Home
        Instruction Manual for 6
         Contents
1.                                                                                                                                          O ia  D  ol       ne    d  O  ipe NT                                Right side fork      starter  And apply engine oil to a kick gear    of the kit  and fix it          Apply grease to a stock washer  and fix it  to the tip of a kick shaft     Kick starter  Washer     lt              Put the kick starter into a hole on the  right side crankcase    Xx Please note that the kick starter cannot be  fixed after joining together the crankcases     O0 O   Remove dirt and dust remaining on the  mating surfaces of the right  and left side  crankcases  and degrease the mating  surfaces      Apply liquid packing to the mating surface  of the left side crankcase   Recommended sealant    KAWASAKI Bond   silver color liquid gasket   92104 002   x Do not apply liquid packing to the portion   A   as shown in the figure below                 Mar    06   07    crankcase  Attach a stock spacer to the    mainshaft  And attach the processed left    crankcase  and join a right and left  crankcases together by hitting them with a    plastic hammer       Align the tipQ of the kick shaft with a kick  shaft hole on the left crankcase  and fix      the cases     Locating pins       ea  See Sy    Stock spacer      Fix screws on the crankcase  and screw    them up in the numerical order     Torque  6 NI  m  0 6 kgf   m       Apply screw locking agent to the screw    No 
2.       N       Instruction Manual for 6 Speed Transmission Kit    tem No  0000 00 0000  Application    KSR110    Frame Nos    KL110A 000001     A1 A2   Up to    04 models       Read all instructions first before starting the installation        Thank you for purchasing one of our TAKEGAWA made products  Please read the following instructions before installation    O Before installing the kit  please be sure to check the kit contents  Should you have any questions about the kit  please contact your local motorcycle dealer    O This kit is for exclusive use in KSR110  Please note that the kit cannot be installed on any other types of motorcycles    O Installation of this kit requires engine removal   mounting and crankcase splitting  At some stages of the installation  some special tools are required   Besides  this instruction manual  as well as a service manual  is prepared for those who have acquired basic skill and knowledge  Therefore  those who  are not sklled or do not have sufficient knowledge may not be able to install the kit correctly       This instruction manual covers the installation work only after the procedures of the engine removal from the body  disassembly of a cylinder head   cylinder  piston  clutch cover  flywheel  generator cover  and primary and scondary clutch assemblies  and the splitting of the crankcase    Please do the removal work referring to a KAWASAKI    s service manual for KSR110 for the removal procedures before this stage    O Be sure to re
3.  00  M1 gear  13171  M3 4 gear  19T  21  Main shaft M2 gear  161   ooooo    loo   coo COU U USALE 00000 000000    Spacer  Stock         A R ees U Ur  SS   FAS  ZAG   a  Ball bearing 6803    Spline washer 17mm Special washer 17mm    Extemal circlips 17mm    Counter shaft    C5 gear  26T Thrust washer 17mm C6 gear  25T  at ee UO A gi TESE  ieee 1 00 mood    C1 gear  3510   C4 gear  281  C3 gear  307    C2 gear  3210    000000000 U N 0000   00 UU  oo000 4D m 00000000 L0        Counter shaft        N  des fe  gt   oOoooo   ooo0   o00 T 7  i Thrust washer 12mm  i J    HEU     TT           tc           T       IN    uR ear 4q  ga      Spline washer 17mm       Extemal circlips 17mm Extemal circlips 17mm    Spline washers 17mm    Part Name Qy   Repair Part ttem No   1 packs oF  pine washers Timm   4   am   5o  eemal crips Imm   6   239   5  pecial washer T7mm                Thrust washer Tamm          SPECIAL PARTS UNEC NVA p    Mrr    06   07       
4.  O The installation of this kit will change the gear change pattern to the return system of 1 down 5 up  Change gears infallibly and only after you have  completely disengaged the clutch  Changing gears forcibly or without disengaging the clutch on the manual gearshift motorcycle will cause the  gears and other parts to get damaged    O Before riding  check every hardware like screws and nuts for slack and for abnormal sound  When you notice something abnormal with your  motorcycle while riding down a road  immediately stop riding and check what went wrong with the motorcycle           Please be informed that  mainly because of improvement in performance  design changes  and cost increase  the product specifications and prices  are subject to change without prior notice     Important Notice from TAKEGAWA    Though we have developed and designed each tuning up part to have a certain level of strength and durability  the wrong use or handling of them will  most likely increase the fear of parts breakage  Therefore  you are kindly requested to use these parts with great care as special parts  not as stock       parts       Features      This is a kit for 6 speed transmission with a gear ratio for sport driving as compared with a standard 4 speed transmission  A wide range of settings will  be available when this kit is used in combination with a final gear  Docks of each gear are tapered to prevent the gear from coming out         Stock 4 speed transmission on KSR110   TAKEGAWA 
5. 10     X Wipe off the liquid packing that will squeeze      out        O O   Attach a spring and pin to the shift drum     Attach an O ring to a neutral switch  and  attach the switch to the case        Apply liquid packing to the lower screws     and tighten two screws     Torque  3 NO m  0 3 kgf   m        As a hole will be made after processing of      packing to the screws at the lower part      If no liquid packing is applied  this will cause     the engine oil leakages   a Q y  S3    Neutral switch                                   A __ Liquid packing      AOS    f f     of                      Shift arm spring    O0 O O   Attach the change shaft lever to the    the crankcase  never fail to apply liquid           O0 O O   Referring to the service manual  reinstall  back the removed hardware     O O   Fix two locating pins and O ring to the   O O   Invert the crankcase         Put a return spring tip into a hole on the kick  shaft  and rotate the spring clockwise     Put the other spring tip into a hole on the    crankcase        Attach a plastic spring guide      X Check that the crankshaft mainshaft and  countershaft rotate smoothly      Xx While rotating the countershaft  rotate the    shift drum and check if the gear shifts to each    position     Kick starter    vid Pa                     Return spring                              O0 OO   Detach a shift arm spring from a stock      change shaft lever  which please fix toa    provided change shaft lever       Attach 
6. a provided change shaft return    spring to the change shaft lever     Change shaft return spring    Change shaft lever    crankcase        SPECIAL PARTS WwN4Sey W     3 5 16 Nishikiorihigashi Tondabayashi    Osaka Japan  TEL   81 721 25 1357  FAX   81 721 24 5059             j    URL   http   www takegawa co jp    oA    Mar    06   07    la                  Counter shaft side Main shaft side    67mm  2 638in  with ball bearings       48mm  1 890in  from crankcase s 38mm  1 496iIn  from crenkcase s      Rasp these  porsions to make them  Imm  0 039in  lower     Depth should be  measured from       7 N  Crankcase Machining       Flat end mill  or blue nosed end mill  under          Process Standard   Diameter when measured with bearings in the middle    Type of Cutter      Depth when measured with crank case s mating surface in the middle  Where to process   Shaded portion    Caution   Cover the bearings with a masking to prevent chips and shavings from falling  into them    Remark  Take note that this machining leaves a hole on the spot for mounting a lower  neutral switch    Machining Sizes    45mm  1 772in  with needle bearings  ia     riddle Plaine in the middle    mating surface    Left side crankcase           Wi              this point    A hole will be left on this threaded portion          SPECIAL PARTS UNLEY NVA r           Mrr    06   07            Transmission gear assembly drawing D    Main shaft  M5 gear  221  M6 gear comp    23T  OOUUU0U0 O00    O000 EU  0 Pe Bi
7. d to put in the pin  insert it by  hitting it with a plastic hammer     cam with its tapered portion pointing down          Drum cam pins          Locating pin  wo       Tapered portion                                                       Los Mar    06 07        Place a holder and tighten up a cap bolt    O O   Apply engine oil to pawls on each shift fork    O O   Detach a stock kick gear from the kick           Apply screw locking agent to the cap bolt     Torque  6 N   m  0 6 kgf   m       Cap bolt         Set the shift drum at a NEUTRAL position     Drum cam       Position roller                                                                      0 O   Invert the crankcase       After applying grease to a provided 12mm    thrust washer  attach it to the countershaift      And After putting together a mainshaft    assembly and countershaft assembly  fit    them into the right side crankcase at a time      x Take care to prevent a thrust washer from    coming off      x Apply engine oil to every gear and    bearing                                                                                                   Mainshaft    Countershaft          and fit the forks into grooves on each gear     Change speed pull rod    ry        Left side fork i i uy    Ic    Center fork           Right side fork Pa 3  T a  x Pay attention to the location of each fork      Apply engine oil to a change speed pull rod    and moving each shift fork  put in the rod to   attach it to a case      
8. place gasket  O ring  packing and others with news ones at the time of disassembly  In this kit are not included gasket  O ring and others  necessary for engine disasembly  So please purchase them separately    O This kit is designed to be applicable to KSR110 of up to 04 models  For installation on KSR110 from    05 models and onward  please purchase a  KAWASAKI made genuine change lever for 04 motorcycle models       Please be informed that  mainly because of improvement in performance  design changes  and cost increase  the product specifications and prices are  subject to change without prior notice       This manual should be retained for future reference     Machining of a left side crankcase is needed for the installation of this kit  Please contact a machining workshop for this processing with the processing  drawing     The following show the envisioned possibility of injuries to human bodies and property damage as a result of disregarding the following  cautions     O Before starting the installation  make sure the engine and muffler are cool at below 35 degrees Celsius   Otherwise  you will burn you      O Do the installation with right tools  Always use a torque wrench to screw bolts and nuts tight and securely to the specified torque     Otherwise  these parts may get damaged or fall off  resulting in accidents      O Do not use or process other parts than those included in the kit or specified parts  Otherwise  the breakage of parts is highly likely to follow   
9. s close 6 speed transmission  3 000  36 12  2 692  35 13   1 937  31 16  2 000  32 16        1 350  27 20  1 578  30 19     1086  257320  Soa ooo 1181  267221  0o Ee 1086 25 23  J                         ce Nar    06   07                a Kit includes         No   Part Name  y Repair Part Item No    Please see the Transmission Gear Assembly   sss   Drawing on the last page of this Manual  Las   24301 KLI T00   Ca  shite drum cam     1 a   24142   6  Thrust washer  12mm   1 _ BW 0I 0023   28211 KLI T00    8  Change shaft lever COMP     1  24610 KL1 T01    9  Change shaft reum spring   1 _ 24651 KLT T00   P10  let shit fork     ST peaa a O O    iT  Cental shit fore    a e T T   iz  Position lever spring   2    S    1      Please order repair parts by indicating the Repair Part Item No  as listed above  As you see from the  list  depending on the repair parts  in some cases we may not be in a position to accept your order for  a single item in the quantity of one                   Installation Instructions       O O   Process a left side crankcase as per the   O O   Prepare a suitable stand to place a     Change the spring with a provided spring   instructions   Please see the machining   crankcase on      Aligning a hole on the shift drum cam with  drawing of the crankcase     Put a stock locating pin into a gear shift drum  the locating pin on the drum  fix a cam    and fit the drum into the right side crankcase    Put five shift drum cam pins into the drum    In case it s har
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Tips for Portable Cot Installation PC-06    WD SATA Internal Hard Drive Quick Install Guide  1 - Fischer HiFi AG  Lenoxx Electronics CD-87 CD Player User Manual  JAI CM(B)-141 (P)MCL Manual  Manual  Ampli1™ WGA Kit  2 - Sony  5240 Quick Reference Guide Template    Copyright © All rights reserved. 
   Failed to retrieve file