protocol confirms that the involved DiaSafe Systems according to the manufacturer s estere e ere in Hungary and the current standards rie ae System installation should be well documented with photos especially parts which will later be covered and will not be visible e g soil Ae e apiy dete Gf ta MP INC 12 month guarantee period the owner of the building that the system is regularly inspected and that the manufacturer s permission needed for the proper and safe usage is prolonged
42. longation of the anchoring system X cm Measure given by the body height 150 cm Absorbtion strain PPE 100 cm Safety distance 100 cm Min building height H cm H free fall height Any disadvantageous conditions which negatively influence system operation must be avoided extreme temperatures sharp edges chemical interaction electricity cuts grinding weather effect potential swinging motion when falling etc All instructions and drawings in the manual must be strictly adhered to DiaSafe system documentation contains all important data related to types year of manufacture and system identification You must check whether the content of the documentation folder matches those items listed in the table of contents 49 DIADEM 14 General safety instructions 14 1 Danger zones on flat and low pitch roofs The entire surface of walkable flat roofs and roofs which are used for special purposes are considered potential threats Individuals within a 2 00 m wide area measured from the edge of the roof fall point face the highest risk All roofs with an inclination lower than 5 are considered flat roofs The following locations are extremely dangerous and as such they require special safety measures Generally speaking roof edges actually all locations from where individuals can fall Building sections e g long sides where swinging motion can develop after a fall Roof edges and corners beneath which the
43. m Duo allows anchoring two users simultaneously The karabiner of the personal protective equipment has to be attached to the circular opening on top of the Single anchor post In the case of the DiaSafe Line System Multi one user can be anchored in every other section simultaneously one section should be left free between two users The karabiner has to be attached to the wire rope of the system DiaSafe Line System Glide Solo can be used by maximum one person at a time while DiaSafe Line System Glide Duo can be used by maximum two persons at a time and the users have to attach the karabiner to the glider that allows free movement along the whole line of the system Single Solo Single Duo Line Multi Line Glide Solo Line Glide Duo E UU H T s P KM one user two users several users one user two users Wee may Ls iN p tacet f 4 z 7 13 3 General terms of use 48 DiaSafe system structure components and their roles were accurately described with figures and text in previous chapters of this manual We shall herein highlight these sections again If measures listed in Chapter 13 or individual inspections listed in Chapter 14 were not conducted system use should be suspended or limited If maintenance works were omitted or partially completed and this jeopardizes system safety it is prohibited to use the system This rule applies when weather conditions hamper safe use of the fall prote
44. m getting into dangerous position 15 4 2 Combination of fall arrest and restraint systems The figure below shows roof area allocation based on whether the system operates as a fall arrest or a restraint system The radius of operation is given by the length of the rope attached to the personal protective equipment When used as a restraint system the length of the rope must be at least 0 5 m shorter than the shortest distance between the system and the edge of the roof When used as a fall arrest system the rope may not be more than 2 0 m longer than the distance between the system and the edge of the roof The system may operate as a fall arrest system only in such cases when the minimum free fall height is given otherwise the system may be used only as a restraint system m d S oo s d max 2 00 m Sc radius of operation fall arrest system radius of operation fall restraint system Flat roof E CEA VA UA Ns d 4 3 System type combinations The figure below shows the combination of two types of restraint and fall arrest systems Line System and Single System DiaSafe Line System pid Zu LL K Z radius of operation fall restraint system BE OA C2 CS e radius of operation fall restraint system radius of operation fall arrest system N DiaSafe Single Syste N Ly Th m Pitched roof ine K 3 DiaSafe Single System
45. n and assembly should follow the manufacturer s plans or plans approved by the manufacturer to the letter e The installer is not allowed to modify the plans at all in case of any deviations the installation works may only be continued after the approval of the manufacturer e Systems are to be bond to the lightning protection system according to the national standards in force 24 7 DiaSafe Single System Solo Duo specification 7 1 Tools needed for the installation cutter 8 m tape measure shovel 7 2 System components Name Photo Pictogram DS Single Glide anchor post Damping plate with integrated damping mat A 7 3 Steps of installation 6 Lay a protective geotextile under the DiaSafe system onto the upper roof surface which is generally some waterproof insulation bitumen PVC laminated rubber etc or a technical layer which constitutes a part of the roof structure 25 Step 2 On the protective geotextile position the Single System post at the exact location detailed in the plan Step 3 Place the Damping plate with integrated damping mat onto the posts The base of the high grade steel post should be fitted to the center of the damping plate into the projecting section at the bottom of the cone Step 4 Unfold the damping mat to its entire area Smooth the mat starting from the center with radial movements toward the corners If the plans
46. o any work done at heights is a properly designed and tested fall protection system whose elements operate in a well coordinated way in order to ensure maximum protection for individuals working on roofs All key manufacturer s data and regulations which are needed for safe operation can be found in the Diadem DiaSafe system document folder Long term and reliable operation of the fall protection system not only requires proper use but also necessitates adherence to the following rules 50 System component maintenance and storage Safe operation and damage free condition of personal fall protection equipment and other protective equipment require regular cleaning and suitable storage of system elements Regular inspections The personal fall protection system and other protective systems should be regularly checked for damage wear and tear Regular inspections by experts These are inspections carried out by experts who have received proper training from the manufacturer These experts can spot potential system errors or weak points they can help uncover the reasons behind failures and if necessary can rectify the error or take necessary measures for correction 15 2 Field inspection before usage by user Naturally safety of work made on roofs does not solely depend on the state of the fall protection anchoring system Nevertheless it is important to ensure that the entire work area including driveways and paths leading
47. on and maintenance of the system by manufacturer 52 15 4 Manufacturer directions for system INSPECTION cceeccccesseeccccesececeesececeeeeceeceeceesegeceeeees 53 195 5 Diete OT TINGS SUNG uncut tee Eee uui Sd EL Seu tenseni S 54 ES Iu eT TE 55 16 1 Manufacturer research investigation and TESTING ccccccssecceceessececeesececeeeceeeeneceeseneceesees 55 17 Important notes and safety warnings ccscccccsssccccessecccceseeccccesececeesececeueceeceuceeseeeceesenecesseges 55 17 1 Modiica tions anda CANS CS setis id Eaux Pd SUPE EN AAS 55 17 2 Instructions for the safe use of DiaSafe systems ccccccessecccceesseccceeeceeeeeeceseusecesseneceeeees 56 le Conclusion dnd DOES acres 265s hence acer suo eU Qui Eae itd euet ode equum Eadaladc tene update paobassaanmranetaas ceonet lt 57 1 Introduction General description DIADEM DiaSafe is a range of elements that perfectly combine into a fall protection system designed to ensure the safety of staff working at heights They have been tested by TUV AUSTRIA Europe s leading safety validation organization The systems conform to the most recent standard EN 795 2012 when used with personal protection equipment that meets standards EN 363 and EN 365 The DiaSafe Systems may be used both as fall arrest or fall restraint systems The systems meet all work safety standards and requirements without affec
48. ordertechnik Akkreditierte Pruf Inspektions und Zertifizierungsstelle Notified Body 0408 17 Important notes and safety warnings 17 1 Modifications and changes In order to ensure continuous product development technical characteristics of DiaSafe components are subject to change by the manufacturer If such changes affect system safety the registered inspecting institution which completed system checks and issued the type certificate shall examine the modified product as well 55 17 2 Instructions for the safe use of DiaSafe systems 56 The Manual must be read thoroughly Can only be used with personal protective equipment and built in fall decelerating device Anchoring max 1 user simultaneously Single System Solo Anchoring max 2 users simultaneously Single System Duo For simultaneous fixing of several users Maximum 1 user in every other span section Line System Multi At least one section should be kept clear between two users Anchoring max 1 user simultaneously Line System Glide Solo Anchoring max 2 users simultaneously Line System Glide Duo The 2 users can be attached in the same span section 18 Conclusion and notes DiaSafe Line and DiaSafe Single System are anchoring installations tested and approved by the standard EN795 2012 These systems are adequate for attaching approved personal protective equipment compliant with EN363 and EN365 and use as safety device ag
49. priate location on the control label onto the side of a laminated cone at one of the anchoring points The manufacturer shall use his project tracking system to notify the owner of the periodic inspections due 4 DiaSafe System Function 4 1 Fall arrest and restraint system two in one DiaSafe anchoring systems have both fall arrest and restraint functions A system installed at a particular location can be used for a given purpose depending on roof geometry characteristics and the free fall height System installation is regulated by a commissioning plan approved by the manufacturer LJ Fall arrest system Fall restraint system H minimum building height a Fall arrest system The user has a personal protective equipment to secure himself Should a fall occur the system prevents the user from falling onto the ground or a building part and it effectively decreases fall length The system thus prevents the user from free falling to the ground or hitting a building part b Fall restraint system When used as a restraint system it prevents the user from actually reaching a fall danger zone because rope lengths are configured in such a way that the user cannot possibly get close to free roof edges By taking special building characteristics into consideration the manufacturer carefully designs systems described herein restraint systems and fall arrest systems Restraint systems shall always be favored as they prevent users fro
50. products Should a fall occur system components designed for energy absorption deform Manufacturer shall cease to take any further responsibility for these components and related parts and as such the system must be discarded preventing further use 3 DiaSafe System Product description 3 1 Introduction All metal DiaSafe components are made from stainless steel alloy which complies with EN 10020 high grade standard its material code is 1 4404 316 The damping plate and the cone fitted onto it are made from fiberglass reinforced polyester resin The connecting ballasting layer geotextile is made from polypropylene This mat carries the ballasting layer which is necessary for static reasons Standard damping mat size is 9 00 m where sides are 3 00 x 3 00 m Custom size mats can be installed by taking specific weight and related ballasting layer thickness into consideration see tables in chapters of specification of each systems Minimum thickness of the ballasting layer shall never be less than 3 cm DIADEM 3 2 Components of the DiaSafe Systems DS Single Glide anchor post Product No 100353 High grade 1 4404 steel console bent and welded from a circular sectioned steel rod including an absorption spring Rod diameter 8 0mm Base diameter 250mm Height 300 mm Custom sizes up to 1400 mm can be ordered from the manufacturer DS Line anchor post Product No 100316 High grade 1 4404 steel
51. r work to be carried out on roofs where personal protective equipment or fall protection systems are necessary Owners and facility managers are not obliged to have a detailed knowledge of standard textual content Owners and facility managers shall observe local safety and tool related regulations For further information please refer to Chapters 13 and 14 of this Manual 2 2 Legislations In accordance with actual labor safety and accident prevention regulations all personnel participating in the construction maintenance and other works on roofs must be secured against fall n all countries where DiaSafe system is installed all relevant regulations about commercialisation and application shall be respected When selling the system in a third country the distributor shall notify relevant parties of regulations and legislation in force Ifa distributor exports the DiaSafe fall protection system to a third country the distributor shall have to make sure that the entire Technical Manual of the system is available in the official language s of that country A DiaSafe fall protection system installed by the manufacturer or its authorised representative shall be received by the owner facility manager as a part of the official handover process 2 3 Manufacturer s responsibility Manufacturer s responsibility covers faulty products unless the fault occurred as a result of inappropriate use Manufacturer shall only replace fa
52. rder to obtain skills necessary for the completion of periodic inspections the manufacturer offers technical training Annual technical inspections can only be carried out by an expert or a professional service technician Important warnings Regular technical inspections are indispensable as such tests can ensure the proper operation and durability of anchoring points and guarantee safe and secure system operation gt f regular technical inspections are not carried out at least every 12 months permission to use expires and the system must not be used If a country has other regulations in force the system is used frequently or the system is exposed to extreme environmental conditions technical inspections can be carried out more frequently than 12 months gt Service technicians executing such inspections shall always refer to the manufacturer s instructions Maintenance and care of personal protective equipment shall strictly follow manufacturer s instructions Should the personal protective equipment become wet during use it can only be dried naturally it must not be exposed to a direct heat source gt It must be ensured that the system is not exposed to harmful or extreme weather conditions constantly wet environment sharp edges intensive vibrations etc for a long period s 52 gt As far as products falling into the scope of standard EN365 are concerned these products in some countries may have to comply with a
53. re are projecting building sections e g balcony wall corner etc and therefore minimum building height required for safe use of a fall arrest system is not guaranteed Roof sections where there is a danger of tripping roof vents lightning conductors low surface lights projecting structures etc Roof stairs without safety devices poorly lit places and places without lighting n built snow removal or other devices Non shockproof roof components e g lights 14 2 Basic safety when working on flat roofs Besides on site safety measures in order to provide safe working conditions on the roof it is important that individuals present can use the Diadem DiaSafe system and that they are familiar with all their functions and elements It is vital for their own safety in order to avoid risk of falling when working at heights It is therefore necessary to wear fall prevention personal protective equipment body harness The personal protective equipment and the fall protection anchoring system are combined into a single unit It is of utmost importance that the individual working on the roof should receive proper training and should master all relevant knowledge Only then will the worker be able to select use and maintain the most appropriate personal protective equipment and to check any disturbances as well as to gauge embedded risks before use 15 DiaSafe System Maintenance 15 1 Introduction A precondition t
54. serted into the swaging tube The wire rope must be well visible at both perforations of the tube to be swaged Make sure the preset swaging force is delivered by the swaging machine The swaging machine must click when the preset force is reached If the machine does not click the swaging is not complete and must be considered as inadequate and must be discarded If the battery is low in charge the failure indication light turns on All swaging made while the low battery charge light is on must be considered as inadequate and must be discarded 45 11 4 Swaging process Once the wire rope is fully inserted into the swaging tube the wire rope can be seen through the check perforations or it is completely out at the other end open the pressing tong and place it over the pressing tube as on the picture below Press the rivet of the pressing machine until the click indicating that the maximal press force of the machine has been reached sounds The swaging is finished 46 12 Installation of the system at different heights of ballast material DIADEM DiaSafe anchoring post DIADEM DiaSafe anchoring post 220cm max 125 cm 1 Ballast material S 20 cm Ballast material 2 20 cm The layer thickness of ballast material on green roofs may vary If the thickness of the ballast doesn t exceed 20 cm then the system can be installed in the standard way In all cases it is important to leave at least 10 cm from the
55. stitutor of the installer It is recommended to give the contact of the owner facility manager as well in order to supply them with the information about the expiration and result of the technical inspections It is also suggested to upload plan and photodocumentation relating to the registered system 44 11 Swaging DIADEM 11 1 Press Machine to be used for swaging DiaSafe anchoring systems have been tested and approved with swaging made with REMS radial press machines The following models are considered to be appropriate for swaging Power Press Power Press SE Power Press ACC Akku Press Akku Press ACC These machines are set to press with a thrust of 36kN originating a pressing power of 100kN All radial press machines must be yearly revised by its manufacturer in order to guarantee the appropriate swaging Make sure the press machine you are using has a certificate that proofs that the yearly check has been done within the last 12 months The use of any other press machine must be first approved by the manufacturer of the DiaSafe system 11 2 Pressing tong and die to be used for swaging In all cases the swaging must be done with a T12 die which will fit the normal pressing tong Pressing tongue Pressing die Pressing tongs must be replaced after 10 000 swagings Pressing dies must be replaced after 5 000 swagings 11 3 Safety warnings for all swaging in the system Make sure the wire rope is fully in
56. ting the roof in any way The waterproofing roof insulation and roof structure remain intact The DiaSafe Systems can be installed on green gritted or paved roofs with up to a 5 incline The key factor is to ensure a minimum ballast weight of 80 kg m for the standard 3mx3m size fall arrest mat This manual is intended to present four members of the DiaSafe family DiaSafe Single System Solo Product No 130097 DiaSafe Single System Duo Product No 130097 DiaSafe Line System Multi Product No 130098 DiaSafe Line System Glide Solo Product No 130100 DiaSafe Line System Glide Duo Product No 130100 VN VN N Besides many other all systems have their own specific advantage and feature Single Systems Solo and Duo anchoring one or two users are used when there s no need for linear protection on a roof The installation of these systems is very quick and simple Line Systems provide linear protection along the edge of the roof In case of Multi numerous users may be attached to the system at a time while one main advantage of Glide Solo and Glide Duo system is that it s designed in such a way that users have the maximum freedom of movement without the need of reattachments DiaSafe System users are obliged to carefully read this manual prior to using pii the system and shall closely follow all relevant safety regulations during use DIADEM 2 Regulations Legal background
57. tional energies Ballast material is an integral part of the system It is very important to always ensure the necessary ballasting weight the appropriate thickness in accordance with the material s specific weight Sliding of ballasting material also absorbs energies that would act on the human body DIADEM Snap Line 1 Deformed Cobra post Anchoring post embedded into the cone stretched as planned and the cone split along the lower horizontal snap line Cone split along the built in vertical snap line 4 5 Maximum deflection and forces permitted Maximum forces and deflections generated for single posts and system wires horizontal movement of the anchoring point wf 2 38 3 6 4 3 oe ered pulled at the center One 1 5 m span 47 23 3 spans of 1 5 1 5 8 0 m pulled at the center of the 8 0 m span 3 spans of 1 5 1 5 8 0 m 1 1 ne oss 46 pulled at the center of the end 1 5 m span Line System post i with 100 300 kg load Single System post with 100 300 kg load Single System post with 200 600 kg load Single System post With max mat size of 5x8 m 18 kg m2 load With mat size of 2x2 m 180 kg m2 load With mat size of 1x1 m 180 kg m2 load In accordance with EN795 2012 and CEN TS 16415 2013 all components were tested to withstand the prescribed forces as described in below table Complete single system 80 kg m2 ballasting 1 EN795 2012 Deformation test Complete line system 70 kg test
58. to it as well as the personal fall protection system are in safe condition see local work safety regulations The user should at a minimum inspect the following components on site as safe operation of these elements is of crucial importance Obviously there can be other things to be checked as these items affect the safety of individuals working on roofs Inspection of all paths and walkways leading to the work site roof stairs stairs ropes ladders etc Is it safe to walk on use them are the walkways clear of any disturbing objects can one trip and fall on into something Are necessary signs affixed at visible spots are the signs easy to read Does the DiaSafe system documentation contain all items listed in the table of contents s the roof properly lit Bearing the actual weather conditions in mind ice snow water moss on constantly wet surfaces can work be safely done within the effective range of the fall protection system Independently from norms and local regulations we do not recommend to do work or remain on any roof when temperatures are below 5 C or freezing is likely A fall protection system used on a roof cannot be combined with different types of fall protection devices Act on Work Safety Have all the necessary maintenance and preservation operations been completed as per the control schedule stherelevant control label filled out in harmony with actual conditions H
59. tures Its operation has been checked on the most common insulation materials and roof surfaces Structural characteristics can help determine which system is the most suitable for a particular roof Fixing head Anchoring wire 8 mm TT Anchor post Ballast material Damping plate Protective geotextile UY RR LS LE E e BEER AE EB ARR BRE 2528 cece BINE CIA LORH s AES 0302 et EIE PEH CERE E 829 977 EVI s i E ERAS ERR ET Different types of roof structure 5 6 Ballasting layer If roof structure is not available or there are doubts in terms of under structure compatibility please contact the manufacturer of the anchoring system VLF separating geotextile layer System stability is ensured by the ballasting layer which in case of green roofs can be soil or soil like mixture gravel cobble stone or other bulk material Different types of ballasting materials require a statically determined layer thickness These are defined by the manufacturer on an individual basis and must be checked on site during the handover process DiaSafe anchoring points can be used on roofs with less than 5 slope It must be ensured that the surface weight of the ballasting layer is at least 80 kg m in dry condition for the standard size mat in case of one user See specifications for each system
60. ulty or damaged components No further claims indirect or property damage are acknowledged by the manufacturer A major prerequisite of long term fall protection system operation is regular maintenance as prescribed by the manufacturer Should maintenance steps fail to be executed in due time or they are not executed by an individual authorised by the manufacturer to do so the manufacturer s responsibility shall terminate after 12 months of official system handover This is not the case when the owner operator has entered a proper maintenance contract with the manufacturer Manufacturer s responsibility shall also terminate after 12 months if any periodic system check fails to be completed or such checks are not conducted by a certified inspector or trained installer trained by the manufacturer System checks should be carried out at least once in every 12 months Check interval durations depend on relevant regional regulations system use frequency as well as local conditions e g chemical hazards DiaSafe systems can be extended using original accessories developed exclusively by the manufacturer Should any components or products of any other manufacturer be installed or used in the system manufacturer s responsibility and guarantee terminate immediately Should the system not be installed or assembled by the manufacturer or a contractor authorised for installation the manufacturer shall accept no claims other than for faulty
61. ut such modification requires the manufacturer s approval 8 DiaSafe Line System Multi specification 8 1 Tools needed for the installation cutter 17 mm wrench 8 m tape measure cable thimble expanding plier torque wrench 5mm torque wrench bit wire cutter lighter 5 mm allen key swaging tool shovel pincers 29 8 2 System components Name Photo Pictogram DS Line anchor post type a and b Damping plate with integrated damping mat type g ig and b Clamp ring type a and b FGM 1 0 Fixing head type di d and b FGSH 2 0 Square ring type a FGKa 1 0 Cable thimble type a FGBD ES 08 Nut clamp type a FGSR 12 ES Turn buckle type a Swaged square end type b Swaged square end turn buckle type b FGL 50 Anchoring wire type a and b 30 8 3 Steps of installation Line System Multi can be mounted two ways a and b The steps of installation of the different types of mounting

Download Pdf Manuals

image

Related Search

Related Contents

  HC 997 MOD B PI-MA-CLK-PH-RX    ROOF TOP FS 564A036-090  Pico projecteur Français  Stationsportal Benutzerhandbuch    SMART Board 600i4 and D600i4 Interactive Whiteboard System  取扱説明書等(1) - アイ・オー・データ機器  

Copyright © All rights reserved.
Failed to retrieve file