Home

Control Valve Drive Part List For

image

Contents

1. Spring Detent i PSP KN OE OS 15748 PO Screw Program Wheel IP ea dies aaah ak 60405 15 Program Skipper Wheel Assy Specify Hardness Capacity 2 ee PPP 13806 Program Wheel Retainer P4 P SEERE 13953 Cover Label Program Wheel Dates eee LA ak Electrical Cord 2 eee ATO 12681 c6 ia dx Wire Connector tere l1 ox saa 13547 POP tea da Strain Relief 20 dotes RPS 13229 iius premis Back Cover S P E PA PS RO O Not Assigned p z eee ode 13933 taka peace Front Label Beige saae dd 13958 Front Label Silver PORTE BPO ae 13310 2 sua Re Rear Label Softener Papa 18520 52222 ess Rear Label Filter osa PER 159575 k Tape Stripe Beige PM 13960 444644 Tape Stripe Silver IUe ea aei S 60514 Brine Cam Assembly 3 18 PPP 60514 01 Brine Cam Assembly 6 36 rr 60514 02 Brine Cam Assembly Minutes SY SO a ck 12473 ee Screw Drive Mounting a Gk wr 12037 Washer cy POS sekce 13830 esa 404 Drive Pinion Program Wheel 38 i PRES Boo PAPET PRE Clutch Drive Pinion kO AA PPP 14253 qe canner aid Spring Retainer Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Metered Control Valve Drive Part List Cont Page 25 Item No No Reg d Part No Description 40 pP 14276 odd s Spring Al NUN eee 14043 Cable Assembly Std PARADA 14910522 ws Cable Assembly Ext Rt Angle B Gea del paneer omer 14176
2. Valve Position Dial Standard rere 14278 ne Valve Position Dial Low Water deseris 15478 Valve position Dial Filter AD eta maiba agang ara I Sy e Knob Label Beige PPS 14207 Knob Label Silver 44 P dcn Rec B ccn Screw Knob AS cina aaa 40214 Screw Brine Cam Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Bypass Valve Assembly Plastic Page 26 Item No No Req d Part No Description Mes ua Es PPP 1912 uad aa By Pass Valve Body Plastic Dedicate IPO UBS sa P a eee O Ring 015 k PP lozexaeee34 TOT Lua as d xs Cap By Pass L POP tae Tit Pac oes eue pea Screw Hex Washer Head 6 24 x 3 DAG eda a ed 17820 Plug By Pass Inlet SPO eee re 17820 01 Plug By Pass Outlet White Oda aaa 18661 25 weaning ewes O Ring 218 ree Pr 18662 Retaining Ring Oa ue Zacka 18660 O Ring B uud xd Desa as ee 13305 ces at ER O Ring 119 10 waka Da ges dut exi 13255 w te pea ara Clip Mounting Il PROMO gale ang an 13314 Screw Hex Washer Head 8 18 x 5 8 Da ea M 18706 Yoke Plastic 17 NPT 18706 02 Yoke Plastic 3 4 I2B 4345 aakit a 13 708 i oet doa Yoke 3 4 M 13708NP Yoke 3 4 Nickel Plated Miras desa 13398 Sem Yoke 1 IPPT 13398NP Yoke 1 Nickel Plated Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Meter Assembly Page 27 Item No No Req
3. Maintaining Your System The system is set to use about 9 Ibs of salt or potassium per regeneration cycle For the next few months monitor the brine tank to establish how often to add salt or potassium If your system has a timed valve you should have to fill the brine tank about every 5 to 6 weeks If your system is metered it may be less often based on water usage and the meter setting for your water The system will manually regenerate itself clean If you find that the system is not pro ducing enough clean water then set the regen pins to regenerate more often If the system doesn t seen to be pulling any brine solution in check the screen in the brine line at the base of the valve It may be clogged and need cleaning Tech Support 1 888 989 7873 PURE WATER TREATMENT INC l l E W O SSS s e8 Information Notes Page 15 e Even though you now have PURE WATER in your cold water lines your water heater is still full of raw water Through normal use this water will be replaced with soft water in about 2 to 3 days e You may experience cloudy water in the mornings This is caused by the clean water sitting in your pipes over night and stripping the build up off Run your water for 2 to 3 minutes every morning until it clears This should last no longer than 1 to 2 weeks e We supply a toll free number 888 989 7873 to all of our customers to use in case they don t understand something contained in our installation in
4. 888 989 7873 PURE WATER TREATMENT INC F ee SS az Turning the Water Back On Page 13 1 INSTRUCTIONS FOR USING A BYPASS VALVE If you are using a bypass valve make sure your bypass valve is now in the BYPASS position 2 Turn your water on slowly leaving all your faucets in the house open until water starts coming out of them After they are all running steady and the air is out of the water lines turn them off one by one The raw water will be bypassing your system at this time 3 Slowly open your bypass valve to the SERVICE position and begin filling the sof tener resin tank with water In a few minutes the sound of water entering the system will stop 4 Next open one faucet preferably an outside faucet a laundry sink or bathtub let ting the water run through it slowly for a few minutes This allows the water to rinse the inside of your resin tank out and settle the media 5 Sometimes you may experience some light medium brown color rinsing off the new resin beads This is normal and should only last a few minutes 6 This is why we suggest running the water through only one faucet to clear the sof tener of this colored water 7 After a few minutes and the water is running clear turn the faucet off 8 You now have soft water on your cold water side The hot water will take a couple of days to become soft as your hot water tank is full of hard water 9 Finally if you are using a demand valv
5. E Repeat Flushings of the Hot Water Tank is Required F Leak At Distributor Tube F Make Sure Distributor Tube is Not Cracked Check O Ring and Tube Pilot 0 A G Internal Valve Leak G Replace Seals and Spacers and or Piston 3 Unit Uses too much salt A Improper Salt Setting A Check Salt Usage and Salt Setting ro B Excessive Water in Brine Tank B See Problem No 7 4 Loss of Water Pressure A Iron Buildup in Line to Water A Clean Line to Water Conditioner Conditioner B Iron Buildup in Water Conditioner B Clean Control and Add Mineral Cleaner to Mineral Bed Increase Frequency of Regeneration C Inlet of Control Plugged Due to Foreign C Remove Piston and Clean Control Material Broken Loose From Pipes by Recent Work Done on Plumbing System 5 Loss of Mineral Through Drain A Air in Water System A Assure that Well System has Proper Air Eliminator Control Check for Dry Well Condition 6 Iron in Conditioned Water A Fouled Mineral Bed A Check Backwash Brine Draw and Brine Tank Fill Increase Frequency of Regeneration Increase Backwash Time C Foreign Material in Brine Valve C Replace Brine Valve Seat and Clean Valve D Foreign Material in Brine Line Flow D Clean Brine Line Flow Control Control A Clean Drain Line Flow Control YD Line Pressure is tooLow D Increase Line Pressure to 20 P S I E internal Control Leak E Change Seals Spacers and Piston Assembly Tech S
6. NPT 51B ze 18706 bu erase Se Yoke Plastic 17 NPT RO ESO DTC 18706 02 aaa Yoke Plastic 3 4 NPT SP RRER vn tens deies mua T3308 ci er ERE ER Drain Hose Barb Not used with meter controls Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Metered Start up Page 22 The water softener should be installed with the inlet outlet and drain connections made in accordance with manufacturer s recommendations and to meet applicable plumbing codes MANUAL REGENERATION KNOB 24 HOUR GEAR SKIPPER WHEEL SHOWS EVERY OTHER DAY RED TIME REGENERATION SET 194 ka Wow PEL MIKA Pa om U VA O M TO BILIN PETRA TIME OF DAY ARROW 1 Manually index the softener control into the service position and let water flow into the resin tank When the water flow stops open a softened water tap until all air is released from the lines then close the tap NOTE The various regeneration positions may be dialed manually by turning the knob on the front of the control until the indicator shows that the softener is in the desired position 2 Set water usage program wheel using any one of the following procedures Typical Residential Application To program just set the time set the hardness and it automatically monitors system needs and regenerates only when necessary To set time of day press red time set button and turn 24 hour gear until present time of day 1s at time of day Set program wheel by lifting
7. installation has a three valve by pass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there is only a shut off valve near the conditioner inlet close it 3 Relieve water pressure in the conditioner by putting the control in the backwash position momentarily Return the control to the service position 4 Pull cable out of meter cover Remove the control valve back cover 5 Remove screw and washer at drive yoke Remove timer mounting screws The entire timer assembly will now lift off easily 6 Put new timer on top of valve Be sure drive pin on main gear engages slot in drive yoke rotate control knob if necessary 7 Replace timer mounting screws Replace screw and washer at drive yoke 8 Return by pass or inlet valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off 9 Plug electrical cord into outlet 10 Set time of day program wheel and salt usage Cycle the control valve manually to assure proper function Make sure the control valve is returned to the service position 11 Replace the control valve back cover Be sure grommet at cable hole is in place 12 Make sure there is enough brine in the brine tank 13 Rotate program wheel counter clockwise until it stops at regeneration position 14 Start regeneration cycle man
8. the people dial and rotating it so that the number of people in the household is aligned with the household grains per gallon water hardness Release the dial and check for firm engage ment at setting This method will provide reserve capacity based on 75 gallons per person Optional Programming Procedures Calculate the gallon capacity of the system subtract the necessary reserve requirement and set the gallons available at the small white dot on program wheel gear Note drawing shows 850 gallon setting The capacity gallons arrow denotes remaining gallons exclusive of fixed reserve 3 Rotate the program wheel counterclockwise until it stops at regeneration position 4 Manually index the control to the back wash position and allow water to flow at the drain for 3 or 4 minutes 5 Remove back cover plate Make sure than the salt dosage is set as recommended by the manufacturer Manually index the control to the brine fill position and allow the brine tank to fill to the top of the air check 6 Manualy index the control to the brine rinse position and allow the control to draw water from the brine tank until it stops 7 Plug in the electrical cord and look in the sight hole in the back of the montor to see that it is running 8 Manually advance the control to the beginning of the brine fill position and allow the control to return to the service position automatically 9 Fill the brine tank with salt Replace back cover on the c
9. 0 gallons If not performing properly replace meter Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Service Instructions Page 32 A TO REMOVE TIME BRINE VALVE INJECTORS AND SCREEN Unplug electrical cord from outlet Turn off water supply to conditioner a If the conditioner installation has a three valve by pass system first open the valve in the by pass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there is only a shut off valve near the conditioner inlet close it 3 Relieve water pressure in the conditioner by putting the control in the backwash position momentarily Return the control to the service position 4 Disconnect brine tube and drain line connections at the injector body 5 Remove the two injector body mounting screws The injector and brine module can now be removed from the control valve Remove and discard valve body Orings 6 To Replace Brine Valve 1 Pull brine valve from injector body also remove amp discard O ring at bottom of brine valve hole 0 Apply silicone lubricant to new O ring and reinstall at bottom of brine valve hole 0 Apply silicone lubricant to O ring on new valve assembly and press into brine valve hole shoulder on bushing should be flush with injector body 7 To replace injectors and screen 1 Remove injector cap and screen discard O ring Unscrew injector no
10. 00 Piston Softener 60102 10 Piston Filter 60102 20 Piston Low Water 60125 Lecce ep Seal Kit 60084 XX Injector DUO P oae xw Brine Valve 60514 Brine Cam 3 18 60514 01 Brine Cam 6 36 60514 02 Brine Cam Minutes BUSTO dasad Coupling with Clip amp Screws 60040 Bypass Brass 3 4 NPT 60041 4 Bypass Brass 1 NPT 60049 Bypass Brass Plastic 60086 Meter Std 60087 Meter Ext 60136 5600 Service Kit Meter 60135 5600 Service Kit Clock 14860 Skipper Wheel 7 Day 14381 Skipper Wheel 12 Day 60405 10 Meter Program Wheel Std 60405 20 Meter Program Wheel Ext Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Troubleshooting Page 30 PROBLEM CAUSE CORRECTION 1 Softener Fails to Regenerate A Electrical Service To Unit Has Been A Assure Permanent Electrical Service Interrupted Check Fuse Plug Pull chain or Switch B Timer is Defective B Replace Timer Po C Power Failure C Reset Time of Day 2 Softener delivers Hard water A Bypass Valve is open A Close Bypass Valve C Injectors or Screen Plugged C Clean Injector Screen D Insufficient Water Flowing Into Brine D Check Brine Tank Fill Time and Clean Tank Brine Line Flow Control if Plugged B No Salt in Brine Tank B Add Salt to Brine Tank and maintain Salt Level above water level E Hot Water Tank Hardness
11. E WATER TREATMENT INC PURE TECH 2200 FLOW DIAGRAM Page 4 PURE TECH 2200 TO DRAIN RAW WATER CLEAN WATER Figure A Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Job Specification Sheet Page 5 e JOB NO e MODEL NO e WATER TEST e CAPACITY PER UNIT MAX PER REGENERATION e MINERAL TANK SIZE DIA HEIGHT e BRINE TANK SIZE amp SALT SETTING PER REGENERATION e CONTROL VALVE SPECIFICATIONS Type of Timer A Std C 7 Day E Meter Std B L D 12 Day F Meter Ext Day Time of Regeneration Drain Line Flow Control gpm Brine Refill Rate gpm Injector Size Meter Gallon Setting gal TYPICAL CONTROL VALVE INFORMATION Dia Color gpm uid TUR m White 38g 45gpm Sem 15gpm o a white 38gpmwa4sgpm Sem 20gpm 24 gpm 35am 80 gpm 5 0 gpm 70 gpm 24 gm em Log Som To em Due to varying water conditions tank sizes and water pressures the above settings should be used only as a guideline Tm B L F C Brine Line Flow Control Refill Rate for Filling Brine Tank D L F C Drain Line Flow Control Backwash and Rapid Rinse Flow Rates Tech Support 1 888 989 7873 PURE WATER TREATMENT INC System Overview Page 6 e This installation guide gives a step by step start to finish procedure for installing PURE TECH 2200 systems using Fleck valves All of these systems will regenerate with softener Solar Salt or P
12. Pin Drilled for Thumb Screw L Housing w Pin RAEE AI L Housing w Pin Drilled for Designer Motor Mounting Plate Motor 120V 60 Hz Motor 24V 60 Hz Screw Motor Mtg amp Ground Wire Screw Component Mounting PURE WATER TREATMENT INC Control Valve Drive Part List Cont Page 18 Item No No Reg d Part No Description Draga es SY 13017 rh Idler Gear pP los idet 13018 Idler Pinion EEE P Dc a MAN xs Spring Idler Ntra acon 038 cecus O k Drive Gear SEP 22344244 13170 44 44446445 Main Gear amp Shaft l2 NC prre 19203 cuerdas 24 Hour Gear Assembly Silver DRAGES SEERNES 19205 01 24 Hour Gear Assy Tan I3 Raus asaan VOL pakalat paha Cycle Actuator Gear 14 a kha kaka V paces was 17 Pe Knob Manual Regeneration P DT 13300 Ball 1 4 Dia RSP P oo gee oo ng Bosne Spring Detent Skipper Wheel Deska PPP 14381 k Skipper Wheel Assembly 12 Day PP 14860 Skipper Wheel Assembly 7 Day P PSO ep 13864 Skipper Wheel Ring PA ere Ds exbsbads 14457 ne Spring Detent Main Gear ee ee ee ere 13014 Regeneration Pointer 23 Se cada ge 11842 awa sasa a Electrical Cord Standard n ry ADP 12681 Wire Connector Not Shown Z MEN fpc 13947 PPV OE Strain Relief 204 aa La ll ae ak 132295 esae Back Cover P WFP 13309 Front Label Brown on Beige eat 1343 T ui ees eg Front Label Blue Sil
13. Pure Water Treatment Inc PURE TECH 2200 Owners Manual Installation Instructions For Models PTUF 5600 10 ES e PTUF 5600 13 MEMBER SS Ost T ech Su Table of Contents Subject PURE TECH 2200 Diagram Job Specification Sheet System Overview Pre Installation Installation Installing Drain line Brine Tank Connection Turning Water Back On Post Installation Maintaining Your System Information Notes Start up Procedure Control Valve Drive Assembly Control Valve Drive Parts List Control Valve Drive Assembly for Clock or Meter Control Valve Drive Parts List for Clock or Meter Pure Water Treatment Inc P O Box 730486 Ormond Beach FL 32173 0486 1 888 989 PURE 7873 Office 1 877 219 PURE 7873 Fax Copyright 2003 all rights reserved ort 1 888 989 7873 Page VY A U R Page 2 PURE VATER TREATMENT INC T ech Su Table of Contents Subject Meter Start up Metered Control Valve Drive Assembly Metered Control Valve Drive Parts Lists Bypass Valve Assembly Plastic Meter Assembly Bypass Valve Assembly Brass Service Assembly Parts List Troubleshooting Service Instructions Warranty Notes ort 1 888 989 7873 Pure Water Treatment Inc P O Box 730486 Ormond Beach FL 32173 0486 Copyright 2003 all rights reserved Page 22 23 24 26 27 28 29 30 32 36 37 1 888 989 PURE 7873 Office 1 877 219 PURE 7873 Fax Page 3 PUR
14. ction with the use of the system Modification of the Warranty PURE WATER TREATMENT INC does not author ize any other person to assume for PURE WATER TREATMENT INC any other liability in connection with this product The dealer has no authority to make any representa tions on behalf of PURE WATER TREATMENT INC or to modify the terms of this warranty in any way Page 36 PURE WATER TREATMENT INC Notes Page 37 Tech Support 1 888 989 7873 PURE WATER TREATMENT INC
15. d pret Orde sas A Vou dx ns z d je Zm i ET zoe rs oasi Ve m Voz o SM ere or v B oid esed addi ausu R las fes CREE TP Des te GE Bee IPO Tech Support 1 888 989 7873 Description CZ Screw Meter Cover Assembly d n Meter Cover Assembly Standard T Meter Cover Assembly Extended Range Rt Angle Pe O Ring Meter Cover Assembly SZCZE Impeller Screw Adapter Clip ades Adapter Clip m Meter Body RETTE O Ring Meter Body Z Flow Straightener PURE WATER TREATMENT INC Bypass Valve Assembly Brass Page 28 E S B 9 P gt p Lend s KOD yan 4 NY 4 CD 3 NA An 3 ACE x IN 1 B 4 oa Mi SK dt 2 SZ SA PEN Mod tt bo Item No No Req d Part No Description One W E KN UE MORA By Pass Valve Body Plastic me MP 17290 PSR By Pass Valve Body 3 4 hinahawi 17290NP By Pass Valve Body 3 4 Nickel Plate Doareen 13399 M By Pass Valve Body 1 Lee casas 13399NP By Pass Valve Body 1 Nickel Plate wade MED 11728 i tens adus Seal By Pass Dison aus Vos 11972 vana Plug By Pass Mama se Oe INSEE Side Cover Jaws de Le ka c 13604 01 Label TEEN B POPP IN ode tt Screw Teepensas lax ea 11986 Side Cover PREIS TT LIST PO Lever By Pass ORDRE POCZTE 11989 Screw Hex Head 1 4 14 Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Service Assembly Parts List Page 29 Part No Description 60102
16. d on it Remove the black nut and then put the brine float back into the brine well Notice there is a small hole drilled in the brine well that you can insert this small section of screw through 4 Hold the brine float with the section of screw in the hole as you put the small black nut back on This is what holds the brine float in place 5 On top of the brine float you will see a larger black elbow with a black plastic nut Carefully remove the black nut and you will find two small compression rings inside the nut one black and one white These small pieces help seal the end of the 3 8 tube that connects the brine tank with the valve on top of the system 6 Each one of these small rings has a flat side Hold the two small rings together with the flat sides touching This is the way they fit together when they go inside the black nut white piece first 7 Next insert one end of the 3 8 tubing though the hole in the side of the brine tank and brine well and slide the black nut onto the tube with the threads facing the end of the tube Then slide the two small compression rings onto the tube white piece first then the black piece making sure the flat edges of both rings are together 8 Now insert the end of the tube into the black elbow as far as it will go Hold it there as you thread the black nut onto the black elbow tightening it finger tight which com presses the two rings inside the nut onto the tubing 9 Replace the lid
17. e firmly insert the small brass end of the black Meter Cable into the small hole located on top of the dome shaped Meter housing The end of the cable will only insert about 1 8 3 16 into the meter housing hole Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Post Installation Page 14 We will have already pre set the meter on the system to regenerate according to your water test results You will only need to set the time of day on the front of the valve If you are not sure what the meter is supposed to be set on please give us a call with information on your water test results and we will help you determine what setting to place your meter on 2 Look in your service manual for your particular model Fleck valve and manually run your valve through a regeneration cycle To do this simply turn the manual Regen dial clockwise just a few clicks at a time stopping at each setting for a minute to clear the air out of the resin tank and valve Once you have completed turning the Regen knob one complete revolution and it is set back to the Service position the system is now ready for use 3 Finally plug the valve in the electrical outlet and set the current time of day Our sys tems will regenerate around 2 00am 4 Check all connections for leaks 5 You are now ready to experience PURE WATER Don t forget to tell your friends family and neighbors about how excellent the PURE TECH 2200 works for you
18. eat 20 Liu waa PSR DIG ovas eus Brine Valve Cap JU sn o 1316 E 5 ees ean ake Brine Valve Spacer LI og xas laeua du iria 12550 Quad Ring d E erm IPO LISTA cae pat ven Spring Brine Valve ro O 16098 Washer Brine Valve i Pg 11981 01 Retaining Ring Oda ane POP 10329 B L F C Fitting Nut 6 P INTE 10330 B L F C Ferrule Oque e lebat 10332 cosas t X B L F C Tube Insert Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Control Valve Drive Part List For Clock Or Meter Page 21 Item No No Reg d Part No Description 38 bad 44 ah pnaka kad 12094 B L F C Button 25 GPM n 12095 B L F C Button 5 GPM PRISE 12097 B L F C Button 1 0 GPM 39 stament era 12977 al ace O Ring B L F C 40 PR 13245 B L F C Button Retainer D D devant aut 13244 B L F C Fitting 3 8 Adwana We D L F C Button Specify Size 43 Few 13173 Lis ists D L F C Button Retainer dl sed s wore eres IXIBT sinerezis Screen Brine Line AS ee prep 15348 O Ring D L F C not shown 46 Nicea I340T paaa ky Air Disperser AI casa i i te Se tet 13546 End Plug Retainer 48 Dese ca mia DTP ase esa na Screw 490 bee P nk Washer 3044 abus Dette 13296 Screw SA zen NW 13398 SEO Yoke Brass 1 NPT Pe 13708 x vents Yoke Brass 3 4
19. er by putting the control in the backwash position momentarily Return the control to the service position Pull cable out of meter cover Remove the control valve back cover Remove screw and washer at drive yoke Remove timer mounting screws The entire timer assembly will now lift off easily Remove end plug retainer plate Pull upward on end of piston rod yoke until assembly is out of valve Remove and replace seats and spacers with fingers TO REPLACE METER Unplug electrical cord from outlet Turn off water supply to conditioner a If the conditioner installation has a three valve by pass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there is only a shut off valve near the conditioner inlet close it Relieve water pressure in the conditioner by putting the control in the backwash position momentarily Return the control to the service position Pull cable out of meter cover Remove two screws and clips at by pass valve or yoke Pull resin tank away from plumbing Connections Remove two screws and clips at control valve Pull meter module out of control valve Apply silicone lubricant to four new O rings and assemble to four ports on new meter module Assemble meter to control valve Note meter portion of module must be assembled at valve outlet Attach two cli
20. er inlet close it Relieve water pressure in the conditioner by putting the control in the backwash position momentarily Return the control to the service position Pull cable out of meter cover Remove four screws on cover Lift cover off of meter module discard O ring Remove and inspect impeller for gear or spindle damage replace if necessary Apply silicone lubricant to new O ring and assemble to the smallest diameter on meter cover Assemble cover to meter module Be sure impeller spindle enters freely into cover Press firmly on cover and rotate if necessary to assist in assembly Replace four screws and tighten Return by pass or inlet valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off Check for leaks at all seal areas Plug electrical cord into outlet Set time of day Make sure the control valve is in the service position Rotate program wheel counter clockwise until it stops at regeneration position Start regeneration cycle manually if water is hard Plug cable into meter cover Rotate cable to align drive flat if necessary Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Warranty Pure Water Congratulations on the purchase of your PURE TECH Water System 10 YEAR WARRANTY Treatment NC FOR RESIDENTIAL APPLICATIONS PURE WATER TREATMENT INC warrants its products to be free from defects in material and workmanship accord
21. holes in your Fleck valve the hard water line will always enter the hole on the LEFT SIDE of the yoke or bypass valve assem bly The valve body also has an arrow stamped into each side showing the direction of flow 17 If you use our optional bypass valve arrows indicating water flow direction are printed on the top of the bypass valve assembly I8 Just remember that as you are looking directly into the two holes where the water enters and exits the valve the hard water line from your house always enters the hole on the LEFT The conditioned water flowing out from the system back into your house is always the hole on the RIGHT 19 If you purchased a Meter On Demand Water Softener you will need to make sure the gold tipped black cable protruding from the valve is securely plugged into the domed shaped portion of the rear of the valve Tech Support 1 888 989 7873 PURE WATER TREATMENT INC E YY ira a Installing the Drain Line to the Valve Page 10 All of our Fleck valves have a drain hose barb generally located on the lower back side or side of the valve First check to make certain this drain hose barb is securely threaded into the valve body and that the threads have been sealed with Teflon tape 2 Once you know the drain hose barb is installed properly carefully push the 1 2 ID plastic drain hose completely over the barbed end of the fitting and then attach a small hose clamp to the end of the line so it cann
22. ing to the following terms and conditions What is Covered L The PURE TECH 2200 series 10 YEARS ON PARTS JI The PURE TECH 1000 R O System A Installed following a PURE TECH 2200 10 YEARS PARTS 5 YEARS ON THE REVERSE OSMOSIS MEMBRANE B Installed separately 10 YEARS PARTS 3 YEARS REVERSE OSMOSIS MEMEBRANE Who is Covered This product warranty is transferable to a subseguent owner The only requirement is that the system must re main at the site of original installation Extension of Warranty to a Subseguent Installation The ORIGINAL OWNER may move the system to another location The influent water guality at the subseguent loca tion MUST however be within your system s operating specifications Please contact a local authorized PURE TECH dealer prior to installation at another location Registration and Service To place your system under warranty your authorized PURE TECH dealer should complete the owner s registra tion form and return one copy to PURE WATER TREAT MENT INC P O Box 730486 Ormond Bch FL 32173 0486 within 30 days of the installation date For service under this warranty you should contact the dealer Retain a copy of this warranty for reference if service is necessary Pure Water Treatment Inc P O Box 730486 Ormond Beach FL 32173 0486 OFFICE 1 888 989 PURE FAX 1 877 219 PURE Our Reputation Is Worth More Than Money Tech Support 1 888 989 7873 Limits on this Wa
23. is not controlled by a switch Our Fleck valves have a 5 power cord but you can use an extension cord if an outlet is not nearby Please follow any local building safety codes if you need to use an extension cord e IMPORTANT NOTE IF you decide to set the brine tank in your garage remember that the water inside the brine tank will not freeze but the water in the small 3 8 plastic water line running from the system valve to the brine tank will Make certain the garage is warm enough to prevent this line from freezing e Make a list of all the plumbing fittings you will need to completely install the system to make it ready for operation e Assemble all tools needed to install the system and start your installation Tools and Materials needed 1 Pipe Cutters 2 PVC Glue 3 PVC copper or CPVC pipe 4 Two 1 or 34 male adapters Depending on which bypass is ordered Tech Support 1 888 989 7873 PURE WATER TREATMENT INC E gt a Installation Page 8 Turn off the main water shutoff valve 2 Next open all plumbing fixtures in the house including all outside faucets in order to drain the lines of all water possible 3 Cut and remove a section of the main incoming water line near where the system is to be installed Allowing this line to drain thoroughly 4 Remove the yoke or optional bypass valve from the back of the tank valve by loos ening the two small stainless steel clamps on either side of the
24. ith water running through it turn on a few hot and cold water faucets and let them run until there is no more air in your lines then turn the electricity back on to your water heater e Our systems can safely handle a pressure range of 35 95 psi However as with most residential plumbing and for best operation causing the least wear on critical parts we recommend an operating range of 40 65psi Now all you have to do is plumb in the system plug it in and set the current time of day Tech Support 1 888 989 7873 PURE WATER TREATMENT INC E Z 55554 Pre Installation Page 7 e Your system should be located in a protected dry level and non freezing area The brine tank and resin tank can have as much as 20 feet of 3 8 brine tubing connecting them So the brine tank can set several feet from the resin tank The brine tank will hold 2401bs of softener Solar Salt or Potassium Chloride so be sure to make it acces sible for filling the tank when needed e We recommend a 4 drain for the regeneration backwashing cycles If possible the house drain should be no farther than 20 feet from the system You will also need to purchase some flexible 4 inside diameter plastic tubing from a local hardware or building supply store This same size tubing will be used for both the valve drain fit ting and on your brine tank safety overflow fitting Always follow local plumbing codes e You will need a standard 3 prong 120V grounded outlet that
25. ive yoke rotate control knob if necessary Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Service Instructions Cont Page 34 C TO REPLACE PISTON ASSEMBLY cont 10 11 12 13 14 15 16 17 18 Replace timer mounting screws Replace screw and washer at drive yoke Return by pass or inlet valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off Plug electrical cord into outlet Set time of day Cycle the control valve manually to assure proper function Make sure the control valve is returned to the service position Replace the control valve back cover Be sure grommet at cable hole is in place Make sure there is enough brine in the brine tank Rotate program wheel counter clockwise until it stops at regeneration position Start regeneration cycle manually if water is hard Plug cable into meter cover Rotate cable to align drive flat if necessary D TO REPLACE SEALS AND SPACERS l 2 Don Unplug electrical cord from outlet Turn off water supply to conditioner a If the conditioner installation has a three valve by pass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there as only a shut off valve near the conditioner inlet close it Relieve water pressure in the condition
26. on the top of the brine well Your brine tank is now ready to be con nected to the Fleck valve 10 Take the other end of the 3 8 brine tube and find the 3 8 brass nut located on the valve body of your system Remove this brass nut and you will find a small plastic compression ring inside Tech Support 1 888 989 7873 PURE WATER TREATMENT INC ee ee a Brine Tank Connection Cont Page 12 11 Slide the brass nut over the end of the tube threads facing the end of the tube Then slide the compression ring on with the narrow side facing the end of the tube 12 Insert the end of the tube fully into the opening on the valve where the brass nut was located then slide the compression ring and brass nut up the tube finally threading the brass nut back onto the threads Tighten the brass nut gently with a small wrench 13 Notice the plastic elbow that is located on the side of your brine tank This is a Safety Overflow and will use the same size drain line that is used on the valve drain 1 2 ID flexible plastic line This drain line will not be under pressure so it must be directed to a drain that is physically lower than it is DO NOT connect this drain line into the drain line coming from the Fleck valve It must be run separately to the drain 14 Fill the brine tank with 9 gallons of water 15 Add 240 lbs of Solar Salt or Potassium Chloride to the brine tank and you are now ready to turn the water back on Tech Support 1
27. ontrol Be sure cable is not pinched between cover and housing 10 Make sure that any by pass valving is left in the normal service position RED POINTER Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Metered Control Valve Drive Assembly Page 23 Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Metered Control Valve Drive Part List Page 24 Item No No Req d Part No Description prm Naka 14448 000 Housing with Roll Pin 14488 001 Housing w Pin Drilled for Screw seca eae 14448 0 Housing w Pin Drilled for Thumb Screw TA eau I sree sae ang 15494 01 L Housing w Pin 222234 15494 03 L Housing w Pin Drilled for Designer ee T3175 tyi Motor Mounting Plate c ent da U Kaawa 187457 3 ordered Motor 120V 60 Hz j Poe 13494 resta te Motor 24V 60 Hz Oita epee r al de3 ee 11384 Screw Motor Mtg amp Ground Wire et hs ceka ee 13296 cg coke Ga a Screw Component Mounting Oak losa dsk Oza Idler Gear pP perm IURIS Idler Pinion ee ee Vict hades 5512 4446464444 Spring Idler sa eae ce ISTOR pes Drive Gear ji SPO losses IST x PZA Main Gear amp Shaft ILASTE Mp 19203 RENEE 24 Hour Gear Assembly Silver agata 19205 01 24 Hour Gear Assy Tan ETZ Dorene 13802 Cycle Actuator Gear E ANOMANG PPA IA POPP ra Knob Manual Regeneration n es tion a 13300 tees da Ball 1 4 Dia 16 43 4444 PPPOE 14457
28. ot work loose over time Run the op posite end of this drain hose to the drain you are going to use for your system Re member to leave a small air gap at the end of the hose going to the house drain Follow local plumbing codes and secure it there 3 When the system is in the backwash regeneration mode water will flow out of this drain line with a fair amount of pressure especially during the rapid rinse phases of the process and the line may sometimes jump a little when changing cycles Tech Support 1 888 989 7873 PURE WATER TREATMENT INC a a Brine Tank Connection Page 11 I Next connect your brine tank to your system One end of the supplied 3 8 brine line tubing will be connected to your brine tank and the opposite end needs to be con nected to your Fleck valve 2 Look inside your brine tank and you will see a 4 diameter Brine Well tube Re move the lid off the top of the brine well and look inside this tube Here you will find the Brine Float assembly The brine float assembly works like a toilet tank float shutting the water off inside the brine tank should the level of water get too high 3 Check to see if the brine float assembly is loose inside the brine well tube If it is simply pull it up out of the brine well and look about 2 down from the top of the brine float assembly where you will see the metal end of a small threaded screw stick ing out about 4 There will be a small black plastic nut threade
29. otassium Chloride e Your new system from the PURE WATER TREATMENT INC comes with an owner service manual which is enclosed along with these instructions and will help explain all necessary details reguired for successful installation and operation of your system Please refer to these instructions and the service manual supplied with your system during installation and programming e All steps provided herein are for typical installations only If you require additional plumbing to install your system simply contact a person who is knowledgeable in residential plumbing or have a local plumbing company help you install or install the system for you e There is a bit of over kill in our instructions but please bear with us as we want to ensure that you our customer fully understand the instructions and are completely satisfied with your installation e We recommend that you take a few minutes and look at the service parts manual for your particular model to help you better understand your new water system Take your time and carefully read the instructions e Get all of your plumbing parts together before you start and have an assistant help you if possible Typical installation should take no more than a few of hours e If you are going to turn the water off to your house while installing the system we recommend that you turn off the electricity to your electric water heater during instal lation After the system is installed w
30. ps and screws at control valve Be sure clip legs are firmly engaged with lugs Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Service Instructions Cont Page 35 E TO REPLACE METER cont 10 11 12 13 14 15 16 17 18 Push resin tank back to the plumbing connections and engage meter ports with by pass valve or yoke Attach two clips and screws at by pass valve or yoke Be sure clip legs are firmly engaged with lugs Return by pass or inlet valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off Check for leaks at all seal areas Plug electrical cord into outlet Set time of day Make sure the control valve is in the service position Rotate program wheel counter clockwise until it stops at regeneration position Start regeneration cycle manually if water is hard Plug cable into meter cover Rotate cable to align drive flat if necessary F TO REPLACE METER COVER AND OR IMPELLER 1 2 Ov DA GE 10 11 12 13 14 15 16 17 Unplug electrical cord from outlet Turn off water supply to conditioner a Ifthe conditioner installation has a three valve by pass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there is only a shut off valve near the condition
31. rear valve assembly that holds it in place Then simply pull it off the back of the valve Now that you have the yoke or bypass valve removed follow the directions below to make them ready to install on the valve 5 INSTRUCTIONS FOR USING A YOKE If you have a standard Noryl Plastic yoke it will have two or 1 male thread nipples one inlet amp one outlet You will need to buy two 34 or 1 Female thread adapters to whatever type and size of piping you are plumbing the system to 6 INSTRUCTIONS FOR USING A BYPASS If you are using our optional 44 or 1 brass bypass valve you will need to purchase two 34 or 1 Male thread adapters to whatever type and size pipe you are plumbing to 7 If you are going to use copper piping and be soldering joints we do not recommend applying intense heat to your new valve meter assembly We always recommend that you remove the yoke or bypass from the valve assembly and attach your plumbing adapters to the yoke or bypass away from the valve This simple step will ensure that you are not applying any heat as you solder or pressure as you tighten the adapters onto the yoke bypass while they are mounted on the valve body itself 8 Another tip if you are using copper adapters Always solder a 3 to 5 piece of copper pipe into each of the two pipe adapters away from the valve then let them cool off before threading each one onto the yoke or bypass valve 9 After they cool off apply Teflon tape to
32. ributor Tube 1 WP 10244 sasawa O Ring Distributor Tube 13 16 D PRT 1 achat exe 12981 ossa pee mes O Ring Top of Tank Deia me du FR RC do bU End aci cdd Not Assigned rpm ee N 14241 sas ama ses Spacer 8 APP O lasse vas T3237 iosuada ws Piston Standard aata ka WAG 15781 ed DEE DD Piston Low Water 13852 22 sae RS Piston Filter p PSE pop c 10690 seis pega Piston Pin K S satus BO s ee ers Piston Rod Assembly IL eed Pe 12933 5 d bee adie Piston Retainer Veciana lec hs 13446 ess End Plug Assembly Std White eee 13446 10 End Plug Assembly Filter Black vas 13446 20 End Plug Assembly Low Water Gray JESZCZ JH qase s 139155 oe ae ee Screw Injector Mounting SID pansa do Sia d a 19228 vg esas Adapter Coupling TIO oss d sas nes 1330595 cake O Ring Adapter Coupling TI MP ZA re 13314 v d Screw Adapter Coupling clock or meter jE icai Pee 12638 obere i tres O Ring Drain 19 ack eds Z sss xexwkas 13301 s sets O Ring Injector P isses snu a n ch EV O Ring Brine Spacer Zase ka taxa 130 osa arva O Ring Injector Cover Ds SE Pe BIG si OK ee yx Injector Body pk ang ka Linseed has 10913U Injector Nozzle Undrilled JA o dd ia bk 10914 Injector Throat Specify Size ih PM ocd gate NO East edats Injector Screen Dates et 25 recita 13150 rede Injector Cover d es awe dos ace 13172 ics os Brine Valve Stem p A n 12626 Brine Valve S
33. rranty Your system must be sold to you by an authorized PURE TECH dealer in order to receive coverage under this war ranty Additionally this warranty does not cover products installed for commercial industrial institutional or multi family applications The design of the overall treatment system and performance of your system is related to the chemistry of the water being treated therefore This warranty is limited to the equipment manufactured and distributed by PURE WATER TREATMENT INC This Warranty does not include damage to your system due to Abuse misuse or neglect Excessive pressure over 100 psi for a PURE TECH 1000 R O system or 125 psi for all other PURE TECH systems Excessive water temperature over 100 for a PURE TECH 1000 R O system or 120 for all other PURE TECH systems Freezing alterations or misapplication A change in the influent water characteristics Your equipment must be installed and operated in accordance with your owners manual s recommendations and applicable state and local codes No Other Warranties There is no other express warranty Implied warranties including any warranty of merchantability or fitness for a par ticular purpose are limited to the duration of this warranty and are excluded to the extent permitted by law There are no warran ties other than those contained herein In no event shall the com pany be liable for indirect special or consequential damages in conne
34. ruction sheet Manually index the control to the brine fill position and allow the brine tank to fill to the top of the air check 5 Manually index the control to the brine draw position and allow the control to draw water from the brine tank until it stops 6 Plug in the electrical cord and look in the sight hole in the back of the motor to see that it is running Set the days that regeneration is to occur by sliding tabs on skipper wheel outward to expose trip fingers Each tab is one day Finger at red pointer is tonight Moving clockwise from red pointer extend or retract fingers to obtain the desired regeneration schedule 7 Manually advance the control to the beginning of the brine fill position and allow the control to return to the service position automatically 8 Fill the brine tank with salt 9 Replace back cover on the control 10 Make sure that any by pass valving is left in the normal service position SKIPPER WHEEL SHOWS EVERY OTHER DAY RED TIME REGENERATION SET BUTTON ba Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Control Valve Drive Assembly Page 17 Part List Item No No Req d Part No akalang POR RM MM T OET PEREN PEPEO los a ee aagaw ce RERUM IDE ADE DER oe cas aa 3 5 Tech Support 1 888 989 7873 14448 14448 14448 010 011 012 15494 01 Description T Housing w Pin ah RR Housing w Pin Drilled for Screw PRZEZ Housing w
35. structions e Be sure to cut back on your detergent soap and shampoo usage Generally you should be able to cut your soap use in half e Hard copper pipe generally comes in two types Use the thicker L type copper pipe rather than thinner M type copper pipe e Follow your local plumbing and building codes when installing our systems e Please Email us a picture of your installed system Let us see how good of a job you did on the installation PureWT aol com Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Start up Procedure Page 16 The water softener should be installed with the inlet outlet and drain connections made in accordance with manufacturer s recommendations and to meet applicable plumbing codes 1 Manually index the softener i MANUAL 24 HOUR Gi control into the service mi NABASA R GEAR position and let water flow into the resin tank When the water flow stops open a softened water tap until all air is released from the lines then close the tap Note the various regeneration positions may be dialed manually by turning the knob on the front of the control until the indicator shows that the Aoftener is in the desired position 2 Manually index the control to the backwash position and allow water to flow at the drain for 3 or 4 minutes Remove back cover plate 4 Make sure that the salt dosage is set as recommended by the manufacturer If necessary set salt in accordance with the setting inst
36. the male threads of the Noryl yoke or onto the male adapters for the brass bypass valve and securely tighten them to the yoke or bypass valve Again doing this before you re attach them back onto the rear of the valve meter body assembly Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Installation Cont Page 9 II Important WE DO NOT recommend connecting adapters to either the yoke or by pass valve while the yoke or bypass valve is connected to the Valve Meter assembly You may exert too much pressure on the valve while securing the adapters causing damage to the valve housing 12 After all soldering is finished and the adapters are securely threaded onto either the yoke or the brass bypass valve assembly then attach the yoke or bypass valve back onto the valve meter assembly and secure it with the two small stainless steel clamps 13 Now position your conditioning system in place for the final water line installation 14 Remember if you are using our optional brass bypass valve make certain the bypass valve is set in the Service position while soldering the pipes to the system Then return it to the Bypass position before turning your water back on to the house 15 Measure and cut the lengths of pipe you need to plumb the main hard water line into your system Then do the same for the conditioned water line that will exit from the system back out into the house l6 NOTE As you look directly into the two
37. ually if water is hard 15 Plug cable into meter cover rotate cable to align drive flat if necessary New C TO REPLACE PISTON ASSEMBLY 1 Unplug electrical cord from outlet 2 Turn off water supply to conditioner a If the conditioner installation has a three valve by pass system first open the valve in the bypass line then close the valves at the conditioner inlet and outlet b If the conditioner has an integral by pass valve put it in the by pass position c If there is only a shut off valve near the conditioner inlet close it 3 Relieve water pressure in the conditioner by putting the control in the backwash position momentarily Return the control to the service position 4 Pull cable out of meter cover Remove the control valve back cover 5 Remove screw and washer at drive yoke Remove timer mounting screws The entire timer assembly will now lift off easily Remove end plug retainer plate 6 Pull upward on end of piston yoke until assembly is out of valve 7 Inspect the inside of the valve to make sure that all spacers and seals are in place and that there is no foreign matter that would interfere with the valve operation 8 Take new piston assembly as furnished and push piston into valve by means of the end plug Twist yoke carefully in a clockwise direction to properly align it with drive gear Replace end plug retainer plate 9 Place timer on top of valve Be sure drive pin on main gear engages slot in dr
38. upport 1 888 989 7873 PURE WATER TREATMENT INC Troubleshooting cont Page 31 PROBLEM CAUSE CORRECTION 10 Control Cycles Continuously A Broken or Shortened Switch A Determine if Switch or Timer is Faulty and replace it or Replace Complete Power Head 11 Drain Flows Continuously A Internal Control Leak A Replace seals and or piston assembly B Foreign Material in Control B Remove piston assembly and inspect bore Remove Foreign Material and Check Control in Various Regeneration Positions D Timer motor stopped or jammed D Replace timer C Control valve jammed in brine or back C Replace Seals and or Piston Assembly wash position GENERAL SERVICE HINTS FOR METER CONTROL Problem Softener Delivers Hard Water Cause could be that Reserve capacity has been exceeded Correction Check salt dosage reguirements and reset program wheel to provide additional reserve Cause could be that Program wheel is not rotating with meter output Correction Pull cable out of meter cover and rotate manually Program wheel must move without binding and clutch must give positive clicks when program wheel strikes regenera tion stop If it does not replace timer Cause could be that Meter is not measuring flow Correction Check output by observing rotation of small gear on front of timer Note pro gram wheel must not be against regeneration stop for this check Each tooth to tooth is approximately 3
39. ver on Black PBE pabahay de Dr senta uu 13310 es ako gata Rear Label Softener Pe 19220333 Rear Label Filter p seh a 13348 Tape Stripe Brown on Beige POR 13436 Tape Stripe Blue on Silver JU ci sues loses 60514 ois ta Brine Cam Assy 3 18 Ne emeses da 60514 0 Brine Cam Assy 6 36 Pe 60514 0 Brine Cam Assy Minutes Do p Pru DE LEE oa BENTE Screw Drive Mounting DO aw eva lee gas 12037 ia tonals Washer S zda r TS POR Screw Knob 38 aguas mad ey 14176 ona Valve Position Dial Standard perc IA Ian eae es Valve Position Dial Low Water P 135478 cessa es Valve Position Dial Chemical Filter SP IKOTA a tee Valve Position Dial Filter 3 MPO BPS E areca 14173 4644546444 Knob Label Beige ere 14207 creer s Knob Label Silvers 40 are sed 40214 Screw Brine Cam Tech Support 1 888 989 7873 PURE WATER TREATMENT INC SS SS SSS SS Sy Control Valve Drive Assembly For Clock Or Meter Page 19 Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Control Valve Drive Part List For Clock Or Meter Page 20 Item No No Reg d Part No Description as oad p PDT 13255 ha pes Adapter Clip clock or meter p Pc ees 118977 MENT m Seal Su eq Paga LET Bes asas Silicone Seal ee NO reer ee 61400 12 Valve Body Assembly 1 Dist liess 61400 11 Valve Body Assembly 3 4 Dist Cee ee nm 13304 O Ring Dist
40. zzle and throat from injector body 0 Screw in new injector throat and nozzle be sure they are seated tightly Install a new screen 0 Apply silicone lubricant to new O ring and install around oval extension on injector cap 8 Apply silicone lubricant to three new O rings and install over three bosses on injector body 9 Insert screws with washers thru injector cap and injector Place this assembly thru hole in timer housing and into mating holes in the valve body Tighten screws Be sure to reinstall brass spacers with injector on model 4600 valve 10 Reconnect brine tube and drain line 11 Return by pass or inlef valving to normal service position Water pressure should now be applied to the conditioner and any by pass line shut off 12 Check for leaks at all seal areas Check drain seal with the control in the backwash position 13 Plug electrical cord into outlet 14 Set time of day and cycle the control valve manually to assure proper function Make sure the control valve is returned to the service position 15 Make sure there is enough brine in the brine tank 16 Rotate program wheel counter clockwise until it stops at regeneration position 17 Start regeneration cycle manually if water is hard N Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Service Instructions Cont Page 33 TO REPLACE TIMER Unplug electrical cord from outlet Turn off water supply to conditioner a If the conditioner

Download Pdf Manuals

image

Related Search

Related Contents

Zone Revolution Manual.indd  Manual - PMS (Instruments)  Welding and Cutting Outfit - Northern Tool + Equipment    MANUAL DEL USUARIO  

Copyright © All rights reserved.
Failed to retrieve file