Home
DT3 2011_EN - Central Vacuum Solutions
Contents
1. s QB CENTRAL POWER UNIT WITH WALL ENCLOSURE ELECTRICAL PREPARATION The following electric connections are made AIR EXPULSION FROM THE DOOR Recommended for central power 1 A schuko electrical socket for units located on a terrace or outside 220 240V power supply E 2 electric board for 12V aspiration The the aspirated air is released line sockets through the outlet P prepared in the 3 220 240V line switch disconnector door only in the case of installation with direct connection to the electrical power supply without the use of a schuko plug H recommended height from the ground min 80 cm The QB central power unit can be connected both to the Dynamic Control Display as well as to the REMOTE panel kit NOTE MNA MEME DUUM with appropriate electrical protection Is used 126 General Catalogue WIRELESS KIT THE WIRELESS FLEXIBLE HOSE Is the solution for situations in which the system does not have the electrical preparation or to add a new socket to an already existing system without installing the 12V socket line It can be used with all types of vacuum sockets RECEIVER Inside a building the transmission range between the wireless hose and the receive
2. ELECTRICAL CONNECTION FOR TERTIARY SECTOR GENERAL COMPONENTS 7 electric board for vacuum module m 2 electric board for dust separator 3 pre wired sheathing 2x1 216 for socket line 4 pre wired sheathing 4x1 916 for Dynamic Control Display a NEN 5 electric junction box SEE NOTE 6 Dynamic Control Display electric junction box for vacuum sockets line 8 socket frames NOTE If installing Dynamic Control Display is necessary auxiliary power supply o S i D 110 General Catalogue Technical Manual DYNAMIC CONTROL DISPLAY CMT800 FOR PERFETTO TXA TPA TP AND CLASSIC TC POWER UNITS The Dynamic control display is compatible in MODBUS mode with all central power unit models It signals the start of operation of the central power unit and makes it possible to RESET the system without having to access the machine It resets itself according to the type of central power unit to which it is connected VISUAL INDICATORS A CLEAN BAG FILLING his detects the filling level of the dust container and displays 5 different levels B FILTER CARTRIDGE SATURATION It displays the saturation level of the filter cartridge based on the calculation of the differential sensors C CENTRAL POWER UNIT ON This signals that the centralised vacuum syste
3. sl d j LA LL LLLA A Q PERFETTO TXA A 138 328 418 418 s so aso 96 09m C 257 257 257 257 D 300 300 340 340 ce 2m me 9 F 230 230 340 340 G H e CO D ee D w D w p c 0 308 n IN C2 IN N Co jo C2 e oO o m JN Em m c N TN o c e N 560 560 900 1115 P 1500 1400 1400 O v Floor line The indicates measurements are in mm 1115 c w O co o O e 1400 Recommended allowance PERFETTO TP PERFETTO TPA TP1 TP1A TP2 TP2A TP3 TP3A TP4 TP4A 138 328 418 418 257 257 257 257 300 300 340 340 N co Oo Co 230 600 n LA a Oo cw oO Co oO ao e zx N N 560 1500 286 N Co e co w D CO p w P w D 00 N IN Co 560 1400 304 Co AB am 1115 co co O co o Q e 1400 04 340 1115 w c o 6o 600 1400 2 e e CLASSIC TC TET TC2 TC3 TC4 138 328 418 418 350 350 350 350 257 257 257 257 300 300 340 340 286 286 304 304 230 230 340 340 34 34 34 34 600 900 1115 1115 273 273 308 308 115 115 137 137 103 103 112 112 560 560 600 600 1500 1400 1400 1400 General Catalogue 121 I
4. APF System Europe PATENT pending n 067934216 6 Central power unit body made of a metal structure HOT TREATED WITH EPOXY POLYESTER PAINT guaranteed and certified for 1 000 hours of salty mist Cup Instrument panel with keyboard Multifunction pockets Ergonomic handles and Dust container are made of plastic WITH UV PROTECTION Dual dust inlet opening on the right side and on the left side to facilitate the connection of the dust inlet line with the central power unit Service socket built into the front instrument panel activated via the START button on the instrument panel QUICK FIX fastening bracket QUICK FIX type or quick fitting with front central power unit insertion and fastening kit with antivibration brackets Multifunction pockets to the side of the machine body to house the dust bag and the technical documentation etc not included in model TP1A DUST CONTAINER Dust container with BLOCKING SYSTEM using pressure clips to hook the dust bag onto the bottom of the container washable made of plastic Ergonomic handles with SECURING SYSTEM for safe hooking and unhooking of the dust container and rapid removal of the dust bag with wide grip to facilitate manual opening made of plastic CLEAN BAG with built in string and strip for immediate and safe closing of the bag without any contact with the dust Cone conveyor Made of plastic built in and fixed to the machine body with strong seal retains the dust deposited an
5. 4 25 1 15 1 1 1 1 3 3 20 4 6 6 3 8 25 1 15 1 1 1 1 4 4 26 5 7 7 4 9 30 1 20 1 1 1 1 5 5 34 7 8 8 5 10 50 1 30 1 1 1 1 6 6 40 8 10 10 6 11 60 1 30 1 1 1 1 7 7 48 10 12 12 7 12 75 1 35 1 1 2 1 8 8 56 12 13 13 8 14 75 1 40 1 1 2 1 9 9 62 12 18 18 8 15 75 2 45 1 1 2 1 10 10 70 14 20 20 9 17 80 2 50 1 1 2 1 11 11 76 15 22 22 10 19 90 2 55 1 1 2 1 12 12 84 16 24 24 11 20 100 2 60 1 1 2 1 13 13 90 18 26 26 12 22 110 3 65 1 1 2 1 14 14 98 19 28 28 13 24 120 3 70 1 1 3 1 15 15 104 20 30 30 14 25 125 3 75 1 1 3 1 16 16 110 22 32 32 15 27 130 3 80 1 1 3 1 17 17 118 23 34 34 16 29 140 3 85 1 1 3 1 18 18 124 24 36 36 17 30 150 3 90 1 1 3 1 19 19 132 26 38 38 18 32 160 E 95 1 1 3 1 20 20 140 27 40 40 19 34 170 4 100 1 1 3 1 NOTE If the remote devices Dynamic Control Display or the REMOTE panel kit are to be installed the sheathing 4x1 16 code PE130 must be purchased 5 S c E 2 fated 132 General Catalogue Technical Manual Space for Aertecnica s Distributor Stamp think clean the advanced vacuum system www aertecnica com
6. LTV YET E t ET D Nd y a a AS A Cit TE fel a5 A Q 9 N AL Y H E i i E i 1 D H E H i j E E I P We y f OTT 8 Dynamic Control Display or Remote panel 7 8 5 G 3 4 g B z a a i MEM I ea a M PS REN p 2 E ra r z General Catalogue Technical Manual g Li T_T LW WLW LAVAL AD OL aU L aD aL in TOAD RRA Ta WRI Aaa Raa aR aa 109 S 3 E c ims c D S ELECTRICAL CONNECTION FOR THE RESIDENTIAL SECTOR GENERAL COMPONENTS 1 Flush mounted junction box for powering central power unit 2 12v socket cable line Dynamic Control Display 3 electric junction box 4 pre wired sheathing 2x1 916 for socket line 5 pre wired sheathing 4x1 216 6 socket frames 7 Dynamic Control Display NOTE If installing more than one Dynamic Control Display arrange for an auxiliary power supply
7. PAN SOCKET FRAME BUILT IN INSTALLATION 1 Vac Pan socket frame built in 2 built in trace for wall 3 950 flexible hose with union 4 socket frame cover with extractor 5 vacuum line 6 12V electrical line 7 Vac Pan socket 8 socket electrical connection Vac Pan 9 frame finish NOTE The vacuum system is turned on and off by pressing and releasing the lever 10 The dust that is brought near the socket using a broom is aspirated quickly SYSTEM INSTALLATION IN A FALSE CEILING For systems installed in a false ceiling LEGEND 7 clamps It is important to use collars with 1 false ceiling 8 socket frame rubber along the main line to prevent 2 electrical connection lines 9 air conditioning channel noise caused by vibration and to 3 electric box accessible for permit settling Inspection 4 surface piping fastened It is recommended to install the to the roof electric boxes in chases under the 5 elastic fastening collar false ceiling so they can be inspected 6 piping buried in the wall MILLA LLL LILA WM 7 7 7 7 7 7 7 Z 7 6 Z 7 7 7 7 7 7 7 Z 7 7 7 7 L 8 7 NN PL LLL LLLELLL ELLE LLL LLL General Catalogue 107 SYSTEM INSTALLATION WITH PIPING ON THE SURFACE This type of system is installed in two Cases A when the walls are made out of reinforced concrete therefore the c
8. automation Systems AVI Display With Immediate Display displays the central power unit s operating parameters in real time including central power unit s operating time expressed in hours filter cartridge saturation expressed as a percentage filling level of the dust bag or CLEAN BAG operating vacuum with an indication of the operating range motor chamber temperature FILTER SECTION PRECISION type washable polyester with a large filtering surface with conical centring system and built in plastic fastening system APF System filter cartridge self cleaning system with vibration and self powered mechanical shaking The vacuumed air is conveyed in a purpose provided chamber equipped with a helicoidal turbine The storage chamber in glass sphere filled nylon is situated between the motor compartment and the filter cartridge The rotation of the helicoidal turbine acts on a shaking pin The device consists of a steel spring with a rubber half sphere that rotates on high velocity bearings with dust proof seal The fully mechanical self cleaning system requires no electrical connections and is always active when the central power unit is in operation the pressure drops do not exceed 3 mbar The system is equipped with electronic sensors to detect the vacuum displaying the power range on the display signalling any drop in performance due to anomalies and locks the central power unit when the vacuum value exceeds 220 mbar for more than 15 seconds
9. l SQUARE SOCKET BODY The central power unit turns on with the insertion of the flexible hose or with an electrified hose by using the switch on the handle e m m T 4 i E w Im E iy NEW AIR ADAPTER SUPPORT for electrical switch plates NEW AIR TOUCH SOCKET New Air Touch covers the sockets with elegant retractable systems The sockets include a socket body plate support and electrical switch plate he central power unit turns on with the insertion of the flexible hose or with an electrified hose by using the switch on the handle General Catalogue 115 116 ECLET TIS TUBO VACUUM SOCKET The Eclettis TUBO socket represents the ideal solution for architecturally sophisticated environments A brushed stainless steel finish combines aesthetic design with high technology The central power unit turns on with the insertion of the flexible hose or with an electrified hose by using the switch on the handle The Eclettis TUBO vacuum socket can be installed in masonry walls with a curved union or a straight union and in plasterboard walls 1 parallel electrical connection 2 Eclettis TUBO socket body 3 inlet frame with Eclettis socket frame 4 fixing screws 5 OR gasket to be lubricated st Thai Laas 3 ECLETTIS TUB ECLETTIS TUBO WHITE INOX TURNING ON THE CENTRALISED VACUUM SYSTEM Turning on the centralised vacuum system depends on the type of hose and
10. the TUBO system tester with the flexible hose inserted in the built in socket C 3 Start the TUBO system tester and seal off the other end of the hose with your hand D The safety valve E must open and the integrated vacuum gauge F should read a vacuum value General Catalogue m m of approx 150 mbar VALUE 1 Note the value that appears 4 Connect the TUBO system tester hose in the dust inlet line arriving from the central power unit and read the vacuum value shown on the vacuum gauge VALUE 2 which must be similar to the previously written down value 1 approx 150 mbar first checking the opening of the safety valve If value 2 is similar to value 1 the inspection is positive If the difference between value 1 and value 2 is greater than 15 mbar this means that there are abnormal leaks in the piping check with the system in a vacuum where the air leaks are and repair them Note Keep the TUBO system tester kit in a vacuum for a maximum continuous period of 5 minutes If the system tester kit must be used in a vacuum for a longer period of time remove the flexible hose from the socket in which it is inserted for a minimum of 3 minutes and then reinsert it restarting the control phase General centralised vacuum system inspection The general centralised vacuum system inspection must be done after the final assembly of all vacuum sockets and the selected central power unit The detection of t
11. the central power unit and makes it possible to RESET the system without having to access the machine VISUAL INDICATORS A CONTAINER FILLING LEVEL This calculates the presumed filling level of the dust container using 5 progressive stages B FILTER CARTRIDGE SATURATION It displays the saturation level of the filter cartridge based on the calculation of the differential sensors ELECTRICAL CONNECTION for LM mode FOR STUDIO TS AND C500 POVVER UNITS GENERAL COMPONENTS 1 flush mounted junction box for powering central power unit 2 dual plug cable not supplied cod 3000388 3 plug socket not supplied cod 3000400 4 electric junction box 5 pre wired sheathing 2x1 216 for socket line 6 pre wired sheathing 4x1 216 for Dynamic control display socket frames 8 Dynamic control display WA s doo wy we Tura pi C CENTRAL POWER UNIT ON This signals that the centralised vacuum system is operating ub Studio TS4 STUDIO TS CENTRAL POWER UNIT O0 D CENTRAL POWER UNIT HOURS OF OPERATION This displays the total hours of central power unit operation General Catalogue 113 REMOTE PANEL KIT FOR QB STUDIO TS AND C500 POWER UNITS The REMOTE panel shows operation of the central power unit It can be located anywhere in the home integrating perfectly with the most commonly
12. the installed vacuum socket model THERE ARE TWO TYPES OF HOSES with the TYPE 1 flexible hose the central power unit turns on by inserting the hose in the inlet A with the TYPE 2 flexible hose the central power unit turns on by pressing the switch on the hose itself VACUUM SOCKET ELECTRIC CONTACTS The electric contacts are inside the vacuum socket E The centralised vacuum system turns on when the union B of the TYPE 1 flexible hose or the plates D of the TYPE 2 flexible hose come into contact with the electric contacts NOTE With socket models Air Active Open and the NEW AIR sockets with a microswitch NA699 the central power unit turns on when the socket door is opened General Catalogue NEW AIR TYPE 1 flexible hose with activator union B TYPE 2 SQUARE LOGIK NEW AIR INSTALLATION OF THE PLASTER MOULD The plaster mould is used with the NEW AIR inlet frames in the case of wall irregularities cement must be used 1 insert the plaster mould A into the NEW AIR inlet frame B 2 2 arrange the plaster C around the mould 3 cut the part of the extension that exits from D the plaster line flush with the wall using an appropriate d cutter E 4 fit the NEW AIR vacuum socket F to proceed with the installation NOTE he mould for the finishing is only used with the NEW AIR inlet frames INSTALLATION OF THE EXTENSION FOR VACUUM SOCKE
13. 5 silencer 5 6 dust inlet cap 7 alr exhaust cap 8 air exhaust grille WARAVRABVAABABWAVAAVAWAAVWAAWr Vaasa Vea aSa A N INSTALLATION WITH EXHAUST TO THE AMBIENT ATMOSPHERE When the central power unit Is installed externally the air exhaust conveyor is not needed The air grille provided with the central power unit must be installed on both air exhaust openings following the directions indicated below INTERIOR NOTE this solution is recommended only for central power units installed externally Ll bL AAA I Y Y Y d dV V dd ddl d LLL dV V Y ill il i td ddl YT dV dV Y dV e Y V Y V dl V Y dV d V d d d 120 General Catalogue CONNECTING THE CENTRAL POWER UNIT TO THE CENTRALISED VACUUM SYSTEM POWER SUPPLY CONNECTION The power supply cable with Schuko plug 3 for the central power unit is Supplied as standard equipment with the central power unit 2 SOCKET CABLE CONNECTION A cable is supplied for connecting the socket line and the Dynamic Control Display 1 with the socket activation consent line and the remote data transmission 4 as standard equipment with the central power units SS NW Www INS 3 NOTE When installing the central power unit externally ensure that a junction box 5 with an adequate degree of electrical protection is used INSTALLATION ALLOWANCES PERFETTO TXA TPA TP AND CLASSIC TC POWER UNITS
14. D IN THE FLOOR PIPING PASSAGE The minimum thickness for laying the piping and the fittings is minimum floor slab piping 2 cm Install the piping along the passage of the doors to prevent making chases in the walls that divide two environments INLET FRAME INSTALLATION The inlet frames have housings for the electric connection sheathing inlets Install the inlet frame in the wall flush with the plaster keeping the recommended orientation Check that the inlet frame is perfectly horizontal INSTALLATION NOTES FOR BUILT IN EF A NM id MIS LS LS SLY MS LS LS LS LS SS SS SS Le SS LS C ILI SR NIG NS LLLI LILY A LD U T Fr mH Tr m Tr Fa Tr T TNN LU i Y iy A d Y Y Y d Y d Y P PARALLEL CONNECTION BETWEEN VACUUM SOCKETS The vacuum socket parallel connection is done in succession using the pre wired 2x1 216 8 pre wired sheathing 2x1 216 9 inlet frame with sheathing inlet for socket connection A AN a WS vm ed WO 4 sim sE ANN D JN ARD ia n AED Ip fare AES po 4 FILMIE TUN IT ETT TT LT LEY LT LET LT PLT LT TT LI LET Td f F fo dose 4 d Ae pg d p 7 7 Is possible to install socketframes for 3 flush plaster 050 240 and 2
15. NSTALLATION ALLOWANCES STUDIO AND C500 POWER UNITS STUDIO TS LINE P Recommended allowance Q Floor line The indicates measurements are in mm 122 General Catalogue SELECTION OF THE QB CENTRAL POWER UNIT QB CENTRAL POWER UNT Q200 It represents the best central power unit alternative that minimises the Space occupied in modern homes and keeps all the functionalities of advanced vacuum systems BUILT IN ENCLOSURE Thanks to its reduced depth 23 cm it can be installed in perimeter walls with a minimum thickness of 25 cm The door can be painted the same colour as the wall WALL ENCLOSURE The total depth of the enclosure is 23 5 cm with a degree of electrical protection equal to IP55 and can be installed in walls anywhere The entire enclosure can be painted the same colour as the wall THE TWO QB CENTRAL POWER UNIT SOLUTIONS PART DESCRIPTION 1 box for built in power unit 2 insulation 3 door 4 box for wall power unit 5 fastening brackets 6 OB central power unit body General Catalogue Technical Manual 123 3 S ims S lt D HK 124 INSTALLATION OF THE QB CENTRAL POWER UNIT QB INSTALLATION WITH BUILT IN ENCLOSURE TECHNICAL FEATURES 1 Insulation 2 Box 3 Central power unit body 4 Door ARRANGEMENT
16. TS The extensions are necessary when the inlet frame is not properly built into D D max 20 mm the wall with respect to the surface of FORD D min 7 mm FOR D BETWEEN reference and the airtight seal of the ILLE BETWEEN 20 Ana m 7 AND 20 mm system is not guaranteed ae AND 32mm USE I ENGAGE THE i THE EXTENSION VACUUM 2 EXTENSION FROM BY CUTTING SOCKET THE PART OF THE OR OFF 13mm SURFACES TO IN THE SOCKET AND GLUE FROM EXTENSION CUT IT TO 2 mm THE PART GLUE IT USING WITH PLASTER OPPOSITE OF SOCKET CIANOACRYLIC GLUE FRAME THE OR D max 32 mm o Au E D max 43 mm D gt 43mm H D min 32 m L D PERPENDICULAR CUT FOR D BETWEEN 20 AND 32mm USE FOR D BETWEEN 32 AND 43mm USE FOR D LONGER THAN 43mm USE TWO THE EXTENSION BY CUTTING OFF 13mm THE ENTIRE EXTENSION OR MORE EXTENSIONS FROM THE PART OPPOSITE OF THE OR General Catalogue 117 118 SELECTION OF THE CENTRAL POWER UNIT PERFETTO TPA TP LINES The TP line represents a new conception of advanced vacuum systems The TPA line also has the APF self cleaning system It can also be installed outside PERFETTO INOX TXA LINE The TXA line includes all of the prestigious solutions of the TPA line enclosed in an Inox AISI 304 stainless steel body It can also be Installed outside CLASSIC TC LINE The TC line represents the best solution at a limited cost among advanced vacuum systems It can also be installed outside Gen
17. TUBO the advanced vacuum system RESIDENTIAL TECHNICAL MANUAL DT3 ee CA think clean 97 S gt em S S lt D 98 General Catalogue Technical Manual INDEX 99 102 109 115 118 120 tzo 124 ley ler 128 130 131 132 TUBO SYSTEM DESIGN TUBO VACUUM SYSTEM PREPARATION TUBO SYSTEM ELECTRICAL CONNECTION VACUUM SOCKET INSTALLATION CENTRAL POWER UNIT SELECTION INSTALLATION OF THE SINGLE PHASE CENTRAL POWER UNIT QB CENTRAL POWER UNIT SELECTION INSTALLATION OF THE QB CENTRAL POVVER UNIT WIRELESS KIT BRAVO POWER UNIT KOMPAT TA KT TUBO VACUUM SYSTEM INSPECTION PERFETTO TPA LINE TECHNICAL SPECIFICATIONS LIST OF MATERIAL FOR INSTALLING THE CENTRALIZED VACUUM SYSTEM TUBO VACUUM SYSTEM DESIGN POSITIONING OF THE VACUUM SOCKETS The correct positioning of the vacuum sockets makes cleaning operations easier for the user and makes it possible to reach all areas of the building also reducing system costs The main parameter for positioning the sockets is the length of the flexible hose in the residential sector a 7 m or a 9m hose is recommended MAIN CRITERIA FOR POSITIONING THE VACUUM SOCKETS 1 position the vacuum socket near to the doors to prevent them from being covered by furnishings 2 position the vacuum socket at the bottom of stairs 3 assess the entire area of the building that must be reached by the fle
18. The built in box has a depth of only 23 cm This makes it possible to install it in perimeter walls with a minimum 1 thickness of 25 cm The enclosure and the door are made out of galvanized steel and have a gasket The QB central power unit reaches degree of electrical protection IP55 with channelled air exhaust and IP45 with air exhaust from the door This solution is suitable for outdoor 14 5 installations NN f DIMENSIONS OF THE BUILT IN BOX The measurements of reference in co e 27 cm for the box are provided to the NY Mes W side SN Em SS WEIT UE Te Nae LA lt 23 58 f 3 22 80 13 CENTRAL POWER UNIT INSERTION AND FIXING The installation phase of the central power unit is simple and quick insert the central power unit body and hook it into the two holes in the box using the appropriate pivots A The dust inlet fitting will engage in the housing in the central power unit Fix the central power unit to the built in enclosure using the appropriate screws General Catalogue QB INSTALLATION WITH WALL ENCLOSURE TECHNICAL FEATURES 1 Box 2 Door with reversible opening 3 Central power unit ARRANGEMENT The wall box has a total depth of 23 5 cm The wall installa
19. c grip with switch for starting the central power unit and speed variator acum n Tot c E CLEAN BAG i e CLEAN BAG with built in string and strip for immediate and safe closing of the bag without any contact with the dust pack of 5 CAGE M Xue Tot e G PRECISION FILTER CARTRIDGE PRECISION type with high filtering efficiency made of washable polyester AG ONT ERE Nunc neu Tot IL Lm General Catalogue 131 LIST OF MATERIAL FOR INSTALLING THE CENTRALISED VACUUM SYSTEM RESIDENTIAL SECTOR The following table shows a grid that can be used for general reference in order to have a reliable indication of the quantity of installation material necessary based on the number of vacuum sockets to be installed The first column shows the number of vacuum sockets the row corresponding to the number of vacuum sockets to be installed shows the quantity of the fitting articles and installation material that Is required PAO12 TRO50 TRO55 TRO51 TRO52 TRO56 TR210 PE110 CF105 PE410 TR250 TR310 PE309 CF080 P reeNteivi gt cse sockets inlet pipe 90 ff 45 mf 45 ff 90 ff sleeve 2X1 16 250 g PVC PVC conical Exhaust Flush Wall point frame 950 elbow elbow elbow offtake with head pre wired adhesive wiring adapter grille mounted mounted n n perm 650 50 050 50 50 100m forPVC clamps QsoF g2 082 electric bracket 1 1 14 2 2 2 0 2 10 1 5 1 1 1 1 2 2 14 3 4 4 2
20. clogging and reducing loss of HA pressure it is recommended to install SE the tubing in a manner that makes it possible to create the widest curving radiuses possible The solutions shown to the side are all optimal Aertecnica also supplies an elbow and COMPOSED 90 OFFTAKE U BOLT TYPE an offtake with a 90 curvature WW General Catalogue Technical Manual 103 gt S S S lt HK PIPE AND UNION ASSEMBLY The pipe must only be cut using a Specific pipe cutter in order to obtain YES a perfect cut CORRECT CUT INCORRECT CUT correct assembly of the union incorrect pipe cut use the wheeled pipe cutter CLEANING THE BURRS Once the piping is cut remove any burrs of material inside and outside of the cut with the deburring tool built into the pipe cutter code AT110 or with scissors 1 pipe cutting 2 burr material cleaning NOTE Before gluing it is recommended to preassemble the fittings to check the correct installation APPLICATION OF THE ADHESIVE Clean the surface to be glued Apply the adhesive only on the male union and in a quantity that adhesive 3 residue can be seen when the union N NO is inserted 3 the adhesive is applied on the YES male union 4 the adhesive is not applied on the female union 5 S ees 104 General Catalogue Technical Manual INSTALLATION OF THE SYSTEM BURIE
21. d facilitates dust bag closure A PREPARATION made with AERTECNICA PVC PIIP C certified 50 mm piping and fittings cold bonded with self sealing adhesive with low voltage 12 Volt electrical line Preparation buried in the floor and wall Sca m n Tot Y B VACUUM SOCKETS Socket bodies and adapter supports arranged for coupling with the following electrical switch plates BTICINO brand models INTERNATIONAL LIVING LIGHT LIGHT TECH AXOLUTE MATIX VIMAR brand models IDEA RONDO PLANA PLANA SILVER EIKON EIKON NEXT AVE brand models SISTEMA 45 BANQUISE SISTEMA 44 GEWISS brand models PLAYBUS CHORUS LEGRAND brand models VELA CROSS MOSAIC ABB brand ELOS models aco C ua OE E Tot PE C CLEANING ACCESSORIES KIT Comprising container for brushes with support for flexible hose and plastic hook for wand set of dusting brush crevice nozzle radiator brush clothes brush upholstery brush with felt chrome plated wand 30cm universal brush with floor bristles with castors icon P nn Tot es D FLEXIBLE HOSE STANDARD type 9 metres long 232 diameter with pressure regulator QUICK FLOW type electrified 9 metres long 232 diameter with ergonomic grip with switch for starting the central power unit and pressure regulator QUICK FLOW WITH SPEED VARIATOR electrified 9 metres long 932 diameter with ergonomi
22. e used to quickly calculate an approximate number of vacuum sockets using the total usable surface 7 Position the central power unit in the garage or in an adequate equipment room f Tn FLEXIBLE HOSE n of vacuum sockets total surface ud 30m N 9 m FLEXIBLE HOSE total surface 50m GROUND FLOOR mL ESL n of vacuum sockets Vacuum socket Central power unit with built in socket Dynamic Control Display or REMOTE panel kit Positioning the first socket HOW TO CALCULATE THE NUMBER OF VACUUM SOCKETS TERZIARY SECTOR l SS H m SOCKETS INSTALLED IN CORRIDOR SOCKEIS INSTALLED IN CORRIDOR VAI SOCKETS INSTALLED IN THE ROOMS RECOMMENDED METHOD FOR THESE ENVIRONMENTS 9m FLEXIBLE HOSE There is a formula for roughly calculating the number of vacuum sockets even without the working plan which consists in calculating the total surface of the building including the service rooms Om FLEXIBLE HOSE total surface 40m2 n of vacuum sockets S 3 E c ims c D S General Catalogue Technical Manual 101 TUBO VACUUM SYSTEM PREPARATION MATERIAL SELECTION Aertecnica supplies a complete line of articles for installing the TUBO centralised vacuum system TYPES OF PIPING All of Aertecnica s fittings have been designed to obtain a completely smooth inner surface with perfect YES NO joints in
23. ed electronics but still with optimal performance 10 Fuse 11 Filter cartridge 12 Fixing Knob 13 Fixing bracket 14 Locks lever 15 Cone conveyor 16 Ergonomic handles 17 Dust container 18 Dust inlet closing cap PART DESCRIPTION 1 Top air exaust 263 2 Cover 3 Sound proof motor compartment 4 Power supply input 5 Operation signal input 6 Left dust inlet 7 Right dust inlet 8 Fixing bracket 9 Dust container hinges 10 Filter cartridge 11 Dust conveyor 12 Dust container General Catalogue Technical Manual 119 S 3 c c D INSTALLATION OF THE SINGLE PHASE CENTRAL POWER UNIT POSITIONING The central power unit of PERFETTO TXA PERFETTO TPA PERFETTO TP and CLASSIC TC lines are installed in service areas for example store rooms garages cellars aired and protected from extreme temperature changes The high degree of electrical protection and resistance to atmospheric conditions also allows external installation The dust inlet and air expulsion on both sides offer maximum installation flexibility The installation area must be sufficiently spacious and lighted to allow filter cartridge and dust bag substitutions Legend 1 air exhaust line 2 dust inlet line 3 220 240V central power unit power supply 4 12v socket line Dynamic Control Display optional
24. eral Catalogue lec PART DESCRIPTION 1 Right and left double air exhaust 2 Electronic card protection 3 Electric motor 4 Temperature sensor 5 AVI display PERFETTO INOX TXA PERFETTO TPA PERFETTO TP models 6 Sound proofed chamber 7 Integrated vacuum socket PERFETTO INOX TXA PERFETTO TPA PERFETTO TP models 8 Self Cleaning filter APF system PERFETTO INOX TXA PERFETTO TPA models 9 PRECISION filter cartridge 4 10 11 12 10 Cone conveyor 11 CLEAN BAG dust bag with dust contact preventing quick closure 12 CLEAN BAG blocking system points 16 and 17 only for PERFETTO INOX TXA PERFETTO TPA PERFETTO TP models 13 Dust container 14 Ergonomic handles 15 Side multifunction pockets not included in TC TX1A TP1A and TP1 models 16 QUICK FIX bracket and front hook 17 Double right and left dust inlet 2 STUDIO TS LINE Studio TS new central power units with electronic featuring SOFT START starting and boasting remote monitoring thanks to the REMOTE Control Panels cod CMT800 CM8890 PART DESCRIPTION 1 Sound proof motor compartment 2 Electric motor 3 Motor air intake 4 Dual right left dust inlet 5 Air Exhaust line only TS4 6 Power supply 7 Operation Signal input 8 Green Led On power unit on 9 Green Led On power unit running C500 C500 central power unit installing two motors and 263mm top air expulsion With simplifi
25. hases cannot be made in the walls B when the building is already finished and the chasing work would require a complicated project 1 surface tubing 2 watertight junction box 3 fastening collar with pin 4 electric line to the sockets 5 reinforced concrete walls 6 turret THE VACUUM SOCKETS THAT CAN BE USED FOR THIS TYPE OF SYSTEM ARE 50 mm OPEN SOCKET PA450 OPEN SOCKET PA455 TC100 TURRET For the NEW AIR and LOGIK NEW AIR sockets which are not suitable for surface installation the covering white aluminium turret code TC100 is available inside of which the vacuum socket is installed o c D 108 General Catalogue Technical Manual TUBO SYSTEM ELECTRICAL CONNECTION THE TWO ELECTRICAL LINES The system consists of a 2x1 low voltage electrical line which connects the vacuum sockets circuit in parallel making it possible to start the central power unit A second 4x1 electrical line is necessary to connect the optional remote disposal GENERAL COMPONENTS 1 electric junction box for powering central power unit 2 electric junction box for 12v socket cable line remote control 3 technical room for central power unit 4 electric junction box 5 pre wired sheathing 2x1 216 for socket line 6 pre wired sheathing 4x1 216 7 socket frames BOLO BEOGUBENy ag cip cp C D CIE EU EIU EUM fT EIU ET FT EET ETE ES LT EIE n
26. he operating vacuum and the features of the central power units differ from each other It is recommended therefore to follow the specific inspection procedures indicated in the user manual that is provided with each central power unit j INSNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN TECHNICAL SPECIFICATIONS PERFETTO TPA LINE UPPER SECTION Motor housed in a sound proofed chamber with a low noise emitting internal channelled system With SOFT START system for gradual starting and motor protection Degree of protection THROUGH FLOW electric motor with an electrical degree of protection of IP55 or IP43 models TP1A and TP2A RADIAL electric motor with a degree of protection of IP45 or IP43 models TP3A and TP44 Dual air exhaust opening on the right side and on the left side with the possibility of choosing the direction of the air exhaust line EVOLUTION 1 0 electronic card supporting the MODBUS protocol and which can be interfaced with the most widely available home
27. in closed environments ELECTRIC AND HYDRAULIC PREPARATION The following electric connections are made 1 connection between the building s electrical line and the central power unit power supply cable 2 connection of the 12V line to the vacuum sockets 3 220 240V line switch 4 dust inlet fitting 5 dust inlet line The aspirated air is released through the union R to be installed in place of the closing cap To be ordered separately L Silencer code CM835 M Conical increase adapter code TR250 N Grille codeTR310 ZO eS ee L The QB central power unit can be connected both to the Dynamic Control Display as well as to the REMOTE panel kit s
28. inch piping with curved 4 cover union or straight union 5 straight union 1 curved union 6 90 alignment 2 electrical pre wired 7 pipe gluing General Catalogue 105 SYSTEM INSTALLATION IN MOVABLE WALLS In this type of wall it is possible to install the NEW AIR LOGIK NEW AIR SQUARE SOCKETS and the ECLETTIS SOCKET Is possible to install on plasterboard A 850 and 240 with curved union B 2 inch with straight union INSTALLATION S EXAMPLE IN MOVABLE WALLS LEGEND 4 wall fixing collar 2 plasterboard wall 5 flush plaster 3 panel fixing screws 6 activation line 12V 2 gt E59 5 6 3 4 6 SII S SSS SSIS SRR ES SS Po sees ese H LI i SS 1 im L SOOO Sa KO SN SS ISO NN MO E NEW AIR socket frame SQUARE socket frame ECLETTIS socket frame VAC PAN KIT INSTALLATION Rege e g CUTTO BE MADE WALL ES in the furniture skirting board 1 socket for furniture VAC PAN 2 flexible hose for connecting the piping with the socket 3 socket activation line 12V 4 Socket electrical connection Vac Pan 5 on off lever for socket activation 6 kitchen furniture skirting board 7 piping from the system NOTE The vacuum system is turned on and off by pressing and releasing the lever 5 The dust that is brought near the socket using a broom is aspirated quickly umi iW mon al cel al 106 General Catalogue VAC
29. installed electrical switches available PLUG with interface REMOTE and dual plug cable are components supplied VISUAL INDICATORS GREEN ON SYSTEM RUNNING Indicates that the central power unit Is operating correctly REMOTE PANEL KIT CONNECTION FOR QB STUDIO TS AND C500 POWER UNITS Using the electronic card of PLUG with REMOTE interface to connection REMOTE panel with central power units 9 114 General Catalogue BLINKING GREEN RED ON CENTRAL POWER UNIT LOCK DUE TO STARTS ANOMALY Indicates that the central power unit has locked due to more than 6 starts in one minute BLINKING GREEN BLINKING RED SAFETY LOCK INTERVENTION Indicates that the central power unit has locked after continuous use for more than 30 minutes Safety timer intervenes 1 OB built in central power unit 2 STUDIO TS or C500 central power units 3 PLUG with REMOTE interface 4 dual plug cable 5 pre wired sheathing 2x1 216 for socket line 6 pre wired sheathing 4x1 016 for REMOTE panel 7 REMOTE panel 1 REMOTE panel 2 PLUG with interface for REMOTE panel 3 Dual plug cable FIXED YELLOW CHECK DUST CONTAINER FILLING Indicates the possibility that the dust container is full BLINKING YELLOW FILTER MAINTENANCE NECESSARY Indicates imminent clogging of filter cartridge BLINKING YELLOW RED ON FILTER MAINTENANCE NECESSARY Indicates imminent clogging
30. m is operating ELECTRICAL CONNECTION for MODBUS mode FOR PERFETTO TXA TPA TP AND CLASSIC TC POWER UNITS GENERAL COMPONENTS 1 flush mounted junction box for powering central power unit SEE NOTE 1 2 12v socket cable line Dynamic Control Display SEE NOTE 2 3 electric junction box 4 pre wired sheathing 2x1 916 for socket line 5 pre wired sheathing 4x1 216 6 socket frames 7 Dynamic Control Display SEE NOTE 3 NOTE 1 EXTERNAL CENTRAL POWER UNIT The central power unit can also be installed externally in this case ensure that the junction box is equipped 1 with suitable electrical protection I AMA TRO eoe Ta CIT 4 E OPERATING VACUUM This displays the operating vacuum in D OPERATING VACUUM RANGE This displays the vacuum level at which the system is operating LO OK HI mbar when the system is operating NOTE2 12V SOCKET CABLE LINE DYNAMIC CONTROL DISPLAY Cable supplied with the central power unit to be wired according to these specifications 2 wires for micro line 3 power supply wires for Dynamic Control Display NOTE 3 DYNAMIC CONTROL DISPLAY The central power unit can power only one Dynamic Control Display If installing more than one Dynamic Control Display arrange for an auxiliary power supply General Catalogue 111 112 DYNAMIC CONTROL DISPLAY CMT800 FOR QB CENTRAL POWER UNIT The Dynamic control display is compatible i
31. ms for multi operators 1 Single fase power unit 2 Three phase power unit 3 Vacuum sockets 4 Pipes 5 False ceiling AO 6 Dynamic or Remote panel RESIDENTIAL SECTOR Central vacuum systems for one operator 1 Single fase power unit 3 Vacuum sockets 4 Pipes 6 Dynamic or Remote panel o 3 E c c D S General Catalogue Technical Manual 129 TUBO VACUUM SYSTEM INSPECTION AHNAALALLTAALLLLIVALLLLTALLL LL AALLLLILAALLLTL ALI Electric consent inspection To check the correct position of the activation line connect the inlet line with the outlet line in parallel on each inlet frame In the last socket short circuit the two wires together A Connect a tester instrument to the activation line of the central power unit B select the function CONTINUITY and check that the circuit is ring connected The value O ohm will display on the instrument Piping inspection This check is used to make sure that there are no air leaks in the piping still without sockets and the central power unit It must be performed when completing the positioning preparations and repeated before gluing the screed Use the TUBO system tester kit AT380 or if not available a portable vacuum cleaner a vacuum gauge to measure the vacuum and a series of caps for Inspection PARRA AA Viyg TT M TT oo MSR ee 1 Insert a system tester cap on each inlet frame 2 Power
32. n LM mode with OB central power unit It signals the start of operation of the central power unit and makes it possible to RESET the system without having to access the machine VISUAL INDICATORS A CONTAINER FILLING LEVEL This calculates the presumed filling level of the dust container using 5 progressive stages B FILTER CARTRIDGE SATURATION It displays the saturation level of the filter cartridge based on the calculation of the differential sensors ELECTRICAL CONNECTION for LM mode FOR QB POWER UNIT GENERAL COMPONENTS 1 flush mounted junction box for powering central power unit SEE NOTE 1 2 12vsocket cable line Dynamic Control Display 3 electric junction box 4 pre wired sheathing 4x1 916 5 Dynamic Control Display 6 pre wired sheathing 2x1 916 for socket line sxketframes NOTE 1 EXTERNAL CENTRAL POWER UNIT The central power unit can also be installed externally in this case ensure that the junction box is equipped 1 with suitable electrical protection General Catalogue C CENTRAL POWER UNIT ON This signals that the centralised vacuum system is operating D CENTRAL POWER UNIT HOURS OF OPERATION This displays the total hours of central power unit operation DYNAMIC CONTROL DISPLAY CMTS800 FOR STUDIO TS AND C500 POWER UNITS The Dynamic control display is compatible in LM mode with STUDIO and C500 central power units It signals the start of operation of
33. of filter cartridge 8 socket frames 9 220v power supply 10 216 pre wired 3x1 for connection between plug and OB VACUUM SOCKET INSTALLATION SOCKET BODIES ADAPTABLE TO THE ELECTRICAL SWITCH PLATES Aertecnica produces NEW AIR series socket bodies and adapter supports that are compatible with the electric switch plates widely found on the market NOTE The electric switch plates are not included in the supply with the exception of the complete vacuum socket models indicated below 1 parallel electric connection with the preceding socket 2 vacuum socket body 3 adapter support for switch plate 4 fixing screws 5 electrical switch plate not supplied by Aertecnica 6 OR gasket to be lubricated easy door opening 8 parallel electric connection with the following socket COMPLETE VACUUM SOCKET Aertecnica also produces the following complete vacuum socket lines NEW AIR SOCKET WITH NORMAL OPENING The central power unit turns on with the insertion of the flexible hose or with an electrified hose by using the switch on the handle Electrical switch plates included The socket may be equipped with the microswitch kit for turning on the central power unit when the door is opened code NA699 Pi NEW AIR SOCKET BODY LOGIK NEW AIR SOCKET The central power unit turns on with the insertion of the flexible hose or with an electrified hose by using the switch on the handle
34. order to prevent possible clogging COLD BONDED PIPING HOT WELDED PIPING perfectly smooth inner surface inner surface with burrs from casting inner surface with steps I 3 S z SOCKETED PIPING SOCKETED PIPING WITH O RING COLD BONDED inner surface with steps lt e 102 General Catalogue Technical Manual OFF TAKE ORIENTATION When installing the fittings it is important to orient the offtakes M NO towards the central power unit This 2 makes it possible for the central power unit to aspirate the material as easily YES gom as possible CENTRAL RU SIG Gs POWER UNIT Q0 n e e AM INCORRECTLY ORIENTED ENTRAL Sess Muro UNIT OFFTAKE ny the suction of the dust along line 2 m proceeds in the opposite direction of CORRECTLY ORIENTED the central power unit OFFTAKE the suction of the dust flows along line 1 or line 2 CENTRAL POWER UNIT CENTRAL POWER UNIT CORRECTLY ORIENTED c3 a4 a INCORRECTLY ORIENTED the suction of the dust OFFTAKE from line 1 proceeds towards the central power unit in a flowing manner The dust transiting in the offtake does not fall inside line when aspirated by line 2 1 the dust transiting in the offtake could drop m J to gravity into line RI clogging the inlet ES of the vacuum socket 2 connected to the base HOW TO REDUCE THE PRESSURE DROPS OFFTAKE FOR TWO END LINES COMPOSED 90 ELBOW To optimise the system eliminating all risks of
35. r is 15 m which makes it possible to go up or down 2 floors wireless hose 2 receiver 3 direct connection line to the central power unit BRAVO VACUUM SYSTEM POWER UNIT The BRAVO built in vacuum system power unit was designed to solve space related problems that are found in all types of modern homes with smaller surfaces BRAVO is recommended for one room flats shops small offices bars garages etc INSTALLATION IN AN EXTERNAL WALL The built in vacuum system power unit must be installed in the external wall of the room of installation A minimum of a 25 cm diameter 30 cm deep hole is sufficient for housing the vacuum system power unit Its dimensions guarantee the venting of the aspirated air directly outdoors yg IAA INSIDE OUTSIDE Air outlet grill p BRAVO LE minimum 20 em Flexible hose 7 Floor minimum 30 cm TECHNICAL ROOM i EXTERNAL SIDE TECHNICAL ROOM SIDE i i Convolve built in support Alluminium flexible hose Flangia air exaust Air vent grille Flexible hose Adjust stirrup Electrical connection input General Catalogue 127 KOMPATTA KT The KOMPATIA KT line was created 3 from one to three simultaneous to sa
36. tion is very simple and quick thanks to the fixing brackets and the cabling prepared for the electric connection already inserted in the enclosure he OB central power unit reaches degree of electrical protection IP55 with channelled air exhaust and IP45 with air exhaust from the door This solution is suitable for outdoor installations WALL BOX MEASUREMENTS The measurements of reference in cm for the box are provided to the side CENTRAL POWER UNIT INSERTION AND FIXING he installation phase of the central power unit is simple and quick insert the central power unit body and hook it into the two holes in the enclosure using the appropriate pivots A he dust inlet fitting will engage in the housing in the central power unit Fix the central power unit to the wall enclosure using the appropriate screws 11 52 26 General Catalogue 23 5 125 QB CENTRAL POWER UNIT ELECTRIC AND HYDRAULIC CONNECTION QB CENTRAL POWER UNIT EXPULSION OF CHANNELLED AIR WITH BUILT IN ENCLOSURE Recommended for central power PE units that are located indoors or
37. tisfy the requirements of operators terziary professional sector to offer 4 4 models with air filter and self a guarantee of absolute reliability cleaning system and above all the top swiftness of 5 speed and swiftness of installation installation speeding up the product 6 installation size reduced setup and reducing the size 7 dust container capacity 150 liter Main caracteristics are 1 engine housing with three phase motor inside in the upper section 2 electric board integrated in the machine frame DESCRIPTION OF THE PARTS 1 Sound proof sponge 10 Reversible air outlet 2 Exhaust valve 11 Motor support 3 Compressed air cylinder 12 Turbine motor 4 Vacuum display 13 Self cleaning valve 5 Main switch 14 Polyester filter cartridge 6 Electric panel 15 Dust container release lever 7 Self cleaning timer 16 Fixed nut filter cartridge 8 Condensation drain valve 17 Dust container 9 Compressor for air cylinder recharge 2 INSTALLING KOMPATTA KT TC 1 Air vent grill 2 Silencer 3 Self cleaning compressor 4 Supporting feet 5 Suction manifold 6 Ball valve 7 Vertical rising pipe 8 Orizontal rising pipe 9 400V power supply 10 12V vacuum sockets line 3 EN f M 2 NN o S i D 128 General Catalogue Technical Manual TERTIARY SECTOR Mixed central vacuum syste
38. xible hose including balconies store rooms outdoor stairs porch etc a Dynamic Control Display CMT800 or REMOTE panel kit CM8890 b Vacuum socket General Catalogue Technical Manual 99 Technical Manual 100 HOVV TO CALCULATE THE NUMBER OF VACUUM SOCKETS RESIDENTIAL SECTOR Proceed as follows to correctly position the vacuum sockets ANALYTICAL METHOD LZU TI L 1 map to scale 2 ruler and pencil 3 compass HOW TO PROCEED 1 Remember that the length of the tube iS 7 or 9 m therefore consider the presence of future furnishing that could obstruct them when distributing the sockets 2 Use the compass and building map According to the drawing scale ratio set the opening of the compass to a measurement of 1 m less than the length of the flexible hose 3 Position the first socket at the bottom of the stairs see point p on the GROUND FLOOR 4 Trace a circumference on the drawing placing the centre at the point where the socket will be installed drawing the operating range of the socket itself 5 Position the subsequent sockets considering the operating range of the first socket and a limited overlapping of the operating ranges as a safety I margin I l 6 Use a rule to check that the positioning is sufficient in order to cover all rooms very important phase General Catalogue SYNTHETIC METHOD The formula below can b
Download Pdf Manuals
Related Search
Related Contents
Manuel d`utilisation Bangor University Talentlink User Guide Sony XM-405EQX Operating Instructions Guide d`entretien et manuel d`installation Cisco Aironet 350 Wireless Bridge EVO4 User manual - AiM Sportsystems 7_pcet_pdm_fiches_bonnes_pratiques_1 (pdf Fox DVD Ripper - FoxEasy Software 888 SMITH SYSTEM Copyright © All rights reserved.
Failed to retrieve file