Home
        Installation & Service Manual
         Contents
1.                                                                                        PUMP IS USED  NOT REQUIRED  WITH A CENTRIFICAL PUMP   TANK    USED WITH SCS 303 AND SCS 313 BOOM   PRESSURE VALVES  AGITATOR RELIEF VALVE  CONSOLE VALVE  plz CONTROL BOOM 1  o    PRESSURE    VALVE TRANSDUCER       lt   STRAINER       TANK  gt k CN BOOM 2  3 VALVE PUMP EE AA a  gr    H  8 BOOM 3  8   lt   O   l A     a PRESSURE                            CONSOLE CONTROL CABLE GAUGE                NOTE  WHEN USING A PRESSURE TRANSDUCER  TRANSDUCER  MUST BE PLUMBED IN A VERTICAL POSITION TO ALLOW  FOR DRAINAGE   FIGURE 1    STANDARD SPRAYER PLUMBING DIAGRAM                                                                                                                                                                               BY PASS     USE PRESSURE RELIEF VALVE  HAND VALVE IF POSITIVE DISPLACEMENT TYPE  PUMP IS USED  NOT REQUIRED  pha WITH A CENTRIFICAL PUMP   z    USED WITH SCS 303 AND SCS 313  XE CONTROL  VALVE  TANK 800    PRESSURE VALVES  AGITATOR RELIEF VALVE X P  VALVE ae  CONSOLE  lt   pk    PRESSURE HOON        TRANSDUCER GSA   5 a  1 TANK         py ak BOOM 2  Se VALVE PUMP L_  MAIN LINE     gt   lt   24 STRAINER HAND VALVE a     BOOM 3  8     gt   O o  4 i X PRESSURE  CONSOLE CONTROL CABLE CAUCE  NOTE  WHEN USING A PRESSURE TRANSDUCER  TRANSDUCER      MUST BE PLUMBED IN A VERTICAL POSITION TO ALLOW  FOR DRAINAGE   FIGURE 2    ALTERNATE BY PASS SPRAYER PLUMBING DIAGRAM    4  WIRIN
2.  010  0 Flow Ext  Cable  12 ft   07 0159 025  1 Flow Control Cable  6 ft   5 0159 013   Flow Control Cable  12 ft   5 0159 015  2 Union Fitting 333 0001 008  3 Tubing  length as required  214 0001 001  4 3 4  Valve Assembly 063 0159 001  5 1  Valve Assembly 063 0159 447  6 11 2  Valve Assembly 063 0171 895  7 SCS 200 series Console 063 0159 203  8 Gauge only 417 0001 002  9 Gauge Fitting 333 0001 004   p A    3                                                                                                                                            SCS 303 REPLACEMENT PARTS                                                                                                                                                                                                                                ITEM DESCRIPTION RAVEN PART       1 ounting Bracket 07 0159 007  2 Boom Switch 412 2011 038  3 ounting Knob 309 1000 006  4 aster Switch 412 2011 037  5 Pressure Gauge 417 0001 016  6 Fuse Holder 510 2001 003  7 Fuse  15 Amp  510 1003 003  8 Pressure Adjust Switch 412 2011 039  3 Console Control Cable  8 ft   5 0159 011  10 Flow Ext  Cable  12 ft   07 0159 043  11 Flow Control Cable  6 ft   5 0159 008  12 Pressure Transducer 063 0159 316  13 3 4  Valve Assembly 063 0159 001  14 1  Valve Assembly 063 0159 447  15 11 2  Valve Assembly 063 0171 895  16 Console 063 0159 315  PEN A  NEL Z A               4   U W U  Sprayer Control ZE          8   NE Y        2  gp ZE  MJ  gt   d z        x NR 
3. 10 1  358            Day  2  z f  2 E  a       o  SPAN       E                   TOP VIEW OF PC BOARD  Position Console MASTER and BOOM switches ON   Run pump at normal operating RPM     Hold PRESSURE ADJUST switch down until Test Gauge reads 10 PSI  If necessary  close main  line hand valve to obtain 10 PSI     Turn ZERO ADJUST with a small screwdriver until SCS 313 meter reads 10 PSI   CAUTION  Do NOT touch screwdriver to components mounted to console faceplate     Hold PRESSURE ADJUST switch up until Test Gauge reads 40 PSI  If necessary  open main line  hand valve to obtain 40 PSI     If SCS 313 meter does not read within   2 PSI of Test Gauge  turn the SPAN ADJUST   If span adjustment is required  repeat Steps 7 10    The Console is now calibrated and ready for field use    Replace the faceplate and mounting screws  Remove the Test Gauge     Repeat this calibration procedure at the start of each spray season as needed   10    SCS 202  203 REPLACEMENT PARTS                                                                                                                                  ITEM DESCRIPTION RAVEN PART    1 Mounting Bracket 07 0159 007  2 Boom Switch 412 2011 038  3 ounting Knob 309 1000 006  4 aster Switch 412 2011 037  5 English PSI Gauge  Female Fitting  7 0159 006  Male Fitting  195  Tubing      Liquid Gauge  optional  417 0001 018  6 Fuse Holder 510 2001 003  7 Fuse  15 Amp  510 1003 001  8 Pressure Switch 412 2011 039  9 Console Control Cable  8 ft   5 0159
4. EE   due a En IE af  al al HO   Li ae  EA  gt     jJ                                                             SCS 11 REPLACEMENT PARTS    ITEM DESCRIPTION   1 Printed Enclosure   2 Back Cover Bracket   3 On Off Switch   4 Pressure Adjust Switch   5 English PSI Gauge  Female Fitting     Male Fitting  195  Tubing    6 Fuse Holder   El Fuse  5 Amp    8 Console Control Cable  16 ft    9 3 4  Valve Assembly   10 1  Valve Assembly   Ti  1 1 2  Valve Assembly   12 Tubing  length as required                                                  RAVEN PART    07 0159 092  06 0159 00  412 2011 038  412 2011 04   7 0159 007    q a                         RAVEN  RAVEN INDUSTRIES    Limited Warranty    What Does this Warranty Cover   This warranty covers all defects in workmanship or materials in your  Raven Applied Technology Product under normal use  maintenance   and service     How Long is the Coverage Period   Raven Applied Technology Products are covered by this warranty for  12 months after the date of purchase  This warranty coverage applies  only to the original owner and is nontransferable     How Can I Get Service   Bring the defective part and proof of purchase to your Raven Dealer   If your Dealer agrees with the warranty claim  the Dealer will send the  part and proof of purchase to their distributor or to Raven Industries  for final approval     What Will Raven Industries Do   Upon confirmation of the warranty claim  Raven Industries will  at our  discretion  repair or replac
5. G THE SPRAYER CONTROL SYSTEM    WIRING DIAGRAM FOR SCS 11                                                    FUSE  5 AMP                          TT m                Sprayer Control BA  i SCS 11 CONSOLE       NL                                                                                                    CONSOLE CONTROL CABLE  115 0159 005  16 FT      E      HOY     gt                  GAUGE TUBE  BLACK  BOOM VALVE CONNECTORS  WHITE  CONTROL VALVE                         gt      GAUGE TUBE    O  a A Hk  O  E    gt   WHITE  O OT  WIRING DIAGRAM FOR SCS 200 SERIES  PR  SCS 202  203 CONSOLE  063 0159 203  cay RED  O PR  CONSOLE CONTROL CABLE  O 115 0159 010  8 FT    O  3   gt  a WHITE q                                        FLOW EXT  CABLE  Ja  12 FT    Yue A    JM A                   FLOW CONTROL CABLE j    5 0159 013  6 FT    115 0159 015  12 FT          WIRING DIAGRAMS CONT  ON NEXT PAGE   4       WHITE   BLACK   BOOM VALVE CONNECTORS  BROWN   BLUE    a  k          NTROL VALVE                A       OOOOOO    000000       WIRING DIAGRAM FOR SCS 303             Sprayer Control                                                                                                                      K   SCS 303 CONSOLE  063 0159 315  E  c    RED  NASA CONSOLE CONTROL  CABLE PRESSURE TRANSDUCER  115 0159 011  8 FT      W  Ha at 5    WHITE U  FLOW EXT  CABLE  107 0159 043  12 FT    WHITE   O BLACK   BOOM VALVE CONNECTORS    Ee  lt Q BROWN  Ha BLUE  CONTROL VALVE     5           FL
6. KET SCS 203 8 303 CONSOLE BRACKET                S AP L   A    AS    e    E  N     Q              A  Y              0  N                3  Route the two Power Wires  Red  amp  White  from the Console to a 12 volt source  Connect the White  wire to ground  Connect the Red wire to a  12 VDC  hot  wire  battery  ignition solenoid  or fuse  block      CAUTION  Some ignition solenoids are 24 VDC           4  Route the 8 foot  16 foot on SCS 11  Console Control Cable out the tractor cab     2  INSTALLING THE PRESSURE SENSOR    1  The SCS 11  202  and 203 Sprayer Control systems sense pressure by means of a black plastic  tube which is tapped into the sprayer line and connected to the pressure tube provided with the  system     2  The SCS 303 and SCS 313 Sprayer Control sense pressure through an electronic Pressure  Transducer and therefore does not bring a liquid tube into the Console gauge  Attach Pressure  Transducer with quick disconnect so periodic flushing is possible when using suspensions  Refer  to Appendix 1 and Appendix 3 for calibration instructions for the Pressure Transducer     INSTALLING THE MOTORIZED CONTROL VALVE    Install the motorized Control Valve as shown in the Sprayer Plumbing Diagrams below  The  plumbing will vary depending on whether your sprayer has a positive displacement pump or a  centrifugal pump     3       USE PRESSURE RELIEF VALVE  IF POSITIVE DISPLACEMENT TYPE                                                                                        
7. OW CONTROL CABLE  115 0159 008  6 FT         WIRING DIAGRAM FOR SCS 313                                  Sproyer Control                                                                                                          beid                                                                                                    YS j  SCS 313 CONSOLE  063 0172 085  Ic  p  RED  e CONSOLE CONTROL CABLE  115 0171 184  8 FT       ADAPTER CABLE PRESSURE TRANSDUCER  ae 422 0000 059  Uh Na I     WHITE   EN ls  FLOW EXT  CABLE  107 0159 043  12 FT    WHITE  SA     m BLACK   BOOM VALVE CONNECTORS   N L  o BROWN  E   2 BLUE    NTROL VALVE      5 E  co  FLOW CONTROL CABLE                115 0159 008  6 FT               bied    INITIAL SYSTEM SET UP    1     1     2     3     4     5     6     7     8     9     10     11     ADJUSTING THE SYSTEM    Fill tank with water only     Place MASTER ON OFF Switch to ON  BOOM ON OFF switches to OFF  and open tank shut off  valve     With pump not running  fully open main line hand valve and totally close agitator line hand valve    If positive displacement type pump is used  fully open pressure relief valve      If centrifugal pump is used  proceed with Step 5  If positive displacement pump is used  proceed  as follows     a  Place MASTER ON OFF switches to OFF   b  Set Pressure Relief Valve to 65 PSI  448 KPAI   c  Place MASTER ON OFF switch to ON     Verify that each boom solenoid valve operates by operating BOOM ON OFF switches and that no  nozz
8. RAVEN    Simply improving your position      Installation  amp  Service Manual                         SCS 11  SCS 203 MG  SCS 303 313 EG    WARNING       Disconnect console before jump starting  charging battery  or welding  on equipment     016 0159 008    06103 TABLE OF CONTENTS    INSTALLATION csm esa   K WA taa akta Ea  1  MOUNTING THE SPRAYER CONTROL CONSOLE                                  2  INSTALLING THE PRESSURE SENSOR                                                   3  INSTALLING THE MOTORIZED CONTROL VALVE                                 4  WIRING THE SPRAYER CONTROL SYSTEM                                            NIMAL SYSTEM SET UP aaa ol i oli boi  1  ADJUSTING THE SYSTEM sect seta crete een ae Martine eda ir ek  2  CALIBRATING THE PRESSURE GAUGE                                                     APPENDIXES    1  PRESSURE TRANSDUCER CALIBRATION PROCEDURE                              2  GAUGE GUARD ASSEMBLY INSTRUCTIONS                                                 3  SCS 313 CONSOLE PRESSURE CALIBRATION    REPLACEMENT PARTS SHEETS    INSTALLATION  1  MOUNTING THE SPRAYER CONTROL CONSOLE    1  Select a mounting location for the Console in the tractor cab where the pressure gauge is clearly  visible and switches are within easy reach     2  Use the Console bracket as a pattern to drill the mounting holes  Drill one 1 4  hole and bolt the  bracket in the position desired  Now drill the second hole and install the second mounting bolt     SCS 11 CONSOLE BRAC
9. READ SEALANT TO PIPE NIPPLE   ASSEMBLE TRANSDUCER                 a THREAD SEALANT    ONIZ3344 NOHA d33A                   2  FILL THE TRANSDUCER AND GAUGE GUARD  CAVITY WITH 5W 30 OIL        FILL WITH OIL HERE                         3  ASSEMBLE GAUGE GUARD TO TRANSDUCER   CAUTION  AN EXCESSIVE LOSS OF OIL DURING  ASSEMBLY MAY AFFECT TRANSDUCER CALIBRA        5              ONIZA3UJ WONT daa       4  WITH TRANSDUCER POSITIONED AS SHOWN   REMOVE BLEED SCREW  SOME AIR AND EXCESS  OIL MUST ESCAPE              BLEED  SCREW                         5  REPLACE AND TIGHTEN BLEED SCREW                 BLEED  SCREW                   ONIZA3UJ MOYA daal       6  INSTALL TRANSDUCER AND CALIBRATE AS  DESCRIBED IN RECALIBRATION OF PRESSURE    TRANSDUCER                FRON FREEZING  UJ                            APPENDIX 3  SCS 313 CONSOLE PRESSURE CALIBRATION  PROCEDURE    The SCS 313 Control Console is factory calibrated  However  if re calibration is necessary  complete the  following procedure     1   2   3     4     5   6     7     8     9     10   11   12   13     14     Install Pressure Transducer and Control Valve  see page 3   Install Test Gauge  standard pressure gauge  on boom line   Fill sprayer tank with water only     Remove screws from console faceplate  Pull faceplate outward     2s                    O   Se    LI                                                    ZERO             Je  ZERO  O   8   5   Pe  27  158                                              4   2   6   5  
10. e the defective part and pay for return  freight     What is not Covered by this Warranty   Raven Industries will not assume any expense or liability for repairs  made outside our facilities without written consent  Raven Industries  is not responsible for damage to any associated equipment or  products and will not be liable for loss of profit or other special  damages  The obligation of this warranty is in lieu of all other  warranties  expressed or implied  and no person or organization is  authorized to assume any liability for Raven Industries     Damages caused by normal wear and tear  misuse  abuse  neglect   accident  or improper installation and maintenance are not covered  by this warranty        RAVEN    SCS 11  SCS 203 MG  SCS 303 313 EG Simply improving your position     Installation      Service Manual   P N 016 0159 008 Rev E 2 09     Raven Industries Toll Free  U S  and Canada    800  243 5435  Applied Technology Division or Outside the U S   1 605 575 0722  PO  Box 5107 Fax  605 331 0426    Sioux Falls  SD 57117 5107 www ravenprecision com  atdinfo ravenind com       Notice  This document and the information provided are the property of Raven Industries  Inc  and may only be used as authorized  by Raven Industries  Inc  All rights reserved under copyright laws     
11. eading as your  reference point for maintaining the desired pressure at the nozzle     APPENDIX 1  PRESSURE TRANSDUCER CALIBRATION PROCEDURE    The SCS 303 Control Console and Transducer are factory calibrated  However  if re calibration is  necessary  complete the following procedure     1  Install Pressure Transducer and Control Valve  see page 3    2  Install Test Gauge  standard pressure gauge  on boom line    3  Fill sprayer tank with water only    4  To remove Transducer cover  rotate cover until slot and tab are aligned  Lift off cover     SPAN ADJUST       ZERO ADJUST                      SLOT  TAB TAB  SLOT  COVER    TOP VIEW OF TRANSDUCER    5  Position Console MASTER and BOOM switches ON   6  Run pump at normal operating RPM     7  Hold PRESSURE ADJUST switch down until Test Gauge reads 10 PSI  If necessary  close main  line hand valve to obtain 10 PSI     8  Turn ZERO ADJUST with a small screwdriver until SCS 303 meter reads 10 PSI     9  Hold PRESSURE ADJUST switch up until Test Gauge reads 40 PSI  If necessary  open main line  hand valve to obtain 40 PSI     10  If SCS 303 meter does not read within   2 PSI of Test Gauge  turn the SPAN ADJUST   11  If span adjustment is required  repeat Steps 7 10    12  The Transducer is now calibrated and ready for field use    13  Replace the Transducer cover and remove the Test Gauge     14  Repeat this calibration procedure at the start of each spray season     APPENDIX 2  GAUGE GUARD ASSEMBLY INSTRUCTIONS       1  APPLY TH
12. les are plugged     Place all BOOM ON OFF switches ON     Hold the MAN ADJ switch in INC position until the pressure stops increasing and begins to  decrease     Adjust agitator line hand valve for desired agitation   Close the main line hand valve  if necessary  to set the maximum desired operating pressure   The  maximum pressure should be approximately 10 PSI  69 kPA   above the nominal spraying    pressure      Hold the MAN ADJ switch in DEC until the pressure stops decreasing and begins to increase  If  desired minimum pressure cannot be obtained  install larger bypass hose     Verify the desired maximum pressure of the Sprayer System by repeating Step 7     2     3     CALIBRATING THE PRESSURE GAUGE    The pressure tap on the Raven Sprayer Control systems is located away from the nozzles  thus   there can be a pressure difference between nozzle pressure and gauge pressure at the Console   Therefore  for best results  we recommend the following procedure     When the sprayer is ready and the tank filled with water  NO CHEMICALS AT THIS TIME   attach  an accurate pressure gauge to a nozzle in place of the spray tip     Start up the pump  turn on the electric shut off valves  Boom Valves  and adjust the pressure control  valve so that the desired pressure is maintained on the gauge at the nozzle     Because of pressure drops through the system  the pressure shown on the gauge in the Console  may read slightly higher than the gauge at the nozzle  Use this Console pressure r
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Teac (HDU250KIT) 250 GB Hard Drive  Dans ce numéro: ITTO - CITES ITTO  Optimus CD-3680 (42-5075) CD Player User Manual  POLARON EX-1400 - Modellbau Lindinger  CellFax Plus Installation and User Manual  Samsung GT-C5212 Hướng dẫn sử dụng    Pocket RxTx –Multimode Transceiver Control for Android  StarFire 3000-Empfänger - stellarsupport global  Manual de Instalación de RTLinux    Copyright © All rights reserved. 
   Failed to retrieve file