Home

SEQ/SEQ-1U User Manual

image

Contents

1. Aux Relay Contact HOUOL Pin 7 Aux Relay Contact 3 2 1 Up Down Sequence Control Inputs The SEQ can be controlled by a DC voltage in the range of 5V to 30V by a contact closure such as a relay or by a switch In this manual the terms momentary and latching are used when describing Switches A momentary switch is considered to be a switch which provides a connection only while it is actually held pressed and a latching switch is considered to be a switch which remains in either the on or the off state like a light switch Momentary switches are preferred for use with the SEQ since multiple control locations can be used and also because some of the functions of the SEQ are not available when a latching switch is used see programming section Switches with gold contacts are recommended for the best long term reliability The type of input is selected totally through programming making the electrical connections straightforward The six control options are discussed below a DC VOLTAGE The SEQ will power up when the voltage is present and power down when there is no voltage Connect the positive wire to the Up input and the ground or negative wire to Common Program the input for 5 30 V DC b CONTACT CLOSURE The SEQ will power up when the contacts are closed and power down when the contacts are open Connect the two wires from the contacts to Up and Common Program the input for Latchin
2. Delay C On 5 Delay C Off 5 Aux Output or 12V DC Output C Aux or 12V Delay On 10 Aux or 12V Delay Off 0 These delay times are an example Set actual times as required for each application In the above example the turn on delay for Bank C is 5 seconds and the turn on delay for the X1120 RT is 10 seconds Because the Aux Output is set to Bank C the same internal trigger is used to start both time delays What then happens is that after Bank B turns on there is a 5 second delay before Bank C turns on then there is further 5 second delay before the SX1120 RT turns on the 10 second timer started at the same time as the 5 second timer for Bank C When it is time to power down the X1120 RT turns off immediately the delay is set to zero then 5 seconds later Bank C turns off In another example if the X1120 RT should turn on first and off last the programming would be as follows Menu Item Setting Delay A On EN Delay A Off 25 Aux Output or 12V DC Output A Aux or 12V Delay On 0 Aux or 12V Delay Off 10 These delay times are an example Set actual times as required for each application SurgeX Technical Support 800 645 9721 surgex com Page 17 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 As can be seen in the above two examples by choosing the appropriate sync setting and delay times it is possible to position the 4 bank anywhere in the se
3. SURGEX energy intelligence SEQ SEQ 1U SURGEX Programmable Sequencer Surge Eliminator Power Conditioner User Manual Software Version 2 0 SurgeX Technical Support 800 645 9721 surgex com SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 U S Patent Nos RE39 446 6 728 089 6 744 613 6 947 266 7 068 487 7 184 252 7 511 934 7 541 696 and 7 551 412 U S Patent Application Publication Nos 20090303648 20110063759 20110102052 20120128078 20120130658 and 20120194955 Canadian Patent No 2 461 332 and Canadian Patent Application No 2 511 695 European Patent Application Nos EP2482085 and EP 2469554 SURGEX energy intelligence energy intelligence CSPG ESP ENERGY INTELLIGENCE MULTI STAGE ECOMMANDCENTER NEXT GEN PCS DIGITAL QC SURGEX DEFENDER SERIES ELIMINATOR SERIES SURGE ELIMINATION SERIES MODE ICE INRUSH CURRENT ELIMINATION COUVS ADVANCED SERIES MODE AXESS CERVELLA SurgeX Technical Support 800 645 9721 surgex com Page 2 Software Version 2 0 SURGE SEQ SEQ 1U User Manual 1 Introduction 4 De Features 2 3 Installation 3 3 1 120VoltConnectons ss 3 3 2 Remote Control Connections e ss 4 3 2 1 Up Down Sequence Control lnputs ss 4 3 2 2 Over ridelnput CO 5 3 2 3 ExternalLED Connections sss 5 3 2 4 ConfirmationConnection ss 5 4 Quick Start 6 5 Programming 7 5 1 PowerSequencingControl 7 5 2 Over ride
4. Power Fail Restore n unit back on after a power failure if unit was powered up when the power SurgeX Technical Support 800 645 9721 surgex com Page 8 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 5 Programming The SEQ is a very versatile sequencer and has 25 menu items that control its operation Some menu items allow predetermined options to be selected and others allow time delays or voltage limits to be adjusted All adjustments are made via the front panel and are achieved by turning the two screwdriver accessible rotary encoders labeled SEL select and ADJ adjust Turning SEL steps through the menu shown on the first line of the display and turning ADJ allows each menu item to be changed shown on the second line of the display To enter the programming mode first turn SEL one click clockwise The display will then tell you to press the front panel button This puts you into the programming mode All the options delay times and voltage adjustments are set using this mode When you have completed the set up turn SEL counter clockwise until the display tells you to press the button again Doing so saves the new set up information in non volatile memory and puts you back into normal operation A password can be set while in the programming mode Once a password has been set you need to enter the same password before you can get back into the programming mode again This prevents unauthor
5. or if you wanted a fourth bank to power on last and off first you should select C as the 12V DC Output and set this delay time to be shorter than the delay that you set for Main Bank C Off the 12V Delay Off can be set to zero in this case SurgeX Technical Support 800 645 9721 surgex com Page 11 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 5 5 Auxiliary Relay The programmable Auxiliary Relay provides a single normally open contact which is available at the rear of the unit The aux relay can be used to provide confirmation to a central controller to control another power distribution product or for controlling another SEQ when two or more are ganged or cascaded together Please see the applications section for full details on setting up an expanded system There are three menu items to control the aux relay one to select the mode of operation and two delay times The two delay times are only applicable when option A B or C is selected for Aux Output There is additional information on the aux relay in section 3 2 4 Menu Item Options Description Aux Output Confirm Relay contacts provide confirmation to a controller A Contacts synchronized with Bank A B Contacts synchronized with Bank B C Contacts synchronized with Bank C Gang Provide control to the next ganged unit Cascade Provide control to the next unitin a cascaded chain Aux Delay On 0 40 Seconds Set power up dela
6. com Page 21 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 7 Troubleshooting Condition Check Initial Check Whenever power is applied to the SEQ the LCD display should be illuminated and should show two lines of text as follows Status All On or All Off 120VAC or whatever the actual line voltage is Protection Good If the first line of the display does not show Status the unit is in programming mode and therefore the three banks of receptacles will not turn on Turn the SEL rotary encoder counter clockwise and then press the button to get out of programming mode If the display is not illuminated and showing the above two lines of information check that power is actually being supplied to the unit and that the breaker on the rear panel adjacent to the power cord has not tripped If you are certain that power is being supplied to the unit consult the factory for assistance Unit will not power up from If you have performed initial checks as above and the unit will still not power up it could be remote control connection because the down input terminal 2 is being held active all the time Remove the terminal block from the rear and check that the Up and Down signals are correct with a meter The front panel button will Check whether the front panel button has been programmed to Delay or Disable If it has not work been programmed to Delay you must hold the button for one se
7. 1 6 1 2 Controlling the SEQ The SEQ is primarily designed to be used with momentary action switches A momentary switch is a Switch where the contacts are closed only while the switch is actually pressed such as a push switch Using momentary switches allows several switches to be connected in parallel so that the SEQ can be controlled from multiple locations A single push switch would cause the unit to power up on the first press and then power down on the second press A dual momentary switch such as a center biased rocker or two separate push switches one for UP and the other for DOWN can also be used with equal versatility It is up to the installer to choose the configuration Whatever type of switch is used Switches with gold contacts are recommended for the best long term reliability Where there are multiple control locations it is advantageous to use the 12V dc output to drive LEDs so that there is an LED at each control location Up to four LEDs running at 10mA each can be powered from the 12V dc output Each control location then has an indication of the operational status of the SEQ regardless of which location last initiated power up or power down The SEQ also supports latching switches contact closure and applied DC voltage but these types of input cannot be used with multiple control locations they are intended primarily for a small system or for hook up to a central controller The front panel push button will not work w
8. Confirmation Connection The SEQ offers two ways to provide confirmation feedback to a central controller a 12V DC output and isolated relay contacts Confirmation tells the controller that the SEQ has indeed powered up or that it is fully powered down If the 12V DC output and the Aux Relay contacts are not used for any other function you will be free to choose whichever provides the best interface for the application However if one of these outputs is used for another function you will have to use the one that is available To use the 12V DC output for confirmation connect 12V DC output to the positive input of the controller and Common to ground The output will be at 12V when all banks are powered up and will be zero when all banks are powered down Program 12V DC Output for Confirm Note that the SEQ common terminal is shared between the inputs and the 12V DC output If you need relay contacts for confirmation and you are using the Aux Relay for another function you can connect a small relay between the 12V DC output and common The relay coil current must not be more than 40mA and you must connect a diode such as a 1N4148 or 1N4002 across the relay coil cathode to 12V dc to Suppress the back EMF from the coil If you need assistance with this please contact our technical Support department To use the Auxiliary Relay contacts for confirmation connect the contacts to the input of the controller The relay contacts will be
9. Control _ i 8 5 3 Front Panel Push Button 8 5 4 12vDC Output 9 5 5 AuxiliaryRelay Rhj C O Oa 10 5 6 Out of Range AC Voltage ShutDown y C C Oaaaaaaaaaaaaaaaaaaaaaaaaaaaa 10 5 7 Self TestFailureShutDown se 11 5 8 RestoreFunctions L 11 5 9 fasso k I AES ES EO 11 6 Applications 12 6 1 GeneralPoins 12 6 1 1 ControlingtheSEQ C C O 12 6 12 12VDC Output 12 6 1 3 AuxiliayRelay Rj C C O O 13 6 1 4 OverrideFunction C C Oa 13 6 1 5 Other Functions O 13 6 2 Single UnitSystems j C 14 6 3 ExpandedSystem j C CO Oaala 15 6 4 GangedSystem C C Oaaaaaaaaaaa 18 6 5 CascadedSystem C C C Oa 19 7 Troubleshooting 20 8 Error Codes 20 9 Specifications 21 SurgeX Technical Support 800 645 9721 surgex com Page 3 SURGE energy 1 SEQ SEQ 1U User Manual Software Version 2 0 intelligence Introduction The SurgeX SEQ and SEQ 1U are 120V 20 Amp three bank AC power sequencers incorporating SurgeX Advanced Series Mode power conditioning and surge protection The surge protection is rated A 1 1 the highest standard of the Federal Commercial Item Description for Endurance Sequence Bank A Sequence Bank Sequence Bank Always On Total Model Size Receptacles B Receptacles C Receptacles Receptacles Receptacles SEQ 2 RU 4 4 4 2 14 SEQ 1U 1RU 2 2 2 2 8 SurgeX Bank C which is next to the two always on receptacles on the rear pan
10. Push Button The front panel push button allows the unit to be powered up or powered down from the front panel There is one menu item associated with the push button which allows it to be disabled or to operate only after a one second delay The delay option prevents the unit inadvertently powering on or off if the push button is accidentally bumped Note that the push button cannot be used in conjunction with applied voltage or latching type remote control inputs Menu Item Options Description Front Panel Enable Front panel button is enabled Button Delay Button has a 1 second delay Disable Front panel button is disabled SurgeX Technical Support 800 645 9721 surgex com Page 10 SURGE energy intelligence 5 4 12V DC Output SEQ SEQ 1U User Manual Software Version 2 0 The programmable 12V DC output provides a nominal 12 Volts at up to 40mA of direct current and is available at the rear of the unit The 12V DC output can be used to provide confirmation to a central controller to control another power distribution product to drive LEDs or to provide feedback to the previous SEQ in a cascaded chain Please see the applications section for full details on setting up an expanded system There are three menu items to control the 12V DC output one to select the mode of operation and two to set the delay times The two delay times are only applicable when option A B or C is selected for 12V DC Output There is
11. additional information on the 12V DC output in Sections 3 2 3 and 3 2 4 If the DC output is not used it can be left at any setting Menu Item Options Description 12V DC Output Confirm Output provides confirmation to a controller A Output synchronized with Bank A B Output synchronized with Bank B L Output synchronized with Bank L LED Flashes while powering Up and Down to drive LEDs Cascade Provide feedback to the previous cascaded unit 12V Delay On 0 40 Seconds Set power up delay time when set to A B or C This delay time begins with the same internal trigger as the bank selected in the previous item For example if you wanted a fourth bank to power on first and off last you should select A as the 12V DC Output and set this delay time to be shorter than the delay that you set for Main Bank A On the 12V Delay On can be set to zero in this case or if you wanted a fourth bank to power on last and off first you should select C as the 12V DC Output and set this delay time to be longer than the delay that you set for Main Bank C On 12V Delay Off 0 40 Seconds Set power down delay time when set to A B or C This delay time begins with the same internal trigger as the bank selected in 12V DC Output For example if you wanted a fourth bank to power on first and off last you should select A as the 12V dc Output and set this delay time to be longer than the delay that you set for Main Bank A Off
12. ation could be incorrect It is recommended that you completely check the programming and save the settings again If Error 15 is still displayed there is most likely a permanent problem with the non volatile memory Error 16 There is an internal error The unit will need to be returned to the factory for repair Error 24 Please call the factory SurgeX Technical Support 800 645 9721 surgex com Page 22 SURGE energy intelligence 9 Specifications SEQ SEQ 1U User Manual Software Version 2 0 Parameter Specification Load Rating 20 Amps at 120 Volts Maximum Load Inrush Energy 1400 J oules total during power up UL 1449 Adjunct Classification Test Results Surge Let through Voltage 6000 Volt Surge 0 Volts 1000 Surges 6000 Volts 3000 Amps B3 pulse measured suppressed voltage 170 Volts no failures Maximum Applied Surge Current Maximum Applied Surge Voltage 6000 Volts Unlimited due to current limiting Maximum Applied Surge Energy Unlimited due to current limiting Endurance C62 41 1991 category B3 pulses 1 KV gt 500 000 3 KV gt 10 000 6 KV gt 1000 EMI RFI Filter Normal mode 500 load gt 30 dB 100 KHz 50 MHz Common Mode 50Q load gt 20dB 1MHz 50 MHz Under Voltage Auto Shutdown Adjustable from 90V to 110V Over Voltage Auto Shutdown Adjustable from 130V to 150V Delay Time per Bank 1 40 secon
13. ce All the amplifiers will then bank in the sequence The turn on last and off first equipment rack will then turn on first and off last SurgeX Technical Support 800 645 9721 surgex com Page 19 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 6 4 Ganged System A ganged system consists of two or more SEQs connected together in such a way that they all turn on and off together Figure 6 shows how to connect and program each unit in a three unit system If only two units are to be ganged together then ignore the middle unit in the diagram If more than three units are to be ganged together then keep the first and last units set up as shown add units in the middle and set them up and connect them in the same way as the middle unit in the diagram The remote control inputs should be connected to the first unit and the same control options are available as for a single unit system If confirmation feedback is required for a central controller use the aux relay contacts on the last unit The delay times should be set the same for all the SEQs unless you want to skew the turn on or turn off points from one unit to the next If the low and high voltage shutdown points are narrowed from their defaults of 90V and 150V this should be done on the first unit only The other units should be left set to 90V and 150V The two restore options should only be enabled if required on the first unit The self test shutdo
14. closed when all IDV do Oulnut et ens banks are powered up and open when all a L 2 banks are powered down The default for menu T item Aux Output is Confirm so you do not need to program this item unless you comman previously changed it The contacts are rated for 30V DC at 1 Amp Connectina a 12 Volt relay to the 12V DC outnut SurgeX Technical Support 800 645 9721 surgex com Page 7 SURGEX energy intelligence 4 Quick Start This section is intended to allow users with a simple straightforward system incorporating a single SEQ to get up and running with minimum effort If this is not the case then skip this section and go directly to the section on detailed programming Section 5 If you are going to follow the quick start instructions you only need to perform the following Steps since the unit has been shipped with default settings suitable for basic operation HE 2 Make all connections as per Section 3 Insert a screwdriver in the hole labeled SEL and turn it one click clockwise Press the front panel button and you will see the first menu item Bank C Function on the display Leave this set to Sequence unless you want to use Bank C as Always On receptacles In that case insert the screwdriver in the hole labeled ADJ and turn one click clockwise to change it to Always On Advance SEL one click to get the second menu item Up amp Down Inputs Select the option required for the install by
15. cond before it will operate If ithas been programmed to Disable it will not operate at all The front panel button will not work if the Up amp Down Inputs has been set to Latching or 5 30V DC This is due to the fact that a latching type input will always over ride a momentary Switch like the front panel button The unit sequences up but Check the remote control connections using a meter and also the programming of the Up will not sequence down amp Down Inputs If Up amp Down Inputs is set to Separate Up amp Down and you are using a single momentary switch the unit will sequence up but not sequence down The unit starts to There are two likely causes for this One cause is a Down input that is on all the time and Sequence up but then over riding the power up sequence Check the down input with a meter The other cause is immediately sequences that the Over Ride Func menu item has been set to Master when the unit is not actually down connected to another SEQ and is in cascade mode Change this menu item to Disable The unit will not go into You must power down the unit first before you can get into the programming mode programming mode 8 Error Codes Error Error Description Error 05 The calibration of the AC voltmeter is no longer accurate The unitis otherwise fully operational Call the factory for assistance Error 15 There is a checksum error in the non volatile memory This indicates that the set up inform
16. ds in 1 second increments Agency Listings Voltmeter Accuracy 2 Remote Control Input Voltage 5 30 VDC Current Draw 4 mA Maximum Auxiliary Relay Contact Rating 30V DC at 1A Contact Closure Max Resistance 100 O 12V DC Output Max Current 40 mA Dimensions SEQ 19 W x 10 5 D x3 5 H 2 RU SEQ 1U 19 W x 12 25 D x 1 75 H 1 RU Weight SEQ 16 Ib SEQ 1U 13 Ib Temperature Range 5C to 35C Humidity Range 0 to 95 R H Non condensing UL 1449 3 Edition SEQ 1U Pending UL 1283 5 Edition SEQ 1U Pending CSA C22 2 No 8 M1986 R2008 SEQ 1U Pending 1 2 x 50 microsecond industry standard combination wave surge as per IEEE C62 41 SurgeX Technical Support 800 645 9721 surgex com CAUTION Do not install this device if there is not at least 10 meters 30 feet or more between the electrical outlet and the electrical service panel Page 23
17. e limits are adjusted by using two menu items with the low limit adjustable from 90V to 110V and the high limit adjustable from 130V to 150V If the unit has shut down due to an out of range line voltage and the line voltage subsequently returns to normal the power up sequence will only resume if the Power Fail Restore option section 5 8 has been set to Enable Menu Item Options Description Low VoltShutDown 90 110 VAC Set low voltage shut down point High VoltShut Down 130 150 VAC Set high voltage shut down point SurgeX Technical Support 800 645 9721 surgex com Page 12 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 5 7 Self Test Failure Shut Down The SEQ circuitry has integral self monitoring which tells the microprocessor that the surge protection is on line and operating within specification This menu item allows an option to be selected so that the unit will begin the power down sequence should the self test ever fail Menu Item Options Description Self Test Shut Disable Banks will not be powered off if self test fails Down Enable Banks will be powered off if self test fails 5 8 Restore Functions There are two menu items which when enabled allow the SEQ to restore the original on condition after shut down caused either by loss of AC power or out of range AC or by an over ride When these options are disabled the SEQ will not power up whe
18. el can itself be configured to be always on increasing the number of always on receptacles SurgeX ICE Inrush Current Elimination circuitry is incorporated into the SEQ This eliminates problems associated with inrush currents from large loads such as amplifiers With SurgeX ICE it is not necessary to take inrush currents into account when designing the AC power for a system and special time delay circuit breakers are not required you only need to ensure that the steady state currents of all products plugged into the SEQ are within the 20 Amp rating The front panel houses a two line back lit LCD display which provides status information in normal use and allows interaction with menu items during programming Also on the front panel are two screwdriver accessible rotary encoders which are used to step through and select from a menu of items which determine the operation of the unit The push button when pressed causes the unit to power up or power down This button can be disabled if not required The LED above the button indicates the status of the unit When the LED is off the unit is fully powered down when itis on the unit is fully powered up when itis flashing the unit is in the process of powering up or down A built in AC voltmeter indicates the line voltage on the LCD display The internal voltmeter is a peak reading type which was chosen because most electronic equipment incorporates a power supply that charges mostly during the AC peak
19. for confirmation feedback to a central controller and when the 12V dc output is used for control it cannot be used to drive LEDs If more current capability is required additional SurgeX RT products can be connected to the second unit Connect pins 6 amp 7 of the second unit to pins 1 amp 2 of the third unit and so on It is possible to configure a five bank expanded system by using both the aux relay and the 12V dc output to simultaneously control two separate pieces of equipment or two racks of equipment In this case refer to Figures 3 4 amp 5 and follow the instructions below The SEQ in an expanded system can be controlled by the same inputs as a single unit system Figure 3 page 16 shows how the two units are wired together using the aux relay contacts The aux relay contacts on the SEQ terminals 6 amp 7 are connected to the contact closure inputs at the back of the RT terminals 1 amp 2 In order to work as a 4 bank system the aux relay must be programmed accordingly The Aux Output menu item must be set to A B or C This synchronizes the aux relay to one of the internal triggers used for main banks A B or C The Aux Delay On and Aux Delay Off delay times are then set to position the 4 bank wherever it is required to be in the sequence As an example if an X1120 RT connected to an SEQ should turn on last and off first the menu items shown below should be programmed as follows Menu Item Setting
20. for programming details The aux relay has a special use when SEQs are ganged or cascaded together this is covered in the sections on ganged and cascaded systems 6 1 4 Over Ride Function The SEQ has an over ride function that can be used for fire safety and other applications where the power must be held on or forced off The over ride function is programmable so that it can be set to either force the unit off or force it on When a signal is applied to the over ride input the unit will be forced on or off regardless of the main inputs If the unit has been forced off by an over ride the Over Ride Restore menu option determines whether the unit will power up again or remain off There is a special delay which can be used only with an over ride condition This allows a faster turn on or turn off than the main delays It is not recommended to use the special delay with expanded systems because the auxiliary bank may not turn on or turn off in the correct sequence during an over ride condition The over ride input can be programmed to accept either a contact closure or applied DC voltage See Section 3 2 for connection details and Section 5 2 for programming details The over ride input has a special use when SEQs are cascaded together This is covered in the section on cascaded systems If an over ride is required with a ganged system use the over ride input on the first SEQ If an over ride is required with a cascaded system use the o
21. g c MOMENTARY SWITCH ES The SEQ will power up when a switch is pressed once and power down when a switch is pressed a second time Connect the two wires from the switch es to Up and Common Program the input for Momentary d SEPARATE Up amp DOWN SWITCHES The SEQ will power up when the UP switch is pressed and power down when the DOWN switch is pressed Connect the two wires from the UP switch to Up and Common and the two wires from the DOWN switch to Down and Common Program the input for Separate Up amp Down e CENTER OFF SWITCH The SEQ will power up when the switch is pressed to the UP position and power down when the switch is pressed to the DOWN position Connect the wire from the UP terminal to Up the wire from the DOWN terminal to Down and the wire from the COMMON terminal to Common Program the input for Separate Up amp Down f LATCHING SWITCH The SEQ will power up when the switch is closed and power down when the Switch is open Connect the two wires from the switch to Up and Common Program the input for Latching Note The front panel button will not operate with options a b or f SurgeX Technical Support 800 645 9721 surgex com Page 6 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 3 2 2 Over Ride Input The SEQ has the option of adding an over ride function for purposes such as providing fi
22. g Aux Relay Momentary Confirmation Switch If Required LED and 1K 1 4W Resistor AONC BA 1234567 A On Switched 1234567 SEQ SX1120 RT Program Up amp Down Inputs Momentary 12V DC Output LED Aux Output A B or C Aux Delay On Set as Needed Aux Delay Off Set as Needed Figure 3 SurgeX Technical Support 800 645 9721 surgex com Page 18 SEQ SEQ 1U User Manual SURGE a Q Software Version 2 0 energy intelligence Expanded System Using 12V DC Output Confirmation Momentary If Required Switch AONC BA 1234567 A On Switched 1234567 SEQ X1120 RT Program Up amp Down Inputs Momentary 12V DC Output A B or C 12V Delay On Set as Needed 12V Delay Off Set as Needed Aux Output Confirm Five Bank Expanded System Example SIGNAL PROCESSING AMPLIFIER AMPLIFIER AMPLIFIER ipl EQUIPMENT EQUIPMENT RACK POWERED BY SX1120RT X1120RT SX1120RT X1120RT Connect pins 6 amp 7 of the SEQ to pins 1 amp 2 of the first Connect pins 5 amp 4 of the SX1120RT as per Figure 3 Then connect pins 6 amp 7 of the SEQ to pins 3 amp 2 of the first SX1120RT to pins 1 amp 2 of the second SX1120RT SX1120RT inside the Continue connecting as many SX1120RTs as needed equipment rack as per There is no limit to the number of additional units that can Figure 4 Program the SEQ be connected in this way Program the SEQ Aux Output to 12V DC output to be the first be the last bank in the sequen
23. ith a latching switch contact closure or applied voltage inputs 12V DC Output The 12V DC output can be used to drive LEDs thereby showing the operational status at remote control locations This output can drive up to 40mA which can power four LEDs at 10mA each or more LEDs at reduced current A resistor is required for each LED to limit the current The 12V DC output can also provide confirmation to a central controller or be used to drive a small relay 40mA maximum coil current The 12V DC output can be configured to control an external bank of equipment as an alternative to or in addition to the Aux Relay See Section 3 2 for connection details and Section 5 3 for programming details The 12V DC output has a special use when SEQs are cascaded together this is covered in the section on cascaded systems SurgeX Technical Support 800 645 9721 surgex com Page 14 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 6 1 3 Auxiliary Relay The primary uses of the aux relay are to control other remote turn on products or to provide status feedback to a central controller to confirm that the unit has completed the requested operation Details of using the aux relay to control other products are covered in the specific applications sections The aux relay provides one normally open contact at the rear terminal block and can handle 1 Amp at up to 30 Volts DC See Section 3 2 for connection details and Section 5 4
24. ized personnel from changing the set up information The password option is the last menu item and can be from one to six letters A Z You must be sure to remember the password once it is set as the only way to erase it is to erase all the set up information stored in the non volatile memory Please consult the factory to get instructions if you ever need to do this The instructions and notes that follow are in the same order as the actual menu items 5 1 Power Sequencing Control The following eight menu items must be set before the SEQ can be used in a system These determine the function and delay times of the sequenced banks and the type of control input DC voltage contact closure or Switch Please see Section 3 2 1 for details Menu Item Options Description Bank C Function Sequence Bank C is sequenced normally Always On Bank C is no longer sequenced On and Off Up amp Down Inputs Momentary Use with momentary switch es Separate Up amp Use with separate switches for Up and Down Down Latching Use with a latching switch or contact closure 5 30V DC Use with an applied DC voltage of 5 to 30 Volts Delay A B C On 1 40 Set power up delay time for each bank Seconds Delay A B C Off 1 40 Set power down delay time for each bank Seconds SurgeX Technical Support 800 645 9721 surgex com Page 9 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 5 2 Over Ride Contr
25. limination e SurgeX Impedance Tolerant EMI RFI filtering s SurgeX ICE Inrush Current Elimination e All time delays and functions easily programmed from the front panel e Bank C can be configured as always on e Accepts both DC voltage and contact closure control inputs e Two or more units can be ganged or cascaded together for larger systems e Programmable auxiliary relay output can be used to control other SurgeX products e Programmable 12 Volt DC output can be used to control other SurgeX products or drive LEDs e Auxiliary relay or 12 Volt DC output can be programmed to provide confirmation feedback e Built in AC Voltmeter e Separate over ride input can be used to force unit off or force unit on e Optional password can be used to prevent unauthorized access to set up information e Adjustable under voltage and over voltage shut down e Optional restore after power failure feature Installation The SEQ is designed to be installed in a 19 inch equipment rack and requires two units 2RU of rack space Use the four thumbscrews included to secure the rack ears to the rack rails These screws can be tightened by hand and do not require tools The SEQ 1U is designed to be installed in a 19 inch equipment rack and requires one unit LRU of rack space Use the eleven flathead screws included to secure the left and right rack ears to the product Use the four thumbscrews included to secure the rack ears to the rack rails Con
26. n the condition that caused the shut down goes away The restore functions cannot be used in conjunction with applied voltage or latching type remote control inputs Menu Item Options Description Power Fail Disable Banks will remain off after a power failure Restore Enable Restore the original status after a power failure Over Ride Disable Original status will not be restored after an over ride Restore Enable Original status will be restored after an over ride 5 9 Password A password can be set which will prevent unauthorized access to the programming mode From one to six letters A through Z can be used as a password It is important to remember the password because once it has been set you cannot get into the programming mode again without entering the password If you do forget the password the only way to erase it is to erase all the set up information If you ever need to do this please call the factory to obtain instructions When you select Password in the menu you will see a blinking cursor on the bottom line of the display Set the first letter of the password by turning ADJ Then advance SEL one click so that the cursor moves to the next position and repeat the process until you have set all the letters of your chosen password To erase a password set the cursor on the first letter and turn ADJ counter clockwise until you see only the cursor and no letter above it Then turn SEL one click back It is not
27. necessary to erase each letter erasing the first letter erases the whole password Menu Item Options Description Password A Z Set optional password of up to six letters Set each letter with ADJ and advance SEL to go to the next letter SurgeX Technical Support 800 645 9721 surgex com Page 13 SURGE energy intelligence 6 SEQ SEQ 1U User Manual Software Version 2 0 Applications The SEQ can be used in four types of configuration a single unit providing three sequenced banks an expanded system where the SEQ controls remote turn on SurgeX products providing four or five sequenced banks or three banks with increased current capacity on extra units a ganged system where two or more SEQs are connected together such that they all turn on and off at the same time providing three banks with increased current capacity for all three banks a cascaded system where two or more SEQs are connected together such that the banks turn on sequentially from one SEQ to the next SEQ Each configuration is covered separately in its own section but first there are some general points which apply to all types of installation 6 1 General Points This Section provides detailed information about the remote control connections If you have not already done so please read Section 3 2 before continuing The information in Section 6 1 applies to all types of installations and you should also read this section before continuing further 6 1
28. nect power to the unit by plugging the cord into a 120VAC 20 Amp wall or floor receptacle Do not plug the unit into a re locatable power tap 3 1 120 Volt Connections The SEQ has a total of 14 receptacles three sequenced banks of four and two always on The SEQ 1U has a total of 8 receptacles three sequenced banks of two and two always on Each receptacle is rated for a maximum load of 15 Amps but the total load must not exceed 20 Amps Plug the equipment cords into the receptacle banks as needed to turn on equipment in the required sequence The always on receptacles provide power as long as power is supplied to the SEQ Bank A always powers up first and off last IQ B SurgeX Technical Support 800 645 9721 surgex com Page 5 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 3 2 Remote Control Connections Remote connections are wired to the green 7 pin plug in Phoenix terminal block on the rear of the unit next to the power cord The terminal block itself is shipped in the accessory bag After you have made the connections to the terminal block plug it into the connector on the rear of the unit Never solder tin wires before inserting in a terminal block solder creeps and you will eventually have loose connections Pin 1 Up Input Pin 2 Down Input Pin 3 Over Ride Input Pin 4 12 V DC Output Pin 5 Common The connections are shown here Pin 6
29. off by an over ride See Section 5 8 for more details 6 2 Single Unit System Most of the information necessary to install and set up a single unit system can be found in Sections 3 2 and 6 1 Figure 1 shows a Single unit system controlled by momentary switches at three different locations and Figure 2 Shows a single unit controlled by a central controller Single Unit System Controlled by Momentary Switches Signal Processing Use an LED and 1K W AON G BA 1254567 resistor at each location SEQ Program Up amp Down Inputs Momentary 12V DC Output LED Figure 1 Single Unit System Controlled by Central Controller Confirmation Feedback Controller Low Voltage Signal Processing Contact Closure AONC BA 1234567 Program Up amp Down Inputs Latching Aux Output Confirm SurgeX Technical Support 800 645 9721 surgex com Page 16 SURGEX SEQ SEQ 1U User Manual Software Version 2 0 energy intelligence 6 3 Expanded System A basic expanded system consists of an SEQ in combination with a remote turn on SurgeX such as the X1120 RT or the SX20 NE RT Such a system provides a total of four banks and 40 Amps total load capacity The auxiliary relay inside the SEQ is normally used to control the second unit although the 12V DC output can also be used for this purpose The only difference in these remote control configurations is that when the aux relay is used to control a second unit it cannot be used
30. ol The SEQ has an optional over ride and four menu items that control this function If you do not require an over ride you can skip the next four menu items since units are shipped with this function disabled The over ride can be used for such purposes as fire safety over ride and can be set to either force the unit on or force it off when an over ride signal occurs The over ride input is also used for feedback when two or more SEQs are cascaded together This is covered in the applications section Menu Item Options Description Over Ride Input Contact Closure Use with relay contacts or latching switch 5 30V DC Use with an applied DC voltage of 5 to 30 Volts Over Ride Func Disable Disable over ride if not required Force On Force unit On when over ride is applied to input Force Off Force unit Off when over ride is applied to input Master Use when unit is the master in a cascaded chain Pass Thru Use when unit is an intermediate unit in a chain Over Ride Option Use Main Delays The main delays are used when an over ride occurs Special Delay The special delay is used when an over ride occurs A special delay should not be used when the Aux Relay is used to provide a fourth sequenced bank as the sequencing between the fourth bank and the three main banks during an over ride may not coordinate correctly Over Ride Delay 0 30 Seconds Set delay time to be used only during an over ride 5 3 FrontPanel
31. own add units in the middle and set them up and connect them in the same way as the middle unit in the diagram The remote control inputs should be connected to the first unit and the same control options are available as for a single unit system If confirmation feedback is required for a central controller use the aux relay contacts on the last unit The delay times should be set as required for the application If the low and high voltage shutdown points are narrowed from their defaults of 90V and 150V this should be done on the first unit only The other units should be left set to 90V and 150V The two restore options should only be enabled if required on the first unit The self test shutdown should be the same for all units If an over ride is required connect it to the last unit and program that unit to accept the type of over ride you need Three Units Cascaded Together Confirmation If Required LED and 1K 1 4W Resistor A ONC BA 1234567 AONC BA 1234567 A ONC BA 1234567 SEQ Program Up amp Down Inputs One Mom Over Ride Input 5 30 VDC Over Ride Func Master 12V DC Output LED Aux Output Cascade SEQ Program Up amp Down Inputs Latching Over Ride Input 5 30 VDC Over Ride Func Pass Thru 12V DC Output Cascade Aux Output Cascade Figure 7 SEQ Program Up amp Down Inputs Latching 12V DC Output Cascade Aux Output Confirm SurgeX Technical Support 800 645 9721 surgex
32. quence If an over ride is used with an expanded system do not use the Special Delay because the 4 bank may not turn on and off in the correct sequence during an over ride condition Figure 4 page 17 shows how to configure an expanded system using the 12V DC output instead of the Aux Relay to control external units This option allows the aux relay to be used for confirmation but it is then no longer possible to drive external LEDs from the 12V DC output The programming and delay timing set up follow the Same concepts as for the aux relay which is explained above Figure 5 page 17 shows an example of a medium sized system where the SEQ is controlling two separate sets of equipment independently by using both the aux output and the 12V DC output as control outputs The equipment rack is controlled by the 12V DC output and the bank of amplifiers is controlled by the aux output via SX1120RTs The signal processing equipment is powered from the SEQ itself Control wiring and programming is aS per Figures 3 and 4 Figure 5 is just one example of the versatility of the SEQ and the banks do not have to be set up exactly as shown in this example The aux output and the 12V DC output could be programmed to be the first two sequenced banks or the last two sequenced banks Similarly the rack mount SX1120RT remote turn on SurgeX was used in this example whereas the ICE20C or the hard wired SX20 NE RT could equally have been used Expanded System Usin
33. re safety over ride to force the system either on or off An over ride is initiated by applying a dc voltage of 5 30V or bya Sustained contact closure The selection of dc voltage or contact closure is accomplished during programming This topic is covered fully in the programming section Connect the over ride signal to the over ride input and common In the case of a dc voltage connect the positive wire to over ride and the negative wire to common 3 2 3 External LED Connections The SEQ is able to drive external LEDs or other signaling devices through its 12V DC output which can provide up to 40mA of current External LEDs connected in this way will mimic the LED on the front panel When connecting LEDs to the 12V output a series resistor is required For example many LEDs work well with 10mA of current so a 1K resistor is usually a good choice If more than one LED is required then use a separate series resistor for each LED In this example four external LEDs could be powered at 10mA each from one SEQ If more than four LEDs are required it will be necessary to increase the series resistor so that the total load is not more than 40mA Connect each LED anode to 12V DC output through a resistor and the cathodes to Common Program the 12V DC Output for LED This causes LEDs connected to the SEQ to flash while the unit is powering up or powering down in the same manner as the front panel LED 3 2 4
34. referring to section 3 2 1 and set the option by rotating AD Advance SEL one more click You will now be able to set the first delay time which is for bank A powering up Use AD to set the required delay time in seconds Advancing SEL one click ata time and using ADJ to adjust the delay times set the remaining five delay times B on C on A off B off C off If you have set Bank C to be Always On skip the delay Settings for Bank C If you have connected an LED to the 12V DC output for remote signaling step through the menu until you reach 12V DC Output Then advance AD to select LED This selection will make the remote LED mimic the LED on the front panel which flashes while the unit is powering up or powering down Turn SEL fully counter clockwise and press the button to exit programming SEQ SEQ 1U User Manual Software Version 2 0 Although the above steps are all that are required to get the SEQ running you may want to take a look at the following programming options to see if you want to make use of any of these functions You will find these listed on the reverse Side of the Programming and Connection Guide and they are near the end of the menu that you step through by turning SEL Programming Option Description Low Voltage Shutdown Shuts unit off if AC voltage drops below the set point High Voltage Shutdown Shuts unit off if AC voltage rises above the set point Self Test Shutdown Shuts down unit if self test fails
35. s Monitoring the peak of the AC provides a more useful indication of the real voltage available to the electronic equipment plugged into the SEQ The SEQ is microprocessor controlled and designed to be versatile and expandable Two or more SEQs can be connected together to provide control and power conditioning for larger systems The SEQ can also control other SurgeX products with its auxiliary relay contacts and or its 12V dc output All options are set via the front panel and all connections are made at the rear panel An optional password of up to six letters may be specified preventing unauthorized access to set up information All set up information is stored in non volatile memory A plug in Phoenix terminal block on the rear panel accommodates the remote control connections and also the low voltage outputs There are three inputs which control sequencing one programmable 12V dc output and one programmable auxiliary relay providing normally open contacts The inputs can be controlled by an applied DC voltage from 5V to 30V by a contact closure or by different types of switch the input selection being made during programming The inputs and 12V output are designed to withstand incorrect connections including polarity reversal and shorts Technical Support 800 645 9721 surgex com Page 4 SURGEX SEQ SEQ 1U User Manual energy intelligence 2 Software Version 2 0 Features e Unsurpassed SurgeX Advanced Series Mode surge e
36. ver ride input on the last SEQ 6 1 5 Other Functions Reading through the programming section is a good way to understand all the functions and options available in the SEQ Most of the functions are associated with main operation outlined in this section above However there are some other independent functions that can be selected The front panel button can be programmed to be operational non operational or operate after a one second delay Choosing the last setting prevents accidental power up or power down See Section 5 5 for more details The SEQ has built in voltage limits that will cause the unit to power down if the line voltage is outside these limits The low limit can be set from 90V to 110V and the high limit can be set from 130V to 150V See Section 5 6 for more details SurgeX Technical Support 800 645 9721 surgex com Page 15 SURGEX SEQ SEQ 1U User Manual energy intelligence Software Version 2 0 The SEQ has internal self test circuitry that constantly monitors the operation of the unit and displays the word Good or Fail on the front panel The unit can be programmed to shut down in the unlikely event that the self test should fail See Section 5 7 for more details There are two Restore options The first option allows the unit to restore to a power on state after loss of AC power or out of range AC voltage The second option allows the unit to restore to a power on State after being forced
37. wn should be the same for all units If an over ride is required connect it to the first unit Three Units Ganged Together LED and 1K 1 4W Resistor Confirmation If Required AONC BA 1234567 AONC BA 1234567 AONC BA 1234567 SEQ SEQ SEQ Program Program Program Up amp Down Inputs One Mom Up amp Down Inputs Latching Up amp Down Inputs Latching 12V DC Output LED Aux Output Gang Aux Output Confirm Aux Output Gang Figure 6 SurgeX Technical Support 800 645 9721 surgex com Page 20 SEQ SEQ 1U User Manual Software Version 2 0 SURGE energy intelligence 6 5 Cascaded System A cascaded system consists of two or more SEQs connected together such that they turn on and off one after another in an extended sequence Connecting a cascaded system together is a little more complicated than the other types of system because there must be feedback from each unit to the previous unit as well as control from each unit to the next unit The 12V DC output terminal 4 is used as the feedback source and the over ride input terminal 3 is used as the feedback input Figure 7 shows how to connect and program each unit in a three unit system Note that terminals 5 and 6 are connected together for all units except the last one If only two units are to be cascaded together then ignore the middle unit in the diagram If more than three units are to be cascaded together then keep the first and last units set up as sh
38. y time when set to A B or C This delay time begins with the same internal trigger as the bank selected in the previous item For example if you wanted a fourth bank to power on first and off last you should select A as the Aux Output and set this delay time to be shorter than the delay that you set for Main Bank A On the Aux Delay On can be Set to zero in this case or if you wanted a fourth bank to power on last and off first you should select C as the Aux Output and set this delay time to be longer than the delay that you set for Main Bank C On Aux Delay Off 0 40 Seconds Set power down delay time when set to A B or C This delay time begins with the same internal trigger as the bank selected in Aux Output For example if you wanted a fourth bank to power on first and off last you should select A as the Aux Output and set this delay time to be longer than the delay that you set for Main Bank A Off or if you wanted a fourth bank to power on last and off first you should select C as the Aux Output and set this delay time to be shorter than the delay that you set for Main Bank C Off the Aux Delay Off can be set to zero in this case 5 6 Out of Range AC Voltage Shut Down The SEQ has built in line voltage monitoring and out of range shut down The default limits are 90V at the low end and 150V at the high end and the shut down sequence begins if the line voltage remains outside the set limits for 1 second or more Thes

Download Pdf Manuals

image

Related Search

Related Contents

down-the-clown-carni..  Husqvarna 67521HVE Lawn Mower User Manual  Husky C803H Installation Guide  Bedienungsanleitung  さいたま市CSRチャレンジ企業 ロゴマーク取扱説明書  PDF file  こちら - バンドーエラストマー株式会社  こちらから【pdf】 - 日本心エコー図学会  Graco 313597E User's Manual  

Copyright © All rights reserved.
Failed to retrieve file