Home

SERVICE MANUAL

image

Contents

1. All appropriate local pressure codes and pressure limitations on other system components must be adhered to and supersede the guidelines given in this manual Consult your TDI distributor if you have exhaust plumbing that creates back pressure and reduces starter performance You may be able to increase the supply pressure to restore the lost power Follow the engine manufacturer s instructions for starting the engine 9 0 PREVENTIVE MAINTENANCE The TDI TURBOTWIN starters provide distinct advantages of size and efficiency as compared to electric motor vane type or other turbine type starters It is important to properly install the starter to receive full benefit of these advantages Repair technicians or service organizations without turbine starter experience should not attempt to repair this starter until they receive factory approved training from TDI or its representatives Proper operation and repair of your TDI TURBOTWIN starter will assure continued reliable and superior performance for many years 9 1 Every Six 6 Months Perform the following procedures at six 6 months intervals if the normal cranking cycle is 0 10 seconds 9 1 1 Check the amount and condition of grease in the planetary gearbox If gearbox requires re greasing only use TDI grease Approximately one 1 pint of grease is needed to repack the gearbox 9 1 2 Check the turbine bearing and carrier output bearings for freedom of rotation with
2. than recommended exhaust piping is installed If back pressure hampers starter performance compensation can be made by increasing the supply pressure Consult your TDI distributor for advice Exhaust piping should be routed downward to help prevent any accumulation of condensation in the starter motor If the overhung section of the starter is not otherwise supported TDI recommends supporting the exhaust piping with a suitable bracket s 6 0 NATURAL GAS INSTALLATION The installation of the starter using natural gas is similar to the air installation except all fittings piping valves and regulators must be compatible with natural gas Proper control of natural gas is a major consideration when used in the starter system All starters using natural gas must pipe the exhaust according to industry codes and local regulations There is a natural gas vent port in the turbine housing that is plugged for compressed air use This vent is used to remove any natural gas that could leak past the primary turbine shaft seal Remove this 3 8 NPT plug and install a line to carry gas away from the starter area 7 0 PIPING SYSTEM Only type approved metallic hose assemblies are approved in permanently pressurized compressed air lines of starters Non metallic hose assemblies are allowed only in case the piping system will be emptied after the starting procedure Pipe unions must be type approved by GL Downstream of the pressure regulator a
3. SS pmm lt Cw a TECH DEVELOPMENT INSTALLATION AND OPERATING MANUAL MODEL T100 C 60057 TURBOTWIN Engine Air Starter For Post 1992 Engines gt yy Au ai yINE a 4 22 Se A A w p TURBO TWIN yy v r Traat ai ov Taqat GS We ES WW WHI amp ASSoE Engine Coutrols d Panels Compressor Parts 860 North 9th Avenue Brighton CO 80603 Ph 303 659 5139 Fax 303 659 5309 www rjmann com 1 0 GENERAL INFORMATION This manual provides instructions for the installation and operation of the TDI T100 C TURBOTWIN Air Starter If there are questions not answered in this manual please contact your TDI TURBOTWIN distributor or dealer for assistance The T100 TURBOTWIN starters are designed for operation with compressed air or natural gas materials used are compatible with sour natural gas and marine environments Small amounts of foreign matter or liquid in the air stream will not adversely affect TURBOTWIN starters As with all other TDI starters no lubrication is required in the air supply Please review the rest of this manual before installing the T100 TURBOTWIN series air starter WARNINGS CAUTIONS AND NOTES Certain types of information are highlighted in this manual for your attention WARNING used where injury to personnel or damage to the equipment is likely CAUTION used where there is the possibility of damage to the equipment NOTE used to p
4. TWIN series is highly tolerant of dirt in the air line however starter life can be increased with the use of an air strainer A pressure regulator is required when the air supply pressure is great enough to exceed the starter operating pressure at the inlet port and or the maximum torque The supply line should be dry fitted for proper alignment location prior to final assembly All pipe threaded joints should be sealed with Loctite Pipe Thread Sealant TDI P N 9 94085 or equivalent for leak tight joints prior to final assembly Be sure to tighten all joints to proper torque after final assembly CAUTION If the supply lines lead to the base of the engine oil reservoir have the pipe plugs ready to install quickly as oil will rush out from the reservoir In cold weather climates care should be taken while designing your installation to prevent condensation from developing in the starter system In systems with a regulator valve or relay valve there is the possibility of freeze ups 3 0 SUPPLY LINE INSTALLATION WARNING Be sure to either bleed the pressurized air reservoir and or safety the system such as closing all valves prior to installing starter supply line A tee connection with a quick disconnect can be added to the inlet This will allow an external air source to be used to accomplish a blow start if the system freezes Once the engine has been started the other system compone
5. The housing proof pressure is 600 psig and is also shown on the nameplate This means the turbine housing will not burst when subjected to a static pressure of 600 psig The following steps can be used to properly install the T100 C on the engine e Remove the entire starting system from the skid This includes the motors starter gearbox pad lubricators and inlet manifold There should be six studs and the female portion of the slot drive remaining on the accessory gear case The two 2 exhaust hoses can remain in place Make note of the clocking positions of both the inlet and exhaust ports of the existing vane motors e install a new O ring around the bearing housing on the accessory gear case e Install the O ring on the overflow hole lower small hole on the face of the T100 C 60057 housing e Position the male driver end of the slot drive on the starter motor in the vertical position e Position the female portion of the slot drive in the vertical position to match the male end e Install the T100 C housing assembly over the studs being careful not to damage the O ring e Reinstall the washers and nuts e Remove the hex head screws that secure the TDI motor assembly to the flange casting e Without pulling the motor backwards and disengaging the slot drive positions rotate the motor until the inlet is at the 9 o clock position or positioned in the original position Reinstall the TDI motor screws and tigh
6. nts may be thawed CAUTION WARNING On new installations it is strongly recommended to blow out the supply line with air to remove possible dirt and welding slag prior to final connection to the TURBOTWIN starter Be sure to secure the free end of the supply line prior to blowing out the line Do not connect the turbine housing vent line to the turbine exhaust line Exhaust gas can pressurize the housing 4 0 INLET PRESSURE PORT A 1 4 NPT port is located on the air inlet This port may be used to check the supply pressure at the starter when the starter is operating Remove the 1 4 NPT pipe plug and save for later use Install a 1 4 minimum size tubing to the port Route the tubing away from the starter to a safe location away from the engine Install a pressure gauge on the tubing This pressure monitoring line gauge may be permanently installed Use Loctite Pipe Thread Sealant or equivalent Alternately a pressure transducer may be installed at the pressure check port and electrical lines routed to a digital display at the operator s station This pressure port is invaluable in diagnosing air starter and or installation problems 5 0 EXHAUST PIPING The turbine exhaust may be plumbed away from the starter area All starters using natural gas must be piped according to industry codes and local regulations The performance of a turbine starter will be decreased because of back pressure when smaller
7. oint out special interest information 2 0 INSTALLING THE STARTER A turbine air starter does not require lubrication in the supply air Therefore if a vane type starter motor is being replaced TDI recommends that all lubrication devices and lines removed to minimize flow restrictions WARNING If a fuel pulse lubricator has previously been installed in the system disconnect and plug the line to eliminate spraying diesel fuel on the engine The starter should be installed with the inlet in a position between horizontal and straight down Any condensation will be restricted to the air lines and not in the starter WARNING Do not operate this starter unless it is properly connected to the engine NOTE Throughout this manual the term air is used to designate the starter drive medium Unless other wise stated air means either compressed air or natural gas 1 1 PRODUCT IDENTIFICATION The starter nameplate which is attached to the turbine housing contains the following information model number serial number part number direction of rotation and the maximum rated operating pressure The maximum operating pressure is also stamped on the nameplate This pressure is measured at the check port on the starter inlet with the starter in operation CAUTION Exceeding the maximum pressure shown on the nameplate may result in damage to the starter or damage to the engine
8. out excessive play between races If bearings are damaged replace them with genuine TDI parts Refer to TDI Service Manual for part numbers 9 2 Every Three 3 Months Follow the six 6 month procedures if there are severe starter loading or extended duration crank cycles Also perform these procedures every three 3 months when starter is used for motoring the engine for maintenance or valve adjustments Motoring Crank Cycle 10 60 seconds Extended Crank Cycle 60 seconds or longer
9. pressure relief valve is to be provided 8 0 STARTER OPERATION Prior to operation check that all connections are tight and free from leaks Check the 1 4 NPT pipe plug or a pressure gauge transducer that may be connected to the pressure port on the starter inlet WARNING Do not operate the TDI TURBOTWIN starter with air pressure greater than the pressure rating on the nameplate This pressure is measured at the starter inlet while the starter is running The maximum operating pressure limit is the inlet pressure measured at the starter s inlet pressure check port In order to check the starter a 1 4 NPT pipe tap connection is provided in the inlet housing to attach a pressure gauge transducer The maximum pressure assumes an open exhaust standard turbine exhaust guard The standard exhaust guard causes no back pressure The static non flowing supply pressure will always be higher than the operating dynamic pressure The maximum pressure limit proof pressure that the TDI TURBOTWIN starter housings may be subjected to is 600 PSIG 42 BAR System pressure that exceeds the maximum operating limit must use a pressure reducing device to ensure that the operating pressure limit to the TDI TURBOTWIN starter is maintained System static pressure that exceeds the 600 PSIG 42 BAR limit must in addition to pressure reducer devices incorporate a pressure relief valve set below 600 PSIG 42 BAR in the supply air line
10. ten e You will have either a threaded or welded manifold for the air inlet that accommodates the lubricators and the two 2 inlet hoses at the base of the skid attached to the start gas inlet piping If this is welded together use a pipe plug to block off one of the female holes as only one inlet hose will be used e f threaded disassemble and create a manifold for only one hose from the remaining pieces Remove one of the 2 NPT hydraulic flange adapters from the inlet ports of one of the original air motors and install into the TDI motor using thread sealer e Reconnect the 2 hose from the air inlet at the base of the skid into the TDI starting motor e Remove the socket head screws holding the exhaust back cover and remove cover e Install TDI PN 2 28676 exhaust manifold not include in 60057 assy in the 6 o clock position e Reinstall hex screws with minimal thread locking compound e Remove the exhaust 2 NPT hydraulic flange adapters 2 from each of the removed IR vane motors and install into the installed TDI exhaust manifold using light thread sealer e Connect the existing 2 exhaust hoses to the hydraulic portion of the adapter e There is an oil feed tube that lubricates the gear case on the original IR gear case Follow this tube to its source and remove Cap the hole using a pipe plug e There are oil supply lines feeding the lubricators for the original vane motors This supply line typicall
11. y comes from the oil reservoir Depending upon the application there could be two of these supply lines Follow these lines back to their source and remove them NOTE The 7100 C air starters come standard with a 2 NPT female pipe thread for the inlet connection port The supply line consists of the line from the air source a pressure regulator when necessary a manual or relay valve and the connection to the starter inlet Hard piping may be used but a section of flexible tubing should be installed at the starter to prevent leaks due to engine vibration Care must be taken to ensure that all inlet supply line piping is no less than 1 5 and all components used are capable of passing the required air flow NOTE Valves with a Cv of 40 or higher are recommended If the supply line must be longer than 20 feet the inlet supply line piping should be increased to 2 in diameter to ensure proper performance by your TURBOTWIN Because turbine starters such as the T100 TURBOTWIN series are sensitive to flow restrictions care must be taken to use uniform hose or tubing and fittings for connection of the supply line Tees elbows and line length must be kept to a minimum TDI recommends that hose or flex couplings are installed to eliminate possible leakage caused by strain on the supply line Normally an air strainer is not required However in dirty environments use of a 40 mesh Y strainer is recommended The T100 TURBO

Download Pdf Manuals

image

Related Search

Related Contents

  Forerunner® 920XT  (横つり用)(約17MB)  Emisor óptico 4 canales de vídeo modelo D441, Manual de Usuario  Documentation et spécifications techniques - Distri  Gigaset A340 s  Igloo FR834 User's Manual    GX 120 - Hilti  こちら  

Copyright © All rights reserved.
Failed to retrieve file