1. DUT CHASSIS CURRENT HV 05002D 37 4 38142 Interlock Red Marker Red Marker T 05030DT 21 Blue Marker ES 05030DT 22 Blue Marker If you order the HY AMP III interconnect kit you will receive the following items Interconnect Kit 5030DT 22 38142 36541 When connecting HY AMP III to HYPOT III the 38075 Interlock connectors may no longer be used The 38142 Interlock connectors provided with the kit will replace these parts 48 eiu When HYPOT III is connected to HYAMP III the HYPOT III should have PLC remote turned on In this configuration you will only be able to start and reset the HYAMP III from the HYAMP III It is possible to reset or abort the Hipot from both instruments 7 3 1 Sequential and Simultaneous Testing Hipot Start parameter The Hipot start parameter found in the system menu controls whether the Hipot test will run sequentially after the Hyamp test or simultaneously with the Hyamp test Please refer to section 4 1 Setup System for instruction on how to set this parameter The Hipot Start parameter is only used when connecting the HYAMP III with an Associated Research Hypot The parameter controls if the Hypot will run after the HYAMP III has completed its test GW or if the Hypot will run at the same time as the HYAMP II G W The Hipot Start parameter directly controls the Start output r
2. GROUND BOND TESTER RESET BUTTON Momentary contact switch used to reset the instrument If a failure condition occurs during a test you will need to reset the system to shut off the alarm and signal the system that you are aware of a failure condition The reset button must be pressed before you can proceed to the next test or change any of the set up parameters This switch also serves as an abort signal to stop any test in progress controlled by the HYAMP III TEST BUTTON Momentary contact switch used to start tests Press the green button to activate the test that is set up in the test buffer shown on the display GRAPHIC LCD 128 X 64 Monographic LCD SOFT KEYS Multifunction parameter selection keys Keys used to select screens and change parameters CURRENT OUTPUT JACK Connector used to attach the Current test lead adapter box or test fixture to the instrument RETURN OUTPUT JACK Connector used to attach the Return test lead adapter box or test fixture to the instrument POWER SWITCH Rocker style power switch with international ON and OFF 0 markings TEST LED INDICATOR This red indicator flashes to warn the operator that voltage is present at the output terminal and a test is in process INTERCONNECT JACK Connector used to attach the return lead from the hipot tester when performing both Hipot and Ground Bond tests on the same test item Qane 3 2
3. M1 1 GND Max Fail Settings 25 004 100mQ 0mo 1 05 Results A gt 120mQ 0 05 Test Pressing the Test soft key from this menu will allow you to access the Parameter Review screen For specific instructions for reviewing and editing test parameters refer to section 4 2 Test Parameters System Pressing the System soft key from this menu will allow you to access the Setup System screen For specific instructions for editing system parameters refer to section 4 1 Setup System 39 Qu 5 3 Perform Tests Metering The HYAMP III Perform Test screen will display Current Time and Resistance during a test 5 4 Performing a Test 1 From the Main Menu select the memory and step you wish to perform then press the Exit soft key to return you to the Perform Test screen 2 Attach the appropriate load or DUT to the instrument refer to section 5 1 for instrument connections 3 Press the TEST button 4 The instrument will now perform the test or connected sequence of tests If the Test is started from any other step than 01 when you push Reset or Test buttons it will always return to the originally selected step 5 4 1 Single Step Single step is a function that allows you to run one step at a time from a sequence of connected steps To access the Single step function refer to section 4 1 Setup System This function is used to temporarily override the automatic
4. M1 1 GND Current 25 004 Settings Nen Max Lmt 100mo 4 r Min Lmt 0ma Memor v 25 004 i Dwell 1 05 NEL 100mo Step Frequency 60Hz Edi 0mQ Offset 0mo 1 05 Exit Connect OFF Exit Select the memory and step number using their corresponding softkeys Section 4 2 1 Step 2 32 Press the Test soft key Section 4 2 1 Step 4 Press the Edit soft key Section 4 2 2 Step 2 Current 25 004A Max Lmt 100mQ 4 Min Lmt 0mo Dwell 1 05 7 r ME Frequency 60Hz Enter Offset 0mo Connect OFF Esc a eim 4 2 2 Editing Test Parameters Refer to FIG 2 1 From the Test parameter review screen refer to section 4 2 1 scroll the cursor to the test parameter you wish to edit using the up and down arrow soft keys 2 Press the Edit soft key The Test parameter edit screen will now be displayed 3 You may now change the value of the test parameter with the up and down arrow soft keys 4 Press the Enter soft key to accept the new value or press Esc soft key to escape from the edit All available test parameters may be edited using this procedure 4 2 3 Reviewing Test Results Method 1 Hot key 1 Pressing the bottom soft key at the Perform Test screen will display the Results screen Method 2 Menu Selection 1 From the Perform Test screen press the Menu soft key The Main Menu will now be displayed 2 From the
5. to Exit TIT Calibration 2 Enter standard Voltage reading T M Vol tage XXXXV Enter lt RESET gt to Exit 53 eu 10 Replacement Parts List Rev A 11 27 02 ECO 4920 Number Designator 3599 2 BlackBananaJacks 3641 1 Adapter Box 3239 4 sigh Current Connectors 37497 1 RestSwith Red PowerSwith2P 10A 250V BarhConnecto 1 0 7 1 InerockConmector 1 Feet Kit w o Rubber Inserts 38102 4 jJ RubberinsrtforFeet 3820 1 I28x64QGraphic Display Test Switch Green Fate ASSY High Current Output Ll gt Cable ASSY High Current Return __ e For safety tester interconnect cables refer to INSTRUMENT CONNECTIONS section 7 3 54 eiu 11 Schematic Index Drawing Number Description Reference Pages Designator 803130 Wiring Diagram 3130 NENNEN 838367 Main Control Board CON 3670 838325 Power Amplifier Board AMP 3130 838267 Keypad Board KEY 3670 838268 Input Voltage Select PCB PWR 3670 55 eiu 12 Index Adapter BOX A ii 23 41 55 61 Alarm Paramete can eere e e eet a aor ede a E O EE E ES a 31 Bencina A AE AT es i 13 Calibration Procedure a EE 11 58 Connected Ia u 16 30 31 42 45 59 Continuity Tessa 10 38 Coat da
6. Any replacement cables and high voltage components should be acquired directly from Associated Research Inc Refer servicing to an Associated Research Inc authorized service center PHONE 1 847 367 4077 ASSOCIATED RESEARCH INC 1 800 858 TEST 8378 13860 WEST LAUREL DRIVE FAX 1 847 367 4080 LAKE FOREST IL 60045 4546 U S A E MAIL info asresearch com www asresearch com Service Interval The instrument its power cord test leads and accessories must be returned at least once a year to an Associated Research authorized service center for calibration and inspection of safety related components Associated Research will not be held liable for injuries suffered if the instrument is not properly maintained and safety checked annually User Modifications Unauthorized user modifications will void your warranty Associated Research will not be responsible for any injuries sustained due to unauthorized equipment modifications or use of parts not specified by Associated Research Instruments returned to Associated Research with unsafe modifications will be returned to their original operating condition at the customers expense QM n 1 4 2 Test Station Location Select an area away from the main stream of activity which employees do not walk through in performing their normal duties If this is not practical because of production line flow then the area should be roped off and marked for TESTING No employees other tha
7. may be accessed Menu Memory and Step Pressing the Exit soft key at any time will return you to the Perform Tests Menu Pressing the Menu soft key from the Main Menu will display the Results Tests and System selections Please refer to section 5 2 3 Results Test and System Menu Memory The HYAMP III has 10 three step programmable memory locations M0 M9 Press the Memory soft key to increment the instrument to the desired memory location As the Memory softkey is pressed the parameters of the selected memory location are automatically loaded into the instrument Step Each of the ten memory locations in HYAMP III has three programmable steps that may be Connected together to create multi step testing Press the Step soft key to increment the step number 5 2 3 Results Tests and System Selections From the Main Menu press the Menu soft key M1 1 GND Settings Results Test 25 004 100mQo mo 1 05 Exit System The Results Tests and System selections will now be displayed From the Results Tests and System selection screen three Software controls may be accessed Results Test and System Pressing the Exit soft key at any time will return you to the Perform Tests 38 Qu Results Pressing the Results soft key from this menu will allow you to review the test results of the last test performed An example of a Results screen is shown below
8. 2 Rear Panel Controls 1 FUSE RECEPTACLE To change the fuse unplug the power mains cord and turn the fuse receptacle counter clockwise The fuse compartment will be exposed Please replace the fuse with one of the proper rating 2 INPUT POWER RECEPTACLE Standard IEC 320 connector for connection to a standard NEMA style line power mains cord 3 INPUT POWER SWITCH Line voltage selection is set by the position of the switch In the left position it is set for 115 volt operation in the right position it is set for 230 volt operation 4 CHASSIS GROUND EARTH TERMINAL This terminal should be connected to a good earth ground before operation 5 REAR PANEL OUTPUT CONNECTORS These connectors are in parallel with the front panel connectors 6 THERMAL COOLING FAN Full time cooling fan 7 OPTION CONNECTOR Undefined 8 REMOTE SIGNAL OUTPUT 9 Pin D sub miniature female connector for monitoring PASS FAIL PROCESSING and RESET output relay signals 9 REMOTE SIGNAL INPUT 9 Pin D subminiature male connector for remote control of test reset and interlock functions as well as remote program memory selection and withstand processing input 10 CALIBRATION BUTTON To put the instrument into the calibration mode push this button and turn on the POWER switch simultaneously 21 Qu 3 3 Quick start This quick start guide assu
9. Bond Test Parameters Current 25 004 Max Lmt 100mQ 4 d Min Lmt 0mo v Dwell Tais Frequency 60Hz Edit Offset mo Connect OFF Exit From the Ground Bond review screen the following parameters may be selected for editing Current Max Limit Min Limit Dwell Frequency Offset and Connect Offset The Offset function may be used to compensate for lead and test fixture resistance during the test Using the up and down arrow keys scroll the cursor to the Offset parameter and press the Edit softkey You may now manually or automatically set an Offset value To manually set the Offset use the and soft keys to increase and decrease the resistance value Press the Enter soft key to accept the new value or press the Esc soft key to escape from the edit To automatically set an Offset value set the current and frequency to the values that will be used on the DUT and connect the test cables or test fixture with fixturing to the instrument Next short circuit the ends of the test cables and press the TEST button The instrument will now read the lead resistance and update Offset parameter automatically Press the Enter soft key to accept the new value or press the Esc soft key to escape from the edit 34 Qen 4 3 3 Default Parameters The following table is a listing of the Default Parameters in the HY AMP III These parameters may be programmed to all of the memories and s
10. Main Menu screen press the Menu soft key The Results Test and System selections will now be displayed 3 From this screen press the Result soft key The Results screen will now be displayed The Results screen will appear as follows M1 1 GND Max Fail Settings Results lt 25 00A A 100mQ gt 120m0 0mo 0 0s Exit AH 1 05 For connected tests use the up and down soft keys to scroll through the results 4 3 Test Parameters Description of Test Parameters Current The Current that is applied between the Current and Return lead during a ground bond test Max Limit A maximum current or resistance threshold that when exceeded triggers a failure 33 Qane Min Limit A minimum current or resistance threshold that when not exceeded triggers a failure Dwell Time A length of time that is allowed for the set point voltage to be applied Frequency This parameter is selectable using a softkey between 50 and 60Hz Offset This function allows the instrument to compensate for lead and test fixture resistance during a ground bond or continuity test A description of how to set up this parameter is given in the 4 3 2 Ground Bond parameter sections of this manual Connect This function when turned ON will connect or link the current step to the next step The third step in a Memory will not have this function because it is the last step of the Memory location 4 3 2 Ground
11. Research s customer support department Please save the shipping carton and packing material for the carriers inspection Our customer support department will assist you in the repair or replacement of your instrument Please do not return your product without first notifying us and receiving an RMA return material authorization number To receive an RMA number please contact our customer support department at 1 800 858 8378 e Please retain all of the original packaging materials 2 1 2 Contents of the Carton Inside the carton should be the following Description AR Part Number HYAMP III Instrument 3130 Cable ASSY High Current Output 05002D 24 Cable ASSY High Current Return 05002D 37 Fuse 5 Amp fast acting 250VAC Line Cord 33189 Standard Interlock Connector 38075 2 1 3 Returning the Instrument When it is necessary to return the instrument for servicing or calibration repackage the instrument in its original container please include all accessories and test leads Indicate the nature of the problem or type of service needed Also please mark the container FRAGILE to insure proper handling Upon receipt your instrument will be issued an AR service number Please refer to this number in all correspondence If you do not have the original packaging materials please follow these guidelines e Wrap the instrument in a bubble pack or similar foam Enclose the same information as above 1
12. contact our CUSTOMER SUPPORT GROUP at 1 800 858 TEST 8378 Many safety agency specifications allow either AC or DC voltages to be used during the hipot test When this is the case the manufacturer must make the decision on which type of voltage to utilize In order to do this it is important to understand the advantages and the disadvantages of both AC and DC testing AC testing characteristics Most items that are hipot tested have some amount of distributed capacitance An AC voltage cannot charge this capacitance so it continually reads the reactive current that flows when AC is applied to a capacitive load Qu AC testing advantages AC testing is generally much more accepted by safety agencies than DC testing The main reason for this is that most items being hipot tested will operate on AC voltages AC hipot testing offers the advantage of stressing the insulation alternately in both polarities which more closely simulates stresses the product will see in real use Since AC testing cannot charge a capacitive load the current reading remains consistent from initial application of the voltage to the end of the test Therefore there is no need to gradually bring up the voltage since there is no stabilization required to monitor the current reading This means that unless the product is sensitive to a sudden application of voltage the operator can immediately apply full voltage and read current without any wait time Another advantag
13. hardware has been configured to provide the interlock connections on pins 4 and 5 of the Remote Interface Signal Input port The instrument can still be used without the external interlock device as long as the Interlock Connector 38075 provided with unit is plugged into the Remote Interface Signal Input port If there is nothing connected to the Remote Interface Signal Input port to provide a connection to the interlock the instrument will not perform tests Please check your connections to be sure they are making good contact Clear the area of any debris that may create a hazardous situation and ask any unnecessary personnel to leave the area To initiate the test press the GREEN test button on the front panel This is a momentary button and does not need to be held in the pressed position during the test The instrument will then initiate the test presently loaded in this case Memory 1 Step 1 If the DUT passes the test you will hear a short audible beep If a failure occurs you will hear a long audible alarm and the red failure indicator will light up If a failure occurs during the test a continuous alarm will sound and the red indicator light in the Reset button will illuminate To stop the alarm you must press the illuminated RED button marked RESET This will silence the alarm clear the red fail light and reset the instrument for the next test The RESET button may also be used to quickly ABORT a test and cut off the power to
14. is simple If a product will function when exposed to extremely adverse conditions it can be assumed that the product will function in normal operating circumstances Common Applications of the Dielectric Withstand Test e Design performance testing Determining design adequacy to meet service conditions e Production Line testing Detecting defects in material or workmanship during processing e Acceptance testing Proving minimum insulation requirements of purchased parts e Repair Service testing Determine reliability and safety of equipment repairs The specific technique used to apply the dielectric voltage withstand test to each product is different During a dielectric voltage withstand test an electrical device is exposed to a voltage significantly higher than it normally encounters for a specified duration of time During the test all current flow from the high voltage output to the return is measured If during the time the component is tested the current flow remains within specified limits the device is assumed safe under normal conditions The basic product design and use of the insulating material will protect the user against electrical shock Qane The equipment used for this test a dielectric withstand tester is often called a hipot for high potential tester The rule of thumb for testing is to subject the product to twice its normal operating voltage plus 1 000 volts However specific products may be t
15. results in an easy to use interface This eliminates the need to decipher cryptic abbreviations The graphic display makes testing safer easier and more reliable than ever before The easy to follow setup screens ensure that the operator correctly sets up all test parameters This makes it possible to limit user access to the setup screens so that only authorized personnel with a security code can change test parameters A real benefit for manufacturers that test different products This makes it possible to store all the various test parameters required and quickly recall them for each of the different products that needs to be tested Memories can also be linked to run multi step tests Interconnection of the HY AMP III and the HYPOT III makes these two instruments a complete test system The test system can be configured to test Ground Bond first and then advance to the Dielectric Withstand test and Insulation Resistance tests The test system can also be configured to perform Ground Bond and Dielectric Withstand tests simultaneously This system maintains the output current to within 2 from no load to full load and over the line voltage range to ensure that test results remain consistent and within safety agency requirements HYAMP III was designed for the global market This feature makes it simple for the user to select the output frequency in the Ground Bond mode so that products can be tested at the same frequency they will be
16. selections are All P F and Last When All is selected a Results summary screen will be displayed at the end of the test or sequence of connected steps displaying the results of all of the steps The Results summary screen will appear as follows D Pass 1 05 1 1 25 004 3mo GND Pass 1 05 1 2 25 004 3mQ GND Pass 1 05 1 2 25 004 mo TIT 27 Qu When P F is selected a Pass or Fail screen will be displayed at the end of the test The Pass and Fail screens will appear as follows When P F is selected it is not possible to directly see the test results at the end of the test In order to review the test results refer to section 4 2 3 Reviewing Test Results TIT TIT When Last is selected the results of the last step performed will be displayed on the Perform Tests screen There will not be a change in appearance or special screen displayed in this mode Lock Scroll the cursor to the Lock parameter using the directional soft keys When the cursor is pointing to the Lock parameter you may turn the function ON and OFF by pressing the soft key When the exit soft key is pressed the security settings will take immediate effect Selecting Lock ON restricts access to parameter and system settings The level of security is determined by the Mem Lock function Once the Lock function is activated a special procedure is required to defeat
17. the DUT 23 Qane When a test is being performed a red test indicator located in the lower right side of the front panel will illuminate and flash until the test is finished If the DUT passed the test you will hear a brief beep indicating the DUT passed and that the tests are complete Reviewing results The most direct method for reviewing test results is to press the bottom soft key at the end of the test Pressing the bottom soft key from the Perform Test screen will display the Results screen For more information about reviewing test results refer to section 4 2 3 Reviewing Test Results 24 es 4 Programming Instructions 4 1 Setup System Refer to FIG 1 1 From the Perform Test screen press the Menu soft key The Main Menu will now be displayed 2 From the Main Menu screen press the Menu soft key The Results Tests and System selections will now be displayed 3 From this screen press the System soft key The Setup System menu will now be displayed 4 At the Setup System menu scrolling from the PLC Remote parameter is restricted to down only Press the down arrow key to access system parameters 5 Scrolling to More will display the second page of System Parameters From the Setup System screen fourteen different Hardware and Software controls may be accessed PLC Remote Single Step Alarm Contrast Results Lock Mem Lock Hipot Start Cal Alert Cal Date Cal Due Alert Date and Ti
18. 22 28 31 40 Control Sii terre 1 20 23 28 33 43 51 56 DE Withstand REED 45 47 Default Para meto eeror aa tos a a ld td ii 26 40 Dielectric Withstand Testi E E T A RE i 7 8 A A Id eM d eire denied 9 10 IBN 11 12 15 26 27 39 41 45 46 47 D well Rue EE dide ein E REP M 15 20 38 40 45 Edit Parameters eee eet titer tenu eto n eere e aa goin n e bene eaa aao e reden 33 34 36 37 38 39 59 IE EDGE instalas 1 7 13 14 luce M RR 8 13 20 38 39 40 Front Panel Controls eese enn e ener eene EAEE reiner eese N etse ee eee 1 13 23 Er i EN c P 1 3 PEM e C a 3 Insulation R sistafice iia 1 7 10 12 13 47 Interlock e Eo etr REND 15 16 22 24 26 53 55 56 61 LED 00d t pede nate 13 15 23 31 45 LA 1 9 10 11 12 Lims eea hue ea eee 47 Edu 26 53 hub abu m 40 47 Medical Restrictions iere PE RP RE NIE I EI ME 6 MEMO Sea li 15 22 24 26 32 36 38 42 43 45 52 A ETA li 11 13 22 25 28 32 36 37 42 43 44 45 48 49 56 Min Mtra tana NE 40 47 Ditsetoni a da 14 Opera iia 1 5 6 9 13 15 17 23 25 52 53 DONS P 11 34 57 56 eiu Par
19. 5 Qu e Use a strong double wall container that is made for shipping instrumentation 350 Ib test material is adequate e Use a layer of shock absorbing material 70 to 100 mm 3 to 4 inch thick around all sides of the instrument Protect the control panel with cardboard e Seal the container securely e Mark the container FRAGILE to insure proper handling e Please refer in all correspondence to your AR service number 2 2 Installation 2 2 1 Work Area Locate a suitable testing area and be sure you have read all safety instructions for the operation of the instrument and suggestions on the test area set up in the Safety section Make sure the work area you choose has a three prong grounded outlet Be sure the outlet has been tested for proper wiring before connecting the instrument to it 2 2 2 Power Requirements This instrument requires a power source of either 115 volts AC 10 50 60 Hz single phase or 230 volts AC 10 50 60 Hz single phase Please check the rear panel to be sure the proper switch setting is selected for your line voltage requirements before turning your instrument on For operation at 115 and 230 Volts AC use a 5 Amp fast acting 250VAC fuse Do not switch the line voltage selector switch located on the rear panel while CAUTION the instrument is on or operating This may cause internal damage and represents a safety risk to the operator 2 2 3 Basic Connections Power Cable Before connecting powe
20. MED INTO THAT MEMORY DO NOT CONNECT VOLTAGE OR CURRENT TO THE SIGNAL CAUTION INPUTS THIS COULD RESULT IN DAMAGE TO THE CONTROL CIRCUITRY MEMORY ONE Momentarily connecting terminal 7 to 8 signals the instrument to immediately begin the test program that is stored in memory one MEMORY TWO Momentarily connecting terminal 7 to 9 signals the instrument to immediately begin the test program that is stored in memory two MEMORY THREE Momentarily connecting terminal 7 to terminals 8 and 9 signals the instrument to immediately begin the test program that is stored in memory three Remote Interlock HYAMP III is equipped with a featured referred to as Remote Interlock Remote Interlock is a feature that utilizes a set of closed contacts to enable the instruments output In other words if the Interlock contacts open the output of the instrument will be disabled Remote Interlock could also be referred to as a remote system lockout utilizing Fail When Open logic If the Interlock contacts are open and the Test button is pushed 46 eun a pop up message will be displayed on the screen for two seconds The message will appear as follows Interlock is Open If the Interlock contacts are opened during a test the pop up message will be displayed and the test will abort The hardware and has been configured to provide the interlock connections on pins 4 and 5 of the Remote Interface Signal Input port The instrument can still
21. OPERATION AND SERVICE MANUAL HY AMP III MODEL 3130 GROUND BOND TESTER SERIAL NUMBER E quee Associated Research Inc 2002 Model 3130 13860 West Laurel Drive Lake Forest Illinois 60045 4546 U S A Item 38301 Ver 1 03 Printed Nov 27 2002 Manufacturer Address Product Name Model Number DECLARATION OF CONFORMITY 13860 W Laurel Lake Forest USA EYAMPO Associated Research 3130 Ground Bond Tester Conforms to the following Standards Safety EMC Supplementary Information IEC 61010 1 1993 A2 EN 55011 1998 Group EN 61326 1997 Al EN 61000 4 2 1995 EN 61000 4 4 1995 EN 61000 4 6 1996 EN 61000 4 11 1994 Dr IL 60045 EN 61000 4 3 1996 1995 1993 The product herewith complies with the requirements of the Low Voltage Directive 73 23 EEC as amended by 93 68 EEC and the EMC Directive 89 336 EEC as amended by 92 31 EEC The CE marking has been affixed on the device according to article 10 of the EMC Directive 8 336 EEC The technical file and other documentation are on file with Associated Research Inc SII Joseph Guerriero Vice President General Manager Associated Research Inc Lake Forest April 3 2002 Illinois USA TABLE OF CONTENTS T TMtrOGMU CHOI icicisciccdsdeeciccdieccedsscucsecdcscacedeasdeecsdcsscdeassedesestebeaseseacecdesdcssessasdecesesce
22. Testing Product Safety Tests are specified during the design and development stages of a product as well as in the production of the products to insure that it meets basic safety requirements These tests are designed to verify the safety of the electrical products in that they do not jeopardize the safety of the people domestic animals and property of anyone who may come in contact with these products In an era of soaring liability costs original manufacturers of electrical and electronic products must make sure every item is as safe as possible All products must be designed and built to prevent electric shock even when users abuse the equipment or by pass built in safety features To meet recognized safety standards one common test is the dielectric voltage withstand test Safety agencies which require compliance safety testing at both the initial product design stage and for routine production line testing include Underwriters Laboratories Inc UL the Canadian Standards Association CSA the International Electrotechnical Commission IEC the British Standards Institution BSI the Association of German Electrical Engineers VDE and T V the Japanese Standards Association JSI These same agencies may also require that an insulation resistance test and high current ground bond test be performed 1 6 The Different Types of Safety Tests 1 6 1 Dielectric Withstand Test The principle behind a dielectric voltage withstand test
23. age that flows from an applied part between applied parts or into an applied part The Applied Part Leakage Current test is required only for medical equipment All of these tests are used to determine if products can be safely operated or handled without posing a shock hazard to the user Line Leakage Testers provide the capability of meeting the line leakage test specified in the following standards UL 544 IEC 950 UL 1950 IEC 601 1 UL 2601 UL 1563 UL 3101 IEC 1010 and others The Line Leakage test is a test which measures the leakage current of a product through a circuit that is designed to simulate the impedance of the human body The simulation circuit is called the Measuring Device MD The instrument has five different MD circuits selectable through the menu which are representative circuits designed to simulate the impedance of the human body under different conditions The impedance of the human body will vary depending upon point of contact the surface area of the contact and the path the current flows For these reasons the specifications of the Measuring Devices are different depending upon the type of test being performed as well as the maximum allowable leakage 11 Qane current Leakage current measurements are performed on products under normal conditions and single fault conditions as well as reversed polarity This simulates possible problems which could occur if the product under test is faulted or misused while th
24. alibration of Parameters From the Calibration screens use the v soft key to scroll the Cursor to the parameter you wish to calibrate Once the cursor is pointing to the parameter you wish to calibrate press the Select soft key A calibration prompt screen will now appear that describes the necessary load and connection information for the parameter being calibrated The following is a list of the calibration parameters and an example of the prompt screen with the details that will be displayed for each parameter screen shown at left Once you press TEST the Calibration data entry screen will appear for the selected parameter screen shown at right Adjust the numeric value of the parameter using the and soft keys and press the Enter soft key to accept the new parameter or press RESET to escape the edit Calibration of Ground Bond AC Current Calibration Connect the standard 30AAC current meter from Current to Return TEST to Start RESET to Exit RESET to Exit Calibration Enter standard Current reading Currentz XXXXA E Enter TIL 32 eun Calibration of Ground Bond AC Voltage Calibration Calibration Step 1 Step 2 Short the Current and E Connect the standard Return leads Ru 6VAC volt meter from together Current to Return TEST to Start ERN TEST to Start RESET to Exit RESET
25. ameters A e A eesti d EEE ARN 28 30 44 Test Paratmeters coire rei da idad CHR RR e e TUE ii 13 22 36 37 38 42 44 jer HER 28 30 PPG ANC AA sary coded A A 1 28 Rear Panel Contt ls n nom Re HER RE HE HEGI reU Meds 1 24 Receptacle E 17 24 25 50 A 13 20 iouis TES 11 15 22 24 26 28 30 40 47 48 50 52 53 56 R mot nterlock tete lada 26 52 53 R sistance RARI dde 3 5 6 10 11 12 14 38 39 45 47 Review mia Test REUS m ii 27 32 37 A iir eienn ERE REEE O REER O EEEO AORA TRE i 2 4 7 17 Safety SYMBOLS irreais A T 1 2 SCHEMALIC cmri UU 11 62 SCHEMAS AS 11 62 cuni 13 22 32 35 EU 16 30 31 45 59 Service Interval oen tata ato roi em eI 4 SOU I P 1 13 15 28 30 40 44 45 56 Mum 26 39 47 A NR T 28 30 40 42 45 A M i 20 System Para Mett Sins HR 28 30 Test Parameters iaa ana 28 30 AS E TA S T S T AAR 1 5 ii AA 3 TUV ad 15 e 7 11 15 48 A o O A E 1 16 RUTILIUS 11 22 25 48 49 W aco 1 ii 1 4 58 57
26. bacedsesdoss 1 A LT 1 1 2 Safety Symbols uns ld ibas 2 1 2 1 Product Marking Symbols ti io 2 1 2 2 Caution and Warning Do e 2 LIO AO erni K E E A E EA 3 E S afely eet E E R a E E d a 4 1 4 1 Service and Maintenance occccccnonononunicoccnnnnnononananicccncnnononnnnanocicccnnnonnnnns 4 kekar POSES AMO id idos 5 14 3 Test Opefator vias 6 1 5 Introduction to Product Safety Testing 7 1 5 1 The Importance of Safety TestiM8 oococnnnccnnoncccnoncnononccnnonncnnanaconnnacinnos 7 1 6 The Different Types of Safety Tests nee ii 7 1 6 1 Principles and Uses of Dielectric Withstand Testing 7 1 6 2 Insulation Resistance TesSt ccccccnonnninccnnccnononaninocncncnnononananaciciccnononanons 10 1 6 3 Ground Bond TesSt cooocncncncncnnononuninocncnnonononananacicnnonononananncccnccnnnonanons 10 1 64 R n T65t 12i datada 11 T5 Line Leakage sees 11 cr Keydeatures dnd Bene is E E R Li center idu 13 2 Crete Started ai oie roo ihr I ER EPI INN IPIE isto Te ve NIRE IPIE 15 2 1 Unpacking and Inspection uiii tilapia Dre e E otcdadavens 15 2 11 PACK ADIT eo ond ode A die oeil 15 2 1 2 Contents Of CartOn tret e cece e EE EQ IEEE e PE P TREE e Ek 15 2 1 3 Returning the Instrument for Service or Calibration 15 2 2 InstallatiQm z s oo Wash AA de de Dh er oe Ee ide eda TA e Meet A 16 2 2 1 Work ATCA inici 16 2 212 Power Reg irementS di
27. be used without the external interlock device as long as the Interlock Connector 38075 provided with unit is plugged into the Remote Interface Signal Input port If there is nothing connected to the Remote Interface Signal Input port to provide a connection to the interlock the instrument will not perform tests Withstand Processing When a HYAMP III is integrated with a Hipot as a test system the processing signal from the hipot tester will be sent across pin 6 and pin 7 of the HYAMP III remote input This signal will activate the front panel Withstand Processing indicator that notifies the operator that high voltage is enabled If the Hipot start is set to G W sequential then the Withstand Processing indicator will appear as the following pop up message Withstand Test is processing If the Hipot start signal is set to G W then a small W T indicator will appear in the upper right of the display PLC Remote Pop up message If you attempt to start a test from the front panel Test button and the PLC remote function is turned ON a pop up message will be displayed The pop up message will appear as follows PLC Remote ON 47 eiu 7 3 System 3100 HYAMP III Integrated with HYPOT III The following illustration and should be used to configure the HYAMP III for integrated operation with HYPOT III SYSTEM 3100 36541 DUT I E AC FAN LINECORD x
28. c functionality many customers also require some basic test data to be recorded while the DUT is powered up A Run Test System allows the product to be powered up immediately after the safety tests are completed with a single connection to the DUT Measurements that are commonly made while the DUT is running can include Amperage Voltage Watts and Power Factor 1 6 5 Line Leakage Test The Line Leakage test is one of many product safety tests that are normally specified for electrical products by safety testing agencies such as Underwriters Laboratories UL and the International Electrotechnical Committee IEC The line leakage specifications vary as well as the method in which the measurements are taken depending upon the application or function of a product and the standard to which the product is being tested Current Leakage or Line Leakage tests are general terms that actually describe three different types of tests These tests are Earth Leakage Current Enclosure Leakage Current and Applied Part Leakage Current The main differences in these tests are in the placement of the probe for the measuring device The Earth Leakage Current is the leakage current that flows through the ground conductor in the line cord back to earth The Enclosure Leakage Current is the current that flows from any enclosure part through a person back to ground if it were contacted by a person The Applied Part Leakage Current or Patient Lead Leakage Current is any leak
29. ccess The HYAMP III remote connector enables remote operation of the TEST RESET REMOTE INTERLOCK and WITHSTAND PROCESSING functions and allows the operator to remotely select Memory 1 Memory 2 or Memory 3 When the PLC Remote mode is on the HYAMP III will respond to simple switch or relay contacts closures A normally open momentary switch can be wired across pins 3 and 5 to allow remote operation of the TEST function A normally open momentary switch can be wired across pins 2 and 5 to allow remote operation of the RESET function When the PLC remote function is ON the TEST switch on the front panel will be disabled to prevent a test from being activated through this switch For safety the front panel RESET switch remains active even when a remote reset switch is connected so that high voltage can be shut down from either location The HYAMP III also allow access to three MEMORY PROGRAMS through the remote control connector This gives the user the capability to quickly change parameters and initiate a test remotely The HYAMP III basically operates in a PLC mode by responding to simple switch or relay contact closures The built in memory programs of the instrument are used to accomplish this Three internal memory programs can be accessed by connecting terminals 7 8 and 9 in different combinations ACTIVATING MEMORY PROGRAM FUNCTIONS THROUGH THE WARNING REMOTE CONNECTOR SELECTS THE PROGRAM AND STARTS THE TEST WHICH IS PREPROGRAM
30. connection feature When the Single Step function is ON the instrument will pause after each step is completed To continue the test sequence press the Test button to execute the next connected step Each time the Test button is pressed the next connected step will execute If you press the Reset button before completing all connected steps it will return you to the original starting step If a step fails and you wish to continue to the next step do not press Reset 5 4 2 Description of displayed messages While performing tests a number of messages will be displayed to indicate the test state or test results These messages are displayed in the status area of the screen located on the first line at the top of the LCD These messages also used on other screens where test results are displayed Messages GND xx xx n enu E O M2 2 999 95 m OOs Hm Dwell This message appears on the display during the AC DC Withstand test in process when the values are being updated in real time Pass This message appears on the display when the test process is complete and the DUT passed the test 40 Qu Abort This message appears on the display if the test in process is aborted with the RESET button or remote Reset control Max Fail This message appears on the display if the measured reading exceeds the Max Lmt current setting of the AC DC Withstand test or Max Lmt resistance setting of the Insulatio
31. costs for the return of the instrument for warranty service must be prepaid by the customer AR will assume the return freight costs when returning the instrument to the customer The return method will be at the discretion of Associated Research Except as provided herein Associated Research makes no warranties to the purchaser of this instrument and all other warranties express or implied including without limitation merchantability or fitness for a particular purpose are hereby excluded disclaimed and waived Any non authorized modifications tampering or physical damage will void your warranty Elimination of any connections in the earth grounding system or bypassing any safety systems will void this warranty This warranty does not cover batteries or accessories not of Associated Research manufacture Parts used must be parts that are recommended by AR as an acceptable specified part Use of non authorized parts in the repair of this instrument will void the warranty ei 1 2 Safety Symbols 1 2 1 Product Marking Symbols Product will be marked with this symbol when it is necessary to refer to the operation and service manual in order to prevent injury or equipment damage Product will be marked with this symbol at connections that require earth grounding i Product will be marked with this symbol when hazardous voltages may be present aL 1 2 2 Caution and Warning Symbols Calls attention to a procedure practice or co
32. cted Step Indicator uei poe eret ac 37 A O RR 37 S s Perform Tests MESAS E 40 2 4 Performing a ERE 40 6 Instrument Verification oeukoobe ktm papa ba ERe PR icon cidos Elea eae EP MR Fe VEA E PET eU PM PR eo Pan 42 6 1 Verification Intalizatiofi cocos ecco etn ri POS to cated ned Iove sas tov dante ae euge 42 6 2 Verification Mena de 42 6 2 1 Ground Bond Verification ra cirio cena b ee e ee Re cia 43 7 Remote Control ss 5er oe deter DU koe eoe aha deor PETERS A aaa 44 7 1 Signal Outputs on Remote I O iiie oret iere tr th ttan oae ntes the iaa 44 7 2 Signal Inputs of Remote I O and Memory Access eene 46 7 3 System 3100 HY AMP III Integrated with HYPOT III 48 Se Bini eR CETT 50 9 Calibration Procedure soescessessoesocssessoesocssessossocesessoesoossossossoossosssesoocssessossossseessssose 51 9 1 Warranty Require Hielils oe debere pan eats dh cart eec apa da aaa gael 51 O ose RUE 52 921 Calibration of Parameters qe saei ep R 52 10 Replacement Parts List e sseessooesoosssoesssesssesssoossoossssesssesssosssoossoossssssssesssocsssosesssssse 54 11 Schematic AAA II A Rae opp ket w p ds 55 12 Inu x iiie ds Rip h o as dp PM o isi nid bM xr PE I i DEP HE 56 11 ein 1 Introduction 1 1 5 Year Warranty Policy Associated Research Inc certifies that the instrument listed in this manual meets or exceeds published manufacturing specifications Th
33. d pin 6 while the instrument is performing a test The connection is opened at the end of the test PASS The relay contact closes the connection between pin 1 and pin 2 after detecting that the item under test passed all tests The connection is opened when the next test is initiated or the reset function is activated FAIL The relay contact closes the connection between pin 3 and pin 4 after detecting that the item under test failed any test The connection is opened when the next test is initiated or the reset function activated RESET OUT The relay contact closes the connection between pin 7 and pin 8 while the reset function is activated This is only a continuous closure dependent on the length of time the reset button is held in an active state START OUT The relay contact closes the connection between pin 7 and pin 9 The Hipot Start parameter directly controls the Start output relay G W will momentarily close the start output relay at the end of the HYAMP III test and G W will momentarily close the start output relay at the start of the HYAMP III test The Hipot Start parameters main purpose is to control the sequential timing between HYAMP III and a connected Associated Research Hypot The parameter controls if the Hypot will run after the HY AMP III has completed its test G W or if the Hypot will run at the same time as the HYAMP III G W 45 eiu 7 2 Signal Inputs of Remote I O and Memory A
34. dapter box to the HYAMP III and to the device under test 3130 36541 Optional CURRENT OTRO CHASSISf Test Connections e The rear output connections on the HY AMP III may be used as well 36 Qs 5 2 Perform Tests Main Menu and Results Screens The HYAMP III automatically defaults to the Perform Tests screen upon power up The Perform Tests screen will appear as follows Settings Menu 25 00 D One From the Perform Tests screen the Main Menu may be accessed by pressing the Menu softkey The Perform Tests screen is the main operational screen of instrument From this screen test parameters are monitored while the test is being performed This screen may also be used to debug memories with connected steps with the use of the single step function 5 2 1 Connected Step indicator The connected step indicator is an under score symbol located directly next to the Memory and Step number and only will be displayed when the connect function has been turned On in the Test parameters Connected Step Indicator 5 2 2 Main Menu GND Settings Ml 1 1 058 Menu TIT From the Perform Tests screen press the Menu soft key M1 1 GND Settings Menu 25 004 Memory 100mQ 0mQ 1 0s Exit Step 37 Qu The Main Menu will now be displayed From the Main Menu screen three Software controls
35. das 16 2 2 3 Basic CONNECHONS riada 16 2 2 4 Environmental Conditions ccccccnonnninocccncnnonononenicnicocnnnnnnnnnacocccnnononanens 17 3 Specifications and Controls uec een e e HERI Ee a Ree Nein acca tae bM ONE SN US 18 Sj coii P PEE 18 3 2 Instrument Controls ccccccncnnnocccncnnnnononanicnococnnnnonaninicononnnnonananacocccnnononananininoss 20 3 2 1 Front Panel Controls oooonncncncnnnnoninonocinoncnnononanicococnconononanacncconccnnnnns 20 3 2 2 Rear Panel Controls sive AA e eee e erede eo dt bs 21 3 95 OUICKSUALU S d reete mecum vitres 22 4 Programming Instructolis c s coves covedodcdvnsvscsues qere tee rn Pese IN eth RR eR C CREE PER OPEN UeER 25 Z1 Setup Sys ELS oo dn bitu A TEE 25 4 1 1 Cal Alert Calibration Alert raid d dte Read bares 20 2 2 CUMIN SU esiste rcu lee Lut as weds teased 32 4 2 1 Reviewing Test parar ea 32 4 22 Editing Test Parameters cene ete qs ed Bae 33 22 3 Reviewing Test Results 5e ot od etd esee 33 4 3 Test Parametet ADA E ade a 33 4 3 1 Ground Bond Test Parameters 34 2 5 2 Default Paramelers cust ee vet ori bep pues rit gitur biis 35 5 Operating Instruction ccs sicccsssvvessessevseonssescssessencesvevencssassvexsecssvecs sesseevendeevsuavevsncissvaucssee 36 2 1 Instrument Connect 36 5 1 1 Adapter Box Connections Adapter box is sold separately 36 5 2 Perform Tests Main Menu and Results Screens sseeeee 37 5 2 1 Conne
36. e I O The rear panel connector provides three output signals to remotely monitor PASS FAIL and PROCESSING conditions and it also provides a RESET OUT pulse signal and a START OUT pulse signal The monitoring signals are provided by three normally open internal relays that switch on to indicate the current condition of the tester The RESET OUT signal and the START OUT pulse signal are also provided by a normally open internal relay The RESET OUT gives a signal whenever the reset function is activated This can be used to abort a withstand test while the units are interfaced as a test system The START OUT gives a momentary output pulse that can be used to start the hipot test These are normally open free contacts and will not provide any voltage or current The ratings of the contacts are 1 AAC 125 VAC 0 5 ADC 30 VDC The signal outputs 44 essem are provided on the 9 pin female type D connector Below is a listing that indicates what conditions activate each pin When a terminal becomes active the relay closes thereby allowing the external voltage to operate an external device Pins 1 and 2 provide the PASS signal Pins 3 and 4 provide the FAIL signal Pins 5 and 6 provide the PROCESSING signal Pins 7 and 8 provide the RESET OUT signal Pins 7 and 9 provide the START OUT pulse signal The following describes how the relays operate for each test condition PROCESSING The relay contact closes the connection between pin 5 an
37. e of AC testing is that since AC voltage cannot charge a load there is no need to discharge the item under test after the test AC testing disadvantages One disadvantage of AC testing surfaces when testing capacitive products Again since AC cannot charge the item under test reactive current is constantly flowing In many cases the reactive component of the current can be much greater than the real component due to actual leakage This can make it very difficult to detect products that have excessively high leakage current Another disadvantage of AC testing is that the hipot has to have the capability of supplying reactive and leakage current continuously This may require a current output that is actually much higher than is really required to monitor leakage current and in most cases is usually much higher than would be needed with DC testing This can present increased safety risks as operators are exposed to higher currents DC testing characteristics During DC hipot testing the item under test is charged The same test item capacitance that causes reactive current in AC testing results in initial charging current which exponentially drops to zero in DC testing DC testing advantages Once the item under test is fully charged the only current flowing is true leakage current This allows a DC hipot tester to clearly display only the true leakage of the product under test Another advantage to DC testing is that the charging current only n
38. e product is operating under high line conditions 110 of the highest input voltage rating of the product Line Leakage tests are normally specified as Type Tests or Design Tests which are performed during the development of the product This helps verify that the design is safe but it does not guarantee the safety of the products being produced on the production line The only way to be sure you are shipping safe products is to test each product at the end of the production line The user may perform a Leakage Current test along with other common safety test such as Dielectric Withstand Insulation Resistance and Ground Bond on the production line with a single connection to the device under test IF YOU SHOULD HAVE ANY QUESTIONS RELATING TO THE OPERATION OF YOUR INSTRUMENT CALL 1 800 858 TEST 8378 IN THE U S A 12 Qu Key Features and Benefits HYAMP III The first manual Ground Bond instrument with an enhanced graphic LCD All parameters for the setups can be adjusted through a simple menu driven program by using front panel keys Tamper proof front panel controls Storage of up to 10 different test programs Interconnection with HYPOT III Line and Load regulation User selectable output voltage frequencies of 50 or 60 Hertz Adjustable output current and milliohm trip ranges Four wire measurement Kelvin method and milliohm offset capability This provides the operator with complete test setup and
39. eeds to be applied momentarily This means that the output power requirements of the DC hipot tester can typically be much less than what would be required in an AC tester to test the same product DC testing disadvantages Unless the item being tested has virtually no capacitance it is necessary to raise the voltage gradually from zero to the full test voltage The more capacitive the item the more slowly the voltage must be raised This is important since most DC hipots have failure shut off circuitry Qen which will indicate failure almost immediately if the total current reaches the leakage threshold during the initial charging of the product under test Since a DC hipot does charge the item under test it becomes necessary to discharge the item after the test DC testing unlike AC testing only charges the insulation in one polarity This becomes a concern when testing products that will actually be used at AC voltages This is an important reason that some safety agencies do not accept DC testing as an alternative to AC When performing AC hipot tests the product under test is actually tested with peak voltages that the hipot meter does not display This is not the case with DC testing since a sinewave is not generated when testing with direct current In order to compensate for this most safety agencies require that the equivalent DC test be performed at higher voltages than the AC test The multiplying factor is somewhat inconsistent bet
40. elay Setting the Hipot start parameter to G gt W will momentarily close the start output relay at the end of the HYAMP III test Setting the Hipot start parameter to G W will momentarily close the start output relay at the start of the HY AMP III test 49 eiu 8 Options Introduction This section contains a list and descriptions of available factory installed options at the time of this printing The list of options contains an option code number that can be referenced on the data plate on the rear panel of the unit Option Label On the rear panel of the instrument you will find a label that contains the option code For example your options code would appear as follows Fitted with option O1 er OPT 01 Fitted with option 01 and 03 esee OPT 0103 HYAMP III Options Option List Not Available Not Available 50 eio 9 Calibration Procedure This instrument has been fully calibrated at the factory in accordance to our published specifications It has been calibrated with standards traceable to the National Institute Standards amp Technology NIST You will find in this manual a copy of the Certificate of Calibration It is recommended that you have this instrument re calibrated and a safety check done at least once per year AR recommends you use Calibration Standards that are NIST traceable or traceable to agencies recognized by NIST to keep this instrument within published spec
41. ested at much higher voltages than 2X operating voltages 1 000 volts For example a product designed to operate in the range between 100 to 240 volts can be tested between 1 000 to 4 000 volts or higher Most double insulated products are tested at voltages much higher than the rule of thumb Testing during development and prototype stages is more stringent than production run tests because the basic design of the product is being evaluated Design tests usually are performed on only a few samples of the product Production tests are performed on every item as it comes off the production line The hipot tester must also maintain an output voltage between 100 and 120 of specification The output voltage of the hipot must have a sinusoidal waveform with a frequency between 40 to 70 Hz and has a peak waveform value that is not less than 1 3 and not more than 1 5 times the root mean square value Types of Failures only detectable with a Hipot test e Weak Insulating Materials e Pinholes in Insulation e Inadequate Spacing of Components e Pinched Insulation Dielectric Withstand Test AC verses DC Please check with the Compliance Agency you are working with to see which of the two types of voltages you are authorized to use In some cases a Compliance Agency will allow either AC or DC testing to be done However in other cases the Compliance Agency only allows for an AC test If you are unsure which specification you must comply with please
42. etely calibrated without removing any covers and exposing the technician to hazardous voltages This provides the operator with an easy and safe way to set output current since parameters are set without the current output activated This assures you that this instrument meets or exceeds safety requirements to ensure operator safety HYAMP III powers up with the parameters that were used during the last test to avoid operator setup errors The electronic dwell control helps keep test results consistent by ensuring that the test duration is the same for each product tested Monitors the minimum level of current flow thus ensuring that the DUT is properly connected and that the hipot test is being performed HYAMP III can be switched for either 115 or 230 volt input operation through an easy access rear panel mounted switch to allow it to be used in any country Qu 2 Getting Started Introduction This section contains information for the unpacking inspection preparation for use and storage of your Associated Research Inc product 2 1 Unpacking and Inspection 2 1 1 Packaging Your instrument was shipped in a custom foam insulated container that complies with ASTM D4169 92a Assurance Level II Distribution Cycle 13 Performance Test Sequence If the shipping carton is damaged inspect the contents for visible damage such as dents scratches or broken display If the instrument is damaged notify the carrier and Associated
43. f the instrument fails the Verification test pass indicating the fail detectors are not working properly the following message will appear GND 1 05 M1 1 29 994A 2mQ Ground Bond failure not detected Check leads or call 1 800 858 8378 lt TEST gt to Retest lt RESET gt to Exit 43 eiu 7 Connection of Remote I O Two 9 pin D type connectors are mounted on the rear panel that provide REMOTE INPUT OUTPUT control and information These connectors mate with standard 9 pin D sub miniature connector provided by the user The output mates to a male plug connector while the input mates to a female receptacle connector For best performance a shielded cable should be used To avoid ground loops the shield should not be grounded at both ends of the cable Suggested AMP part numbers for interconnecting to the Remote I O are shown below 205204 4 PLUG SHELL WITH GROUND INDENTS 205203 3 RECEPTACLE SHELL 745254 7 CRIMP SNAP IN PIN CONTACT for plug 745253 7 CRIMP SNAP IN SOCKET CONTACT for receptacle 745171 1 SHIELDED CABLE CLAMP for either plug or receptacle 747784 3 JACKSCREW SET 2 Remote Interface Rear Panel SIGNAL OUTPUT SIGNAL INPUT T RESET eu TEST INTERLOCK ds E FAIL PASS m MEMORY 1 START RESET PROCESSING oe OUT OUT MEMORY 2 e lt MEMORY 3 7 1 Signal Outputs on Remot
44. gate the System parameters during reviewing and editing The directional soft keys in the system parameters will change depending on which parameter the cursor is pointing to At the PLC remote parameter only the down arrow key is available PLC Remote Scroll the cursor to the PLC Remote parameter using the directional soft keys When the cursor is pointing to the PLC Remote parameter you may turn the PLC remote function ON and OFF by pressing the soft key Refer to the section 6 Connection of Remote I O for details When the PLC remote is turned ON the front panel Test button is disabled and a test may only be started through the rear panel I O If you attempt to start a test from the front panel Test button when the PLC Remote function is turned ON a pop up message will be displayed The pop up message will appear as follows PLC Remote ON Single Step Scroll the cursor to the Single Step parameter using the directional soft keys When the cursor is pointing to the Single Step parameter you may turn the function ON and OFF by pressing the soft key This function is used to temporarily override the automatic connection feature When the Single Step function is ON the instrument will pause after each step is completed To continue the test sequence press the Test button to execute the next connected step Each time the Test button is pressed the next connected step will execute If you press the Reset button bef
45. ifications End user metrology standards or practices may vary These metrology standards determine the measurement uncertainty ratio of the calibration standards being used Calibration adjustments can only be made in the Calibration mode and calibration checks or verifications can only be made while operating in Test mode 9 1 Warranty Requirements AR offers a standard one year manufacture s warranty This warranty can be extended an additional four years provided that the instrument is returned each year to Associated Research Inc for it s annual calibration In order to be eligible for the extended warranty instruments must be returned to Associated Research Inc for calibration service at least once every twelve months A return material authorization number RMA must be obtained from AR before returning this instrument for calibration To obtain an RMA number or for information regarding our warranty please contact our Customer Support Representatives at 800 858 TEST Required Calibration Equipment e 30 Amp AC Ammeter e 10 VAC Voltmeter 51 eiu 9 2 Calibration Initialization Press and hold the calibration key on the rear panel with a pen pencil or small screwdriver while powering ON the HYAMP III The HYAMP III enters the calibration mode after the power on sequence is complete The Calibration screen will appear as follows Calibration gt AC 30 004 AC 6 00V Vv Select Exit 9 2 1 C
46. ired Within the Calibration Due Date parameter are three separate fields month day and year Use the gt key to select the field within the date you want to edit Use the key to change the numeric value Once you change the value it is automatically stored Alert Alert Date The Alert date is like an alarm clock that will warn you in advance of the actual calibration due date After a calibration is performed the Alert Date is automatically set 11 months after the calibration date For example if the calibration is performed on 12 15 2002 the Alert Date will automatically be set to 11 15 2003 This parameter defaults to 11 months after the calibration date but may be overwritten to any advanced date desired Within the Alert Date parameter are three separate fields month day and year Use the gt to select the field within the date you want to edit Use the key to change the numeric value Once you change the value it is automatically stored 29 Qu Date Scroll the cursor to the Date parameter using the directional soft keys Within the Set Date parameter are four fields date format mdy dmy month day and year Use the gt key to select the field within the date you want to edit then use the key to change the numeric value Once you change the value it is automatically stored Time Scroll the cursor to the Time parameter using the directional soft keys Within the Set Time parameter are three fields hours mi
47. is instrument was calibrated using standards that are traceable to the National Institute of Standards and Technology NIST Your new instrument is warranted to be free from defects in workmanship and material for a period of 1 year from date of shipment You must return the Owners Registration Card provided within 15 days from receipt of your instrument AR recommends that your instrument be calibrated on a twelve month cycle Instruments purchased and used in North America only may have their warranty extended in one year increments to a maximum of 5 years provided they are returned to AR at least annually for calibration and inspection The annual calibration and inspection must be performed annually every year following receipt of instrument Any instrument not calibrated and inspected annually will not be eligible for extended warranty status This extended warranty is non transferable and is offered only to the original purchaser A return material authorization RMA must be obtained from AR before returning this instrument for warranty service Please contact our Customer Support Center at 1 800 858 TEST 8378 to obtain an RMA number It is important that the instrument is packed in its original container for safe transport If the original container in not available please contact our customer support center for proper instructions on packaging Damages sustained as a result of improper packaging will not be honored Transportation
48. me Pressing the EXIT key at any time will return you to the Perform Test screen FIG 1 GND Settings M1 1 1 05 Meng Ny E i M i Press the System key O BS OE i Alarm 5 Section 4 1 Step 3 v A Contrast 5 Results Last Lock OFF mo m Mem Lock OFF Exit More Press the Menu key Press the Arrow key Section 4 1 Step 1 Section 4 1 Step 4 M1 1 GND PLC Remote ON Settings Menu Single Step OFF m Alarm 5 4 25 00A PEE E Contrast 5 e Step 2 petis e m oc 1 05 Exit mm Mem Lock OF F Exit lt More gt Press the Menu key ie a Section 4 1 Step 2 ection 4 1 Step Hipot Start GoW MI 1 GND gt Settings Results DRM Cal Alert OFF Cal Date09 25 01 25 004 Test Cal Due 09 25 02 4 ua Alert 08 25 02 100ma one en Date mdy09 25 01 ram Ti me 02 14 PM i 1 05 Exit exit MR 25 ae 4 1 2 Setup System Soft keys Directional soft keys gt v The gt A v soft keys are used to scroll the cursor to the different system parameters The and soft key is used to increase or decrease numerical values or toggle settings ON and OFF Exit The Exit soft key is used to return to the Perform Tests screen 4 1 3 System Parameters Directional soft keys v down up and gt right are used to navi
49. mes the operator has some familiarity with automated Ground Bond testing Locate a suitable testing area and be sure you have read all safety instructions for the operation of the instrument Locate a three prong grounded outlet Be sure the outlet has been tested for proper wiring before connecting the instrument to it Check to be sure that the correct input line voltage has been selected on the CAUTION rear panel either 115 volts AC or 230 volts AC Connect the power input plug into its socket on the rear panel of the instrument Connect the male end of the plug to the outlet receptacle Please be sure that the safety ground on the power line cord is not defeated and that you are connecting to a grounded power source Turn on the POWER switch located on the lower left hand side of the front panel The initialization screen will appear with a message at the bottom indicating TEST to verification You now have the option to press the TEST button and activate the Verification Menu Refer to the section Instrument Verification The option to activate the Verification expires approximately 3 seconds after power up If you do not press the TEST button with in the 3 second window the initialization screen will disappear The initialization screen will appear as follows e 45500 ATED RESEARCH INC HYAMP Ill 3130 Version Hank TEST to verification TIT After the initialization screen disappears the Perform Te
50. n Resistance test Min Fail This message appears on the display if the measured reading drops below the Min Lmt current setting of the AC DC Withstand test or Min Lmt resistance setting of the Insulation Resistance test Short This message appears on the display if the DUT current is well beyond the metering range of the test Out Error This message appears on the display after exiting from the Output Error screen If the instrument has an internal problem and the TEST button is pressed the Output Error screen will appear as follows Output Error Device malfunction Setting X XXA Reading x xxA Press Exit to continue or call 1 800 858 8378 The RESET button is not active while this screen is displayed To clear this screen and return to test mode the Exit soft key must be pressed When the Exit soft key is pressed the instrument will continue with its normal failure indication process The failure light and Alarm can then be cleared by pressing the RESET button 41 Qs 6 Instrument Verification Verification is a process by which an instruments fail detectors are proven to be functioning properly and thereby Verifying the functionality of the electrical safety tester and connected accessories Verification of failure detect circuitry of the electrical safety tester is required by safety agencies such as CSA UL and TUV 6 1 Verification Initialization Turn on the POWER switch located o
51. n the lower left hand side of the front panel The initialization screen will appear with a message at the bottom indicating TEST to verification You now have the option to press the TEST button and activate the Verification Menu The option to activate the Verification expires approximately 3 seconds after power up The Initialization screen will appear as follows Version Hank TEST to verification e ASSOCIATED RESEARCH INC MEM HYAMP M 3130 EN 6 2 Verification Menu From the Initialization screen First start up screen press the TEST button The Verification Menu will now be displayed Ground Bond Verification Disconnect the leads from the instrument lt TEST gt to Begin lt RESET gt to Exit During the Verification process all Remote control output signals except the Fail output are disabled 42 gt ee 6 2 1 Ground Bond Verification From the Verification menu press the TEST button to begin the verification process At the end of the Verification process a message will appear indicating the outcome of the process If the instrument passes the Verification test failure indicating the fail detectors are working properly the RESET button will illuminate the alarm will sound and the following message will appear GND 0 05 MI 1 0 014 120mo Verification OK Ground Bond failure detected RESET to Exit I
52. n the test operators should be allowed inside If benches are placed back to back be especially careful about the use of the bench opposite the test station Signs should be posted DANGER TEST IN PROGRESS UNAUTHORIZED PERSONNEL KEEP AWAY Work Area Perform the tests on a non conducting table or workbench if possible There should not be any metal in the work area between the operator and the location where products being tested will be positioned Position the tester so the operator does not have to reach over the product under test to activate or adjust the tester If the product or component being tested is small it may be possible to construct guards or an enclosure around the device to be tested Construct the guards of a non conducting material such as clear acrylic so that the item being tested is within the guards or enclosure during the test If possible the guards or enclosure should also contain safety switches that will not allow the tester to operate unless the guards are in place or the enclosure closed Keep the area clean and uncluttered All test equipment and test leads not necessary for the test should be removed from the test bench and put away It should be apparent to both the operator and to any observers the product that is being tested and the product that is waiting to be tested or has already been tested Do not perform Ground Bond tests in a combustible atmosphere or in any area where combustible mate
53. ndition that could possibly WARNING cause bodily injury or death CAUTION Calls attention to a procedure practice or condition that could possibly cause damage to equipment or permanent loss of data Qane 1 3 Glossary of Terms As used in this manual Alternating Current AC Current that reverses direction on a regular basis commonly in the U S A 60 per second in other countries 50 times per second Conductive Having a volume resistivity of no more than 103 ohm cm or a surface resistivity of no more than 105 ohms per square Conductor A solid or liquid material which has the ability to let current pass through it and which has a volume resistivity of no more than 103 ohm cm Current The movement of electrons through a conductor Current is measured in amperes milliamperes microamperes nanoamperes or picoamperes Symbol I Dielectric An insulating material that is positioned between two conductive materials in such a way that a charge or voltage may appear across the two conductive materials Direct Current DC Current that flows in one direction only The source of direct current is said to be polarized and has one terminal that is always at a higher potential than the other Hipot Tester Common term for dielectric withstand test equipment HYAMPO Registered trademark of Associated Research Inc for its Ground Bond test equipment HYPOT Registered trademark of Associated Research Inc for its dielec
54. ndle fault current if the product should ever become defective A low impedance ground system is critical in ensuring that in case of a product failure a circuit breaker on the input line will act quickly to protect the user from any serious electrical shock International compliance agencies such as CSA IEC TUV VDE BABT and others have requirements calling out this test This test should not be confused with low current continuity tests that are also commonly called out in some safety agency specifications A low current test merely indicates that there is a safety ground connection It does not completely test the integrity of that connection 10 Qs Compliance agency requirements vary on how different products are to be tested Most specifications call for test currents of between 10 and 30 amps Test voltages at these currents are typically required to be less than 12 volts Maximum allowable resistance readings of the safety ground circuit are normally between 100 and 200 milliohms If you are testing a product that is terminated in a three prong plug you are required to perform a continuity or ground bond test on the ground conductor to the chassis or dead metal of the product 1 6 4 Run Test All manufacturers of a product that runs on line power normally need to run the DUT Device Under Test after final safety testing so that they can verify the functionality of their products In addition to running the DUT to test its basi
55. nutes and Military or Standard time setting Use the key to select the field within the time parameter you want to edit then use the key to change the numeric value Once you change the value it is automatically stored The Calibration Alert Warning screen appears as follows Cal Alert Model 3130 is due for calibration on 10 16 04 Show screen again At the Calibration Alert Warning screen there are two options Show screen again Yes or No Show screen again is asking if you would like to continue seeing the Calibration Alert Warning screen every time you power up the instrument The question must be answered by toggling between the word Yes and No using its corresponding softkey and then pressing the OK softkey You may turn this screen OFF by toggling to the word No using the soft key next to this parameter and pressing the OK soft key Selecting the Show this screen again parameter No will disable the Calibration Alert function You may leave this screen ON by toggling to the word Yes using the soft key next to this parameter and the pressing the OK soft key Selecting the Show this screen again parameter Yes will exit the Calibration Alert Warning screen and go to the standard introduction screen without disabling the Calibration Alert function If security is enabled you will not see the question Show screen again or the Yes No soft key It is po
56. ollowing limits Temperature cs west 40 167 F 40 75 C Alide senesi 50 000 feet 15 240 meters The instrument should also be protected against temperature extremes that may cause condensation within the instrument 17 Qs 3 Specifications and Controls 3 1 HYAMP III Functional Specifications INPUT Voltage 115 230 VAC 10 user selectable Frequency 50 60 Hz 5 Fuse 6 3 Amp slow acting 250 V AC TEST MODE Output Rating Output Frequency Range 50 60 Hz user selectable Dwell Time Setting Maximum Limit Minimum Limit Offset Capability Current Display Ohmmeter Display Timer Display 18 Current Resolution Regulation Voltage Range Resolution Accuracy Range Resolution Accuracy Range Resolution Accuracy Range Resolution Accuracy Range Resolution Accuracy Range Resolution Accuracy Range Resolution Accuracy 1 00 30 00 Amps AC 0 01 Amp step 2 of setting 0 02 Amps 6 Volts AC fixed 0 and 0 5 999 9 seconds 0 for continuous running 0 1 second step 0 196 of setting 0 05 seconds 0 120 mA for 1 30 Amps 0 510 mA for 1 10 Amps mQ step t 2 of setting 2 mQ 0 120 mA for 1 30 Amps 0 510 mA for 1 10 Amps mQ step 2 of setting 2 mQ 0 100 mQ 1 mQ step 2 of setting 2 mQ 0 00 30 00 Amps 0 01 Amp step 3 of reading 0 03 Amps 0 510 mQ 1 mQ ste
57. ore 26 Qane completing all connected steps it will return you to the original starting step If a step fails and you wish to continue to the next step do not press Reset Alarm Volume Scroll the cursor to the Alarm parameter using the directional soft keys When the cursor is pointing to the Alarm parameter you may use the soft key to increase and decrease the volume of the Alarm The numbers corresponding to the different volume settings are 0 through 9 0 meaning the volume is off and 9 being the loudest setting After the is pressed a momentary alarm chirp will occur to indicate the volume of the new setting LCD Contrast Scroll the cursor to the Contrast parameter using the directional soft keys When the cursor is pointing to the Contrast parameter you may use the soft key to increase and decrease the contrast of the LCD display The numbers corresponding to the different contrast settings are 0 through 9 0 meaning the lightest color of displayed characters and 9 meaning the darkest color of displayed characters After the is pressed the display will automatically adjust to the new display setting Results Scroll the cursor to the Results parameter using the directional soft keys When the cursor is pointing to the Results parameter you may use the soft key to select what type of results you would preferred displayed at the end of a test or sequence of connected steps The available
58. p 2 of reading 2 mQ 0 0 999 9 seconds 0 1 seconds step t 0 1 of reading 0 05 seconds Qu GENERAL Remote Control And Signal The following input and output signals are provided Output through two 9 pin D type connectors Remote control Test Reset Interlock and Withstand Processing Remote recall of memory program 1 2 and 3 Outputs Pass Fail Test in Process Start Out and Reset Out Program Memory 10 Memories 3 steps per memory all steps within a memory are linkable Security Key Lock capability to avoid unauthorized access to all test parameters Memory Lock capability to avoid unauthorized access to memory locations Verification System Built in software driven verification menu to test fault RENE MEN Line Cord Detachable 6 ft 1 80m power cable terminated in a three prong grounding plug Mechanical Tilt up front feet Dimensions W x H x D 8 5 x 4 0 x 15 5 in 216 x 103 x 390 mm includes feet Weight 19 15 lbs 8 7 Kgs Environmental Operating Temperature 32 104 F 0 40 C Relative Humidity 0 to 80 Calibration Traceable to National Institute of Standards and Technology NIST Calibration controlled by software Adjustments are made through front panel keypad in a restricted access calibration mode Calibration information stored in non volatile memory 19 Qs 3 2 Instrument Controls 3 2 1 Front Panel Controls 20
59. r to this instrument the protective ground Earth terminals of this instrument must be connected to the protective conductor of the line mains power cord The main plug shall only be inserted in a socket outlet receptacle provided with a protective ground earth contact This protective ground earth must not be defeated by the use of an extension cord without a protective conductor grounding The instrument is shipped with a three wire power cable When the cable is connected to an appropriate AC power source the cable will connect the chassis to earth ground The type of power cable shipped with each instrument depends on the country of destination 16 em Test Leads The test leads provided are designed specifically for use with this instrument The red Cable ASSY High Current Output will mate with the red Current jack The black Cable ASSY High Current Return will install into the black Return jack The test lead ratings are as follows Description Cable ASSY High Current Output 05002D 24 3 A 750V Cable ASSY High Current Return 05002D 37 31 A 750V 2 2 4 Environmental Conditions This instrument may be operated in environments with the following limits Tei peratures cssccsaresenas 32 104 F 0 40 C Relative humidity 0 80 Altitude 6560 feet 2 000 meters Storage and Shipping Environment This instrument may be stored or shipped in environments with the f
60. rials are present Power Be certain that the power wiring to the test bench is properly polarized and that the proper low resistance bonding to ground is in place Power to the test station should be arranged so that it can be shut off by one prominently marked switch located at the entrance to the test area In case of an emergency anyone can cut off the power before entering the test area to offer assistance Qin 1 4 3 Test Operator Qualifications The operator should understand the electrical fundamentals of voltage current and resistance Rules Operators should be thoroughly trained to follow all of the aforementioned rules in addition to any other applicable safety rules and procedures Defeating any safety system should be considered a serious offense with severe penalties such as removal from the Ground Bond testing job Allowing unauthorized personnel in the area during a test should also be dealt with as a serious offense Dress Operators should not wear jewelry that could accidentally complete a circuit Medical Restrictions Personnel with heart ailments or devices such as pacemakers should be informed that the current generated by the instrument are very dangerous If contacted it may cause heart related problems that a person of good health may not experience Please have the test operator consult their physician for recommendations ein 1 5 Introduction to Product Safety Testing 1 5 1 The Importance of Safety
61. se the start output relay at the start of the HYAMP III test 4 1 4 Cal Alert Calibration Alert Calibration Alert is a feature that allows the instrument to give an advanced alert that the calibration for the instrument is coming due Scroll the cursor to the Cal Alert parameter using the directional soft keys When the cursor is pointing to the Cal Alert parameter you may turn the function ON and OFF by pressing the soft key Turning this parameter ON will activate the Cal Alert function and when the date matches the Alert Date the instrument will display the Calibration Alert warning screen upon power up If the Show this screen again function has been turned OFF at the Calibration Alert Warning screen this parameter will automatically be set to OFF Cal Date Calibration Date Calibration Date is a non editable parameter that indicates the Date when calibration was last performed on the instrument This parameter automatically updates after calibrating the instrument Cal Due Calibration Due Date It is recommended that calibration should be performed at least once a year It is recommended that the Calibration Due date not bet set greater than one year from the Calibration Date displayed After a calibration is performed the Calibration Due Date is automatically set 1 year after the calibration date This parameter defaults to one year after the calibration date but may be overwritten to any advanced date des
62. ssible to quickly bypass the security of the Calibration Alert by powering up the instrument while depressing the soft key that is second from the top of the instrument This will temporarily start the instrument in an unsecured state The Calibration Alert Warning screen will be displayed and allow you to disable the Calibration alert by selecting No and 30 Qu then pressing the OK soft key This type of security override only affects the Calibration alert screen It is not necessary to restart the instrument to activate the security setting 3l u 4 2 Setting up Tests Refer to FIG 2 4 2 1 Reviewing Test parameters 1 From the Perform Test screen press the Menu soft key The Main Menu will now be displayed 2 Select the memory and step location you want to review or edit using their corresponding soft keys 3 From the Main Menu screen press the Menu soft key The Results Test and System selections will now be displayed 4 From this screen press the Test soft key The Test parameter review screen will now be displayed You may now review the test parameters by scrolling the cursor with the up and down arrow keys FIG 2 GND Settings M1 1 GND M1 1 1 05 iis Settings Results He Press the Menu soft key Test e 5 0 Da Section 4 2 1 Step 3 25 004 z 100 mQ System E 0mQ 0 Onc en 2 E Press the Menu soft key Section 4 2 1 Step 1
63. sts screen will be displayed The Perform Tests screen will appear as follows GND Settings M1 1 1 05 e 5 0 lOO nc Menu TIT 22 Qu The HYAMP III comes with all of the memories and steps loaded with the default parameters The initial test loaded for use is Memory 1 Step 1 If this test is unacceptable for your DUT then refer to the section 4 3 Setting Up a Test for instructions on how to program tests into the instrument If these parameters are acceptable then connect an appropriate set of test leads to the device under test DUT or test fixture Make sure the safety ground of this instrument is connected to a known good ground DO NOT TOUCH THE DEVICE UNDER TEST ONCE THE TEST HAS WARNING BEEN STARTED Remote Interlock HY AMP III is equipped with a featured referred to as Remote Interlock Remote Interlock is a feature that utilizes a set of closed contacts to enable the instruments output In other words if the Interlock contacts open the output of the instrument will be disabled Remote Interlock could also be referred to as a remote system lockout utilizing Fail When Open logic If the Interlock contacts are open and the Test button is pushed a pop up message will be displayed on the screen for two seconds The message will appear as follows Interlock is Open If the Interlock contacts are opened during a test the pop up message will be displayed and the test will abort The
64. teps by pressing the two bottom soft keys and powering the instrument at the same time The Default Parameters are as follows Test Type Parameter Current Max Lmt current Min Lmt current Dwell Frequency Offset Connect Setup Sys PLC Remote OFF Single Step OFF Alarm 2 Contrast 5 Results Last Lock OFF Mem Lock OFF Hipot Start G gt W Date Format mdy month day year Cal Alert ON Alert Date Cal Date 11 months 35 Qane 5 Operating Instructions 5 1 Instrument Connections Test Leads The test leads provided are designed specifically for use with this instrument The red High Current lead will mate with the red Current jack The black Return lead will install into the black Return jack The test lead ratings are as follows High Current lead 05002D 24 31 A 750V 05002D 37 31 A 750V Connecting the Test Leads Connect the High Current lead 05002D 24 red markers to the Current connector on the HYAMP III then connect the other end of the lead to the earthing contact usually the ground conductor connection point for the Line cord inlet Connect the Return lead 05002D 37 to the Return connector on the HYAMP III then connect the other end of the lead to chassis ground 5 1 1 Adapter Box Connections Adapter Box is sold separately The adapter box provides an easy way to connect a DUT to the HYAMP III that is terminated in a two or three prong line cord The following diagram shows how to connect the a
65. the security To defeat the security press the top most soft key while powering up the instrument Now you may access the system menu and turn the security function OFF Mem Lock Scroll the cursor to the Mem Lock parameter using the directional soft keys When the cursor is pointing to the Mem Lock parameter you may turn the function ON and OFF by pressing the soft key Mem Lock is a sub function of the Lock setting In order for the Mem Lock function to work the Lock must first be turned ON Selecting the Mem Lock ON will allow the user to access all available Memory locations and steps but restricts access to memory and step editing capabilities Selecting the Mem Lock OFF will allow the user to only run the currently loaded memory Hipot Start Scroll the cursor to the Hipot Start parameter using the directional soft keys When the cursor is pointing to the Hipot Start parameter you may toggle the selection between G gt W and G W by pressing the and soft key 28 Qu The Hipot Start parameter is only used when connecting the HYAMP III with an Associated Research Hypot The parameter controls if the Hypot will run after the HYAMP III has completed its test G W or if the Hypot will run at the same time as the HYAMP III G W The Hipot Start parameter directly controls the Start output relay G W will momentarily close the start output relay at the end of the HYAMP III test and G W will momentarily clo
66. tric withstand test equipment Insulation Gas liquid or solid material which has a volume resistivity of at least 1012 ohm cm and is used for the purpose of resisting current flow between conductors Resistance That property of a substance that impedes current and results in the dissipation of power in the form of heat The practical unit of resistance is the Ohm Symbol R Trip Point A minimum or maximum parameter set point that will cause an indication of unacceptable performance during a run test Voltage Electrical pressure the force which causes current through an electrical conductor Symbol V eiu 1 4 Safety This product and its related documentation must be reviewed for familiarization with safety markings and instructions before operation This product is a Safety Class I instrument provided with a protective earth terminal Before applying power verify that the instrument is set to the correct line voltage 115 or 230 and the correct fuse is installed 1 4 1 Service and Maintenance User Service To prevent electric shock do not remove the instrument cover There are no user serviceable parts inside Routine maintenance or cleaning of internal parts is not necessary Avoid the use of cleaning agents or chemicals on the instrument some chemicals may damage plastic parts or lettering Any external cleaning should be done with a clean dry or slightly damp cloth Schematics when provided are for reference only
67. used at This capability makes the HYAMP III versatile enough to meet all safety agency specifications for ground bond test requirements These features minimize the effect of test lead resistance The four wire measurement technique eliminates test lead resistance when using the standard test leads The milliohm offset function allows the use of longer test leads and test fixtures without compromising the test results 13 Qi PLC remote inputs and outputs Test indicator Withstand processing indicator Software calibration control No load setup of output current TUV amp UL listing Automatic storage of test program Electronic dwell settings Low current sense User selectable input voltage 14 The standard 9 pin interfaces provide outputs for Pass Fail Test in Process Start Out and Reset Out Inputs include Test Reset Interlock and Withstand Processing Remote recall of memory program 1 2 and 3 This gives the user all the basic remotes required to configure the Hypot III through simple PLC relay control A flashing LED clearly indicates when high current is active to provide maximum operator safety The enhanced graphic LCD indicates when the high voltage from the HYPOT III is being applied to the item under test for greater operator safety HYAMP III is calibrated through the front panel keypad All calibration information is stored in non volatile memory This allows HYAMP III to be compl
68. ween agencies which can cause confusion concerning exactly what equivalent DC test voltage is appropriate 1 6 2 Insulation Resistance Test Some dielectric analyzers today come with a built in insulation resistance tester Typically the IR function provides test voltages from 500 to 1 000 volts DC and resistance ranges from kilohms to gigaohms This function allows manufacturers to comply with special compliance regulations BABT TUV and VDE are agencies that may under certain conditions require an IR test on the product before a Hipot test is performed This typically is not a production line test but a performance design test The insulation resistance test is very similar to the hipot test Instead of the go no go indication that you get with a hipot test the IR test gives you an insulation value usually in Megohms Typically the higher the insulation resistance value the better the condition of the insulation The connections to perform the IR test are the same as the hipot test The measured value represents the equivalent resistance of all the insulation which exists between the two points and any component resistance which might also be connected between the two points Although the IR test can be a predictor of insulation condition it does not replace the need to perform a dielectric withstand test 1 6 3 Ground Bond Test The Ground Bonding test determines whether the safety ground circuit of the product under test can adequately ha

Download Pdf Manuals

image

Related Search

Related Contents

National Instruments RS422 User's Manual  VariTab® - Cash Piscines  Fiche 08- Mites Alimentaires  ET MARCHÉS PUBLICS, _MODE D`EMPLOI    Nordmann ES4 - Nordmann Engineering  Samvad user guide  IBM ILC200 Projector User Manual  INSTAUCTIO MANUAL  Procyon Editor Software User's Guide  

Copyright © All rights reserved.
Failed to retrieve file