1. A B 6 D E F L T1 T2 T3 T4 T5 T6 Tvpe mm mm mm mm mm mm mm inch mm mm inch inch EN 20 700 800 595 410 425 530 700 1 139 106 Y EN 30 700 800 595 460 425 530 800 1 139 106 EN 0 700 800 595 560 425 530 900 1 139 106 EN 50 700 800 595 660 495 530 1000 1 139 106 Y EN 60 790 1015 685 610 495 635 1010 11 159 125 34 EN 70 790 1015 685 710 495 635 1110 1 159 125 34 EN 80 790 1015 685 810 495 635 1210 2 159 125 Y 34 EN 90 790 1015 685 910 495 635 1310 2 159 125 34 EN 100 1040 1240 950 910 540 635 1350 27 193 146 1 EN 120 1040 1240 950 1010 540 655 1450 2 193 146 de EN 140 1040 1240 950 1110 540 655 1550 2 Ya 193 146 1 EN 0 1040 0 950 1260 540 655 1700 2 Va 193 146 11 EN 180 1040 1240 950 1010 640 790 1600 2 Vo 244 160 1 11 EN 200 1040 1240 950 1010 640 790 1600 2 Va 244 160 1 11 EN 220 1040 1240 950 1260 640 790 1850 2 Va 244 160 a 11 EN 250 1040 1240 950 1260 640 790 1850 2 Vo 244 160 1 11 EN 300 1040 1240 950 1510 640 790 2100 3 293 160 1 11 ENP 350 2500
2. Fig 12 Cleaning the chimney box 7 3 Maintenance after long stop It is necessary to perform a general maintenance and cleaning of the boiler after the heating season Check the doors and the sealing cord Make sure the contact with the boiler is air tight Check that the door is correctly regulated and closes tight Remove the turbinators from the heat exchanger and check their condition It is recommended that you clean the chimney box of the boiler and the chimney pipes at least once a year in order to assure efficient and safe function of the boiler The cleaning interval depends on the type of fuel used oil gas etc Clean thoroughly all the surfaces of the boiler as described in the corresponding paragraph Also clean the chimney box and all the chimney parts where ash might be deposited After long stop of the boiler before you put in function you need to perform the following checks Check the condition of the electric cables and the sensors Make sure they are not damaged Check that the thermometer indicates the correct temperature and all the thermostats function properly Make sure the bulbs are properly positioned in the case Make a general check of the chimney and make sure it is clean and free of obstacles Verify the pressure in the heating network and the boiler A Do not empty the water of the boiler and the heating installation after the heating seaso
3. y D Type A B 6 D E F L T1 T2 T3 T4 T6 mm mm mm mm mm mm mm inch mm mm inch ENP 350 1290 1545 1170 1270 750 980 1850 DN 80 343 220 2 ENP 400 1290 1545 1170 1270 750 980 1850 DN 80 343 220 2 ENP 0 1290 5 10 10 750 980 2150 DN 100 343 220 2 ENP 0 1290 5 1170 1520 750 980 2150 DN 100 343 220 2 ENP 550 1290 1545 1170 1770 750 980 2450 DN 100 343 220 2 ENP 0 1290 5 1170 1770 750 980 2450 DN 100 343 220 2 ENP 650 1290 1545 1170 2020 750 980 2700 DN 125 343 220 2 ENP 0 1540 5 1350 1520 960 1000 2450 DN 125 343 270 2 ENP 750 1540 1935 1350 1520 960 1000 2450 DN 125 343 270 2 ENP 800 1540 1935 1350 1770 960 1000 2700 DN 125 395 270 2 ENP 0 1540 5 1350 2020 960 1000 2900 DN 125 395 270 2 Y ENP 1000 1540 1935 1350 2020 960 1000 2900 DN 125 395 270 2 Y ENP 1100 1540 1935 1350 2270 960 1000 3150 DN 150 395 270 2 Y ENP 1200 1540 1935 1350 2270 960 1000 3150 DN 150 395 270 2 Y ENP 1300 1540 1935 1350 2270 960 1000 3150 DN 150 485 270 2 Y ENP 1400 1540 1935 1350 2520 960 1000 3550 DN 150 485 270 2 Y ENP 1500 1540 1935 1350 2520 960 1000 3550 DN 150 485 270 2 Y ENP 1650 1540 1935 1350 2770 960 1000 3800 DN 150 485 270 2 Y ENP 1800 1940 2235 1850 2100 1250 1500 3200 DN 150 580 380 3 ENP 2000 1940 2235 1850 2100 1250 1500 3200 DN 150 580 380 3 ENP 2300 1940 2235 1850 2600 1250 1500 3700 DN 200 580 380 34 ENP 2500 1940 2235
4. The chimney must be positioned if possible in the interior of the building It must be vertical with no changes in the direction The cross section of the chimney can be round or rectangular If the chimney is installed in the exterior it must be insulated The horizontal part connecting the boiler s chimney pipe with the vertical chimney must have maximum length 2 m If this distance is bigger it is recommended to have a 15 30 inclination upwards The connection with the boiler s chimney pipe must be air tight The chimney must be equipped with a cleaning door at its base Also cleaning doors are recommended where there are changes in direction and ash can be accumulated Tactical cleaning is recommended every 3 months for efficient boiler function A chimney terminal must be installed at the end of the chimney for protection against weather effects and foreign objects entrance In areas with strong winds a special anti downdraught terminal is recommended The chimney height must exceed the roofline by at least 1 m If there are other obstacles positioned on the roof the chimney height must exceed them by at least 1 m If there are multiple chimneys minimum distance between them is 0 3m Each boiler should be connected to an independent chimney Connection of multiple boilers to the same chimney is not recommended at least at least 0 6m 1 5m Fig 4 Chimney distances Abe vee RES See PLY G
5. When liquid fuel is used pay attention at the following When filling the fuel tank avoid any water or dust entering together with the fuel in the tank When the room temperature of the location where the boiler is mounted is lower than 0 C it is recommended the use of a pre heater 3 BOILER MOUNTING 3 1 Transportation and delivery The boiler is delivered complete with the metal covers well packaged The loading and unloading of the boiler must be performed with a forklift or a crane A special hook is provided on the upper part of the boiler for lifting Ame boiler is heavy Do not try to lift by hands or other unsuitable equipment Danger of injury Perform all moves with extreme attention and care Remove the boiler packaging with attention Keep the packaging material away from chidren since it can be dangerous After having unpacked everything make sure that the appliacne is intact and undamaged In case of doubt do not use the appliance and inform the supplier The ENP boiler is delivered with the following equipment already fitted and mounted Boiler steel body Rockwool insulation mounted on the boiler body and tightened with plastic tapes Metal covers mounted on the boiler body Turbinators positioned inside the fire tubes The following accessories are positioned inside the boiler body Remove them carefully by opening the middle door Cleaning tools Drainage valve Burner sealing cord Control panel option
6. Thermometer THERMOSTAHL HEATING systems Burner thermostat MAN e neou 3 Safety thermostat THERMOSTAT p 4 Pump thermostat 2 L DO 5 General ON OFF switch 0 E 3 6 Burner indication lamp IM 7 Pump indication lamp DOT 4 Fig 7 EN 1 control panel The general switch ON OFF interrupts the electrical supply to all the devices The burner thermostat interrupts the burner function when the preset boiler temperature has been reached It is recommended that this temperature is set between 70 90 C This temperature should never be set below 55 C Please note that various pellet burners might have different electrical connections In any case follow the manufacturer s instructions The pump thermostat starts the circulation pump function at the preset temperature It is recommended that this temperature is set around 45 55 C The safety thermostat will interrupt the fan function if the boiler temperature reaches above 95 C If so it needs to be reset manually by unscrewing the plastic cover The burner and pump indication lamps follow the function of the corresponding devices The control panel offers the possibility to connect with a room thermostat When the room thermostat contact opens the burner function stops 18 BURNER PUMP 230V F PE N PE 6 20 110 100 WM 1 TP 6 y
7. and perfect combustion with a small excess of air and uniform heat charge of the surfaces The door has an insulation cord to ensure air tight closing The door is equipped with a flange for burner mounting and an inspection eye for flame inspection 2 3 Working medium The ENP boiler is designed for function with water as working medium with a maximum concentration in polypropylene glycole of 50 The maximal temperature of the water is 95 C The minimal temperature of the return water is 65 C for nominal decrease of temperature At 20 C in a device of heat performance The boiler is appropriate for open and closed heating systems with maximal operation pressure 4 bars The maximal operation pressure of the boilers with power bigger than 800 kW is 5 bar The quality of the heating plant water is an important element for the performance of the system The water that enters the heating plant must be clean transparent and free from salts and chemical substances It must be filtered so as no quantity of sand or mud from the water supply comes into the boiler The hardness of the water must be within permissible limits In regions where the water is hard it is necessary to use water softeners Properties of the water for use Appearance clean transparent Total hardness Max 20 F Free oxygen Max 0 05 mg lit Organic substances Max 0 5 mg lit ph min 8 5 2 4 Dimensions 2 ENP 20 300
8. be chosen marginal size but a size greater The expansion vessel should be connected at the return line of the boiler Before the installation the pressure inside the expansuion vessel should be regulated according to its geometrical height from the point of its position up to the highest point of the installation If this height is lower than 8 m then the pressure is adjusted at 0 8 bar If the boiler room is on a rooftop the pressure on the tank should be adjusted at 0 5 bar The automatic filling valve must be installed next to the expansion tank and it is adjusted so that when the installation is cool there is a pressure equal to the geometrical height mentioned above plus 2 m In areas where high pressure distributing networks are present a pressure reducing gear must be placed 15 4 3 Safety features The boiler equipment includes a safety kit which shall be connected to the corresponding safety connection pipe The kit consists of a safety valve an air relief valve and a thermomanometer Additional safety equipment can be mounted on the outlet line at a distance less than 1 5 m from the boiler Boiler power Safety valve 50 kw 100 kw Ya 200 kW 1 350 kw 1 580 kW 1 870 kW 2 Fig 6 Boiler safety kit 4 4 Return temperature protection For the correct function of the boiler and for protection against condensation and corrosion it is very impor
9. check the situation inside the boiler If the walls are too black it means that there is insufficient air supply If there is condensation forming on the boiler walls it means that the pump operation starts at a low temperature Make sure you set the pump according to the indications and you install a return temperature protection system as indicated A It is prohibited to light the boiler with inflammable or explosive liquids 22 6 4 Combustion regulation The flame from the burner must be thin and longitudinal and should not reach the side walls of the fire chamber nozzle projection angle 60 possibly 45 for power over 140 Mcal h The loading of the boiler with an atomizer smaller than the one that corresponds to the normal heat value supply of the boiler is not recommended The function of ENP boilers is possible up to 70 of their nominal heating output without any significant reduction on the outlet temperature of the exhaust gases Output below 70 is not allowed since there may be caused harmful corrosions due formation of condensations If during the performance measurements the temperature of exhaust gases is too low there is the possibility of increasing the by removing two or more turbinators as required from the fire tubes that are placed at the bottom of the front tube plate During the combustion regulation of the burner on ENP boiler type the following values must be reached Burning of light oil CO2 12 13
10. overheating If it happens and function of the pumps and safety devices 8 TROUBLESHOOTING again check the installation Problem Cause Solution The lamps of the control panel do not light no electrical supply to the lamp the control panel is not connected to electricity lamp defect electric cable defect check replace the lamp connect to electricity check replace the cabels The boiler does not reach set temperature fan blocked air passages are blocked boiler is not cleaned incorrect boiler start up insufficient water in the system too big pump debit boiler under dimensioned bad quality fuel used insufficient chimney draught check replace the fan check the function of the fan regulator and thermostat clean the air passages clean the boiler start the boiler correctly fill the system regulate the pump speed change the fuel used check clean the chimney High temperature in the boiler but low temperature at the radiators too high hydraulic resistance in the heating network thermostatic mixing valve is connected wrong increase the pump speed check replace the mixing valve Condensation formation in the fire chamber too big boiler power too low return temperature in the boiler fuel with excessive humidity load less fuel in the chamber install a return protection system thermostatic valve change the fuel used Smoke c
11. separated from the boiler with a non flammable wall and proper distanced from the boiler Fig 2 Boiler room ventilation and air supply 10 3 2 2 Boiler room dimensions The boiler must be placed on a horizontal plane with adequate mechanical resistance to support the boiler s weight The boiler must be positioned in the room in such a way so that it is easily accessible from all the sides The following dimensions are recommended see Fig 3 Distance from the front wall N For boilers up to 100 kW minimum 1 5 m For boilers bigger than 100 kW minimum 2 m Distance from the rear wall L Appropriate distance for maintenance access Minimum 0 6 m Distance from side walls M For boiler up to 300 KW minimum 0 6 m For boilers bigger than 300 kW minimum 1 m Boiler room height H For boilers up to 70 kW minimum 2 m For boilers 70 to 230 kW minimum 2 4 m For boiler 230 to 400 kW minimum 3 m For boiler bigger than 400 kW minimum 3 5 m XX Distance between two boilers P must be at least 1m XXX KO VfL LLL LLL LLL VAS EXPANSIUNE Fig 3 Recommended boiler room dimensions 11 3 3 Chimney The chimney installation must supply sufficient draught air tightness and protection against condensation A The appropriate chimney installation is very important for the boiler s efficient and safe function
12. 1850 2600 1250 1500 3700 DN 200 580 380 3 TECHNICAL DATA Nominal Back eana Heated Pressure Water Weight Pmax Effici power pressure surface drop content ency Type volume Mcal h kw l mmH O lit m ue Ton lit kg bar ENP 20 20 23 2 4 24 1 2 20 46 158 4 91 5 ENP 30 30 35 2 4 31 1 6 20 57 179 4 91 5 ENP 40 40 47 2 4 39 1 9 20 70 197 4 91 5 ENP 50 50 58 2 4 47 2 4 30 81 220 4 91 5 ENP 60 60 69 4 6 56 2 6 40 117 271 4 91 5 ENP 70 70 81 4 6 64 3 1 50 128 308 4 91 5 ENP 80 80 93 6 10 76 4 5 75 138 416 4 91 5 ENP 100 100 116 6 10 144 4 9 80 246 439 4 91 5 ENP 120 120 140 6 10 161 6 0 90 282 465 4 91 5 ENP 140 140 163 8 15 179 6 7 100 305 502 4 91 5 ENP 160 160 186 10 20 205 7 2 120 326 538 4 91 5 ENP 180 180 209 10 20 206 6 7 100 400 687 4 93 ENP 200 200 233 10 20 206 7 2 120 427 747 4 93 ENP 220 220 256 10 20 263 8 0 150 471 782 4 93 ENP 250 250 291 10 20 263 8 7 150 523 805 4 93 ENP 300 300 349 20 30 320 10 3 180 607 885 4 93 ENP 350 350 407 20 30 423 13 4 200 782 1518 4 93 ENP 400 400 465 20 30 423 13 4 200 753 1529 4 93 ENP 450 450 522 20 30 539 15 8 220 809 1587 4 93 ENP 500 500 581 20 30 539 15 8 220 809 1598 4 93 ENP 550 550 637 20 30 577 16 8 250 848 1621 4 93 ENP 600 600 698 20 30 577 18 3 250 877 1690 4 93 ENP 650 650 756 30 40 692 20 7 300 947 1817 4 93 ENP 700 700 814 30 40 872 23 3 350 1180 2250
13. 5 93 ENP 750 750 872 30 40 872 24 0 350 1250 2390 5 93 ENP 800 800 930 30 40 1052 25 4 350 1325 2510 5 93 ENP 900 900 1047 30 40 1052 26 3 400 1365 2620 5 93 ENP 1000 1000 1163 30 40 1098 27 1 400 1390 2710 5 93 ENP 1100 1100 1279 30 40 1280 29 8 400 1440 2880 5 93 ENP 1200 1200 1396 30 40 1280 31 0 400 1495 2980 5 93 ENP 1300 1300 1453 30 40 1280 33 2 400 1550 3090 5 93 ENP 1400 1400 1628 30 40 1390 34 5 400 1640 3220 5 93 ENP 1500 1500 1740 30 40 1390 36 8 400 1740 3360 5 93 ENP 1650 1650 1919 30 40 1550 39 0 400 1830 3650 5 93 ENP 1800 1800 2093 40 60 1940 39 7 450 2178 4455 5 93 ENP 2000 2000 2326 40 60 1940 40 5 450 2140 4570 5 93 ENP 2300 2300 2675 40 60 2185 47 1 450 2464 5220 5 93 ENP 2500 2500 2887 40 60 2785 54 5 450 2600 5800 5 93 2 5 Fuel The ENP is designed for function with the following fuels 1 Natural Gas according to DIN 4756 and 4788 with lower calorific power 8 500 kcal Nm The delivery conditions of natural gas to the burner are stabilized by the Norm for natural gas I 6 98 for gas with low pressure p 500 mmCA 2 Light oil fuel EL according to DIN 4755 and 4787 with a viscosity of 4 5 cSt at 20 C and lower calorific power 9 900 kcal kg 3 Light oil fuel with lower calorific power 9 650 kcal kg A No other fuel than the ones mentioned should be used with this boiler If you wish to use an alternative fuel please contact the manufacturer
14. 6 4 5 Filling the ste Msi a da 16 4 6 Connection CIAGrAMS s sia ina l a ay 17 4 6 1 Central heating installation overview nn r nn r nn 17 5 ELECTRICAL CONNECTIONS nnn 18 GA iGeneralinstructiof 5 2 18 5 2 Control panel 6010 5 a 18 5 2 1 7 EN 2 Control panel ilissen into kata ii A kai ki a A i R 18 52 2 EN 2S control panels saint A A A A AA 20 6 OILER START UP aa eee eee N AN N ANN a Eaa 22 Gal Initialvlighting CHECKS ssa ien ie a al a EE E a E E 22 6 2 A o o o al 22 6 3 Checks to carry after initial start Up oo eee eee renee eens teeta teeta tents 22 6 4 Combustion l eh i geben 23 7 SERVICE AND MAINTENANCE aa eee AM 24 7 12 Cleaning the boiler i a i A A A 24 7 2 Cleaning the chimney BOX sis e tii i e a E e 24 7 3 Maintenance after long StOp LLL0 cette eee nee eee ene ene eens 25 7 4 Basic service Procedures cecceccecee cece eee eee eee een corner EEE ner ner SEEDS SESE SEES HESS ESOS SEES 26 7 4 1 Servi e after OVEMEAtiNG ssa i enti Lede cece lead likwida wf ka Ba bi bnini bbw aa 26 8 TROUBLESHOOTING ae eee A AMMEN ANMENNEHMEHMR 26 9 WARRANT 27 1 GENERAL INFORMATION 1 1 Proper use of the appliance Before you make use of this appliance make sure you have read and fully understood the instructions included in this manual The installation and use of the appliance must be performed according to the inst
15. KON thermostahl group ot companies GAS LIQUID FUELED STEEL BOILER ENERSAVE PLUS INSTALLATION AND SERVICE MANUAL Enersave 4 VERSION 2 1 UPDATE 14 10 2013 Contents 1 GENERAL INFORMATION coccion 3 1 1 Proper uSe of the appliance 21 cecccecee cece eee eee eee eee AEE AEDS EEE KEE KEE ESE ES EES nr nn 3 1 2 0 Savery WarNINGS wisn pi pajp al nance A eames 3 17333 Data labelin deme se Ansari uaa eset cpa ett toe en ee Sea ks ae be Go ines A 3 1 4 DOCUMENT INFORMATION iste ck estas ak eek dd dt idas 3 2 TECHNICAL FEATURES AND DIMENSIONS cccccscceeeeceeceeeeeeeeeseneeeneaseseeseeenensens 4 Za Technical So 4 2727 kUunction PA es a eC eae decease VAN See eae Ve RS 4 2 3 5 2 4 DINIMEN SIONS iii i anki 6 DEBITURI a l a A 9 3 BOILER MOUNTING 7 9 3 1 Transportation AN delivery ici sie A AAA 9 3 25 OOM A Ki a 10 3 2 1 General requirements llli EEA seen KEE KEE KEE SESH SESE SESE ESSE 10 3 2 2 Boiler room dimensioNS LL LAKE NEE KEE NEE ren NEE E KEE NEE NEE EERE Etna En ii 323 MOM A ATA 12 3 4 Mountin the elaborate miniera iwittu eerie 13 4 INSTALLATION i ia ia kai akaja ka kk awa aka a anna aeaaeae ada 14 4 1 Hydraulic connections 14 4 2 EXPANSION Vessel iii ui isem ikali ip a be rw l l l 15 4 3 Safety features vc is da ii a a a A A hae dase Rs Wad desea aol 16 4 4 Return temperature 1
16. a M 0 6 Ts i T re Fig 8 EN 1 control panel wiring diagram Legend M General ON OFF switch TS Safety thermostat TB Burner thermostat TP Pump thermostat L General function lamp LB Burner indication lamp LP Pump indication lamp TR Room thermostat PE Grounding Unscrew the control panel back plate to have access to the connection terminals in the interior Connect the main electrical supply to the terminals 1 2 3 as indicated The burner is connected to the terminals 9 10 11 and the pump to the terminals 4 5 6 Between the terminals 7 8 there is a jumper If you want to connect a room thermostat remove the jumper and connect it to these two terminals Attention The room thermostat must be a simple contact interruptor It is not allowed to connect a digital thermostat with an electrical signal output 19 5 2 2 EN 2S control panel Legend Thermometer Burner thermostat TR 1 Burner thermostat TR 2 Safety thermostat Pump thermostat General ON OFF switch Burner indication lamp Pump indication lamp THERMOSTAHL HEATING SYSTEMS GF IL BURNER TR 1 PUMP REGUL E JM E E 4 SAFETY HERMOSTAT PNDMKWNH Fig 9 EN 2S control panel The general switch ON OFF interrupts the electrical supply to all the devices The burner thermostat TR 1 controls the stage one function of the burner When the preset temperature is reached the stage one stops function and the burner
17. ahl ro
18. al In the documentation folder you will find Technical manual Warranty leaflet Declaration of conformity 3 2 Boiler room 3 2 1 General requirements The boiler must be installed in a special and separate room This room must be chosen so that it offers easy access for fuel transport air supply and exhaust gas evacuation The doors of the boiler room must be metallic open outwards and have at least 0 9 m width A The boiler installation is prohibited in rooms with extensive dust dangerous gases and moist spaces For the correct boiler function it is necessarv that the boiler room has openings for natural ventilation and combustion air supplv It is recommended that two different openings are used for this purpose positioned on opposite walls and diagonallv to ensure good air circulation The cross section of the openings can be estimated bv the following formula F Q 8 1000 Where F Surface of the opening in cm with grid without grid by receiving 2 3 of the F Q Heating power of the boiler in kcal h The boiler room must be provided with a drainage channel All safety devices must be connected to this channel The boiler room must have an appropriate fire extinguishing system according to the regulations in force In case that the building is designed with a fire alarm system a smoke detector must be positioned on top of every boiler The fuel storage is prohibited in the boiler room If so the storage must be
19. at PE Grounding Unscrew the control panel back plate to have access to the connection terminals in the interior Connect the main electrical supply to the terminals 1 2 3 as indicated The burner is connected to the terminals 9 10 11 12 First stage comand is connected to terminal 11 F1 and second stage comand to terminal 12 F2 Pump is connected to the terminals 4 5 6 Between the terminals 7 8 there is a jumper If you want to connect a room thermostat remove the jumper and connect it to these two terminals Attention The room thermostat must be a simple contact interruptor It is not allowed to connect a digital thermostat with an electrical signal output 21 6 BOILER START UP 6 1 Initial lighting checks Before you start the boiler make the following checks Check that all the hydraulic connections and make sure they are tight Make sure there is no leakage or moisture on the pipes or other equipment Make sure that the connection with the chimney is air tight and the chimney installation is properly made Check that the controller bulbs are well inserted and secured in the boiler s case Make sure that the pressure in the network is correct Check that the boiler pump and the central heating pumps function properly Make sure that the connection with the expansion vessel is correct and the expansion volume is sufficient for the boiler No valves should be installed between the boiler and the expansion ve
20. er production The boiler is designed for maximum working temperature of 90 C DESCIPTION OF COMPONENTS Steel boiler body with horizontal tube exchanger High efficiency stainless steel turbinators Removable rear smoke box with inspection cleaning door Front door insulated with refractory material equipped with a flange for burner mounting and a flame inspection pipe Rockwool body insulation of 50 mm thickness Electrostaticallv painted external covers Control panel for electromechanical operation optional 2 2 Function principle ENP 20 EN 300 EN 350 EN 2500 Fig 1 Boiler function scheme The function of the boiler is is based on the counter pressure that is created bv the returnable flame in the combustion chamber and by the transmission of heat with radiation The burned gases reverse their course at the bottom of the fire chamber surrounding this wav the flame which does not get into immediate contact with the surrounding walls The burned gases are then guided towards the smoke box through the fire tubes where the heat transfer is mainly through conductivity and afterwards evacuated to the chimney The smoke box is equipped with an inspection and cleaning door which also actions as an explosion relief The turbinators in the tubes create turbulance to the burned gases so as to get into a continuous contact with the walls of the tubes and increase the heat transfer efficiency The resultis a complete
21. goes automatically to stage two function When the preset temperature of the TR 2 thermostat is reached the burner function is interrupted It is recommended that this temperature is set between 70 90 C This temperature should never be set below 55 C Please note that various pellet burners might have different electrical connections In any case follow the manufacturer s instructions The pump thermostat starts the circulation pump function at the preset temperature It is recommended that this temperature is set around 45 55 C The safety thermostat will interrupt the fan function if the boiler temperature reaches above 95 C If so it needs to be reset manually by unscrewing the plastic cover The burner and pump indication lamps follow the function of the corresponding devices The control panel offers the possibility to connect with a room thermostat When the room thermostat contact opens the burner function stops 20 BURNER PUMP 230V F2 F1 PE PE 6 6 26 1 0 10 DI 64 TB 2 TB 1 TP fe 4 9 M c 0 g co p TS LB os LB Lp S Fig 10 EN 2S control panel wiring diagram Legend M General ON OFF switch TS Safety thermostat TB 1 Burner thermostat stage one TB 2 Burner thermostat stage two TP Pump thermostat L General function lamp LB Burner indication lamp LP Pump indication lamp TR Room thermost
22. he burner must be correctly aligned in connection with the center of the combustion chamber In this way a uniform flame is developed and a better distribution of the thermal load is ensured The door must fit well on the sealing cord in order not to have combustion gas leaks The space between the injection neck of the burner and the door of the boiler must be insulated with fireproof material The fireproof material of the door of the boiler must be replaced with new material if it gets damaged during the use Aine burner neck must penetrate inside the combustion chamber in a way that the entire heat exchange surface of the fire chamber is performed uniformly by the exhaust gas If the neck of the burner is of very small size the flame goes directly to the fire tubes a fact that results in excessive increase of the thermal strain of the boiler Legend Burner Burner mounting flange Door insulation with fire proof material Insulation around the injection neck of the burner Boiler door Ceramic insulation flange Sealing cord Burner injection neck Tube O Boiler front plate ae ONAY l l ENP ENP ENP ENP ENP ENP ENP Dimensions 59 50 60 90 100 160 180 300 350 700 800 1800 2000 4000 D mm 114 139 159 193 273 356 394 Li mm 140 150 150 170 190 220 250 280 360 500 500 600 800 1000 L2 mm 15 20 25 35 40 50 60 80 80 100 120 200 200 400 Tabi Bu
23. maximum temperature of burned gases outlet 220 C up to 180 kW and for boilers of bigger size 240 C soot rate 0 1 Bacharach Gas burning CO2 max 0 05 maximum temperature of burned gases outlet 240 C Burning of heavy crude oil temperature of burned gases outlet 220 260 C soot rate 0 1 Bacharach The measurements are carried out after the temperature of the water of the boiler has been increased to 80 90 C For built chimneys the temperature of burned gases outlet must be at least 150 170 C GENERAL SUGGESTIONS CO This indicates the excess air supply for good quality combustion The more the air increases the CO value reduces and the more the air reduces the CO value increases SOOT RATE according to Bacharach This number indicates that in the exhaust gases there are solid particles If this number exceeds 2 on BH scale you should check the atomizer for possible defects or unsuitability for the burner and the boiler make type and diffusion angle Generally the BH number reduces by increasing the pressure of the valve In this case you should be careful because the fuel supply increases TEMPERATURE OF EXHAUST GASES This is a value that expresses the heat losses through the chimney to the environment The higher the temperature is the greater the heat loss is and therefore the lower the efficiency If the temperature is very high you should reduce the quantity of the consumed oil NOTE The current regulation
24. n It will corrupt all the installation and especially the boiler Check that all the valves are working properly Replace them if necessary Pay special attention so that all the safety equipment of the boiler functions properly Make sure all the ball valves of the boiler and other relative equipment are open Check the function of the pumps They might be blocked after long stop Check that there have been no modifications to the installation and the boiler room ventilation openings chimney doors Check the burner function and clean from dust 25 7 4 Basic service procedures 7 4 1 Service after overheating If overheating occurs the safety valves of the boiler must open Make sure the boiler pump is working In case of blackout the burner will stop operation and the temperature will soon fall Open some valves of the system if necessary to decrease the boiler temperature faster All safety devices must lead to drainage After overheating make sure that all the water from the safety devices has drained and the system has filled with cold water Check the pressure and the temperature of the boiler At overheating the safety thermostat will activate and cut electrical supply to the burner In that case you need to manually reset the safety thermostat and put the system back in function Unscrew the plastic cover of the safety thermostat and press the switch Put the plastic cover back A Verify the causes of the
25. oming out of the doors boiler doors not regulated defect sealing cord of the door insufficient chimney draught too high air supply by the fan regulate the doors so that the sealing cord stays tight check replace the sealing cord check clean the chimney reduce the air speed The fan does not function or it makes a lot of noise set temperature reached disconnected by safety thermostat capacitor motor defect bad electrical connection of the fan correct boiler function reset manually check replace the fan check the electrical connection of the fan 26 9 1 14 15 16 17 18 WARRANTY Warranty duration is 3 years for all boiler parts under pressure 1 year for other electro mechanical equipment The warranty period starts from the date of installation but no longer than 120 days from the day of purchase The warranty covers costs of replacing parts that have been proved to be defect and any work that is connected with replacing these parts Costs related to removing defect parts or products transportation etc are not covered by the producer s warranty The producer will not accept to cover warranty terms in case of the following Maltreating the product and bad conditions of transportation and loading unloading Wrong installation failing to apply the directions given in the manual Improper use of the product Damages that have been cause by using imp
26. rner mounting dimensions 13 4 INSTALLATION 4 1 Hydraulic connections ENP 20 300 T6 T3 1 T2 ENP 350 2500 T1 Ta 4 T3 Legend T1 Boiler outlet T2 Boiler inlet T3 Chimney connection TS Drainage valve T6 Safetv connection Legend Ti Boiler outlet T2 Boiler inlet T3 Chimnev connection T6 Safetv connection The boiler is intended for connection with a closed expansion vessel network The boiler is intended for maximum working temperature 90 C and maximum pressure 3 bar The expansion vessel must be connected on the return line The discharge valve must be connected through a pipe to the drainage A If a connection pipe is not used it must be sealed before water fill 14 Legend 1 Burner 2 Control panel 3 Manometer 4 Safety kit 5 7 8 Safety valve 6 Air relief valve 9 Drainage valve 10 Ball valve 11 13 15 Pump 12 One way valve 14 Expansion vessel 4 2 Expansion vessel The ENP boiler is recommended to be connected with closed expansion vessel The volume of the expansion vessel is calculated according to the quantity of the water in the installation and the static height When choosing the expansion vessel it should never
27. roper fuels with dimensions or characteristics different from those described in the manual Damages from freezing if not necessary measures are taken against anti freezing Incident of explosion due to use of impropriate chemical substances Electrical shocks that may harm electrical parts of the appliance Warranty is only valid if the installation is performed by a professional installer authorized by the producer according to the local legislation and the instructions of this manual Warranty does not cover function problems or damages that are caused by bad chimney installation failing to respect the instruction of this manual and local legislation Warranty is not valid if the boiler cleaning maintenance and service intervals are not respected and the directions given are not followed Warranty is not valid if the maintenance is not performed by an authorized professional according the instructions given and at the time intervals given Warranty does not cover costs related to emergency incidents like earthquake fire electrical blackout robbery Warranty is not valid if the hardness of the water is over the allowed limits and no water softening protection is installed The warranty is not transferable in case of reselling or replacing the product A new warranty should be accorded to the new user 27 THERMOSTAHL ROMANIA SISTEME TERMICE S R L DRUMUL OSIEI 57 59 sector 6 Bucuresti 062395 Romania www thermost
28. ructions indicated in this manual in combination with the current national safety regulations The appliance is designed for use in pumped hot water central heating systems Any other use is considered improper and is prohibited THERMOSTAHL declines any responsibility for damages or injuries caused by improper use in this case the risk is completely at the user s responsibility To ensure an efficient and flawless function of the appliance it is strongly recommended that you have performed an annual service by a qualified technician 1 2 Safety warnings All installation and maintenance procedures must be carried out by professional and authorized personnel in compliance with the indications in the present manual and national regulations Any failure to correctly install this appliance could cause damage or injuries Do not make modifications to parts of the appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you respect the cleaning and maintenance procedures on the corresponding intervals Failure to do so can cause malfunction to the appliance and possible damages The boiler is design to function on the fuels indicated in the corresponding paragraph Any other fuel is prohibited Do not use explosive or flammable substances Do not store such substances inside the boiler room The working press
29. s Pete set III IEA AUREA piak Fig 5 Chimney connection 12 3 4 Mounting the burner The ENP boilers are overpressure boilers and it is necessary to take into account the static pressure of counter pressure in the combustion chamber to select the proper burner The dimensions of the flange on the boiler door for mounting the burner as well as of the support screws are according to DIN 4789 The part of the fuel pipes which are connected to the burner must have sufficient length and must be flexible in order to allow the opening of the boiler door The gap around the boiler flange is filled by fireproof ceramic material The supply of fuel must be adjusted at the nominal power of the boiler by selection of the appropriate atomizer For the mounting of the burner on the boiler you must take care of the following The burner must be well fixed on the special flange of the boiler The four screws must be fastened well so that the burner is not loose on the boiler The sealing flange of the burner ensures insulation from combustion gas leaks Take care that it does not break The injection neck of the burner must be deep enough in the boiler so that its edge reaches deeper than the plate that carries the tubes The burners with long injection neck are more proper for boilers made of steel The burner must be positioned horizontally and parallel to the combustion chamber The position of t
30. s of each country may require different adjustments from those that have already been done and this requires observance of other parameters 23 7 SERVICE AND MAINTENANCE 7 1 Cleaning the boiler The boiler should be maintained and cleaned once a year To clean the boiler follow the next steps Switch off the main switch in the boiler panel Disconnect the burner if necessary Open the boiler door Remove the turbinators from the fire tubes Clean the fire chamber and the fire tubes by using a proper brush Clean the turbinators Assemble the pieces again and close the door Connect the burner again if you had disconnected it Fig 11 Cleaning the boiler A The boiler function must be stopped before cleaning Make sure all the devices are stopped and the boiler has cooled down It is strictly prohibited to clean the boiler while in function 7 2 Cleaning the chimney box To ensure efficient and safe function of the boiler you must clean the chimney box once a year The ash box is equipped with a cleaning door for this purpose as shown in Fig 12 In order to open the door unscrew the wing nuts remove the washers and springs that keep it in place Clean the interior of the chimney box and remove all the ash and residues Put back the door the same way as removed ZA the springs must not be omitted They act as safety in order of explosion of exhaust gases in the chimney box 24
31. ssel Make sure the boiler s separation valves are open Make sure that there is sufficient air supply and natural ventilation in the boiler room A Do not store inflammable materials or fuel close to the boiler Before you light the boiler make sure the boiler room is clear and safe 6 2 Start up To correctly start up the ENP boiler follow the next steps Make sure the control panel switch is set to OFF and the burner is stopped Make sure there is fuel in the fuel tank or gas supply Make sure all the connections guiding fuel to the burner are tight Turn ON the control panel and the burner Turn the burner thermostat ON so that the burner will start function Follow the burner instruction in order to correctly start and set the burner Wait several minutes until the flame develops Check the shape and color Check the quality of the flame 6 3 Checks to carry after initial start up During the first start up you need to carefully check the air tightness of all the connections especially the doors and the connection with the chimney Check that the thermostats function properly and devices operate accordingly Wait for the boiler to reach the preset temperature and make sure the burner stops properly and the flame falls down Check the temperature and pressure rise in the network Make sure it is according to the indications Check if there is any water leakage in the network After a burning cycle is completed
32. t least 1 bar lower than working pressure 16 4 6 Connection diagrams 4 6 1 Central heating installation overview St SSES Legend 1 Boiler 15 Water filter 2 Burner 16 Radiators 3 Burner filter 17 Radiators valves 4 Pump 18 Expansion vessel 5 Fuel tank 19 Automatic water filler 6 Water level indicator 20 Burner thermostat 7 Tank ventilator 21 Pump thermostat 8 Tank alimentation 22 4 way mixing valve 9 Tank plug 23 Control panel 10 Fuel valve for the burner 24 External temperature sensor 11 Electromagnetic oil valve 25 Chimney 12 Water return 26 Chimney cleaning door 13 Outlet water collector 27 Drainage 14 Return water collector 17 5 ELECTRICAL CONNECTIONS 5 1 General instructions All electrical connection must be performed by an authorized professional in conformity with the local regulations and the indications of this manual Connections must be done according to norms EN 60529 and EN 60335 1 and protection norms IP 40 and IP 44 All wiring must be waterproof insulated Exposed cables should be protected within plastic channel The main electrical supply of the boiler must be connected to an independent safety of max 16A The boiler room lighting must be on a separate circuit A THERMOSTAHL is not responsible for accidents or malfunctions caused by wrong or bad electrical connections 5 2 Control panel functions 5 2 1 EN 1 control panel 3 2 1 Legend 1
33. tant to ensure steady temperature at the return of the boiler of at least 55 C This can be ensured by installing a recirculation pump between the boiler outlet and return see connection diagrams An alternative variation is by installing at the return of the boiler a three way thermostatic valve 4 5 Filling the system After completing all the hydraulic connections the circuit may be filled with water After filling the system open the radiators air valves to get rid of the air in the installation Verify that the installation pressure is according to the technical feature of the boiler The pressure must be verified through the boiler s manometer An additional manometer should be installed on the cold water inlet to verify the cold pressure at the lowest point of the installation at a point close to the boiler The whole installation must remain under nominal pressure for at least 10 minutes During this period check that all the connections are tight and there are no water leakages Make sure that during this period no pressure drop appears After firing the boiler make sure the network functions properly at working temperature and pressure A The hardness of the mains water supply affects the boiler s life span It is recommended to use a water softener if water hardness exceeds 15 f A Do not fill the system at the working pressure When the boiler will be heated the water pressure will raise Filling pressure must be a
34. ure varies according to the model Make sure you use the appropriate water pressure Working in a pressure higher than the one indicated in this manual is strictly prohibited and dangerous 1 3 Data label The data label of the appliance is placed on the boiler s side cover on the external part Make sure that it is properly placed and readable On the label it is indicated the serial number and the manufacturing year of the appliance 1 4 Document information This document is an integral and indispensable part of the product and must be retained in good condition by the user Keep it in a safe place for future reference If the appliance is sold or transferred to another person this manual has to always follow the appliance and handed to the new user or installer 2 TECHNICAL FEATURES AND DIMENSIONS 2 1 Technical features The ENERSAVE boiler si made of steel as a monobloc construction with horizontal tubed heat exchanger and pressurized fire chamber It functions on the principle of reversed flame with three passes of burned gases two passes in the combustion chamber and one pass in the exhaust tubes The heat transfer is performed through radiation at the first two passes and through conduction at the third pass of the tubes It is appropriate for light oil combustion and gas combustion It is available as an independent boiler or as a unit with an integrated burner It can also be combined with a hot water boiler hot wat
Download Pdf Manuals
Related Search
Related Contents
Compte-rendu du groupe IREM "élémentaire" Manual Brake Adapter Kit (MMBAK-2.1) ClearOne AP800 User's Manual Deuxième PArtie IM Spanish Grabadora K-AGRN10G01 (03-12-2014).cdr ZG Series Smart Sensor 2D Profile Measuring Sensors User`s Manual HMS BYOD Student, Parent and Teacher Guide chasis ctu-aa manual de servicio - Diagramasde.com Copyright © All rights reserved.
Failed to retrieve file