Installation and Service Manual Clamshell Heater Design
Contents
1. EACH ASSEMBLY MUST BE CONNECTED TO THE PROPER VOLTAGE AS INDICATED ON THE HEATER ASSEMBLY 2 Remove ceramic terminal caps hex nuts washers and loose ring terminals from Heater lead wire terminals no jumper wire Remove 5 16 of jacket from customer supplied lead wires and crimp ring terminals onto wires Make sure terminal bar is free of mold flashing Reinstall the lead wire with ring terminal flat washer lock washer and the hex nut Hold the heater terminal with 3 8 open end wrench when tightening the nut Torque the hex nut to 26 in lbs and replace the ceramic cap See Figure 2 2 NOTE Do not torque nuts without holding the heater terminal with wrench as heater damage may result from twisting the elements 22 233 RMG Rex Materials Group CERAMIC CAP ax CERAMIC COVER S oo N NUT X LOCK WASHER FLAT WASHER RING TERMINAL ja i Lak i TERMINAL STUD FIGURE 2 2 REX TCS HEATER TERMINAL CONNECTION VIEW Check before wiring Note the voltage printed on each heater half and also specified on the BOM document Heaters are rated in halves and must be wired in series when line voltage is higher than the marked heater voltage See figure 2 2 prior to making electrical connections Care required Electrical connections require 26in lb tightness Use 3 8 a wrench to hold the terminal in place while tightening the nut to prevent potential damage due to twisting the terminal 3 Heaters
2. Glowing at any terminal connection on the heater assembly indicates that the connection is not secure and may fail rapidly If this is observed mark or carefully note the terminal location then shut down machine operation immediately Lock out the power supply to the heater remove the Teflon covers and re tighten the connection as described in Section Three of this manual 30 233 RMG Rex Materials Group Barrel Overheating If the zone temperature goes above the set point beyond the normal control range it could be caused by e Thermocouple is improperly located or switched with another zone thermocouple e Thermocouple not seated properly in the adapter e Thermocouple damaged If none of the above conditions exist the overheating could be caused by excessive shear heat generated by the screw in combination with the excellent insulating properties of the TCS heater which prevents the heat from escaping causing an over temp condition The excessive shear heat is wasted energy and should be minimized if possible by reducing the screw RPM or increasing the zone temperature of the previous zone to decrease the viscosity of the material entering the shear zone If you are unable to reduce the temperature to an acceptable level contact your TCS sales representative or Rex TCS Technical Support Heater Repair and Replacement Heater Repair If the insulating refractory of a heater has been damaged or broken it may be possible
3. Each Rex TCS Heater Assembly consists of two clamshell halves oriented around the barrel Each clamshell has an exposed element secured in Pyrolite a high temperature ceramic insulation material This material provides an excellent balance between superior insulating properties high electrical resistivity and durability for barrel set point temperatures up to 750 degrees F Higher temperatures may also be accommodated contact your local Rex TCS representative or Rex TCS Technical Service as shown in Section One of this manual for more details on higher temperature applications PYROLITE CLAMSHELL HEATER L TERMINAL SCREW ef f gt fy f A i N _ STRAP LY fo SLL a Z A SA 4 3 Pi S VY ty BS JUMPER WIRE ALP ISHS LS Kj s s 7 A CUSTOMER BARREL x ELEMENT ASSEMBLY FIGURE 1 2 Rex TCS Heater Assembly 33 RMG 8 Rex Materials Group Installation amp Assembly Section Two Site Preparation Overview 10 Heater Clearance and Obstructions 10 Blow Back Prevention 10 Power Supply Controls and Wiring 10 Thermocouple Adaptors 11 Documenting Savings and Performance Gains 11 Guarding 11 Installation Time and Labor Requirements 11 Final Machine Preparations 12 Removing Packaging and Handling 13 Installation Overview 14 Rex TCS Heater Assembly Installation 15 Rex TCS Heater Assembly Wiring 20 Teflon Zone Cover Installation 24 23 RMG 9 Rex Materials Group Site Preparation Over
4. WEAR GLOVES AND WASH WITH SOAP AND WATER AFTER HANDLING USE OF A DUST MASK AND OR DUST COLLECTION IS RECOMMENDED WHEN SAWING SANDING OR OTHER DUST GENERATING OPERATIONS ARE DONE 14 233 RMG Rex Materials Group Rex TCS Heater Assembly Installation 1 Identify the first heater to be installed Each Rex TCS Heater can be identified by the part number marked on the Heater The marking also shows the heater voltage and wattage Refer to the Installation Bill of Material for correct location of heaters CARE REQUIRED HEATERS ARE FRAGILE TAKE CARE NOT TO DAMAGE THE HEATERS WHEN REMOVING PACKAGING OR HANDLING WHENEVER POSSIBLE THE HEATERS SHOULD BE HANDLED BY THE OUTSIDE GRIPPING THEM BY THE INSIDE MAY DISPLACE THE HEATER ELEMENT Replace thermocouple adaptors with a longer adaptor if the existing adaptor is shorter than 3 5 4 adaptor length is recommended Thermocouple adaptors are not included in the TCS System kit 15 233 RMG Rex Materials Group 3 TCS Oxxxxx TCS System kit Zone Qty per Item Number Description zone 1 2 TCS 120xxx TCS HTR HALF x xD I2 0L 480V xxxxW 1 2 TCS 070xxx TCS HEATER STRAPS x xD 1 2 TCS 060xxx TCS ZONE COVER x xD x xW 32 0C 1 1 TCS 060xxx TCS JUMPER WIRE x xL 2 2 TCS 120xxx TCS HTR HALF 5 5D x xL 480V 5290W 2 2 TCS 070xxx TCS HEATER STRAPS x xD 2 2 TCS 060xxx TCS ZONE COVER x xD x x W 32 0C 2 1 TCS 060xxx TC
5. four in series or a combination so that zone voltage is properly divided 20 233 RMG Rex Materials Group SINGLE ZONE SINGLE ZONE 2 HALF HEATERS IN SERIES 2 HALF HEATERS IN PARALLEL ZN Yr JUMPER WIRE SUPPLIEDWITH Ee We OR ILS KIT JUMPER WIRE NOT SUPPLIED SINGLE ZONE Maia 4 HALF HEATERS IN SERIES E E T E E JUMPERWIRE JUMPERWIRE JUMPER WIRE L SUPPLIED WITH NOT SUPPLIED SUPPLIEDWITH KIT WITH KIT KIT HEATER WIRING SCHEMATIC Applying higher than the actual rated voltage to the heaters will increase the watt density which can lead to premature failure and or damage to barrel from being subject to higher amperage than the heater is rated for See heater markings for rated amperage ED Verify that an over current device ex fuse is installed to prevent the heater 21 233 RMG Rex Materials Group NOTE ALL HEATERS IN A SINGLE ZONE ARE CONTROLLED CUSTOMER MACHINE BY THE SAME TEMPERATURE CONTROLLER BUT ARE NORMALLY NOT WIRED IN SERIES REX TCS HEATER ASSEMBLIES m 1 HEATER ZONE 2 HEATER ZONE 3 HEATER ZONE INSTALL CUSTOMER SUPPLIED HEATER CUSTOMER ZONE THERMOCOUPLE LEADS SEE TERMINAL CONNECTION VIEW FIGURE 2 1 REX TCS HEATER LEAD WIRE VIEW NOTE Fig 2 1 shows heater terminals on one side Depending on heater length terminals may be on alternating sides CAUTION TO PREVENT PREMATURE HEATER FAILURE
6. within the same zone are controlled by the same temperature controller Verify that the voltage supplied to each heater is in accordance with the voltage marked on the heater Refer to customer temperature controller literature for controller wiring 23 233 RMG Rex Materials Group Teflon Zone Cover Installation Teflon Zone Covers are used to cover small gaps between Heaters and to protect the Heater s outside surfaces from contamination Cover installation steps are as follows 1 Wrap Teflon Zone Covers around Heaters and tuck in excess tail under the lead edge of the cover See Figure 2 3 amp 2 4 2 Trim or cut holes in Zone Covers for thermocouple adapters and sensors See Figure 2 3 amp 2 4 3 Run Lead Wires under Zone Covers and out Zone Cover ends See Figure 2 3 amp 2 4 WRAP TEFLON ZONE COVERS AROUND HEATERS TRIM COVERS AROUND f AND TUCK IN EXCESS TAIL THERMOCOUPLE ADAPTERS lt ZONE 3 ZONE 2 ZONE 1 RUN LEAD WIRES UNDER ZONE COVERS AND OUT ZONE COVER ENDS FIGURE 2 3 Teflon Zone Cover Installation View 24 233 RMG Rex Materials Group Cut the Teflon cover flap as needed to allow for wires and thermocouple adaptors Install Teflon cover with flap over the terminals and fasten with silicone O rings Wires can be neatly routed underneath the flap in the Teflon co
7. OCOC Rex TCS O z R 3 x A z 2 a Thermal Control Solution 000000000 installation and OOO0O00000 0 O service Manual DID OG ee oe DIGIOIOIOIOlOlOlOlOleleno woes Se eein OO O O Heat Only Applications Croo ES CGS SiS DOOD SIS eeo CSS Sore Rex Materials Group 4101010101010101 010010100 P2O0000000000000 T E S D GOOG 61S Sa GOS GS COS CSG Si Bie 1 Cle DOC 0100005 Revision O Installation amp Service Manual Rex Materials Inc retains all proprietary rights in and to the information disclosed here No part of this information may be reproduced copied or used for any purpose without written permission from Rex Materials Inc Changes and or corrections to this document may be made periodically These will be reflected in subsequent editions and Rex Materials Inc undertakes no commitment to notify the user of such changes or corrections DOC 0100005 First Edition Revision 0 Printed in the United States of America Best efforts have been made in the preparation of this document These efforts include the development research and testing of the theories to determine their effectiveness However Rex Materials Inc the author and the publisher make no warranty of any kind expressed or implied in regard to the use of the theories instructions suggestions or other information contained in this manual Each user must depend upon his or her own judgment knowledge and expertise in the interpret
8. S JUMPER WIRE x xL Review the installation BOM for your specific machine make model and size to identify all parts needed for each zone 4 Measure distance A from starting point on the feed end of the barrel to the center of the first thermocouple The starting point should be the edge of the feed end platen or bolt heads 16 233 RMG Rex Materials Group No terminals a On the back side in this case P i Check before installing Heater halves are supplied with two terminal connections on each half The two terminals on a half could be on the same or opposite sides depending upon the length of the heater In the case where both terminal connections are on the same side of each half the heaters should be installed such that all four terminals are on the same side of the barrel 6 Use measurement A from step 4 to locate where the thermocouple will lie within the first set of heater halves If zone is long thermocouple may lie within the second set of heater halves Use a 5 8 diameter round file to cut half of the thermocouple hole on each heater half Do not exceed 3 8 depth of cut on either half 17 233 RMG Rex Materials Group Place the heater halves on the barrel and place the strap s around the heater Two straps are supplied for any heater 9 25 or longer Move to step 8 before tightening the strap Add remove gasket material on heater ID for minor
9. S xxxxxxx part number the description as shown on the Heater or Installation Bill of Material 33 233 RMG Rex Materials Group
10. adjustment as needed Secure the heater firm to the barrel by fastening the strap s to a maximum of 10 in lb Heater should not be movable by hand when tight but over tightening can cause damage to the heater 18 233 RMG Rex Materials Group Measure dimension B from edge of the first installed zone to the center of the next zone thermocouple 10 Repeat installation steps for each zone There should be little or no gap between zones and the last heater will generally stop short of the end cap 19 233 RMG Rex Materials Group Rex TCS Heater Assembly Wiring CAUTION TO AVOID POSSIBLE INJURY DISCONNECT MAIN POWER SUPPLY BEFORE WIRING REX TCS HEATER ASSEMBLIES Use of LOCK OUT TAG OUT PROCEDURES IS HIGHLY RECOMMENDED Each Rex TCS Heater Assembly must be wired to the minimum specifications below and in accordance with customer s standard wiring practices 1 Customer supplied lead wire should be rated for exposure to a minimum of 250 degrees C We use and recommend 14 GA Type MGT 450 Deg C Cut customer supplied lead wire lengths to suit locations of all Rex TCS Heater Assemblies Allow sufficient wire length to run the lead wires under the Zone Covers as shown in Figure 2 3 NOTE It is extremely important to apply the correct voltage to each heater half Refer to the voltage marked on each heater half In rare cases with four heater halves in a zone it may be necessary to wire all
11. arrel with a cloth may be sufficient If there is scale or plastic buildup use steel wool wire brush or tools as necessary to remove it The ideal result is a clean dry and smooth barrel with no remaining oil dirt or moisture 6 Grind off any metal burrs protruding from the barrel 7 Verify barrel dimensions diameter s lengths thermocouple locations etc Any variations from the original customer specifications can more easily be accommodated at this stage than after the installation has begun If measured barrel dimensions do not match customer supplied design specifications component modifications or replacements may be required Contact Rex Materials immediately if discrepancies are found 8 Caution It is very important that the barrel be electrically grounded to prevent possibility of electrical shock Test with continuity tester to insure good conductivity between barrel and machine ground 233 RMG Rex Materials Group 12 Removing Packaging and Handling Your Rex TCS System has been palletized to allow the use of a lift truck for unloading and transport to the work site CARE REQUIRED BE SURE THAT BOXES CONTAINING YOUR REX TCS HEATER ASSEMBLIES DO NOT HAVE ANYTHING STACKED ON TOP OF THEM CARE REQUIRED HEATERS ARE FRAGILE TAKE CARE NOT TO DAMAGE THE HEATERS WHEN REMOVING PACKAGING OR DURING HANDLING Most items have individual labeling but some components are identified only on the box label R
12. ation and use of these materials 233 RMG 2 Rex Materials Group Introduction Section One Introduction and Welcome 4 About This Guide 5 Safety 5 Equipment Overview 7 Rex TCS Heater Assembly 8 233 RMG 3 Rex Materials Group Introduction and Welcome Thank you for choosing the Rex Thermal Control Solution Rex TCS for the temperature control needs on your Plastic Injection Molding or Extrusion machines Rex TCS engineers have designed the Rex TCS Barrel Heaters to provide the latest and most efficient barrel temperature control technology for users seeking to meet the following performance criteria Energy Savings The Rex TCS heaters release high radiant energy directly into the barrel from exposed elements to maximize the heat transfer rate Exposure of nearly the entire barrel surface to direct heat increases efficiency The elements are captured in and protected by a high temperature ceramic insulating jacket which assures that the heat is contained and directed to the barrel rather than heating the work area The result is dramatically reduced energy usage in the range of 30 70 Faster Thermal Response Time Traditional barrel heaters must heat themselves before they begin to conduct heat into the barrel They also retain considerable residual heat This results in considerable lag time before the heat actually affects the barrel The exposed elements of the Rex TCS heaters transfer heat immediately into the
13. barrel providing much faster heat up and quicker response times Better Temperature Control The Rex TCS System s direct radiant heating results in faster response to changing barrel conditions This reduces set point overshoot resulting in much tighter barrel temperature control typically better than 1 0 degree F This improvement can result in tighter dimensional control and thereby better product quality and less scrap Improved Safety and Ergonomics The Rex TCS heater elements are encased in a high temperature ceramic insulation which stays relatively cool compared to all other types of heaters virtually eliminating the chance of burns The excellent insulation also greatly reduces the ambient heat around the barrel Therefore the Rex TCS System contributes to a safer more comfortable work environment Long Life Rex TCS heaters are designed to provide exceptionally long service life This greatly reduces the ongoing replacement cost normally associated with standard barrel heaters Quick and Easy Replacement Rex TCS heaters are modular for fast and easy installation and replacement 33 RMG 4 Rex Materials Group About This Guide This manual will 1 help you plan and prepare for implementing your Rex TCS System 2 guide you through the installation procedure 3 introduce you to the principles of its operation and 4 describe the maintenance troubleshooting and repair practices used to achieve opti
14. e temperature controller o All temperature controllers are functioning correctly o All thermocouples and sensors are mounted and adjusted to seat properly o All Teflon Zone Covers are installed and secured with o rings o All wires are neatly routed secure and protected 27 RMG Rex Materials Group Rex TCS System Start up Once the Rex TCS System has been installed and checked it is time to switch on the power and start the initial heat up It is recommended that the initial set point be 300 F and that once the barrel reaches this temperature it be held there for 15 20 minutes to verify proper heater function and control system performance During this initial period you may see or smell a small amount of burn off from the small amount of organic binders in the heaters Any emissions are non toxic but some degree of ventilation may be useful to minimize any inconvenience This is the time to re check that the barrel temperature thermocouples are properly seated and functioning properly It is also a good idea to inspect the heater connections If any are seen to be glowing orange it indicates that they are not sufficiently tightened to make a good connection To correct the problem the glowing positions should be carefully noted and then the heating system shut down Remove the Teflon Zone Covers and the ceramic insulator cap from the position and check the tightness of the nut using the torque wrench set at 26 in lbs Reme
15. ed within 3 6 hours given that the old heaters have been removed and the barrel prepared This excludes any time required for rewiring or control modifications It is ideal to have at least two people involved during the complete installation especially if the barrel is not easily accessible This also assures that more than one person is trained on the installation procedures 11 233 RMG Rex Materials Group Final Machine Preparations In order to properly install your new Rex TCS System the following machine preparation steps must be completed prior to installation SO r Tools Materials Required Round File 12 lg x minimum Dia Torque socket wrench w drive Set 26 in lbs with 3 8 hex socket 3 8 Open end wrench Precision Flat head screwdriver Portable shop vacuum Safety knife Needle nos Tape measure Small hack saw blade Wire cutters strippers pliers Q Q Q Q Q Q Q Q 1 Gather the tools and materials listed on the left which will be required to install a typical Rex TCS System Lock out power to existing barrel heaters Make sure the barrel has cooled to a safe working temperature per customer safety requirements below 140 F preferred Disconnect electrical connections and completely remove all existing heaters and thermocouples Remove any barrel surface contamination to assure heating is applied directly to the barrel Simply wiping the b
16. efer to the Installation Bill of Materials to help identify them during the installation process NOTE Inspect TCS Heaters to assure that they arrived complete and in good condition CARE REQUIRED HEATERS MUST BE STORED IN A DRY LOCATION HEATER REFRACTORY CAN ABSORB MOISTURE AND IF SO IT MUST BE THOROUGHLY DRIED PRIOR TO INSTALLATION AND USE 13 233 RMG Rex Materials Group Installation Overview This section provides step by step instructions for installing your new Rex TCS barrel heaters It is recommended that you carefully read the entire section before beginning the installation Also please assure that all preparations described in the previous section are complete A minimal amount of cutting and trimming of the heaters is acceptable when proper clearance cannot be achieved at the time of installation Do not trim the material to a thickness of less than 1 0 from the embedded elements as you will begin to lose insulating properties The portion to be trimmed should be measured and marked to clear the obstruction and carefully sawed off with a small hack saw type blade The terminals and wires must not be modified Be sure to use proper dust collection methods when performing modifications Be very cautious when doing any modification to your system in order to reduce the risk of damage to the heaters and insulation CAUTION HANDLING PYROLITE MATERIALS MAY BE IRRITATING TO THE SKIN EYES AND RESPIRATORY TRACT
17. his provides an excellent quality control and diagnostic tool to further optimize the process 28 233 RMG Rex Materials Group Documenting Savings and Performance Gains If you wish to confirm the energy savings you achieve with your Rex TCS Barrel Heaters it is necessary to gather performance data with your existing heaters before they are removed as described on Section Two of this manual If you have done so it is now time to again record the power consumption and heater on time for a period of at least two hours of normal operation Be sure that the product material being run and any other significant process variables and conditions are the same as during the Before measurements Once you have tuned the controllers again record the range of barrel temperature variation around the set point so that you can confirm the improvement in temperature control accuracy that you have achieved You may find that this improved process control translates into significant and measurably improved product quality control and higher yield Accurately record the time required to heat the barrel to set point from a cold start This is normally reduced by more than half compared to band heaters This should translate to higher machine utilization or at least reduce the need to bring people in early to start up the heaters Maintenance amp Repair Overview One of the major benefits of the Rex TCS Barrel Heating System is that there is no ro
18. itry Thermocouple Adaptors Due to the 3 thick insulation on the Rex TCS heaters it is recommended to install 3 1 2 or longer thermocouple port extension adaptors NOTE It is important to order these well in advance of installation to assure availability Documenting Savings and Performance Gains If you need to document the energy savings and performance gains you achieve with your Rex TCS Barrel Heaters it is vital to gather data using your existing heaters before they are removed We recommend recording the power consumption for a period of at least two hours of normal operation Be sure to note the product material being run temperature set points cycle times shot size and any other significant process variables so they can be duplicated for the After trials It is also important to record the range of barrel temperature variation around the set point to confirm the improvement in temperature control accuracy that you have achieved Also accurately record the time required to heat the barrel to set point from a cold start Guarding Rex TCS heaters have a much lower surface temperature than conventional heaters so the need for guarding to protect against burns is normally eliminated However Rex Materials does recommend guarding to protect the heaters from possible damage due to work done on or around the heaters Installation Time and Labor Requirements Your new Rex TCS Heater System can normally be install
19. mber to hold the base of the terminal to prevent the terminal from twisting when applying force to the terminal nut If the nut is already tightened to the torque value do not over tighten Instead remove the nut washers and connector Check for and remove any debris or mold flashing on the stud or base Then re assemble the connection and re tighten with the torque wrench as above Use of a high temperature lubricant or anti seize may help to achieve a better connection After the initial check out period at 300 F you can ramp up the barrel temperature set point to the desired operating temperature Once the barrel is stabilized at the target temperature you can begin normal production using your standard practice Temperature Control and Monitoring If you are controlling your Rex TCS heaters using an auto tune type controller the system will very quickly begin to control the barrel temperature to within a very tight control band Typically this is within 1 0 F It may tune to the point that the readout never varies from the set point i e less than 0 5 F If you do not have auto tune controllers you will need to manually tune the controllers to optimize the control band You may also wish to tighten the set points for any over or under temperature alarms to provide the quickest possible response to any malfunction Increasingly customers are using continuous data logging systems to monitor the performance of their machines T
20. mum performance from your Rex TCS System It is not intended to serve as a comprehensive training program However it does provide detailed easy to understand instructions If you have any questions that are not addressed by this guide please consult your Rex TCS Sales Representative or Rex TCS Technical Support at the numbers listed below Rex TCS Technical Support Telephone 1 517 223 3787 Fax 1 517 223 6822 E Mail tcsinfo rematerials com Internet www rexmaterials com Safety Safety is a primary consideration in the design of Rex TCS Systems Safety must also be a priority in its use This manual provides guidelines and procedures to properly operate and maintain your Rex TCS System It contains warnings and cautions that must be followed to reduce the risk of personal injury or damage to the equipment However due to the unique nature of each facility it is impossible to foresee all of the potential hazards associated with its use Your company is solely responsible for determining the adequacy of these recommendations and providing suitable safety instructions for your facility Carefully read and understand this entire document This important information will maximize safety heater performance efficiency and system life All heating elements inherently pose burn fire and electrical shock hazards These can result in injury to personnel or damage to equipment Care should always be exercised during ins
21. nd pose a risk to the machine or operating personnel This control should be both functionally and electrically independent Insulate all live electrical connections Exposed electrical wiring is a violation of Electrical Safety Codes including O S H A AA Surface temperature of the heaters is highly variable The Hot Surface label supplied with the TCS System kit should be applied to the machine to alert all operators and maintenance employees of this danger Do not touch the heater surface or Teflon cover during or directly after operation Allow heaters to cool before servicing 233 RMG 6 Rex Materials Group Equipment Overview Rex TCS Systems are designed using Rex TCS System integration software based on dimensions and specifications provided by the customer A system can serve any number of zones Each zone can contain one or more heater assemblies Changes in barrel diameter can normally be accommodated If you purchased the barrel or zone cooling option please refer to Clamshell Heater Design Heat with Cooling Option Installation and Service Manual Doc 0100006 instead of this manual CUSTOMER MACHINE REX TCS HEATER ASSEMBLIES a 1 HEATER ZONE 2 HEATER ZONE 3 HEATER ZONE CUSTOMER HEATER LEADS CUSTOMER ZONE THERMOCOUPLE FIGURE 1 1 Rex TCS System General Assembly Heaters Only with Teflon Covers Removed 233 RMG 7 Rex Materials Group Rex TCS Heater Assembly
22. problem It is strongly advised to confirm that all thermocouples are fully inserted and properly seated prior to every start up of the machine but especially when the tube extensions are first installed Worn thermocouples should be replaced on a preventive basis to avoid unplanned shut down of the machine and reduce the potential for heater and or barrel damage Heater Troubleshooting The procedures below are offered for diagnosing problems that may be experienced Barrel Zone Not Heating Up Properly or Temperature is Dropping from the Set point 1 Verify that the controller is at the proper set point and is calling for power 2 Check that the thermocouple controlling the zone is seated properly and functional 3 Check that current is flowing through the wires to the heater assembly using a clamp on amp meter 4 If not verify that the relay serving the heater is functioning properly If the relay is not stuck it indicates that one of the heater halves has failed It will be necessary to shut down the machine and lock out the power supply to the heater and then proceed to the next section Diagnosing a Failed Heater Assembly 1 Disconnect one of the power supply leads Use a meter to check the continuity of the entire heater assembly across the power supply terminals 2 If there is not continuity through the heater assembly check the continuity of each heater half individually to identify the one that has failed Connectors Glowing
23. ssure molten plastic that may blow back from the molding machine It is therefore recommended that a shield or Purge away be installed behind the nozzle to divert any blow back from reaching the heaters Consult your local Rex TCS Representative or Rex Materials for recommendations Power Supply Controls and Wiring Rex TCS heaters can normally be served by the existing electrical power supply and control system NOTE Please verify that the actual power supply to each heater is as specified when ordering the heaters Rex TCS heaters are capable of controlling the barrel temperature within a very tight control band While your TCS heaters will perform well with any standard controller the use of self 10 233 RMG Rex Materials Group tuning controllers is recommended to optimize performance Also your existing controller may be reprogrammed to a tighter control range for less variability in barrel temperature If the existing heater wires or their insulation have been damaged due to exposure to excessive heat from the old heaters the wiring to the heaters should be replaced See also Section Two of this manual under the heading Rex TCS Heater Assembly Wiring Rex Materials can advise you about your wiring scheme and control strategy upon request However because every control system is unique and we cannot control plant conditions we do not perform any wiring or take any responsibility for power supply or control circu
24. tallation and use Do not install heaters in areas where combustible gas vapor or dust is present Only instructed or skilled persons shall be entrusted with the maintenance work of electro heat installations No maintenance work shall be carried out with equipment live Special arrangements 233 RMG 5 Rex Materials Group such as locking devices shall be used to prevent switching on of the equipment while work is in progress Personnel whose activities involve the operation of electro heat installations or work in the vicinity shall be notified of the safety requirements to be observed during the operation of the installation by means of orders or service instructions brought to their attentions by posting up notices or if necessary by handing them a book of instructions for which acknowledgement is obtained The responsible persons shall ensure that the safety requirements are observed Personnel shall have at their disposal the safety equipment required for carrying out the operations they are called upon to undertake and for facilitating their intervention in the event of an incident or an accident This equipment shall be adapted to the working voltage and maintained in perfect condition Operating the heater above the maximum temperature rating may cause damage to the machine or heater It is recommended that the user install a high temperature protection device where conditions for an over temperature fault are likely to occur a
25. to patch or repair it as long as the heater element and terminal are still sound NOTE Check continuity before doing repairs to avoid needless work If a corner or small piece of the pad has broken off it may be reattached using the high temperature cement supplied in your Rex TCS repair kit Small punctures or broken areas can be filled or patched using Pyrolite E Z Fill available from Rex Materials and provided in the repair kit CAUTION If cement or E Z Fill are used in contact with heater terminals or element wires the products must be thoroughly dried before power is supplied to the unit to avoid potential electrical hazard Allow 24 hours for air drying 31 233 RMG Rex Materials Group Appendix Section Four How to Order Spare Parts 33 32 233 RMG Rex Materials Group How to Order Spare Parts The Rex TCS Heaters and End Rings if used are custom made to fit the specific machine requirements and are not normally stocked by Rex Materials It is strongly recommended that the Customer stock at least one heater half for each different heater assembly on the machine Spare parts should be ordered from the authorized TCS distributor where you purchased the original TCS system You can also contact Rex Materials Customer Service Department for assistance in identifying correct spare parts Telephone 1 517 223 3787 Fax 1 517 223 6806 E Mail customerservice rexmaterials com When ordering spare parts include the TC
26. utine or preventive maintenance required In fact barring any mechanical damage or electrical malfunction the heaters can be expected to give years of trouble free service However to avoid any failures it is recommended to occasionally inspect the heaters and their electrical connections as described below Routine Inspection Mechanical Damage Rex TCS Heaters are made from Pyrolite vacuum formed ceramic fiber material which is relatively fragile Therefore the potential exists for mechanical damage due to physical abuse The good news is that the units are quite robust and often damage can be repaired as long as the electrical elements and terminals are intact See Heater Repair section below for details The O rings on the Teflon covers hold the cover in place on the heater It is recommended that they be inspected annually Replace any O ring that exhibits signs of melting or cracking 29 233 RMG Rex Materials Group The terminals on the heaters absorb a lot of heat throughout the life of the heater and can cause the terminal connection to become loose It is recommended the terminals be re tightened with a torque wrench to prevent a poor connection from causing the terminal to overheat and fail Refer to Figure 2 2 in the installation manual for proper torque procedure and specification Replace Ceramic Cap and Ceramic Insulator when finished Thermocouples Improperly seated or malfunctioning thermocouples are a common
27. ver or captured outside the flap by O rings FIGURE 2 4 This completes the installation of your Rex TCS Heater System 25 233 RMG Rex Materials Group Operation amp Maintenance Section Three Operation Overview 27 Rex TCS Pre Start Inspection and Checklist 27 Rex TCS System Start up 28 Temperature Control and Monitoring 28 Documenting Savings and Performance Gains 29 Maintenance amp Repair Overview 29 Routine Inspection 29 Heater Troubleshooting 30 Barrel Overheating 30 Heater Repair and Replacement 31 26 Rex Materials Group Operation Overview Before applying power to your new Rex TCS System it is important to verify that all assembly and wiring procedures have been properly performed Then we will review the normal operation of the Rex TCS System and discuss how to monitor its performance Rex TCS Pre Start Inspection and Checklist Prior to switching on the power to your Rex TCS System please review the following checklist to assure that all components have been installed in accordance with Section Two of this manual Please verify the following All Rex TCS Heaters are tight on the barrel with no gaps between heaters Double check that the power supply voltage to each heater is per its design o Check that barrel is properly grounded See page 12 o Lead wires are in good condition and securely fastened at all connections o All heaters in a given zone are controlled by the sam
28. view The installation and start up of your Rex TCS system can be made much faster and easier through proper planning and preparation The areas outlined below require attention well before the installation date If you have any questions about these preparations please contact your local Rex TCS representative or Rex TCS Technical Service as shown in Section One of this manual Heater Clearance and Obstructions Rex TCS heaters require a minimum of 3 1 4 inches of clearance around the full diameter of the barrel Please verify that adequate clearance is available and make any machine adjustments necessary to provide the necessary clearance Be sure to verify that there is a minimum of 3 25 clearance around the lead edge of the barrel to the stationary platen when the barrel is in the full forward position One area for special attention is around any barrel support bracket Make sure that any angled brace on the foot or other obstruction does not interfere with the 3 25 clearance on the barrel diameter Also verify that the location of the support along the length of the barrel matches that shown on the drawing datasheet If not adjust accordingly The Rex TCS Heater design allows for a certain amount of cutting or trimming to clear small obstructions or tight spots Consult your Rex TCS Rep for details if necessary Blow Back Prevention Like any heating system Rex TCS Heaters are subject to damage due to exposure to high pre
Download Pdf Manuals
Related Search
Related Contents
Smeg S45MCX1 Instructions for Use CONSTRUCTION CPA CONFERENCE Untitled - 121ware.com ATD Tools ATD-80318 User's Manual Emerson 6081-P User's Manual Tripp Lite WEXT3-BP24V TEG-224WSplus Quick Installation Guide Avec les bois feuillus français, vous avez le choix ! manual do usuário B DIRECTIVA 2007/46/CE DO PARLAMENTO EUROPEU E Copyright © All rights reserved.