Home
        Control Valve Drive Part List For
         Contents
1.        Spring   Detent  i PSP KN   OE OS 15748 PO Screw   Program Wheel  IP ea dies aaah ak 60405 15          Program Skipper Wheel Assy    Specify  Hardness Capacity  2 ee   PPP 13806            Program Wheel Retainer  P4 P SEERE 13953            Cover Label   Program Wheel  Dates eee LA ak   Electrical Cord  2 eee ATO 12681  c6 ia dx Wire Connector   tere l1  ox  saa 13547  POP tea da Strain Relief  20 dotes   RPS 13229  iius premis Back Cover  S   P E PA PS RO O Not Assigned  p z eee ode 13933  taka peace Front Label   Beige  saae dd 13958            Front Label   Silver  PORTE   BPO ae 13310  2 sua Re Rear Label   Softener    Papa 18520  52222 ess Rear Label   Filter  osa   PER 159575 k   Tape Stripe   Beige    PM 13960    444644 Tape Stripe   Silver  IUe ea aei   S 60514            Brine Cam Assembly  3 18    PPP 60514 01         Brine Cam Assembly  6 36    rr 60514 02         Brine Cam Assembly   Minutes  SY  SO a ck 12473 ee  Screw Drive Mounting  a Gk   wr 12037            Washer  cy POS sekce 13830  esa 404 Drive Pinion   Program Wheel  38         i PRES Boo PAPET PRE Clutch   Drive Pinion  kO AA   PPP 14253  qe canner aid Spring Retainer    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Metered Control Valve Drive Part List Cont  Page 25    Item No  No  Reg d Part No  Description   40           pP 14276 odd s Spring   Al NUN   eee 14043            Cable Assembly  Std  PARADA 14910522 ws Cable Assembly  Ext  Rt Angle   B Gea del   paneer omer 14176       
2.      Valve Position Dial   Standard    rere 14278 ne Valve Position Dial   Low Water  deseris 15478            Valve position Dial   Filter   AD eta maiba agang ara I Sy e  Knob Label   Beige    PPS 14207            Knob Label   Silver   44     P dcn Rec B  ccn Screw   Knob   AS   cina   aaa 40214            Screw  Brine Cam    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Bypass Valve Assembly  Plastic Page 26       Item No  No  Req   d Part No  Description  Mes ua Es PPP 1912 uad aa By Pass Valve Body  Plastic  Dedicate IPO UBS sa P a eee O Ring   015  k PP lozexaeee34 TOT Lua as d xs Cap  By Pass  L POP tae Tit Pac oes eue pea Screw  Hex Washer Head  6 24 x 3  DAG eda a   ed 17820              Plug  By Pass  Inlet     SPO   eee re 17820 01           Plug  By Pass  Outlet  White   Oda aaa 18661 25 weaning ewes O Ring   218  ree Pr 18662              Retaining Ring  Oa ue Zacka 18660              O Ring  B uud xd Desa as ee 13305 ces at ER O Ring   119  10    waka Da ges dut exi 13255 w te pea ara Clip  Mounting  Il       PROMO gale ang an 13314              Screw  Hex Washer Head  8 18 x 5 8  Da ea M 18706              Yoke  Plastic  17 NPT  18706 02           Yoke  Plastic 3 4     I2B  4345 aakit a 13 708 i oet doa Yoke  3 4     M 13708NP           Yoke  3 4  Nickel Plated  Miras desa 13398 Sem Yoke  1   IPPT 13398NP           Yoke  1    Nickel Plated    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Meter Assembly Page 27       Item No  No  Req   
3.   Maintaining Your System    The system is set to use about 9 Ibs  of salt or potassium per regeneration cycle  For the  next few months  monitor the brine tank to establish how often to add salt or potassium   If your system has a timed valve  you should have to fill the brine tank about every 5 to 6  weeks  If your system is metered  it may be less often based on water usage and the meter  setting for your water     The system will manually regenerate itself clean  If you find that the system is not pro   ducing enough clean water  then set the    regen    pins to regenerate more often     If the system doesn   t seen to be pulling any brine solution in  check the screen in the  brine line at the base of the valve  It may be clogged and need cleaning     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC   l l E W O SSS   s     e8    Information Notes Page 15    e Even though you now have PURE WATER in your cold water lines  your water  heater is still full of raw water  Through normal use  this water will be replaced with  soft water in about 2 to 3 days     e You may experience cloudy water in the mornings  This is caused by the clean water  sitting in your pipes over night and stripping the build up off  Run your water for 2 to  3 minutes every morning until it clears  This should last no longer than 1 to 2 weeks     e We supply a toll free number  888 989 7873   to all of our customers to use  in case  they don t understand something contained in our installation in
4.  888 989 7873 PURE WATER TREATMENT  INC   F ee SS az    Turning the Water Back On Page 13    1  INSTRUCTIONS FOR USING A BYPASS VALVE  If you are using a bypass valve   make sure your bypass valve is now in the  BYPASS  position     2  Turn your water on slowly  leaving all your faucets in the house open until water  starts coming out of them  After they are all running steady and the air is out of the  water lines  turn them off one by one  The raw water will be bypassing your system at  this time     3  Slowly open your bypass valve to the    SERVICE    position and begin filling the sof   tener resin tank with water  In a few minutes the sound of water entering the system  will stop     4  Next  open one faucet   preferably an outside faucet  a laundry sink or bathtub   let   ting the water run through it slowly for a few minutes  This allows the water to rinse  the inside of your resin tank out and settle the media     5  Sometimes you may experience some light medium brown color rinsing off the new  resin beads      This is normal   and should only last a few minutes     6  This is why we suggest running the water through only one faucet  to clear the sof   tener of this colored water     7  After a few minutes  and the water is running clear     turn the faucet off     8  You now have soft water on your cold water side     The hot water will take a couple  of days to become soft  as your hot water tank is full of hard water     9  Finally  if you are using a demand valv
5.  E  Repeat Flushings of the Hot Water Tank is  Required   F  Leak At Distributor Tube  F  Make Sure Distributor Tube is Not  Cracked  Check    O    Ring and Tube Pilot   0 A G  Internal Valve Leak  G  Replace Seals and Spacers and or Piston   3  Unit Uses too much salt A  Improper Salt Setting  A  Check Salt Usage and Salt Setting     ro B  Excessive Water in Brine Tank  B  See Problem No  7     4  Loss of Water Pressure A  Iron Buildup in Line to Water A  Clean Line to Water Conditioner  Conditioner     B  Iron Buildup in Water Conditioner B  Clean Control and Add Mineral Cleaner  to Mineral Bed  Increase Frequency of  Regeneration     C  Inlet of Control Plugged Due to Foreign   C  Remove Piston and Clean Control   Material Broken Loose From Pipes by  Recent Work Done on Plumbing System     5  Loss of Mineral Through Drain   A  Air in Water System  A  Assure that Well System has Proper Air  Eliminator Control  Check for Dry Well  Condition     6  Iron in Conditioned Water  A  Fouled Mineral Bed  A  Check Backwash  Brine Draw and Brine  Tank Fill  Increase Frequency of  Regeneration  Increase Backwash Time        C Foreign Material in Brine Valve      C  Replace Brine Valve Seat and Clean Valve     D  Foreign Material in Brine Line Flow D  Clean Brine Line Flow Control   Control     A  Clean Drain Line Flow Control     YD Line Pressure is tooLow    D  Increase Line Pressure to 20 P S I      E internal Control Leak    E  Change Seals  Spacers and Piston Assembly        Tech S
6.  NPT   51B       ze 18706 bu erase Se Yoke  Plastic  17 NPT  RO ESO DTC 18706 02          aaa  Yoke  Plastic 3 4  NPT   SP  RRER vn tens deies mua T3308 ci er ERE ER Drain Hose Barb      Not used with meter controls    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Metered Start up Page 22  The water softener should be installed with the inlet  outlet and drain connections made in  accordance with manufacturer   s recommendations and to meet applicable plumbing codes     MANUAL  REGENERATION KNOB    24 HOUR GEAR             SKIPPER WHEEL   SHOWS EVERY  OTHER DAY  RED TIME REGENERATION   SET       194 ka Wow  PEL MIKA Pa om     U VA    O M  TO BILIN PETRA          TIME OF DAY ARROW   1  Manually index the softener control into the service position and let water flow into the  resin tank  When the water flow stops  open a softened water tap until all air is released  from the lines  then close the tap  NOTE  The various regeneration positions may be  dialed manually by turning the knob on the front of the control until the indicator shows  that the softener is in the desired position    2  Set water usage program wheel using any one of the following procedures    Typical Residential Application   To program  just set the time  set the hardness and it automatically monitors system needs   and regenerates only when necessary  To set time of day press red time set button and turn   24 hour gear until present time of day 1s at  time of day   Set program wheel by lifting
7.  installation has a    three valve  by pass system  first open the  valve in the bypass line  then close the valves at the conditioner inlet and outlet   b  If the conditioner has an integral by pass valve  put it in the by pass position   c  If there is only a shut off valve near the conditioner inlet  close it   3  Relieve water pressure in the conditioner by putting the control in the backwash  position momentarily  Return the control to the service position   4  Pull cable out of meter cover  Remove the control valve back cover   5  Remove screw and washer at drive yoke  Remove timer mounting screws  The entire  timer assembly will now lift off easily   6  Put new timer on top of valve  Be sure drive pin on main gear engages slot in drive  yoke  rotate control knob if necessary    7  Replace timer mounting screws  Replace screw and washer at drive yoke   8  Return by pass or inlet valving to normal service position  Water pressure should now  be applied to the conditioner  and any by pass line shut off   9  Plug electrical cord into outlet   10  Set time of day  program wheel  and salt usage  Cycle the control valve manually to  assure proper function  Make sure the control valve is returned to the service position   11  Replace the control valve back cover  Be sure grommet at cable hole is in place   12  Make sure there is enough brine in the brine tank   13  Rotate program wheel counter clockwise until it stops at regeneration position   14  Start regeneration cycle man
8.  the   people  dial and rotating it so that the number of people in the household is aligned with   the household grains per gallon water hardness  Release the dial and check for firm engage   ment at setting   This method will provide reserve capacity based on 75 gallons per person     Optional Programming Procedures   Calculate the gallon capacity of the system  subtract the necessary reserve requirement and   set the gallons available at the small white dot on program wheel gear  Note  drawing shows   850 gallon setting  The capacity  gallons  arrow denotes remaining gallons exclusive of   fixed reserve    3  Rotate the program wheel counterclockwise until it stops at regeneration position    4  Manually index the control to the back wash position and allow water to flow at the  drain for 3 or 4 minutes    5  Remove back cover plate  Make sure than the salt dosage is set as recommended by the  manufacturer  Manually index the control to the brine fill position and allow the brine  tank to fill to the top of the air check    6  Manualy index the control to the brine rinse position and allow the control to draw water  from the brine tank until it stops    7  Plug in the electrical cord and look in the sight hole in the back of the montor to see that  it is running    8  Manually advance the control to the beginning of the brine fill position and allow the  control to return to the service position automatically    9  Fill the brine tank with salt  Replace back cover on the c
9. 0 gallons  If not performing properly  replace meter     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Service Instructions Page 32    A  TO REMOVE TIME BRINE VALVE  INJECTORS  AND SCREEN   Unplug electrical cord from outlet      Turn off water supply to conditioner    a  If the conditioner installation has a    three valve    by pass system  first open the  valve in the by pass line  then close the valves at the conditioner inlet and outlet    b  If the conditioner has an integral by pass valve  put it in the by pass position    c  If there is only a shut off valve near the conditioner inlet  close it    3  Relieve water pressure in the conditioner by putting the control in the backwash  position momentarily  Return the control to the service position    4  Disconnect brine tube and drain line connections at the injector body    5  Remove the two injector body mounting screws  The injector and brine module can  now be removed from the control valve  Remove and discard valve body Orings   6  To Replace Brine Valve  1  Pull brine valve from injector body  also remove  amp  discard O ring at bottom of   brine valve hole   0  Apply silicone lubricant to new O ring and reinstall at bottom of brine valve hole   0  Apply silicone lubricant to O  ring on new valve assembly and press into brine  valve hole  shoulder on bushing should be flush with injector body    7  To replace injectors and screen    1  Remove injector cap and screen  discard O ring  Unscrew injector no
10. 00        Piston   Softener  60102 10        Piston   Filter  60102 20        Piston   Low Water   60125 Lecce ep Seal Kit   60084 XX         Injector   DUO P oae xw Brine Valve  60514           Brine Cam  3 18  60514 01        Brine Cam  6 36  60514 02        Brine Cam  Minutes   BUSTO dasad Coupling with Clip  amp  Screws  60040           Bypass  Brass 3 4    NPT  60041        4   Bypass  Brass 1    NPT  60049           Bypass  Brass  Plastic  60086           Meter  Std   60087           Meter  Ext   60136 5600      Service Kit  Meter  60135 5600      Service Kit  Clock  14860           Skipper Wheel 7 Day  14381           Skipper Wheel 12 Day  60405 10        Meter Program Wheel  Std   60405 20        Meter Program Wheel  Ext     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Troubleshooting Page 30    PROBLEM CAUSE CORRECTION  1  Softener Fails to Regenerate A  Electrical Service To Unit Has Been A  Assure Permanent Electrical Service   Interrupted   Check Fuse  Plug  Pull chain or Switch     B  Timer is Defective B  Replace Timer    Po C  Power Failure C  Reset Time of Day   2  Softener delivers Hard water A  Bypass Valve is open  A  Close Bypass Valve    C  Injectors or Screen Plugged  C  Clean Injector Screen  D  Insufficient Water Flowing Into Brine D  Check Brine Tank Fill Time and Clean  Tank  Brine Line Flow Control if Plugged     B  No Salt in Brine Tank  B  Add Salt to Brine Tank and maintain  Salt Level above water level   E  Hot Water Tank Hardness 
11. E WATER TREATMENT  INC        PURE TECH 2200 FLOW DIAGRAM Page 4    PURE TECH 2200         TO DRAIN    RAW WATER CLEAN WATER    Figure A    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Job Specification Sheet    Page 5                e JOB NO    e MODEL NO    e WATER TEST   e CAPACITY PER UNIT MAX  PER REGENERATION  e MINERAL TANK SIZE DIA  HEIGHT    e BRINE TANK SIZE  amp  SALT SETTING PER REGENERATION        e CONTROL VALVE SPECIFICATIONS    Type of Timer  A  Std C  7 Day E  Meter  Std   B   L  D  12 Day F  Meter  Ext   Day Time of Regeneration    Drain Line Flow Control gpm       Brine Refill Rate gpm       Injector Size       Meter Gallon Setting gal        TYPICAL CONTROL VALVE INFORMATION    Dia  Color  gpm   uid TUR         m   White   38g 45gpm   Sem   15gpm     o   a   white   38gpmwa4sgpm   Sem   20gpm       24 gpm      35am     80 gpm     5 0 gpm      70 gpm      24 gm  em  Log  Som  To em    Due to varying water conditions  tank sizes and water pressures  the above settings  should be used only as a guideline    Tm B L F C   Brine Line Flow Control   Refill Rate for Filling Brine Tank         D L F C   Drain Line Flow Control   Backwash and Rapid Rinse Flow Rates        Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     System Overview Page 6    e This installation guide gives a step by step  start to finish procedure for installing  PURE TECH 2200 systems using Fleck valves  All of these systems will regenerate  with softener Solar Salt or P
12. Pin Drilled for Thumb Screw       L    Housing   w Pin    RAEE AI    L    Housing   w Pin Drilled for Designer    Motor Mounting Plate   Motor   120V   60 Hz    Motor   24V   60 Hz    Screw   Motor Mtg   amp  Ground Wire  Screw   Component Mounting    PURE WATER TREATMENT  INC     Control Valve Drive Part List Cont  Page 18    Item No  No  Reg d Part No  Description   Draga es   SY 13017    rh Idler Gear   pP los idet 13018            Idler Pinion   EEE P Dc a MAN xs Spring   Idler   Ntra acon 038   cecus   O k   Drive Gear     SEP   22344244 13170  44 44446445 Main Gear  amp  Shaft   l2 NC prre 19203  cuerdas 24 Hour Gear Assembly  Silver    DRAGES SEERNES 19205 01         24 Hour Gear Assy  Tan   I3 Raus asaan VOL  pakalat paha Cycle Actuator Gear   14 a kha kaka V paces was 17 Pe Knob   Manual Regeneration     P DT 13300            Ball   1 4  Dia       RSP P oo gee oo ng Bosne Spring   Detent   Skipper Wheel   Deska   PPP 14381  k   Skipper Wheel Assembly   12 Day  PP 14860            Skipper Wheel Assembly   7 Day   P   PSO ep 13864            Skipper Wheel Ring   PA ere Ds exbsbads 14457  ne Spring   Detent   Main Gear   ee ee ee ere 13014            Regeneration Pointer   23 Se cada ge 11842  awa sasa a Electrical Cord   Standard   n ry ADP 12681            Wire Connector  Not Shown    Z MEN   fpc 13947  PPV OE Strain Relief   204 aa La ll ae ak   132295 esae Back Cover   P   WFP 13309            Front Label   Brown on Beige  eat 1343 T ui ees eg Front Label   Blue Sil
13. Pure Water   Treatment  Inc     PURE TECH 2200    Owners Manual    Installation Instructions    For Models       PTUF 5600 10  ES e PTUF 5600 13    MEMBER      SS Ost       T    ech Su    Table of Contents    Subject    PURE TECH 2200 Diagram   Job Specification Sheet   System Overview   Pre Installation   Installation   Installing Drain line   Brine Tank Connection   Turning Water Back On   Post Installation   Maintaining Your System   Information Notes   Start up Procedure   Control Valve Drive Assembly   Control Valve Drive Parts List   Control Valve Drive Assembly for Clock or Meter  Control Valve Drive Parts List for Clock or Meter    Pure Water  Treatment  Inc     P O  Box 730486    Ormond Beach  FL 32173 0486  1 888 989  PURE  7873 Office   1 877 219  PURE  7873 Fax    Copyright   2003 all rights reserved    ort  1 888 989 7873    Page       VY A U R    Page 2    PURE VATER TREATMENT  INC        T    ech Su    Table of Contents    Subject    Meter Start up   Metered Control Valve Drive Assembly  Metered Control Valve Drive Parts Lists  Bypass Valve Assembly  Plastic   Meter Assembly   Bypass Valve Assembly  Brass   Service Assembly Parts List  Troubleshooting   Service Instructions   Warranty   Notes    ort  1 888 989 7873    Pure Water   Treatment  Inc     P O  Box 730486  Ormond Beach  FL 32173 0486    Copyright   2003 all rights reserved    Page    22  23  24  26  27  28  29  30  32  36  37    1 888 989  PURE  7873 Office   1 877 219  PURE  7873 Fax    Page 3    PUR
14. ction with the use of the system        Modification of the Warranty   PURE WATER TREATMENT  INC  does not author   ize any other person to assume for PURE WATER  TREATMENT  INC  any other liability in connection with  this product     The dealer has no authority to make any representa   tions on behalf of PURE WATER TREATMENT  INC  or  to modify the terms of this warranty in any way     Page 36       PURE WATER TREATMENT  INC     Notes Page 37                                                                            Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     
15. d  pret Orde sas  A  Vou dx ns   z  d       je Zm i ET  zoe rs oasi Ve    m Voz    o SM ere or  v B oid esed  addi ausu R   las fes  CREE   TP  Des te GE Bee IPO     Tech Support  1 888 989 7873    Description    CZ Screw   Meter Cover Assembly  d  n   Meter Cover Assembly   Standard   T Meter Cover Assembly   Extended    Range  Rt  Angle    Pe O Ring   Meter Cover Assembly  SZCZE Impeller       Screw   Adapter Clip   ades Adapter Clip   m Meter Body   RETTE O Ring   Meter Body       Z Flow Straightener    PURE WATER TREATMENT  INC     Bypass Valve Assembly  Brass Page 28        E  S     B  9   P  gt  p  Lend s  KOD   yan 4  NY   4  CD  3  NA  An  3 ACE x IN 1  B 4 oa Mi SK  dt   2  SZ    SA  PEN        Mod  tt    bo   Item No  No  Req   d Part No  Description    One   W E KN UE MORA By Pass Valve Body  Plastic    me   MP 17290 PSR By Pass Valve Body  3 4   hinahawi 17290NP           By Pass Valve Body  3 4    Nickel Plate  Doareen  13399 M By Pass Valve Body  1     Lee casas 13399NP          By Pass Valve Body  1    Nickel Plate  wade   MED 11728  i tens adus Seal  By Pass  Dison aus Vos 11972  vana Plug  By Pass  Mama se   Oe INSEE  Side Cover  Jaws de Le  ka c 13604 01         Label  TEEN B POPP IN ode tt Screw  Teepensas lax ea 11986            Side Cover  PREIS TT LIST PO Lever  By Pass  ORDRE    POCZTE 11989            Screw  Hex Head  1 4 14    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Service Assembly Parts List Page 29    Part No  Description  60102 
16. d on it  Remove the  black nut and then put the brine float back into the brine well  Notice there is a small  hole drilled in the brine well  that you can insert this small section of screw through     4  Hold the brine float with the section of screw in the hole as you put the small black  nut back on  This is what holds the brine float in place     5  On top of the brine float  you will see a larger black elbow with a black plastic nut   Carefully remove the black nut and you will find two small compression rings inside  the nut  one black and one white  These small pieces help seal the end of the 3 8  tube  that connects the brine tank with the valve on top of the system     6  Each one of these small rings has a flat side  Hold the two small rings together with  the flat sides touching  This is the way they fit together when they go inside the black  nut  white piece first     7  Next  insert one end of the 3 8  tubing though the hole in the side of the brine tank  and brine well  and slide the black nut onto the tube with the threads facing the end of  the tube  Then  slide the two small compression rings onto the tube  white piece first   then the black piece making sure the flat edges of both rings are together     8  Now insert the end of the tube into the black elbow as far as it will go  Hold it there as  you thread the black nut onto the black elbow  tightening it finger tight which com   presses the two rings inside the nut onto the tubing     9  Replace the lid 
17. e firmly insert the small brass end of the black  Meter Cable  into the small hole located on top of the dome shaped Meter housing   The end of the cable will only insert about 1 8    3 16  into the meter housing hole     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Post Installation Page 14       We will have already pre set the meter on the system to regenerate  according to your  water test results  You will only need to set the time of day on the front of the valve   If you are not sure what the meter is supposed to be set on  please give us a call with  information on your water test results  and we will help you determine what setting to  place your meter on     2  Look in your service manual  for your particular model Fleck valve  and manually run  your valve through a regeneration cycle  To do this  simply turn the manual  Regen   dial clockwise just a few  clicks  at a time  stopping at each setting for a minute  to  clear the air out of the resin tank and valve  Once you have completed turning the   Regen  knob one complete revolution and it is set back to the  Service  position  the  system is now ready for use     3  Finally  plug the valve in the electrical outlet and set the current time of day  Our sys   tems will regenerate around 2 00am     4  Check all connections for leaks     5  You are now ready to experience PURE WATER     Don   t forget to tell your friends  family and neighbors about how excellent the    PURE TECH 2200 works for you      
18. eat   20 Liu waa   PSR DIG ovas eus Brine Valve Cap   JU sn   o 1316 E 5 ees ean ake Brine Valve Spacer   LI og xas laeua du iria 12550             Quad Ring   d E erm IPO LISTA cae pat ven Spring   Brine Valve   ro       O 16098             Washer   Brine Valve   i       Pg 11981 01          Retaining Ring   Oda ane   POP 10329             B L F C  Fitting Nut   6  P INTE 10330             B L F C  Ferrule   Oque e lebat 10332 cosas t X B L F C  Tube Insert    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Control Valve Drive Part List For  Clock Or Meter  Page 21    Item No  No  Reg d Part No  Description   38 bad 44 ah pnaka kad 12094             B L F C  Button    25 GPM  n   12095             B L F C  Button    5 GPM    PRISE 12097             B L F C  Button   1 0 GPM   39 stament   era 12977  al ace O Ring   B L F C    40           PR 13245             B L F C  Button Retainer   D  D  devant aut 13244             B L F C  Fitting  3 8    Adwana  We D L F C  Button   Specify Size   43         Few 13173 Lis ists D L F C  Button Retainer   dl sed  s wore eres IXIBT sinerezis Screen   Brine Line   AS  ee   prep 15348             O Ring   D L F C   not shown    46         Nicea I340T paaa ky Air Disperser   AI casa i i te Se tet 13546             End Plug Retainer   48         Dese ca mia DTP ase esa na Screw   490         bee P nk Washer   3044 abus Dette 13296             Screw   SA zen   NW  13398 SEO Yoke  Brass  1  NPT    Pe 13708  x vents Yoke  Brass  3 4 
19. er by putting the control in the backwash   position momentarily  Return the control to the service position    Pull cable out of meter cover  Remove the control valve back cover    Remove screw and washer at drive yoke  Remove timer mounting screws  The entire   timer assembly will now lift off easily  Remove end plug retainer plate    Pull upward on end of piston rod yoke until assembly is out of valve  Remove and   replace seats and spacers with fingers       TO REPLACE METER    Unplug electrical cord from outlet    Turn off water supply to conditioner    a  If the conditioner installation has a    three valve    by pass system  first open the  valve in the bypass line  then close the valves at the conditioner inlet and outlet    b  If the conditioner has an integral by pass valve  put it in the by pass position    c  If there is only a shut off valve near the conditioner inlet  close it    Relieve water pressure in the conditioner by putting the control in the backwash   position momentarily  Return the control to the service position    Pull cable out of meter cover    Remove two screws and clips at by pass valve or yoke  Pull resin tank away from   plumbing Connections    Remove two screws and clips at control valve  Pull meter module out of control   valve    Apply silicone lubricant to four new O rings and assemble to four ports on new meter   module    Assemble meter to control valve  Note  meter portion of module must be assembled at   valve outlet    Attach two cli
20. er inlet  close it    Relieve water pressure in the conditioner by putting the control in the backwash   position momentarily  Return the control to the service position    Pull cable out of meter cover    Remove four screws on cover   Lift cover off of meter module  discard O ring    Remove and inspect impeller for gear or spindle damage  replace if necessary    Apply silicone lubricant to new O ring and assemble to the smallest diameter on   meter cover    Assemble cover to meter module  Be sure impeller spindle enters freely into cover    Press firmly on cover and rotate if necessary to assist in assembly    Replace four screws and tighten    Return by pass or inlet valving to normal service position  Water pressure should now   be applied to the conditioner  and any by pass line shut off       Check for leaks at all seal areas     Plug electrical cord into outlet    Set time of day  Make sure the control valve is in the service position    Rotate program wheel counter clockwise until it stops at regeneration position   Start regeneration cycle manually if water is hard    Plug cable into meter cover  Rotate cable to align drive flat if necessary     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Warranty    Pure Water    Congratulations on the purchase of your PURE TECH Water System     10 YEAR WARRANTY  Treatment  NC  FOR RESIDENTIAL APPLICATIONS    PURE    WATER TREATMENT  INC  warrants its products to be free from defects in  material and workmanship accord
21. holes in your Fleck valve  the hard water  line will always enter the hole on the LEFT SIDE of the yoke or bypass valve assem   bly  The valve body also has an arrow stamped into each side  showing the direction  of flow     17  If you use our optional bypass valve  arrows indicating water flow direction are  printed on the top of the bypass valve assembly     I8  Just remember  that as you are looking directly into the two holes where the water  enters and exits the valve  the hard water line from your house always enters the hole  on the LEFT  The conditioned water flowing out from the system  back into your  house is always the hole on the RIGHT     19  If you purchased a Meter On Demand Water Softener  you will need to make sure the  gold tipped black cable protruding from the valve is securely plugged into the domed  shaped portion of the rear of the valve     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC   E      YY   ira a      Installing the Drain Line to the Valve Page 10        All of our Fleck valves have a drain hose barb  generally located on the lower  back   side or side of the valve  First  check to make certain this drain hose barb is securely  threaded into the valve body and that the threads have been sealed with Teflon tape     2  Once you know the drain hose barb is installed properly  carefully push the 1 2  ID  plastic drain hose completely over the barbed end of the fitting  and then attach a  small hose clamp to the end of the line so it cann
22. ing to the following terms and conditions     What is Covered     L The PURE TECH 2200 series   10 YEARS ON PARTS  JI  The PURE TECH 1000 R O  System  A  Installed following a PURE TECH 2200   10 YEARS PARTS  5 YEARS ON THE REVERSE OSMOSIS  MEMBRANE  B  Installed separately   10 YEARS PARTS  3 YEARS REVERSE OSMOSIS  MEMEBRANE       Who is Covered     This product warranty is transferable to a subseguent  owner  The only requirement is that the system must re   main at the site of original installation        Extension of Warranty to a Subseguent Installation  The ORIGINAL OWNER may move the system to another  location  The influent water guality at the subseguent loca   tion MUST  however  be within your system   s operating  specifications  Please contact a local authorized PURE  TECH dealer prior to installation at another location        Registration and Service   To place your system under warranty  your authorized  PURE TECH dealer should complete the owner s registra   tion form and return one copy to  PURE WATER TREAT   MENT  INC   P O  Box 730486  Ormond Bch  FL 32173   0486  within 30 days of the installation date  For service  under this warranty  you should contact the dealer  Retain a  copy of this warranty for reference if service is necessary     Pure Water  Treatment  Inc     P O  Box 730486  Ormond Beach  FL 32173 0486  OFFICE 1 888 989 PURE   FAX 1 877 219 PURE     Our Reputation Is Worth More Than Money       Tech Support  1 888 989 7873    Limits on this Wa
23. is not controlled by a  switch  Our Fleck valves have a 5  power cord  but you can use an extension cord if  an outlet is not nearby  Please follow any local building safety codes if you need to  use an extension cord     e IMPORTANT NOTE   IF you decide to set the brine tank in your garage  remember  that the water inside the brine tank will not freeze  but the water in the small 3 8   plastic water line running from the system valve to the brine tank will  Make certain  the garage is warm enough to prevent this line from freezing     e Make a list of all the plumbing fittings you will need to completely install the system  to make it ready for operation     e Assemble all tools needed to install the system  and start your installation   Tools and Materials needed   1  Pipe Cutters   2  PVC Glue    3  PVC  copper or CPVC pipe    4  Two 1    or 34    male adapters   Depending on which bypass is ordered     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC   E     gt      a       Installation Page 8       Turn off the main water shutoff valve     2  Next  open all plumbing fixtures in the house including all outside faucets in order to  drain the lines of all water possible     3  Cut and remove a section of the main incoming water line near where the system is to  be installed  Allowing this line to drain thoroughly     4  Remove the yoke  or optional bypass valve  from the back of the tank valve by loos   ening the two small stainless steel clamps on either side of the 
24. ith water running through it  turn on a few hot  and cold water faucets  and let them run until there is no more air in your lines  then  turn the electricity back on to your water heater     e Our systems can safely handle a pressure range of 35 95 psi  However  as with most  residential plumbing and for best operation causing the least wear on critical parts  we  recommend an operating range of 40 65psi  Now all you have to do is plumb in the  system  plug it in and set the current time of day     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     E Z 55554    Pre Installation Page 7    e Your system should be located in a protected  dry  level and non freezing area  The  brine tank and resin tank can have as much as 20 feet of 3 8  brine tubing connecting  them  So  the brine tank can set several feet from the resin tank  The brine tank will  hold 2401bs of softener Solar Salt or Potassium Chloride  so be sure to make it acces   sible for filling the tank when needed     e We recommend a 4  drain for the regeneration backwashing cycles  If possible  the  house drain should be no farther than 20 feet from the system  You will also need to  purchase some flexible 4  inside diameter  plastic tubing from a local hardware or  building supply store  This same size tubing will be used for both the valve drain fit   ting  and on your brine tank safety overflow fitting   Always follow local plumbing  codes      e You will need a standard 3 prong  120V  grounded outlet that 
25. ive yoke   rotate control knob if necessary      Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Service Instructions Cont  Page 34    C  TO REPLACE PISTON ASSEMBLY cont     10   11     12   13     14   15   16   17  18     Replace timer mounting screws  Replace screw and washer at drive yoke    Return by pass or inlet valving to normal service position  Water pressure should now  be applied to the conditioner  and any by pass line shut off    Plug electrical cord into outlet    Set time of day  Cycle the control valve manually to assure proper function  Make  sure the control valve is returned to the service position    Replace the control valve back cover  Be sure grommet at cable hole is in place    Make sure there is enough brine in the brine tank    Rotate program wheel counter clockwise until it stops at regeneration position    Start regeneration cycle manually if water is hard    Plug cable into meter cover  Rotate cable to align drive flat if necessary     D  TO REPLACE SEALS AND SPACERS    l   2     Don    Unplug electrical cord from outlet    Turn off water supply to conditioner    a  If the conditioner installation has a    three valve  by pass system  first open the  valve in the bypass line  then close the valves at the conditioner inlet and outlet    b  If the conditioner has an integral by pass valve  put it in the by pass position    c  If there as only a shut off valve near the conditioner inlet  close it    Relieve water pressure in the condition
26. on the top of the brine well  Your brine tank is now ready to be con   nected to the Fleck valve     10  Take the other end of the 3 8  brine tube and find the 3 8  brass nut located on the  valve body of your system  Remove this brass nut and you will find a small plastic  compression ring inside     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC   ee ee a    Brine Tank Connection Cont  Page 12    11  Slide the brass nut over the end of the tube  threads facing the end of the tube  Then  slide the compression ring on with the narrow side facing the end of the tube     12  Insert the end of the tube fully into the opening on the valve where the brass nut was  located  then slide the compression ring and brass nut up the tube  finally threading  the brass nut back onto the threads  Tighten the brass nut gently with a small wrench     13  Notice the plastic elbow that is located on the side of your brine tank  This is a   Safety Overflow   and will use the same size drain line that is used on the valve  drain  1 2  ID flexible plastic line   This drain line will not be under pressure  so it  must be directed to a drain that is physically lower than it is  DO NOT connect this  drain line into the drain line coming from the Fleck valve  It must be run separately to  the drain     14  Fill the brine tank with 9 gallons of water     15  Add 240 lbs of  Solar Salt  or  Potassium Chloride  to the brine tank  and you are  now ready to turn the water back on     Tech Support  1
27. ontrol  Be sure cable is not  pinched between cover and housing    10  Make sure that any by pass valving is left in the normal service position     RED POINTER    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Metered Control Valve Drive Assembly Page 23       Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Metered Control Valve Drive Part List Page 24    Item No  No  Req   d Part No  Description  prm Naka 14448 000        Housing   with Roll Pin    14488 001        Housing   w Pin Drilled for Screw    seca eae 14448 0          Housing   w Pin Drilled for Thumb Screw  TA eau I sree sae ang 15494 01             L    Housing   w Pin    222234 15494 03             L    Housing   w Pin Drilled for Designer          ee T3175  tyi Motor Mounting Plate  c ent da U Kaawa 187457 3 ordered Motor   120V   60 Hz   j  Poe 13494    resta te Motor   24V   60 Hz   Oita epee   r al de3 ee 11384             Screw   Motor Mtg   amp  Ground Wire  et hs ceka ee 13296  cg coke Ga a Screw   Component Mounting  Oak losa dsk Oza Idler Gear  pP   perm IURIS Idler Pinion  ee ee Vict hades  5512 4446464444 Spring   Idler  sa eae ce ISTOR pes Drive Gear  ji SPO losses IST  x PZA Main Gear  amp  Shaft  ILASTE Mp 19203    RENEE 24 Hour Gear Assembly  Silver    agata 19205 01          24 Hour Gear Assy  Tan  ETZ  Dorene  13802            Cycle Actuator Gear  E ANOMANG   PPA IA POPP ra Knob   Manual Regeneration   n es tion a 13300 tees da Ball   1 4  Dia   16 43 4444 PPPOE 14457     
28. ot work loose over time  Run the op   posite end of this drain hose to the drain you are going to use for your system  Re   member to leave a small air gap at the end of the hose going to the house drain    Follow local plumbing codes   and secure it there     3  When the system is in the backwash regeneration mode  water will flow out of this  drain line with a fair amount of pressure  especially during the  rapid rinse phases  of  the process  and the line may sometimes  jump  a little when changing cycles     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC   a a      Brine Tank Connection Page 11    I  Next  connect your brine tank to your system  One end of the supplied 3 8  brine line  tubing will be connected to your brine tank and the opposite end needs to be con   nected to your Fleck valve     2  Look inside your brine tank and you will see a 4  diameter  Brine Well  tube  Re   move the lid off the top of the brine well and look inside this tube  Here you will find  the  Brine Float  assembly  The brine float assembly works like a toilet tank float   shutting the water off inside the brine tank should the level of water get too high     3  Check to see if the brine float assembly is loose inside the brine well tube  If it is   simply pull it up out of the brine well and look about 2  down from the top of the  brine float assembly where you will see the metal end of a small threaded screw stick   ing out about 4   There will be a small black plastic nut threade
29. otassium Chloride     e Your new system from the PURE WATER TREATMENT  INC  comes with an  owner service manual  which  is enclosed along with these instructions  and will help  explain all necessary details reguired for successful installation and operation of your  system  Please refer to these instructions and the service manual supplied with your  system during installation and programming     e All steps provided herein are for typical installations only  If you require additional  plumbing to install your system  simply contact a person who is knowledgeable in  residential plumbing or have a local plumbing company help you install  or install the  system for you     e There is a bit of  over kill  in our instructions  but please bear with us as we want to  ensure that you  our customer  fully understand the instructions and are completely  satisfied with your installation     e We recommend that you take a few minutes and look at the service parts manual for  your particular model  to help you better understand your new water system  Take  your time and carefully read the instructions     e Get all of your plumbing parts together before you start  and have an assistant help  you  if possible  Typical installation should take no more than a few of hours     e If you are going to turn the water off to your house while installing the system  we  recommend that you turn off the electricity to your electric water heater during instal   lation  After the system is installed w
30. ps and screws at control valve  Be sure clip legs are firmly engaged   with lugs     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Service Instructions Cont  Page 35    E  TO REPLACE METER cont     10     11     12     13   14   15   16   17   18     Push resin tank back to the plumbing connections and engage meter ports with by   pass valve or yoke    Attach two clips and screws at by pass valve or yoke  Be sure clip legs are firmly  engaged with lugs    Return by pass or inlet valving to normal service position  Water pressure should now  be applied to the conditioner  and any by pass line shut off    Check for leaks at all seal areas    Plug electrical cord into outlet    Set time of day  Make sure the control valve is in the service position    Rotate program wheel counter clockwise until it stops at regeneration position   Start regeneration cycle manually if water is hard    Plug cable into meter cover  Rotate cable to align drive flat if necessary     F  TO REPLACE METER COVER AND OR IMPELLER    1   2        Ov DA GE          10   11     12  13   14   15   16   17     Unplug electrical cord from outlet    Turn off water supply to conditioner    a  Ifthe conditioner installation has a  three valve    by pass system  first open the  valve in the bypass line  then close the valves at the conditioner inlet and outlet    b  If the conditioner has an integral by pass valve  put it in the by pass position    c  If there is only a shut off valve near the condition
31. rear valve assembly   that holds it in place  Then simply pull it off the back of the valve  Now that you have  the yoke or bypass valve removed  follow the directions below to make them ready to  install on the valve     5  INSTRUCTIONS FOR USING A YOKE  If you have a standard Noryl Plastic yoke   it will have two    or 1  male thread nipples   one inlet  amp  one outlet   You will need  to buy two 34  or 1  Female thread adapters to whatever type and size of piping you  are plumbing the system to     6  INSTRUCTIONS FOR USING A BYPASS  If you are using our optional 44  or 1   brass bypass valve  you will need to purchase two 34  or 1  Male thread adapters to  whatever type and size pipe you are plumbing to     7  If you are going to use copper piping and be soldering joints  we do not recommend  applying intense heat  to your new valve meter assembly  We always recommend that  you remove the yoke or bypass from the valve assembly  and attach your plumbing  adapters to the yoke or bypass away from the valve  This simple step will ensure that  you are not applying any heat as you solder or pressure as you tighten the adapters  onto the yoke bypass  while they are mounted on the valve body itself     8  Another tip if you are using copper adapters  Always solder a 3  to 5  piece of copper  pipe into each of the two pipe adapters away from the valve  then let them cool off  before threading each one onto the yoke or bypass valve     9  After they cool off  apply Teflon tape to 
32. ributor Tube   1       WP 10244    sasawa O Ring   Distributor Tube   13 16      D PRT 1 achat exe 12981 ossa pee mes O Ring   Top of Tank   Deia me du FR RC do bU End aci cdd Not Assigned   rpm ee N 14241 sas ama ses Spacer   8 APP O lasse vas T3237 iosuada ws Piston   Standard  aata ka WAG 15781 ed DEE DD Piston   Low Water    13852 22 sae RS Piston   Filter   p PSE  pop c 10690 seis pega Piston Pin   K S   satus BO s ee ers Piston Rod Assembly   IL eed Pe 12933  5 d bee adie Piston Retainer   Veciana lec hs 13446    ess End Plug Assembly Std    White    eee 13446 10         End Plug Assembly Filter   Black    vas 13446 20         End Plug Assembly Low Water   Gray   JESZCZ JH qase  s 139155 oe ae ee Screw  Injector Mounting   SID pansa do Sia d a 19228 vg esas Adapter Coupling   TIO oss d sas nes 1330595 cake O Ring  Adapter Coupling   TI MP ZA re 13314  v d Screw  Adapter Coupling  clock or meter    jE  icai Pee 12638 obere i tres O Ring   Drain   19  ack eds Z sss xexwkas 13301 s sets O Ring   Injector   P isses snu a n  ch  EV O Ring   Brine Spacer   Zase   ka taxa 130 osa arva O Ring   Injector Cover   Ds SE   Pe BIG si OK ee yx Injector Body   pk ang ka Linseed has 10913U           Injector Nozzle   Undrilled   JA o dd ia   bk 10914             Injector Throat   Specify Size   ih PM   ocd gate NO East edats Injector Screen   Dates et   25 recita 13150  rede Injector Cover   d es awe dos     ace 13172  ics os Brine Valve Stem   p A     n 12626             Brine Valve S
33. rranty   Your system must be sold to you by an authorized PURE  TECH dealer in order to receive coverage under this war   ranty  Additionally  this warranty does not cover products  installed for commercial  industrial  institutional or multi   family applications     The design of the overall treatment system and performance  of your system is related to the chemistry of the water being  treated  therefore  This warranty is limited to the equipment    manufactured and distributed by PURE WATER TREATMENT   INC   This Warranty does not include damage to your system due to   Abuse  misuse or neglect  Excessive pressure  over 100 psi for a PURE TECH 1000  R O  system  or 125 psi for all other PURE TECH systems        Excessive water temperature  over 100   for a PURE TECH  1000 R O  system  or 120   for all other PURE TECH  systems   Freezing  alterations or misapplication  A change in the influent water characteristics  Your equipment must be installed and operated in    accordance with your owners manual   s recommendations  and applicable state and local codes        No Other Warranties   There is no other express warranty  Implied warranties  including any warranty of merchantability or fitness for a par   ticular purpose  are limited to the duration of this warranty and  are excluded to the extent permitted by law  There are no warran   ties other than those contained herein  In no event shall the com   pany be liable for indirect  special or consequential damages in  conne
34. ruction sheet  Manually index the  control to the brine fill position and allow the brine tank to fill to the top of the air  check    5  Manually index the control to the brine draw position and allow the control to draw  water from the brine tank until it stops    6  Plug in the electrical cord and look in the sight hole in the back of the motor to see  that it is running  Set the days that regeneration is to occur by sliding tabs on skipper  wheel outward to expose trip fingers  Each tab is one day  Finger at red pointer is  tonight  Moving clockwise from red pointer  extend or retract fingers to obtain the  desired regeneration schedule    7  Manually advance the control to the beginning of the brine fill position  and allow the  control to return to the service position automatically    8  Fill the brine tank with salt    9  Replace back cover on the control    10  Make sure that any by pass valving is left in the normal service position     SKIPPER WHEEL   SHOWS EVERY       OTHER DAY  RED TIME REGENERATION   SET    BUTTON    ba    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Control Valve Drive Assembly Page 17       Part List    Item No  No  Req   d Part No     akalang   POR  RM  MM  T OET PEREN PEPEO  los a   ee aagaw  ce RERUM  IDE ADE   DER oe cas  aa  3 5           Tech Support  1 888 989 7873    14448  14448  14448     010   011   012    15494 01            Description     T Housing   w Pin  ah RR Housing   w Pin Drilled for Screw  PRZEZ Housing   w 
35. structions     e Be sure to cut back on your detergent  soap and shampoo usage  Generally  you  should be able to cut your soap use in half     e Hard copper pipe generally comes in two types  Use the thicker  L  type copper pipe  rather than thinner  M  type copper pipe     e Follow your local plumbing and building codes when installing our systems     e Please Email us a picture of your installed system   Let us see how good of a job you  did on the installation  PureWT aol com    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Start up Procedure Page 16    The water softener should be installed with the inlet  outlet and drain connections  made in accordance with manufacturer s recommendations and to meet applicable  plumbing codes    1  Manually index the softener    i   MANUAL 24 HOUR Gi  control into the service mi NABASA R GEAR    position and let water flow  into the resin tank  When  the water flow stops  open a  softened water tap until all  air is released from the  lines  then close the  tap Note  the various  regeneration positions may  be dialed manually by  turning the knob on the  front of the control until the indicator shows that the Aoftener is in the desired  position    2  Manually index the control to the backwash position and allow water to flow at the   drain for 3 or 4 minutes    Remove back cover plate    4  Make sure that the salt dosage is set as recommended by the manufacturer  If  necessary  set salt in accordance with the setting inst
36. the male threads of the Noryl yoke   or onto  the male adapters for the brass bypass valve   and securely tighten them to the yoke or  bypass valve  Again  doing this before you re attach them back onto the rear of the  valve meter body assembly     Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Installation Cont  Page 9    II  Important   WE DO NOT recommend connecting adapters to either the yoke or by   pass valve  while the yoke or bypass valve is connected to the Valve Meter assembly   You may exert too much pressure on the valve while securing the adapters  causing  damage to the valve housing      12  After all soldering is finished and the adapters are securely threaded onto either the  yoke or the brass bypass valve assembly  then attach the yoke or bypass valve back  onto the valve meter assembly and secure it with the two small stainless steel clamps     13  Now position your conditioning system in place for the final water line installation     14  Remember  if you are using our optional brass bypass valve  make certain the bypass  valve is set in the  Service  position  while soldering the pipes to the system  Then  return it to the  Bypass  position before turning your water back on to the house     15  Measure and cut the lengths of pipe you need to plumb the main hard water line into  your system  Then do the same for the conditioned water line that will exit from the  system  back out into the house     l6   NOTE  As you look directly into the two 
37. ually if water is hard   15  Plug cable into meter cover  rotate cable to align drive flat if necessary     New    C  TO REPLACE PISTON ASSEMBLY   1  Unplug electrical cord from outlet    2  Turn off water supply to conditioner    a  If the conditioner installation has a    three valve    by pass system  first open the  valve in the bypass line  then close the valves at the conditioner inlet and outlet    b  If the conditioner has an integral by pass valve  put it in the by pass position    c  If there is only a shut off valve near the conditioner inlet  close it    3  Relieve water pressure in the conditioner by putting the control in the backwash  position momentarily  Return the control to the service position    4  Pull cable out of meter cover  Remove the control valve back cover    5  Remove screw and washer at drive yoke  Remove timer mounting screws  The entire  timer assembly will now lift off easily  Remove end plug retainer plate    6  Pull upward on end of piston yoke until assembly is out of valve    7  Inspect the inside of the valve to make sure that all spacers and seals are in place  and  that there is no foreign matter that would interfere with the valve operation    8  Take new piston assembly as furnished and push piston into valve by means of the  end plug  Twist yoke carefully in a clockwise direction to properly align it with drive  gear  Replace end plug retainer plate    9  Place timer on top of valve  Be sure drive pin on main gear engages slot in dr
38. upport  1 888 989 7873 PURE WATER TREATMENT  INC        Troubleshooting cont  Page 31    PROBLEM CAUSE CORRECTION    10  Control Cycles Continuously    A  Broken or Shortened Switch  A  Determine if Switch or Timer is Faulty and  replace it  or Replace Complete Power Head     11  Drain Flows Continuously  A  Internal Control Leak  A  Replace seals and or piston assembly     B  Foreign Material in Control  B  Remove piston assembly and inspect  bore  Remove Foreign Material and Check  Control in Various Regeneration Positions     D  Timer motor stopped or jammed  D  Replace timer        C  Control valve jammed in brine or back    C  Replace Seals and or Piston Assembly   wash position    GENERAL SERVICE HINTS FOR METER CONTROL    Problem  Softener Delivers Hard Water  Cause could be that    Reserve capacity has been exceeded     Correction  Check salt dosage reguirements and reset program wheel to provide additional  reserve   Cause could be that    Program wheel is not rotating with meter output     Correction  Pull cable out of meter cover and rotate manually  Program wheel must move  without binding and clutch must give positive    clicks  when program wheel strikes regenera   tion stop  If it does not  replace timer    Cause could be that       Meter is not measuring flow     Correction  Check output by observing rotation of small gear on front of timer  Note   pro     gram wheel must not be against regeneration stop for this check    Each tooth to tooth is approximately 3
39. ver on Black   PBE pabahay de Dr senta uu 13310  es ako gata Rear Label   Softener    Pe 19220333 Rear Label   Filter   p              seh a 13348            Tape Stripe   Brown on Beige    POR 13436            Tape Stripe   Blue on Silver   JU ci sues loses 60514  ois ta Brine Cam Assy   3 18  Ne emeses da 60514 0          Brine Cam Assy   6 36  Pe 60514 0          Brine Cam Assy    Minutes   Do p Pru DE LEE oa BENTE Screw Drive Mounting   DO aw eva lee gas 12037  ia tonals Washer   S zda  r TS POR Screw   Knob   38 aguas mad   ey 14176    ona Valve Position Dial   Standard  perc IA Ian eae es Valve Position Dial   Low Water    P 135478  cessa es Valve Position Dial   Chemical Filter    SP  IKOTA a   tee Valve Position Dial   Filter   3 MPO   BPS E areca 14173  4644546444 Knob Label   Beige  ere 14207 creer s Knob Label   Silvers   40           are sed 40214            Screw  Brine Cam    Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     SS SS SSS SS Sy    Control Valve Drive Assembly For  Clock Or Meter  Page 19       Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Control Valve Drive Part List For  Clock Or Meter  Page 20    Item No  No  Reg d Part No  Description   as oad p PDT 13255 ha pes Adapter Clip  clock or meter    p Pc ees 118977  MENT m Seal  Su eq Paga LET Bes asas Silicone Seal   ee NO reer ee 61400 12          Valve Body Assembly   1  Dist   liess 61400 11         Valve Body Assembly   3 4  Dist    Cee ee   nm 13304            O Ring   Dist
40. zzle and  throat from injector body    0  Screw in new injector throat and nozzle  be sure they are seated tightly  Install a  new screen    0  Apply silicone lubricant to new    O    ring and install around oval extension on  injector cap    8  Apply silicone lubricant to three new O rings and install over three bosses on injector  body    9  Insert screws with washers thru injector cap and injector  Place this assembly thru  hole in timer housing and into mating holes in the valve body  Tighten screws   Be  sure to reinstall brass spacers with injector on model 4600 valve     10  Reconnect brine tube and drain line    11  Return by pass or inlef valving to normal service position  Water pressure should now  be applied to the conditioner  and any by pass line shut off    12  Check for leaks at all seal areas  Check drain seal with the control in the backwash  position    13  Plug electrical cord into outlet    14  Set time of day and cycle the control valve manually to assure proper function  Make  sure the control valve is returned to the service position    15  Make sure there is enough brine in the brine tank    16  Rotate program wheel counter clockwise until it stops at regeneration position   17  Start regeneration cycle manually if water is hard     N       Tech Support  1 888 989 7873 PURE WATER TREATMENT  INC     Service Instructions Cont  Page 33      TO REPLACE TIMER  Unplug electrical cord from outlet   Turn off water supply to conditioner   a  If the conditioner
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Zone Revolution Manual.indd  Manual - PMS (Instruments)  Welding and Cutting Outfit - Northern Tool + Equipment    MANUAL DEL USUARIO    Copyright © All rights reserved. 
   Failed to retrieve file