1. is heavy never position yourself below a suspended load Finger Glove and loose clothing trap area Figure 1 Fast Test Sub Safety Care to be taken to avoid trapping fingers gloves and loose clothing during stabbing OPS 2349 Rev E procedure User Manual Phuel Fast Test Sub oe 117 2349 HHO 1 Introduction 1 1 General The Phuel Fast Test Sub is designed to save rig time while pressure testing the pressure control string when multiple wireline runs are required The Fast Test Sub is inserted into the riser lubricator at the position of the joint that is normally opened to insert or retrieve the tool string After performing the first pressure test to check the integrity of the whole string subsequent pressure tests can be made at the Fast Test Sub to verify the integrity of the only joint that was disconnected rather than having to test the whole assembly This is achieved by connecting a small hydraulic hand pump to pressure test between two seals from the outside It is estimated that the use of the Fast Test Sub can reduce the time needed to pressure test by more than 30 minutes The Fast Test Sub body is constructed in two parts that are connected by a collar When the collar is backed off the two parts can be separated to break into the riser string Both of the collars are Otis type with the Phuel safe lok feature incorporated as standard The test port is replaceable saver sub and can also be isolated from th
2. used to prevent accidental back off of the collar The following shows the sequence for correct operation 3 3 1 Preparing the Safe Lok Collar After removing the thread protector the collar will be set in the lower position and must be moved to the high position before making up the connection With both hands raise the collar ensuring the Stop Pins go through the gaps in the raised rim Rotate the collar through 90 and gently lower onto the raised rim Ensure collar rests into the grooved area OPS 2349 Rev E m User Manual ZD Fast Test Sub huel 117 2349 HHO 3 3 2 Making up the Safe Lok Collar Lift and stab the pin into the mating box and check that there are no signs of damage to the o ring caused by being misaligned while stabbing in With both hands raise the collar clear of the grooved area on the raised rim and rotate through 90 Lower the collar until it reaches the top of the threads Turn the collar anticlockwise until the start of the thread is found and then start turning clockwise to make up the collar to the box thread When almost made up fully release the plungers from the locked open position Tighten the collar down OPS 2349 Rev E EH User Manual Phuel Fast Test Sub ae 117 2349 HHO 3 3 3 Breaking the Safe Lok Collar Unscrew the collar completely Lift the collar up ensure the stop pins go through the gaps in the raised rim Rotate the collar 90 and lower gentl
3. 15 117 2150 N66 1 SAVER BLOCK 100 910 2155 N66 1 9 4 ACME MALE PROTECTOR 101 910 2156 N66 1 9 4 ACME FEMALE PROTECTOR Table 3 Parts List Note 1 Thread protectors items 100 and 101 not shown on Assembly Drawing Figure 6 OPS 2349 Rev E 16 User Manual i Ph Fast Test Sub nue 117 2349 HHO 28 19 0 72 m m OPS 2349 Rev E LN SE E KD Figure 6 Assembly Drawing User Manual Phuel Fast Test Sub ous 117 2349 HHO 8 Spares Use only spares supplied or approved by Phuel Oil Tools Ltd It is recommended that sufficient quantities of the following spares be maintained to ensure that the equipment is always available when required Elastomeric spares are supplied in Viton material as standard Many other materials are available please specify when ordering Part No Qty Description Comments 801 0119 V90 1 O Ring B S Size 119 801 0438 V90 2 O Ring B S Size 438 801 0108 V90 1 O Ring B S Size 108 Table 4 Redress Kit Part No RDK 2349 HHO 8 1 1 Individual Items Individual items may be ordered as required using the part number specified Note O Rings conform to industry standards and may be substituted with those from other suppliers at the sole risk of the user OPS 2349 Rev E 18
4. EL Unit 17 Denmore Industrial Estate Denmore Road Bridge of Don Aberdeen AB23 8JW User Manual Fast Test Sub 117 2349 HHO OPS 2345 Rev E User Manual j Fast Test Sub Phu el 117 2349 HHO Table of Contents Revision HIStory EE ii E E iii T reel e esini N rari 1 11 General sensie nen TE EE EEA 1 1 2 ErosgetJeeheeEt eegene 1 2 Technical Specification wi iiccccsscccesectectcntiaraonnntdebroneetnesivivionieldaeemionaaanes 2 3 Technical DESSCHPNOM 2 vrccicapiecestreteenteenenthascectcaendenpcatenenatapabaghantnedaicnents 3 3 1 Wie FaSt Test Su E 3 3 2 The Isolation Valve iss oesectesicteateaiexeec tee ciaaroeserscinenir een eace 4 3 3 Coll r ANON E 5 3 4 Test Port Saver Sub EEN EE 8 4 EIDEN 9 rey Me ale P E 9 E ne DEE 9 GZ ONE ne E 9 GG EE le E 9 Ee EE 10 46 EE egene dE 10 G Se Se E 10 5 EE 11 5 1 WT Ween ME 11 52 EIERE 11 E WE 11 E SE 12 55 Redress del 12 5 6 Maintenance Record Sheet AANEREN 14 6 SW ccibbecre tech itieceeGietybendeseeiersdateakcuetadonberckiniehbeceticheniebieeidieebhodelouie 15 7 Parts List and DrawindS E 16 8 e 18 Tabl 1 Technical Data is cieacscasscevesanmmausenerdacucnnssasnnauastiontiereeananuecuasacuamnenaniues 2 Table 2 Maintenance Hecord EEN 14 EST el Parts EE 16 Table 4 Redress Kit Part No PDK 22340 HH0 ccc ccceececceeeeceeeeeeeeeeeeeeeeees 18 Figure 1 Fast Test Sub Safety e egietteuesergegereee eege Seu jii Figure 2 Fast Test Sub WEE 2 Figure 3 The operation
5. ce record sheet and ensure the equipment has been maintained by competent personnel e Check all certification is in date e Confirm information band is fitted and correct Ensure equipment is suitable for the maximum working pressures and services involved Ensure O ring is seated correctly and there are no signs of damage Ensure threads are clean Inspect for signs of damage Pressure test to 1 2x the maximum well pressure Carry out a collar lock test and ensure correct operation Ensure all connections are tight and that the test port is tightly fitted Ensure that spare o rings are available and sent with the equipment Ensure isolation valve is moving freely 4 6 During Job e Ensure collar lock has operated correctly and the collar is locked in position e Avoid excessive movement of the riser string 4 7 Post Job e Inspect for signs of damage and report any findings e Ensure threads are cleaned and the re greased e Ensure thread protectors are fitted OPS 2349 Rev E 10 User Manual Fast Test Sub Phu el 117 2349 HHO 5 Maintenance All maintenance to be carried out by suitably qualified and competent personnel 5 1 Introduction Regular maintenance of the equipment using Phuel redress kits or Phuel approved parts is essential to its continued safe operation Ensure that the pre and post job operating procedures are followed and that maintenance records are kept 5 2 Schedule The maintenance schedule may be
6. e well pressure by closing a metal seal valve This user manual serves as an introduction to the equipment and contains the relevant specifications operation planning and maintenance instructions parts list and drawings 1 2 Product Identification Phuel products are identified by a unique serial number that facilitates full product traceability Each product is supplied with a documentation pack that contains product certification and material inspection reports The serial number is always etched on the surface of the product but can sometimes be difficult to find or read after painting A stainless steel band secures the nameplate tag that is stamped with the information shown This tag should be located in the first instance to ensure that this manual PHUEL OIL TOOLS LTD refers to the correct equipment A customer DESCRIPTION amp SIZE identification number is also included to allow CUSTOMER ID No the customer to track the asset in their system PHUEL ID No 06 XXX XX MWP amp SERVICE TEST DATE OPS 2349 Rev E 1 Phue 2 Technical Specification Part No 117 2349 HHO Connection 9 4 Otis Type Connection 2 NPT Maximum Working Pressure 10 000 Psi Test Pressure 15 000 Psi Service H2S Weight 394 Ibs 179 Kg Overall Length A 31 85 0 81M Make Up Length B 29 17 0 74M Inner Diameter 5 13 0 13M Table 1 Technical Data OPS 2349 Rev E User Manual Fast Te
7. governed by international or company standards and the following is considered to be the minimum requirements 5 2 1 Pre amp Post Job Refer to Section 4 5 and Section 4 7 for details 5 2 2 Yearly e Disassemble fast test sub 5 5 1 clean and degrease all components e Inspect the condition of all sealing surfaces and surface coatings e Re coat threads and sealing surfaces if necessary If in doubt contact Phuel Oil Tools Ltd Replace all elastomeric seals with items from redress kit Table 4 Re grease components Re assemble 5 5 2 Pressure test to maximum working pressure Inspect paint work and repair as necessary 5 2 3 Five Yearly e Yearly Maintenance plus the following e Carry out 100 surface NDE on all surfaces e Pressure test to test pressure witnessed by certifying authority 5 3 Safety e Many of the components are heavy and should not be lifted without lifting aids e Wear appropriate personal protective equipment e Do not over exert yourself while using torque wrenches Use appropriate mechanical advantages when available OPS 2349 Rev E 11 User Manual yp Phuel Fast Test Sub 117 2349 HHO Ensure that all tools and equipment are in good condition and are suitable for the intended use 5 4 Tools The following tools are required 2 x Memac Chain Wrench No3 with 14 chain Other pipe wrenches may be used but will mark equipment 3 8 hex Allen key 5 16 hex Allen key 2 Spanner 7 8 Span
8. lock in the high position Lift the riser upwards 6 8 inches so that the two parts are clear of each other Lower the riser complete with the top half of the Fast Test Sub and change the tool string ROND gi 4 3 Joining 1 Check the inside of the Fast Test Sub to ensure that the o rings are in place and are in good condition change if necessary 2 Before lifting the riser ensure that the collar for the fast test sub is still set in the high position 3 Position the top half of the Fast Test sub with the riser over the connection and slowly stab in ensuring that the string is as vertical as possible Ensure that the sub is fully engaged 4 Lower the collar and make up 5 Attach the test hose 4 4 Testing _ Close the isolation valve by tightening the valve as far as possible 2 Apply 3000 psi pressure then open isolation valve and confirm there is a significant drop in pressure 3 Apply pressure to the test line bleed of a few times to minimise the amount of trapped air 4 Apply the test pressure of 1 2 x maximum expected well pressure or 10 000 psi and hold for 10 minutes No leaks acceptable If leaks occur then the joint will need to separated again the o rings changed OPS 2349 Rev E 9 User Manual j Fast Test Sub Phu el 117 2349 HHO 5 Bleed off the pressure 6 Close the isolation valve and detach the test hose 4 5 Pre Job e Ensure thread protectors are fitted e Check maintenan
9. m length and washers Slide the Split Collar over the bottom sub make up the two halves of the split ring and tighten down until the ends are flush with the collar Back off slightly to align the holes Insert 4 Stop Pins and washers Slide the Split Collar over the top sub make up the two halves of the split ring and tighten down until the ends are flush with the collar Back off slightly to align the holes Insert 4 Stop Pins and washers Operate Collar Safe Lok system and hold collar in the up position Grease OD of top sub and internal O rings of the bottom sub Make up the top sub to the bottom sub release the collar and tighten check operation of the collar safe lok system to ensure the collar is locked in position OPS 2349 Rev E 13 Pie User Manual Fast Test Sub 117 2349 HHO 5 6 Maintenance Record Sheet Date Performed Type of Maintenance Performed By Verified By Comments em Table 2 Maintenance Record OPS 2349 Rev E 14 User Manual pPhuel Fast Test Sub 117 2349 HHO 6 Testing All testing is to be carried out in the designated test area and by suitably qualified and competent personnel WARNING Trapped air requires considerable time to compress and when it is compressed is highly dangerous It has enough stored energy to separate parts with considerable force On completion of reassembly fi
10. ner If NPT plug to be fitted Circlip pliers Wire brush 5 5 Redress Procedure 5 5 1 5 5 N Dis Assembly Operate collar safe lok system to release the collar Loosen the collar and lock in the up position Remove the top sub from the bottom sub Remove 4 Stop Pins and washers from the split collar on the top sub Loosen split rings from collar and remove from split collar Remove split collar from the top sub Remove 4 Stop Pins and washers from the split collar on the bottom sub Loosen split rings from collar and remove from split collar Remove split collar from the bottom sub Remove the saver block and test port from the bottom sub Remove the circlip holding the equalisation valve in and remove the equalisation valve Remove and discard all O rings Degrease and clean all components Inspect for signs of damage Fit thread protectors Re Assembly Remove thread protectors Inspect all threads for damage and clean with wire brush Fit internal and external O rings to the bottom sub Fit O rings to the equalisation valve and test port Grease equalisation valve O rings and thread Fit equalisation valve to bottom sub tighten down and fit circlip OPS 2349 Rev E 12 User Manual yp Phuel Fast Test Sub 117 2349 HHO Grease test port O ring and fit to bottom sub using 2 screws 0 75 1 9cm length and washers Fit saver block over test port on bottom sub using 2 screws 1 25 3c
11. of the Fast Test Gub 3 Figure 4 Isolation Valve EE 4 Figure 5 NPT Test Port and Saver GOb ENNEN 8 Figure 6 Assembly Drawing ENEE 17 OPS 2349 Rev E i Prue User Manual Fast Test Sub 117 2349 HHO Revision History Issue Release Date Description Rev A 19 Jun 08 Initial Issue Rev B 18 May 11 Parts List Updated for Alternative Isolation Valve Item 5 Rev C 05 Jul 11 Isolation valve Pt No 190 1871 Removed from Parts List Rev D 30 Jan 12 Parts list updated Rev E 31 Jan 12 Illustrations updated to reflect valve with single O Ring OPS 2349 Rev E User Manual Lp Fast Test Sub huel 117 2349 HHO Safety WARNING Trapped air requires considerable time to compress and when it is compressed is highly dangerous It has enough stored energy to separate parts with considerable force All pressure equipment has a particular pressure rating and care must be taken to ensure that no item is used in a situation that may cause its working pressure to be exceeded All personnel involved in pressure testing must be formally trained competent and utilising the appropriate PPE Safe Lok devices where fitted should be checked for positional security to avoid unnecessary movement of the collar Ensure the identification band plate is fitted and is displaying the correct information as per the Tag Sheet Index This equipment and the equipment it is attached to
12. st Sub 117 2349 HHO Figure 2 Fast Test Sub User Manual Zp Fast Test Sub Ka 117 2349 HHO 3 Technical Description 3 1 The Fast Test Sub The Fast Test Sub provides a single connection in the riser string that can be broken and then made up and tested without the need to pressure test the whole string thus reducing the operational time required to install tools in the well The figure below shows the operational sequence for the fast test sub Notice that the seals are not exposed when the sub is separated which helps avoid damage when stabbing back in Isolation Valve Seal Break Here N Test Port Figure 3 The operation of the Fast Test Sub OPS 2349 Rev E 3 User Manual Pie Fast Test Sub OIL TOOLS 1 1 7 2349 HHO 3 2 The Isolation Valve The isolation valve is located at the test port and consists of a metal to metal cone seal that is energised by tightening the valve with a suitable hexagonal key The valve should be open i e screw backed out when testing between the o rings and closed screwed in when wishing to isolate from the well pressure The circlip prevents the full removal of the valve Closed for Isolation Open for Testing Figure 4 Isolation Valve OPS 2349 Rev E User Manual Phuel Fast Test Sub huel 117 2349 HHO 3 3 Collar Safe Lok The safe collar lock is designed to provide safe handling of the union collars In addition it can be
13. t the appropriate test caps to either end of the Fast Test sub and NPT plug to test port Ensure equalisation valve is closed Fill with test fluid and bleed off any air in the system Apply a pressure of 500 psi and ensure pressure holds for a minimum of 10 minutes Increase pressure to 10 000 psi Maximum Working Pressure allow to stabilise and maintain this pressure until it is evident there are no apparent leaks Bleed off pressure drain test fluid and dry Remove test caps and plug Apply coating of de watering solution to protect the bore and threads Fit thread protectors On completion of all maintenance ensure the maintenance record sheet 5 6 is completed OPS 2349 Rev E 15 User Manual Phuel Fast Test Sub ye 117 2349 HHO 7 Parts List and Drawings Item Number Part Number Quantity Description 1 117 2291 480 1 TOPSUB 2 117 2290 480 1 BOTTOM SUB 3 110 2053 480 2 COLLAR 9 4 SPLIT TYPE 4 110 2054 480 2 SPLIT RING 9 4 5 190 1718 316 1 Equalization Valve 6 1 7 8 8 2 900 1631 480 TEST PORT 110 2329 3A4 STOP PIN SHC 0583 3A4 Soc Hd Cap Size 1 2 Length 0 75 in SC 9 WNL 0580 STL 12 Nord Lock Washer M12 10 117 2166 STL 1 CIRCLIP INTERNAL 19mm DHO 19 11 SHC 0592 STL 2 Soc Hd Cap Size 1 2 Length 2 5 in 12 801 0119 V90 1 O Ring B S Size 119 13 801 0438 V90 3 O Ring B S Size 438 14 801 0108 V90 1 O Ring B S Size 108
14. y so that the pins rest in the grooved portion of the raised rim The connection can now be separated without any risk of dropping the collar OPS 2349 Rev E User Manual ji Fast Test Sub Ka 117 2349 HHO 3 4 Test Port Saver Sub The saver sub provides the ability to change a damaged pressure fitting without repairing or replacing a major component The saver sub is held in place by two socket head cap screws and is sealed by means of an o ring With the Fast Test Sub the saver block may be covered by the protector which is designed to prevent damage to the connected fitted when the tool is lying on the deck Saver Sub Protector Block Our Giel Gel Figure 5 NPT Test Port and Saver Sub OPS 2349 Rev E User Manual Fast Test Sub Phu el 117 2349 HHO 4 Operation All operations to be carried out by suitably qualified and competent personnel 4 1 Setting up 1 Locate the Fast Test Sub at the point in the riser where the connection will be broken to facilitate the insertion or removal of the tool string normally immediately above the wireline valve 2 Attach the male part of the quick release fitting to the Fast Test Sub with the mating part on the test hose assembly Attach the test hose at this time 3 Open the isolation valve 4 2 Separating Secure a lifting clamp to the top of the riser Close the isolation valve and ensure the test hose is detached Back off the safe lok collar and

Download Pdf Manuals

image

Related Search

Related Contents

Taylor 7324EXP User's Manual  aSecure GSM Premium  取扱説明書  019-100-R00 - HT-Hidrautrônica Sistemas Hidráulicos LTDA  Indústria da Borracha e das Matérias Plásticas  Associations  Samsung SGH-Q200 User Manual  

Copyright © All rights reserved.
Failed to retrieve file