Home

- Lutz

image

Contents

1. Fig 2 2 View of the multi functional control block Key D measuring water inflow Q filter 3 needle valve DN 2 5 central drainage pipe of the overflow piping pivoting drainage pipe for manual water testing 6 excess chlorine measurement cell reference electrode for excess chlorine measurement cell floating elements with bar magnet 9 dry reed contact potentials adjustment pin receptacle holes for the pH and REDOX single rod measuring cell 2 receptacle holes for the temperature gauge Pt100 3 water drainage from the measurement cell with PVC pipe collection hopper Assembly Operating manual PM04 9 2 2 Measurement of free chlorine and or chlorine dioxide The measuring of excess chlorine works in accordance with the ampere metric measure ment principle with free measuring electrodes i e the measuring electrode is in direct contact with the test water Ampere metric sensors can be divided by the following criteria e 2 electrodes system e 3 electrodes system with potentiostatic connection A potentiostatic measuring cell is fitted on the PM 04 instrument panel to measure the concentration of disinfectant It contains a gold electrode as a measuring electrode a high grade steel electrode as a backing electrode and a glass reference electrode KCl The potent
2. 15 5 1 MSTA ATOM E EE 15 5 2 Adjusting the test water quantity 5 3 Calibrating the measurement amplifier Bt m M 17 7 Turning the T EE 17 8 Maintenang a mm 18 9 Technical Data aNG 19 10 Installation TE 20 2 Operating manual PM04 Contents 11 Order documents inci ni nin cea 21 11 1 Pre assembled instrument pang 21 11 2 Accessories and spare parts 21 12 Fault analysis ee 22 13 Spare paris bier ne er Pcr deca tend eta ec 23 15 Declaration of harmlessness eere 29 16 Revision nnne nennen nennen tereti te tertiae tnn 30 17 Warranty siiin riisiintoisanasana niaaa anaae teava na nnna aana diaaa aKa E aniatra naan TKE E niaaa 31 Contents Operating manual PM04 3 WARNING 1 General and Safety Instructions 1 1 General This Operation amp Maintenance Manual contains basic information to be noted during in stallation operation and maintenance It is therefore essential that the contractor read the manual before installing and commissioning the pump system as well as by the relevant operating personnel owner of the pump system It must remain accessible at the dosing pump system for reference at all times In addition to the general safety instructions under this main heading of Safety the special safety precautions outlined another section must also be observed 1 2 Warning symbols used in this Operation amp Maintenance Manual Th
3. Test range 0 00 14 00 REDOX single rod measuring cell Test range 1000 1000 Technical Data Operating manual PMO4 19 10 Installation example OI u Fig 10 1 Installation example Key CD Test water withdrawal Instrument panel PM04 3 Pump for test water recirculation Dosing pump pH adjustment Injection point pH adjustment Jet pump with check valve Drive water pump Chlorine gas control valve 9 Chlorine gas flow meter Introduction of chlorine solution OT Drive water rate 20 Operating manual PM04 Installation example 11 Order documents 11 1 Pre assembled instrument panel Naa rr o measure free chlorine and or chlorine dioxide 42200010 iostatic measurement cells d high grade reference electrodes o measure free chlorine and or chlorine dioxide pH value 42200011 iostatic measurement cells d high grade reference electrodes ingle rod measuring cell easuring cable o measure free chlorine and or chlorine dioxide pH value temperature 42200012 iostatic chlorine measurement cells d high grade reference electrodes and balls to clean the electrodes ingle rod measuring cell 1 50cm measuring cable perature gauge Pt100 2 5m connection cable 04 to measure free chlorine and or chlorine dioxide pH value REDOX 42200013 entiostatic chlorine measu
4. IMPORTANT 4 1 2 Water drainage The drainage of water from the instrument panel is free from pressure Two streams of water run off the acrylic block one from the overflow pipe and one from the actual measurement cell Both of the water streams are pooled together in the collection hopper at the bottom left hand corner of the instrument panel The water for the manual tests is withdrawn at the pivoting drainage pipe The water from the hopper must be able to drain downwards freely The recirculation of water in a pressure system is possible with a submerged pump in a collection tank for instance see installation example 4 2 Electric connection The local DIN VDE must be observed for the general electric installation A specialist must always carry out the electrical work The controller and or measurement amplifier should be installed directly on to the instru ment panel and or for the installation of the control cabinet as near to the instrument panel as possible The connecting lines for the pH and redox single rod measuring cells in particular should not be any longer than approx 10 cm without any special precautions If larger distances have to be bridged an impedance transformer then has to be put on the electrode Under no circumstance may the measuring cables be laid directly parallel to the power and control lines or their pipe ducts junctions have to be at a 90 angle Equipoten tial bonding is necessary if the t
5. PM04 Spare parts Spare parts to assemble the electrodes of the potentiostatic measurement cell 13 N a 9 2 1 5 6 2 8 B 5 6 14 7 3 4 Rc 10 Fig 13 2 Spare parts to assemble the electrodes of the potentiostatic measurement cell me mes ege oer ho po ememe lao 2 Te amping aa se 5 Je owtewarssmmazowez mw 5 wemem 6 omean eme n v peesseamteas ame Tr rennt am Spare parts Operating manual PM04 25 14 Index A ACCOSSOLBS aa kaaya darasal ta lata TAGA ee ee 21 Adjustingithe test water quahlly rtr aa 15 ASSE mDl Y Hesse se een 7 C He ln EE 15 chlorine dioxide nnn nnne 7 D IFIDIKTTI WR eg T F Fault analysls 23 0 rtt etre e e te ens 22 user RUTRUM 7 Elle lt 11 H Hydraulic connection 12 l aala mn ee 12 Installation example sse 20 Installation of the Sensor nnn 15 M Maintenance Aa AA ANAN ANNA NABA NE NANANA 18 Measurement aman nnne nnne tnnt 10 measurement cells ener 16 0 Operating Order documents an KANG enr P Pr AA c NANA P Pc c 21 26 Operating manual PMO4 Index P BC M 10 R Eet 10 S SETUP IhSTHICHON een 4 APA 15 Spare E 23 T Technical Data iiie te ette rer terit better AA Apn 19 temperate E 10 Turning the TD TNCS EE ELSE 17 U WIP AG Katie ti tei IRE trot hitting 6 W
6. up and the dry reed contacts connect This signals to the electric controller that there is enough test water current and that the adjustment control can be enabled 5 3 Calibrating the measurement amplifier Before the measurement amplifier is calibrated the test water should flow for about an hour as the excess chlorine measurement cell needs an inflow phase before a stable measurement value can be given out The measurement amplifier is calibrated with the same procedure regardless of its make The detailed procedure is to be taken from the user manual for the measurement amplifier and or controller Before the excess chlorine measurement cell is calibrated the pH value should be constant as varying pH values from the chemical procedures in the water create different chlorine ions and thereby different measurements of chlorine the chlorine meas urement s dependence on the pH value is described in point 2 2 Setting up Operating manual PM04 15 WARNING WARNING WARNING WARNING The pH value has a decisive influence on the chlorine measurement pH Value In order to calibrate the pH measurement amplifier one requires two buffer solutions They should isolate the anticipated test range e g buffer solutions pH 6 8 and pH 9 28 for test values of pH 7 2 During the calibration the pH single rod measuring cell can be hung up on the mounting plates in the acrylic block REDOX Potentials Only one buffer solution is r
7. Germany Phone 49 5130 5802 0 Fax 49 5130 5802 68 E Mail info lutz jesco de Internet www lutz jesco de 24h Hotline 49 5130 580 280 Austria Lutz Jesco GmbH AredstraBe 29 212 2544 Leobersdorf Austria Phone 43 2256 62180 Fax 43 2256 6218062 E Mail info lutz jesco at Internet www lutz jesco at USA Lutz JESCO America Corp 55 Bermar Park Rochester NY 14624 USA Phone 1 585 426 0990 Fax 1 585 426 4025 E Mail mail jescoamerica com Internet www jescoamerica com Great Britain Lutz Jesco GB Ltd Gateway Estate West Midlands Freeport Birmingham B26 3QD Great Britain Phone 44 121 782 2662 Fax 44 121 782 2680 E Mail info gb jesco de Internet www lutz jesco de East Asia Lutz Jesco East Asia Sdn Bhd Taman Perindustrian Jaya 47200 Petaling Jaya Malaysia Phone 603 78454812 Fax 603 78458413 E Mail info lutz jescoasia com Internet www lutz jescoasia com Netherlands Lutz Jesco Nederland B V Nijverheidstraat 14 C 2984 AH Ridderkerk Netherlands Phone 31 180 499460 Fax 31 180 497516 E Mail info lutz jesco nl Internet www lutz jesco nl Middle East Lutz Jesco Middle East FZE P O Box 9614 SAIF Free Zone Center Sharjah UAE Phone 971 6 5572205 Fax 971 6 5572230 E Mail info me jesco de Internet www jescome com Hungary Lutz Jesco Uzletag Vasvari P u 9 9024 Gy r Hungary Phone 36 96 523046 Fax 36 96 523047 E Mail info hu
8. JESCU Water Sampling Station PM04 Measurement of free chlorine or chlorine dioxide EN Operation amp Maintenance Instructions Read these operation and maintenance instructions before start up To be held for future reference Dosing Liquids Conveying Gases Control Systems Contents 1 General and Safety Instructions eere 4 1 4 GONG al ara eek lie HB 4 1 2 Warning symbols used in this Operation amp Maintenance Manual 4 1 3 Qualification and training of personnel nnn 4 1 4 Important safety instructions sssini 4 1 5 Hazards due to non compliance with safety instructions 5 1 0 Sate OPSTAT E 5 1 7 Safety instructions for the owner operator enn 1 8 Safety instructions for inspection maintenance and installation work 1 9 Unauthorized modifications and production of spare parts 10 General notes of metruchon 6 WA SCONE OF deliVOny sto e o reete e e erben eere erba den 6 1612 DISDOSal ccrte tete tee nn 6 ACIDUM AA 2 1 General 2 2 Measurement of free chlorine and or chlorine dioxide 10 2 3 Measuring the pH value redox potentials and temperature 10 E UU E 12 Z3 Eyaraulic connection aaa ri tet te ete et err ee e LANANG 12 2 2 RE ll Ee 14 5 SettiNg Up ome
9. The rod is removed along with the clamping screw connection and the reference electrode is screwed in Prior to this the O ring supplied approx 30 cm is slid onto the reference electrode and serves as a centring device WARNING When installing the reference electrode the test water may not flow so that the glass ball is not flushed out of the chlorine measurement cell The pH and chlorine single rod measuring cells are fitted from above in the acrylic block WARNING the temperature sensor if necessary below on the side with a smaller clamping screw connection The cable s connection to the pH and redox single rod measuring cells has to be attached with great care Even the smallest amount of contamination or humidity leads to false measuring results INFORMATION The protective caps for the glass electrodes should be removed They are needed when the instrument panel is shutdown to stop the electrodes getting damp INFORMATION 5 2 Adjusting the test water quantity The needle valve on the acrylic block is set up in such a way that some water drains off in the overflow pipe Fluctuations in the system s pressure are to be expected for example when the pumps are turned off overnight so the needle valve has to be adjusted at the lowest system pressure so that enough flows through the measurement cell If sufficient test water flows the glass balls in the chlorine measurement cell start to rotate in the same way the floats come
10. Water drainage ssseseseeeeeeenenennennennnennnennnn ener 14 Index Operating manual PM04 27 28 Operating manual PM04 Index 15 Declaration of harmlessness Please copy and send in with your device Please display anon the outer packaging Declaration of harmlessness please fill out a separate form for each appliance We forward the following device for repairs Type of device Part no Order no Delivery date Reason for repair Medium used Properties irritant yes no corrosive yes no We hereby certify that the machine has been thoroughly cleaned inside and out before its dispatch and that it is free from health risk chemical biological and radioactive materials as well as having been drained of oil If the manufacturer find it necessary to carry out further cleaning work we accept the charge will be made lo us We certify that the aforementioned information is correct and complete and that the unit is dispatched in compliance with legal requirements Company address Phone Fax E Mail Customer number Contact person Date Signature stamp If not applicable please cross out Declaration of harmlessness Operating manual PM04 29 16 Revision This Operating Manual is valid for the following devices It contains all the technical information required for installation start up and maintenance Should you have any ques
11. ally and does not concur with the comparative measure ment Inflow water pressure too low the control block is dirty Blocked needle valve nflow nozzle of the chlorine measurement cell is very dirty The chlorine measurement cell s reference electrode is not centred in the hole The adjustment between the floating elements and the dry reed contact is wrong y reed contact de particular during excess chlorine measurement varying pH values strongly affects the chlorine measure ment disproportionately with the DPD manual mea surement even with lower pH the active chlorine in the water is not ascertained and so a higher value of free chlorine is simulated 22 Operating manual PM04 Fault analysis ilter in the test water line or in Install test water line with a larger cross section WARN ING observe delay time Install a measuring water pump see 4 1 Hydraulic con nection Installation Clean the filter set and or replace it Fully open the needle valve once and install again Clean the nozzle see 9 Maintenance Fit an O Ring on the reference electrode see 5 1 Sensors nstallation of the Align the upper catch for the floating elements see 9 Maintenance move poss reed contact in the clamping screw ion he dry reed contacts Stabilise the pH value in the water e g optimise control path control parameters 13 Spare parts potentiost
12. atic excess chlorine measuring cells single electrodes Reference electrode with 1 5m fixed cable and O Ring to centralise in the 41100060 acrylic block Gold electrode 34168 High grade steel electrode 34146 1 2 15 16 5 ie 25 27 20 5 26 19 3 i 20 21 22 23 Potentiostatic Measuring Cell see draft 13 2 Spare parts to assemble the electrodes of the potentiostatic measurement cell Fig 13 1 Spare parts for the complete multi control block 24 Spare parts Operating manual PM04 23 Spare parts for the complete multi control block Screw connection M12x1 5 78232 Alternative blank plugM12x1 5 78235 0 Ring d12x2 80058 eed contact with cable 2 5m 25070 33906 native blank plugM12x1PG 13 5 78883 ng d20 35x1 78 80001 Potentials adjustment pin 35177 Screw connection PG 13 5 33906 Control block 34168 Valve spindle 34182 Threaded connectors G 1 2 35709 Blank plug M12x1 5 78235 Slit nozzle 34184 0 Ring d7x1 80782 Upper filter withdrawal 34181 Filter tray 88093 Lower filter withdrawal 34180 0 Ring d12 4x2 62 80004 Coupling nut G 5 8 82087 2 ft Bonding connection d12i 82013 Hose connector for hose d6 18266 Hose clamp 8 15 82398 Reducer G 5 8a G1 2a 34166 Pipe clamps d25 13606 Hopper with hose connector d10 34167 O Ring 10x2 80384 WEN Floating elements d8 3x42mm 34145 Standpipe cpl with reducer and O Ring 35418 24 Operating manual
13. dity or excessive transition resistances 1 11 Scope of delivery IMPORTANT Please unpack the product and ordered accessories with great care in order not to miss any small parts Immediately compare the scope of delivery with the delivery note The cause of any discrepancies must be determined 1 12 Disposal Should the device need to be permanently taken out of operation please bear in mind that it contains electrolytic capacitors and must therefore be disposed of accordingly 6 Operating manual PM04 General and Safety Instructions 2 Assembly 2 1 General For hygiene reasons the drinking water or other water with which people come in direct contact has to be treated frequently with agents that kill off any micro organisms contained therein Chlorine or chlorine compounds are mainly used for this purpose as disinfectants A high level of safety is an absolute necessity for the user in this sensitive area therefore one uses devices that fully automatically monitor regulate and record the concentration of disinfectant To measure the amount of free chlorine or chlorine dioxide ampere metric sensors are fitted in the PM04 instrument panel 3 electrode systems for a potentiostatic operating mode Depending on the level of the assembly further water parameters can be mea sured such as pH value redox potentials and the temperature An electronic controller e g the TOPAX model which shows and evaluates the sensor valu
14. dry out the chlorine measurement cell The reference electrode and the pH and REDOX single rod measuring cell are to be disassembled and stored accordingly WARNING Be careful not to lose the glass balls when dismantling the electrodes Before the pH and REDOX and reference electrodes are dried out they must first be protected To do this the rubber protective cap and or storage tank supplied depending on the type of measurement section are filled with KCI solution and put on the electrodes The electrodes are stored vertically Operating Turning the unit off Operating manual PM04 17 WARNING INFORMATION 8 Maintenance The annual maintenance work is limited to a visual inspection of all the components and if necessary the cleaning of the control block with a replacement of the washers The service life of the single rod measuring cell depends on the operating conditions and the properties of the water e g corrosiveness grease etc They normally last about 12 to 15 months whereby a 50 storage time is counted on When re assembling the refer ence electrode ensure that the O ring is mounted on the glass shaft The gold and high grade steel electrodes can have a service life of several years depend ing on the corrosiveness and abrasiveness of the water They only have to be replaced when there are strong signs of wear e g very thin points on the gold wire If there are strong impurities on the surface of the
15. ension introduced causes measuring errors especially in the chlorine and pH measurements The sensors are directly connected to the measure ment amplifier via terminal blocks WARNING Measuring cables must not be laid parallel to or in close proximity to the power lines and or high voltage lines Interfering random agents distort the measurement Power lines and measuring lines may only cross at close proximity at right angles The permissible length for the measuring line is to be considered with the given sensor in mind It is of crucial importance to know whether it concerns high impedance e g pH value or low impedance e g surplus chlorine measurement cell measurements For high impedance measurements pay particular attention to ensuring that the connections and or plug socket are clean and dry and that the lines are not weakened by major kinks The shielded cables normally used for such measuring lines have to be used in the prescribed quality IMPORTANT If possible a continuous length should be used from the sensor to the measured value input Extending the cable with connectors and or connection boxes increases the risk of disturbances through contamination humidity or transfer resistance 14 Operating manual PMO4 Installation 5 Setting up 5 1 Installation of the sensors During the transport a plastic rod is inserted in place of the reference electrode this stops the glass ball from falling out of the measuring cell
16. equired to calibrate the REDOX measurement amplifier During the calibration the REDOX single rod measuring cell can be hung up on the mounting plates in the acrylic block WARNING Buffer solutions only last for a limited amount of time Once they expire the calibration of the sensors is unreliable Chlorine and or chlorine dioxide measurement cells Free chlorine and or chlorine dioxide are measured with the same measurement cell It is not necessary to Zero point calibrate with the potentiostatic measurement cell with 3 elec trodes This only needs to be done if either the zero point on the measurement amplifier is moved or if the measurement amplifier implicitly requires a zero point calibration The zero status of the measurement cell is achieved by disconnecting the cable from the gold electrode After the zero point calibration is complete the cable is connected again If the displayed value is set at a stable value then the slew rate calibration can be carried out This can take a few minutes To perform the slew rate calibration a water sample is taken from the pivot pipe on the overflow of the measurement cell and the content of the effective chlorine and or chlorine dioxide ions is determined manually For this purpose a photometer is usually used that works according to the DPD method The user manual for the photometer has to be followed to the letter and regard must be given to cleanliness Dirty cuvettes or finger
17. er the intake phase of a couple of hours they secure a long term stability of the chlorine measurement It is not necessary to clean the measuring cells by hand at specific intervals 2 3 Measuring the pH value redox potentials and temperature The receptacle holes for the pH and redox single rod measuring cells and a Pt100 temperature sensor are located in the transparent flow through casing The sensors are screwed directly onto the flow through casing The single rod measuring cells can be hung up with mounting plates on the acrylic block during calibration 10 Operating manual PM04 Assembly 3 Functions All of the following functional units of the instrument panel are located in a transparent multi functional control block potentiostatic chlorine measurement cells with electrode cleaning without zero point calibration pH and Redox single rod measuring cells depending on the design hydrostatic through flow with vapour lock separator for an even through current for the measurement cell Test water filter to protect the measurement cell from abrasive dirt Fine tuned valve to adjust the water current Flow through monitoring contact test water deficiency for the controller Potentials adjustment pin to discharge unwanted and disruptive foreign potentials Sample withdrawal for manual water testing when calibrating Functions Operating manual PM04 11 4 Installation If a measurement amplifier
18. es can be fitted directly onto the instrument panel This provides a compact measuring and regulating unit to control the actuating elements like the regulating valve or dosing pump IMPORTANT The test water channel is of crucial importance for perfect measuring results Therefore before installing carefully read through the information in particular regarding hydraulic installation IMPORTANT Assembly Operating manual PM04 7 pe 82 30 Controler optional IT HUT LAT LE LU J DB ri 670 p Redox 730 EB o RE an pa 08 30 20 20 280 A 320 Fig 2 1 Dimensional drawing of the PM04 8 Operating manual PM04 Assembly Depending on the design the sensors are fitted in a transparent multi functional control block In detail it concerns the following functions 11 10 7 4 12
19. iostatic connection is integrated in the corresponding measurement amplifier A specific D C voltage is set on the measuring cell by the potentiostatic connection in the measurement amplifier which polarises the measurement cell It is therefore not neces sary to zero calibrate this cell The current only flows with the addition of free chlorine and or chlorine dioxide This cur rent increases proportionally to the concentration The content of disinfectants is verified and the measurement amplifier is calibrated with the help of the comparative measure ment as per the DPD1 method The excess chlorine measurement is heavily dependent on the pH value Consequentially there is a need for the constant pH value of the water to be analysed to be at preferably pH 7 20 or lower Otherwise the same chlorine content would give different readings The condition of the chlorine in the water changes depending on the pH value and therefore so does the measurement signal At pH 7 00 approx 20 of the free chlorine is dissociated into hypochlorite CIO and at 8 00 pH already about 80 Hy pochlorite CIO only has a small disinfecting effect and therefore only produces a smaller current at the measurement cell The chlorine dioxide measurement only depends to a lesser extent on the pH value In the potentiostatic measurement cell of the PM 04 instrument panel rotating balls in the water current ensure the continuous cleaning of the electrodes Aft
20. is Operation amp Maintenance Manual contains vital information which may endanger people the environment and the dosing pump system if disregarded These statements are identified by the following symbols DANGER Refers to an imminent danger Non compliance can lead to death or serious injury WARNING Refers to a potentially hazardous situation Non compliance can lead to death or serious injury CAUTION Refers to a potentially hazardous situation Non compliance can lead to minor injury or property damage NOTICE or INFORMATION Appear in conjunction with safety instructions which may endanger the pump system and its operation if disregarded IMPORTANT Draws attention to supplementary information to make the work easier and ensure trouble free operation 1 3 Qualification and training of personnel The personnel employed for installation operation inspection and maintenance work must be qualified to do so The areas of responsibility competence and supervision of the personnel must be precisely defined by the owner Personnel who do not have the required knowledge must be duly rained and instructed If necessary this training can also be provided by the manufacturer supplier on behalf of the dosing pump s owner In addition the owner of the system must ensure that the relevant personnel are fully familiar with and have understood the contents of this Operation 8 Maintenance Manual 1 4 Important safety instructions When insta
21. jesco de Internet www lutz jesco hu Best Nr BA 42200 02 V02 Subject to technical changes Lutz Jesco GmbH 08 2007 Printed in Germany
22. lling and using this electrical equipment basic safety precautions should always be followed including the following 1 Read and follow all instructions 2 WARNING To reduce risk of injury do not permit children to use this product unless they are closely supervised at all times 4 Operating manual PM04 General and Safety Instructions 3 WARNING Risk of electric shock Connect only to a grounding type receptacle protected by a ground fault circuit interrupter GFCI Contact a qualified electri cian if you cannot verify that the receptacle is protected by a GFCI 4 Do not bury the cord Locate the cord to minimize abuse from lawn mowers hedge trimmers and other equipment 5 WARNING To reduce the risk of electric shock replace damaged cord imme diately 6 WARNING To reduce the risk of electric shock do not use an extension cord to connect the unit to the electricity supply provide a properly located outlet 7 Save these instructions 1 5 Hazards due to non compliance with safety instructions Failure to comply with safety instructions may endanger not only people but also the en vironment and the dosing pump system Non compliance with the safety instructions can lead to the loss of all entitlement to damages The following hazard in particular may arise Danger to people due to electrical mechanical and chemical effects Failure of system functions Danger to the environment due to leakage of hazard
23. metal these can be carefully removed with a fine emery cloth e g grit 800 The nozzle for the incoming flow of the potentiostatic measurement cell can be pulled out from the side with a M5 threaded rod to clean and then be installed again After dismantling the complete block the upper catch of the floating element has to be positioned again To check the switching function the electrical through flow of the dry reed contact is verified Floating elements above contact closed floating elements below contact opened If the switching function does not work after the upper catch has been adjusted then the dry reed contact can be moved to the fine alignment in the clamping screw connection INFORMATION Electro chemical sensors are wear and tear parts and are not covered by the warranty terms 18 Operating manual PM04 Maintenance 9 Technical Data Water test panel Mesh aperture of the filter 0 5 Water requirement approx 45 Temperature maximum 45 Water inflow mm hose connection 6 0 2 6 bar Water drain mm hose connection 10 drain in free downward incline m imensions 320x680x105 WxHxD Potentiostatic excess chlorine measurement cell Test range mg l 2 00 free chlorine 1 00 chlorine dioxide pH range 5 5 8 0 only for chlorine measurement Electrode materials Measuring electrode Backing electrode high grade steel Reference electrode KCI gel filling pH single rod measuring cell
24. or controller is installed on the instrument panel then it has to be mounted at such a height on the wall that the operator can read off the controller and operate the electronic automatic controller with ease The test water must be able to drain down freely from the panel Use the screws and washers provided to fix it to the wall These are purpose made with regard to the size and material of this application Install the instrument panel without mechanical tension The nuts are to be adjusted on the threaded rods in such a way that all four fixing points are all on one level 4 1 Hydraulic connection 4 1 1 Water inflow The test water travels through plastic tubes or hoses made of PVC or PE Under no circum stances may metal tubes be used as they can falsify the measurement through chlorine loss through shrinkage The test water must be carried to the instrument panel with as little deceleration as pos sible so that it is possible to control the water quality well Brief dead times are attained by using the shortest possible hoses and smallest possible cross sections 50 metre long pipes DN 6 already yield approx 2 minutes of dead time If the pipe s cross section were widened to DN 15 due to losses from friction in the pipes then the dead time increases to approx 10 minutes Therefore it is recommended for when there are great distances between the withdrawal of the test water and the instrument panel to build an installation as pe
25. ous substances 1 6 Safe operation The safety instructions in this Operation amp Maintenance Manual must be observed The owner is responsible for ensuring the compliance with local safety regulations 1 7 Safety instructions for the owner operator Leakages e g due to ruptures in the lining of hazardous substances e g toxic or abrasive must be discharged in such a way as to exclude all danger to people and the environment Statutory regulations must be observed Danger due to electric current must be excluded for further details refer to the German VDE standards as well as local regulations or chapter 1 4 1 8 Safety instructions for inspection maintenance and installation work The owner must ensure that all inspection maintenance and installation work is under taken by authorized and duly qualified personnel who have also studied this Operation amp Maintenance Manual The dosing pump must always come to a complete stop before starting any work on the pump The procedure specified in this Operation amp Maintenance Manual for shutting down the Dosing pump system must be observed without fail Dosing pumps or systems in contact with potentially harmful media must be decontami nated All safety mechanisms and guards must be refitted and reactivated as the work is completed General and Safety Instructions Operating manual PM04 5 WARNING gt WARNING AN WARNING IMPORTANT IMPORTANT 1 9 Unau
26. prints on the cuvette can cause huge errors in the measurements The value determined manually is immediately set in the measurement amplifier WARNING For the first run the chlorine and or chlorine dioxide measurement has to be calibrated again after one to two days During this time the surface of the electrodes adapts to the chemical and mechanical operating conditions 16 Operating manual PM04 Setting up 6 Operating When it is operating one must be careful that there is always some water flowing out of the overflow pipe If necessary the needle valve has to be opened a little further The measurement has to be checked every week unless there are local regulations stipu lating shorter intervals If need be the measurement inserts should be calibrated again In the same cycle a visual check should be made on the filters in the test water inflow If they are dirty they have to be cleaned and or replaced in order to avoid false measure ment readings through the loss of chlorine in the filters 7 Turning the unit off For short interruptions to the operation the water flow through the measurement cell should not be stopped An oxide coating forms on the outer surface of the electrodes the rotating balls remove this when the operation starts again It is then seen as a new inflow phase of the chlorine measurement cell For longer shutdown periods over several days we recommend to empty the water out of the control block and to
27. r the following diagram fig conduit with water pump gauge The use of a measuring water pump is useful if the test water is not flowing through with enough pressure at least 0 2 bar at the connection with the instrument panel Long periods of deceleration due to the great distance between the withdrawal point and the measuring panel can be avoided too by using measuring water pumps The pump pushes the test water over the long distance in a ring circuit to the instrument panel and only one component current is taken for the actual measurement Under no cir cumstances may the throttle valve be closed as otherwise very long deceleration periods hinder the control In addition the water in the pump is warmed up a lot and can lead to measurement errors It is helpful having a manometer in the circuit ring when adjusting the throttle valve When withdrawing test water see fig 4 2 the applicable regulations have to be observed When withdrawing test water from a pipe it must be done from the line s centre as shown in the diagram 12 Operating manual PMO4 Installation o ZB 50m DN15 OY E Fig 4 1 Conduit with water pump gauge gt C Fig 4 2 Water withdrawal gauge Installation Operating manual PM04 13 WARNING
28. rement cells ith gold high grade reference electrodes and balls to clean the electrodes single rod measuring cell ith 1 50cm measuring cable dox Electrode ith 1 50cm measuring cable M 04 to measure free chlorine and or chlorine dioxide pH value REDOX 42200014 temperature entiostatic chlorine measurement cells ith gold high grade reference electrodes and balls to clean the electrodes single rod measuring cell ith 1 50cm measuring cable dox Electrode ith 1 50cm measuring cable temperature gauge Pt100 ith 2 5m connection cable Reference electrodes for the potentiostatic measuring cell 41100060 4 11 pH single rod measuring cell with N cable cap screw PG 13 5 1100004 and separate connection cable Redox single rod measuring cell with N cable cap screw PG 13 5 41100011 and separate connection cable Temperature gauge Pt 100 with fixed cable 2 5m 41100022 Special measuring cable with N socket link for pH value and REDOX single rod 78103 measuring cells 0 60m long for instrument panel Order documents Operating manual PM04 21 EET EEEE PSvepBletveve wi U 12 Fault analysis Type of fault Balls in the chlorine measure ment cell rotate too slowly and or floating elements do not float Floating elements float up but the dry reed contact does not switch to channel pass The display of the connected measurement amplifier varies erratic
29. thorized modifications and production of spare parts The device may only be modified or converted in consultation with the manufacturer Genuine spare parts and accessories authorized by the manufacturer ensure greater safety The use of other parts can void the liability for the subsequent consequences 1 10 General notes of instruction Measuring cables must not be laid parallel or close to power supply or high voltage current lines Interferences would mutilate the measurement At close distances power supply and measuring lines may only cross at a 90 angle The admissible length of the measuring cables must be adhered to with regard to the sen sor used It is of decisive importance whether high impedance e g pH value or low im pedance e g free chlorine sensor measurements are carried out In the case high imped ance measurements make sure that the plug connections are clean and dry plug and the lines do not become brittle due to sharp buckling The screened cables normally used for such measuring lines must be handled according to the prescribed quality Screening may only be connected to ground at one end of the cable preferably at the controller Interface lines must be twisted and screened see recommended cables IMPORTANT If possible a continuous cable from sensor to measuring input should be used An extension of the cable by plugs or terminal socket increases the risk of dis turbances due to contamination humi
30. tions or require further informations regarding these operating instructions please contact the manufacturer or its official national representative 30 Operating manual PM04 Revision 17 Warranty Relays for the main voltage switch have to be protected from damages through demolishing sparks by a wireless quenching circuit Please copy and send with the device If the device breaks down within the period of warranty please return it in a cleaned condition with the complete warranty application filled out Sender COMPANY aaa ANAN GMA ALA PAG nl Ee EE Lutz Jesco order mp Delivery date ern rennen tnnt DOVICG AM SIR M naaa Nominal capacitynominal pressure sssseseeeneeennennnennnennennennnennnnen nnne nnns RE ele NEE Type of fault 1 Mechanical fault 2 Electrical fault premature wear loose connections such as plug connector or cable wear parts operating elements e g switches buttons breakage other damage electronics corrosion damage in transit 3 leaks 4 No or inadequate suction connections defective diaphragm dosing head other Service conditions of the dosing pump Duty peroid approx operating hours Please describe the specifics of the installation and provide a simple diagram with details of the material diameter length and levels Warranty Operating manual PM04 31 JESCU Lutz Jesco GmbH Am Bostelberge 19 30900 Wedemark

Download Pdf Manuals

image

Related Search

Related Contents

Autoclave 8 litros usb  MODE D`EMPLOI DU RÈGLEMENT  ハイスロットルセット 取扱説明書  Le Nouvel Observateur 45  HI 839800 Aquecedor de Tubos de Ensaio Série 2008  Sony DRX-510UL User's Manual  Sound Bar  取扱説明書  D BEDIENUNGSANLEITUNG LCD−8110 Wissenschaftlicher  KS-M100 取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file