Home
Coolant Refill Instruction Sheet
Contents
1. Unlock the front lid using the high security key Raise the lid and slide it out from the opposite side Figure 7 Py Figure 7 Remove Front Top Lid Coolant Refill Instruction Sheet 5 of 9 020 100686 02 Rev 1 02 2014 CHRISTIE 4 Remove the PCM cover by pushing on the tab at the top of the cover Tilt the cover slightly then lift enough to clear the tabs at the bottom and remove Figure 8 5 Remove the air filter cover by releasing the 2 tabs on the air filter cover lift and remove Figure 8 i LL LAAHAA K R Life EO Figure 8 Remove PCM and Air Filter Covers 6 Use a 2 Phillips to remove the 2 screws on the security bracket above cardcage which secures the liquid cooling panel Figure 9 Figure 9 Remove Security Bracket 6 of 9 Coolant Refill Instruction Sheet 020 100686 02 Rev 1 02 2014 CHRISTIE 7 Remove the 4 screws securing the access panel frame which is located on the input side of the projector Figure 10 Figure 10 Remove Access Panel Frame 8 Remove the 5 screws securing the liquid cooling panel Four of these screens are on the panel and one is located along the bottom of the panel Figure 11 Swing the panel out and hang it on the screws located on the frame Swing Panel Out and Hang on Screws C Remove 4 Screws Along Outer Edge of Panel C Remove 1 Screw Along Bottom of Panel Figure 11 Remove Liquid Cooling Panel 9
2. reservoir disappears into the system immediately after the pump has been started You must continually refill the reservoir until the coolant level stops falling CAUTION Purge all hoses of air On CP2000 X XB and Roadie 25K HD 30K HD 35K check hoses in belly pan area RESERVOIR HEAT EXCHANGER Lay Figure 3 Refill the System amp Prime all Hoses to Eliminate Air Locks Coolant Refill Instruction Sheet 3 of 9 020 100686 02 Rev 1 02 2014 CHRISTIE 4 Continue running the projector no lamp topping up the reservoir as you eliminate more and more air pockets from all coolant hoses Figure 4 TIPS Tiny bubbles clinging to wall Watch for air near all hose fittings i i needs elated Ay e Tiny or large bubbles indicates air present Continue priming shake hose etc 0 priming Joa et 20 arose Solid opaque hoses with no bubbles indicates system is primed and ready for use 5 Power down Make sure reservoir is approximately 1 2 3 4 full topping up as necessary In the CP2000 S SB i h double check level through All hoses uniformly opaque ae no bubbles System is ready the viewing gauge on the pedestal door 6 When you are certain that all air is purged replace Figure 4 Check all Coolant Hoses the reservoir cap belly pan igniter door and for Air Bubbles projector lid 7 Power up and test CP2000 M MR ACCESSING THE COOLING SYSTEM 1 Turn the projector lamp OFF Wait at leas
3. CHRISTIE Coolant Refill Instruction Sheet The following procedure should be performed whenever the coolant system needs to be refilled NOTICE Never allow the pump to run dry to avoid damaging it SAFETY AND WARNING GUIDELINES 1 Coolant contains ethylene glycol Use caution when handling DO NOT ingest Minimize contact with skin Refer to the Material Safety Data Sheet provided in the coolant kit for more information Use only Christie approved coolants with your projector 2 ELECTRICAL SHOCK HAZARD Always turn off disconnect and disengage all power sources to the projector before servicing Failure to comply results in death or serious injury A Ete 1 NON INSULATED DANGEROUS VOLTAGES MAY BE EXPOSED Always disconnect from AC prior to disassembly 2 OBSERVE ALL ELECTROSTATIC PRECAUTIONS Use a grounded wrist strap when handling electronic assemblies 1 Allow the cooling fans to automatically turn OFF before disconnecting from AC and opening the projector Depending on your projector model this can take 10 15 minutes 2 Never operate the projector or the fans without all the covers installed 3 Only Christie accredited service technicians are permitted to open any enclosure on the projector and only if the AC power has been fully disconnected Failure to comply could result in minor or moderate injury SERVICING LIVE EQUIPMENT Only Christie accredited technicians who are knowledgeable about the hazards associated with ha
4. Fill the reservoir with coolant NOTE The reservoir only holds I 2 of the required coolant for the System Coolant Refill Instruction Sheet 7 of 9 020 100686 02 Rev 1 02 2014 CHRISTIE 10 Power the pump ON and watch the coolant begin circulating Keep adding coolant into the reservoir as _ Fill reservoir needed to prevent the fluid level from dropping below the an 5 Minimum Fill Line Continue running the system until the coolant appears free from air bubbles SERIES Il Series 2 projectors include the CP2210 CP2220 and CP2230 models For detailed information on flushing the coolant system refer to the CP2210 CP2220 and CP2230 Coolant Flush Instruction Sheet P N 020 100685 xx CP2210 Figure 12 Fill Reservoir ACCESSING THE COOLING SYSTEM 1 Power the projector lamp OFF Wait for at least 10 minutes to allow for proper cooling to take place before powering the projector OFF via the TPC 2 Usea 2 Phillips to loosen the 7 captive screws securing the top lid to the projector housing Figure 13 Figure 13 Remove Top Lid 3 Unlock the rear access door using the low security key Lift the lid up from the rear of the projector and pull it away from the 2 tabs on the front skin 8 of 9 Coolant Refill Instruction Sheet 020 100686 02 Rev 1 02 2014 CHRISTIE CP2220 AND CP2230 ACCESSING THE COOLING SYSTEM 1 Turn the projector lamp OFF Wait at least 10 minutes to allow for proper cooling to take place bef
5. ludes JeffCool E105 jug of coolant refill bottle funnel MSDS sheet INSTRUCTIONS SERIES Series 1 projectors include the CP2000 S SB h 1 X XB Z M MR and the Roadie 25K HD 30K HD 35K For details on how to flush the coolant system on these models refer to Roadie 25K HD 30K HD 35K CP2000 S SB h V X X B M MR ZX Coolant Flush Instruction Sheet P N 020 100179 03 CP2000 S SB H I X XKB AND ROADIE 25K D 30K HD 35K ACCESS COOLING SYSTEM 1 Remove the projector lid On the Roadie 25K HD 30K HD 35K or CP2000 X XB open the igniter door Figure 1 left On a CP2000 S SB 1 h Figure 1 right open the non operator side pedestal door and skip to Step 3 CP2000 X XB and ROADIE 25K HD 30K HD 35K CP2000 S SB h I Figure 1 Access Cooling System Coolant Refill Instruction Sheet 020 100686 02 Rev 1 02 2014 CHRISTIE 2 On the CP2000 X XB or Roadie 25K HD 30K HD 35K remove the center 8 screws and front belly pan 4 screws as shown in Figure 2 Elevate proj 4 Hex Driver Center Belly Pan Figure 2 Remove Belly Pans 3 Prime Purge of Air Power up the projector no lamp Manipulate or prime all coolant hoses by flicking pinching and raising them as necessary Figure 3 to keep liquid moving and flowing to and from the pump You must purge the system of all air otherwise the coolant will not flow properly and may cause the DMDs to overheat NOTE The coolant in the
6. ore powering down the projector via the TPC 2 Unlock the front lid using the low security key provided Lift the lid up and remove Figure 14 Low Security Key Figure 14 Remove Front Top Lid CP2210 CP2220 AND CP2230 FILLING THE RESERVOIR 1 Loosen the top screw Figure 15 and use the fill bottle provided to add coolant 2 Power the projector ON and continue adding coolant until the fluid level does not drop below the Minimum Fill Line 3 Continue running the system until the coolant appears free from air bubbles nf Minimum fill line Minimum Fill Lin i 4 Lain Figure 15 Fill Reservoir Reservoir for CP2210 CP2220 and CP2230 shown Coolant Refill Instruction Sheet 9 of 9 020 100686 02 Rev 1 02 2014
7. t 10 minutes to allow for proper cooling to take place 2 Turn power OFF from the Control Display Panel CDP 3 Remove the top lid a Usea 2 Phillips to loosen the 7 captive screws securing the top lid to the projector housing Figure 5 Figure 5 Remove Top Lid b Unlock the rear access door using the low security key c Luft the lid up from the rear of the projector and pull it away from the 2 tabs on the front skin NOTE When installing align the front 2 tabs and reverse the above steps 4of 9 Coolant Refill Instruction Sheet 020 100686 02 Rev 1 02 2014 CHRISTIE CP2000 S SB H I X XB M MR AND ROADIE 25K D 30K HD 35K FILLING THE RESERVOIR 1 Loosen the top screw Figure 6 and use the fill bottle to add coolant Power up the projector and continue adding coolant so the fluid level does not drop below the Minimum Fill Line Minimum Fill Line Figure 6 Fill the Reservoir Reservoir for CP2210 CP2220 and CP2230 shown 2 Air Bubble Impeding Flow If the liquid in the reservoir does not move due to air bubbles remove the entire fan pack and pump section For instructions refer to the CP2000 M MR Service Manual P N 020 100124 xx Tilt the pump at different angles until the coolant starts to flow CP2000 2ZX ACCESSING THE COOLING SYSTEM 1 Turn the projector lamp OFF Wait at least 10 minutes to allow for proper cooling to take place 2 Turn power OFF from the Touch Panel Controller TPC 3
8. zardous voltage ultraviolet exposure and high temperatures are authorized to assemble install and service Christie equipment To make sure you remain safe when servicing energized live Christie equipment Locate the main AC power shut off prior to servicing the equipment This will allow you to turn the power off quickly in an emergency Disconnect the projector from the communication and management network so it cannot receive commands to turn the lamp on open the douser and move the lens Familiarize yourself with all potential safety hazards prior to servicing the equipment This includes but is not limited to the location and accessibility of hazardous voltages Read and understand all written procedures prior to commencing a service procedure Understand and follow all local safety codes and requirements when servicing energized live equipment Coolant Refill Instruction Sheet 1 of 9 020 100686 02 Rev 1 02 2014 2 of 9 CHRISTIE e Perform equipment service in a location free of obstructions and other hazards For example you must have an unobstructed view of the area being serviced e Wear personal protective equipment PPE clothing appropriate to the service you are performing This includes but is not limited to protective electrically insulated footwear safety glasses and gloves rated for the working voltage of the equipment you are servicing KITS REQUIRED 003 001837 xx Coolant Refill Kit inc
Download Pdf Manuals
Related Search
Related Contents
AlarmView User Guide - Pima Electronic Systems Ltd HP G2 User's Manual ErgoXS Extentiontube Projector ceilingmount 50cm Télécharger le dossier de candidature Samsung S Series SH-S183L Vertical SBX IP Installation Guide 3.5 Fisher-Price 74240 Instruction Sheet Trisa Electronics Prof.Clean 2000 Cloud MA60 & MA60MEDIA Installation and User manual CR CLI 20/05/2014 Amphi pays anglophones sauf Angleterre Copyright © All rights reserved.
Failed to retrieve file