Home
        # 310-509 INSTALLATION INSTRUCTIONS 03-07 Jeep
         Contents
1.    T A ROTT LE Ee eae 5 PA Be eS      310 509 INSTALLATION INSTRUCTIONS  03 07 Jeep Grand Cherokee 4 7L    Thank you for purchasing the PowerAid Throttle Body Spacer  Please read the  instruction manual carefully before proceeding with the installation  Contact AIRAID     800  498 6951 8 00 AM   5 00 PM MST Weekdays for questions regarding fit or in   structions that are not clear to you  Your PowerAid Throttle Body Spacer was carefully  inspected and packaged  Check that no parts are missing  or were damaged during  shipping  If any parts are missing  please contact AI RAID    Thank you for selecting AI RAID        Included with your Poweraid Spacer is a sticker with a California Air Resources Board   C A R B   Executive Order  EO  number  This sticker must be placed in plain view inside of  the engine compartment  Failure to do so may prevent you from passing a smog inspection       Also available for your 99 04 Jeep Grand  Cherokee  the Airaid Intake System P N 310     Parts List 127    1   Power Plate   1      O    Ring  240   3   Hex Bolts 6mm x 60mm   5   Flat Washers 6mm   2   Air Box Extension Plates    Tools List  1 4 in  Ratchet  1 4 in  x 12 in  Extension  8mm Socket  10mm Socket     2   Hex Bolts 6mm x 20mm   1   Throttle Cable Bracket   2   636 long w  3 8    hole Spacers   2  3 8 16 x 1 1 2    bolts   1  Nutplate    14mm Socket  14mm Box End Wrench  3 16 Allen Wrench  5 32 Allen Wrench  7 8 Box End Wrench       Installation Instructions  Read Me        1  DISCON
2.   cient SUTPUT        4 Ref     C     2  Air Box Ext  Plates A   2  6mmx20mm Hex Bolts Slama   2  6mm Flat Washers    
3. NECT NEGATIVE     BATTERY CABLE    2  Remove air intake hose assembly    3  Remove throttle body air intake box and save bolts    4  Remove  3  bolts from the throttle body    5  Unclip throttle  amp  cruise cables and remove from manifold and throttle lever    6  Install throttle  amp  cruise cable bracket and tighten bolts   Ref     B       7  Install both throttle  amp  cruise cables thru reinforcement ring of throttle cable bracket  Then slide and lock both  plastic cable retainers into slot separately    8  Install power plate using  3  6mm x 60mm bolts and flat washers   Ref    A          9  Reattach cruise and throttle cables to throttle body lever    10  Locate  2  air box extension brackets  one right  amp  one left hand  using  2  6mm x 20mm bolts   2  6mm   washers  and air intake box using saved bolts   Ref     C    and Step 3    11  Inspect  amp  Test throttle linkage for full Open  amp  Closed travel before driving  Some cruise and kick down cables    may require adjustment  Please refer to vehicles service manual for proper adjustment   12  Reinstall throttle body air intake assembly using Step 2 as an example     13  Reconnect battery cable  Enjoy     The sound of power   The    whistle    means its working              Ref     B     1  Throttle Cable Bracket   2   636 long w  3 8    hole Spacers   2  3 8 16 x 1 1 2    Bolts     1  Nutplate Ref     A     1  Power Plate     1     O    Ring  240    3  6mm x 60mm Hex Bolts    4  6mm Flat Washers  a 7_ VE    ecH  
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  technische bedienungsanleitung - manual técnico  HOLSクッキングヒーター取扱説明書 HCR-262GS,HCR  IC-M72 SERVICE MANUAL - R  Tefal Plancha Thermosignal  取扱説明書 - 三菱電機  K:\marketing\02. Comunicação\4-  Draper KE203-V projection screen  PDF    Copyright © All rights reserved. 
   Failed to retrieve file