Home

VIA BOWLING FASTTRACK - Via Bowling Products

image

Contents

1. 2 Fix the left trip arm baffle plate to have the surface of the elbow of the arm contact the cam weldment Then fasten the bolts 3 Adjust the right trip arm baffle plate by repeating Step 1 amp 2 h Inspection of Trip Arm a Revolve the crank pulley manually b When the ball sense swings back and forth push the cam weldment towards the rear side of the machine COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 9 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL c When the cam weldment follower hits the trip arm have the follower restore its position which heads to the front of the machine d Push forward the cam weldment follower and check whether it restores to position towards the frond side If it does the adjustment is successful Check the other side of the follower with the same method e Fix the triangle belt onto the crank pulley and the spring onto the belt tightening pulley f Re check the operation of the cam weldment follower by touching it with screwdriver or wooden batten If the follower does not restore to its position correctly towards the front readjust the trip arm IV Installation of Ball Return System See fig 7 1 Place the spirit level in turn on the top and at each side of the dolly Regulate the adjustment bolts of the rollers left right front or back to keep the dolly in horizontal position 2 Adjust the height of the dolly so that the center
2. of its entrance hole is slightly lower than the one of its return hole Due to the flatness of the ground and the installing deviation of ball lane adjust accordingly so that the upper side of the fasttrack frame is 33 37mm away from the top of the dolly 3 After adjusting the height fasten all the nuts 4 The horizontal space should be based on the requiement that the four pins on the rear side of the dolly can be inserted into the corresponding holes of the fasttrack frame COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 10 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL Fasttrack Iron Kick Back Rear Roller Front Roller Fig 7 V Maintenance of Ball Return System 1 The ball return system needs maintenance after running for 500 hours 2 Shut down the power supply and pull out the Fasttrack clean up all omponents COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 11 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL 3 Check whether the components are worn out or damaged replace them if necessary 4 Check all of the fasteners fastening the loosened bolts and nuts 5 Inject grease in the grease cock and lubricate all the moving components with the engine oil which should be innocuous and with effective lubricating property 6 Replace the capacitor of the motor 60W after running 3000 hours VI Trouble shoot Problems Possi
3. the ball pan and let it roll down naturally When the Lock Assembly opened and Pan comes down and restores smoothly the adjustment is over When the ball pan opens but can hardly restores Set bolt should be adjusted backward so that the interspace is enlarged a little Or expand the spring a little If the Lock Assembly does not open make re adjustment according to step b and c 4 Adjustment of Rudder and Ball Sense and Paddle Assembly a Operation of ball sense assembly Adjust the height of cam follower bearing make it can reach the Rudder Cam and high enough to reach the Cam The cam follower bearing can be adjusted with inserting spacers See fig 4 b Adjustment of Rudder Bracket Shaft See fig 4 amp 5 The Rudder Bracket are mounted at the position near the center of both frames of Fasttrack and with a 15mm deviation close to the left frame O Loosen the bolts to adjust Remove the spring from the Belt Tighten and remove the belt from the Crank Pulley COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 5 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL Trip Arm Cam Weldment Link Eccentric Plate D 2 Du E a O Rudder Cam Fig 4 Insert Spacer to adjust the Paddle Arm Frame Rudder Bracket Fig 5 6 OF 12 COPYRIGHT 2004 SHANGHA
4. the deviation of the Flat Belt Therefore regulate the two adjustment bolts of fast belt pulley on the traction wheel axle to solve the deviation problem Turn the primary wheel manually and observe the running of the Flat Belt whenever the flat belt slides loosen the nut on the deviated side and regulate the adjustment bolts clockwise to correct the displacement of Flat Belt and make it align with the center of the wheel Alternatively loosen the nut on the deviated side of the flat belt and regulate the adjustment bolt counterclockwise to correct the deviation 2 Adjustment of Limited Cam and Pressing Force See fig 2 a Adjustment of limited cam Loose the four binding bolts of limited cam and regulate the Adjustment Bolt 1 of the cam to make the distance between the fast COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 2 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL Adjust Bolt 2 Spring Limited Cam Bolt Adjust Bolt 1 pane Grease Cock Adjust Bolt Flat Belt aoci if Fig 2 pulley and bottom of the fasttrack frame be about 220mm Then fasten the binding bolts b Adjustment of pressing force Loosen the pressure regulating screw nuts of the wheel rim and regulate the adjustment bolt 2 clockwise or counterclockwise to make the spring reach a length of 105mm 3 Adjustment of Ball holding Baffle Plate Components See fig 3 Adjustment of
5. I ZHONGLU INDUSTIAL CO LTD MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL c Adjustment of Rudder and Ball Sense 1 Remove the two Trip Arms 2 Remove the nuts from the eccentric axis See fig 6 3 Pull out and turn away the link from the eccentric axis 4 Loose the Nuts of adjustment axis and clockwise revolve the adjustment plate to the biggest degree then fasten all nuts Eccentric R H Trip Cam Pulley L H Trip Cam Assembly Adjustment Plate Paddle Arm Fig 6 COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 7 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL d Adjustment of Paddle Arm Assembly 1 Run the Rudder make sure the paddle Arm can touch the both frames of Fasttrack the Paddle Arm should move smoothly 2 If the rod does not move smoothly insert some spacer between the Bracket and Frame to adjust the Paddle Arm See Fig 5 e Adjustment of Rudder and Ball Sense by Regulating the Link 1 Fix one end of the link onto the eccentric axis See fig 6 and revolve the rudder driving pulley eccentric belt pulley wheel while observing the movement of the rod assembly ball sense rod 2 Adjust the length of the link to have the rod assembly ball sense rod swing on the basis of the central line symmetrically Then fix the fastening nuts See fig 6 While adjusting the links extend the left one to increase the distance and shorten the right o
6. VIA BOWLING FASTTRACK Installation amp Service MANUAL Z VIA BOWLING PRODUCTS File No M200506 01 COPYRIGHT 2005 VIA BOWLING PRODUCTS MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL I General Description 1 The fasttrack ball return system is to send the ball back to the Blower where the player pick up the ball 2 The fasttrack ball return system is composed of such components as fasttrack frame Dolly fasttrack motor fast pulley assembly and adjust lever ball sense assembly and track See fig 1 Pin Frame Adjust Lever Motor Fast Pulley Assy Ball sense Assy Fig 1 COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 1 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL 3 Operating principle of the ball return system The ball rolls into Fastrack via the Ball Door Directed by the ball guided tray and Lock Assemble triged it passes through the two disjunctors of the ball holding baffle plate and comes into the track And the ball accelerated by Flat Belt then it flies to the Blower along the track II Technical Parameter Power of the Fasttrack motor 550W 60W Lengthx WidthxHeight 1145x250x1100 mm III Adjustment of the Ball Return System Note It is usually adjusted before leaving factory and does not need re adjustment 1 Adjustment of the Flat Belt See fig 2 Any disalignment of the two axles of the fast pulley assembly will lead to
7. ball holding baffle plate components Switch 1 and switch 2 are the key of the Lock Assembly COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 3 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL which determines whether the ball can enter the track smoothly Therefore it is important to adjust the height of switches appropriately Switch 1 Pan Switch 2 Set Pin Trigger Set Bolt Fig 3 a The Lock Assembly will not open unless both switch 1 and 2 are pressed down at the same time Either one of them will not open the Lock Assembly b When the Lock Assemble opens while only switch 1 is pressed down it should be adjusted Loose lock nut of Switch 1 adjust switch and make the ball enter smoothly and can press down it then the Set Pin should not separate from the Lock Arm with a joggling distance of 2 3mm COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 4 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL c When the ball pan opens while only switch 2 is pressed down the distance between the Set Bolt and the Lock Arm should be adjusted Loosen the nuts on the Set Bolt to reduce the distance changed into about 0 5mm or regulate the trigger to increase its distance with the Lock Arm so as to ensure the one between the Limited Bolt and Lock Arm d After the switch 1 and 2 are adjusted respectively fasten all the nuts and test with a ball Suggestion put a 16 Ib ball onto
8. ble causes Solutions The ball The power cord is not Connect the power return connected correctly cord correctly system The small disjunctor is not Close the small does not closed disjunctor to the run The connecting wire is not ON position linked with the pin Connect all the depositing machine wires well The ball The ball holding baffle plate Adjust the ball does not does not open holding baffle enter the The amplitude of swing of plate track the ball sense plate is not Adjust the ball enough sense system COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 12 OF 12
9. ne to decrease the distance Since both ends of the rod are with right hand screw thread one end should be removed to adjust the other 3 Loosen the fastening nuts on the adjustment plate and move the plate counterclockwise to make the rod assembly contact both sides of the bracket with balanced force instead of towing the cam weldment Then fasten the nuts 4 Recheck the machine by turning the crank pulley eccentric pulley wheel If the rod assembly ball sense rod only contact one side of the bracket re adjust according to the Step 2 f Adjustment of Cam Weldment COPYRIGHT 2004 SHANGHAI ZHONGLU INDUSTIAL CO LTD 8 OF 12 MC2 BOWLING FASTTRACK INSTALLATION amp SERVICE MANUAL 1 Turn the crank pulley to make the rod assembly ball sense rod be situated in the oscillation center of the bracket plate See fig 6 2 Push the cam weldment follower of the cam weldment forward as much as possible 3 There should be a gap of 3mm between the cam weldment and the cam weldment on both sides 4 If adjustment is necessary loosen the bolts of the bent lever and relocate the lever 5 Then fasten the bolts and re check whether the gaps on both sides accord with the requirements g Adjustment of Trip Arm See fig 6 1 Revolve the crank pulley to turn the rod assembly ball sense rod to the margin of its running distance so that the pulley can slightly contact the left bracket The contacting position should be fixed

Download Pdf Manuals

image

Related Search

Related Contents

Manual de instrucciones, Modo de empleo Cool Control  Baixe - Pioneer  GE B30 Patient Monitor - Frank`s Hospital Workshop  Xemac User Manual  

Copyright © All rights reserved.
Failed to retrieve file