Home
Operating Manual
Contents
1. Electrical connection data redLINE UL units for USA and Canada Electrical data Nominal voltage 210 50 60 Hz Nominalpower KW 08 10 08 10 025 03 Unit fuse 5x 20 mm 10 10 10 10 10 250V time lag T pee external external external external external Temperature fuse class 1 DIN 12880 internal internal up to 98 of the set value All technical data is specified for units with standard equipment at an ambient temperature of 25 C 7 F and a power supply voltage fluctuation of 10 The temperature data is determined in accordance to factory standard following DIN 12880 observing the recommended wall clearances of 10 of the height width and depth of the inner chamber All indications are average values typical for units produced in series We reserve the right to alter technical specifications at all times If the cabinet is fully loaded the specified heating up times may vary according to the load 14 5 Equipment To operate redLINE chambers use only original accessories or accessories from third party suppliers authorized by the manufacturer The user is responsible for any risk arising from using unauthorized accessories Chamber type Standard equipment Microprocessor temperature controller with LED display Integrated timer adjustable 0 9999 minutes Temperature safety device class 1 acc to DIN12880 Stainless steel interior equipped with 2 chrome plated trays Inner glass door
2. Exhaust duct internal diameter 50 mm 1 97 inches with adjustable ventilation slide Redline Operating Manual RE RF RI 07 2010 page 37 38 cle Ri Manufacturer BINDER GmbH Postfach 102 D 78502 Tuttlingen Germany Internet www binder redline com Made in Germany The reproduction distribution and utilization of this document as well as the communication of its content to others without explicit authorization is prohibited Offenders will be held liable for the payment of damages All rights reserved in the event of the grant of a patent utility model or design BINDER GmbH 2009 Redline Operating Manual RE RF RI 07 2010 page 38 38
3. The products described above are in conformity with the following EC guidelines Les produits d crits ci dessus sont conformes aux directives CE suivantes Niederspannungsrichtlinie Richtlinie 2006 95 EG des Europ ischen Parlaments und des Rates 2006 95 EG vom 12 Dezember 2006 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten betreffend elektrische Betriebsmittel zur Verwendung Low voltage directive innerhalb bestimmter Spannungsgrenzen 2006 95 EC T Council Directive 2006 95 EC of 12 December 2006 on the Directive basse tension s l harmonization of the laws of Member States relating to electrical 2006 95 CE ae ae equipment designed for use within certain voltage limits Directive 2006 95 CE du Parlement Europ en et du Conseil du 12 d cembre 2006 concernant le rapprochement des l gislations des Etats membres relatives au materiel electrique destine a tre employe dans certaines limites de tension EMV Richtlinie Richtlinie 2004 108 EG des Europ ischen Parlaments und des Rates 2004 108 EG vom 15 Dezember 2004 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten ber die elektromagnetische Vertr glichkeit und zur EMC Directive Aufhebung der Richtlinie 89 336 EWG 2004 108 EC Directive CEM Directive 2004 108 EC of the European Parliament and of the Council 2004 108 CE of 15 December 2004 on the approximation of the laws of the Member States relating to electromagnetic compatibility and repealing Directive
4. 29 92 inch 24 41 25 98 24 41 25 98 24 41 25 98 mm m SR D e gt P 100 100 100 100 100 100 inch 3 94 3 94 3 94 3 94 3 94 3 94 m 150 150 150 150 150 150 inch 5 91 5 91 5 91 5 91 5 91 5 91 el o o D D C C 5 oi D D o o o nn CD a D S nterior dimensions inch 15 79 23 62 15 79 23 62 15 79 23 62 inch 15 75 18 89 15 75 18 89 15 75 18 89 inch 12 99 15 75 12 99 15 75 12 99 15 75 Interior volume 53 115 53 115 53 115 Number of trays regular max 24 24 2 4 24 2 4 24 Ibs 22 33 22 33 22 33 Ibs 77 99 77 99 77 99 Ibs 90 139 90 139 90 139 Temperature data above ambient up to F 428 428 428 428 158 158 Temperature at37 C 9B6F K 08 10 m ieee tart et ae Temperature at37 C 9B6F K 03 03 xen B sse jo S oa Pes Hea nguptime to37 C 986F mi 46 40 to 150 C 302 F min 45 60 28 36 Recovery time after at 37 C 98 6 F mn 10 15 30 sec Electrical data gen To Te Te T Tees 60529 Nominal voltage 10 50 60 Hz Nominalpower kW 08 10 08 10 02 025 230V 10A middle time lag M external external external external external external Installation category acc to IEC 61010 1 u u Ww f un W f u Pollution degree acc to IEC 61010 1 Redline Operating Manual RE RF RI 07 2010 page 36 38
5. Do NOT use acidic or chlorine cleaning detergents D Any corrosive damage that may arise following use of other cleaning agents is excluded from liability by the manufacturer Redline Operating Manual RE RF RI 07 2010 page 29 38 Residual cleaning agents Danger of samples being disturbed Any residual cleaning agents in the chamber may pollute the samples 8 2 Decontamination Disconnect redLINE chambers from the power supply prior to decontamination Pull the power plug You can use the following disinfectants Inner chamber Standard commercial surface disinfectants free from acid or halogenides Alcoholic solutions In case of impurity of the interior with biological or chemical hazardous goods there are three possible procedures depending on the type of contamination and of the charging material e The ovens RE and RF can be hot air sterilized at 190 C 374 F for at least 30 minutes All inflammable goods must be removed from the interior before e Spray the inner chamber with an appropriate disinfectant Before start up redLINE chambers must be absolute dry and ventilated because explosive gases may form during the decontamination process e f necessary have strongly contaminated inner chamber parts removed by an engineer for cleaning or have them exchanged Sterilize the inner chamber parts in a sterilizer or autoclave With every decontamination method ensure adequate personal safety Thoroughly
6. The following labels are located on the unit Pictograms Warning signs GE red ERE by gt BINDER by gt BINDER Ce em AA em gm redLINE redLINE UL Figure 1 Position of labels on the unit Keep safety labels complete and legible Replace safety labels that are no longer legible Call up www binder redline com Redline Operating Manual RE RF RI 07 2010 page 13 38 ile Ri 1 4 Type plate The type plate is located on the left hand side of the unit bottom right hand Art No 9090 0001 50 60 Hz Nominal temperature 2206 0 80 kw 428 F 20 TENE Enclosure protection IP 20 35 A C E ML mm Ears ER redi ss EE RE 53 Serial No RE 000000 00000 by RIM www binder redline com Made by BINDER in Germany Figure 2 Type plate example RE 53 Indications of the type plate Information Nominal temperature 220 C Nominal temperature 428 F Enclosure protection IP 20 Art No 0 80 KW 230V 1N 35A 50 60 Hz RE 53 serial No RE 000000 00000 serial No RE 000000 00000 Symbol on the type plate Information Electrical and electronic equipment manufactured placed on the market in the EC after 13 August 2005 and to be disposed of in a separate collection according to directive 2002 96 EC a on waste electrical and electronic equipment WEEE The equipment is certified by Underwriters Laboratories Inc C ON US UL units only according to standards CAN
7. 98 336 EEC Directive 2004 108 CE du Parlement Europ en et du Conseil du 15 d cembre 2004 relative au rapprochement des legislations des Etats membres concernant la compatibilite electromagnetique et abrogeant le directive 98 336 CEE Die oben beschriebenen Produkte tragen entsprechend die Kennzeichnung CE The products described above corresponding to this bear the CE mark Les produits d crits ci dessus en correspondance portent l indication CE Redline Operating Manual RE RF RI 07 2010 page 6 38 i Die oben beschriebenen Produkte sind konform mit folgenden harmonisierten Normen The products described above are in conformity with the following harmonized standards Les produits d crits ci dessus sont conformes aux normes harmonis es suivantes Sicherheit safety s curit EN 61010 1 2001 Sicherheitsbestimmungen f r elektrische Mess Steuer Regel und Laborger te Teil 1 Allgemeine Anforderungen Safety requirements for electrical equipment for measurement control and laboratory use Part 1 General requirements R gles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 1 Prescriptions g n rales EN 61010 2 010 2003 Sicherheitsbestimmungen f r elektrische Mel Steuer Regel und Laborgerate Teil 2 010 Besondere Anforderungen an Laborgerate fur das Erhitzen von Stoffen Safety requirements for electrical equipment for measurement control a
8. of the unit Please remove any transportation protection devices and adhesives in on the unit and on the doors and take out the operating manuals and accessory equipment Sliding or tilting of the unit Damage to the unit Risk of injury by lifting heavy loads Do NOT lift or transport a redLINE chamber using the door handle or the door gt Lift a redLINE chamber from the pallet at its four lower corners with the aid of 2 people In case of warranty please contact www binder redline com For disposal of the transport packing see chap 12 1 Redline Operating Manual RE RF RI 07 2010 page 19 38 3 2 Guidelines for safe lifting and transportation Observe the advice for temporal decommissioning chap 9 Sliding or tilting of the unit Damage to the unit Risk of injury by lifting heavy loads gt Transport the redLINE chamber in its original packaging only gt Secure the redLINE chamber with transport straps for transport N Do NOT lift or transport a redLINE chamber using the door handle or the door gt Lift a redLINE chamber at its four lower corners with the aid of 2 people and place it on i a transport pallet with wheels Push the pallet to the desired site and then lift the unit from the pallet at its four lower corners e Permissible ambient temperature range during transport 10 C 14 F to 60 C 140 F You can order transport packing and pallets for transportatio
9. proper fit and mechanical damage Annually e Check the temperature controller and if necessary adjust it chap 7 Replace the door gasket only when cold Otherwise the door gasket may become damaged 11 Technical service Web ressources Visit the website www binder redline com for e Complete technical service contact information e Access to the online catalogue and information about accessories and related products e Additional product information and special offers Contact us For information or technical assistance contact your local distributor or visit www binder redline com Redline Operating Manual RE RF RI 07 2010 page 31 38 12 Disposal 12 1 Disposal of the transport packing We recommend keeping the transport packing for transport purpose Packing elemen Weed epes Pallet size 115 with foamed plastic stuffing Transport box Cardboard Paper recycling E Metal recycling Edge protection Styropor or PE foam Plastic recycling Protection of doors and trays Plastic recycling Bag for operating manual PE foil Plastic recycling Insulating air cushion foil packing of PE foil Plastic recycling optional accessories If recycling is impossible all packing parts can also be disposed of with normal waste 12 2 Disposal of redLINE chambers in the member states of the EC According to directive 2002 96 EC of the European Parliament and of the Council on waste electrical and electronic equipment WEEE r
10. remove all residues of disinfecting agents from the interior with sterile RI deionized water If necessary ventilate the interior thoroughly Residual disinfecting agents Danger of samples being disturbed Any residual disinfecting agents in the chamber may pollute the samples 9 Decommissioning Switch off the redLINE chamber at the main switch 7 Disconnect the chamber from the power supply When switching off the main switch 7 the stored parameters remain saved e Clean the redLINE chamber and its trays and dry them completely e Temporal decommissioning See indications for appropriate storage chap 3 3 e Final decommissioning Dispose of the unit as described in chap 12 2 to 12 3 Redline Operating Manual RE RF RI 07 2010 page 30 38 ile Ri 10 Maintenance A DANGER Electrical hazard Danger of death N redLINE chambers must NOT become wet during operation or maintenance work Do NOT dismount the rear panel of the unit gt Disconnect the chamber before conducting maintenance work Disconnect the power plug gt Ensure all maintenance work is conducted by licensed electricians or experts authorized by the manufacturer 10 1 Maintenance plan Weekly e Dust the housing e Check the power cable for damage Following use e Clean and if necessary disinfect the chamber chap 8 e Check the chamber for mechanical damage and corrosion e Check the door gaskets for
11. up and operation and for the maintenance of the unit Understanding and observing the instructions in this operating manual are prerequisites for hazard free use and safety during operation and maintenance This operating manual cannot cover all conceivable applications If you would like additional information or if special problems arise that you feel are not sufficiently addressed in this manual please ask your dealer or contact us directly Furthermore we emphasize that the contents of this operating manual are not part of an earlier or existing agreement promise or legal relationship nor do they modify such a relationship All obligations on the part of the manufacturer derive from the respective purchase contract which also contains the entire and exclusively valid statement of warranty administration The statements in this manual neither augment nor restrict the contractual warranty provisions 1 2 Structure of the safety instructions In this operating manual the following harmonized denominations and symbols indicate dangerous situations following the harmonization of ISO 3864 2 and ANSI Z535 6 1 2 1 Signal word panel Depending on the seriousness and probability of the consequences dangers are identified with a signal word the corresponding safety color and if appropriate the safety alert symbol DANGER Indicates an imminently hazardous situation that if not avoided will result in death or serious irreversible
12. 2004 108 EG vom 15 Dezember 2004 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten ber die elektromagnetische Vertraglichkeit und zur EMC Directive Aufhebung der Richtlinie 89 336 EWG 2004 108 EC Directive CEM Directive 2004 108 EC of the European Parliament and of the Council 2004 108 CE of 15 December 2004 on the approximation of the laws of the Member States relating to electromagnetic compatibility and repealing Directive 98 336 EEC Directive 2004 108 CE du Parlement Europ en et du Conseil du 15 d cembre 2004 relative au rapprochement des l gislations des tats membres concernant la compatibilit electromagnetique et abrogeant le directive 98 336 CEE Die oben beschriebenen Produkte tragen entsprechend die Kennzeichnung CE The products described above corresponding to this bear the CE mark Les produits d crits ci dessus en correspondance portent l indication CE Redline Operating Manual RE RF RI 07 2010 page 4 38 i Die oben beschriebenen Produkte sind konform mit folgenden harmonisierten Normen The products described above are in conformity with the following harmonized standards Les produits d crits ci dessus sont conformes aux normes harmonis es suivantes Sicherheit safety s curit EN 61010 1 2001 Sicherheitsbestimmungen f r elektrische Mess Steuer Regel und Laborger te Teil 1 Allgemeine Anforderungen Safety requirements for electrical equipment for measurement contro
13. CSA C22 2 No 61010 1 2 LISTED Edition 2004 07 Electrical Equipment for Measurement LABORATORY EQUIPMENT Control and Laboratory Use Part 1 General Requirements UL 61010 1 2 Edition 2005 07 22 Electrical Equipment for Measurement Control and Laboratory Use Part 1 General Requirements IEC 61010 1 2001 2 Edition and IEC 61010 2 10 Particular Requirements for Laboratory Equipment for the heating of materials Redline Operating Manual RE RF RI 07 2010 page 14 38 1 5 General safety instructions on installing and operating the redLINE chambers With regard to operating the redLINE chambers and to their installation location please observe regulations BGR 120 issued by the German professional association for the chemical industry formerly ZH 1 119 laboratory guidelines issued by the employers liability insurance association for Germany The manufacturer is only responsible for the safety features of the unit provided skilled electricians or qualified personnel authorized by the manufacturer perform all maintenance and repair and if components relating to chamber safety are replaced in the event of failure with original spare parts To operate the unit use only original accessories or accessories from third party suppliers authorized by the manufacturer The user is responsible for any risk caused by using unauthorized accessories Danger of overheating Damage to the unit DS Do NOT install redLIN
14. During this phase do not place any sample materials in the chamber Danger of samples being destroyed Load the chamber only after equilibration of temperature and CO Redline Operating Manual RE RF RI 07 2010 page 26 38 redgsseg 6 1 Continuous operation The display shows the actual temperature value The actual value reaches the set point and equilibrates to it Setting the temperature set point Press one of the arrow buttons The set point is displayed for 2 seconds Set the set point with the arrow buttons Now the controller operates until cancellation with the entered set point in continuous operation The heating is active 6 2 Timer operation You can use the timer function to switch off the incubator heating after a defined time You can set the timer from 0 up to 9999 minutes The set point which has been entered in Continuous operation is valid also for timer operation 1 Set the set point with the arrow buttons 2 Press the functional button LG several times until Emr appears 3 Set the tempering time in minutes with the arrow buttons 4 As soon as a value gt 0 was entered for the tempering time the timer starts with the enered time The set point is reached ans equilibrated Indication Emr The timer counts down towards zero During timer operation you can increase or decrease the remaining time according to the demands of the process And you can change to the actual value display and mod
15. E chambers in unventilated recesses gt Ensure sufficient ventilation for dispersal of the heat The redLINE chambers must NOT be operated in hazardous locations DANGER Explosion hazard Danger of death Do NOT operate redLINE chambers in potentially explosive areas gt KEEP explosive dust or air solvent mixtures AWAY from the unit The redLINE chambers do not dispose of any measures of explosion protection _ DANGER Explosion hazard Danger of death Do NOT introduce any combustible or explosive substance at working temperature into the redLINE chambers NO explosive dust or air solvent mixture in the inner chamber Any solvent contained in the charging material must not be explosive or inflammable l e irrespective of the solvent concentration in the steam room NO explosive mixture with air must form The temperature inside the chamber must lie below the flash point or below the sublimation point of the charging material Familiarize yourself with the physical and chemical properties of the charging material as well as the contained moisture constituent and its behavior with the addition of heat energy Familiarize yourself with any potential health risks caused by the charging material the contained moisture constituent or by reaction products that may arise during the temperature process Take adequate measures to exclude such risks prior to putting the unit into operation Redline Operating Man
16. ION OF CONFORMITY CE DECLARATION DE CONFORMITE Anbieter Supplier Fournisseur BINDER GmbH Anschrift Address Adresse Im Mittleren Osch 5 D 78532 Tuttlingen Produkt Product Produit Warme Trockenschranke mit forcierter Umluft Mechanical Convection Ovens Etuves universelles circulation d air forc e Typenbezeichnung Type Type RF 53 RF 115 Die oben beschriebenen Produkte sind konform mit folgenden EG Richtlinien The products described above are in conformity with the following EC guidelines Les produits d crits ci dessus sont conformes aux directives CE suivantes Niederspannungsrichtlinie Richtlinie 2006 95 EG des Europaischen Parlaments und des Rates 2006 95 EG vom 12 Dezember 2006 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten betreffend elektrische Betriebsmittel zur Verwendung Low voltage directive innerhalb bestimmter Spannungsgrenzen 2006 95 EC Council Directive 2006 95 EC of 12 December 2006 on the Directive basse tension Rd l harmonization of the laws of Member States relating to electrical 2006 95 CE i ae on equipment designed for use within certain voltage limits Directive 2006 95 CE du Parlement Europ en et du Conseil du 12 d cembre 2006 concernant le rapprochement des l gislations des Etats membres relatives au mat riel lectrique destin tre employ dans certaines limites de tension EMV Richtlinie Richtlinie 2004 108 EG des Europaischen Parlaments und des Rates
17. a degree After switching on the chamber at the main switch 7 the controller is in Continuous operation or Standby mode dependent on which was the operating mode before switching off the chamber Continuous operation The display shows the actual temperature value See chap 6 1 Standby The display shows the actual temperature value alternating with End The LED MAN Standby is lit See chap 6 2 To view the current set point press one of the arrow buttons The set point is displayed for 2 seconds To view the temperature unit shortly press the configuration button B or the functional button LG The unit C or F is displayed for 2 seconds Pressing the configuration button 2 and the functional button Lo together will always return you to the actual value display If at any time no key is pressed within 45 seconds the display will always return to the actual value display To view the temperature unit shortly press the configuration button 2 or the functional button Le The unit C or F is displayed for 2 seconds The display ACCS which appears after pressing several times the configuration button 2 has no function You can operate the controller in two operating modes Continuous operation chap 6 1 and Timer operation chap 6 2 Controller adjustment is described in chap 7 During the equilibration phase of an hour after switching on the chamber undefined temperature conditions occur within the unit
18. above 150 C 302 F the influence of the oxygen in the air may cause coloration of the metallic surfaces yellowish brown or blue by natural oxidation processes These colorations are harmless and will in no way impair the function or quality of the unit The housing is RAL 7035 powder coated All corners and edges are completely coated Heating and ventilation redLINE chambers are heated electrically and ventilated naturally Mechanical convection ovens RF are ventilated by fan assisted forced air circulation The direct heating system provides an extremely precise internal temperature A thermoelement serves to measure the tempering of the interior which is controlled by the redline controller Temperature range Ovens RE and RF by by 7 C 12 F above room temperature up to 220 C 428 F Incubators RI by by 7 C 12 F above room temperature up to 70 C 158 F Temperature safety device redLINE chambers are regularly equipped with a temperature safety device class 1 according to DIN12880 The temperature fuse is triggered irreversibly if the maximum temperature of 229 C 444 2 F RE RF resp 110 C 230 F RI inside the chamber is exceeded Electrical connection redLINE chambers are available for a 230 V redLINE UL chambers for a 100 120 V power supply 2 1 Scope of delivery e redLINE gravity convection oven RE or redLINE mechanical convection oven RF or redLINE incubator RI e 2trays e Flat assembly b
19. ar for stacking it is vital to keep them as two flat assembly bars are required to stack two devices and each device comes supplied with one Redline Operating Manual RE RF RI 07 2010 page 17 38 2 2 Equipment overview _ TT O pu um m mmm E wem E m em wm e eee by gt BINDER o BE FTA mm E 2 Z 0 m A E NN SS se c NN Figure 5 redLINE incubator RI 1 Chamber door 4 Tray 5 Inner glass door 2 Door handle red 4 4 3 Controller Redline Operating Manual RE RF RI 07 2010 page 18 38 E 2 3 Control panel The control panel with the controller and the main switch is located on the housing below the door 6 6 Controller 7 Main switch 7 Figure 6 redLINE control panel 3 Scope of delivery transportation storage and installation 3 1 Unpacking and checking equipment and scope of delivery After unpacking please check the redLINE chamber and its optional accessories if any based on the delivery note for completeness and for transportation damage If transportation damage has occurred inform the carrier immediately and have it confirmed on the proof of delivery by the vehicle driver who delivers the equipment The final tests of the manufacturer may cause traces of the trays on the inner surfaces This has no impact on the function and performance
20. ating to electrical 2006 95 CE Ge sc equipment designed for use within certain voltage limits Directive 2006 95 CE du Parlement Europ en et du Conseil du 12 d cembre 2006 concernant le rapprochement des l gislations des Etats membres relatives au mat riel lectrique destin tre employ dans certaines limites de tension EMV Richtlinie Richtlinie 2004 108 EG des Europaischen Parlaments und des Rates 2004 108 EG vom 15 Dezember 2004 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten ber die elektromagnetische Vertraglichkeit und zur EMC Directive Aufhebung der Richtlinie 89 336 EWG 2004 108 EC Directive CEM Directive 2004 108 EC of the European Parliament and of the Council 2004 108 CE of 15 December 2004 on the approximation of the laws of the Member States relating to electromagnetic compatibility and repealing Directive 98 336 EEC Directive 2004 108 CE du Parlement Europ en et du Conseil du 15 d cembre 2004 relative au rapprochement des l gislations des tats membres concernant la compatibilit lectromagn tique et abrogeant le directive 98 336 CEE Die oben beschriebenen Produkte tragen entsprechend die Kennzeichnung CE The products described above corresponding to this bear the CE mark Les produits d crits ci dessus en correspondance portent l indication CE Redline Operating Manual RE RF RI 07 2010 page 2 38 i Die oben beschriebenen Produkte sind konform mit folgenden harmonisi
21. djusted Redline Operating Manual RE RF RI 07 2010 page 28 38 8 Cleaning and decontamination DANGER Electrical hazard Danger of death Do NOT spill water or cleaning agents over the inner and outer surfaces Do NOT dismount the rear panel of the unit gt Disconnect the chamber before cleaning Disconnect the power plug gt Completely dry the appliance before switching it on again 8 1 Cleaning Disconnect redLINE chambers from the power supply before cleaning Disconnect the power plug Wipe the surfaces with a moistened towel In addition you can use the following cleaning agents Exterior surfaces inner Standard commercial cleaning detergents free from acid or halogenides chamber trays door Alcoholic solutions gaskets glass door RI Instrument panel Standard commercial cleaning detergents free from acid or halogenides D For surface protection perform cleaning as quickly as possible After cleaning completely remove cleaning agents from the surfaces with a moistened towel D Soapsuds may contain chlorides and must therefore NOT be used for cleaning Thoroughly remove all residues of cleaning agents from the interior with sterile RI deionized water RI Use sterile cloths to dry off any residual water adhering to the interior of the incubator and the inside of the glass door If necessary ventilate the interior thoroughly Danger of corrosion Damage to the chamber
22. e exactitude the heating up and the recovering times and the maximum temperature will be negatively influenced So no suction plant should be directly connected to the outgoing air pipe Active suction from the oven must only be effected together with extraneous air Perforate the connecting piece to the suction device or place an exhaust funnel at some distance to the outgoing air pipe The exhaust duct and its cover will become hot during operation Danger of burning Do NOT touch the exhaust duct and its cover during operation Redline Operating Manual RE RF RI 07 2010 page 23 38 5 Start up 5 1 Adjusting the air change The air flap on top on the inner back wall serves to adjust the air change Without connecting a suction plant e RI and RE Fresh air circulation can be elevated using the outgoing air pipe The air flap in the outgoing air pipe serves to adjust the fresh air entry e RF With the air flap open and the fan operating fresh air comes in via aeration gaps Cm If the air flap is completely open the spatial temperature accuracy may be negatively influenced OI Il p U air flap closed Figure 8 Adjusting the air change RF Figure 9 Adjusting the air change RE and RI Adjust the air flap in a way that no condensation occurs inside the unit Redline Operating Manual RE RF RI 07 2010 page 24 38 redz sss 5 2 Controller overview Figure 10 redLINE controller Functional button Config
23. e of 25 C 77 F to which the specified technical data relate For other ambient conditions deviations from the indicated data are possible Redline Operating Manual RE RF RI 07 2010 page 20 38 e Permissible ambient humidity 70 r H max non condensing e Installation height max 2000 m 6562 ft above sea level Maintain a minimum distance of 250 mm 9 84 in between each unit Wall distances rear 100 mm 3 94 in sides 160 mm 6 30 in To completely isolate the unit from the power supply you must disconnect the power plug Install the unit in a way that the power plug is easily accessible and can be easily disconnected in case of danger The unit must NOT be installed and operated in hazardous locations _ DANGER Explosion hazard Danger of death Do NOT operate redLINE chambers in potentially explosive areas gt KEEP explosive dust or air solvent mixtures AWAY from the vicinity of the unit redLINE chambers are not waterproof Do not install the chamber in locations where water could be sprayed about e g in the vicinity of sinks or safety showers DANGER Electrical hazard Danger of death gt redLINE chambers must NOT become wet during operation or maintenance work 3 5 Stacking Two redLINE chambers can be piled on top of each other To ensure that they are safely positioned both devices should be attached to one another using the flat assembly bars supplied One flat assembly bar i
24. edLINE chambers are classified as monitoring and control instruments category 9 only intended for professional use They must not be disposed of at public collecting points redLINE chambers bear the symbol for the marking of electrical and electronic equipment manufactured placed on the market in the EC after 13 August 2005 and be disposed of in separate collection according to the directive 2002 96 EC on waste electrical and electronic equipment WEEE WEEE marking crossed out wheeled bin with solid bar under At the end of the device s service life notify the distributor who sold you the device who will take back and dispose of the unit according to the directive 2002 96 EC of 27 January 2003 a on waste electrical and electronic equipment WEEE Violation against existing law Do NOT dispose of redLINE chambers at public collecting points gt Have the redLINE chambers disposed of professionally at a recycling company which is certified according to conversion of the directive 2002 96 EC into national law or Instruct the distributor who sold you the redLINE chambers to dispose of it The agreements apply that were reached with the distributor when purchasing the unit e g his general terms of payment and delivery Redline Operating Manual RE RF RI 07 2010 page 32 38 Ces a Certified companies disassemble waste redLINE chambers in primary substances for recycling according to directive 2002 96 EC In
25. ements Mat riel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 1 Exigences g n rales EN 61326 2 2 2006 Elektrische Mess Steuer Regel und Laborger te EMV Anforderungen Teil 2 2 Besondere Anforderungen Pr fanordnung Betriebsbedingungen und Leistungsmerkmale f r ortsveranderliche Pr f Mess und berwachungsger te in Niederspannungs Stromversorgungsnetzen Electrical equipment for measurement control and laboratory use EMC requirements Part 2 2 Particular requirements Test configurations operational conditions and performance criteria for portable test measuring and monitoring equipment used in low voltage distribution systems Materiel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 2 2 Exigences particuli res Configurations d essai conditions de fonctionnement et criteres d aptitude a la fonction des mat riels portatifs d essai de mesure et de surveillance utilis s dans des syst mes de distribution basse tension D 78532 Tuttlingen 22 12 2009 BINDER GmbH Mk CO P M Binder Dr H von Both Gesch ftsf hrender Gesellschafter Leiter F amp E Managing Director Director R amp D Directeur g n ral Chef de service R amp D 2 2 Redline Operating Manual RE RF RI 07 2010 page 3 38 cle Ri EC Declaration of Conformy redLINE RF EG KONFORMITATSERKLARUNG C EC DECLARAT
26. erten Normen The products described above are in conformity with the following harmonized standards Les produits d crits ci dessus sont conformes aux normes harmonis es suivantes Sicherheit safety s curit EN 61010 1 2001 Sicherheitsbestimmungen f r elektrische Mess Steuer Regel und Laborger te Teil 1 Allgemeine Anforderungen Safety requirements for electrical equipment for measurement control and laboratory use Part 1 General requirements R gles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 1 Prescriptions g n rales EN 61010 2 010 2003 Sicherheitsbestimmungen f r elektrische Mel Steuer Regel und Laborgerate Teil 2 010 Besondere Anforderungen an Laborgerate fur das Erhitzen von Stoffen Safety requirements for electrical equipment for measurement control and laboratory use Part 2 010 Particular requirements for laboratory equipment for the heating of materials Regles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 2 010 Prescriptions particuli res pour appareils de laboratoire utilis s pour l chauffement des mati res EMV EMC CEM EN 61326 1 2006 Corr 2008 Elektrische Mess Steuer Regel und Laborgerate EMV Anforderungen Teil 1 Allgemeine Anforderungen Electrical equipment for measurement control and laboratory use EMC requirements Part 1 General requir
27. he power supply voltage Compare the values to the data specified on the type plate of the unit on the left hand side of the unit chap 1 4 e When connecting please observe the regulations specified by the local electricity supply company and as well as the VDE directives for Germany e Pollution degree acc to IEC 1010 1 2 e Over voltage category acc to IEC 1010 1 II Danger of incorrect power supply voltage Damage to the equipment gt Check the power supply voltage before connection and start up gt Compare the power supply voltage with the data indicated on the type plate See also electrical data chap 14 4 Redline Operating Manual RE RF RI 07 2010 page 22 38 Danger by electrical short circuit Danger of fire gt Only use the chamber connected to a power source fused to at least 10 Amp _ DANGER Electrical hazard Danger of death Do not connect any chamber with a dented or damaged rear panel to the power supply gt If the chamber has a damaged power cable or rear panel withdraw it from use immediately remove the power plug and contact your dealer to have it repaired To completely isolate the unit from the power supply you must disconnect the power plug Install the unit in a way that the plug is easily accessible and can be easily disconnected in case of danger 4 2 Connection to a suction plant optional When directly connecting a suction plant the spatial temperatur
28. he timer Repeat timer Heating pilot lamp OP1 is not lit stand by mode programming or change to Stand by pilot lamp MAN is lit continuous operation Controller indicates the actual value alternating with End Chamber doesn t heat up Controller in stand by mode Repeat timer programming or Heating pilot lamp OP1 is not lit change to continuous operation Stand by pilot lamp MAN is lit Controller indicates the actual value Deviations from the indicated Oven fully loaded Charge the oven less or consider heating up times longer heating up times The controller returns to the No button was hit for more Repeat entries enter the values actual value display from any than 45 sec rapidly level Repaired units must comply with the manufacturer s quality standards Repair must only be performed by qualified service personnel with electrotechnical training Redline Operating Manual RE RF RI 07 2010 page 34 38 14 Technical description 14 1 Factory calibration and adjustment redLINE chambers were calibrated and adjusted in factory Calibration and adjustment were performed using standardized test instructions according to the QM DIN EN ISO 9001 system applied by the manufacturer certified since December 1996 by TUV CERT All test equipment used is subject to the administration of measurement and test equipment that is also constituent part of the manufacturer s QM DIN EN ISO 9001 systems They are controlled and cal
29. ibrated to a DKD Standard at regular intervals 14 2 Over current protection redLINE chambers are protected by a miniature fuse against over current accessible from the outside The miniature fuse is located at the rear of the chamber below the strain relief of the power cord The fuse holder is equipped with a fuse clip 5mm x 20 mm UL units 6 3x32 mm The fuse may be replaced only with a substitute of the same ratings Refer to the technical data of the respective device type 14 3 Definition of usable space The usable volume illustrated below is calculated as follows A B C Internal dimensions W H D a b c Wall clearances a 0 1xA b 0 1xB Vuse A 2a x B 2b x C 2c Figure 11 Determination of the useable volume The technical data refers to the so defined usable space A Do NOT place samples outside this usable volume Do NOT load this volume by more than half to enable sufficient airflow inside the chamber Do NOT divide the usable volume into separate parts with large area samples Do NOT place samples too close to each other in order to permit circulation between them and thus obtain a homogenous distribution of temperature Redline Operating Manual RE RF RI 07 2010 page 35 38 cle Ri 14 4 Technical data Chamber type RE 53 RE 115 RF 53 RF115 RI53 RI 115 xterior dimensions inch 23 62 31 50 23 62 31 50 23 62 31 50 inch 26 77 29 92 26 77 29 92 26 77
30. ify the set point value without interrupting timer operation To terminate the timer you need to set the value to zero or switch off the chamber 5 When the timer is run down the indication End flashes on the controller display and the controller changes to Standby mode This can be recognized by the LED MAN which is lit In Standby mode the heating is switched off i e the chamber wil cool down The flashing indication End will last until either you enter a new value for the tempering time and so start again the timer or you reset the timer Repeated Timer operation e Press the functional button e several times until Emr appears e Enter a new value for the tempering time with the arrow buttons The timer starts with the enered time Changing to Continuous operation e Timer reset press down the configuration button Lo and the functional button e simultaneously The flashing indication End goes off The controller remains in Standby mode LED MAN is lit e Change from Standby mode to Continuous operation press the functional button several times until m H appears Select the desired operating mode Huta Continuous operation with the arrow buttons e he actual value reaches the set point and equilibrates to it Redline Operating Manual RE RF RI 07 2010 page 27 38 7 Calibrating and adjusting the temperature controller Check the temperature controller for accuracy every year calibration and if necessary ad
31. injury Indicates a potentially hazardous situation which if not avoided could result in death or serious irreversible injury Redline Operating Manual RE RF RI 07 2010 page 11 38 redz sss Indicates a potentially hazardous situation which if not avoided may result in moderate or minor reversible injury Indicates a potentially hazardous situation which if not avoided may result in damage to the product and or its functions or of a property in its proximity 1 2 2 Safety alert symbol Use of the safety alert symbol indicates risk of injury Observe all measures that are marked with the safety alert symbol in order to avoid death or injury 1 2 3 Pictograms Warning signs A Stability hazard Lifting hazard M Read operating Disconnect the power Lift with several persons instructions plug Do NOT spray with water Information to be observed in order to ensure optimum function of the product Redline Operating Manual RE RF RI 07 2010 page 12 38 1 2 4 Word message panel structure Type cause of hazard Possible consequences Instruction how to avoid the hazard prohibition gt Instruction how to avoid the hazard mandatory action Observe all other notes and information not necessarily emphasized in the same way in order to avoid disruptions which could result in direct or indirect injury or property damage 1 3 Localization position of safety labels on the unit
32. just it adjustment Required measuring equipment An electronic measuring and display device with a valid calibration certificate and which has been approved by a recognized standards or calibration authority or regulatory body RE RF Measuring range 2 20 C 68 F up to 250 C 482 F RI Measuring range 2 20 C 68 F up to 70 C 158 F at 10 9o r H to 70 9o r H The sensor should be connected to the display instrument via a slim cable that can be placed over the door gasket of the redLINE chamber without this causing a leak Check calibration e Attach the temperature sensor of the reference measuring device to a tray in the center of the usable volume and place the sensor cable over the door gasket in a way that it is possible to close the glass door RI and the chamber door Close the glass door RI and the chamber door e Switch on the redLINE chamber and set the lower adjustment temperature Wait for 60 minutes after the interior temperature has first reached the set point to permit equilibrating e Compare the temperature displayed on the controller display to the reading of the reference measuring device Note down the value of the reference measuring device and the difference to the value shown on the controller e Then set the upper adjustment temperature Wait for 60 minutes after the interior temperature has first reached the set point to permit equilibrating e Compare the temperature displayed on the con
33. l and laboratory use Part 1 General requirements R gles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 1 Prescriptions g n rales EN 61010 2 010 2003 Sicherheitsbestimmungen f r elektrische Mel Steuer Regel und Laborgerate Teil 2 010 Besondere Anforderungen an Laborgerate fur das Erhitzen von Stoffen Safety requirements for electrical equipment for measurement control and laboratory use Part 2 010 Particular requirements for laboratory equipment for the heating of materials Regles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 2 010 Prescriptions particuli res pour appareils de laboratoire utilis s pour l chauffement des mati res EMV EMC CEM EN 61326 1 2006 Corr 2008 Elektrische Mess Steuer Regel und Laborgerate EMV Anforderungen Teil 1 Allgemeine Anforderungen Electrical equipment for measurement control and laboratory use EMC requirements Part 1 General requirements Mat riel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 1 Exigences g n rales EN 61326 2 2 2006 Elektrische Mess Steuer Regel und Laborger te EMV Anforderungen Teil 2 2 Besondere Anforderungen Pr fanordnung Betriebsbedingungen und Leistungsmerkmale f r ortsveranderliche Pr f Mess und berwachungsger te in Niederspannungs Stromversorg
34. n purposes via www binder redline com 3 3 Storage Intermediate storage of the unit is possible in a closed and dry room Observe the guidelines for temporary decommissioning chap 9 e Permissible ambient temperature range during storage 10 C 14 F to 60 C 140 F e Permissible ambient humidity max 70 r H non condensing If following storage in a cold location the unit is transferred to the installation site for start up condensation may form Wait at least one hour until the oven has attained ambient temperature and is completely dry 3 4 Location of installation and ambient conditions Set up redLINE chambers on an even and non flammable surface free from vibration and in a well ventilated dry location and align them using a spirit level The site of installation must be capable of supporting the units weight see technical data chap 14 4 Set up the chamber in such a way that tha main switch 7 is easily accessible and can be switched off immediately in case of danger Danger of overheating Damage to the unit Do NOT set up redLINE chambers in non ventilated recesses gt Ensure sufficient ventilation for dispersal of the heat e Permissible ambient temperature range during operation 18 C 64 4 F up to 40 C 104 F At elevated ambient temperature values fluctuations in temperature can occur The ambient temperature should not be substantially higher than the indicated ambient temperatur
35. nal Information See UL On lme Certification Directory at WWW UL COM for additional information Only those products bearing the UL Listing Mark for the US and Canada should be considered as being covered by UL s Listing and Follow Up Service meeting the appropriate requirements for US and Canada The UL Listmg Mark for the US and Canada generally includes the UL m a circle symbol with C and US identifiers the word LISTED a control number may be alphanumenc assigned by UL and the product category name product identifier as indicated in the appropriate UL Directory Look for the UL Listing Mark on the product William R Carney Director North American Certification Programs Any information and docemsantation involving UL Mark sarricas ars provided on bekalf of Underwriters Laboratories Inc UL or amy authored licensee of UL For questions please contact a local UL Cstezoar Service Repewsentais at bttp www al com global ung paged corporate contact Redline Operating Manual RE RF RI 07 2010 page 8 38 Content EC Declaration of Content redLINE RE u aa a run 2 EC Declaration of Contormy redLINE EE 4 EC Declaration of Contormy redLINE Ru a ea 6 UL certificate valid Tor red NINE UL Wis ans ee nn ende 8 Mie PRES U 11 del e E Re OT NSIC Ee 11 1 2 Structure of the safety Imstruchons nennen nennen nnne nnn nnne n nnns 11 t21 Signal word Panel EE 11 1 2 2 Safe
36. nd laboratory use Part 2 010 Particular requirements for laboratory equipment for the heating of materials Regles de s curit pour appareils lectriques de mesurage de r gulation et de laboratoire Partie 2 010 Prescriptions particuli res pour appareils de laboratoire utilis s pour l chauffement des mati res EMV EMC CEM EN 61326 1 2006 Corr 2008 Elektrische Mess Steuer Regel und Laborgerate EMV Anforderungen Teil 1 Allgemeine Anforderungen Electrical equipment for measurement control and laboratory use EMC requirements Part 1 General requirements Mat riel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 1 Exigences g n rales EN 61326 2 2 2006 Elektrische Mess Steuer Regel und Laborger te EMV Anforderungen Teil 2 2 Besondere Anforderungen Pr fanordnung Betriebsbedingungen und Leistungsmerkmale f r ortsveranderliche Pr f Mess und berwachungsger te in Niederspannungs Stromversorgungsnetzen Electrical equipment for measurement control and laboratory use EMC requirements Part 2 2 Particular requirements Test configurations operational conditions and performance criteria for portable test measuring and monitoring equipment used in low voltage distribution systems Materiel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 2 2 Exigences particuli res Configuration
37. ng to condensation will be set free Observing the instructions in this operating manual and conducting regular maintenance work chap 10 is part of the intended use Due to the special demands of the Medical Device Directive MDD this ovens are not qualified for sterilization of medical devices as defined by the directive 93 42 EWG Redline Operating Manual RE RF RI 07 2010 page 16 38 2 Unit description Function Gravity convection ovens RE and mechanical convection ovens RF are suitable for drying and heat treatment of solid or pulverized charging material as well as bulk material using the supply of heat They are designed for all standard drying and tempering tasks as well as sterilizing glassware RF permits shorter drying times The incubators RI are designed for exact temperation of harmless materials They are designed to cultivate microorganisms at defined temperatures Controller redLINE chambers are equipped with an electronic PID controller with digital display The ovens RE and RF have a temperature display and setting with an accuracy of one degree The incubators RI have a temperature display and setting with an accuracy of a tenth of a degree The integrated timer can be set to 0 9999 minutes Also continuous operation is possible Interior and housing The inner chamber the pre heating chamber and the inside of the doors are all made of stainless steel When operating the ovens RE and RF at temperatures
38. nnne 29 Lg E 29 82 DECOM TAMU AON EE 30 9S DECOMMISSIONING nn weisen 30 10 MAINTENANCE oenen Tannen Eee Eee ee 31 10 1 EE ee 31 Redline Operating Manual RE RF RI 07 2010 page 9 38 11 TECHNICAL AT Lei EE E OS ace ce tess ann one ce ee meee eee eee 12 1 Disposal of the transport packing 12 2 Disposal of redLINE chambers in the member states of the EC 12 3 Disposal of redLINE chambers in non member states of the EC 13 TROUBLESHOOT ING vente 14 TECHNICAL DESCRIPTION 14 1 Factory calibration and adjustment 14 2 Over current protection 14 3 Definition of usable space 14 4 Technical data 14 5 Equipment Redline Operating Manual RE RF RI 07 2010 page 10 38 redgssegm Dear customer For the correct operation of the redLINE chambers it is imperative that you read this operating manual completely and carefully and observe the given instructions 1 Safety This operating manual is part of the scope of delivery Always keep it at hand To avoid injuries and damage observe the safety instructions of the operating manual Failure to observe the safety instructions Serious injuries and unit damage Observe the safety instructions in this operating manual Carefully read the complete operating instructions of the redLINE chambers 1 1 Legal considerations This operating manual contains information necessary for the intended use correct installation start
39. order to eliminate any health hazards to the employees of the recycling companies the devices must be free from toxic infectious or radioactive substances D It is the user s responsibility that the redLINE chamber is free from toxic infectious or radioactive substances prior to handing it over to a recycling company Prior to disposal clean all introduced or residual toxic substances from the chamber e e Prior to disposal disinfect the chamber from all sources of infection Be aware of the fact that sources of infection may also be located outside the inner chamber e If you cannot safely remove all sources of infection and toxic substances from the unit dispose of it as special waste according to national law Contamination of the device with toxic infectious or radioactive substances Danger of intoxication Danger of infection NEVER take redLINE chambers contaminated with toxic substances or sources of infection for recycling according to directive 2002 96 EC Prior to disposal remove all toxic substances and sources of infection from the chamber Dispose of redLINE chambers from which all toxic substances or sources of infection cannot be safely removed as special waste according to national law 12 3 Disposal of redLINE chambers in non member states of the EC Alteration of the environment Observe the statutory regulations for appropriate environmentally friendly disposal The main board of the o
40. redi SEEE by gt BINDER Operating Manual redLINE RE Gravity Convection Oven RE 115 UL 100 120 V 9090 0008 9190 0008 redLINE RF Mechanical Convection Oven RF 115 UL 100 120 V redLINE RI Incubator RI 115 UL 100 120 V www binder redline com Issue 07 2010 Art No 7001 0201 cle Ri EC Declaration of Conformy redLINE RE EG KONFORMITATSERKLARUNG C EC DECLARATION OF CONFORMITY CE DECLARATION DE CONFORMITE Anbieter Supplier Fournisseur BINDER GmbH Anschrift Address Adresse Im Mittleren Osch 5 D 78532 Tuttlingen Produkt Product Produit Trockenschranke mit nat rlicher Umluft Gravity Convection Ovens Etuves de s chage circulation d air naturelle Typenbezeichnung Type Type RE 53 RE 115 Die oben beschriebenen Produkte sind konform mit folgenden EG Richtlinien The products described above are in conformity with the following EC guidelines Les produits d crits ci dessus sont conformes aux directives CE suivantes Niederspannungsrichtlinie Richtlinie 2006 95 EG des Europ ischen Parlaments und des Rates 2006 95 EG vom 12 Dezember 2006 zur Angleichung der Rechtsvorschriften der Mitgliedstaaten betreffend elektrische Betriebsmittel zur Verwendung Low voltage directive innerhalb bestimmter Spannungsgrenzen 2006 95 EC Tm Council Directive 2006 95 EC of 12 December 2006 on the Directive basse tension Segen harmonization of the laws of Member States rel
41. s d essai conditions de fonctionnement et criteres d aptitude a la fonction des mat riels portatifs d essai de mesure et de surveillance utilis s dans des syst mes de distribution basse tension D 78532 Tuttlingen 22 12 2009 BINDER GmbH Mk CO P M Binder Dr H von Both Gesch ftsf hrender Gesellschafter Leiter F amp E Managing Director Director R amp D Directeur g n ral Chef de service R amp D 2 2 Redline Operating Manual RE RF RI 07 2010 page 7 38 red gt BIND oO lt m A UL certificate valid for redLINE UL units RE 53 UL RE 115 UL RF 53 UL RF 115 UL RI 53 UL RI 115 UL Certificate of Compliance Certificate Number 20100408 E200795 Page 1 Report Reference E200795 A10 UL 1 BT Issue Date 2010 April 8 U Unde rwriters L Laboratories BINDER GMBH Issued fo Im Mittleren Oesch 5 Tuttlingen 78532 Germany This is io certify tha Laboratory Use Electrical Equipment representative samples of RI universal laboratory incubators Models RI 53 UL RI 53 A UL RI 115 UL and RI115 A UL KE universal laboratory warming chambers with natural convection Models RE 53 UL and RE 115 UL RF universal laboratory forced convection ovens Models RF 53 UL and RF 115 UL Have been investigated by Underwriters Laboratories in accordance with the Standard s indicated on this Certificate Standard s for Safety UL 61010 1 2nd Edition CAN CSA C22 2 No 61010 1 2nd Edition Additio
42. s supplied with each redLINE chamber Sliding or tilting of the upper chamber Damage to the chambers amp Niemals mehr als zwei redLINE chambers aufeinander stellen Always secure stacked redLINE chambers using both flat assembly bars supplied Redline Operating Manual RE RF RI 07 2010 page 21 38 e Place the first chamber at the intended location Leave enough space between the rear panel of the chamber and the wall behind it so that you can turn screws into the rear panel using a TX20 screwdriver e Unscrew two of the screws which fix the upper edge of the rear panel of the lower chamber e Fasten two flat assembly bars with these screws at the upper edge of the rear panel e Place the second chamber on top of the first e Unscrew two of the screws which fix the lower edge of the rear panel of the upper chamber e Place the upper chamber in a way that the empty drilling holes overlap the holes in the lower chamber s flat assembly bar e Screw the two assembly bars to the rear panel of the upper chamber Figure 7 Stacking two redLINE chambers 4 Installation of the equipment 4 1 Electrical connection e Power supply voltage 230 V 1N 10 96 50 60 Hz UL units 100 120 V 1N 10 96 50 60 Hz e Power connection IEC connector plug and cable of 2500 mm 98 4 in in length e Plug 230 V units shockproof plug Plug UL units NEMA 5 15P e Prior to connection and start up check t
43. troller display to the reading of the reference measuring device Note down the value of the reference measuring device and the difference to the value shown on the controller Adjusting the temperature controller is necessary if the temperature displayed on the controller deviates by more than 1 K RE RF resp 0 5 K RI from the temperature shown by the reference measuring device Adjustment two point adjustment e Press the configuration button 8 twice to access the input menu P e Press the functional button LY to select the parameter LHL P e Enter the password 1 with the arrow keys PH55 will be displayed e Press the functional button e to select the parameter LRL e Select USEr with the arrow buttons e With the functional button e you can call up the four adjustment parameters one after the other Pnt H and UFSH are displayed only after setting the first 2 parameters Use the arrow keys to set the temperature values of the reference measuring device and the corresponding offset values PnEL Temperature value of the reference measuring device at the lower adjustment temperature UF SL Offset value at the lower adjustment temperature difference noted during calibration Pnt H Temperature value of the reference measuring device at the upper adjustment temperature UF SH Offset value at the upper adjustment temperature difference noted during calibration The temperature controller of your redLINE chamber has now been a
44. ty alert SYMBOL EE 12 UE we 0 016 62 E 12 1 2 4 Word message panel structure aaneen eene eenennrevenensenanrsennnennanenenans nennen venne rennen 13 1 3 Localization position of safety labels on the unt 13 tA PDC DIAS ee ee en ee eo ee ee eee 14 1 5 General safety instructions on installing and operating the redLINE chambers 15 1 6 IMende Use tee ee een leeren 16 2 ENEE 17 2 1 SCOPE ie EU EE 17 22 EIER Ee 18 293 onboard nende persmensen eneen 19 3 SCOPE OF DELIVERY TRANSPORTATION STORAGE AND INSTALLATION19 3 1 Unpacking and checking equipment and scope of delen 19 3 2 Guidelines for safe lifting and transportation un uuuunseneennnenrennneervenseneennnenvennnenrennnenn vens 20 Oes RON NC ROT P 20 3 4 Location of installation and ambient conditions nennen nnnnnnnnnennnn nennen 20 Nn 21 4 INSTALLATION OF THE EQUIPMENT eere ee eene 22 4 1 El ctrical connector E 22 4 2 Connection to a suction plant optional 23 MEE Ye i UP tec M 24 5 1 aldi e ING AI change EE 24 SP MER Go diee EU ERN E m 25 sn MEE teln nie OMNE Ln 26 6 OPERATING THE CONTROLLER nennen eeen nennnennenn 26 0 1 CONUNUOUS OPSrAUOM ars ae eect eds be oc da ne dene eier 27 8 2 Hinne Te EE 2 7 CALIBRATING AND ADJUSTING THE TEMPERATURE CONTROLLER 28 8 CLEANING AND DECONTAMINATION nanne enne
45. ual RE RF RI 07 2010 page 15 38 Electrical hazard Danger of death The unit must NOT become wet during operation or maintenance redLINE chambers have been produced in accordance with VDE regulations and were routinely tested in accordance to VDE 0411 1 IEC 61010 1 The inner chamber and the outgoing air pipe will become hot during operation Danger of burning Do NOT touch the inner surfaces the access ports or the charging material during operation 1 6 Intended use Gravity convection ovens RE and mechanical convection ovens RF are designed for all standard drying and tempering tasks as well as sterilizing glassware They are intended for use in biological chemical medical pharmaceutical and physical laboratories Incubators RI are designed to cultivate microorganisms at defined temperatures They can be used e g for determining the number of microorganisms through plate count methods or detecting of pathogenic germs e g in product samples They are intended for use in biological chemical medical and pharmaceutical laboratories Any solvent content must not be explosive or flammable A mixture of any component of the charging material with air must NOT be explosive The operating temperature must lie below the flash point or below the sublimation point of the charging material Other applications are not approved Do NOT use redLINE chambers for drying purpose if greater quantities of steam leadi
46. ungsnetzen Electrical equipment for measurement control and laboratory use EMC requirements Part 2 2 Particular requirements Test configurations operational conditions and performance criteria for portable test measuring and monitoring equipment used in low voltage distribution systems Materiel lectrique de mesure de commande et de laboratoire Exigences relatives la CEM Partie 2 2 Exigences particuli res Configurations d essai conditions de fonctionnement et criteres d aptitude a la fonction des mat riels portatifs d essai de mesure et de surveillance utilis s dans des syst mes de distribution basse tension D 78532 Tuttlingen 22 12 2009 BINDER GmbH P M Binder Dr H von Both Gesch ftsf hrender Gesellschafter Leiter F amp E Managing Director Director R amp D Directeur g n ral Chef de service R amp D 2 2 Redline Operating Manual RE RF RI 07 2010 page 5 38 cle Ri EC Declaration of Conformy redLINE RI EG KONFORMITATSERKLARUNG C EC DECLARATION OF CONFORMITY CE DECLARATION DE CONFORMITE Anbieter Supplier Fournisseur BINDER GmbH Anschrift Address Adresse Im Mittleren Osch 5 D 78532 Tuttlingen Produkt Product Produit Brutschranke mit nat rlicher Umluft Incubators with natural convection Incubateurs circulation d air naturelle Typenbezeichnung Type Type RI 53 RI 115 Die oben beschriebenen Produkte sind konform mit folgenden EG Richtlinien
47. uration button access to the adjusting menu Arrow buttons Standby pilot lamp heating off Heating pilot lamp Timer Setting the tempering time inminutes Timer run down controller changes to Standby mode Change over Standby Continuous operation Continuous operation actual value equilibrates to set point P USEr LHLP CAL Dok I nr cr Adjusting menu PnEH DFSH Redline Operating Manual RE RF RI 07 2010 page 25 38 ile Ri 5 3 Switching on the unit Insert the plug into a socket chap 4 1 and switch on the chamber at its main switch 7 RF The fan is permanently active as long as the chamber is switched on at the main switch independent on the current controller function After switching on the chamber the controller runs a 3 second self test sequence displaying the software version Then it shows the main display actual value display During the equilibration phase of an hour after switching on the chamber undefined temperature conditions occur within the unit During this phase do not place any sample materials in the chamber Danger of samples being destroyed gt Load the chamber only after equilibration of temperature and CO 6 Operating the controller Controller setting is identical on all redLINE chambers The temperature controllers only differ in their temperature range and the temperature display and setting accuracy RE and RF with degree accuracy RI with accuracy of a tenth of
48. ven includes a lithium cell Please dispose of it according to national regulations Redline Operating Manual RE RF RI 07 2010 page 33 38 13 Troubleshooting Fault description Possible fault cause Unit without function Unit switched off Switch on the unit at the main switch 7 No power supply Check connection to power supply Wrong voltage Check power supply for voltage of 100 120V or 230V Unit fuse has responded Check unit fuse and replace it if appropriate If it responds again contact a service tecnician for qualification see Service Manual Contact a service tecnician for qualification see Service Manual Set point temperature is not ae a EZUNE Controller not Sauter or Calibrate and adjust ae adjustment interval exceeded Chamber heating permanently Controller defective Contact a service tecnician for set point not held Temperature sensor qualification see Service daf defective Semiconductor relay defective Controller not adjusted or Calibrate and adjust controller adjustment interval exceeded Chamber doesn t heat up mesg element defective Contact a service tecnician for Heating pilot lamp OP1 is lit qualification see Service s defective Chamber doesn t heat up Contact a service tecnician for Heating pilot lamp OP1 is not lit defective qualification see Service Manual Controller indicates the actual value Chamber doesn t heat up Timer run off Controller in Reset t
Download Pdf Manuals
Related Search
Related Contents
time related weather station - Electrical and Information Technology Lock-it Block-it LB-0001 Instructions / Assembly bordereaux des prix – detail estimatif Color MultiWriter 7500C - 日本電気 Barriera immateriale di sicurezza tipo 4 OM, Gardena, Idrokit per fioriere, Art 01407, 2013-02 GemFire Enterprise DataBrowser User`s Manual Elation Professional 250B Projector User Manual Télécharger le rapport public BEAD-air-A-2012-002 Manual Copyright © All rights reserved.
Failed to retrieve file