Home
08. Response to Clarification Letter
Contents
1. Total Xylene Methyl Tertiary Butyl Ether Naphthalene 6 With reference to question six 6 on the request for further clarification please see APPENDIX 4 for the flyer and relevant signatures APPENDIX 1 REVISED SCOPE OF WORKS AND PROJECT SCHEDULE Trinidad amp Tobago National Petroleum Marketing Company Limited NPMC STARLITE CONSTRUCTION SCHEDULE i CIVIL WORKS 9 days SO y Em Preliminary Works 21 days Mobilsation 7 days a a Hoarding 7 days 3 5S Demalition 7 days 4 k Building Works 67 days Setting Out 6 days E W Piling 6 days 7 9 Fabricaton of Reinforcement and Formwork 14 days 8 10 Jf Pile cap formwork 2 days 9 nj Placement of reinforcement Pile cap 2 days 10 14 Cast Pilecap up to underside of Grd Beams 6 days 11 13 Install Services in foundation Electrical and Plumbing 3 days 12 14 zs Backfill excavated areas to underside of Grd Beams 2 days 13 15 f T Ground Beam Formwork 4 days 14 16 T Placement of reinforcement Grd Beam Slab and Columns 4 days 15 iw Jj Cast Insitu Ground floor slab 1 day 16 18 Placement of Column reinforcement 2 days 17 19 5 Column Formwork 3 days 18 20 Cast Insitu Columns 1 day 19 21 p Suspended Beams and First Floor Slab Formwork 4 days 20 22 Cast Insitu Suspended Beams and First Floor Slab 1 day 21 2 Blockwork 4 days 22 Constructon 2 days 23 25 Plumbin
2. Any soil contaminated from any releases would be E E collected and re mediated by a competent service provider Copies of all MSDS would be available on the construction site EROSION AND SEDIMENT MIGRATION Sediment retention measures would be utilised prior to the commencement of any earthworks to minimise the amount of sediment migrating off site including but not limited to e detention basins and silt traps placed along drains e Regular inspection and maintenance of all sediment control measures EXHAUST EMISSIONS FROM VEHICLES All equipment and vehicles used on site will be well maintained SOLID WASTE GENERATION All potential hazardous and solid waste would be collected and disposed by a competent service provider LEAKING UNDERGROUND STORAGE Double walled fibre glass tanks equipped with TANKS leak detection sensors SPILLS ON FORECOURT Fuel absorbents and fire equipment will be kept on forecourt Nb An emergency crisis management team is in place with well trained members Work will proceed under the direction and guidance of NP HSE MEEA Operation section Trinidad and Tobago Police Service and Trinidad and Tobago Fire Services 2 COMMENTS STARLITE SERVICE STATION DIEGO MARTIN FLYER RECEIPT LOG SHEET T maq usar a TT Mele eel Sea AETA PAS oe e ca osm ERI hy 592776 V N 2 GG 11 SU
3. 9 9 4 Close Store Check if power failure is isolated to the store by checking neighbouring buildings If trouble is within your store Check the electrical panel for a blown fuse or a breaker that has tripped If the electricity is out throughout the neighbourhood contact T amp TEC Always ensure that there is a working flashlight at all times Do not open the cooler doors ice cream freezers or refrigerators until the electrical service is restored If you are without electricity for more than 15 minutes notify your Manager In addition make arrangements to secure perishable items e g ice cream milk so that merchandise can be moved in order to prevent spoilage All personnel are expected to know the location of fire extinguishers and how to use them If a fire breaks out in the store and it is safe to do so the Associate on duty should attempt to put out the fire with the dry chemical extinguisher available in the store If a fire breaks out in the store evacuate all customers and do not permit any additional customers to enter Do not lock the doors to the store Keep emergency numbers posted nearby Fire Services Ambulance Emergency Health Services EHS the nearest Regional Health Authority Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 9 Fires continued Electrical Fires nho Ne 9 9 6 9 9 7 9 9 8 9 9 9 If th
4. 10 Certification for Natural Gas use Senay rf Ye A compressor and it s all fittings shall be tested for compliance of relevant standard suitable for CNG use by a competent person agency prior to installation Dispensing Unit Perr Dispensers will be installed on a suitable foundation observing the minimum safety distances Dispensing unit will be protected against possible damage by vehicular movement The flexible hoses fitted on the dispenser will mechanically and electrically continuous The design materials and construction of hoses will be suitable for CNG and will withstand not less than four times the maximum working pressure of the system All rigid piping tubing fittings and other piping components will conform to the recommendations of ANSI B 31 3 All the elements of piping would be designed for the full range of pressures temperatures and loading to which they may be subjected with a factor of safety of at least 4 based on the minimum specified tensile strength at 20 deg C Gaskets packing and any other materials used will be compatible with natural gas and its service conditions All the piping and tubing will have minimum turns with adequate provision for expansion contraction jarring vibration and settling Exterior piping may be either buried with suitable corrosion protection or installed 30cm above the ground level with supports and protection against mechanical and corrosive damage Rigid pipelines
5. CYLINDERS TO VENT ALL THE SYSTEM OPEN THE PURGE VALVE OF THE BLOW DOWN AFTER PERFORMING ANY MAINTENANCE THE ENTIRE SYSTEM MUST BE PURGED WITH GAS PRIOR TO OPERATION TO AVOID A POTENTIALLY EXPLOSIVE AIR GAS MIXTURE TRAPPED GAS PRESSURE CAN PRESENT A PERSONAL SAFETY HAZARD HEN YOU MAKE SOME TECHNICAL SERVICE WORK IN A WINDY AREA AND FREE OF SPARK P DO NOT BREATHE GAS WHEN YOU VENT tA rA iii KA emm iii s 6 MAINTENANCE 6 1 Lubrication See Fig No 6 FIG No 6 Lubrication is vital for the good operation and long useful life of the compressor and therefore requires special care since the equipment operates under high Pressure and Temperature conditions which could jeopardize some of the equipment s mechanical parts Note that a good lubrication will allow A Reduction of mechanical friction and therefore power consumption B Reduction of wear and tear by increasing the operational life of the equipment and consequently reducing maintenance costs C Prevention of corrosion in contact parts D Maintenance of friction surfaces in good conditions allowing work under mechanical tolerance conditions The lubrication system is designed for such purpose therefore the operator will have to bear the following considerations in mind 6 1 1 _ Features Mineral oil SAE 40 Control Amount of oil in sump 8 Lts Oil Change every 1000 hours Filter Change every 1000
6. 2 12 3 3 12 5 4 12 3 5 145 6 12 3 4 12 5 8 14 5 9 SMOKING OPEN FLAME is prohibited at ALL outlets The USE OF CELLULAR PHONES is prohibited at ALL outlets DO NOT SIT on the fire extinguisher or the sand bins which are clearly identified DO NOT STAND in the way of motorists as they approach dispensers DO NOT EXPOSE or KEEP large sums of money on your person Know where EMERGENCY SWITCHES are located BE CAREFUL when handling 20 Ib LPG cylinders Check for LEAKS using the soapy water test e Be aware of a SAFE AREA on the premises which should be upwind of the site Motorists must SWITCH OFF their ENGINES while filling their tanks Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 6 PORTABLE FIRE EXTINGUISHERS 12 6 1 12 6 2 12 6 3 12 6 4 12 6 5 A l portable fire extinguishers at Service Stations are all purpose fire extinguishers This means that they are able to extinguish all types of fires Portable fire extinguishers must remain in their designated positions and must be easily accessible All employees must be familiar with the location of the fire extinguishers All fire extinguishers smoke detectors and alarms must be checked periodically for damages Report any defects to the NP Sales Representative as soon as possible for corrective action To operate the Portable Fire Extinguisher 12 6 5 1 Remov
7. Assuming and announcing overall command Confirming the nature of the emergency Activating the Emergency Operations Centre as necessary Managing response activities to ensure effective performance of all parties Confirming the welfare of staff including those who require initial first aid treatment and any further necessary medical care for the injured Directing activities to properly protect human life and the environment and to keep the situation from escalating Activities include evacuation search and rescue first responder fire fighting safety of personnel and equipment request for first aid Ensuring timely liaison with and involvement of other occupiers required personnel clients and governmental authorities Managing media press and public relations and Determining when to stand down the emergency and sounding of the All Clear Starlite Service Station Emergency Response Plan 2014 Post Emergency duties Arranging debriefing post emergency survey post emergency investigations completion of required reports post mortem critique Pre Emergency duties Ensuring a current Emergency Response Plan Manual Developing the plan to include emergency procedures evacuation routes and emergency personnel roster Ensuring the availability of all fire and emergency equipment is in a state of readiness at all times Providing employees with detailed information regarding
8. Do not wait to see if fight stops It is the duty of the Police to stop the fight and to provide any necessary protection the police that there is a fight in the store them the store name phone number and address 9 4 Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL Incidents of Violence Cont d 9 4 9 Extortion Situations Extortion is the use of physical threat to force a person to comply with the extortionist s wishes Extortion efforts directed at NP Stores Associates may take the following form If threats are received via phone calls or in person contact the police If an associate receives a call such as described above the associate should take the following action 9 4 9 1 Tell the caller you will comply with his demands 9 4 9 2 Call the police inform them of the call and request that a patrol come to the store Call the NP Security and request that an officer be dispatched to the site 9 4 1 3 DO NOT COMPLY WITH THE CALLER S DEMANDS 9 4 1 3 The most important consideration in this type of circumstance is to ensure the safety of sales associates and customers Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 5 Robberies Break Ins Assaults and Vandalism In the event of a robbery for your safety and the safety of others the following procedures should be followe
9. FRANCHISE MODEL MANUAL 10 4 Conduct during Investigations 10 4 1 10 4 2 Associates should co operate fully with law enforcement officers conducting investigations of incidents on store property Associates should comply with all reasonable requests from law enforcement officers and avoid any confrontation or arguments If an associate has a question about a law enforcement officer s actions he she should report the matter to the Manager Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 1 0 OTHER SECURITY AND SAFETY ISSUES 11 1 Weapons 11 1 1 ITIS A DIRECT VIOLATION OF NP POLICY TO USE CARRY OR CONCEAL A WEAPON OF ANY TIME WITHIN THE WORK SETTING NO EXCEPTIONS WILL BE TOLERATED 11 1 2 A weapon is defined as anything that can be used for fighting Ke 11 2 2 or to cause injury Guns knives sticks clubs tire irons mace baseball bats etc are not permitted in any NP property 11 2 Company Prosecution NP will institute proceedings and prosecute offenders responsible for any criminal acts against the Company These offences include robbery burglary theft embezzlement criminal damage and written threats to commit such acts In most serious criminal offences the police investigation will often result in criminal charges being directly filed against the suspect s by the local district or prosecuting attorney The store manager and as
10. Hospital All Departments Emergency Health Services Environmental Management Authority National Emergency Management Agency NEMA Water amp Sewerage Authority St Joseph Trinidad amp Tobago Electricity Commission ODPM END 637 9222 990 623 4343 640 4343 990 637 3860 999 645 4673 645 2640 623 295 811 628 8042 44 45 623 2079 8004 645 8573 643 1974 311 Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL EMERGENCY SITUATIONS HEALTH SAFETY SECURITY AND THE ENVIRONMENT 9 1 EMERGENCY SITUATIONS 9 1 1 Robberies at Service Stations 9 1 1 1 During A Robbery 9 1 1 1 1 During a robbery it is important to stay as safe as possible by staying calm and giving the robber what he asks for Do not try and prevent the robbery stop or chase the robber or confront him in any way Your primary role in the situation is to keep yourself and others as safe as possible 9 1 1 1 2 As soon after the incident as possible write down a description of the robber or robbers and everything that happened Look for distinguishing characteristics that will assist in identifying the criminal 9 1 1 1 3 As much as possible try and protect the crime scene by not touching areas that the robber might have touched 9 1 1 1 4 Keep the store locked and discontinue serving customers until the police have concluded their investigation and left the premises Do not estim
11. and including termination 10 1 2 Ask customers for exact change or to pay with the smallest bills they have ALL CASH SHOULD EITHER BE IN THE CASH REGISTER DRAWER OR IN A LOCKED SAFE Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 10 2 CIT Pick Up 10 2 1 10 2 2 10 2 3 10 2 4 10 2 5 10 2 10 2 6 The station s vault is to be opened in the presence of the security officer and two service station employees e g station manager and supervisor or supervisor and c store associate All packets in vault must include safe drop slips reflecting the contents of the packet All packets in vault must be colour coded to reflect the shift on which the money was deposited The security officer must verify the number of packets being placed in the deposit bags No more than thirty packets must be placed in a deposit bag After the packets are counted and placed in the respective deposit bags i e one deposit bag per shift the CIT provider must then check vault in the presence of station employees to ensure that all packets have been removed and placed in the respective deposit bags before bags are sealed Information on deposit slips must be written on deposit bags reflecting the following information Station Name To Delivery Address Date Of Collection Number Of Packets Amount Said To Contain Trinidad amp Tobago National Petrol
12. hours Oil level in compressor viewer OIL LEVEL INDICATOR 12 MAX MIN MAXIMUM AND MINIMUM INDICATED ima pang mami a m i an one p Dar p et ae r THE OIL LEVEL MUST BE CHECKED WITH THE COMPRESSOR RUNNING VENT THE BLOW DOWN 2 OR 3 TIMES PER DAY POE OAT OO LOLS URIS Ds FOE PE 7 Wa m Omm o 4 IR AD OD DO NOT REUTILIZE THE OIL EXTRACTED FROM THE PURGE ARA Tama Wm PEP am CAO S nw EM C WT TER OP iZ t D Til 6 2 Radiator Cleaning The cleaning of the radiators is very important for proper operation of the compressor heat exchangers GAS AIR Therefore pressurized air must be injected upstream weekly preferably with the fan running in order to eliminate the dust or any other material that can stick to the diverter plates of the heat exchanger This will increase its efficiency and thus produce an outlet gas at room temperature THE HOT COMPRESSED GAS TEMPERATURE SPECIALLY FROM THE DISCHARGE AREAS IN THE CYLINDERS AND IN THE FRICTION AREAS COULD CAUSE IMPORTANT BURNINGS TURN OFF THE UNITY AND LEAVE IT CATCH COLD BEFORE MAKING MAINTENANCE WORKS IN THOSE AREAS THE COUPLING PROTECTOR MUST BE ALWAYS IN ITS POSITION FOR SAFETY REASONS NEVER START UP THE COMPRESSOR WITHUOT SET UP THE COUPLING PROTECTOR IT IS FORBIDEEN TO EXTRACT THE COUPLING PROTECTOR BY A NOT QUALIFIED OPERATOR FOR THE MAINT
13. jo Aveda si SUL P9 059J we VS erby 8 2 Compressor Electrical Panel rs 3581 rower aan ids a feest ee T PTET NSD 4515 Guang 353 SA naani Nitang aims mt u NY 0000 tt9 1i 00 j 06141 S39V1S LO3NOO 103810 ee 8 BOLON 918193713 VHIOV HOSS3UdWOO mE Sy sg proe gboor moo 20120 02 I3NYd 1OHLNOO HOSS3HdWOO eue paugueg gin NOU diti9S30 33435 HAW 1 AYN sil TING E r Anna paman rae 009 Ate oT s ee ee ee me BE ot ITT NCES TSB SS TPES EC awe s et n t3 E e mis ERES en JEB ic i s 6 8 21 90 iine E EU F S a usaq h He oe z a E amp Jinu sms a wv GEZ HOLMS 24755244 30 4013 st s 1 L7 ot s enims 4019 ANI OYINA WHER LL Lj su n cm BC LH PE n Fre 1 t Sos sr Sa acl 4015 AINIDUINI JAWA QONG10S TWWININ cx LI zz z 4019 420309303 JAWA QION3105 25 4 oe pe EF lon LN U35N34510 MUNIN Fe m ux c ep H 02 j onem 202903490 ISHA H f ot tu 012 Gb cm 6 et mesa LN V3SN34 MUNIN z ex s LL ot gi J rmum LN VISOSSIO ISHA FI O 1
14. must easily allow the fuel nozzle to enter when filling and must have an air tight screw cap Be manufactured under international standards including but not limited to ASTM USDOT UL and CSA As such the following are examples of items that are NOT suitable for receiving fuel e Beer soft drink cans e Buckets of any type e Empty household cleaning bottles bleach bottles etc e Soft drink Jaliter bottles e Styrofoam containers e Water bottles Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 9 Health Issues To ensure that Forecourt Attendants do not injure their health on the job they must follow these guidelines 12 9 1 123 4 12 9 3 12 9 4 12 9 5 12 9 6 Always WASH HANDS before eating DO NOT EAT at the fuel pumps STAND UP WIND while dispensing fuel DO NOT LAUNDER your working uniform with home 8 clothes CHANGE UNIFORM as regularly as can be permitted PRACTISE PERSONAL HYGIENE Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 10 Environmental Issues 12 10 1 Absorbent materials must be used on all fuel spillages Never wash fuel with water into public drains Sand from the sand bins can also be used also dispose of waste in the appropriate bin bag etc and tag or identify it 12 10 2 Oily rags and empty oil containers are to be placed in the garbag
15. the Emergency Response Plan Ensuring training activities for adequate performance of duties during an emergency Ensuring knowledge and location of Assembly Points emergency exits and related routes used for evacuation process Ensuring identification and location of any physically challenged person s who will require special assistance during emergencies Liaising with and involvement of upper management contractors and external organizations as necessary Maintaining plan current with changes in facilities emergency wardens and personnel e Plan is to be reviewed whenever changes occur after any major incident and certainly at least annually Ensuring that management is provided with current copies of this Plan Following up on the appointing of emergency wardens Ensuring availability of emergency response equipment and supplies Conducting hazard identification risk assessments to ensure appropriate control measures and Answering any questions regarding this plan or providing further information or explanation of individual duties under the plan Starlite Service Station Emergency Response Plan 2014 Emergency duties Undertaking initial assessment Directing emergency activities Determining required response actions Arranging for any medical treatment for the injures as necessary Providing for assistance to disabled or impaired employees Ensuring that the Contractor Safety Repre
16. white Muster Point sign attached to a utility pole At the sound of a klaxon horn all workers will down all tools and proceed to the main gate in an orderly fashion The security guard stationed at the main gate will stop all traffic and direct the workers to proceed to the muster point There all relevant safety representatives will do a head count to account for every worker 2 Crisis Management Team members make a visual sweep of their respective areas for missing personnel exit the compound and proceed to the designated Muster Point for a head count 3 Ahead count is taken and verified Any missing persons will be immediately reported to the NPMC Injured persons are attended to until emergency personnel arrive 5 At the end of the evacuation Crisis Management Team members to escort employees into the compound upon receiving authorization from emergency personnel Starlite Service Station Emergency Response Plan 2014 OCTETS Bomb Threat Fire First Aid Spill and Natural Disasters Procedure 1 As outlined in NPMC Francise Model Manual Procedure Starlite Service Station Emergency Response Plan 2014 Roles and Responsibilities of Key Personnel HSE Manager or Alternate The Crisis Management Team is headed by the NPMC HSE Manager and or the Capital Project Manager Emergency duties Reporting to the Emergency Operations Centre Receiving briefs from the stand in HSE Officers
17. 1 Main Engine 4 2 Fan Engine 4 3 Electrical Panel 4 4 Compressor Panel 5 OPERATION 5 1 General Considerations 5 2 Start Sequence 5 3 Stop Sequence 5 4 Emergency Stop 6 MAINTENANCE 6 1 Lubrication 6 1 1 Oil 6 2 Radiator Cleaning 6 3 General Inspection and Maintenance 6 4 Pneumatic Shock Absorbers 6 5 Power Cut Prevention 7 FAILURES DETECTION AND CORRECTION 8 DRAWINGS 8 1 Connections drawing No 8 0830 A I Rev 0 8 2 Compressor Electrical Panel drawing No 9 0232 U Rev 0 8 3 Compressor electrical wiring Drawing No 8 0910 A Rev 0 REVISIONS READ CAREFULLY THE FOLLOWING MANUAL BEFORE START UP THE MACHINE THE COMPRESS GAS UNITYS ARE COMPLICATED AND DANGEROUS MACHINES FOR THE PEOPLE THAT DON T HAVE THE TRAINING AND ACQUAINTED WITH IT FUNCTIONS BEFORE STARTING THIS UNITS 1 READ AND STUDY START UP AND SHUT DOWN INFORMATION FOR BOTH PACKAGE AND COMPRESSOR CAREFULLY 2_ A GAS AIR MIXTURE UNDER PRESSURE CAN EXPLODE YOU CAN BE SEVERELY INJURED FOR KELLED MAKE SURE THE COMPRESSOR IS SUFFICIENLY PURGED OF ANY EXPLOSIVE MIXTURE BEFORE LOADING 3 AFTER COMPLETING THE ABOVE BEGIN PROPER STARTING PROCEDURE DO NOT ATTEMPT TO START UP UNIT WITHOUT REFERING TO THIS MANUAL SECTION 5 2 START SEQUENCE AND 5 3 STOP SEQUENCE IT IS ALSO ESSENTIAL TO REFER TO THE PACKAGER S OPERATING MANUAL DO NOT MAKE ANY TYPE OF MAINTENANCE OR REPAIR WO
18. 1 868 625 1364 ext 260 or 1 868 759 7467 NPMC HSE Officers NPMC Environmental Co ordinators NPMC Capital Projects Manager NPMC Project Officer sp Starlite Service Station Emergency Response Plan 2014 Emergency Response Guidelines for None Working Days and Public Holidays Ensure that the building is evacuated and that all occupants including visitors have been accounted for Notify senior management Undertake First Responder emergency action if possible Request assistance from emergency responders such as Trinidad amp Tobago Fire Services Emergency Health Services Trinidad amp Tobago Police Service Office of Disaster Preparedness and Management ODPM Prepare to facilitate the Fire Service and any other responding agencies Emergency Response Procedures General Evacuation On the Starlite Service Station s Project minor hoarding works are the scope of works being conducted at this time and as such NPMC has prepared an emergency evacuation for just one area Once the klaxon horn is sounded or an evacuation has been ordered the Crisis Management Team immediately initiates this Emergency Response Plan and any associated policies and procedures 1 Crisis Management Team members escort all their personnel to the designated assembly areas in an orderly fashion e Ground evacuation procedures are as follows One muster point will be established This muster point is will be clearly marked by a green and
19. 13 1 1 Be alert to unsafe conditions that may cause accidents on the store premises such as i Slippery floors Broken glass iii Obstructions in aisles and walkways iv Stacking heights v Poor lighting vi Water leaks vii Mechanical or electrical malfunctions 13 1 2 Report to the Maintenance Department and to your store manager any unsafe conditions that require maintenance work 13 1 3 Know where emergency phone numbers are kept and posted 13 14 Keep all exits free of obstructions Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 14 0 BUSH FIRES In case of a bush fire all stores will provide service up to the last minute possible without endangering personnel or our customers Service to customers will be resumed immediately after all danger to personnel has passed The Franchisee and Area Manger will be in communication during any bush fire He she will advise when to close and leave the premises The following steps should be followed in the event of a bush fire 14 1 Be aware of where your store s first aid kit is located and make sure it is easily accessible The kit should be kept fully stocked with first aid and medical supplies 14 2 Notify the Area Manager as soon as possible 14 3 Ifa bush fire occurs and it is affecting the premises and it is safe to do so the associate on duty should attempt to put out the fire with the dry chemi
20. 65 ojm Eto 1 4 woverserc2 VOLON 2019313 NIYA VO1S294 SHA OL boto 86 ot vow 6x LL 91 eje J 91 VOLON 2012378 N S9 34 ee MC TIA 2 Gi waw sex 8x n n pi joa mm WALUYIS 1305 buto 9 9 oo t LL ot sao FT ot 12x ux zi l tones MUNIN TI e MUNIN 92 du jam iu 11 MUNIN si munan 9 oi Jaan MUNIN LH t MUNIN Yo 8 tr 6 pama Suwanee 1M HiMY3 EH t Kiley x 9 ef 9 g jun rem imi amm 3 MM Be sA a CUA WE L nnaman gt nee ees za QA m 3 e SE es pee x 02 FL t FP t ot t ii ex E 2 LL z E gt 1yCued eq Jo gt g red saga p zuougneun ue YS jo u dod sy YS 8 3 Compressor Electrical wiring JILIWVIO SYIM SHL H31V389 3H1 3ONVISIO 3H1 H31V3UD 13NVd OL HOSSI3YdWOD WOti3 SONVLSIC 40 papjajys usap 21 901291024 USON U Kajes 2 5 E tdl OPL 59 8 9 80 SUBJ OL Z Hdl uu y x p op ue4 Bujjo09 Z 1 xp JOON 2112913 1015141 0 X pazjurappo O wwo
21. CP CNG Storage 1 x 10kg DCP Cascade refueling area 1 x 10kg DCP MCC Electrical installation 1x4 5 kg CO2 NGC COMPRESSED NATURAL GAS CNG FILLING STATIONS EMERGENCY ACTION PLAN GUIDE NGC COMPRESSED NATURAL GAS CNG FILLING STATIONS 2012 EMERGENCY ACTION PLAN GUIDE nak OBJECTIVES The safeguarding of lives the environment and property is always a priority at NGC It is important to therefore understand the characteristics of Natural Gas and Natural Gas Vehicles NGV in order to manage emergency situations While no one can predict the nature of NGV emergencies the information contained within this Emergency Action Plan Guide should e Provide safety specific guidelines for natural gas emergencies e provide essential information necessary to make informed decisions at the scene of the NGV emergency CNG HAZARDS TO PERSONNEL A leak from the high pressure side of a CNG fuel system could produce a high velocity cold gas jet As the jet travels the concentration of the gas drops as it mixes with ambient air A release could cause injury from flying debris the high jet momentum or exposure to the extremely cold gas near the release point The high velocity jet can create high intensity noise thereby alerting emergency response personnel to a gas leak problem and or its location If the gas jet comes into contact with a spark a jet fire or torch fire at very high temperatures can cause serious burns
22. E sa yas E NANA Ne ut 1 BRENNEN sss HB
23. ENANCE OF THE COMPRESSOR WITHOUT THE PREVIOUS DESCONECTION OF THE FEEDING FOUNTAIN 6 3 General Inspection and Maintenance EVERY EVERY EVERY EVERY EVERY EVERY CONTROL DAILY 15 1000 4000 8000 16000 32000 DAYS HOURS HOURS HOURS HOURS HOURS Control Compressor Oil Level Manually Drain the Condensate of Yes Separators Perform a Visual Inspection to Detect Yes any Oil or Gas Leak Control Hot Oil Pressure 35 to 40 Yes Psig Vibrations Record All Pressures and Temperatures ina Yes Daily Notepad e Gas Air Change Oil 8 Lts Normal SAE 40 Supervise that all the stops of the machines are working Change Oil Filter Control all machine locks ano benal instruments Testpipesealing Pees vibration sensor Check rings in all E Jm necessa Change rings in last stage yis EVERY EVERY EVERY EVERY EVERY CONTROL DAILY YS 1000 4000 8000 16000 32000 HOURS HOURS HOURS HOURS HOURS Change packings on both sides of compressor S MEM stages kz link crankshaft Change crankshaft bearings Change Cross Head Bushings joints mere gears Change if necessa of all stages change if Yes necessa Verify light wear and tear between cross head and cross head quide 6 4 Pneumatic Shock Absorbers Verify that the Pneumatic Shock Absorbers always maintain air pressure so that the compressor never makes co
24. IC PANELS SHOULD GOES IN A PROTECT ZONE OF HUMIDITY AND THE TEMPERATURE OF THE EMPLACEMENTS MUST BE LESS THAN 50 C 7 FAILURES DETECTION AND CORRECTION POSSIBLE CAUSE SOLUTION FAILURE Inlet pressure low Outlet fuse Y1 terminal B2 may Change fuse be broken The coil of three way Skinner valve is burnt short circuit Call Technical Service The three way valve does not work properly does not move the actuator Call Technical Service The servo control valve of the measuring bridge is closed Check electrical power and its coil Compressor oil Oil leak in the circuit Visual inspection of oil circuit If pressure low there is any leak tighten connectors Start compressor again just once and verify that oil pressure High viscosity oil at low increases temperature Excess Vibration High sensitivity of vibrations Remove sensitivity from sensor sensor Turn sensitivity knob towards LESS side one division of the scale Set the vibration sensor properly Vibration sensor is loose High inlet pressure Verify inlet pressure within normal values 8 bar Ist stage Pressure high Suction valve in 2nd stage is broken Call Technical Service FAILURE POSSIBLE CAUSE SOLUTION 2nd stage High inlet pressure Verify inlet pressure within normal Pressure high values 8 bar Suction valve in 3rd stage is Call Technical Service broken Gas temperatura Outlet fuse Y4 Term
25. MPRESSOR RUNNING will appear on the display 2 Once the start up ramp is finished estimated in 12 seconds a value that is set in the soft starter the solenoid that controls the depressurization valve Y3 outlet of terminal B2 starts running closing this valve and starting compression The phrase Compressing will appear on the display The controller will check at all times that every variable is working properly The abovementioned times are entered into the program by AGIRA S A personnel during the implementation 5 3 Normal Stop Sequence When the compressor reaches its maximum discharge pressure 200 th bar the 3 stage manometer switch will send a signal to the P L C which will cause the latter to start the stopping sequence described below 1 The inlet valve Y1 outlet of terminal B2 is closed The engine keeps rotating which will cause the existing gas to be consumed in the inlet tank and the consequent inlet pressure drop The phrase COMPRESSOR STOPPING will appear on the display 2 When pressure reaches approximately 1 Bar the compressor will stop Said configuration is set by AGIRA personnel by modifying in the program the time the compressor will take to stop after the valve is closed 3 Once the compressor stops the pressurization valve Y3 outlet of terminal B2 opens and as said valve is connected to the inlet Blow Down pipe pressure is equalized in all stages The equalized pressu
26. NSA Les Nz NP House National Drive Sea Lots Port of Spain Trinidad V rs T 868 625 1364 TRINIDAD amp TOBAGO NATIONAL PETROLEUM F 868 627 4028 MARKETING COMPANY LIMITED W www np co tt June 06 2014 Manager of Technical Services The Environmental Management Authority 8 Elizabeth Street St Clair 8 PORT OF SPAIN Attention Mr W Rajkumar Dear Sir RE NPMC STARLITE DIEGO MARTIN CEC REFERENCE NO CEC3725 2012 We refer to the meeting held on 2014 May 29 CEC reference no CEC3725 2012 The team of EMA officials present at the site visit requested further clarification on information that was supplied for the above mentioned CEC We have enclosed with this letter the requested information 1 The detailed CNG information 2 Flyer 3 Signatures from relative stakeholders Thank you for your positive response Yours faithfully For TRINIDAD amp TOBAGO NATIONAL PETROLEUM MARKETING COMPANY LIMITED Wazeer Aleem Manager Capital Projects Unit DIRECTORS Neil Gosine Chairman Carla Scipio Ranjit Ramnarine Kerry Rampersad Nigel Darwent Rabindranath Lackhan Kenneth Samlal Brendon Gray Keith Narayansingh Mark Alfonso Amreeka Maharaj 08 07 2014 RESPONSE TO FURTHER CLARIFICATION ON CEC 3725 2012 1 With reference to question one 1 on the request for further clarification the installation on compressed natural gas CNG infrastructure and associated pipelines wi
27. RK WHEN THE COMPRESSOR IS OPERATING THE NATURAL GAS COMPRESSOR IS POTENTIALLY DANGEROUS SO IT HAVE TO BE MANAGE BY QUALIFIED PERSONAL USER S MANUAL AGIRA KNOX TP 130 3 STAGE ELECTRICAL ENGINE CNG COMPRESSOR 1 INTRODUCTION This manual aims to provide the user with all the information regarding Installation Start up Operation and Maintenance of the AGIRA KNOX TP 130 3 STAGE CNG compression unit as well as all technical and functional features of this unit Therefore we ask you to read it carefully to assure proper use and maximize performance of the equipment 2 COMPRESSOR DATA 2 1 Technical Specifications Feed 3x440V 60Hz RPM 1780 Approx Weight 8000 KG External Measures mm width 3125 height 2650 length 2250 Oil sump capacity 8 Lts Maximum working pressure 3000 PSI 200 Bar 2 2 Technical Features Number of Stages 3 Cylinders 3 Maximum suction pressure 200 PSI 14 Bar Minimum suction pressure 300 PSI 21Bar Power 150 HP 3 Performance 630 CFM 1000 Nm h at 300 PSI 2 3 Base Support The compressor installation site shall comply with the environmental safety rules in force according to IRAM Standards No 4062 The floor must be made of concrete to support the weight of the equipment without breaking AGIRA KNOX TP 130 3 STAGE compressors have an Exclusive System of Four Pneumatic Supports designed to substantially diminish vibrations and therefore prev
28. and structural damage Remember that the gas to air mixture has to be within the 5 15 range for ignition to take place PROBABLE CNG EMERGENCIES e Gas leakage in CNG Equipment Pipeline Vehicles due to safety disc rupture at CNG station e Fire due to gas leak e Short circuit in CNG vehicle e Hose pulling Hose Snaking e Failure of joints of tubings nozzles break away coupling bursting of dispensing hose e Overturning of LVC mobile cascade on road Prepared By Antonia Lucky CL EHS Page 1 NGC COMPRESSED NATURAL GAS CNG FILLING STATIONS EMERGENCY ACTION PLAN GUIDE 2013 POSSIBLE HAZARDS JET FIRE OR FLASH FIRE DUE TO e Leakage through any valve equipment such as metering skids filter etc small bore connection or flange gasket joint such as insulation joint in the over ground sections at the source dispatch and or fill stations e Leakage from pipeline section piping in either the underground or over ground section e Sudden opening of safety valve in the over ground section e Escape of gas during maintenance repairs carried outand or gas venting at the stations LEVELS OF EMERGENCY RESPONSE FOR CNG FILLING STATIONS Level 1 This is an emergency or an incident which can be effectively and safely managed and contained within the site location or installation by the available resources and has no impact outside the site location or installation Level 2 This is an emergency or an accide
29. ate the amount of loss to the police your Franchisee will provide the necessary information after a cash audit has been completed 9 1 1 1 5 Do not talk to anyone including regular customers about the robber Refer any media inquiries to Franchisee 9 1 1 1 6 Perform an end of day report to determine the size of the loss Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 2 Accidents Injuries Illnesses 9 2 1 Call the Ambulance or emergency operator and provide them with all the information they request including i Your store address and phone number ii Your full name iil The name s of any injured person s 9 22 Stay on the line be patient and give the person answering your call a chance to respond to you If you are asked to wait stay on the telephone and be patient 023 After contacting the appropriate authorities notify NP s Security Department immediately of any accident or injury requiring medical attention Next contact the Area Manager responsible for the site Telephone numbers used for this process are NP Security Department 625 1920 Ext 516 517 Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 3 Incidents of Violence 9 3 1 Misconduct Violence by an Associate 9 3 1 1 NP does not condone any form of misbehaviour or violence in the workplace An Associate ma
30. cal extinguisher available in the store 14 4 Evacuate all customers and do not permit any additional customers to enter 14 5 Keep emergency numbers posted nearby Fire Services Ambulance Emergency Health Services EHS the nearest Regional Health Authority 14 6 is safe access turn off the power to the store Call the fire department immediately 14 7 associates should evacuate the building and wait for the arrival of the fire fighters 14 8 Do not resume store operations until the fire fighting personnel have given clearance Starlit Service Station Project Construction Site Mitigation Measures 2014 STARLITE SERVICE STATION DIEGO MARTIN CONSTRUCTION SITE MITIGATION MEASURES The following is a listing of Mitigation Measures that would be employed on the construction site 1 During the project all applicable safety precautions would be taken to prevent the occurrence of incidents which may have the potential to cause harm to persons damage to the environment and damage to equipment and or property With this in mind the following would be implemented on site appropriate security warning signs barriers lighting measures Job Hazard Analysis Daily Toolbox meetings Site Safety Orientation and any other safety precautions deemed reasonably practicable as the project progress 2 An Emergency Response Plan has been implemented on the construction site to minimize the danger to life environment and
31. d 9 5 1 9 5 2 9 5 4 9 5 5 9 5 6 9 3 7 9 5 9 9 5 10 Keep it short and smooth like a normal sales transaction The average robbery takes less than two minutes Obey the robber s commands your co operation can reduce the threat of violence Try to keep calm and observe the actions of the robber Do not stare at the robber Try to remember exactly what is said what he she looks like and his her means of transportation Avoid surprises or any action that might anger the robber or make him her nervous Warn the robber of any other associates working in the store or about any possible urprises such as a customer pulling into the parking lot If you should move let the robber know what to expect Don t argue with the robber Give the robber what he she asks for Do not argue do not resist the robber After the robber has left the store lock the store doors And call the police immediately Take the necessary steps to determine loses and inform your Franchisee Re open the store when all necessary investigative steps have been taken Do not talk to anyone including regular customers about the robbery 9 6 Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL Dangerous Weather In case of a hurricane all stores will provide service up to the last minute possible without endangering personnel or our customers Service to custom
32. d responders shall attend to all injured personnel and turn over those duties to the Trinidad amp Tobago Ambulance Service on arrival Starlite Service Station Emergency Response Plan 2014 Procedures for Earthquakes In the event of an earthquake the following steps should be taken Protect your head and face from being hit by falling objects Get under a solid structure Stay away from glass windows mirrors and any heavy object Do not rush to exit the compound stand in a strong doorway or structure If outside in the yard building move into the open area away from scaffoldinas heav equipment overhead lines etc After an earthquake take the following steps e Contact the HSE Representative e Check for fires e Check for injured and contact a first aid responder All Contractor supervisor foremen Safety Representatives will check their surroundings for any serious damage and immediately report them to their Emergency Coordinator or Project Manager In the event of evacuation all personnel shall report to the designated assembly areas and await further instructions Starlite Service Station Emergency Response Plan 2014 Emergency Telephone Number Government Agencies Telephone Numbers Trinidad amp Tobago Fire Services Diego Martin Trinidad amp Tobago Ambulance Services EHS Trinidad amp Tobago Police Service Diego Martin Mount Hope Hospital All Departments Port of Spain
33. e Station Emergency Response Plan 2014 Security Guard on Duty All security guards shall be trained in emergency procedures The HSE Manager shall come immediately to the compound and assist the security guards with evacuation as necessary Security guards on duty are responsible for manning their posts at the main exit to ensure rapid efficient flow of personnel out of the premises and efficient entry of emergency response personnel such as the Fire Services into the compound as needed A security guard on duty shall be designated after the evacuation process is performed to aid in the head count with the assistance of the Daily Attendance Register ensuring that all persons on the compound and who would have taken up duties are accounted for Starlite Service Station Emergency Response Plan 2014 Medical Services Contractor Safety representatives will provide the main contractor Safety Representative with a list of all first aiders in their workforce a copy of same must be submitted to the NPMC representative together with a copy of their first Aid Certification Each Contractor MUST have at their Safety Representative s disposal a properly outfitted first aid kit on site AT ALL TIMES In the event of a major medical emergency during normal working hours the Trinidad amp Tobago Ambulance Service shall be notified immediately While waiting for the Trinidad amp Tobago Ambulance Service to arrive first ai
34. e bins 12 10 3 Ensure that motorists do not place garbage or empty oil containers in the sand bins If any are observed remove as soon as possible 12 10 4 Waste oil at outlets where there are service bays is to be placed into 46 gallon drums and disposed of as directed by NP 12 10 5 Interceptor Pits at outlets where there are service bays are to be cleaned periodically and the silt debris allowed to dry before removal disposal as directed by NP 12 11 Fuel Spills The following steps should be followed in the event of a fuel spill 12 11 1 Immediately absorb the spilled fuel using sand and sawdust This should be swept up and bagged separately for disposal 12 11 2 Never use water to dilute a gas spill 12 11 3 Notify your Store Manager immediately 12 11 4 There should be NO smoking or naked lights in the forecourt area Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 12 Nozzle Leaks 12 12 1 Shut the pump OFF immediately 12 12 2 Cover the pump nozzle with a bag to stop usage 12 12 3 Call the Maintenance Department immediately 12 12 4 Notify your Store Manager 12 13 Damaged Pump 12 13 1 In the event of a vehicle striking a gas pump and a spill Occurring immediately turn off the pump using the emergency stop switch 12 13 2 Call the Maintenance Department immediately 12 13 3 Notify your Store manager immediately 12 14 20 lb LPG Cylinder Lea
35. e cause of the fire is electrical Do not attempt to put it out with water If there is safe access turn off the power to the store Call the fire department immediately regardless of whether the fire has been put out Then call your Area Manager All associates should evacuate the building and wait for the ip arrival of the fire fighters Do not resume store operations until the fire fighting personnel have given clearance If there is extensive damage to merchandise contact your insurers so that a proper assessment can be conducted Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 10 0 ROBBERY PREVENTION This policy applies to all personnel involved with the handling of cash Strict compliance with this policy reduces the possibility of stores being robbed and more importantly enhances your safety in the event of a robbery Experience has proven that well trained store personnel who consistently follow these prevention steps can greatly reduce the threat of robbery 101 Cash Control The greatest influencing factor in robbery prevention is the amount of cash immediately available 10 1 1 NO MORE THAN 300 00 IS TO BE HELD BY FORECOURT ATTENDANTS AT ANY TIME NO MORE THAN 500 00 IS TO BE LEFT IN THE CASH REGISTER AT ANY TIME Any amount in excess of this limit should be deposited into the drop safe Cash level violations may result in disciplinary action up to
36. e environment through spills or leakages would be cleaned up immediately by the responsible contractor Any soil contaminated from any releases would be collected and re mediated by a competent service provider Page 1 of 2 Starlit Service Station Project Construction Site Mitigation Measures 2014 10 11 12 13 Chemicals used the construction site would be handled as per the Material Safety Data Sheet MSDS Copies of all MSDS would be available on the construction site All potential hazardous and non hazardous solid waste would be collected and disposed by a competent service provider Appropriate barricades Non Woven Geotextile have been installed on the construction site perimeter to mitigate construction dust that may emanate for the site In addition periodic daily dust damping would be carried out on site Double walled fibre glass tanks equipped with leak detection sensors Fuel absorbents and fire suppression equipment will be kept on forecourt Noise generated from the site preparation construction and operational phases of the facility is not expected to exceed 60Bb Site preparation construction will be limited to the hours of 7am 5pm END OF DOCUMENT Page 2 of 2 Description of CNG Systems to be installed to reduce the risk of Fires or Explosions CNG Storage System 1 The cascade having horizontal cylinder and site of parallel to other cascade cylinder fittings would be arranged s
37. e the extinguisher 12 6 5 2 Remove the Safety Seal 12 6 5 3 Approach the fire 12 6 5 4 Remove the Safety Pin 12 6 5 5 Keeping a safe distance at least 6 8 ft away from the fire aim at the base of the fire and tackle in an upward direction 12 6 5 6 With a sweeping to and fro motion discharge the extinguisher 12 6 5 7 When fire is extinguished wait for a few minutes in case the fire re ignites Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 7 First aid Kits When Installed Be aware of where your store s first aid kit is located and make sure it is easily accessible The kit should be kept fully stocked with first aid and medical supplies Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 8 Fuel Containers breaking 12 8 1 The use of unauthorized and unsafe containers for the against 12 8 2 12 8 3 12 8 4 12 8 5 12 8 6 collecting of fuel is dangerous for the public and the law The MOEFI standards require that all fuel storage containers meet the requirements of the Petroleum Act Chapter 62 01 However as a general rule containers satisfying the following conditions may also be acceptable Be predominantly red in colour and capable of securely holding gasoline without the risk of leaking or Must bear a warning label about the dangers of gasoline The container s mouth
38. ent them from reaching equipment or facilities close to the compressor The location of shock absorbers in the equipment can be found in figure No 1 2 4 Loading and Unloading A crane must be available to place the equipment for its loading and unloading at the installation site The crane must be able to move the equipment on site without risks of accidents The compressor must be attached to the crane by means of a hoisting device as shown in figure No 2 FLATTENING HAZARD IT EXPRESSLY FORBIDDEN THAT ANY OPERATOR f PLACE UNDER THE COMPRESSOR DURING THE RAISE OF IT SO YOU HAVE TO j ALERT AND DELIMITATE THE ZONE ST a a sasa THE OPERATOR CAN ONLY PLACE NEAR THE COMPRESSOR WHEN THIS IS IN THE HORIZONTAL TRANSLATE UNDER 500MM OF THE FLOOR ONLY YOU CAN RAISE THE COMPRESSOR HOOK UP FROM THE 4 HOLES THAT ARE SITUATED IN THE SKID BASE Ah P y N A 2 F o A Ki yzzyyz REPARATIONS OR MAINTENANCE THE OPERATOR SHUOLD CARRY THE FOLLOWING INDIVIDUAL SECURITY EQUIPMENT GLOVES SECURITY BOOTS 3 GAS CONNECTIONS 3 1 Technical Data The piping of gas connections from the network to the equipment shall be performed by the company to be determined while AGIRA S A shall provide the technical specifications regarding the piping 3 2 Descriptive Drawings See Drawing No 8 0830 A I Rev 0 at the end of this section which provides details on the connections and their distribution
39. ers will be resumed immediately after all danger to personnel has passed The Franchisee and Area Manger will be in communication during any Hurricane Watch or Hurricane Warning He she will advise when to close the store 9 6 1 Things To Do In The Event of a Hurricane 9 6 1 1 Prepare store for a hurricane by securely packing away any loose merchandise and store equipment 9 6 1 2 Continue to serve your customer efficiently and calmly Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 7 Things To Do Before Leaving Your Store 9 7 1 Close store as you normally would putting away cash 9 7 2 Place any remaining empty cases in cooler 9 7 3 Store all remaining merchandise inside store 9 7 4 Store cash register in back room off the floor 9 7 5 Be sure back room door is closed tightly locked 9 7 6 Miscellaneous outside signs must be placed inside the store Things To Do After a Storm 9 7 7 Phone your Manager to report any damage shortage or loss of power 97 8 Resume normal work schedule REMEMBER THAT IN THE EVENT OF A HURRICANE OUR CUSTOMERS WILL BE DEPENDING UPON US SO LET US DO OUR BEST TO FULFIL THEIR NEEDS Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 8 Power Failure 9 8 1 9 82 9 8 3 9 8 4 9 8 5 9 8 6 9 9 Fires 9 9 1 9 9 2 9 9 3
40. es of fires to attempt to control e Notification procedures e Shall become familiar with the location and use of Material Safety Data Sheets MSDS e Shall know how to control a chemical spill that does not require the use of a respirator e Shall be trained and familiar with notification procedures Starlite Service Station Emergency Response Plan 2014 Neighbours The compound is surrounded by Starlite Shopping plaza GAK Electrical and other residences Neighbours are advised by telephone when Fire Drills are about to be performed The NPMC HSE Team will communicate with the surrounding neighbours via telephone as per listing below If required base on the emergency situation visits would be made to each neighbour by the HSE Team members The neighbors would be informed about the nature of the emergency the level of risk and how it could impact their facilities The site will also be equipped with audible alarms should incase an emergency situation arises This will also be heard by neighbouring organzations and they will be instructed by our HSE Team as well as the assistance of the Trinidad and Tobago Fire Services and Trinidad and Tobago Police Services to initiate their emergency evacuation plan and assemble at their designated muster point locations depending on the nature of the emergency situation Emergency Telephone Numbers for Neighbours PHONE NUMBER NAM Starlite Servic
41. eum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 10 3 Robbery Prevention Techniques 10 5 1 10 3 2 10 3 3 10 3 4 10 5 5 10 3 6 1 3 7 10 3 8 10 3 9 10 3 10 19 3 11 The store driveway and parking areas should be kept neat and clean at all times and well lit during evening and early morning hours Keep active Your activity will turn away some robbers simply because it indicates that someone is in the store cares Be aware of activities outside the store If you observe suspicious persons or vehicles call the police before something happens Ask for a routine patrol to check out suspicious person s or vehicles Get the complaint officer s name The police welcome such calls and they often pay off in preventing robberies Maximise visibility by moving displays or signs that block the view of the register from the outside Make sure that you can see out and that police or passers by can see in THE REAR DOOR SHOULD REMAIN LOCKED AT ALL TIMES Acknowledge each customer when he she enters the store make eye contact and greet the customer Spend time on the sales floor whenever you can Trash should be taken out only during daylight hours Post police fire utility companies ambulance NP and other emergency phone numbers near the phone No unauthorised persons are allowed behind the counter Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM
42. g 5 days 6 26 Execution of Plumbing Works 5 days N Electrical Works 5 days 25SS 3 days as Installation and Wiring of Buliding s Electrical System 5 days Air Condition 3 days 27 30 installation of Air Condition Units 3 days Rm Forecourt Works 26 days 6SS i Install all Underground Services Plumbing Money Shoot and Electrical 7 days s Backfill all Trenches 2 days 32 34 E Place compact and prepare sub base 7 days 33 35 Cast Insitu Concrete Forecourt Pavement 10 days 34 36 CNG EQUIPMENT 59 days 3 Constructon of concrete base for CNG equipment 7 days 45SS 38 Installabon of CNG compressor and Cascade storage cylinders 2 days 37 39 Installation of gas supply line trom NGC s metering station and high pressure dir 21 days 38 40 Third Party testing of lines 2 days 41FS 2 days Electrical installation of CNG control panel compressor motor and dispenser 21 days 39FF 42 Construction of island forms 2 days 41 51 43 installation of CNG Dispenser 2 days 42 Installation of Protection bollards for CNG Equipment 4 days 43 45 MECHANICAL WORKS 68 days 31SS 48 Install Fibreglass vent piping 14 days Backfill all trenches 10 days 46 48 Install Street Boxes Overspill Manholes and Monitoring Wells 10 days 47 49 Cast Insitu Tank Farm Slab 7 days 48 50 Install Crash Barriers and Pump Island Forms 5 days 49 91 Cast Insitu Pump Islands 7 days 50 52 Install Dispensers Incl
43. h labels what is happening in the compressor at that moment It indicates the starting sequence normal stop and different failures for emergency stops The compressor panel has a start key emergency stop and alarm buzzer Tension signals 220 V leave the P L C to feed the inverter of the main engine and the solenoid valves operating in the different command actuators of the compressor There are also intrinsic safety signals leaving the P L C which are linked to the compressor panel with respect to emergency stops and command signals The electrical engine starts by means of a inverter which is mounted on the same panel 5 2 Start Sequence The compressor may be started by pushing the start key that is located in the remote panel or compressor panel Fig 4 in the compressor The start procedure is performed by moving the key of the panel to RESET position and then to START position At this time the compressor will start running If it does not check the message appearing in the Display in order to troubleshoot the failure see failure details The start is carried out as follows 1 The P L C sends the required electrical signal so the inlet valve opens and the fan starts Y1 and Y4 outlets of terminal B2 After four 4 seconds the P L C sends the required electrical signal to initiate the inverter Y8 outlet of terminal B2 and likewise starts the compressor The phrase COMPRESSOT STARTING and later the expression CO
44. hese security measures is to deter robberies the theft of money merchandise and equipment and to prevent vandalism and the destruction of property 12 1 Building Structure 12 1 1 REAR ENTRANCES TO THE STORES SHOULD BE KEPT LOCKED AT ALL TIMES 12 1 2Front doors must be fully locked while the store is closed store doors are equipped with pivotal dead bolts that prevent prying sawing or removal 12 1 3 Make sure that the pivot bolt swings up inside the frame when locking it Make sure that ALL locks work properly 12 2 Safes 12 2 1 Safes should be kept locked at all times This means that the safe door should be closed and can only be opened with the timer Safes will not be left on what is commonly called day B lock 12 2 2 Before closing the store the associate on duty should place all the money in the safe and make sure that all the store doors are locked 12 2 3 Any malfunction of any safe component 1 e doors dials etc should be reported to the Maintenance Department immediately Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 3 Burglary Prevention Regular inspection and correction of burglary risks are the best methods of preventing burglaries Use the following checklist to guide and assist you when inspecting the store 12 3 1 Keep fences and gates in good repair 12 3 2 sure that all exterior lights are working pr
45. inal B2 may Change fuse high be broken Fan does not work Contacts of contactor are broken Fan does not work Call Technical Service Inter stage radiators are dirty Clean radiators externally with a hydraulic pressure washer Fan motor Failure of motor guard red button Verify phases and stretching on differences among phases Press overload BLACK button START in motor guard Short circuit in motor High electric current verify Verify continuity among motor coils and earth Main motor Inverter failure See soft start manual and proceed accordingly overload Display indicates Y3 Outlet fuse Terminal B2 may Change fuse compression but it be broken does not increase inter stage The coil of three way ee pressures depressurization Skinner valve is all technical Service burnt short circuit Three way valve does not work properly it does not move the actuator Call Technical Service 8 DRAWINGS 8 1 Connections a cty ur nene me sour VO pa SVdV13 HOSS3HdWOO VHIOV SNOILOSNNOO SNOISN3WIQ NOI di LILY 0000 0289 li peoo T9 GupueBiy Sy 58 900E 9530 012 00 OEWY eue pouguod Bing 43S eq pa 20 reped Ados poryouineun Aue yS ex6y
46. ine Fittings Minor First Aid Injuries to Workers or Employees Level 2 Level 2 Emergency may include the following Scenarios at CNG station Sites Safety Disc Rupture in a Bus at CNG station and Caught Fire Gas Leakage due to Station Tubing Joint Ferrule Failure and subsequently caught fire engulfing CNG Vehicles came of refilling at CNG Station Failure of Steel Pipeline due to Third Party Damage and subsequent Fire Fire in Customer premises Gas Leak and Fire due to the LCV Accident on Road Level 3 Level 3 Emergency may include the following Scenarios at CNG stations Sites Ethyl Mercaptan Leakage amp Spillage at the time of Handling Unloading Dosing Main Pipeline Failure Natural Calamities like Floods Earthquake Sabotage and Arson during riots Aerial Attack Terrorist Attack Rupture of CNG Cylinders of Onboard Vehicle Cylinders Mobile Cascade Cylinder Stationary Cascade Cylinders leading multiple casualties EMERGENCY RESPONSE GUIDELINES A e Emergency response personnel are required to wear full structural fire fighting clothing as well as SCBA Deploy a charged hose or hand line when approaching the NGV emergency Avoid cutting into or around fuel lines or tank storage areas of the NGV Isolate the fuel by turning the manual shut off valve or remote location emergency shutdown valve CNG EMERGENCY RESPONSE 1 2 3 4 5 6 Isolate potential sources of ignition from coming into contac
47. kage 12 14 1 Inform the Manager of any leaking 20 Ib LPG cylinders in the storage rack 12 14 2 Notify the supplier to remove the leaking cylinder 12 14 3 Do not stock leaking cylinders HAVE THEM REMOVED Leaking cylinders should be submerged in a container of water until it is removed from the compound Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 15 Disposal of Waste Engine Oils 12 15 1 Collect all engine oil from vehicles on the 46 gallon drum supplied by NP where applicable 12 15 2 When the container is filled notify the relevant personnel 12 15 3 Dispose of the waste oil in the recommended manner 12 16 Non Fuel Spills 12 16 1 Clean up any liquid granular or other non fuel spill from the o floor sidewalk parking area or any other area where the spill has occurred 12 16 2 Immediately place Wet Floor signs to people of the safety hazard 12 16 3 Be watchful of this area to insure that no Associate or customer is injured 12 17 Storage Tank Leakage 12 17 1 Notify the Area Manager as soon as possible 12 18 Use of Cellular Phones 12 18 1 The use of Cellular Phones on the forecourt is STRICTLY PROHIBITED 12 19 Smoking Policy SMOKING IS PROHIBITED BOTH ON THE FORECOURT AND C STORE AREAS Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 13 0 UNSAFE CONDITIONS
48. lation 3 The cylinder will be fabricated from steel 4 Cylinders shall be painted white to reduce solar heating effect and protect it from atmospheric corrosion Compressor Station y 1 Compressor will be designed for use in CNG service and for the pressures and temperature to which it may be subjected under normal operating conditions conforming to API 618 API 813 or equivalent standard Safety and Interlocks in Compressor System Compressor will be fitted with the following minimum devices Pressure relief valves on inlet and all stages to prevent pressure build up above the predetermined set point High discharge temperature shut down High cooling water temperature switch fitted to cooling water return line to shut the compressor in the event of a fault Low lube oil pressure shut down 6 Low cooling water flow switch fitted to the cooling water return line to shut the compressor in the event of fault A remote isolation switch for emergency shut down to be provided with manual reset at control panel Compressor will be provided atleast the following clear and permanent markings readily accessible and easy to read in the installed position Manufacturer s name Model Serial No month amp year of manufacture Certificate of approval no Rated capacity cubic meter per hour Operating speed RPM Required driving power in KW Maximum amp minimum supply pressures Maximum outlet pressure
49. ll form a part of the scope of works for this CEC 3725 2012 Application Please see APPENDIX 1 for a revised description of the scope of works and a revised project schedule for the proposed development o 2 Regarding the area of the development The correct figure should read 2226 2 m and not 2181 66 m as represented on the Emergency Evacuation Route layout drawing 85147 02 3 Please see APPENDIX 2 for the amended drawing including the components that was requested in the request for further clarification document 4 With reference to question four 4 on the request for further clarification please see APPENDIX 3 for the information requested in 4 i 4 ii and 4 iii 5 Regarding EMA s stated lack of data for groundwater at 8 of 10 monitored points Please note that the Authority has typically required of the Company for similar sites that two 2 groundwater monitoring wells be set up on site to get an indication of the quality of groundwater entering the site and leaving the site The two 2 wells are maintained so that additional samples can be retrieved over time as is mandated by the CEC for the site Additional core samples for groundwater are not necessary under these conditions as the two 2 wells are deemed adequate Regarding the missing Permissible limits values and scale for Soil amp Groundwater clean up levels EAN UPTARGETLEVELS O XU Total Recoverable 340 5000 Toune BO
50. nt which cannot be effectively and safely managed or contained at the location or installation by available resources and additional support is alerted or required and is having or has the potential to have an effect beyond the site location or installation and where external support of mutual aid partner TTEMAS may be involved and is likely to be danger to life the environment or to industrial assets or reputation Level 3 This is an emergency incident with off site impact which could be catastrophic and is likely to affect the population property and environment inside and outside the installation and management and control is done by district administration and where once again external support of mutual aid partner TTEMAS may be involved and is likely to be danger to life the environment or to industrial assets or reputation Level 1 Level 1 Emergency may include the following Scenarios at CNG station Sites Gas Leakage in CNG Equipment Pipeline Vehicles due to Safety Disc Rupture at CNG Station Minor Fire due Gas Leak Short Circuit in CNG vehicle or any Station Equipment Hose pulling Hose Snaking Failure of Joints of Tubings Nozzles Break away Coupling Bursting of Dispensing Hose Minor Gas Leak in MDPE Line Prepared By Antonia Lucky CL EHS Page 2 NGC COMPRESSED NATURAL GAS CNG FILLING STATIONS 2012 EMERGENCY ACTION PLAN GUIDE lala Failures from MDPE Line or Steel L
51. ntact with the floor and remains at a minimum distance of 50 mm Otherwise blow shock absorbers up with compressed air at 10 Bar Max so that the compressor is leveled in all directions 6 5 Power Cut Prevention In case of a power outage in the CNG station all thermal magnetic keys of the compressor feed PLC Suppliers and Emergency Stop must be disconnected Once electric power is reestablished all thermal keys must be reconnected In this case the Emergency Stop will remain active for which the reset button of emergency stop must be pushed then a light signal will turn off and the power supply will be reinstated for normal operation NOTE If you have an emergency power generator the operation must follow these steps 1 Disconnect all thermal keys 2 Connect the Emergency Power Generator 3 Connect all thermal keys slowly one at a time until all of them are opened m ee aree T ii iii Y i il iii ii F ma B IN THE CASE OF ELECTRIC MAINTENANCE DICONECT THE MACHINE OF ALL ELECTRIC SUPPLY Ti iii c emt lilii a Seek mee s po marang mE B vsa wa CRT ar oe THE ACCES TO THE ELECTRIC ZONES ARE INDICATED WITH ETIQUETTE OF DANGER WITH A DRAWING OF A THUNDERBOLT ALL ELECTRIC INSTALLATION OF THE PLACE WERE IS GOING TO BE THE COMPRESSOR SHOULD BE APE EXPLOSION PROOF THE EMPLACEMENT OF THE COMPRESSOR WITH THE ELECTR
52. o that they do no face cylinder fittings of other cascade Cylinder installed horizontally in a cascade will be separated from another cylinder in the cascade by a distance of not less than 30mm Cascade with horizontal cylinders will have the valves fitted on the same side within the cascade opposite to the refuelling point and arranged in a manner that any gas leakage is discharged upwards Cascade units will be installed on a firm compacted welldrained non combustible foundation This foundation may be in the form of a plinth with the raised edge at 2M from the front and sides of the cascade forming a kerb up to which vehicles should be permitted The cascade will be securely anchored to prevent floating in case flooding is anticipated Gas storage facility will be protected from the effects of the weather by a roof or canopy designed to facilitate the dispersion of free escaped gas and shall not permit gas to be trapped Adequate means will be provided to prevent the flow or accumulation of flammable or combustible liquids under containers such as by grading pads or diversion curbs Cylinders 1 The cylinders and their fittings for CNG use will be designed manufactured tested including hydrostatic stretch test a pressure in full conformity 2 These cylinders will be permanently and clearly marked for CNG only and also labelled CNG only in letter at least 25mm high in contrasting colour in a location which shall be visible after instal
53. operly 12 3 3 Keep windows free of unauthorised signs 12 3 4 Keep emergency numbers posted in easily accessible locations 12 3 5 Keep ladders and any other form of access secured 12 3 6 Make sure that all security devices are working 12 3 7 Keep any outside storage areas locked at all times 12 4 Burglary Upon arriving at your store if you observe signs of a break in do not enter the store Go directly to the nearest telephone and call the police then call your Manager Do not use the phone in the store because the subjects could still be inside When the police arrive 124 1 Allow them to enter the store first After the police give you permission to enter begin taking an inventory to determine the loss 124 2 Co operate with the police but do not attempt to verify the amount of loss Your Area Manager will furnish this information to the police 12 4 3 Contact the Maintenance Department for any emergency repairs Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 125 FORECOURT HEALTH SAFETY AND ENVIRONMENTAL PROCEDURES Most accidents are preventable NP Stores seeks to ensure a safe environment for working and shopping Each associate has a personal responsibility to work toward achieving a safe environment With the effort of all associates our stores and other facilities can be accident and injury free 12 5 a General Safety Guidelines 12 2 1 12 5
54. over to Marketing 1 day Ch 84 Handover project preparations for opening coordination 0 days 83 e 18 07 Project Construction Schedule APPENDIX 2 PROPOSED SITE PLAN WITH REQUESTED DETAILS SHOWING PROPOSED DRAINAGE AND CNG DETAILS 1 SITE LAYOUT MAP TOO LARGE TO BE SCANNED THE MAP CAN BE FOUND IN THE NATIONAL REGISTER AT THE ENVIRONMENTAL MANAGEMENT AUTHORITY S HEAD OFFICE LIBRARY AT ELIZABETH STREET ST CLAIR APPENDIX 3 CONCEPTUAL EMERGENCY RESPONSE PLAN AND CNG SAFETY DETAILS Starlite Service Station Emergency Response Plan Starlite Service Station Emergency Response Plan Starlite Service Station Emergency Response Plan 2014 Starlite Service Station Project 2 1 4 Emergency June Response Plan Trinidad and Tobago National Petroleum Marketing Company NP House National Drive Sea Lots POS Tel 1 868 625 1364 EXT 260 CAPITAL PROJECTS MANAGER ores DATE 5 5 Created February 2014 Starlite Service Station Emergency Response Plan 2014 Policy amp Purpose Policy In the event of an emergency we will be prepared to protect the health amp safety of all This plan was established to systematically combat emergencies and all employees contractors and visitors are expected to know and follow procedures outlined in this plan Purpose The purpose of the Emergency Response Plan is to minimize the danger to life and prope
55. property in the event of any emergency 3 A Health Safety and Environment Plan has been implemented on the construction site to ensure that all activities are carried out in accordance with applicable standards and statutory requirements of Trinidad and Tobago 4 All equipment and vehicles used in the construction site would be inspected certified and maintained in accordance with the manufacturers specifications to prevent the potential negative impacts of emissions leaks and discharges on the environment and no noxious or sooty vapours would be emitted as a result of these activities 5 All earthworks would be done in a manner to prevent erosion and sediment migration As far as reasonably practicable site preparation and construction of foundation would be scheduled for the dry season or periods of minimal rainfall to prevent erosion that may cause heavily silted run off into any municipal drains surrounding areas or watercourses Sediment retention measures would be utilised prior to the commencement of any earthworks to minimise the amount of sediment migrating off site including but not limited to e detention basins and silt traps placed along drains e Regular inspection and maintenance of all sediment control measures 6 Excess spoil from earthworks if any would be used as a source of backfilling or landscaping the site or disposed of in an appropriate manner 7 Any fuel oils lubricants and waste chemicals released into th
56. r help to arrive DO NOT ATTEMPT TO LEAVE THE STORE DO NOT CONFRONT THE RIOTERS Once the police arrive request an escort from the riot area Leave the store and lock the door upon leaving THE MOST IMPORTANT CONSIDERATION IN THIS TYPE OF CIRCUMSTANCE IS TO ENSURE THE SAFETY OF SALES ASSOCIATES AND CUSTOMERS Trinidad amp Tobago National Petroleum Marketing Company Limited 11 6 iN Re EXTRACTED FROM FRANCHISE MODEL MANUAL Flooding Flooding of a parking lot or driveway may cause potholes that can damage cars and cause personal injury to our associates and customers Do not let this problem go unreported 11 6 1 In the event of a parking lot or driveway flooding because of improper or poor drainage contact the Maintenance Department 11 6 2 If you know that the utility company is causing the drainage problem contact the utility company and your Manager immediately Roof Leaks Roofs that leak may cause product damage create unsafe areas in the store and ruin the entire roof of the store Do not let this problem go unreported Contact the Maintenance Department immediately Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 12 0 PHYSICAL SECURITY The physical security of the Store is the responsibility of every Sales Associate Physical security is a system of building structure locks lighting alarm system safes and cameras The purpose of t
57. r of staff or contractor on the scene or near the incident site should first do what is indicated by the circumstances e g Sound the klaxon horn and or raise a verbal alarm to immediately alert personnel Contractor employees involved will shut off all cutting set turn off all equipment and engines before evacuating providing worker safety is not jeopardized by doing so Where equipment could not be switch off the fire department or other responding emergency agency will be notified of the presence and location of this hazard upon their arrival If fire is small waste bucket size use the nearest portable fire extinguisher If the fire is large close all office doors to area to prevent the fire from spreading Assist as directed by the respective Manager Supervisor and Evacuate the compound The Security Department will immediately implement the Emergency Response System E R S i e 1 Contact the Project Manager Captial Projects Manager H S E Officer Assistant and the Security Officer 2 Keepthe main exit gate open and unobstructed by unnecessary persons or vehicles throughout evacuation procedures As an incident escalates it may become necessary to activate the Starlite Service Station s Crisis Management Team to manage the emergency response The Crisis Management Team comprises the members of the Capital Projects Department and other personnel as follows 1 NPMCHSE Manager Kevon Samaroo
58. re which will be almost equal to the suction pressure will leave the compressor ready for the next start The words READY TO RUN will appear on the display The P L C waits for the 3 stage manometer switch signal When storage pressure drops to 180 bar the compressor will re start the sequence 5 4 Emergency Stops In case some of the controlled parameters are momentarily with a value off the normal operation range the instruments will send a signal to the P L C which will cause the compressor to stop The following are the emergency stop parameters COMPRESSOR OIL PRESSURE LOW OIL LEVEL LOW INLET PRESSURE LOW INLET PRESSURE HIGH x STAGE PRESSURE HIGH 2 STAGE PRESSURE HIGH STAGE GAS TEMPERATURE HIGH 2 STAGE GAS TEMPERATURE HIGH rd 3 STAGE GAS TEMPERATURE HIGH MAIN MOTOR OVERLOAD FAN MOTOR OVERLOAD EXCESS OF VIBRATION LUBRICATION FAULT EMERGENCY STOP These are the messages that can be viewed on the display in case of failure i i i i r f k w wna ates inr Ahmet a AA ee 7 COULD CAUSE SERIOUS PERSONAL HURTS AND MATERIAL DAMAGES IF IT IS NOT FULLY DISCHARGE THE SYSTEM PRESSURE GASKETS ANY MAINTENANCE WORK HAVE TO BE DONE BY QUALIFIED THE NOISE OF THE COMPRESSOR COULD CAUSE DAMAGE IN THE EARS USE EAR PROTECTION WHE THE EQUIPMENT IS WORKING BEFORE STARTING ANY MAINTENANCE OR REMOVING ANY COMPONENTS RELIEVE ALL PRESSURE FROM THE COMPRESSOR
59. rty in the event of an emergency To achieve this goal we have outlined well defined simple steps to be taken should an emergency occur For the purpose of this plan emergency procedures shall be implemented for Fires Explosions Bomb threats Hazardous material spills Natural disasters a Floods b Earthquakes c Hurricanes and Tropical Storms These may require immediate emergency action and or evacuation of the facilities There shall be a minimum of at least one fire drill every four months totaling three per year This Emergency Response Plan Is Applicable To The Following 1 All NP employees both permanent temporary working at NP S Starlite Service Station s facility at Lot 18 Four Roads Diego Martin All contractors working or visiting NP S Starlite Service Station s facility and All visitors to the NP S Starlite Service Station s facility Key Priorities The key priorities in any emergency response are to Protect the safety and health of all persons involved or affected Minimize the impact on the environment Minimize the impact on property and assets Protect continuity of operations Protect current and future business opportunities and Maintain and where possible improve the image and reputation of NPMC ME ME ES Starlite Service Station Emergency Response Plan 2014 Organization For Emergencies In a potential or real emergency situation any membe
60. s 4 ELECTRICAL CONNECTIONS All connections involving the compressor must be taken into account according to drawing No 9 0013 U Rev 0 which describes all the characteristics of the wires for the connection as well as the arrangement of the electrical control panel provided by AGIRA S A 4 1 Main Engine Features Electrical Engine WEG Power 150HP RPM 1780 Feed 3 x 440V 60Hz Class 1 Div 1 APE electrical protection FCXP 4 2 Fan Engine Features Electrical Engine WEG Power 7 5 HP RPM 1180 Feed 3 x 440V 60Hz Class 1 Div 1 APE electrical protection FCXP 4 3 Electrical Panel The electrical panel consists of a Command Electricity inlet panel for a soft start The command electricity panel is formed by Cabinet 600x900x340mm P L C designed to carry out the starting up and stopping in a programmed way Intrinsic safety terminal receives information from the PLC of the different control instruments In turn it sends a signal to a terminal and this terminal sends it to the compressors Murphy panel where the manometer and temperature indicators are installed This way it operates under anti explosive conditions complying with safety standards In addition the panel is formed by two 6 Amp thermal keys to feed the PLC and 24 VCC source and one 20 A three pole thermal key to feed the fan a fan engine guard the PLC Feed source and a fan Contactor Indicating display allow
61. s the viewing of all compressor operating parameters alarm Buzzer compressor s stop Signal and Start Key And a 400Amp disconnecting key with fuse blocks three ultra rapid 400 A fuses and a weg soft start It is designed to control power consumption during the start of the equipment avoiding excessive power consumption The arrangement of the parts in the command panel electricity can be found in drawing No 9 0232 U Rev 0 4 4 Compressor Panel FIG No 4 This panel aims to show the Pressure and Temperature operating parameters of the compressor by means of WIKA instruments located therein Such instruments work through signals issued by the intrinsic safety terminal therefore the panel s operating conditions are anti explosive avoiding any kind of accident At the bottom has a start Key and an emergency Switch for the event of emergency stops See Fig No 4 NOTA 1 PRESION ENTRADA AL COMPRESOR 0 1500 PSI 2 PRESI N 1 ETAPA 0 3000 PSI 3 PRESI N 2 ETAPA 0 5000 PSI 4 TEMP 1 ETAPA 0 350 F 5 TEMP 2 ETAPA 0 350 F 6 PARADA DE COMPRESOR 7 LLAVE DE ARRANQUE COMPRESOR 5 OPERATION 5 1 General Considerations Agira KNOX TP 130 3 STAGE compressor is powered by an electrical engine It will be operated by a Telemecanique TWIDO P L C where a specially designed program is installed with a specific sequence mentioned below The P L C is linked to a display which indicates throug
62. sentative takes a head count of their employees in event of evacuation which is then reporting to the HSE Manager Alerting the HSE Manager of the occurrence Keeping the Crisis Management Team informed of developments actions taken number of persons involved estimate of casualties type of assistance needed etc and Implementing strategies of the HSE Manager Starlite Service Station Emergency Response Plan 2014 Training The H S E Department will ensure that all new employees are informed of the Emergency Response Plan for Starlite Service Stations Project and his her responsibilities under said plan prior to commencing his her work assignment The Main Contractor will arrange delivery of training for Emergency Wardens First Aiders in their responsibilities The HSE Officer Assistant will arrange for facility or departmental evacuation drills at least annually Emergency Coordinators and members of the Emergency Team shall familiarize themselves with all means of escape from the compound and the designated assembly areas The Emergency Team shall be trained to attempt to control small incipient fires only those which are localized in a contained area and which are in their initial stages Emergency Team members are NOT to attempt to fight any fire which is out of control and has spread to become a large or major fire e Fire extinguisher use e Location of fire extinguishers e Typ
63. sociates are required to give all necessary assistance including making written statements co operating with law enforcement investigations and attending court if called upon to do so Associates will be compensated for time spent in these efforts Failure to co operate in a law enforcement investigation may result in disciplinary action up to and including termination Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 11 0 OTHER SECURITY amp SAFETY ISSUES Cont d 11 3 Unauthorized Visitors 11 3 1 Persons not employed by the Store Manager or NP are strictly prohibited from working in any of the stores or serving customers at any time under any circumstances This includes friends or family members of Sales Associates 11 3 2 Loitering is not permitted in any Station This policy includes friends family vendors and or neighbourhood 8 residents If after a customer or vendor has conducted his her business in any store they seem to be hanging around for no obvious reason ask them if they need additional help Help them if required or wish them a nice day and ask them to leave Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 11 4 Bomb Threats If there is a bomb threat store personnel should remain calm and do the following 11 4 1 Immediately evacuate all customers and associates from the
64. store 11 4 2 Lock the cash register and make sure that the safe s are fully locked 11 4 3 Lock the store door 11 4 4 Immediately call the police Tell the police who you are where you are and that you have just received a bomb threat Remain on the phone and answer all questions until told to hang up 11 4 5 Call your Area Manager and notify him her of the bomb threat 11 4 6 Walt outside the store for the police to arrive and follow police instructions 11 4 7 DONOT ATTEMPT TO SEARCH FOR A BOMB 11 4 8 DO NOT RE ENTER THE STORE UNLESS ASKED TO DO SO BY THE POLICE 11 4 9 DO NOT MAKE ANY STATEMENTS OR ANSWER MEDIA QUESTIONS Refer them to your Manager 11 4 10 In order to help the police trace the caller try to remember as much information about the call as you can After you have secured your safety and that of any customers try to write down everything that you remember especially anything the perpetrator said or did which struck you as unusual Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 11 5 Riots In the event that a store is threatened by riot the following actions are recommended LL 11 5 2 11 5 3 11 5 4 11 5 5 11 5 6 EL OLI Lock the store door and set the burglar alarm if available Lock all money in the safe Call the police and request help Go to the back room of the store and stay away from the front windows Wait fo
65. sure validity of CNG Cylinder while refuelling CNG Keep watching the customers and passengers to ensure they do not use mobile phones near dispenser areas and request all passengers to stay away from dispenser areas Ensure no start of vehicles during gas leakage due to failure of equipment Ensure entry of authorized persons only within the station Use proper PPE while moving around the compressor high pressure area Keep away from the hot surfaces while inspecting the compressor Keep away from the live parts of electrical installations Ensure placement of fire extinguishers at safe distance and easily accessible place in case of an emergency Incase of any emergency condition follow the emergency response plan displayed at CNG stations Prepared By Antonia Lucky CL EHS Page 4 AGIRA KNOX TP 130 3 STAGE ELECTRICAL ENGINE CNG COMPRESSOR Revision Date No 0 th Wednesday February 6 2012 AGIRA SA Ruta Panamericana Km 30 No 30048 Colectora Oeste 1617 Pacheco Buenos Aires ARGENTINA Phone 541163340000 Fax 541163340011 WWW agira com ar File mainserver Z Compartido Dise o Industrial Manuales AGRA KNOX TP 130 Manual TP 130 3 ETAPAS CONTENTS 1 INTRODUCTION 2 COMPRESSOR DATA 2 1 Technical Specifications 2 2 Technical Features 2 3 Base Support 2 4 Loading and Unloading 3 GAS CONNECTIONS 3 1 Technical Data 3 2 Descriptive Drawings 4 ELECTRICAL CONNECTIONS 4
66. t with the fuel leak Turn off the gas at the source f the vapour plume is on fire protect surrounding exposures and allow the gas to burn off Use foam and or water to extinguish an interior vehicle fire f gas vents from the pressure release device allow the gas to burn itself out Protect exposures with water and or foam Prepared By Antonia Lucky CL EHS Page 3 NGC COMPRESSED NATURAL GAS CNG FILLING STATIONS EMERGENCY ACTION PLAN GUIDE 2013 7 CNG is almost always odorized one should be able to detect a leak before the gas reaches its flammable limits PIPELINE EMERGENCY SHUT DOWN OR ESD Total ESD of pipeline system shutdown of the entire pipeline system initiated in case of major accident in areas places locations along the pipeline Localized ESD of Pipeline System shut down of limited facilities along the pipeline initiated when the cause of ESD is limited to a small area in the pipeline CNG Station ESD shut down of individual CNG station EARTHQUAKE AND OTHER NATURAL CALAMITIES Area Control Room Technician to isolate local isolation valve to stop gas supply to affected area DESIGNATED ASSEMBLY POINTS earmarked safe areas at each facility for emergency mustering roll calls taken there during drills pre drill and post drill sessions held at assembly points upwind of hazard A SU CNG Do s amp Dont s at CNG Filling Station e Switch off the mobiles when entering CNG station En
67. uding Piping 8 days 51 53 install Compressor and Air Gauge 7 days 52 94 FUEL SYSTEM ELECTRICAL amp LEAK DETECTION 21 days 45SS 25 days 55 Install Rigid Conduits Underground Tanks and Dispensers 10 days 56 Install Sub Panel Pump Controllers Veeder Root 4 days 55 57 Wire Submersible pumps Dispensers and Veeder Root Leak Detection system 7 days 56 o9 CANOPY 15 days 54 59 Install Canopy Main Frame 1 day 60 Install Purlins 2 days 59 Ee Install Soffit Panels 4 days 60 ace Install Fascia 4 days 61 63 Install Lighting to Include LED Red Band 4 days 62 SIGNAGE 14 days 58SS 65 Install Canopy Lighted Logos and Moving Graphics 7 days Install Pylon Sign 5 days 65 Ww Install all Category Signs 2 days 66 68 UTILITY CONNECTIONS 7 days 64 P 69 T amp TEC connection 2 days MN 70 WASA connection 2 days 69 eji TSTT connection 2 days 70 Ea Utility Connections Completed 1 day 71 E INSPECTIONS 11 days 68 X 74 Ministry of Energy inspection 1 day OSHA inspection 1 day 74 6 Fire inspection 1 day 75 Ys LIP Precomissioning test wth MOE 1 day 76 General clean up touch ups 2 days 77 IN Minor remedial works 3 days 78 80 Handover Diego Martin Regional Corporation Completion Certificate 2 days 79 81 Inspections Completed 0 days 80 e 17007 1 PROJECT HANDOVER CLOSURE 1 day 73 83 Hand
68. will have welded joints between their respective components All the piping and tubing will withstand a pressure equal to that of safety relief device and tested accordingly after assembly Valves A minimum of four shut off valves will be fitted between the gas storage unit and vehicle refuelling filling nozzle as explained below 1 Each CNG storage unit to have quick action isolation valve in the steel supply pipe immediately adjacent to such storage unit to enable isolation of individual storage unit 2 These valves will be within fencing of storage unit 3 Master shut off valve with locking arrangement in close position will be installed in steel outlet pipe outside but immediately adjacent to the gas storage unit to isolate all downstream equipment from the gas storage unit This valve shall be outside the fencing 4 A quick action emergency and isolation shut off valve will be installed near dispensing unit with easy approach and to remain closed when refuelling is not being done All these valves and other elements of piping will be suitable for the full range of pressure and temperature to which they may be subjected These valves will have permanent marking for service rating etc FIRE PROTECTION The CNG dispensing station will provide the following fire fighting facilities at different locations Location Type of Extinguishers Dispensing Unit 1 x 10kg DCP Compressor online 1 x 10kg DCP Mother station 1x75kg D
69. x 9u 29 3 VIEW 1 SViB3NVO S3NI i3dld S3HIM 53 84 05 USLUSANI 0333 HOSS3HdAOO dO 538 34 TaNVd QNVWAOO 3LOW3Y MNOSSANMNOD AO INIMIM TVIIANLIATI AHL JO STIVLAC Puy I Ime ee EN n a w w quet pm er wn r As d Ps sh s y tm EZ pem er a e APPENDIX 4 FLYER AND RESPONSES NP House National Drive Sea Lots Port of Spain i Trinidad T 868 625 1364 TRINIDAD amp TOBAGO NATIONAL PETROLEUM F 868 627 4028 MARKETING COMPANY LIMITED W www np co tt NAME OF PROJECT NPMC Starlite Service Station Project CEC REFERENCE NUMBER CEC 3725 2012 NATURE OF PROJECT PROPOSED MULTIFUEL SERVICE STATION amp CONVENIENCE STORE LOCATION OF PROJECT Lot 18 Four Roads Diego Martin ACTIVITIES TO BE UNDERTAKEN AT SITE BUILDING AND CIVIL MECHANICAL AND ELECTRICAL WORKS SCHEDULING JULY 2014 TO DECEMBER 2014 CONTACT INFORMATION National Petroleum Marketing Company HSE Department 1 868 625 1364 EXT 260 DIRECTORS Neil Gosine Chairman Carla Scipio Ranjit Ramnarine Kerry Rampersad Nigel Darwent Rabindranath Lackhan Kenneth Samlal Brendon Gray Keith Narayansingh Mark Alfonso Amreeka Maharaj ADVERSE IMPACTS OF ACTIVITIES MITIGATION MEASURES NOISE EMISSIONS 7am 5pm and is not expected to exceed 60Db DUST EMISSIONS Approved barricades amp daily dust damping would be carried out on site CHEMICALS
70. y be disciplined or terminated if he or she poses a threat of violence in the workplace Any associate who makes an outright statement of a desire to harm others or who makes threats or demonstrates significant problems with controlling anger may be terminated 9 3 1 2 Weapons are absolutely forbidden in the workplace Any associate aware of the presence of a weapon at their workplace should contact the Police 9 4 Misconduct by Others these 9 4 1 9 4 2 9 4 3 9 4 4 9 4 5 To prevent injuries resulting from violence follow procedures Follow robbery and violence prevention procedures If you suspect a weapon do not attempt to detain customers suspected of shoplifting Do not get into arguments or exchange insults with customers regardless of the provocation Stay calm and remain polite If physically threatened avoid direct physical confrontation and call the police Trinidad amp Tobago National Petroleum Marketing Company Limited EXTRACTED FROM FRANCHISE MODEL MANUAL 9 4 Incidents of Violence Cont d Fights If a fight occurs on Company property NP s primary concern is for the safety of its store personnel and customers 9 4 6 physically 9 4 7 becoming 9 4 8 the Advise and give Do not become involved in the fight either or verbally Do not threaten the parties who are fighting Such threats may increase the likelihood of your involved Call the Police immediately
Download Pdf Manuals