Home
        I-Lock™ Coupler Install Manual
         Contents
1.    NORTH AMERICA   wesen    im Elek  Icom       Vi    8 0IN CAB DECALS    The following two  In Cab  Decals must be affixed in a suitable location within the operators working  area  For replacement decals please call your nearest Wedgelock dealer   Fig 8 0 1 Warning Decal  amp   8 0 2 l Lock Coupler Oerating Decal        Fig 8 0 1 Warning Decal    UN LOCK    DETACH    5       LOCK       Fig 8 0 2 l Lock Coupler Operation Decal    19    SECTION 9  TORQUE CHARTS Y    WEDGELO C K    NORTH AMERICA    9 0 TORQUE CHART   METRIC BOLTS    The following chart gives the standard torque setting of the bolts used in this hydraulic kit installation   It is important to follow the chart when installing bolts and nuts  Failure to do so could result in  premature failure  damage to components  or even serious injury   Fig 8 0 1     Torque Setting of Metric Grade 8 8 Bolts  amp  Nuts  Bolt Dia x Pitch  mm     Lb Ft    N  LA    M8 x 1 25 24 0    M10 x 1 5    M12 x 1 75 0      w  A  C   BRIN      Nm  M6 x 1 0   99    240       83    O        NO      83 0  147 4  202 7  287 4    Fig 8 0 1 Torque Setting of Metric Grade 8 8 Bolts  amp  Nuts  9 1 TORQUE CHART   JIC CONNECTIONS    JIC  SAE 37  Flare  Connections are a very common connection in fluid power applications  Both  the male and female fittings have a 37  seat  The seal takes place between the male flare and the  female cone seat  The thread holds the connection mechanically     Torque Setting of JIC Connectors    Nominal Size   DashSize 
2.    l LOGK  COUPLER    INSTALLATION MANUAL   v4        SPECIAL NOTE    Your new Wedgelock Coupler fitted with the I LOCK    Safety Device requires  the installation of a third hydraulic line   please follow the instructions carefully                 COUPLER  HOSES  amp  COMPONENTS    DIPPER ARM I  HOSES  amp  COMPONENTS      BOOM ARM  HOSES  amp  COMPONENTS    BOOM BASE TO VALVE  HOSES  amp  COMPONENTS    PUMP  amp  TANK  HOSES  amp  COMPONENTS    CABIN MOUNTED  COMPONENTS       Toll free  800 CASCADE  227 2233   Telephone  503 669 6257    NORTH AMERICA cascadewedgelock cascorp com       UN    I LOCK COUPLER    INSTALLATION REFERENCE CARD    PLEASE READ INSTALL MANUAL THOROUGHLY BEFORE INSTALLATION    Remove Bucket if attached to the excavator dipper arm   8       Install Quick Coupler using the carrier machine   s original dipper and linkage pins  8  9       Once mounted  rotate coupler through its full range of movement and check clearances around  coupler and dipper arm  9       Begin routing hoses from coupler to the dipper manifold on the dipper arm to determine hose  routing and dipper manifold positioning  10  12       Position dipper arm hoses  install hose clamps and connect hoses to dipper manifold as labeled  10   LE    Position boom hoses  install hose clamps and join unions  Ensure all moving joints are fitted with  abrasive sleeve  13       After hose routing 1s completed  it will be easy to determine the best final mounting location for the  coupler control valv
3.   COUPLER INSTALLATION    NORTH AMERICA    3 4 FITTING THE COUPLER  Dipper Pin     e Place o rings over ear plates of coupler to hold in position until ready for final placement     e Carefully raise the dipper arm of the carrier machine so that the weight of the coupler is off the  ground  Ensure that the dipper arm is in a vertical position   Fig 3 4 1      e Retract the bucket curl cylinder until the coupler front boss aligns with the dipper pin hole  The  coupler will balance allowing an easy insertion of the main dipper pin     e Align pin retention system and fix dipper pin into place     Grease both the dipper pin and the linkage pin   e Rotate coupler through full rotation to check clearances       NOTE   ORIGINAL OEM DIPPER PIN MUST BE USED        Fig 3 4 1 Raise dipper arm to Fig 3 4 2 Retract bucket curl cylinder  take weight off coupler to align dipper pin    CAREFULLY ROTATE THE COUPLER THROUGH FULL ROTATION TO  CHECK CLEARANCES  IF THERE ARE ANY SIGNS OF INTERFERENCE STOP IMMEDIATELY AND  CONTACT YOUR WEDGELOCK DEALER       SECTION 4  HYDRAULIC KIT INSTALLATION Y    WEDGELO C K    NORTH AMERICA    There are three main sections to the hydraulic kit installation which consists of     e Fitting of the Junction Manifold Block to the dipper arm     Fitting of the l Lock Control Valve in the engine pump compartment   e Routing the 3 Line Hydraulic Circuit to complete the hydraulic part of the coupler installation     4 0 JUNCTION MANIFOLD POSITION    Fig 4 0 1 Junctio
4.   Nm   Lb Ft F F F T   15 17 10 8   12 5    114            CO     J  LA            se      6    27 30 19 6   22 0 11 4    427    8   59 65 455 478   1    Fig 8 1 1 JIC Connections Chart    9 2 PRESSURE SETTING CHART    The following chart shows the range of allowable pressure settings for the l Lock Coupler circuit   It is highly recommended that the pressures for each function are tested and checked be   fore the equipment is put to use     l Lock Control Valve    Pressure Range  bar  Pressure Range  psi    p        esum    FuMan    I Lock Primary Cylinder    Retract Primary Wedge 225 240 3260 3580  Extend Primary Wedge 138 145 2000 2100  SAFETY Safety Knuckle Release 225 240 3260 3580   20   Pressure Relief Valve 166 180 2400 2600          iV WEDGELOCK    NORTH AMERICA       PO Box 20187   Portland  OR 97294 0187   USA   800 CASCADE  227 2233    Tel 503 669 6257   www wedgelockusa com    Cascade and Wedgelock are registered trademarks of Cascade Corporation   902 0015 Rev 2      Cascade Corporation 2013  All rights reserved  Form 6827658 500 GE 06 13    
5.   hose route and length through this pivot area is recommended     Mark the position of additional hose clamps along the top of the boom  Prepare the surface of  the boom for welding in these locations  Weld clamp assemblies ensuring that only the vertical  ends of the clamp brackets are welded  Touch up paint the boom and clamp to match the carrier  machine color     Tighten all hose joints between the coupler cylinder and the dipper arm to boom connections     Tighten the clamp assemblies  pulling through any excess hose  working from the dipper end  to the bottom of the boom  Allow    hose slack    for pivot movement and ensuring that the hose  assemblies are not stressed in any way  Use cable ties where required           Dipper to Boom Hose Joint    Boom to Valve Hose Joint    Clamp Assemblies   Multiple locations along boom     Fig 4 6 2 Boom Hose Routing    Hose slack for pivot movement   with nylon abrasive sleeve     SECTION 4  HYDRAULIC KIT INSTALLATION Y    WEDGELOCK       NORTH AMERICA    4 7 HOSE ROUTING   BOOM TO VALVE    Connect the RED color coded hoses for the Boom to Valve to the boom hoses at the base end  of the boom     Route the hoses through to the pump compartment towards the control valve following the  existing hose routing from the boom end     Trace the hoses from the quick coupler cylinder right through to the end where they connect to  the valve to determine the correct hose for each port position on the valve     Connect the hose ends to the con
6.  for leaks     Oil spills are sometimes unavoidable  Contain all fluid spills with appropriate absorbent materials  and dispose accordingly  Immediately clean affected areas to minimize safety risks     When operating plant and machinery keep people and property well out of harms way  Evaluate  the working environment and identify hazards  Ensure that all people involved in the installation  understand the hazards associated with this procedure     2 1 WELDING PRECAUTIONS    Before commencing any welding procedures on the carrier machine ensure that the engine is  turned off and the battery supply is disconnected  refer to the carrier machine service manual      Ensure all surrounding areas are protected with a flame resistant covering  Clear surrounding  areas of combustible materials  Ensure you have a fire extinguisher at hand     Cover highly susceptible surfaces like cylinder rods  glass windows  electrical components and  plastics to prevent spatter or heat damage     Connect the ground cable  earth lead  from the welder to the component to be welded to the  carrier machine     Ensure parts and surfaces to be welded are clean and prepared properly for welding     Use appropriate PPE  Personal Protective Equipment  when carrying out any welding procedures     II WEDGELOCK SECTION 1  SAFETY    NORTH AMERICA    3 0 SAFETY DURING COUPLER INSTALLATION    e Always use the correct PPE when removing attachments from carrier machines     e Stand well clear of machinery that is i
7. COUPLER INSTALLATION    3 2 REMOVE THE EXISTING BUCKET    Before you fit the coupler to the carrier machine you have  to first remove any existing attachment from the dipper  arm   Fig 3 2 1     Place the bucket or attachment in a safe position on the  ground     Undo the pin retention systems holding the dipper pin and  link pin in their position     Gentle raise the bucket off the ground and rotate the  cylinder until the weight is off the dipper pin     Remove the dipper pin and place in a clean area     Lower the bucket to the ground with the bucket curl cylinder  until there is no longer weight on the link pin     Remove the link pin and place in a clean place     3 3 FITTING THE COUPLER  Link Pin     Ensure the coupler is sitting on a flat surface in the correct  orientation     Align the dipper arm of the carrier machine with the coupler     Position the o rings for the linkage boss assembly on the  linkage boss  if fitted      Using the bucket curl cylinder lower the linkage into position  on the rear boss of the coupler  Fig 3 3 1      Align the coupler if necessary using a bar or lever     Insert the linkage pin through the coupler boss and linkage  boss     Align pin retention system and fix linkage pin into place   Locate the o rings into the correct position  if fitted      NOTE     ORIGINAL OEM LINKAGE PIN MUST BE USED     WEDGELOCK    NORTH AMERICA       Ww          Fig 3 2 1 Remove Bucket       Fig 3 3 1 Lower linkage into coupler    II WED G ELO t K SECTION 3
8. SE ROUTING VALVE TO PUMP   TANK    5 0 ELECTRICAL INSTALLATION   6 0 LOOSE HOSE KIT ASSEMBLV   6 1 PRE CRIMPED HOSE KIT ASSEMBLV  6 2 ELECTRICAL SCHEMATIC   7 0 FINISH  amp  TEST   8 0 IN CAB DECALS   9 0 TORQUE CHART   METRIC BOLTS    9 1 TORQUE CHART   JIC CONNECTORS  9 2 PRESSURE SETTING CHART    PAGE    2 9    o 0    O CO OO N N    10  11  11  12  12  13  14  14    15    16    16    17    18    19    20    20  20    II WEDGELOCK SECTION 1  INSTALLATION GUIDELINES    NORTH AMERICA    Please read this Installation Manual thoroughly before you commence installation  of the l Lock Coupler  Deviating from these instructions may result in increased  install time and   or damage to the hydraulic kit  carrier machine or attachment        1 0 CHECK LIST  Before you start check the following  e Check the contents of the installation components supplied       Ensure that the components are correct for the carrier machine that the coupler is to be  installed     e Check that the carrier machine is positioned on level ground   e Check that you have absorbent materials available to soak up any fluid spills   e Dispose of any used materials in a safe and environment friendly manner     e Power off the carrier machine  If the machine has been working ensure that it has cooled down  adequately prior to commencing any part of the installation procedure     e Before carrying out any welding on the carrier machine disconnect the battery  Refer to the  carrier machine operator   maintenance m
9. XT   primary wedge extend  Fig 4 2 1 l Lock Control Valve   e SAFETY   safety knuckle release        PRV set to 145 Bar    PRV set to 240 Bar    e For pressure settings refer to the pressure settings chart on page 20     e For service details regarding the control valve refer to the service section in the Operators  Manual     4 3 INSTALLING THE CONTROL VALVE    e Identify the pump that delivers flow to the BUCKET CURL CYLINDER of  the carrier machine  This is the most common pump used for hydraulic  couplers operating on mains pressure  refer to the carrier machine service  manual if required      e Utilizing the mounting plate supplied determine a suitable location in the  pump   engine compartment of the carrier machine to mount the control  valve  The mounting plate can either be welded or bolted into position   Fig  4 3 1 Mounting Plate  Fig 4 3 1 Mounting Plate       e Bolt the Control Valve to the mounting plate with the bolts provided     NOTE  The best position for mounting of the control valve may be determined after the hose routing  from the boom to the pump compartment  Check where the hoses exit from the boom end in the  pump compartment before mounting the valve as the l Lock hoses will invariable follow this same  route  11    SECTION 4  HYDRAULIC KIT INSTALLATION Y    WEDGELOCK    NORTH AMERICA    4 4 HOSE ROUTING    Wedgelock Hose Kits have been designed to improve the speed and ease in which an installer  can fit the hydraulic kit  The content of the hydrau
10. anual       Ensure that the pressure in the hydraulic system is relieved before opening any hydraulic  lines     SECTION 2  PRECAUTIONS Y    WEDGELOCK    NORTH AMERICA    Please ensure you follow the stated precautions below while carrying out the coupler and hydraulic  kit installation procedure     2 0 SAFETY PRECAUTIONS    Always use PPE  Personal Protective Equipment  when servicing  operating or maintaining  plant  machinery and its components     Refer to the carrier machine  Service Manual    for correct procedures when carrying out work on  the machine  The machine service manual takes precedence over any discrepancies between  that and this installation manual     Allow for hydraulic oil to cool adequately before opening or accessing any hydraulic lines   Hydraulic lines  fittings and components can be hot which can be harmful causing severe burns     Relieve the hydraulic tank pressure before accessing hydraulic lines  Refer to the carrier machine  service manual for proper procedures     Ensure that the stick of the carrier machine is resting on the ground at all times     do not leave  attachments suspended in the air during service   installation     Check and tighten all fittings  hose connections and joints within the hydraulic quick coupler  circuit prior to activating the machine     Visually inspect for oil leaks tighten and adjust accordingly  Avoid contact with hydraulic fluids  and high pressure oils     use cardboard or similar as a backing when checking
11. ck Controller  Dual Switch Assembly and Solenoid Loom are designed to enable a  plug  amp   play  electrical installation process     Determine a suitable position for the l Lock Controller  Ensure the position is a dry location and  easily accessible  Mount into position   Caution   Do not over tighten fixing screws     Find two spare locations in the machine console  preferably side by side  to insert the dual  rocker switches     Route the switch wires to the l Lock Controller  Connect the corresponding male spade fitting to  the female connector on each of the assemblies     Locate a switched  fused  power source from within the console of the carrier machine  Connect  the RED power lead on the Dual Switch Assembly to the power source     Find a suitable earth location  negative  and connect the BLACK wire from the l Lock Controller   Plug the Solenoid Loom into the l Lock Controller     Route the Solenoid Loom from the l Lock Controller position through to the engine compartment  where the l Lock Solenoid Valve is located     Connect the RED labeled DIN Plug to the    WEDGE    solenoid    Connect the BLACK labeled DIN Plug to the  SAFETY  solenoid    Ensure that all electrical looms are routed and fixed securely using cable ties where required   NOTE  See Electrical Assembly  Fig 6 2 2     SECTION 6  ASSEMBLIES    iV WEDGELOCK    Y       NORTH AMERICA    6 0 LOOSE HOSE KIT ASSEMBLY    war     CD Bes  E  CO O  en   2 Port   cio ax DJ   COUPLER  amp  I LOCK E  Sarery syste
12. e  11  14       Route hoses from valve ports to hoses on boom and join with unions  14       Locate and connect pressure line from test port on pump to    P    port on valve  14       Locate and connect hose from hydraulic tank return line to    T    port on valve  14       Locate mounting position for l LOCK control switch in cab  15       Route electrical harness from din connectors on valve to switch harness and attach positive and  negative leads  15       Check circuit pressures  20   and test coupler function to ensure system 1s working properly   refer to Operators Manual          Refers to Installation Manual page reference     CONTENTS    REFERENCE CARD    SECTION 1  INSTALLATION GUIDELINES    SECTION 2  PRECAUTIONS    SECTION 3  COUPLER INSTALLATION    SECTION 4  HYDRAULIC KIT INSTALLATION    SECTION 5  ELECTRICAL INSTALLATION    SECTION 6  ASSEMBLIES    SECTION 7  FINISH  amp  TEST    SECTION 8  DECALS    SECTION 9  TORQUE CHARTS    TV WEDGELOCK    NORTH AMERICA    1 0 CHECK LIST    2 0 SAFETY PRECAUTIONS  2 1 WELDING PRECAUTIONS    3 0 SAFETY DURING COUPLER INSTALLATION  3 1 COUPLER ORIENTATION   3 2 REMOVING THE EXISTING BUCKET   3 3 FITTING THE COUPLER  LINK PIN    3 4 FITTING THE COUPLER  DIPPER PIN     4 0 JUNCTION MANIFOLD POSITION   4 1 FITTING THE JUNCTION MANIFOLD BLOCK  4 2 THE I LOCK CONTROL VALVE   4 3 INSTALLING THE CONTROL VALVE   4 4 HOSE ROUTING   4 5 HOSE ROUTING   DIPPER ARM   4 6 HOSE ROUTING     BOOM   4 7 HOSE ROUTING     BOOM TO VALVE   4 8 HO
13. g radius area and working parameter of the  machine     e From the seat of the excavator  start the machine and lower the excavator arm to near the  ground  In a very slow motion  using the excavator levers  raise the dipper arm and rotate the  coupler through full rotation  Then raise the boom of the excavator and motion the dipper arm  cylinder to full extension  Now motion the dipper arm cylinder to full retraction  lowering the  boom arm in unison  Use this process to check the hose routing throughout the complete circuit   Ensure that the hoses are not under any strain or subject to potential jamming or pinching   Assistance will be required to do this  Modify hose routing if required     e Running the machine at idle or a low engine RPM setting to supply a low volume of oil through  the circuit  Activate the circuit and check for any leaks  Shut down the machine immediately if  leaks are detected  then tighten coupler as required and re check     e Activate the coupler circuit several times to ensure that the system is working correctly     refer to  the l Lock Coupler Operators Manual     e Once the test procedure has been completed  touch up paint any welded brackets or assemblies  and cable tie any loose hoses     e Affix    In Cab  Decals in a suitable location within the operators working area   Fig 7 0 1 In Cab  Decals        Before using the l Lock Coupler carefully read the  I Lock Coupler Operators Manual thoroughly     18    WEDGELOCK SECTION 8  IN CAB DECALS 
14. ilizing a  Pre Crimped  or  Loose  hose kit supplied by Wedgelock we have  endeavored to supply the majority of the fittings required to carry out a complete install of an l Lock  Coupler  however due to the vast array of different carrier machines  fitting types and port sizes  not  all circumstances may be accounted for  In instances where the fittings supplied do not match the  port size or the type of carrier machine that this install is being carried out on please contact your  nearest machinery dealer or hydraulic fittings provider for the additional appropriate component s      NOTE 2  See Hydraulic Schematic  Fig 6 0 1     II WED G ELO t K SECTION 5  ELECTRICAL INSTALLATION    NORTH AMERICA    5 0 ELECTRICAL INSTALLATION       The l Lock Coupler must be operated utilizing the l LOCK CONTROLLER  DUAL  SWITCH ASSEMBLY and SOLENOID LOOM  The proprietary electrical components  have been designed in conjunction with the functionality and operation of the coupler  safety features  The built in  Timer  and  Operational Sequences  controlling the  solenoid valves are features which provide the operator and fellow co workers a safe  work environment during attachment change over     Failure to utilize the proprietary electrical components with the l Lock Coupler could result in coupler  malfunction  causing serious harm or even death   Fig 5 0 1  amp  5 0 2  amp  5 0 3         Fig 5 0 1 Dual Switch Assembly       Fig 5 0 3 Solenoid Loom  Fig 5 0 2 I Lock Controller    The l Lo
15. lic hose kit has been pre determined to ensure  that  in most cases  the majority of fittings required to complete the install are provided  In some  circumstances additional fittings may have to be sourced to complete the connection to the pump  test port and tank return  For information regarding the port type at these locations please refer to  the carrier machine service manual     The  Pre Crimped  Wedgelock hose kits are color coded at each end of the pre crimped hoses   Following the Installation Reference Card will assist with identifying each of the hoses to be routed  in respect to their relative positions on the carrier machine  Once the manifold block and solenoid  control valve are in position begin routing the hoses from the coupler end of the machine to the  engine compartment end     If using a  Pre Crimped  Hose Kit follow the instructions ensuring that each color coded hose is  positioned as required  If using a    Lose Fitting Kit    you can use the color coded instructions as a  guide to achieve the same results     4 5 HOSE ROUTING   DIPPER ARM    e Connect the  Jumper Hoses    from the quick coupler cylinder to the junction manifold block  mounted on the dipper arm  Use jumper hoses  nylon abrasion sleeve and fittings provided which  are color coded YELLOW  Note which hoses are connected to which ports on the quick coupler  cylinder as these will have to match the port options on the valve in the engine compartment     e Connect the    Dipper Arm  hoses 
16. m     8 Bar  E  L         3 LJ cb ch    MTHS cp ap fJ  do p   0 c      3  ges c  DI     oa    Coupler Hoses S          Pump  amp  Tank Hoses     d    Boom Hoses  VALVE    Fig 6 0 1 Loose Hose Kit Assembly       6 1 PRE CRIMPED HOSE KIT ASSEMBLY    Coupler Hoses    CE  9 PORT  HYDRAULIC COUPLER MANIFOLD   amp  I LOCK SAFETY rE 7 16  UNO    SYSTEM EE   Dipper Arm Hoses    Pump  amp  Tank Hoses    MACHINE  SPECIFIC  FITTINGS    Boom Hoses    Fig 6 1 1 Pre crimped Hose Kit Assembly       16    Y  WEDGELOCK    NORTH AMERICA    ES    6 2 ELECTRICAL ASSEMBLY    l Lock Controller    Male   Female  Connectors    Power Source  Connection    Fig 6 2 2 Electrical Assembly       SECTION 6  ASSEMBLIES    Solenoid Loom    SECTION 7  FINISH  amp  TEST Y    WEDGELOCK    NORTH AMERICA    7 0 FINISH  amp  TEST    Before starting this section  position the machine in the    Oil Level Check    position as  suggested by the excavator machine manufacturer  Check the oil level sight gauge  on the hydraulic tank  Add hydraulic oil if necessary  refer to the carrier machine  service manual for further information         e Check the hose clamp assemblies and valve mounting bolts are tightened as  per the Torque Setting of Metric Bolts  amp  Nuts Chart  Fig 8 0 1     e Starting at the coupler end thoroughly check that the hose connections are tightened through  out the complete circuit as per the JIC  SAE 37   FLARE  Connection Chart  Fig 8 1 1      e Clear all personnel and all obstacles from the swin
17. n Manifold Block    The Junction Manifold block is a 9 port block designed to enable multiple IN    This side to dipper arm    routing options and variable positional options to optimize the jumper  Comect onentation   hose routing at the base of the dipper arm  Note correct orientation    Fig 4 0 1     e Positioning of the Junction Manifold Block and the  hose routing option is critical to the life cycle of the  jumper hoses   Fig 4 0 2        e To determine the optimum position of the Junction Manifold Block  first rotate the bucket curl cylinder through full rotation to check    available clearances for the manifold at both full stroke and zero  stroke  Fig 4 0 2 Hose routing options          he manifold should be placed as close as possible to the main dipper pin to minimize jumper  hose length     when utilizing universal jumper hose kits any excess jumper hose can be then  contained inside the coupler body     4 1 FITTING THE JUNCTION MANIFOLD BLOCK    e Once the optimum position has been determined  clean and prepare the surface of the dipper  arm to be welded     e Lightly tack the manifold into position  carefully tacking only the ends of the manifold   Refer to  welding precautions and carrier machine service manual for welding instructions        Fit one adaptor to the manifold and route one jumper hose from the manifold to the coupler  cylinder     e Rotate coupler SLOWLY through full rotation checking that  the hose can move freely and is not subject to pinching 
18. n motion at all times        e NEVER place hands or fingers near pin holes or recesses     e Always use correct tools when carrying out removal and installation of attachments on the carrier  machine       Use correct lifting techniques and lifting equipment when maneuvering heavy objects     e Attachments may roll or tip during removal when placed on the ground     place with extreme  caution     e Always use assistance when installing and removing attachments pinned to the carrier machine     3 1 COUPLER ORIENTATION    The l Lock Coupler has been designed and manufactured to fit the dipper arm  and linkage assembly of the carrier machine  The l Lock Coupler fits the carrier  machine in one orientation only with the C Section facing the operators view    see fig 3 0 1        e Always use the original bucket pins to fit the coupler to the machine  These pins are designed for  the dipper arm and linkage assemblies     e Always replace o rings to original positions and utilize pin retention systems where applicable       DO NOT use standard attachment pins to connect the coupler to the machine  If unsure consult  your Wedgelock Dealer immediately     e ifa THUMB is   will be fitted to the carrier machine utilizing the main dipper pin position refer to  the THUMB Installation Guide for reference                          Dipper Arm QUEE      Operator View   Ag     B a VW  A N Be    ech  f ie wl K  Coupler C Section Coupler C Section    Fig 3 1 1 Coupler Orientation    SECTION 3  
19. or  crushing at any point  Re position manifold if required     ae  e Remove jumper hose  stitch weld the ends ONLY of the ea   manifold block to the dipper arm   Fig 4 1 1 Stitch weld N XQ l    location  Weld here on both ends a i Ru  e Touch up paint finish on welded component to match carrier    machine color  Fig 4 1 1 Stitch weld location    10    II WED GELOC K SECTION 4  HYDRAULIC KIT INSTALLATION    NORTH AMERICA    ES    4 2 THE I LOCK CONTROL VALVE    The l Lock Coupler is designed to operate on the carrier machine s MAINS PRESSURE  supply  The l Lock Control Valve controls the oil pressure and oil flow to the coupler  for both the Primary Wedge function AND the Safety Knuckle function  The l Lock  Coupler Control Valve MUST BE USED for any installation of an l Lock Coupler     e The l Lock Control Valve consists of twin solenoid valves  two pressure reducing  valves and 5 ports for hose routing  The distinguishable markings are there to assist with the  electrical connection and hose routing to ensure that the coupler operates in accordance with  which it has been designed   Fig 4 2 1     e  he markings on the control valve are as follows        Twin Solenoid Valves Twin Solenoids    SAFETY   safety knuckle solenoid   e WEDGE   primary wedge solenoid     Two Pressure Reducing Valves  e 1  PRV set to 240 Bar  e 2  PRV set to 145 Bar    9 Ports for hose routing a    Check Valve   e  P  pressure in    e T     tankreturn    e RET   primary to hydraulic tank line      E
20. to the junction manifold block using the hoses and fittings color  coded BLUE  Route these hoses along the upper side of the dipper arm     e Determine best position for the hose clamps provided  Prepare surface of the dipper arm for  welding the clamps into position  Weld clamp assemblies ensuring that only the vertical ends of  the clamp brackets are welded  Touch up paint the dipper arm and clamp to match the carrier  machine color   Fig 4 5 1     e During clamp welding procedure ensure that the dipper hoses are placed in a clean and safe  position away from heat and the welding area     e Lightly clamp dipper arm hoses into position  do not fully tighten at this stage   Fig 4 5 2           Hose Clamps                Fig 4 5 1 Hose Clamp Position   example only     12    Fig 4 5 2 Hose Clamp Assembly    Y  Y W E D G E L    t K SECTION 4  HYDRAULIC KIT INSTALLATION  NORTH AMERICA    4 6 HOSE ROUTING   BOOM    Fit the nylon abrasive sleeve over the loose ends of the Dipper hoses  A    Using the GREEN color coded hoses for the Boom  connect these to the qis G    dipper arm hoses   Fig 4 6 1   Lay the Boom hoses along the top of the boom arm in preparation of Z  PEA pisse jafni  Ini iti j i  Typical     determining the best hose clamp position for this part of the installation    Fig 4 6 2     Mark the position of the top hose clamp on the boom  allowing for the hose to follow the boom  movement relative to the dipper arm movement on the top pivot point  Following the existing
21. trol valve ensuring that they are connected to their respective  port positions relative to the cylinder     Cable tie Boom to Valve hoses to existing hoses where appropriate and coil any excess hose in  the pump compartment  Ensure that the hoses are not bound up or under any strain     Tighten all hose joints and fittings between the lower boom end and the control valve     4 8 HOSE ROUTING   VALVE TO PUMP   TANK    Using the BLACK color coded hoses from the install kit connect the hose ends to the valve  marked P  Pump  and T  Tank      A  supplied Check Valve should be connected directly to the  P   Pressure  port on the l Lock       14    Control Valve with the fittings provided in the kit   See Control Valve Assy Fig 4 2 1     Utilizing a    TEST PORT    on the pump that delivers hydraulic pressure to the bucket curl cylinder  circuit  see 4 3 above  connect the hose from the check valve on the  P  port to the test port     Locate an existing tank line hose on the main return manifold or hydraulic tank  Disconnect the  existing hose and install a tee fitting     Reinstall the existing hose onto one end of the tee and then connect the new tank line hose from  the control valve  T  port to the other end of the tee     Cable tie hoses to existing hoses where appropriate and coil any excess hose if required  Ensure  that the hoses are not bound up or under any strain     Tighten all hose joints and fittings between the control valve and the pump and tank     NOTE 1  When ut
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
SERVICE MANUAL McDonald`s SinBaD Series SINGLE  novero Rockdale EN_v1_0  User`s Manual  Senseo Senseo HD7825/31 coffee maker  Bedienungsanleitung  User Manual of Cross Camera  H1, H2 and H3 Operation Manual    User Manual - SharePoint    Copyright © All rights reserved. 
   Failed to retrieve file