Home
        Installation & Operation Manual
         Contents
1.                                Terminal      Block     o  DUAL VOLT      TOGGLE SWITCH      ITCB DV HV ITCB DV HV TWIN    ELECTRICAL HOOK UP       Models        CAUTION   Improper electrical installation will damage electronic components  Damage caused by incor   rect electrical connections is not covered by warranty     An electrician must provide electrical service    Determine the available on site electrical service     Steps 3  amp  9 apply to DV models only  Select the desired unit voltage based on the available on site elec   trical service    Using a voltmeter  check the voltage and color coding of each conductor at the electrical source    Remove the front panel to gain access to the terminal block    Feed the power cord through the strain relief and connect it to the terminal block    Connect the power cord to the terminal block as shown    Before proceeding  verify the voltage at the field wiring terminal block    Set voltage switch to the appropriate position and replace the access panel    0  If plumbing is to be hooked up later be sure the brewer is disconnected from the power source  If plumb   ing has been hooked up  the brewer is ready for Initial Set Up     6 36748 3 041714                 pm    CE Requirements      This appliance must be installed in locations where it can be overseen by trained personnel      For proper operation  this appliance must be installed where the temperature is between 5  C to 35  C      Appliance shall not be tilted more than 10
2.              2                      3   User                    4   Electrical Requirements  TB TGB DY                                                    5   Electrical Requirements  ITGB DV HV ATWIN                     6   Plumbing Requirements Optional                                                                          7   Operating                                                                        8           MC                            9      T 10               10   Cleaning Tank    11   Sanitizing Optional SUWBBIGHOI oie rie EE dp emer tries            12   Programming                            etus      ase p oae 15   je E RT   __  120V Infusion Tea Brewer                                                       220 Volt Brewer  ME                      UM MEM E CE UE  Dual Dilution  Ini c CE                            Low Profile Machine                 Dual Voltage                       Dual Voltage High Volume                                Dual Voltage Brewer for Canada                                 230 Volt Brewer  MOBB                                                      200 Volt Brewer   p  e WHERE 2 Brew Stations    3 36748 3 100114    USER NOTICES    Carefully read and follow all notices in this manual and on the equipment  All labels on the equipment should  be kept in good condition  Replace any unreadable or damaged labels        As directed in the International Plumbing Code of the  International Code Council and the Food Code  Manual of the Food 
3.          Models with factory installed sweetener    8  Press and hold the left hidden switch until the display reads   SanitizeSweetnr   Press  YES   Next screen will   ask  CONTAINER READY     9  Press  YES   Allow solution to flow from dilution nozzle for a few seconds    10  Press any brew switch to stop  Display will read  SOAKING  and count down from 15 minutes  Display will  now read  SOAP PURGE    11  Remove the special sanitizing fittings  or empty  cut    1    fittings from the    1     disconnects  QCD   s  and  re connect the QCD fittings to the appropriate           container   You will now begin the process of bringing  syrup back through the system    a  Place empty tea dispenser under unit  b  Place empty brew basket into funnel rails   12  Press  START   Next screen will ask  CONTAINER READY     13  Press  YES   Continue with brew cycle until syrup is flowing freely from the dilution nozzle    14  Press any brew switch to stop  Display will read  SANITAION COMPLETE  and return to home screen     Models with field installed sweetener kit   8  The next steps are to initiate a brew cycle and draw sanitizer through the system   a  Place empty tea dispenser under unit   b  Place empty brew basket into funnel rails  c  Push appropriate brew button for Sweet Tea  brew cycle will initiate   d  Continue with brew cycle until the sanitizing solution is flowing from the dilution nozzle   e  Push the    Enable Brew on off    button to stop the brew cycle and then push aga
4.    for safe operation     An electrician must provide electrical service as specified in conformance with all local and national codes      This appliance must not be cleaned by water jet      This appliance is not intended for use by persons  including children  with reduced physical  sensory or mental  Capabilities  or lack of experience and knowledge  unless they have been given instructions concerning use of  this appliance by a person responsible for its safety      Children should be supervised to ensure they do not play with the appliance        f the power cord is ever damaged  it must be replaced by the manufacturer or authorized service personnel  with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard     Machine must not be immersed for cleaning     PLUMBING REQUIREMENTS    These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi  138  and 620 kPa  from a 1 2    or larger supply line  A shut off valve should be installed in the line before the brewer   Install a regulator in the line when pressure is greater than 90 psi  620 kPa  to reduce it to 50 psi  345 kPa    The water inlet fitting is  75 11 5 NH  HOSE THREAD   For convenience an elbow adaptor is provided to convert  to a 1 4  flare fitting  3 8  flare on Twins   Bunn O Matic does not recommend the use of a reverse osmosis       deionized water supply to this equipment  REQUIRED  1 25 gpm  4 73 Ipm  flow ra
5.   amp  HV    ON OFF      ON OFF  BREW 1   BREW       ITCB TWIN HV    a  ENABLE    ENABLE Y    ON OFF   ON OFF   BREW BREW            SERIES            Brewer Control       a  Right Programming  hidden  switch  just to the right of the display   This is used to access the program   ming mode  and is also used to scroll forward through the function list    b  Left Programming  hidden  switch  just to the left of the display   This is used to scroll backwards through  the function list    c  Brew A B C  Digital Brewer Control   Twins Only   Used to select options that appear on the display during  programming     13 36748 3 111010    PROGRAMMING THE BREWER  The programming of the brewer is divided into two levels  There is one function in Level 1  All other functions  are accessed in Level 2   The following function screens are in order of appearance  Each screen will have instructions on how to  access and the procedures to program the various functions of the brewer     IMPORTANT PROGRAMMING NOTES    READ CAREFULLY     To exit the programming mode at any time  press and release the ON OFF pad located on the front switch  panel  The display will return to the MAIN SCREEN    If none of the five programming switches are pressed within one minute during the setup of the brewer   the programming of the function screen that is being set will be exited and the display will return to the MAIN  SCREEN    Always remember to place a container and funnel under the sprayhead when operating
6.  Pour O Matic  BUNN  BUNN with  the stylized red line  BUNNlink  Bunn OMatic  Bunn O Matic  BUNNserve  BUNNSERVE with the stylized wrench design   Cool Froth  DBC  Dr  Brew stylized Dr  design  Dual  Easy Pour  EasyClear  EasyGard  FlavorGard  Gourmet Ice  Gourmet  Juice  High Intensity  iMIX  Infusion Series  Intellisteam  My Caf    Phase Brew  PowerLogic  Quality Beverage Equipment  Worldwide  Respect Earth  Respect Earth with the stylized leaf and coffee cherry design  Safety Fresh  savemycoffee com   Scale Pro  Silver Series  Single  Smart Funnel  Smart Hopper  SmartWAVE  Soft Heat  SplashGard  The Mark of Quality in  Beverage Equipment Worldwide  ThermoFresh  Titan  trifecta  TRIFECTA  sylized logo   Velocity Brew  Air Brew  Beverage  Bar Creator  Beverage Profit Calculator  Brew better  not bitter   Build A Drink  BUNNSource  Coffee At Its Best  Cyclonic  Heating System  Daypart  Digital Brewer Control  Element  Milk Texturing Fusion  Nothing Brews Like a BUNN  Picture  Prompted Cleaning  Pouring Profits  Signature Series  Sure Tamp  Tea At Its Best  The Horizontal Red Line  Ultra are either  trademarks or registered trademarks of Bunn O Matic Corporation  The commercial trifecta   brewer housing configura   tion is a trademark of Bunn O Matic Corporation     2 36748 3 031314    INTRODUCTION  ITB   This equipment will brew tea into an awaiting dispenser or reservoir    The ITB uses recipe settings to brew tea  It has an LCD for digital readout and programming  The user 
7.  the brewer during  the set up of CALIBRATE FLOW  and testing the brew and dilution valves in SERVICE TOOLS TEST OUTPUTS     MAIN SCREEN    This screen will be shown when the brewer is ready  for use  The screen displays the water temperature  in the tank  When the water in the tank reaches the  correct set temperature  the display will change from  HEATING to READY TO BREW        Dese Brewer Contro       UNLOCK            tk    PROGRAMMING LOCKOUT SWITCH      ITCB located on the memory module board prior to  ITCB HV S N ICB0007479   located on the main control board S N 1CB0007479   and after    ITB located on the main control board    LOCK    PROGRAMMING   LOCKOUT SWITCH   This switch can be set to prevent access to the  programming settings of the brewer  Once all the cor   rect brew Settings are programmed  the operator can  set the switch to the        position to prohibit anyone  from changing the settings  With the switch in the   ON  position  the programming menus can still be  accessed to view the current settings  However  no  changes will be saved        ITB ONLY    NOTE  ITB Switches A B  amp  C are not used     14 36748 3 111010    ITB    PROGRAMMING FUNCTIONS   FLOW CHART    PROGRAMMING FUNCTIONS   LEVEL             Desa  Brewer               PROGRAMMING FUNCTIONS   LEVEL 2    Digitar Brewer Controt Digital Brewer Controt Digitar Brewer Control Digitar Brewer Control                 Brewer                           Brewer Control           Brewer               
8. 4  Slide the funnel into the funnel rails  The brewer will read the coffee name and size ground through the chip  in the funnel handle   NOTE  The brewer will automatically match the brew batch size to the grinder batch size        GRINDER BREWER  Small Half Batch  Medium Full Batch  Large  Full Batch      f BREW is pressed with a large grinder batch  the display will read  INCORRECT GRIND   BATCH SIZE WRONG    and then PRESS BREW      BREW ANYWAY    5  Place an empty server under the funnel    6  The ON OFF must be ON    7  Momentarily press and release the assigned BREW switch  There may be certain situations in which the brew  cycle will not begin when BREW is pressed   a  SWITCH NOT ON   ON OFF must be ON   b  BREW TEMPERATURE TOO LOW     wait until heated or cancel BREW LOCKOUT option       CHECK FUNNEL   remove funnel  empty previously brewed grounds and replace with fresh   d  INCORRECT GRIND   Indicates a large batch was ground using the grinder  Check batch size and grind  weight    8  If none of the above messages are displayed  the display will read NOW BREWING and show the time remain   ing in the brew cycle    9  Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the  coffee no longer drips from the funnel tip    10  Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops     CLEANING  CAUTION     CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY  1  Remove and thoroughly cle
9. CANTER    IF       CRACKED    SCRATCHED     00824 0002          WHEN EMPTY           USED ON HIGH FLAME  FUNNEL CONTENTS    on EXPOSED ELECTRIC  ARE HOT ELEMENTS    READ THE ENTIRE OPERATING        BEFORE USING THIS PRODUCT  FAILURE TO COMPLY RISKS INJURY     00658 0000       To reduce the risk of electric shock     do not remove or open cover    No user serviceable parts inside   Authorized service personnel only   Disconnect power before servicing        37881 0000       REMOVE FUNNEL  SLOWLY     03408 0000    REH     03409 0000               Fill water tank before turning   on    thermostat or connecting appliance  to power source       Use only on a properly protected  circuit capable of the rated load       Electrically ground the chassis      Follow national local electrical codes        Do not use near combustibles     FAILURE TO COMPLY RISKS EQUIPMENT  DAMAGE  FIRE  OR SHOCK HAZARD    READ THE ENTIRE OPERATING MANUAL  BEFORE BUYING OR USING THIS PRODUCT    THIS APPLIANCE IS HEATED WHENEVER  CONNECTED TO A POWER SOURCE    00831 0000F 3 98   1998 BUNN O MATIC CORPORATION        00831 0000 ITB               4 and aligned with Make sure Funnel is rotated an          el is rotate               ake sure uis the RIGHT side to avoid Tea Dispenser on the LEFT      aligned with      Tea 015 qudm and water spills  potential burns and Water spills O avoid    tial bu                          TIL    poten  __               41995 0000 ITB DD    4 36748 3 112912    ELECTRICAL REQUIRE
10. Des Brewer Control    Digitar Brewer Control Digitar Brewer               Digitar Bewer Control    eee ee              Brewer Conor  Desa Brewer Contror           Brewer Control Digital Brewer Control    Digital Brewer Control Digital Brewer             Digital Brewer Control    15 36748 3 111010                        Deiat Brewer Control               ITCB    PROGRAMMING FUNCTIONS   FLOW CHART    PROGRAMMING FUNCTIONS   LEVEL                    Brewer Controt       PROGRAMMING FUNCTIONS   LEVEL 2    Digitar Brewer Control Digital Brewer Contror Digital Brewer Control Digitar Bewer Contror                 Brewer Control           Brewer Control         Brewer Contro    Digitar Brewer Controt Digitar Brewer Conor  Digitar Bewer Control           Brewer                            ee                     Brewer Control Digital Brewer Controt           Brewer Control Digital Brewer Control    Digital Brewer Control           Brewer Controt Dena Brewer                              Brewer Control                                           Digital Control    16 36748 3 111010    ITCB DV HV    PROGRAMMING FUNCTIONS   FLOW CHART    PROGRAMMING FUNCTIONS   LEVEL   aes    Desa  Brewer Control       PROGRAMMING FUNCTIONS   LEVEL 2              Brewer Control Digital Brewer Control           Brewer Control       Brew er Control                      Brewer Conor Desa  Brewer                   Brewer Control           Brewer Control    Digital Brewer Control Digitar Brewer Control         Br
11. ITBATCB  ITCB DV HV  ITCB TWIN HV    Infusion Series            INSTALLATION  amp  OPERATING GUIDE    BUNN O MATIC CORPORATION  POST OFFICE BOX 3227  SPRINGFIELD  ILLINOIS 62708 3227  PHONE   217  529 6601 FAX   217  529 6644    www bunn com  To ensure you have the latest revision of the Operating Manual  or to view the Illustrated Parts  Catalog  Programming Manual  or Service Manual  please visit the Bunn O Matic website  at  www bunn com  This is absolutely FREE  and the quickest way to obtain the latest catalog and  manual updates  For Technical Service  contact Bunn O Matic Corporation at 1 800 286 6070              0   5  36748 0003E 10 14   2010 Bunn O Matic Corporation       BUNN 0 MATIC COMMERCIAL PRODUCT WARRANTY  Bunn O Matic Corp      BUNN     warrants equipment manufactured by it as follows     1  Airpots  thermal carafes  decanters  GPR servers  iced tea coffee dispensers  MCR MCP MCA single cup brewers  ther   mal servers and ThermoFresh   servers  mechanical and digital  1 year parts and 1 year labor    2  All other equipment   2 years parts and 1 year labor plus added warranties as specified below    8  Electronic circuit and or control boards   parts and labor for 3 years    b  Compressors on refrigeration equipment   5 years parts and 1 year labor    c  Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis   parts and  labor for 4 years or 40 000 pounds of coffee  whichever comes first     These warranty 
12. MENTS ITB  amp  ITCB DV    Refer to Data Plate on the Brewer  and local national electrical codes to determine circuit  requirements      Optional Field Wiring ratings are located on the machine near the dataplate       WARNING   The brewer must be disconnected from the power source until specified     WARNING   The power cord must be UL Listed  Flexible Cord Type SO  SJO  SJTO  HSJO or SJOW  Rated 90    C  and the attachment plug cap must be UL Listed  in order to avoid a hazard  The Power Supply Cord must  be at least 3 feet long and maximum 6 feet long  measured from Strain Relief to end of the Attachment  Plug Cap      ITB   120V models require 2 wire  grounded service rated 120 volts AC  15 amp  single phase  60Hz     POWER CORD  POWER CORD                               ITCB DV  ONLY    DUAL VOLT     TOGGLE SWITCH 220 240V 2 WIRE   GROUND       ELECTRICAL HOOK UP       Models     CAUTION   Improper electrical installation will damage electronic components  Damage caused by incor   rect electrical connections is not covered by warranty       Anelectrician must provide electrical service    Determine the available on site electrical service     Steps 3  amp  9 apply to DV models only  Select the desired unit voltage based on the available on site elec   trical service    Using a voltmeter  check the voltage and color coding of each conductor at the electrical source    Remove the back panel to gain access to the terminal block    Feed the power cord through the strain reli
13. an the entire brew funnel  The funnel tip and screen must be free from any tea  particles or residue  Reassemble the funnel   2  Remove and thoroughly rinse the sprayhead  The holes must be open and clear of any mineral deposits  Wipe  the sprayhead panel clean with a damp cloth   NOTE   Any buildup on the sprayhead may restrict water flow  and impact your brewing  For consistently great  tea and coffee  clean sprayhead weekly with sprayhead cleaning tool   38227 0000   Upon visual inspection it  may appear that light passes through all holes in the sprayhead  but a thin film of residue can pass light and still  impede water flow   a  Remove sprayhead from brewer   b  Use the pointed end of sprayhead cleaning tool to remove any mineral deposits from the sprayhead holes   c  Insert the long end of sprayhead cleaning tool into the sprayhead fitting  and rotate several times to  remove any mineral deposits from the fitting   3  The use of a damp cloth rinsed in any mild  nonabrasive  liquid detergent is recommended for cleaning all  surfaces on Bunn O Matic equipment  Do NOT clean this equipment with a water jet device   CAUTION   DO NOT KEEP BREWED ICED TEA OVERNIGHT  THE SERVER MUST BE CLEANED DAILY        TANK DRAIN   1  Remove back access cover  front cover on HV     2  Close the white shutoff clamp on the long hose between tank and inlet solenoid    3  Disconnect the hose clamp and hose from inlet solenoid or check valve    4  Place the end of the drain hose in a container 
14. and Drug Administration  FDA    this equipment must be installed with adequate    backflow prevention to comply with federal  state  and local codes  For models installed outside the  U S A   you must comply with the applicable Plumb   ing  Sanitation Code for your area                  00656 0001         DO NOT OVERLOAD CIRCUIT      ALWAYS ELECTRICALLY GROUND  THE CHASSIS      DO NOT DEFORM PLUG OR CORD      FOLLOW NATIONAL AND LOCAL  ELECTRICAL CODES      KEEP COMBUSTIBLES AWAY     FAILURE TO COMPLY RISKS EQUIPMENT  DAMAGE  FIRE OR SHOCK HAZARD   READ THE ENTIRE  OPERATING MANUAL BEFORE    USING THIS PRODUCT  00986 0000   10 07   1994 Bunn O Matic Corporation     00986 0000 ITCB             For 120 208V or 120 240 volt operation   replace Power Supply Cord only with  Bunn O Matic part number 01699 0000      34072 0000 ITCB        Incorrect programming could result in accidental dispens   ing of HOT LIQUID     Trained personnel are to follow instructions provided for  software programming     Use of additional graphic layer requires disabling of  appropriate switches     Read all instructions for additional graphic layer prior to  installing and programming           TENTS     39175 0000       Risk of Fire  Use a UL listed grounding  type attachment plug  rated 125 250  Vac  30 A  1 phase  4 conductor  Plug  to be selected and installed only by  qualified service personnel           38125 0000   04 05   2005 Bunn O Matic Corporation     38125 0000 TWIN             DISCARD DE
15. ef and connect it to the terminal block s     Connect the power cord to the terminal block as shown    Before proceeding  verify the voltage at the field wiring terminal block    Set voltage switch to the appropriate position and replace the access panel    0  If plumbing is to be hooked up later be sure the brewer is disconnected from the power source  If plumb   ing has been hooked up  the brewer is ready for Initial Set Up     CON             O02 Soro    5 36748 3 041714    ELECTRICAL REQUIREMENTS ITCB DV HV  amp  TWIN    Refer to Data Plate on the Brewer  and local national electrical codes to determine circuit  requirements       Optional Field Wiring ratings are located on the machine near the dataplate    WARNING   The brewer must be disconnected from the power source until specified     WARNING   The power cord must be UL Listed  Flexible Cord Type SO  SJO  SJTO  HSJO or SJOW  Rated 90  C   and the attachment plug cap must be UL Listed  in orderto avoid a hazard  The Power Supply Cord must be at  least 3 feet long and maximum 6 feet long  measured from Strain Relief to end of the Attachment Plug Cap      ITCB HV TWIN   requires 3 wire  grounded service rated 120 208 240 volts AC  30 amp  single phase   60Hz    ITCB DV HV   120V models require 2 wire  grounded service rated 120 volts AC  15 amp  single phase   60Hz  or 3 wire  grounded service rated 120 208 240 volts AC  20 amp  single phase  60Hz     ITCB DV HV  amp  TWIN ITCB DV HV ONLY    POWER CORD       POWER CORD
16. ewer Control         Brewer Control          Deme Brewer Control Desa Brewer Contror              Brewer                         Brewer Control    Digital Brewer Control Digitar Brewer Control Digitar Brewer Control    Desa  Brewer Controt Digital Brewer Contror Digital Brewer Controt                                                          17 36748 3 111010    ITCB HV TWIN    PROGRAMMING FUNCTIONS   FLOW CHART    PROGRAMMING FUNCTIONS   LEVEL           Desa  Brewer Control       PROGRAMMING FUNCTIONS   LEVEL 2              Brewer Controt           Brewer Control           Brewer                         Brewer Control    Deme Brewer Conor  Digital Brewer Control Digitar Brewer                         Brewer Contror              Digitat Brewer Control Digital Brewer Control      Deme Brewer Control Digital Brewer Contro  ee ee 3              Brewer Control Digital Brewer Control Dena Brewer                         Brewer Control              Digital Brewer Control           Brewer                     Brewer             Digital Brewer Control         Brewer Control Digital Brewer Control         Brewer Control           Brewer Control       Desa Brewer Contro          Brewer Control    18 36748 3 111010    
17. in to cancel the brew  cycle  f  Allow sanitizer to remain in lines for fifteen  15  minutes   9  Remove the special sanitizing fittings  or empty  cut          fittings from the    1     disconnects  QCD s  and re   connect the QCD fittings to the appropriate          container   You will now begin the process of bringing syrup  back through the system   a  Place empty tea dispenser under unit  b  Place empty brew basket into funnel rails  c  Push appropriate brew button for Sweet Tea  brew cycle will initiate   d  Continue with brew cycle until syrup is flowing freely from the dilution nozzle  You may need to repeat steps     a    through    d    until syrup is dispensing from the dilution nozzle     12 36748 3 111010    PROGRAMMING  Using the menu driven display on the front of the brewer  the operator has the ability to alter or modify various  brewing parameters such as brew temperatures  brew volumes  dilution volumes  pulse brew  etc  This allows  for the precise brewing of various flavors of tea and coffee   Programming of the brewer is achieved by entering a certain function  Then  by the use of hidden  programming switches and the brew function switches  the operator can customize the brewing process to their  specifications     PROGRAMMING SWITCHES  To access the programming mode  and to scroll through the different function screens  hidden programming  switches are used  There are five of these switches that will be used for the setup of the brewer     ITB ITCB DV
18. is able  to select regular or quick brew for tea programming  Other features include Pre Infusion and Pulse Brew  quick  and standard brew  Energy Savings mode  BUNNLink compatible  Freshness Timer  Sanitation Alert  and brew  counters  Available in low profile  dual dilution and sweetener models     ITCB DV ITCB DV HV   This equipment will brew either tea or coffee into an awaiting dispenser or reservoir  It can be easily configured  for 120V or 120 208V 120 240V  Refer to data plate for specific ratings   The brewer may have an auxiliary hot  water faucet that can be mounted on the front  left or right side     ITCB HV TWIN  This equipment will brew either tea or coffee into an awaiting dispenser or reservoir in either the left or right  side brewing station  The brewer may have an auxiliary hot water faucet that can be mounted on the front  left  or right side   This equipment is only for indoor use on a sturdy counter or shelf     The Infusion Series combines BrewWISE  CDBC and Tea Brewers into one  ITCB is able to brew both tea  and coffee with recipe settings  It has an LCD for digital readout and programming along with the Smart Funnel  options for coffee  The user is able to select regular or quick brew for tea programming  Other features include   Pre Infusion  Pulse Brew  quick and standard brew  and BrewWISE  Energy Savings mode  BUNNLink compat   ible  Smart Reader compatible  Freshness Timer  Sanitation Alert  and sweetener with low product detection     CONTENTS
19. lter  Approximately three to five ounces is recommended  for three gallons of beverage   Level the bed of tea leaves by gently shaking   Slide the funnel into the funnel rails until it stops  On dual dilution models  rotate the funnel handle left or  right to align the funnel discharge over the reservoir   The ON OFF must be ON  Select which batch size to brew   Momentarily press and release the assigned BREW switch  There may be certain situations in which the  brew cycle will not begin when BREW is pressed   a  SWITCH NOT ON   ON OFF must be ON   b  BREW TEMPERATURE        LOW     wait until heated or cancel BREW LOCKOUT option       CHECK FUNNEL   remove funnel  empty previously brewed leaves and replace with fresh tea leaves   d  DISABLED   select different brew switch or batch size   If none of the above messages are displayed  the display will read NOW BREWING and show the time re   maining in the brew cycle   Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the  tea no longer drips from the funnel tip     10  Carefully remove the brew funnel and discard the tea leaves and filter only after visible dripping stops     COFFEE BREWING  ITCB HV ONLY     WITHOUT A SMART FUNNEL AND G9 2T DBC GRINDER                        8     9       Begin each brew cycle with a clean empty brew funnel    Insert a BUNN filter into the funnel    Pour the fresh coffee into the filter and level the bed of grounds by gently shaking    Slide the f
20. ng range for sweetener is 25 60psi  35psi recommended     7 36748 3 062111    OPERATING CONTROLS    ITCB DV  amp  HV    F             Brewer Control            A  ENABLE BREW  ON OFF  SWITCH   Pressing the ENABLE BREW  ON OFF  switch pad will alternately turn the brewer on and off  Pressing this  pad during the brew cycle will interrupt the brew cycle  stopping the flow of water  Pressing this pad during  programming of the brewer will exit the setup and return to the main screen     B  PROGRAMMING  left   This hidden pad can be used to scroll backwards through the function list while in programming mode     C  BREW  A B C  and FUNCTION   When the ENABLE BREW is ON and the brewer is on the main screen  not in programming mode   momen   tarily pressing and releasing this pad will begin a brew cycle  These are also used to program the brewer when  in the programming mode     D  PROGRAMMING  right   Pressing and holding this pad allows entry into the programming menus  Pressing and releasing the pad  steps through each function screen while in the programming mode     E  BATCH SELECTOR PADS   Pressing the pad corresponding to the Half or Full batch selects the amount of product to be brewed  Pressing  a different pad after a brew cycle has been initiated does not change the brew batch in progress  Light indicates  the selected batch to brew  Also used in programming to adjust settings on both batch sizes     F  FUNCTION SCREEN  This is the display which shows the various functio
21. ns of the brewer and allows the programming to be ac   complished     G  FUNNEL SENSING COIL  ITCB ONLY   This is used to  receive  information from the Smart Funnel handle  recipe cards  and ad cards     H  FUNCTION SCREEN SWITCHES  Digital  This is used to select options  NO    that appear on the display during programming   Brewer  This is used to select options  DONE  that appear on the display during programming   Control  This is used to select options  YES    that appear on the display during programming     8 36748 3 111010            INITIAL SET UP    Insert an empty funnel into the funnel rails    Place an empty server under the funnel    Connect the brewer to the power source  Make sure  the ON OFF switch is ON  LED will be lit     Water will flow into the tank and stop when the tank  is filled to its capacity  Display will show PLEASE  WAIT   TANK FILLING until tank is filled with water   Wait approximately twenty minutes for the water in  the tank to heat to the proper temperature  Display  will show READY TO BREW   WATER TEMP  205    when tank is at operating temperature  Some water  will drip from the funnel during this time  this is due  to expansion and should not occur thereafter   MODELS w FAUCET  Place a small container beneath  the faucet and open the faucet handle  Release it when  you hear the tank refilling    Water volumes and flow settings have been preset at  the factory  Refer to the Programming Manual should  the volume need to be increased or dec
22. odifications to this warranty or to make additional warranties that are binding on BUNN  Accordingly  statements by such  individuals  whether oral or written  do not constitute warranties and should not be relied upon    If BUNN determines in its sole discretion that the equipment does not conform to the warranty  BUNN  at its exclusive op   tion while the equipment is under warranty  shall either 1  provide at no charge replacement parts and or labor  during the  applicable parts and labor warranty periods specified above  to repair the defective components  provided that this repair  is done by a BUNN Authorized Service Representative  or 2  shall replace the equipment or refund the purchase price for  the equipment    THE BUYER S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS  EQUIPMENT  WHETHER DERIVED FROM WARRANTY OR OTHERWISE  SHALL BE LIMITED  AT BUNN S SOLE OPTION  AS SPECIFIED HEREIN  TO REPAIR  REPLACEMENT OR REFUND     In no event shall BUNN be liable for any other damage or loss  including  but not limited to  lost profits  lost sales  loss of  use of equipment  claims of Buyer s customers  cost of capital  cost of down time  cost of substitute equipment  facilities  or services  or any other special  incidental or consequential damages     392  A Partner You Can Count On  Air Infusion  AutoPOD  AXIOM  BrewLOGIC  BrewMETER  Brew Better Not Bitter  Brew   WISE  BrewWIZARD  BUNN Espress  BUNN Family Gourmet  BUNN Gourmet  BUNN
23. periods run from the date of installation BUNN warrants that the equipment manufactured by it will be  commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the  applicable warranty period  This warranty does not apply to any equipment  component or part that was not manufactured  by BUNN or that  in BUNN s judgment  has been affected by misuse  neglect  alteration  improper installation or operation   improper maintenance or repair  non periodic cleaning and descaling  equipment failures related to poor water quality   damage or casualty  In addition  the warranty does not apply to replacement of items subject to normal use including but  not limited to user replaceable parts such as seals and gaskets  This warranty is conditioned on the Buyer 1  giving BUNN  prompt notice of   any claim to be made under this warranty by telephone at  217  529 6601 or by writing to Post Office Box   3227  Springfield  Illinois 62708 3227  2  if requested by BUNN  shipping the defective equipment prepaid to an authorized  BUNN service location  and 3  receiving prior authorization from BUNN that the defective equipment is under warranty   THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY  WRITTEN OR ORAL  EX   PRESS OR IMPLIED  INCLUDING  BUT NOT LIMITED TO  ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY  OR FITNESS FOR A PARTICULAR PURPOSE  The agents  dealers or employees of BUNN are not authorized to make  m
24. reased    The brewer is now ready for use in accordance with the  instructions for Tea Brewing and Coffee Brewing     Brew water temperature is factory set at 205   F  96 1   C   Areas of high altitude will require lowering this tempera   ture to prevent boiling  This chart should be used as a  guide when readjusting the brew water temperature     Altitude Boiling point  of water   Feet               Recommended  water temperature           C                                                                   VIEWING ASSIGNED RECIPES    Make sure the ON OFF switch is OFF  LED will not be lit         Press and hold BREW A  The display will show the name of the recipe assigned to Brew A along with SWITCH  NOT ON  This is to indicate that a brew cannot be initiated while the ON OFF switch is OFF     Repeat for BREW B and BREW C    Twins only  Repeat steps 1  3 for other side     Make sure the  ENABLE BREW ON OFF  switch is OFF  To view the asset number of the machine  press and  hold the left hidden button until the display reads  ANXXXXXX    ASSET NUMBER  Release the left hidden    button     After a 5 second delay  the display will read                        This is the serial number of the machine     36748 3 111010    8     9     TEA BREWING  Begin each brew cycle with a clean empty brew funnel and server   Be sure the server lid doesn   t interfere  with the flow of dilution water    Insert a BUNN filter into the funnel   Pour the packet of loose fresh tea leaves into the fi
25. te from water supply line     NOTE   Bunn O Matic recommends 3 8  copper tubing for all installations from the 1 2  water supply line  A tight  coil of tubing in the water line will facilitate moving the brewer to clean the counter top  Bunn O Matic does not  recommend the use of a saddle valve to install the brewer  The size and shape of the hole made in the supply  line by this type of device may restrict water flow     As directed      the International Plumbing Code of the International Code Council and the Food Code Manual  of the Food and Drug Administration  FDA   this equipment must be installed with adequate backflow pre     vention to comply with federal  state and local codes  For models installed outside the U S A   you must  comply with the applicable Plumbing  Sanitation Code for your area        Plumbing Hook Up   1  Remove the shipping cap from the fitting on the rear of the brewer    2  STANDARD MODELS  Securely attach adaptor elbow assembly to the  75 11 5 NH  HOSE THREAD  fit   ting at the rear of the brewer    TWIN MODELS  Securely attach the tube assembly  supplied in parts box  to water supply line  Securely  attach the elbow assemblie to the  75 11 5 NH  HOSE THREAD  fittings at the rear of the brewer  Connect the  tube assembly to the elbows    3  Flush the water line and Securely attach it to the adaptor elbow   4         on the water supply     OPTIONAL SWEETENER  Connect sweetener line to fitting on back of brewer labeled  SWEETENER    NOTE  Operati
26. that has a minimum capacity of 2 0 gallons  7 5 L  ITB ITCB    3 5Gal 13 25L for HV single or 6 0Gal 22 7L for HV Twin     5  Release the white clamp to drain water from the tank    6  When tank is empty  replace the hose onto solenoid  or flow control  and tighten the black clamp   NOTE  Do not tighten white clamp    7  Replace the access cover    8  On HV units  use care so you do not pinch the dilution hoses when replacing cover     11 36748 3 092712    SANITIZING OPTIONAL SWEETENER   All Models      Remove all the quick disconnects  QCD  from all the          containers      Fill a suitable pail or bucket with a warm soapy tap water solution   140         3  Submerge all disconnects  gas and liquid  in the soapy solution and then clean them using a nylon bristle   brush   Do not use a wire brush   Rinse with clean water    Using a plastic pail  prepare approximately five  5  gallons of Kay 5  or equivalent  sanitizing solution with at   least 100 ppm of available chlorine in 120   F water      Rinse the    1     disconnects  QCD   s  in the sanitizing solution      Special sanitizing fittings must be attached to each    1     disconnect  QCD   s   If these fittings are not available   the fittings from empty    1     bags can be cut from the bags and used  These fittings open the    disconnect     so the sanitizing solution can be drawn through the disconnect opening    T  Place all the B I B  disconnects  QCD   s  into the pail of sanitizing solution     N               
27. unnel into the funnel rails until it stops    Place an empty server under the funnel    The ON OFF must be ON  Select the FULL batch size    Momentarily press and release the assigned BREW switch  There may be certain situations in which the brew  cycle will not begin when BREW is pressed    a  SWITCH NOT ON   ON OFF must be ON    b  BREW TEMPERATURE TOO LOW   wait until heated or cancel BREW LOCKOUT option    c  CHECK FUNNEL   remove funnel  empty previously brewed grounds and replace with fresh    d  DISABLED   select different brew switch or batch size        COFFEE FUNNEL    appears when brew volume is greater than 86 0 oz   2 54    and pulse brew is  disabled  Check to make sure the correct funnel is in place  and then press BREW again    If none of the above messages are displayed  the display will read NOW BREWING and show the time remain   ing in the brew cycle    Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the  coffee no longer drips from the funnel tip     10  Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops     WITH A SMART FUNNEL AND G9 2T DBC or MHG GRINDER   ITCB HV ONLY     1     2   di    Select the small batch size on the grinder    Insert a BUNN filter into the funnel    Grind the selected amount of fresh coffee into the Smart Funnel using the G9 2T DBC or MHG with Smart  Funnel operation and level the grounds by gently shaking     10 36748 3 111010    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
MOEN DN4950BK Installation Guide  LCI LIMPIADOR CONCENTRADO spray  USER MANUAL - Northwood Technology  基本の使い方 1M型・3M型/録画・録音タイプ  Bedienungsanleitung  Manuel TF160duo  CAL ET2412 ON/OFF HEAT CONTROLLER 2 1  USER MANUAL LEMON MB1  Lightolier EC2-13 User's Manual  ZERO 100L    Copyright © All rights reserved. 
   Failed to retrieve file