Home
        Here - Hurst
         Contents
1.   Remove tape from cable and re install rubber boots  Place shifter cable into mounting bracket on  transmission oil pan and secure using two  2  internal tooth lockwashers and two  2  7 16    hex nuts  supplied with cable   See Figures 2 and 5   It may be necessary to slightly bend the transmission  cooling lines to attain clearance for cable     5  Make sure shifter is in    Neutral    position  Check and be sure transmission arm on gear selector  shaft is also in    Neutral    position  Thread cable pivot onto end of shifter cable  Adjust cable pivot until  it slides freely into hole in transmission arm  When properly adjusted  lock cable pivot in place using  3 16    hex nut  Insert cable pivot into transmission arm so pivot end is facing outward away from  transmission   See Figure 5   Temporarily install cotter pin        Technical Support  707  544 4761 5 www HURST SHIFTERS com    FORD    C 4  amp  C 6   1  The stock backdrive linkage that locks shifter stick in    Park    position cannot be retained  Linkage  rod lever  located inside engine compartment on steering column  must be secured in the upward  position  This will allow ignition key to be turned to    Lock    position and withdraw freely out of lock     2  Remove linkage and lever that is connected FORD INSTALLATION C 4  amp  C 6  to the downshift lever shaft  Shift linkage rods   we  should be disconnected and discarded  The   POWNSHIFTLINKAGE     Original equipment neutral safety and back up D gt    light s
2.  along indicated lines    Allow transmission arm to cool  and replace     onto transmission gear selector shaft using STOCK   stock bolt or nut  Re install backdrive eatin   linkage     Note  If the backdrive linkage system is not going to be retained  the linkage rod lever  located inside  engine compartment on steering column  must be secured in the upward position  This will allow  ignition key to be turned to    Lock    position and withdraw freely out of lock     2  Remove the two  2  center transmission oil pan bolts  using 1 2    socket  from left  driver  side of  transmission as indicated  Attach Hurst cable bracket Pt  117 4778Z to transmission oil pan re using  stock bolts  Do not overtighten   Refer to Figure 4      Note  Hurst shifter cable bracket features slotted mounting holes to allow for adjustment of cable  forward or rearward        Technical Support  707  544 4761 4 www HURST SHIFTERS com    3  Remove tape from cable and re install rubber boots  Place shifter cable into mounting bracket on  transmission oil pan and secure using two  2  internal tooth lockwashers and two  2  7 16    hex nuts  supplied with cable     4  Be sure shifter is in    Neutral    position  Check and be sure transmission arm on gear selector shaft    is also in    Neutral    position  Thread cable pivot onto end of shifter cable  Adjust cable pivot until it  Slides freely into hole in transmission arm  When properly adjusted  lock cable pivot in place using  3 16    hex nut  Insert 
3.  moving the shifter Stick backward ii el A  and forward through entire shift pattern  See   Figure 9     Move stick through each gear selection     counting positions as you feel them  P R N     D 2 1   fe  LOWER GATE  RATCHET MODE    INDICATOR SHOWS  GEAR POSITION    Cable pivot attached to transmission control arm should be checked in    Park        Neutral  and    Low     gear positions to be sure pivot slides freely    IN    and    OUT    of transmission arm  Move shifter stick  into    Low    gear and check adjustment underneath vehicle by removing cotter pin and cable pivot from  transmission arm  Check to be sure that transmission is FULLY ENGAGED in    Low    gear  When  cable adjustment is correct  shifter will engage    Park    and    Low    gears completely  Once adjustment  is made  secure cotter pins on either end of shifter cable and be sure all adjustment bolts and nuts  are tightened securely     WARNING  Correct cable adjustment is mandatory to insure that when shifter is in    Park    position   transmission is also fully into the    Park    detent  Failure to adjust cable correctly could result in  unexpected vehicle motion when shifter is in    Park    or    Neutral    positions        Technical Support  707  544 4761 9 www HURST SHIFTERS com    STARTER MOTOR AND BACK UP LIGHT TEST OPERATION    We recommend disconnecting the    batt    wire from distributor so engine will crank but not start   Reconnect negative     battery cable  With the shifter in    Pa
4. 8    Drift Punch   12 Volt Test Light or Voltmeter  Electric Drill   Tape Rule   Electrical Tape   Pliers   Flat Blade Screwdriver  Phillips R Tip Screwdriver  Ratchet 3 8    Drive   10    long Extension 3 8    Drive  7 16    Socket   3 8    Drive   1 2    Socket   3 8    Drive   9 16    Socket   3 8    Drive   3 8    Wrench Open End   7 16    Wrench Open End  11 16    Wrench Open End  Fluorescent Work Light    GENERAL MOTORS  3 SPEED TURBO HYDRAMATIC 350  amp  400    24  Bracket Shifter Cable TH 350  amp  400 1174778Z  25  Transmission Arm TH 350  amp  400 1058561    MOPAR  3 SPEED TORQUEFLITE A 727  amp  A 904    26  Bracket Shifter Cable  A 727  amp  A 904   2   Transmission Arm  A 727  amp  A 904   28  Spacers Cable Bracket    1178563    1058564  97093092    FORD   3 SPEED TORQUEFLITE A 727  amp  A 904  29  Bracket Shifter Cable C 4 1178558  1178557    30  Bracket Shifter Cable C 6  31  Transmission Arm  C 4  amp  C 6    1058559       www HURST SHIFTERS com    IMPORTANT  RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE    Technical Service    A highly trained technical service department is maintained by Hurst Performance to answer your  technical questions  provide additional product information and offer various recommendations        Technical service calls  correspondence  and warranty questions should be directed to        Hurst Performance Products   707  544 4761    www Hurst Shifters com    Technical Support  707  544 4761 13 www HURST SHIFTERS com    
5. Cut this wire and splice in the Hurst neutral park start switch        BACK UP LIGHT SWITCH WIRING CONNECTION  EAE MOPAR 1969  maini ui ence ae    1  Pre wire Hurst back up light switch  rear switch located on shifter assembly  using two  2  female  crimp connectors and two  2  suitable lengths of 16 gauge insulated automotive grade wire  not  supplied   Strip 1 4    of insulation off each end of wire and firmly crimp female connector onto one end  of each wire  Push female connectors onto switch terminals  Route wiring away from shifter assembly  so it will not interfere with internal moving parts  See Figure 8     2  Locate wire lead connected to back up lights and trace to the original equipment back up light  switch  Disconnect both wires leading to the back up light switch and connect to Hurst back up light  switch wire leads  Use correct size insulated electrical butt connectors to properly connect the wires  together    Note  one wire lead from the Hurst back up light switch must have 12 volt power when the ignition  key is in the    On    position   See Figure 8      PRO MATIC 2 NEUTRAL PARK START SAFETY SWITCH  AND BACK UP LIGHT SWITCH INSTALLATION    ORIGINAL NEUTRAL SAFETY SWITCH WIRING DIAGRAM SHOWN IS USED IN MOST  VEHICLES  REFER TO THIS DIAGRAM WHEN WIRING AND CONNECTION HURST  NEUTRAL PARK STATER SAFETY SWITCH AND BACK UP SWITCH     ORIGINAL NEUTRAL SAFETY SWITCH   ONLY ONE OR THE OTHER  S USED ON ANY VEHICLE      ORIGINAL NEUTRAL SAFETY SWITCH HAM ORIGINAL NE
6. Installation Instructions    Hurst Pro Matic 2 Truck Shifter  Fits most 2WD  amp  4WD Truck Applications  GM TH 350 400   Ford C4 C6   Mopar Torqueflite A727 A904  Catalog  3838510       WORK SAFELY  For maximum safety  perform this installation on a clean  level surface and with the  engine turned off  Installation of this shifter requires working underneath vehicle  Raise front of  vehicle by lifting at points specified by the vehicle manufacturer  Place blocks or wedges in front of  and behind both rear wheels to prevent movement in either direction  DO NOT USE A BUMPER  JACK FOR SUPPORTING VEHICLE     IMPORTANT  1  All adjustments must be made with shifter and transmission in    Park        Neutral     and    Low    gear  positions     2  Adjustments are critical and must be precise     3  Do not mix components  all parts including shifter cable must be genuine Hurst components  provided with kit      4  lf a shifter is removed and re installed  adjustments must be checked and re adjusted  if necessary   5  When routing cable avoid sharp bends  Provide large full loops  if needed  for smooth shifting and  long cable life  Avoid routing cable near exhaust pipes as heat from the exhaust system will melt    cable casing   Permanent damage of cable will result      6  Always check cable for freedom of movement before connecting to shifter and transmission control    These instructions detail the installation of the Hurst Quarter Stick Shifter for GM Powerglide 2 speed  transm
7. UTRAL SAFETY SWITCH    B     y lgnition Switch    Neutral Park Start j s  Switch j w    7 z   k A a      is       p     F     Back up  race Light y i 7    gt  k l     Lights Fuse  witch A   i i i i g      a d i   I     T  r       me ul    Fi i  man r  r at       i    m   Original      Back up     Light Switch                  in    Use Female Wire Terminals Here  4  Back up Lights         Technical Support  707  544 4761 8 www HURST SHIFTERS com    Applications  1969 Later    The original equipment factory back up light switch is located on the transmission  No additional       wiring necessary     SHIFT INDICATOR LAMP SOCKET WIRING CONNECTION   Use a suitable length of 22 gauge insulated automotive grade wire  not supplied   Strip 1 4    of  insulation off each end of wire  Connect lead wire from light assembly to this wire using the correct  size electrical butt connector  Connect other end of wire to electrical circuit of instrument panel lights        Important  The shifter assembly must have a good chassis    ground    for indicator lamp to work  properly     SHIFTER OPERATION   Caution  Before testing shifter operation  it is recommended that vehicle be placed back on the  ground  parking brake applied  and wheels blocked  Vehicle should be parked in a safe location for  testing  Be sure no one is in front of or behind during testing     Apply brake pedal pressure while testing  SHIFTER OPERATION  Familiarize yourself with the operation of this Nae AE  oer    shifter by
8. cable pivot end into transmission arm so pivot end is facing outward away from  transmission   See Figure 4  amp 7   Temporarily install cotter pin        MOPAR    TORQUEFLITE A 727  amp  A 904   1  The stock backdrive linkage that locks shifter stick in    Park    position cannot be retained  Linkage  rod lever  located inside engine compartment on steering column  must be secured in the upward  position  This will allow ignition key to be turned to    Lock    position and withdraw freely out of lock     2  Remove throttle lever located just MOPAR INSTALLATIONS A 727  amp  A 904 TORQUEFLITE    above transmission arm by removing the  bolt and nut  pry lever off the shaft using       PLACE 1 SPACER  a flatolade screwdriver  Remove linkage BETWEEN EACH END OF A  and stock transmission arm  Install Hurst on A Lf NNE  Transmission arm Pt  105 8564 using Www No Cra    ARM SHOWN  the 1 4    x 1 1 2    hex bolt  Item  19   1 4         split lockwasher  and 1 4    hex nut   ROUTE SHIFTER   e      INSTALLED        CABLE INTO CABLE  supplied  Re install throttle lever and   srackeTFRomFRont  linkage onto shaft  Check throttle lever  9  TRANSMISSION  to be sure it operates freely   See Figure    5      3  Two  2  transmission oil pan bolts  driver side  directly below transmission arm must be removed   Install cable bracket Pt  117 8563  two  2  spacers  and two  2  5 16    18 x 3 4    hex head bolts  supplied  If transmission has a cast aluminum oil pan  spacers may not be needed     4
9. cket and two  2  spacers  Install    the cable bracket onto the oil pan  using the 5 16  18 x 3 4    bolts   Supplied    See Figure 6C   If  transmission has a cast aluminum oil  pan  spacers may not be necessary     PARK LOW  NEUTRAL    5  Remove tape from cable and re install rubber boots  Place shifter cable into mounting bracket on  transmission oil pan and secure using two  2  internal lockwashers and two  2  7 16    hex nuts  supplied with cable     6  Make sure shifter is in    Neutral    position  AUIGHMEN  FRULEDURE Figure 7  Check and be sure transmission control arm   1 PLACE SHIFTER STICK IN  NEUTRAL  POSITION     2  POSITION TRANSMISSION ARM AT  NEUTRAL  POSITION  gear selector shaft is in    Neutral    position  3  INSERT CABLE PIVOT INTO TRANS  ARM  SECURE WITH COTTER PIN  Thread cable pivot onto end of shifter cable  l T   IMPORTANT n  CABLE PIVOT MUST LINE UP    Adjust cable pivot until it slides freely into accra       Ip  hole in transmission arm  When properly aie               RS    adjusted  lock cable pivot in place using          3 16    hex nut  Insert cable pivot end into Eu aes F PS  transmission arm so pivot end is facing       outward away from transmission   See    Figure 6  amp 7   Temporarily install cotter pin        NEUTRAL PARK START WIRING CONNECTION   EXCEPT MOPAR APPLICATIONS   Important  The Pro Matic 2 shifter uses an electrical neutral park start switch that replaces the  Original equipment neutral safety switch on most Chevy  GMC  For
10. connect and remove shift    linkage rod from steering column inside engine    compartment and linkage rod attached to transmission control arm     3  Place Pro Matic 2 Shifter stick in    Neutral    position and remove shifter knob  Lift console up and    off  Remove one  1   8 x 3 4    Phillips head screw that fastens chrome console cover to console and  separate     4  Position shifter in a desired location on  floor allowing clearance for seat travel and  shifter stick travel when shifting into    Park     position  Cut a small section of carpet or floor  matting where shifter assembly will mount to  floor  make sure there are no wires  underneath carpet   Place shifter assembly in  selected location  mark and center punch  four  4 mounting holes  Drill through floor  using a 9 32    drill bit  Deburr holes with a file  and sand with emery cloth   See Figure 1         Technical Support  707  544 4761    FRONT OF    SHIFTER  TOP VIEW OF SHIFTER MOUNTING  AND CABLE MOUNTING HOLE PATTERNS    os ne  a    2 www HURST SHIFTERS com    5  If necessary  mark and cut a slit in the carpet to accommodate shifter cable  Using a hole saw or  other suitable tool  make a 1 1 2    diameter hole in flooring 3    in front of forward mounting hole and 1   3 4    to the left of forward mounting hole to accommodate shifter cable  See Figure 1   For some  vehicles the 3    dimension may be less  Deburr hole with a file and sand with emery cloth  Install  rubber grommet into 1 1 2    diameter hol
11. d  and Mopar applications  The  Original neutral safety switch is typically located at the lower end of steering column  For your  particular application refer to the vehicle manufacturer s service manual for the correct location     1  Pre wire Hurst neutral park start switch  front switch located on shifter assembly  using two  2   female crimp connectors  Item  22  and two  2  suitable lengths of 16 gauge insulated automotive  grade wire  not supplied   Strip 1 4    of insulation off each end of wire and firmly crimp female  connector onto one end of each wire  Push female connectors onto switch terminals  Route wiring  away from shifter assembly so it will not interfere with internal moving parts   Refer to Figure 8         Technical Support  707  544 4761 7 www HURST SHIFTERS com    2  Locate wire connected to starter solenoid terminal marked    S    and trace to original equipment  neutral start switch  Locate wire connected to    Solenoid    terminal of ignition switch and also trace to  Original neutral start switch  Disconnect both wires leading to original equipment switch and connect  to Hurst neutral park start switch wire leads  Use correct size insulated electrical butt connectors to  properly connect the wires together   Refer to Figure 8      Note  If Pro Matic 2 shifter is used in an application without an original equipment neutral park start  switch  locate wire connecting    S    terminal on starter solenoid to    Solenoid    terminal of ignition switch   
12. e     6  Attach shifter assembly to floor using four  4  1 4    20 x 1    hex head bolts  1 4    flatwashers  and  1 4    20 hex nuts  Tighten securely  Install two  2  U Type clip fasteners  Item  10  onto front and rear  console mounting tabs of shifter frame  When installing these clips be sure extruded side is  underneath mounting hole facing downward   Refer to Identification and Contents of Shifter Kit         CABLE werneeeee          7  Remove 3 16    hex nut  two  2  rubber boots  SHIFTER CABLE ROUTING    two  2  7 16    hex nuts  and two  2  internal tooth   lockwashers from threaded end of shifter cable    Using tape  wrap the section of cable that rubber  MOPAR    ROUTE CABLE FROM       boots were covering so dirt or grease will not get  FRONT oF TRANSMISSION Prak    FORD AND GM   embedded inside cable housing causing cable to r AU   4  ROUTE CABLE BEHAD   scuff and bind  Insert cable from inside vehicle T ON     through rubber grommet in floor  Route cable so   there are no sharp bends that would make the   shifter hard to operate  Be sure cable clears all   exhaust pipes by at least 1 1 2     Refer to Figure   2                  Note  Use tie straps or clamps to secure shifter cable away from the exhaust pipes and engine   Cable end with mounting tab attached  shifter assembly end  must slip into slotted opening on shifter  frame  Position tab on the inside of shifter frame and fasten using 1 4    20 x 3 4    hex bolt and 1 4    hex  nut  Slide cable end onto cot
13. ission with both forward and reverse pattern valve bodies and GM Turbo TH 350 400 3 Speed  transmission with a reverse pattern valve body only  Please refer to the specific instructions for your  particular application for detailed information  See the illustration on page 4 for changing from 2  speed to 3 speed operation        The shifter can be mounted directly to the floor with the four sheet metal screws supplied     Technical Support  707  544 4761 1 www hurst shifters com    CONSOLE INSTALLATION    1  Measure depth from top of shifter to below top  of console     2  Adjust points of divider to measure depth     3  Scribe contours of floor along the side of  console as shown  Maintain divider in a  perpendicular plane while scribing     4  Trim portion below scribed line away  Fasten  console to shifter with two  8 x 1 3 4    Phillips  Head screws     INSTALLATION OF PRO MATIC 2 SHIFTER  1  Disconnect negative     battery cable        Caution  when removing or connecting the battery cable terminal  use care to avoid intermittent  contact  arcing or sparking  between battery post and terminal end  This generates voltage spikes  that can damage sensitive ECM  Electronic Control Module  components or memory circuits     2  Turn ignition key to    Unlock    position on steering column if equipped and place factory shifter in       Neutral    position     Column shift lever  remove drive pin that fastens shifter lever to column  then remove lever from    steering column  Dis
14. n must not be able to move in any other gear position  If the shifter can be moved to other gear  positions  column lock is not adjusted correctly and must be re adjusted        SHIFTER OPERATION   GEAR SHIFT PATTERN CHANGES   UPPER GATE MODE   GEAR SELECTION   The upper gear selection gate of the shifter operates    Park    and    Reverse     When in    Park    position   the shifter stick must be lifted to clear the safety stop between    Park    and    Reverse     then pulled  straight back to engage    Reverse     Once in    Reverse     the handle will drop down slightly and shifter is  ready to be pulled straight back to    Neutral     When    Neutral    is engaged the stick will drop again and  enter the lower gate  ratchet mode  of shifter   See Figure 9         DOWNSHIFTING  Dario Pavarce Lift stick  pull back to next detent for    Reverse      stick will drop down slightly   R Pull back to next detent for    Neutral      everse     l  Stick will drop down again   Neutral to Drive 3 Push down then pull back to stop position and  release for    Drive 3      Drive 3 to Drive 2 Pull back again to Stop position and release  for    Drive 2      Drive 2 to Drive 1 Pull back again to stop position and release  for    Drive 1        UPSHIFTING    Drive 1 to Drive 2 Push stick forward to stop position and release  for    Drive 2      Drive 2 to Drive 3 Push stick forward again to stop position and  release for    Drive 3           Drive 3 to Neutral Push stick forward to stop 
15. nnel and  against console scribing a line on the console to  match the contour of floor tunnel by keeping  dividers perpendicular to floor tunnel     Using a utility knife  carefully score a firm cut over the line scribed into console  To prevent any  unnecessary cracking  it is recommended that console be at room temperature before cutting or  trimming  Remove any burrs or rough edges with a small file     Insert indicator lens into chrome console cover and place onto console  fasten using two  2   8 x 3 4     Phillips head screws   Refer to Identification and Contents of Shifter Kit for correct placement of  indicator lens and screws      Place console onto shifter assembly and fasten to mounting tabs on shifter frame using two  2   8 x  1 3 4    Phillips head screws  Slide rubber boot over shifter stick and work it into the chrome console  cover  Thread shifter knob onto stick  turn to desired position and tighten jam nut against knob        Technical Support  707  544 4761 10 www HURST SHIFTERS com    GENERAL MOTORS VEHICLES EQUIPPED WITH STEERING COLUMN LOCK   Once all adjustments have been made and shifter functions properly  check operation of steering  column lock  It must operate in    Park    position ONLY  It is very important that the column lock be  adjusted correctly so that when shifter is placed into    Park    position  ignition key can be turned to       Lock    position  Steering wheel should lock and key should withdraw freely out of lock  The shifter  the
16. position and release  for    Neutral      Neutral to Reverse Lift stick upward  push forward to next  detent for    Reverse      Reverse to Park List stick upward  push forward to  stop position for    Park        Technical Support  707  544 4761 11 www HURST SHIFTERS com       CONTENTS OF SHIFTER KIT      Shifter Knob     Phillips Head Sheet Metal Screw   8 x 3 4       Phillips Head Sheet Metal Screw  8 x 1 3 4     Rubber Boot     Console Cover     Indicator Lens   Console     Shifter Assembly     Hex Head Bolt 1 4    20 x 1        U Type Clip Fastener 1 4    20 x 3 4       Indicator Light Assembly     Shifter Cable     Rubber Grommet 1 1 2    Diameter     Hex Head Bolt 1 4    20 x 3 4        Hex Nut 1 4    20     Flat Washer 3 16    I D      Cottern Pin 1 16        Cable Pivot     Hex Head Bolt 1 4    20 x 1 1 2        Flat Washer 1 4    I D      Hex Head Bolt 5 16    18 x 3 4        Female Wire Connector     Split Lockwasher 1 4    I D     OONOOAWD      Technical Support  707  544 4761    1630064  97093105  2   97093106  2   1148550  1958551  1690005  1298554  3830510  97080969  4   97093081  2   1660004  5008555  97093109  97090029  97000910  6   97000905  97093086  2   97X93089  97000913  97000818  4   97000416  2   2527600  4   97090082    12       TOOLS REQUIRED FOR INSTALLATION    2 or 4 Automotive Support Stands  Car Ramps   1 1 2    Hole Saw   9 32    Drill Bit   Tin Snips   Hacksaw  Ford Only   Hammer   File   Center Punch   Wire Strippers   Wire Crimping Tool   1 
17. rk    position and brake pedal pressure  applied  test starter motor operation in every gear position of the shift pattern  The starter must  operate in    Park    and    Neutral    gear positions ONLY  If starter operates in any other gear position  re   check wiring to be sure connections and adjustments of switches are correct  Test operation of back   up lights  they should operate in    Reverse    only  Turn    On    instrument panel and check illumination of  gear indicator lamp     Note  The Hurst neutral park start switch and back up light switch are pre adjusted from the factory  for your convenience  If adjustment is needed  loosen the screw located at the top of switch mounting  bracket  Pivot switch assembly inward until the required contact is made between switch and actuator  plate  Shifter must be in the correct gear selection  Park  Neutral  or Reverse when making this  adjustment        CONSOLE INSTALLATION  Note  In some applications shifter console must be trimmed to fit the contour of floor tunnel           Place console over shifter assembly and hold it  level with shifter  For proper installation  the  inside of console top must rest on the two  2   mounting tabs of shifter frame    Measure distance    A    from underside of console  to the console mounting tabs on shifter  assembly  See Figure 10   Using a pair of  dividers set to the dimension of distance    A      touch one end of dividers to console and other  end to floor tunnel  Drag along floor tu
18. ter pin     Proceed to section that applies to the model and transmission of your vehicle     Technical Support  707  544 4761 3 www HURST SHIFTERS com        GENERAL MOTORS    Turbo Hydramatic 350 and 400  1  Remove backdrive linkage rod and LRGURE     eh E UEI OE HE Neer alae  stock transmission arm from gear selector RELIJ    shaft on transmission using a 9 16    socket G9  AN  and replace with Hurst transmission arm se Gabi END  PT  1058561 re using stock bolt or nut  i  Transmission arm must be installed with   round hole down and bend in arm    positioned away from transmission   See  Figure 4         Paan  STOCK      HARDWARE      ADJUSTMENT SLOT FOR ALIGNMENT  OF SHIFTER CABLE PIVOT TO TRANS ARM    IMPORTANT   VEHICLES EQUIPPED WITH STEERING COLUMN LOCK   In some applications the stock backdrive linkage system that locks the steering column and shifter in     Park    position may be retained depending on the stock transmission arm configuration     One side of the stock transmission arm must   have a flat unobstructed surface in order to GM TH350 AND 400   be used and retain the factory backdrive PE     oe POSITION OF FACTORY TRANS ARM ON TO HURST   linkage system  Carefully position Hurst TRANS ARM FOR WELDING OPERATION  transmission arm on top of or behind the   stock transmission arm as illustrated   See   Figure 3   The alignment of the mounting     slots in both transmission arms is very     penis  important  With slots aligned  clamp arms d ao  together and weld
19. witch that are found on some ford fete tease lll  transmissions should be disconnected and   discarded   See Figure 6      DOWNSHIFT LEVER    3  The stock transmission arm must be modified  in order to install Hurst transmission arm Pt  105  8559  Lower section of stock transmission arm  must be removed  See Figure 6A  to provide    HURST TRANSMISSION ARM INSTALLATION    STOCK TRANSMISSION ARM    clearance for Hurst transmission arm  Using a  hacksaw  cut shaded section of transmission  arm off so remaining arm is completely flat   Install Hurst transmission arm onto stock  transmission arm pointing downward  with bend  in arm away from transmission  Use 1 4    x 1 1 2     hex bolt  1 4    split lockwasher  and 1 4    hex nut  to secure Hurst transmission arm in place  Re   install downshift lever  make sure o ring is in  position before installing lever onto shaft   Downshift lever must move freely     4  C 4  Two  2  lower bolts  E  on the rear  servo cover  F   must be removed  Install Hurst  cable bracket Pt  117 8558 onto servo cover   re using factory bolts and tighten securely      See Figure 6B      Technical Support  707  544 4761    TRANSMISSION ARM    BE SURE TRANSMISSION CONTROL  SHAFT IS IN NEUTRAL POSITION  CUT STOCK  ARM OFF HERE    C 4 TRANSMISSION       PARK    NEUTRAL     29        www HURST SHIFTERS com    C 6  Two  2  transmission oil pan   C 6 TRANSMISSION  bolts at the left rear corner must be   removed to install the Hurst cable   TRANSMISSION ARM   bra
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
AVG Internet Security Business Edition 2012  Ressources pédagogiques et liens sur le thème du jardin sensoriel    IMPRESSA E70/75 Instructions for use  Emerson EWC1303A TV VCR Combo User Manual  MOVIDRIVE® MD_60A Drive Inverters / Operating Instructions  Polk Audio AM5092-A User's Manual    Zotac ZT-70504-10P NVIDIA GeForce GTX 780 Ti 3GB graphics card  KWC SUPRIMO 10.271.303 User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file