Home
        94 - JH Fletcher & Co.
         Contents
1.    94    1372727777       MINING FEQUIPAFENT  F    jm SN          J  H  FLETCHER 8 CO  Box 2187   Huntington  WV 25722 2187   304 525 7811   FAX 304 525 4025    IMPORTANT SAFETY NOTICE  INFORMATION BULLETIN NO  94  TO  ALL CUSTOMERS WITH J H  FLETCHER   CO  EQUIPMENT  FROM  J H  FLETCHER  amp  CO     DATE  SEPTEMBER 2003    SUBJECT  FLETCHER OPERATOR CANOPIES       All Fletcher roof bolters use or can use operator protection canopies  Most of these  canopies are attached to an extendible support post actuated by a hydraulic cylinder within  the post  A single large bolt connects the inner tube of the support post to the cylinder rod   This connection is critical to the safe operation of the canopy     A near miss recently occurred because of an unexpected drop of the driller canopy  When  the operator activated the canopy lower control lever  the canopy did not immediately lower  and remained in the raised position  and then dropped unexpectedly  The malfunction was  due to the cylinder and support post connection bolt becoming loose or damaged  and  eventually failing  Anytime the canopy control lever is activated and the canopy does not  lower  do not remain under the canopy  The cause of any support post connection  malfunction should be evaluated and repaired immediately by maintenance personnel     In response to this near miss J H  Fletcher  amp  Co  recommends that all operators be made  aware of this potential problem and emphasizes that the service manual requirement
2.   ROD          
3.  of  weekly torque checks be performed to ensure that the bolt is tightened to 150ft lbs  see  Attachment 1   Fletcher requires the inspection of this connection bolt as part of the weekly  torque check  In addition  always check for correct control functions before operating this  machine    Fletcher now offers a cap  part number  381113  to prevent dirt and debris from filling up  the bolt access hole  providing quicker and easier access to the canopy bolt for inspection   see Attachment 2      As an alternative to the existing design that requires the bolt torque inspection  Fletcher has  developed a support post and cylinder design that eliminates the bolt altogether  see  Attachment 3   The new design uses a pin to connect the cylinder rod to the support post  inner tube  The pin is held in place by the canopy or support post cap  You can exchange  your existing post and cylinder for this new design through our service department or an  authorized distributor  or upgrade it during your machine or boom modernization  This new  design will be installed on all new Fletcher equipment     6 4  Information Bulletin 94  september 2003  Page 2    Please provide a copy of this bulletin to all personnel who operate or have access to a  Fletcher machine  including maintenance personnel     Contact Fletcher or an authorized distributor for price and availability of the design  enhancement shown in Attachment 3 or the canopy cap in Attachment 2     lf you have any questions regarding
4.  this bulletin or the information provided within   please call David P  Cooper in the Risk Management Department at  304  525 7811     Ex 240 or by email at dcooper jhfletcher com                          1       94    Fletcher     EE    I DRILLER CANOPY SUPPORT POST      BAGK  NEXI  gt  CYLINDER ATTACHMENT BOLT    E         The driller canopy support post assembly is made up of three nested square tubes   supported by a hydraulic cylinder     bolt  located at the top of the housing asse mbly   provides the connection between the tubing and hydraulic cylinder            DANGER       Failure      the connection between the cylinder and tubing can result in an  unexpected drop      the driller canopy at some point after the CANOPY control     lever         operated      the  canopy lower  direction          a unexpected drop in the canopy can result in serious injury or even                               mon               This        must be checked weekly   making sure it is in place and properly tightened          Whenever re assembling the driller canopy support post assembly  always use     lg genuine Fletcher OEM replacement bolt and tighten to 150 ft lbs           4                       2    SUPPORT POST CANOPY BOLT    NO CAP          CAP WITH CAP IN THE HOLE ABOVE       RING RETAINER BOLT       94                       3    SUPPORT POST   CURRENT DESIGN    CANOPY  RETAINER  PINS    CANOPY  MOUNT  BLOCK       CYLINDER  ROD    PIN THAT  WOULD GO  THROUGH    THE  CYLINDER
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
fr-d700 instrução de instalação inversor  デスク専用空気清浄機  Hypertec 2106HY User's Manual    PB3 Mobile Printer User`s Guide  表紙・一覧・別紙1,3(P1-206)  OFL 300/500Q 120 LP DIRECTIVES D`INSTALLATION  JELD-WEN 404266 Instructions / Assembly  VSX-409RDS - Aerne Menu  WEB VERSION    Copyright © All rights reserved. 
   Failed to retrieve file