Home

CRANEX D - thetechgods.net

image

Contents

1. 1 41 KHU kJoule 1 kJ 05 0 1 020305 1 2 3 5 10 20 30 sec Installation and set up manual 8201085 59 6 Technical Information Unit dimensions Cranex D 60 Installation and set up manual 8201085 Cranex D 6 Technical Information Guidance and manufacturer s declaration electromagnetic emissions The PP1 is intended for use in the electromagnetic environment specified below The customer or the user of the PP1 should assure that it is used in such an environment Emissions test Compliance Electromagnetic environment guidance RF emissions Group 1 The PP1 uses RF energy only for its internal function CISPR 11 Therefore its RF emissions are very low and are not likely to cause any interference in nearby electronic equipment RF emissions Class B The PP1 is suitable for use in all establishments CISPR 11 including domestic establishments and those directly Harmonic Class A connected to the public low voltage power supply emissions network that supplies buildings used for domestic IEC 61000 3 2 purposes Voltage Complies fluctuations flicker emissions IEC 61000 3 3 Installation and set up manual 8201085 61 6 Technical Information Immunity test IEC 60601 test
2. Checking the position of the ceph head support 1 From the previously taken lateral ceph exposure check that the two rings inside the ear posts are concentric on the image If the rings are not concentric then the head support must be adjusted See section 5 5 Option Aligning the cephalostat 40 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit 5 Adjusting the alignment of the unit 5 1 Primary slit NOTE The primary slit DOES NOT have to be adjusted during installation However this procedure may be needed later Before making any alignment adjustments check that the panoramic primary slit is 0 9 mm wide when the unit is in the PIO position To do this 1 Manually rotate the rotating unit to the PIO posi tion parallel to the column 2 Carefully measure the width of the slit with for example a feeler gauge NOTE The primary slit is made of lead and is very soft Be careful not to scratch or damage the sides of slit If the width of the slit needs to be adjusted do it as follows 1 Loosen the fixing screw A in the upper part of slit adjusting cone Use screwdriver to turn the cone B from below until the correct slit width is achieved Tighten the fixing screw Installation and set up manual 8201085 41 5 Adjusting the alignment of the unit Cranex D 5 2 Adjusting the rotation center Top of upper shelf Pulley and pulley holde
3. A 2 Installation and set up manual 8201085 Cranex D Appendix A Ceph upgrade 6 Attach the Positioning Rail to the same holes that the Panoranic Collimator was attached 3 screws Make sure that the Adjusting screw in the side of the Positioning Rail goes through the hole in the side of the Colimator support plate Attach the circlip to the adjusting screw Adjusting screw Circlip Positioning Rail 7 There is a Stepper Motor attached to the Positioning Rail Route the cable that comes from the Stepper Motor across the inside of the C arm to loose connector J14 on the CCD Sensor side Secure the Stepper Motor cable to the other cables with cable ties Connector J14 on Stepper Motor cable Stepper Motor Cable CCD sensor side Stepper Motor Positioning Rail Tube head side Installation and set up manual 8201085 A 3 Appendix A Ceph upgrade Cranex D 8 Attach the Ceph Aperture CCD to the inside of the Side Frame if it is not already attached M4 x 8 Note that the side of the Ceph Aperture CCD with the large aperture must face outwards Attach the Ceph Aperture CCD to inside of the Slide Frame Large aperture Ceph Aperture CCD 9 Slide the Support Bar into the bearings in the Slide Frame Slide Frame A 4 Installation and set up manual 8201085 Cranex D Appendix A Ceph upgrade 10 Place the Slide Frame on to the Positioning Rail so that the two bearings on the underside of the
4. Metal cover Remove the cover from the top of the Z car riage Cover Z carriage Loosen the four nuts that will be used to hold the rotating unit in position Nuts Installation and set up manual 8201085 17 3 Installing the unit Cranex D Upper shelf Slot Rotating unit CAUTION HEAVY OBJECT A minimum of two persons are required for the following task Lift the rotating unit with the linear motor to wards the column and very carefully slide the rotating unit onto the upper shelf as far as it will go The four slots in the rotating unit MUST slide under the four nuts on the upper shelf Make sure that none of cables are caught Tighten the four nuts to hold the rotating part in place Connect all the cables that come from the rotat ing unit to the corresponding connectors of the Top Rack Connector Board N5300 J5303 J5305 J5306 J5309 J5312 J5316 J5320 and J5321 Also one cable goes to the Power Supply Board N4700 X22 Also connect the ground wires from Z carriage and Power Supply Board in the ground wire connection screw at the front of upper shelf The rotating unit ground wire is already connected to this grounding screw NOTE Handle fibre optic cables with care They can be easily damaged if mishandled Connect the fibre optic cables that come from the rotating unit to the connectors inside the rear of the Z carriage 18 Installation and set up manual 8201085
5. Cranex D 3 Installation the unit When the unit is viewed from the rear the cable with text TX goes to the left hand connector and the cable with NO text goes to the right hand connector Cranex D Pan fibre optic cable connections Text on cable NO text on cable Column Upper shelf NO text on cable RX To PC TX Text on cable Z carriage View of unit from rear Cranex D Pan fibre optic cable connections Block diagram Terminal board at pan head ICD15 ICD13 UR Me TX RX View of unit from rear Fibre optic cable connectors at rear of Cranex D Installation and set up manual 8201085 19 3 Installing the unit Cranex D 7 Attach the CCD sensor to the panoramic sensor holder Refer to the Users Manual for information on how to do this NOTE CCD Image Receptor PP1 1 sensor type 1 can ONLY be used with the panoramic sensor holder CCD Image Receptor PP1 2 sensor type 2 can be used with both the panoramic and the cephalometric sensor holders Install the Cranex Graphical User Interface and the PCI Interface Board Driver into the PC to be used with the unit These are on Cranex D Installation CD supplied with the unit From the disk run SETUP EXE and both the GUI and the PCI driver will be installed simultaneously Install DfW 2 5 rev1 or later software into the PC During the installation when the Select Features window appears make sure that you sel
6. Down arrow keys or open the mirror to switch the patient positioning lights on 36 Installation and set up manual 8201085 Cranex D 4 Checking the alignment of the unit 4 When the alignment tool is parallel to the upper shelf the focal trough light beam must coincide Mose Oiital iG HE X20 with the F line 1 mm accuracy on the align ment tool parallel to column Focal trough light tool parallel to upper shelf When the alignment tool is parallel to the col umn the midsagittal light beam must coincide with the M line 1 mm accuracy on the align ment tool If the light beams do not coincide with their respective light beams they must be adjusted See 5 3 Adjusting the positioning lights 4 4 Checking the panoramic radiation field 1 Place the alignment tool in the slot in the front of CCD sensor Slot the CCD sensor and slide the alignment tool down as far as it will go Alignment tool Installation and set up manual 8201085 37 4 Checking the alignment of the unit Cranex D 2 Enter the service mode and select service program EPS 3 Select exposure values of 70kV 10 mA 0 32sec from the unit control panel or from GU WARNING tay a Radiation i VA 4 Protect yourself from radiation and press the La iS exposure switch Check the position of the radiation beam If it is between the outermost vertical lines is vertical not tilted and the bottom of the beam
7. Press the E key to select this and then press and hold down the E key to exit the service mode The Z carriage can now be driven up and down NOTE The Z movement microswitches do not function in this mode so make sure that you do not drive the Z carriage to the mechanical end stops which will cause the Z motor to jam NOTE Remove the service connectors from the unit to avoid accidental access to service programs Installation and set up manual 8201085 31 4 Checking the alignment of the unit Cranex D 4 Checking the alignment of the unit After checking the alignment and making any neces sary adjustments See section 5 Adjusting the Align ment of the Unit replace all the covers that were removed WARNING Protect yourself from radiation when taking x ray exposures 4 1 The service mode To check the alignment you will need to enter the service mode and select the appropriate service program Entering the service mode 1 Switch the unit off Open the mirror and remove the front cover from the Z carriage and insert service connector part no 4801744 into connector X90 on the IO board Switch the unit on Press and hold down the E key 3 seconds until you hear a triple beep the unit is now in the service mode Selecting service programs and parameters 1 There are four unmarked buttons on the control panel left right up down The up and down buttons select the service progra
8. SOREDEX PP_GUI with text editor such as Notepad or Microsoft Word The configuration file contains two lines which specify the serial ports used Correct line identifiers are op and serialdicc After the line identifiers there are Unix type device identifiers that specify the used serial port Port number starts from 0 so that dev tty S0 means COM1 and so on For example op dev ttySO serialdicc dev ttyS1 specifies Cranex GUI will use serial ports COM1 and COM2 and op devittyS4 serialdicc dev ttyS7 specifies Cranex GUI will use serial ports COM5 and COM8 52 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit Make changes according to your system set tings and save configuration file NOTE When using Microsoft Word make sure to save file in Text Only format Restart the Cranex D GUI for changes to take effect Installation and set up manual 8201085 53 6 Technical Information Cranex D 6 Technical Information 6 1 Symbols markings that appear on the unit O Exposure switch locked ail Exposure switch Exposure switch unlocked WY Ready On or enabled O Off or disabled AN Radiation warning AS Attention consult accompanying documents as X ray source assembly emitting 4 Dangerous voltage mu Protective earth ground 4L Ground Functional C CE 0537 symbol gt MDD 93 42 EEC SSIF ey i
9. voltage variations hospital environment If on power supply 40 Ur 40 Ur user of the PP1 requires lines 60 dip in Ur 60 dip in Ur continued operation IEC 61000 4 11 for 5 cycles for 5 cycles during power mains interruptions it is 70 Ur 70 Ur recommended that the PP1 be powered from an uninterruptible power supply or a battery Power frequency magnetic field should be at levels characteristic of a typical location in a typical commercial or hospital environment NOTE Uris the a c mains voltage prior to application of the test level 62 Installation and set up manual 8201085 Cranex D 6 Technical Information Guidance and manufacturer s declaration electromagnetic immunity The PP1 is intended for use in the electromagnetic environment specified below The customer or the user of the PP1 should assure that it is used in such an environment Immunity IEC 60601 test Compliance Electromagnetic environment guidance test level level Portable and mobile RF communications equipment should be used no closer to any part of the PP1 including cables than the recommended separation distance calculated from the equation applicable to the frequency of the transmitter Recommended separation distance Conducted 3 Vrms 3V d 1 2 4P RF 150 kHz to yes GIDGD SU MEIE d 1 2 4 P 80 MHz to 800 MHz d 2 34 P_ 800 MHz to 2 5 GHz aniden avm Swm where P is the maximum output power rating R
10. 2 Installing the cephalometric unit 1 Follow the instructions given in section 3 5 Option Installing a cephalonmetric unit in this manual 3 Electrical modifications 1 On N55300 connect the jumper to JP1 either to the position R right hand side ceph or the L position depending on the ceph being installed 2 On N5200 Digital IO board connect jumper X15 either to the position R right hand side ceph or the L position depending on the ceph being installed 3 Remove the jumper from JP1 in N3500 Motor controller 4 Software modifications 1 The DfW 2 5 folder name should be altered according to the DfW software supplied The Ceph option must be added to DfW To do this open the file Dicc ini Soredex DfW 2 5 using Notepad and from the line beginning with Devices add the text PP1CEPH and save the file Installation and set up manual 8201085 A 7 Appendix A Ceph upgrade Cranex D 5 Checking the alignment of the unit NOTE Apan ceph sensor Type 2 must be used to produce ceph images The Type 2 sensor is not part of the upgrade kit and must be ordered separately The Gain Flies for the new CCD sensor on the Cranex D Installation CD must be installed in the PC To do this copy the contents of the CD s folder Gainfiles to folder Soredex DfW 2 5 Dicc Ortho Gainfiles 1 Reconnect the power supply to the unit and switch the unit on 2 Align the unit pan and ceph according to the instruct
11. 4 at the rear from the z carriage Front cover Side cover Nuts and 2 Remove all packing material the nuts and wash Washers ers from the ceph arm Lift the ceph arm up behind the unit to where it is to be attached CAUTION Handle fibre optic and other cables with care They can be easily damaged if mishandled Carefully route the cables through the hole in the back of the Z carriage to the front of it and then secure the arm in place with the washers nuts 4 Ceph arm Cables 24 Installation and set up manual 8201085 Cranex D 3 Installation the unit 3 Connect the cables from the ceph arm to the appropriate connectors on the Digital IO board and Motor Controller board Connect the ground wire to the grounding point on Z carriage frame NOTE Handle fibre optic cables with care They can be easily damaged if mishandled Connect the fibre optic cable WITH text that comes from the rotating unit The Terminal Board to the left hand connector when viewed from rear inside the rear of the Z carriage Connect the fibre optic cable WITHOUT text that comes from the rotating unit The Terminal Board to the fibre optic cable WITH text that comes from the ceph arm Connect the fibre optic cable WITHOUT text that comes from the ceph arm to the right hand connector when viewed from rear inside the rear of the Z carriage Cranex D Ceph fibre optic cable connections Text on cable NO text on
12. Slide Frame are positioned on either side of the Positioning rail Secure the Slide Frame in position by securing the support bar to the Collimator Support Plate with two M4 x 8 screws one at each end of the support bar LES _ _ OY 9 JIN 6 C Support bar 0 M4 x 8 Screws Collimator support plate Positioning Rail Front bearing Rear bearing Positioning Rail between bearings Installation and set up manual 8201085 Appendix A Ceph upgrade 11 Toothed bar Cranex D Insert the Toothed bar into the small hole in the side of the Slide Frame Position the Toothed Bar so that it engages fully with the motor gear wheel when the Slide Frame is slid to the left as far as it will go Also make sure that there is no play between the Tooth Bar and the gear wheel If necessary eliminate play by adjusting the position of the motor When the Toothed Bar is in the correct position secure in position with the M4 x 6 grub screw Gear wheel 12 Connect the cable that comes from the solenoid on the Slide Frame to N5500 J5502 Also connect the new cable from N3100 to N5500 J5501 Use cable ties to secure the cables so that they cannot interfer with the collimator movement Pa New cable from N3100 to N5500 J5501 LLN 2 e JN N 5500 Cable from solenoid on Slide Frame to N5100 J5502 Installation and set up manual 8201085 Cranex D Appendix A Ceph upgrade
13. UL Classification and CSA classification Type B equipment 54 Installation and set up manual 8201085 Cranex D 6 Technical Information 6 2 Technical Specifications Model PP1 Classification IEC class I type B IP20 Conforms with the standards EN 60601 1 EN60601 1 3 EN 60601 2 7 and EN 60601 1 2 Group 1 class B Conforms with the regulations of DHHS Radiation Performance Standard 21CFR Subchapter J The unit must be installed within a protected clinical area Protection against electric shock Class 1 Degree of protection Type B applied parts with no conductive connection to patient Protection against ingress of liquids IPX 0 Disinfection methods e mild soapy water e non alcholic based disinfectant for the chin rest e disposable plastic covers for bite piece chin support For use in environments where no flammable anaesthics and or flammable cleaning agents are present Mode of operation Continuous operation with intermittent loading Unit description Dental panoramic and panoramic cephalometric x ray units with a high frequency switching mode x ray generator The panoramic version takes panoramic exposures The panoramic cephalometric version takes panoramic and cephalometric exposures The unit uses a CCD sensor as image receptor X ray generator TUBE OPX 105 or equivalent FOCAL SPOT 0 5 mm IEC 336 TARGET ANGLE TARGET MATERIAL Tungsten Installation and set up manual 8201085 55
14. and set up manual 8201085 29 3 Installing the unit Cranex D 3 7 Installing a remote exposure warning light optional If you plan to install a remote exposure warning ready state light it must be connected to connector J5301 on the Motor Controller board on the Z carriage and the cable routed out through the rear of the Z carriage there is a punch hole above the exposure switch Use a grommet to protect the cable The warning light assembly must be positioned outside the room in which the x ray is used in the location where it can be clearly seen For further information on how to install the remote exposure warning light refer to the instructions supplied with the light and the relevant circuit diagram in the unit service manual 30 Installation and set up manual 8201085 Cranex D 3 Installation the unit 3 8 Running the z carriage without the Rotating unit If you need to drive the Z carriage up or down when the rotating unit has not been installed it can be done as follows Connect service connectors not supplied to X90 and X14 on the Digital IO Board N5200 on the Z Carriage NOTE CEPH UNITS A jumper must be connected to JP1 on the Motor controller board N3500 Enter the service mode and select the program rd our See section 4 1 The service mode Press and hold down the L or R key until C 43 FiL appears on the display Press the up button and then the R button
15. be used and then attach the lower wall bracket and leg to the wall Remove the upper cover from the upper shelf 4 screws and then remove the plastic film from the column Upper cover Place some packaging material on the floor to support the column and Z carriage If possible place the packaging material just in front of the wall bracket and leg CAUTION HEAVY OBJECT A minimum of two persons are required for the following task Lift the column and Z carriage from the box DO NOT lift it by holding the patient support handle and place them on to the packaging material on the floor 14 Installation and set up manual 8201085 Cranex D 3 Installation the unit Horizontal bar M10screws Transportation support Remove the two M10 screws and washers from the horizontal bar on the leg CAUTION HEAVY OBJECT A minimum of two persons are required for the following task Lift the column and Z carriage and turn them over so that the upper shelf is pointing towards the floor Attach the lower part of the column to the horizontal bar on the leg with the two M10 screws Rest the upper shelf on a piece of packaging material on the floor Remove the two transport supports from the rear of column Replace the M4 screws NOTE If the unit is to be used in an exhibition mark the position of the transportation supports before removing them The mark will make it easy to replace the transportatio
16. conditions Storage temperature 0 40 C Relative humidity 0 85 RH Minimum computer requirements The values in brackets are recommended values OPERATING SYSTEM Windows XP Professional Home SP1 or SP2 Windows 2000 Professional SP4 CPU Pentium 4 or Athlon XP or equivalent 1 5 GHz or better recommended RAM 256 MB 512 MB recommended HDD 20 GB single user VIDEO RAM 16 MB or more NETWORK CONNECTION 10 100 Mbit s Ethernet NIC DISPLAY 1280 x 1024 x 24 bit Tru Color 85Hz display 19 CRT or 17 TFT LCD recommended COM 1 and COM 2 available free Connection to the PC must meet EN60601 1 requirements The use of ACCESSORY equipment not complying with the equivalent safety re quirements of this equipment may lead to a reduced level of safety of the resulting system Consideration relating to the choice shall include use of the accessory in the PATIENT VICINITY evidence that the safety certification of the ACCESSORY has been performed in accordance to the appropriate IEC 601 1 and or IEC 601 1 1 harmonized national standard only RS 232C interface cable and fibre cable provided by the manufacturer shall be used 58 Installation and set up manual 8201085 Cranex D 6 Technical Information Tube housing assembly cooling characteristics TUBE HOUSING ASSEMBLY COOLING CHARACTERISTICS kHU HEAT UNITS 8 mira A E 90 120 150 180 TIME IN MINUTES OPX 105 and KL5
17. from DfW To do this open the file Dicc ini Soredex DfW 2 5 using Notepad and from the line begin ning with Devices remove the text PP1CEPH and save the file 22 Installation and set up manual 8201085 Cranex D 3 Installation the unit 3 4 Levelling the unit If you are installing a Pan unit the unit must now be levelled If you are installing a Pan Ceph unit level the unit after the Ceph arm and head have been installed 1 To level the unit in the front back direction place a spirit level on the upper shelf so that it is per pendicular to the front of the unit Level the unit by adjusting the position of the nuts loosening and tightening them on the extension bars atthe top of the column To level the unit in the left right direction place a spirit level across the upper shelf so that it is parallel to the front of the unit Level the unit by slightly loosening the nuts that hold the unit to the top wall bracket and then pushing the column to the left or right Check that the unit is level in both directions and then tighten all the adjusting and securing nuts Installation and set up manual 8201085 23 3 Installing the unit Cranex D 3 5 Option Installing a cephalometric unit Installing the cephalometric arm If you are installing a ceph unit the ceph arm must now be installed 1 Remove the front cover 6 screws under the mirror and side covers 2 screws at the front and
18. of the unit to the PC must meet EN60601 1 requirements The use of ACCESSORY equipment not complying with the equivalent safety requirements of this equip ment may lead to a reduced level of safety of the resulting system Consideration relating to the choice shall include use of the accessory inthe PATIENT VICINITY evidence that the safety certification of the ACCESSORY has been performed in accord ance to the appropriate IEC 601 1 and or IEC 601 1 1 harmonized national standard only RS 232C interface cable and fibre optic cable provided by the manufacturer shall be used Installation and set up manual 8201085 Cranex D 2 Pre installation requirements 2 4 Installation tools setup tools and installation hardware Hardware Standard tools Special tools The following tools and hardware are required to install and set up the unit NOTE THESE ARE NOT INCLUDED IN THE DELIVERY OF THE UNIT UNLESS OTHERWISE STATED 4x 8 mm 5 16 in fixing hardware for attaching the wall bracket and leg to the wall Not required if you are using the show stand pt no 9802666 Electric drill Spanners wrenches 5 5 7 8 10 13 17mm Also a longer 10cm min extension socket is needed Allen keys Hexagon socket wrenches 1 5 8mm including a 12 cm long min 3 mm allen key Flat blade screwdriver Torx screwdrivers T20 T25 T30 Spirit level Pliers and wire cutters Scissors Alignment tool par
19. 02666 Use 8 mm 5 16 in minimum diameter fixing hard ware NOT SUPPLIED to attach the unit to the wall The type and length of hardware must be suitable for the wall to which the unit will be fixed Note that if the wall is made of thin material you may have to use a reinforcing backing plate on the rear of the wall to hold the securing screws bolts or nuts Installation and set up manual 8201085 Cranex D 2 Pre installation requirements 2 1 Space requirements The main dimensions of the unit are shown below 1825 Installation and set up manual 8201085 7 2 Pre installation requirements Cranex D 2 3 The PC When installing the unit make sure that there is enough space at the front and sides of the unit to allow patient entry and exit Patients using wheel chairs will require more space around the cephalo metric unit than standing patients Note that units with the ceph mounted on the left hand side require more space than units with the ceph mounted on the right hand side NOTE The height of the unit is 2 32 m 91 If the ceiling in the room where the unit is to be installed is lower than this the height of the unit must be reduced by shortening the leg The PC that is to be used with the unit must be installed in a location that meets all local and na tional safety requirements with regards the connec tion of a PC to an x ray device The PC must not be used as a Server The connection
20. 1 5 Unit description Panoramic version Wall bracket Upper Shelf CCD sensor holder CCD sensor Sy TTI Patient support handle Chin rest holder 4 Installation and set up manual 8201085 Cranex D 1 Introduction Cephalometric option Cephalometric head Cephalometric secondary slot SS CCD sensor holder Installation and set up manual 8201085 5 2 Pre installation requirements Cranex D 2 Pre installation requirements 2 1 The Unit WARNING The room in which the unit is to be installed and the position from where the user will take exposures must be correctly shielded from the radiation that is generated when the unit is operated Since radia tion safety requirements vary from country to country and state to state it is the responsibility of the in staller to ensure that all safety regulations are met The unit is supplied in one box Length Width Height 185 cm 80 cm 100 cm 73 in 32 in 40 in The installed unit weighs 150 kg 330 Ib Make sure that the floor in the room where the unit is to be used can support the weight of the unit Also make sure that the wall to which the unit is attached and the fixing hardware used to attach the unit to the wall can withstand a continuous pull out force of at least 300 kg 660 Ib The unit MUST be attached to a wall Panoramic units NOT PAN CEPH can also be attached to the show stand pt no 98
21. 6 Technical Information Cranex D OPERATING TUBE POTENTIAL Panoramic imaging 57 85 kV 4 kV Cephalometric imaging 60 85 kV 4 kV OPERATING TUBE CURRENT 10 mA 1 mA at 0 5 FS MAXIMUM TUBE CURRENT 11 mA MAXIMUM OUTPUT POWER 945 W nominal at 85kV 11 mA FILTRATION minimum filtration 2 7 mm Al BEAM QUALITY HVL over 3 05 mm AIl 85 kV OUTER SHELL TEMPERATURE 50 C 122 F maximum DUTY CYCLE controlled by the software of the unit Power requirements INPUT VOLTAGE 230 or 115 VAC 10 50 60 Hz single phase grounded socket MAXIMUM LINE CURRENT 8 A 85 kV 10mA 230 VAC mains MAXIMUM LINE RESISTANCE 1 ohm MAXIMUM LINE FUSING 10 A 20A slow 230 115 VAC main fuse 8A 16A slow in the device LINE SAFETY SWITCH when required Approved type min 10 A 250 VAC EARTH LEAKAGE CIRCUIT BREAKER when required Approved type min 16 A 250 VAC breaker activation leakage current in accordance with local regulations Mechanical parameters PANORAMIC Source to Image layer Distance SID 520 mm 10 mm Magnification factor 1 34 CEPHALOMETRIC Source to Image layer Distance SID 1721 mm 20 mm Source to Object Distance SOD 1500mm Magnification factor 1 15 WEIGHT Panoramic unit 120 kg Panoramic cepahlometric unit 165 kg DIMENSIONS Panoramic unit H x W x D 2320 x 1200 x 1000 mm Panoramic cephalometric unit H x W x D 2320 x 1200 x 1900 mm VERTICAL HEIGHT OF CHIN REST 950 1
22. 750 mm 10 mm 56 Installation and set up manual 8201085 Cranex D 6 Technical Information Digital image receptor Only the CCD sensors specifically designed for Cranex D unit can be used PIXEL SIZE 96 micrometres RESOLUTION PAN 6 9lp mm theor CEPH 5 9lp mm theor IMAGE SIZE PAN 9 5 MB CEPH 13 3 MB Timer PANORAMIC EXPOSURE TIMES Normal 17 6 s 15 Child16s 15 Partial 1 9s 3s 9 2s 3s 1 9s Can be freely selected and combined overlapping approx 0 3 s TMJ 3 3 3 3 s 415 Max 240 mAs CEPHALOMETRIC EXPOSURE TIMES 8 20 s scanning times 5 steps according to R 10 series ISO BACK UP TIMER 23 5 s 1 5s Leakage technique factors PANORAMIC 85 kV 2400 mAs h 85 kV 10 mA duty cycle 1 15 CEPHALOMETRIC 85 kV 1800 mAs h 85 kV 10 mA duty cycle 1 20 Measurement bases kV and mA values can be verified with a specified digital multimeter according to separate measurement instructions The exposure times can be measured as the duration of radiation in the primary radiation beam Exposed field size in cephalometry 22 x 26 cm for lateral projections 22 x 22 cm for PA and AP projections Automatic filtration of soft tissues for lateral projections controlled by software Installation and set up manual 8201085 57 6 Technical Information Cranex D Operating ambient conditions Operating temperature 10 40 C Relative humidity 0 85 RH Storage ambient
23. CRANEX D Installation and set up manual 8201085 rev 405 0609 CRANEX D Installation and set up manual CE 0537 Medical Device Directive 93 42 EEC Cranex Installation and setup Manual 8201085 rev 405 0609 Original approved English language version Document 8201085 SDX1TPH 1 rev 4 Soredex P O Box 148 04301 Tuusula FINLAND Tel 358 45 7882 2000 Fax 358 9 701 5261 Soredex endeavours to produce product documentation that is accurate and up to date However our policy of continual product development may result in changes to products that are not reflected in the product documentation Therefore this document should not be regarded as an infallible guide to current product specifications Soredex maintains the right to make changes and alterations without prior notice Contents 1 Introduction sssssssssnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn unnn nnnn nnmnnn nnna 1 ToT INO OMNONN oaee E E i cacmeteeeeeeeeuieee 1 1 2 Associated documentation isecteepettccsceet ee ceareeeces becca isaac ceeenemeaciuccee 1 1 3 Warnings and precautions 3 acccccsnnc aeesecccsteserctarerddeteteiscezeragtecacapicutendecatiact 2 1 4 Identifying the Unit vVersiOM sapienter terstir aeaa 3 1 5 Unit description ssssnseeeeeeeoeeennnneneeennnttrteeeertttennntrneerrttttnneeeettnnnnnnneeeeenene 4 Panoramic version p0i cnc5 cecwemedadancttnenemenennintedntinietenaeelodetabewebabeaaaiabauncns 4 Cephalometric Option
24. F 80 MHz to noe of the transmitter in watts W according to the IEC 61000 2 5 GHz 4 3 transmitter manufacturer and dis the recommended separation distance in metres m Field strengths from fixed RF transmitters as determined by an electromagnetic site survey should be less than the compliance level in each frequency range Interference may occur in the vicinity of equipment marked with the following symbol K NOTE 1 At 80 MHz and 800 MHz the higher frequency range applies NOTE 2 These guidelines may not apply in all situations Electromagnetic propagation is affected by absorption and reflection from structures objects and people Field strengths from fixed transmitters such as base stations for radio cellular cordless telephones and land mobile radios amateur radio AM and FM radio broadcast and TV broadcast cannot be predicated theoretically with accuracy To assess the electromagnetic environment due to fixed RF transmitters an electromagnetic site survey should be considered If the measured field strength in the location in which the PP1 is used exceeds the applicable RF compliance level above the PP1 should be observed to verify normal operation If abnormal performance is observed additional measures may be necessary such as reorienting of relocating the MINRAY gt Over the frequency range 150 kHz to 80 MHz field strengths should be less than 3 V m Installation and set up
25. ITHOUT text to the left hand connector When routing the fibre optic make sure that it is not lying on the floor where it can be trodden on and damaged Also do not bend the cables around radiuses less the 15cm Connect the serial interface RS cable part number 4801742 between the serial ports of PC and unit To the rear of the unit connect the male D connector nine pin to the appropriate female connector at the rear of the unit Secure the connector in place with the holding screws To the PC connect the female connectors to the male D connectors COM1 and COM2 at the rear of the Installation and set up manual 8201085 21 3 Installing the unit Cranex D 13 PC Secure the connectors in place with the holding screws If the PC only has one COM port COM1 you can use either a USB RS adaptor or PCl card RS card to make a second COM port COM2 See section 5 7 Changing the serial port num bers for information on how to do this NOTE Only use the cables supplied by the manufac turer From the Cranex D Installation CD install the CCD Sensor Gain Files into the PC To do this copy the contents of the CD s folder Gainfiles to folder Soredex DfW 2 5 Dicc Ortho Gainfiles Note DfW 2 5 folder name should be altered according to the DfW software supplied When DfW is installed it will support a Pan Ceph unit If you are installing a Pan only unit you must remove the Ceph option
26. cable NO text on cable RX To PC TX Text on cable Z carriage NO text on cable Ceph unit Text on cable es View of unit from rear i ah ee Ceph arm Installation and set up manual 8201085 25 3 Installing the unit Cranex D Cranex D Ceph fibre optic cable connections Block diagram Terminal board at pan head ICD15 ICD13 OX Mey View of unit from rear gt Fibre optic cable connectors at rear of Cranex D jqe uo on cable Text on cable Connector side of Z carriage Terminal board at ceph head ICD15 ICD13 OX RX l 4 NOTE Handle fibre optic cables with care They can be easily damaged if mishandled Connect the fibre optic cables part number 4801743 between the PCI board in the PC and unit To the PCI Board connect the cable WITH text on to the TX connector connect the cable WITHOUT text to RX con nector 26 Installation and set up manual 8201085 Cranex D 3 Installation the unit Installing the cephalometric head 1 Remove the ceph head carefully from its pack age and remove the ceph head cover which is held in place with four screws on the under side Remove four fixing screws from the ceph head holder at the end of the ceph arm Lift the ceph head and slide it partly on to the ceph head holder Route the cables through the opening in the ceph head holder Continue to slide the ceph h
27. ct the N610 board and then remove the ceph secondary slit 2 screws To move ceph head horizontally loosen four fixing screws on top the ceph head and then slide the ceph head backwards or forwards until the beam is correctly positioned The correct position is when the radiation beam is within the vertical lines on the alignment tool To move the ceph radiation field vertically loose the two fixing screws A that hold the collimator slit plate in position and then adjust the plate with the adjustment screws B next to the colli mator The correct position is when the radia tion beam coincides with the M line 2 mm on the alignment tool Tighten all screws when adjusted 48 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit Adjusting the secondary slit NOTE Before adjusting the secondary slit position the cephalometric radiation field previous section 1 Assemble the secondary slit 2 Take anceph exposure ceph PIO 73kV 10mA 1 s alignment tool on CCD sensor 3 If the radiation field cannot be seen on the align ment tool move the tool to the secondary slit attach it in position with tape The correct align ment is when the radiation beam approx 16mm wide strikes the secondary slit symmetrically 4 To adjust the position of the secondary slit loosen the pulley clamping screw A and turn the shaft with screwdriver while holding the timing pulley and tim
28. do not damage the head holder and carefully place it on to the packing material Remove all the remaining accessories from the box Also remove the CCD sensor package that it under the rotating unit Open the package and carefully remove the sensor s Always handle them with care NOTE Before starting to install the unit check that you have all the parts in accordance with the pack ing list 12 Installation and set up manual 8201085 Cranex D 3 Installation the unit 3 2 Attaching the unit on the wall 1 Check the leg assembly The extension bars should be positioned in the middle of the slots in the lower wall bracket Also check that the lower wall bracket is positioned mid way along the extension bar threads If not adjust accordingly 2 Place the leg on the floor and against the wall where the unit is to be attached Position it according to the dimensions below Pananoramic min 500 Pananoramic min 500 Ceph Left min 1500 Ceph Right min 1500 405mm Wall bracket 625 mm Installation and set up manual 8201085 13 3 Installing the unit Cranex D NOTE If the height of the unit with leg 2 32 m 91 is too high for the room in which it is to be in stalled reduce the height of the unit by shorten ing the leg Level the lower wall bar and then use it as a template to mark the position of the fixing holes Drill appropriate size holes for the fixing hard ware to
29. e unit 5 5 Option Aligning the cephalostat Levelling the ceph components Note The ceph components ceph arm secondary slitand CCD sensor holder must be levelled before adjusting the beam alignment Ceph arm is in level factory set when the unit is delivered with the ceph If however it needs to be levelled do it as follows M17 nuts M10 nuts 1 Remove Z carriage front and side covers f Slightly loosen the M17 nuts that hold the ceph arm in place 2 Loosen the M10 nuts two on both sides of Z carriage that hold the L shaped adjustment plates in place 3 Use a spirit level to level the arm When level tighten M10 nuts and then the M17 Check that the arm is level Readjust is necessary The CCD sensor holder and the secondary slit must also be adjusted so that they are vertical To adjust the CCD sensor holder 1 Loosen the sensor holder screws A 2pcs 2 Adjustthe position with adjustment screw B 3 Tighten all fixing screws when adjusted Installation and set up manual 8201085 47 5 Adjusting the alignment of the unit Cranex D D C To adjust the secondary slit 1 Loosen the secondary slit screws C 2pcs Adjust the position with the vertical adjustment set screws D Tighten all screws when adjusted Adjusting the cephalometric radiation field 1 Place the adjusting tool into the slot in CCD sensor and slide it downwards as far as it will go Disconne
30. ead on to the ceph head holder until it reaches the line factory set on the ceph head holder CAUTION Make sure that no wires or cables get trapped between metal parts When the ceph head is positioned correctly secure it in position with the four screws previ ously removed Connect the cables from the ceph arm to their appropriate connectors in ceph head Also connect the ground wire in the grounding point in ceph head CAUTION Handle fibre optic cables with care They can be easily damaged if mishandled Connect the fibre optic cable WITH text on it to the connector marked TX ICD15 Connect the fibre optic cable WITHOUT text on it to RX connector ICD13 Both connectors are on the N5905 Terminal Board on the top of the ceph head Installation and set up manual 8201085 27 3 Installing the unit Cranex D 3 6 Connecting the unit to a power supply The units are manufactured for EITHER 230 VAC or 115 VAC mains voltage The voltage setting CAN NOT be modified in the field IMPORTANT NOTE If x ray unit is ever moved to a new location CHECK that the voltage at the new location is the same to the mains voltage which appears on the unit type label NEVER connect a unit to a mains voltage that is not specified on the type label 1 Before connecting the unit to the power supply make sure that the voltage is 230 VAC or 115 VAC 10 depending on the voltage rating on the type label of the unit Also make su
31. ect the CRANEX D option Refer to the Digora for Windows 2 5 rev 1 or above Installation configuration and adminis tration manual NOTES Ifthe PC has hyperthreading it must be set so that it is OFF If the Cranex D is the ONLY device being used with the PC it is recommended that the enhancement Matrix Size be set to between 19 25 refer to the DfW User s Manual section 11 Options Enhancement tab If other devices are being used leave the setting as recommended in the DfW User s Manual 7 Ifa DfW single user s version is being used images must be stored in a separate folder not inside the database refer to the DfW Installation and setup manual 20 Installation and set up manual 8201085 Cranex D 3 Installation the unit 10 Switch the PC off and install the PCl Interface Board When the PC is switched on again it should automatically find the previously installed PCI Interface Board Driver If not reinstall the driver from the Cranex D Installation CD NOTE Handle fibre optic cables with care They can be easily damaged if mishandled Connect the fibre optic cables part number 4801743 between the PCI board in the PC and unit To the PCI Board connect the cable WITH text on to the TX connector connect the cable WITHOUT text to RX con nector To the rear of the unit Z carriage connect the cable WITH text to the right hand connector connect the cable W
32. es 31 4 Checking the alignment of the unit sssssssssssssnnnnnnnnnnnnnnnnnnnnnn 32 4 A MANS semice mode ce cates Soi aes mec neat eevee ata 32 Entering the service OOS teesese erspart ls aerie tanaan 32 Selecting service programs and parameters cccceeeeeeeeeeeeeeeeeeeees 32 Ei TS service mode cee cict cease eesti e oie eens EEE eases 33 4 2 Checking the rotation center ae ae detec secon tate tertopisienitontcertindesers snuceeda sexes eieeesiaeces 34 4 3 Checking the positions of the lights eccceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeennees 36 4 4 Checking the panoramic radiation field cccceeceeeeeeeeteeeeeeeeeeeeeseeees 37 4 5 Option Checking the cephalometric head ssssssssesssstsetseeeeeeees 39 Checking the ceph radiation field ccccceeeeeeeeeeeeeeeeeeeeeeeeenneeeeeeeeeees 39 Checking the position of the CCD Sensor c sssessssssssntstseeeeeeeees 39 Checking the position of the ceph head SUPPOTt eeeeeeeeeeeeeeeeeees 40 5 Adjusting the alignment Of the unit ccccccceeeeeeeeeeeeeeeeeeeeees 41 5A mah YOU cs nce cad aoc asescceneeieae E A ares 41 5 2 Adj sting the WOT Center ace et vnectetee eerste deeceiniegaedetevecie s verdvsce vnetustes 42 5 3 Adjusting the positioning lights cececceceeeeeeeeeeeeeeeneeeeeeeeeeeeeeeeeeeeeees 45 5 4 Adjusting the position of the radiation field ccccssssssssssssssss
33. etseeeeeees 45 5 5 Option Aligning the cephalostat ccccceseeeeeeeeeeeeeeneeeeeeeeeeeeeeeentaeees 47 Levelling the ceph components cceeeeeeeeececeeeeeeeeeeeseeeeeeeeeeeeeeeetaaes 47 Adjusting the cephalometric radiation field eeeeeeeeeeeeeeeeees 48 Adjusting the Secondary Slit cccccccceeceeeeeeeeeeeeneeeeeeeeeeeeeeeeneeeeeeeees 49 Ear p sts adjuStMent eee nen On nT ee eee 50 Vertical ACUSUIM GMM s costeaccis ics he dascctedec tue oilactedeusvanccteacgtialndctetesiens dnsechectdntuslecasee neat 50 FIOMIZO MAL ACUSUMG NIE cated satesdeveciee be ws eheee WEE waneievctte E A 50 5 6 Ball pin phantom test 2 sonecccenctenessccecbnceaswnnadeneesbepeneeabedecdensden enstedeaenenetenine 51 5 7 Changing the serial port NUMDETS ccccceeeeeeeeeeeeeeeeeeeeeeeeeeeneeeeees 52 6 Technical Information assasssassannnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn nne 54 6 1 Symbols markings that appear on the unit eceeeeeeeeeeeeeeeeeeeeeeeeeees 54 6 2 lechnical SOS CICA ONS sereus 55 Appendix A Upgrading a Pan unit to Pan Cepph A 1 Cranex D 1 Introduction 1 Introduction 1 1 Introduction This manual explains how to install and set up the Cranex D digital panoramic dental x ray unit and the optional cephalometric device You will need to operate the unit during the set up procedure Make sure that you know how to operate the u
34. f the CCD sensor and slide it down as far as it will go 2 Enter the service mode and select service program EPS 3 Select exposure values of 70kV 10 mA 1 sec from the unit control panel or from GUI i 4 Protect yourself from radiation and press the WARNING j exposure switch Radiation J Ela 7i Installation and set up manual 8201085 45 5 Adjusting the alignment of the unit Cranex D Check how much the radiation beam is out of alignment It should be between the outermost vertical lines vertical not tilted and the bottom of the beam level with the M line on the alignment tool 5 To get the radiation beam in the correct horizon tal position the CCD holder assembly must be moved sideways Loosen the four fixing screws that hold the CCD holder assembly in place and then use the two set screws to move it side ways in the direction required Adjusting screws Fixing screws 6 Recheck the position and readjust accordingly Tighten all screws when correctly positioned 7 The height of the radiation beam is adjusted by moving the adult child aperture Loosen first the fixing screw A that holds the adult child aperture in place and the moving it vertically with the set screw B 8 Recheck the position and readjust accordingly Tighten the fixing screws when correctly posi tioned 46 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of th
35. ing belt in place D d Pulley clamping screw 5 The height of the secondary slit must be ad justed so that the radiation beam coincides the marking M on the alignment tool when itis on the CCD sensor To adjust it loosen the two fixing screws C that hold the secondary slit in position and then adjust the position using the adjustment screw D above the slit Installation and set up manual 8201085 49 5 Adjusting the alignment of the unit Cranex D 6 When secondary slit is adjusted and all screws tightened manually move the rotating unit so that it is parallel to the upper shelf exit the serv ice mode select panoramic mode press RE TURN to move the unit in PIO Select the ceph mode and press RETURN again to move the unit into the ceph PIO position again Now check that the alignment is correct Readjust if necessary NOTE Adjustments to the ceph must always be made in ceph PIO position Ear posts adjustment Vertical adjustment 1 Loosen the M6 fixing screw behind the motor it allows the head support to be tilted Adjust the vertical position with the adjustment screw on the top of ceph head Tighten the fixing screws when rings are on the same vertical level Horizontal adjustment 1 Loosen the adjustment fixing screw at the rear top of the ceph head Adjust the horizontal position with the adjustment lever at the front of the ceph head Tighten the screws when rings are o
36. ions given in sections 4 Checking the alignment of the unit and 5 Adjusting the alignment of the unit in this manual IMPORTANT NOTE Perform all the alignment steps NOTE When you level the ceph arm you may have to adjust the position of the stiffening brackets one on each side of the Z carriage to which the ceph arm is Rear of attached Z carriage This can be done by loosening the nuts A that hold the stiffening brackets in position levelling the arm and then retightening the these nuts as well as the Ceph arm nuts B Stiffening bracket s 3 When the unit has been aligned replace all the covers 4 Take test exposures using every program to verify that the device works correctly A 8 Installation and set up manual 8201085
37. is level with the M 2 mm line on the alignment tool then the beam is correctly positioned If it does not then the position of the beam must be adjusted See 5 4 Adjusting the position of the radiation field 38 Installation and set up manual 8201085 Cranex D 4 Checking the alignment of the unit 4 5 Option Checking the cephalometric head Checking the ceph radiation field 1 Take a lateral ceph exposure and check that there are 1 10mm unexposed borders around the exposed area If not the ceph radiation field must be adjusted See section 5 5 Option Aligning the cephalostat Checking the position of the CCD sensor CCD sensor Slot 1 Place the alignment tool in the slot in the CCD sensor and slide it down as far as it will go 2 Press the the RETURN key to drive the unit to the Ceph PIO position The secondary collima tor ear posts and CCD sensor mustline up 3 Enter the service mode and select service program EPS 4 Select the lateral ceph program and exposure values 70kV 10 mA f Alignment tool 5 Check the position of the radiation beam If it is between the outermost vertical lines is vertical not tilted on the alignment tool then the beam is correctly positioned If it does not then the position of the beam must be adjusted See 5 5 Option Aligning the cephalostat Installation and set up manual 8201085 39 4 Checking the alignment of the unit Cranex D
38. level Compliance level Cranex D Guidance and manufacturer s declaration electromagnetic immunity The PP1 is intended for use in the electromagnetic environment specified below The customer or the user of the PP1 should assure that it is used in such an environment Electromagnetic environment guidance Electrostatic discharge ESD IEC 61000 4 2 Electrical fast Power frequency 50 60 Hz magnetic field IEC 61000 4 8 6 kV contact 8 kV air 2 kV for power supply 30 dip in Ur for 25 cycles lt 5 Ur gt 95 dip in Ur for 5 sec 3 A m 6 kV contact 8 kV air 2 kV for power 30 dip in U for 25 cycles lt 5 Ur gt 95 dip in Ur for 5 sec 3 A m Floors should be wood concrete or ceramic tile If floors are covered with synthetic material the relative humidity should be at least 30 Mains power quality transients bursts lines supply lines should be that of a IEC 61000 4 4 1 kV for input output 1 kV for typical commercial or lines input output lines hospital environment Surge 1 kV differential mode 1 kV differential Mains power quality IEC 61000 4 5 2 kV common mode mode should be that of a 2 kV common typical commercial or mode hospital environment Voltage dips lt 5 Ur lt 5 Ur Mains power quality short gt 95 dip in Ur gt 95 dip in Ur should be that of a interruptions and for 0 5 cycle for 0 5 cycle typical commercial or
39. lignment tool 8 Place the chin support onto the holder and then place the alignment tool into the bite piece hole so that is pointing away from the column Make sure that the rotating part is perpendicular to upper shelf parallel to the wall 9 Protect your self from radiation and press the WARNING exposure switch Radiation Check the position of the radiation beam If it strikes the O line accuracy 1 mm on the alignment tool the beam is correctly positioned If it does not then the beam must be adjusted See 5 2 Adjusting the rotation center 10 Manually turn the rotating unit 90 so that it is parallel to the upper shelf Reposition the align ment tool so that it is parallel to the column Installation and set up manual 8201085 35 4 Checking the alignment of the unit Cranex D 11 Protect your self from radiation and press the exposure switch WARNING Radiation A Check the position of the radiation beam If it strikes the M line accuracy 1 mm on the alignment tool the beam is correctly positioned If it does not then the position of the beam must be adjusted See 5 2 Adjusting the rotation center 4 3 Checking the positions of the lights 1 Exitthe service mode 2 Select the panoramic program and then press the RETURN key to drive the unit to the PIO position Reposition the alignment tool so that it is pointing away from the column 3 Press either Up
40. manual 8201085 63 6 Technical Information Cranex D Recommended separation distances between portable and mobile RF communications equipment and the PP1 The PP1 is intended for use in an electromagnetic environment in which radiated RF disturbances are controlled The customer or the user of the PP1 can help prevent electromagnetic interference by maintaining a minimum distance between portable and mobile RF communications equipment transmitters and the PP1 as recommended below according to the maximum output power of the communications equipment Rated maximum Separation distance according to frequency of transmitter m output power of 150 kHz to 80 MHz 80 MHz to 800 MHz 800 MHz to 2 5 GHz transmitter W d 1 2 P d 1 2 P d 2 3 P 0 01 0 12 0 12 0 23 0 1 0 38 0 38 0 73 1 1 2 1 2 2 3 10 3 8 3 8 7 3 100 12 12 23 For transmitters rated at a maximum output power not listed above the recommended separation distance din meters m can be estimated using the equation applicable to the frequency of the transmitter where P is the maximum output power rating of the transmitter in watts W according to the transmitter manufacturer NOTE 1 At 80 MHz and 800 MHz the separation distance for the higher frequency range applies NOTE 2 These guidelines may not apply in all situations Electromagnetic propagation is affected by absorption and reflection from structures objects and people 64 Installatio
41. ms and the right and left buttons change service program parameter values Refer to the Service Manual for information about all the service programs 32 Installation and set up manual 8201085 Cranex D 4 Checking the alignment of the unit Exiting the service mode 1 Ifyou are in the parameter selection level press the E key once to go up to the service program selection level 2 Press and hold down the E key 3 seconds until you hear a triple beep the unit is now in the normal mode 3 Switch the unit off remove the service connector part no 4801 744 and replace all the covers Installation and set up manual 8201085 33 4 Checking the alignment of the unit Cranex D 4 2 Checking the rotation center 1 Open the mirror and remove the front cover from the Z carriage Insert service connector to X90 2 Switch the unit on 3 Attach the CCD sensor to the panoramic sensor holder See the Cranex D User s Manual for information on how to do this 4 Switch the PC on and open the Cranex GUI and DfW Select the panoramic program 5 Enter the service mode and select service program EPS 6 Select exposure values of 70kV 10 mA 0 32sec from the unit control panel or from GUI 7 Press the RETURN key to drive the rotating unit to the ready PIO the rotating unit will be parallel to the wall 34 Installation and set up manual 8201085 Cranex D 4 Checking the alignment of the unit A
42. n and set up manual 8201085 Cranex D Installation and set up manual 8201085 6 Technical Information 65 Cranex D Appendix A Ceph upgrade Appendix A Upgrading a Pan unit to Pan Ceph 1 Replacing the collimator 1 Switch the unit off and disconnect it from the power supply 2 Remove all the covers from the unit Refer to the Cranex D Service Manual section 3 Covers and cover removal for information on how to do this 3 Disconnect the short cable J5502 that connects the panoramic collimator to the cable that goes to N3100 on the CCD sensor side of the Rotating unit and then remove the panoramic collimator 4 screws Keep the screws as they will be need ed to attach the new collimator Cable to N3100 J3104 Tube head Panoramic collimator Installation and set up manual 8201085 A 1 Appendix A Ceph upgrade Cranex D 4 Remove the Panoramic primary collimator and replace it with the Pan ceph primary collimator Tube head Primary collimators Panoramic Pan ceph 5 Replace the cable that connects the panoramic collimator to N3100 with the new cable supplied To make cable routing easier tie a piece of string to one end of the cable to be replaced and the other end to the replacement cable When you pull out the old cable out the new one will be pulled into the correct position C arm viewed from below CCD sensor side Cable from collimator to N3100 J3104 Tube head side
43. n it with the covers off NOTE Also read and familiarize yourself with the warnings and precautions in the User s Manual Also advise operators to familiarize themselves with the warnings and precautions in the User s Manual If the CRANEX D will be used with a 3rd party imaging application software not produced by SOREDEX the 3rd party imaging software must comply with all applicable local laws and regula tions on patient information software This includes for example the Medical Device Directive 93 42 EEC and or FDA is applicable 2 Installation and set up manual 8201085 Cranex D 1 Introduction 1 4 Identifying the unit version The unit type label is located at the rear of the unit next to the main power cable The type code allows the version of the unit to be identified PP 1 123 45 6 Product identification Country or language code 00 General English 01 UKonly 02 German 03 USA 05 France 06 Finland and Sweden 07 Russia 08 Italy 09 Spain 2X OEM version 3X OEM version X ray tube version 0 OPX 105 1 DE 100 156 2 D 051 4 KL5 Unit version 0 Pan unit only no ceph unit 7 Left hand ceph digital unit 8 Right hand ceph digital unit Imaging media 1 Digital unit removable sensors The production version 0 Pilot production version 1 1st production version 2 2nd production version etc Installation and set up manual 8201085 3 1 Introduction Cranex D
44. n supports as the Z carriage can be driven to the same transporta tion position On the upper wall bracket check that the exten sion bars are positioned in the middle of the slots in the wall bracket Also check that the wall bracket is positioned mid way along the exten sion bar threads If not adjust accordingly Installation and set up manual 8201085 15 3 Installing the unit Cranex D Upper wall bracket 9 Attach the upper wall bracket on the top of column 10 CAUTION HEAVY OBJECT A minimum of two persons are required for the following task Lift the column up the column pivots on the lower leg until the upper bracket touches the wall Level the upper bracket and then mark the position of the fixing holes on the wall Lower the column Drill appropriate size holes for the fixing hard ware to be used and then lift the column up again and attach the upper wall bracket to the wall 11 Place a spirit level on the upper shelf and level the unit in the left right direction and in the for wards backwards direction The slots in the wall brackets allow the unit to be levelled in the left right direction and the nuts on the extension bars in the forwards backwards direction When unitis levelled tighten all fixing nuts 16 Installation and set up manual 8201085 Cranex D 3 Installation the unit 3 3 Installing the rotating unit 1 Remove the metal cover from the upper shelf 10 Torx screws
45. n the same horizontal level H OOO 50 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit 5 6 Ball pin phantom test To check that the panoramic unit is correctly aligned take an exposure using the ball pin phantom is Place the ball phantom in the bite block as far it will go Make sure that the ball phantom is paral lel to the upper shelf Set the unit to take a normal panoramic expo sure Refer to the user s manual for information on how to do this Make sure that the focal through light coincides with the two balls in the frontal area and the notch on the side of the ball phantom Take an exposure with 60 kV Check that the balls on the image appear round If they are not the rotating unit must be realigned Installation and set up manual 8201085 51 5 Adjusting the alignment of the unit Cranex D 5 7 Changing the serial port numbers If Cranex D User Interface cannot connect to the x ray unit check to see that the serial ports are configured correctly Cranex D GUI uses serial ports COM1 and COM2 by default but these might not be available in all systems If this is the case the Cranex GUI s configuration file opcc conf must be changed The configuration is located in the same directory where Cranex GUI was installed dij Check the numbers of used serial ports from Windows Device Manager Open Cranex GUI s configuration file
46. nit before starting the set up procedure Itis also required that person installing and setting up the unit should have attended manufacturer s service training course 1 2 Associated documentation The Cranex D User s manual The Cranex D Service manual Digora for Windows 2 5 rev 1 or above User s manual Digora for Windows 2 5 rev 1 or above Installation configuration and administration manual Installation and set up manual 8201085 1 1 Introduction Cranex D 1 3 Warnings and precautions When installing the unit always observe local and national safety regulation concerning the installation and use of dental x ray equipment Failure to install the unit in an approved location according to these installation instructions may cause the device to be dangerous to both patient and operator Do not install the unit in environments where there are corrosive or explosive vapours When checking the alignment of the radiation beam take the necessary steps to protect yourself from the radiation The aperture plate in the collimator is made of lead Pb which is a toxic material Do not touch it with your bare hands Be careful when working on the unit when the covers have been removed Some mechanical parts have sharp edges that can cause injuries if mishandled Some electric components are high voltage and can be lethal if touched Whenever possible disconnect the unit from the main power supply when working o
47. r with marks WARNING Radiation aa a 1 Press the RETURN key to drive the unit to the PIO position parallel to the column With a marker pen place marks on the pulley and the pulley holder that are located on the top of the upper shelf near the front The marks will help you reposition the rotating unit in the same front back direction when you turn the rotating unit to check the rotation center Place the alignment tool parallel to the upper shelf in the chin support Enter the service mode and select service program EPS Select exposure values of 70kV 10 mA 1 sec from the unit control panel or from GUI Protect yourself from radiation and press the exposure switch Move the slider on the align ment tool to mark the position of the beam 42 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit Turn the rotating unit 180 Make sure that the black marks previously placed on the pulley and pulley holder are in the same place This en sures that the rotating unit has not moved in the backwards forwards direction Press the exposure switch and check where the beam strikes The distance between the first position marked with the slider and the second position shows how much the rotating center needs to be adjusted To adjust the position of the rotation center loosen the three fixing screws A one shown in the picture that hold the collimator g
48. re that the power supply is fitted with a 10 A 230 VAC or a 20A 115 VAC slow blow fuse The power supply must also be equipped with proper circuit breaker 2 Switch the main power supply off 3 Connect the power supply cable from the x ray unit to the power supply Also observe any national and local require ments with regards the connection of dental x ray equipment to a power supply 4 Switch the main power supply on and then switch the unit on with the on off switch that is located on the right hand side of the unit Make sure that the exposure switch is not locked Refer to the User s Guide for information on locking and unlocking the exposure switch 28 Installation and set up manual 8201085 Cranex D 3 Installation the unit 5 Check that the unit control panel lights come on Test all the buttons and functions of the unit but do not take any exposures yet Start Cranex D Graphical User Interface GUI from PC by double clicking the icon Check that there is a connection from the PC to unit by selecting different programs using the If there is no connection an error message will appear If this happens first check that the serial ports connections are correct Refer to Section 5 7 Changing the serial port numbers Take test exposures in test T mode to see that the unit moves correctly Refer to the Cranex D user s manual for information on how to do this Switch the unit off Installation
49. scssi peuaiioudecuidakaeleaubhaccteetdeensiuel 5 2 Pre installation requirements sssssssssssnnsnnnsnnnnnnnnunnnnnnnnnnnnnnnnnnnn 6 2 TNE ON eene a E 6 Ze SACS Fe QUIS TNS IING sericese Enee ea AE 7 2S MME IE O eeaeee inane nasetaruss meus xinenedoubiaresandusandansadacamunnga EENS 8 2 4 Installation tools setup tools and installation hardware cccccccceceeees 9 Hardwarea ease neeaners sa gececaeatereca steed eiececcuicecmenveceanea 9 StandarditoolS saone an A 9 SpecialtoolS merenna E A 9 De installing the Unit ssietcsccnsticentcteecaxcnpcsandeztteceenendexscncceliensemesnemeecss 10 3 1 Unpacking the UMi sass eee cca neers ete cep acento corte ennseneennsanaseoneeesenes 10 3 2 Attachngtheunit on TAG wall essiensa aE 13 3 3 Installing the rotating unit eseeeenneeeeeeeeeeeenneerreeeerrrentnseerrennnnnnnneeeennne 17 sA leveling themi aeee EAE EEEE aaa TaN E a 23 3 5 Option Installing a cephalometric Unit sscsiscsesecerecepereseiei nccentieeteecneeedecads 24 Installing the cephalometric arm sssssnseseeeeoeeeeneneeseeererennnnreeeerrrrrnnne n 24 Installing the cephalometric head sccccscctsicsscenenteiwetsavonddetneeceetiaeuiconaecentde 27 3 6 Connecting the unit to a power supply feces codes ccc vertveretsdjeedenenivericoridetnxas 28 3 7 Installing a remote exposure warning light optional eeeeeeeeees 30 3 8 Running the z carriage without the Rotating unit ccceceesessseseteeeeeee
50. t number 6904590 Ball phantom part number 6904580 Service connector 4801744 Pr fk rper test tools for countries where the method is used Installation and set up manual 8201085 9 3 Installing the unit Cranex D 3 Installing the unit 3 1 Unpacking the unit NOTE Save all the packaging materials as they may be needed if you move the unit to a new location 1 Transport the box to the location where the unit is to be unpacked installed 2 Remove the straps that hold the box to the pallet and then remove the lid from the top of the box Remove as much packing material as possible and all accessible accessories 3 Liftoff the sides of the box 10 Installation and set up manual 8201085 Cranex D 3 Installation the unit 4 Remove the leg assembly and the upper wall bracket from the side of the packing material 5 CAUTION HEAVY OBJECT A minimum of two persons are required for the following task s NOTE If the unit is a pan ceph remove the two packing pieces from the sides of the cephalometric head and then lift the cephalometric head from the box with the remaining two packing pieces Side packing pieces Installation and set up manual 8201085 11 3 Installing the unit Cranex D Remove the packing material from the top of the rotating unit and place this packing material on the floor Lift the rotating unit from the box DO NOT lift it by holding the head holder and
51. to adjust the position of the chin rest holder Turn the screw clockwise to move the chin rest to the left Tighten the fixing screw when adjusted Recheck the position of the beam and readjust if necessary NOTE If the chin rest holder was adjusted by more that 1mm you will have to adjust the head holder NOTE the midsagittal light MUST be adjusted first To adjust the chin rest holder remove the head holder lower cover loosen screws A move the head holder sideways until the mid sagittal beam hits the middle of the forehead support Tighten all the screws 44 Installation and set up manual 8201085 Cranex D 5 Adjusting the alignment of the unit 5 3 Adjusting the positioning lights The midsagittal light is adjusted by loosening two nuts that hold the light assembly in place and then sliding the assembly sideways until the light strikes the M line center of the bite block on the adjusting tool when the alignment tool is positioned parallel to column The focal trough light is adjusted by loosening two screws that hold the light assembly in place and the sliding the assembly sideways until the light strikes the F line on the adjusting tool when the alignment tool is positioned parallel to upper shelf Before making any adjustments the rotating unit MUST be in the PIO position 5 4 Adjusting the position of the radiation field 1 Place the alignment tool in the slot in the front o
52. uide in position and turn the set screw B in the re quired direction Tighten the fixing screws and then check the beam position again steps 6 8 Readjust if necessary Now adjust the beam so that it strikes the O line Push the rotating unit towards the column and then press the RETURN button to drive the unit to the PIO position On top of the rotating unit loosen the two nuts B that hold the Y sensor in place Turn screw A to adjust the position of the interrupt plate _ which will change the position where the rotating unit stops in the PIO position and thus change the position of the beam Repeat steps 10 and 11 until the beam coin cides with the O line Installation and set up manual 8201085 43 5 Adjusting the alignment of the unit Cranex D 12 WARNING Radiation A D 14 Adjustment fixing screw 13 Now turn the rotating unit so that it is parallel to upper shelf Protect your self from radiation and press the exposure switch Check how far the radiation beam is away from the M line on the alignment tool To get the beam in the correct position on the M line the position of the chin rest holder must be adjusted Do this by removing the chin rest holder it is held in place with one screw that can be accessed from the under side of the patient handle Loosen the adjustment fixing screw that holds the long set screw in position and turn the long set screw

Download Pdf Manuals

image

Related Search

Related Contents

Manual - sarte audio  Manual de instruções  DistilaMax® LS - Lallemand Biofuels & Distilled Spirits  Directions for use, Connex ProBP 3400, Italian  MANUEL D`INSTALLATION  Varta Longlife Extra AA  Dispenser for Tips    Windows Mobile enrollment guide - Wiki  Sandberg Extension USB 2.0 AA 1.8m BLAC  

Copyright © All rights reserved.
Failed to retrieve file