Home
installer à
Contents
1. NOLLD3NNOO ONINO JO3NNOOSH DINO G3HSQvOT 15 AWOL NOLIV2O1SHL IV 3unso DN3aN HL SI u3dwn MANIN 9 LINN 40 3HLNOQHINDO l I pon JUM AlddNS OL pe gt a 1 2 g YDY Vb ANIMO YOIVYINI M 5 w3woisno OVINOOWeV IV 14 1379 531435 Installation Diagrams GNNOHO Wulfi3N 5 5 OL 5 SYM HIN SYM PANIN GaNddNs YANOLSND 2400419713 OL E Bo CH DAA 5 Ss3d00 W21419713 NOO1 31
2. TERMINALES 7 DEL GENERADOR El y E2 pun TERMINALES DE CARGA T1 y T2 1 3 2 DISYUNTOR DE DESCONEXI N DEL SERVICIO PUBLICO Los disyuntores de desconexi n del servicio p blico y el generador para los modelos de 100 A son Tipo bipolar 120 240 VCA 100 A 50 60 Hz e Calificado para Calefacci n aire acondicionado y refrigeraci n HACR Intervalo del cable N m 1 a 8 AWG El par de apriete del conductor es 50 in lb El disyuntor del servicio p blico para los modelos de 150 200 A es Tipo 225AF bipolar 120 240 150 200 A 50 60 Hz ntervalo del cable 300 MCM 6 STR L nea 250 MCM 6 STR Carga ATS El par de apriete del conductor es 375 in lb L nea 275 in Ib Carga 5 133 TARJETA DE CONTROL DE PREVENCI N DE SOBRECARGA OPCB La tarjeta de control de prevenci n de sobrecarga est dise ada para impedir una sobrecarga del generador cuando est alimentando las cargas del cliente vea la Figura 1 2 La tarjeta OPCB puede gestionar hasta seis cargas 2 cargas de acondicionador de aire y otras 4 cargas La tarjeta OPCB gestiona las cargas rechazando las cargas conectas en el caso de que se produzca una ca da en la frecuencia del generador sobrecarga Las cargas que se rechazar n
3. A O TORQUE 50 IN LBS GROUP G TORQUE ITEM 4 TO 24 30 IN LBS 4 SECTION A A SCALE 0 600 ITEM 44 ONE MOUNTED UNDER SUBPLATE ITEM 24 L SECTION B B SCALE 0 600 CENTER DECAL APPROXIMATELY 6 1 4 DOWN FROM TOP OF COVER SING ASSEMBLY TEMPLATE Page 1 of 2 Exploded View ASSEMBLY 100A SERVICE ENTR GEN Drawing No 0K0164 EXPLODED VIEW ASSEMBLY 100A SERVICE ENTR GEN DRAWING 0K0164A ITEM PART 1 002237 2 074908 3 077033 4 007624 5 022152 6 074138 7 0E7886H 8 0E7890 9 0G5780A 10 0657808 11 0A1495 12 002380 213 0K0103 2 14 0D2572 15 0735904 216 0D7393T 17 0F2659 18 0K0124 19 0 0108 20 090388 21 026902 2 0K01120ALOR 23 0K01130ALOR 24 0K0114 25 0K11120ALOR 26 0K1119 1 27 0K1098 1 28 0K1736A 29 0E3484 30 0F9969 31 0K1018 32 0K1738 33 0H7917 34 0D3587 35 003259 36 003274 37 0 6389 38 0H7274 39 0E7213 40 0 8202 41 026850 42 068411 43 085889 44 022473 45 0E6193 46 0D6162 3 47 0 6155 48 0H7270 49 0K0220A 50 0K1167 51 0K0122 52 0E6303 53 0E6303C 54 058000E QTY Boe MO qe OL OQ BOO Da Da la Da ss Da Da Da Da Da Da NO NO ND Q0 O0 O O OO 1 1 SERIAL NU
4. 60 62 2 b Terminales a E2 240 246 VCA Terminales E1 a NEUTRO 120 123 VCA d Terminales E2 a NEUTRO 120 123 VCA 8 Coloque el disyuntor principal del generador CB1 en su posici n OFF u OPEN Abierto 9 Coloque el generador en modo OFF para parar el generador NOTA NO contin e hasta que el voltaje de salida y frecuencia de CA sean correctos y dentro de los l mites establecidos Si el voltaje sin carga es correcto pero la frecuencia sin carga no la velocidad regulada por el motor puede requerir ajuste Si la frecuencia sin carga es correcta pero el voltaje no el regulador de voltaje puede requerir ajuste 28 3 4 PRUEBAS DEL GENERADOR BAJO CARGA 1 Coloque el disyuntor principal del generador en su posici n OFF OPEN Abierto 2 Coloque el disyuntor DE DESCONEXI N DEL SERVICIO P BLICO en su posici n OFF u OPEN Abierto 3 manualmente los contactos principales del interruptor de transferencia a su posici n de GENERADOR RESERVA Consulte Operaci n manual 4 Para arrancar el generador p ngalo en modo MANUAL Cuando el motor arranque d jelo estabilizarse durante unos pocos minutos 5 Coloque el disyuntor principal del generador en su posici n ON o CLOSED Cerrado El generador ahora alimenta todos los circuitos de CARGA Compruebe el funcionamiento del generado bajo carga como sigue CONECTE las cargas el
5. a 22 ia 22 1 3 Descripci n del 0 22 1 3 1 Mecanismo del interruptor de transferencia 22 1 3 2 Disyuntor de desconexi n del servicio p blico 22 1 3 3 Tarjeta de control de prevenci n de sobrecarga OPCB 22 1 4 Etiqueta adhesiva de datos del interruptor de transferencia 23 1 5 Gabinete del interruptor de transferencia 23 1 6 Uso seguro del interruptor de transferencia 23 Instalaci n 23 2 1 Introducci n a la 23 22 sits nevis rtr nre 23 2 3 Conexi n de la alimentaci n y las l neas de carga 24 2 4 Conexi n de los cables del circuito de arranque 24 2 5 Tarjeta de control de prevenci n de sobrecarga OPCB 24 2 6 Conexi n del suministro de alimentaci n para los contactores 2 6 1 Suministro de 24 26 2 6 2 Suministro de 120 26 Funcionamiento uuu 26 3 1 Pruebas y ajustes de funcionamiento 26 3 2 Operaci n ds 27 3 2 1 Cierre del lado de la
6. N1 Tl UTILITY LDAD 240 CUSTOMER CUSTOMER CONNECTION LOAD CONNECTION CUSTOMER Z CONTROL TB CONNECT IONS Y NOTE BONDING JUMPER X IS REMOVEABLE Q GND is J WIRING DIAGRAM REVISIUN J 5049 C RTSY 2013 DATE 4 22 13 DRAWING 0K0135 GROUP 0 NOTE INSTALLATION MUST MEET ALL NATIONAL STATE AND LOCAL ELECTRICAL CODES RTSR TRANSFER SWITCH 2013 MODEL UTILITY SUPPLY FROM SERVICE DISCONNECT LOAD SHED DEVICE GROUNDING ELECTRODE GFCI CONNECTION BREAKER LOCATED ON THE REAR OF UNIT gt CUSTOMER LOAD DISTRIBUTION PANEL gt TO GROUNDING ELECTRODE EVOLUTION PANEL GENERATOR DUTPUT CIRCUIT BREAKER 2 POLE SIDE VIEW VIEW EXPLODED VIEW REVISION J 4223 B NON SERVICE ENTRANCE ATS DATE 2 11 13 PAGE 1 DF 2 DRAWING 0Ke516 GROUP 0 NOTE INSTALLATION MUST MEET ALL NATIONAL STATE AND LOCAL ELECTRICAL CODES PANEL BOARD RTSY TRANSFER SWTICH 2013 MODEL GROUND CDNNECTID 1 A BONDING JUMPER IS PROVIDED BETWEEN THE NEUTRAL LUG AND ENCLOSURE AT THIS LOCATION FACTORY INSTALLED LOAD SHED DEVICE CONNECTION NEUTRAL BAR IN PANELBDARD GROUND Dene A GROUNDING ELECTRODE CONNECTION lt LOCATED ON THE REAR OF UNIT gt GFCI BREAKER TO GROUNDING ELECTRODE EVOLUTION PANEL GENERATOR OUTP
7. 1 4 TRANSFER SWITCH DATA DECAL A DATA DECAL is permanently affixed to the transfer switch enclo sure Use this transfer switch only with the specific limits shown on the DATA DECAL and on other decals and labels that may be affixed to the switch This will prevent damage to equipment and property When requesting information or ordering parts for this equipment make sure to include all information from the DATA DECAL Record the Model and Serial numbers in the space provided below for future reference MODEL SERIAL 1 5 TRANSFER SWITCH ENCLOSURE The standard switch enclosure is a National Electrical Manufacturer s Association NEMA and UL 3R type UL and NEMA indoor outdoor rated type enclosures primarily provide a degree of protection against falling rain and sleet undamaged by the formation of ice on the enclosure 1 6 SAFE USE OF TRANSFER SWITCH Before installing operating or servicing this equipment read the SAFETY RULES inside front cover carefully Comply strictly with all SAFETY RULES to prevent accidents and or damage to the equipment The manufacturer recommends that a copy of the SAFETY RULES are posted near the transfer switch Also be sure to read all instructions and information found on tags labels and decals affixed to the equipment Three publications that outline the safe use of transfer switches are the following NFPA 70 National Electrical Code NFPA 70E Standard for
8. KNOCKOUT SUITABLE FOR 1 1 2 amp 2 CONDUIT SIZE 2 PLACES REVISIDN A DATE 12 5 12 GRUUP G 68mm 40 37 peus 0 37 4 02mm 0 27 14mm 20 6 KNOCKOUT SUITABLE FOR 1 1 2 2 CONDUIT SIZE 764 3mm 30 1 679 45mm 26 757 KNOCKOUT SUITABLE FOR 1 1 2 amp CONDUIT SIZE 42 4mm 1 77 TYPICAL 175 4mm 6 91 1 PADLOCK CUSTOMER SUPPLIED LOCATION KNOCKOUT SUITABLE FOR 3 4 amp 1 CONDUIT SIZE EXPLODED VIEW 150 2004 SE XFER SWITCH PAGE 1 OF 2 DRAWING 0 2422 GROUP G THIS PAGE IS LEFT INIENTILNALLY BLANK EXPLODED VIEW REVISION A 150 2004 SE XFER SWITCH DATE 12 5 12 PAGE 2 DF 2 DRAWING 0 2422 GROUND LUG LOCATED ON THE REAR OF UNIT 2008 AIR COOLED HSB GENERATORS REVISIONJ 4064 B DATE 1 29 13 GRUUP G SERVICE DISCONNECT ATS 5 2013 MODEL BONDING JUMPER IS PROVIDED BETWEEN THE NEUTRAL LUG GROUND BAR AND ENCLOSURE AT THIS LOCATION FACTORY INSTALLED TILITY METER SOCKET CONNECTION PANELBOARD GROUND BAR DISCONNECT BONDING NEUTRAL BAR PANEL BOARD 194 OR 15B GROUNDING ELECTRODE NOTE INSTALLATION MUST MEET ALL NATIONAL STATE AND LOCAL ELECTRICAL CODES gt Ei AIR COOLED INSTALLATION EXPLODED VIEW AIR COOLED INSTALLATION RTSY TRANSFER SW PAGE 1 DF 2 DRAWING 0K2423 EXPLODED VIEWIR CODLED INSTALLATION RTSY TRANSFER SW
9. 140 m No 18 AWG De 461 730 pi 223 m No 16 AWG De 731 1 160 pi 354 m No 14 AWG De 1 161 1 850 pi 565 m No 12 AWG 2 5 OPCB TABLEAU DE COMMANDE DE PREVENTION DE LOPCB peut contr ler directement un de climatisation 24 ou un contacteur s par 24 V a c ou 120 V a c avec bobine qui peut contr ler toute charge qui lui est reli e Consulter figure 2 2 Le module de gestion d alimentation PMM n est pas fourni avec le commutateur de transfert Il peut tre achet s par ment du fabricant Le PMM sert lorsque est mont sur le commutateur de transfert LOPCB est congu pour tre reli la bobine de fonctionnement du contacteur du PPM afin de l alimenter LOPCB est aliment d une source en provenance d un transformateur 24 V a c Classe 2 reli e la source CHARGE du commutateur Chaque sortie est limit e 1 A Les connexions de la bobine du contacteur du PPM sont faites sur la languette connexion de Connectez la bobine du contacteur du PPM la borne du contacteur de 1 2 ou 4 Le choix de la borne du contacteur d pend du degr de priorit accord e lors du contr le des charges s agit d un circuit 24 V a c Les m thodes utilis es pour le c blage doivent tre celles de la Classe 2 Utilisez des bornes connexion rapide de 0 25 po pour connecter la bobine du contacteur au PMM Voir figure 2 3
10. INSTALLER A G N RATEUR LORS DE L UTILISATION DU L EXT RIEUR SEULEMENT PR SENT DOCUMENT Ce manuel doit rester avec l appareil 31 Table des mati res R gles de s curit Information g n rale 1 1 Introduction 1 2 Retrait de l emballage 1 3 Description de l quipement 34 1 3 1 M canisme du commutateur de transfert 34 1 3 2 Disjoncteur du r seau public 2 1 3 3 OPCB tableau de commande de pr vention de surcharge 34 1 4 Autocollants du commutateur de transfert 35 1 5 Bo tier du commutateur de transfert 35 1 6 Utilisation s curitaire du commutateur de transfert 35 Installation 35 2 1 Pr paration de l installation 35 2 2 ccc dc eG ised anida 35 2 3 Connexion de l alimentation et des lignes de charge 36 2 4 Connexion des fils du circuit de d marrage 36 2 5 tableau de commande de pr vention de surcharge 36 2 6 Connexion l alimentation pour les contacteurs 2 6 1 Alimentation 24 V a c 38 2 6 2 Alimentation 120 V Fonclionnemenhl 3 1 Tests de fonctionnement et r glages 3 2 Fonctionnement manuel 39
11. canisme de transfert d un commutateur de transfert typique CONTACTS DE RESEAU PUBLIC BOBINE DE _ FERMETU el DE RESEAU PUBLIC U E ooo ooo ese al Z IA Elo ooo CONTACTS DE n 7 GENERATEUR BOBINE DE 2 FERMETURE vu O DU GENERATEUR OE A CONTACTS DE CHARGEMENT T1 ET T2 13 2 DISJONCTEUR DU R SEAU PUBLIC Le disjoncteur du r seau public et du g n rateur sont dot s des caract ristiques suivantes Type 2 p les e 120 240 V a c 100A 50 60 Hz Homologu pour les syst mes de chauffage de climatisation et de r frig ration e Calibre du fil 41 8 AWG Le couple de force pour le conducteur est de 50 po lb Le disjoncteur du r seau public des mod les 150 200 A est dot des caract ristiques suivantes Type 225AF 2 p les 120 240 V a c 150 A 200 A 50 60 Hz Calibre du fil 300 MCM 6 STR ligne 250 MCM 6 STR charge commutateur de transfert automatique Le couple de force pour le conducteur est de 375 po lb ligne 275 po lb charge commutateur de transfert automatique 1 3 3 TABLEAU DE COMMAND
12. ou 120 V a c est fourni par pour alimenter chaque bobine de contacteur Les conditions de surcharge du g n rateur sont d termin es par la fr quence du g n rateur Les chargements sont d lest s quand la fr quence est inf rieure 58 Hz pendant 3 secondes ou inf rieure 50 Hz pendant 0 5 seconde pour 60 Hz L OPCB est dot d un bouton de v rification qui force l unit agir comme si une surcharge s tait produite Ce bouton fonctionne m me lorsque le transfert de signal est inactif Figure 1 2 OPCB 1 y 0 Mise Connexions d appareil de climatisation Jusqu deux HELA 2 appareils de climatisation peuvent tre contr l s partir d ici par l entremise de leurs fils de thermostat faible tension DEL d tat Affichent les charges qui peuvent actuel lement tre mises en marche Connexions de charge Jusqu quatre charges de tout type peuvent tre contr l es partir de ces connexions Un module de contracteur s par est n cessaire 14 AUTOCOLLANTS DU COMMUTATEUR DE TRANSFERT Un AUTOCOLLANT est pos en permanence sur le boitier du commutateur de transfert Utilisez ce commutateur de transfert seulement dans les limites affich es sur l AUTOCOLLANT et sur les autres tiquettes ou autocollants qui peuvent avoir t appos s sur le commutateur Cela permettra de pr venir les dommages cau
13. se agrupan en cuatro niveles de prioridad en la tarjeta OPCB Las prioridades 1 y 2 tienen conexiones para un acondicionador de aire y un contactor Se puede usar un acondicionador de aire y un contactor al mismo tiempo si se desea Para controlar un acondicionador de aire no se requieren otros equipos Los rel s internos interrumpen la se al de control de 24 VCA del termostato para deshabilitar la carga del acondicionador de aire Instalaci on Las prioridades 3 y 4 tienen conexiones solamente para un contactor Cuatro LED situados en la tarjeta de control de prevenci n de sobrecarga indicar n cuando se habilita un nivel de prioridad de carga Cuando las cargas est n conectadas los LED estar n encendidos Todas las cargas incluidos los acondicionadores de aire centrales se pueden controlar por medio de un contactor que se debe comprar por separado La tarjeta de control de prevenci n de sobrecarga puede controlar hasta cuatro contactores se suministran 24 VCA o 120 VCA a trav s de la tarjeta OPCB para energizar la bobina de cada contactor La condici n de sobrecarga del generador se determina conforme a la frecuencia del generador Las cargas se interrumpen cuando la frecuencia sea menor que 58 Hz durante 3 segundos o menor que 50 Hz durante medio segundo para 60 Hz La tarjeta OPCB tiene un bot n de prueba Test que fuerza a la unidad a actuar como si se hubiera producido una sobrecarga Este bot n funciona a n
14. 00 Factory Jumper Wire Neutral to Load Supply 2 3 1 FUNCTIONAL TESTS AND ADJUSTMENTS Following transfer switch installation and interconnection inspect the entire installation carefully A competent qualified electrician should inspect it The installation should comply strictly with all applicable codes standards and regulations When absolutely certain the installation is proper and correct complete a functional test of the system A CAUTION Perform functional tests in the exact order presented in this manual or damage could be done to the switch IMPORTANT Before proceeding with functional tests read and make sure all instructions and information in this section are understood Also read the information and instructions of labels and decals affixed to the switch Note any options or accessories that might be installed and review their operation Figure 2 3 24 Vac Supply Connections 0 Ground CL al 194 12V a al CL wiring rax D 1 LOAD 1 2 1 LOAD2 samax 2 1 LOAD 3 2 1 LOAD4 2 Transformer leads Field installed Existing wiring 3 2 MANUAL OPERATION Do NOT manually transfer under load Disconnect transfer switch from all power sources by approved means such as the main circuit breaker s A manual HANDLE 15 shipped with the transfer switch Manual operation
15. 1 Alimentation Pwe Charge 2 Fils de bobine Alimentation PMM 3 Charge 3 Alimentation PMM 4 Charge 4 1 Contr le d un contacteur s par Un module de relai de contacteur s par peut tre achet du fabricant Ce modele est livr avec une bobine 24 V a c ou 120 V a c 1 Installez le module de contacteur et connectez la charge aux contacts principaux 2 Connectez la bobine du contacteur la borne voulue L1 14 de la languette de connexion 3 Connectez les autres modules de contacteur de la m me mani re REMARQUE Il sera n cessaire de d terminer l ordre pour le d lestage des charges et de connecter les charges dans en fonction de l ordre souhait L emplacement 1 a la priorit la plus lev e et l emplacement 4 la priorit la plus basse 3 7 CONNEXION L ALIMENTATION POUR LES CONTACTEURS LOPCB peut tre aliment par une source 24 V a c or 120 V a c Une source 24 Y a c provient d un transformateur de Classe 2 qui peut tre achet du fabricant Des trous de montage sont pr sents dans le boitier pour l installation du transformateur L alimentation 120 a c est associ e un fusible de 5 A qui est connect en usine la borne T1 et NEUTRE de l OPCB 2 6 2 61 ALIMENTATION 24 V A C Les connexions du transformateur doivent tre effectu es selon ce qui est indiqu la figure 2 3 Fil bleu OPCB Borne CHARGE SOURC
16. Electrical Safety in the Workplace UL 1008 STANDARD FOR SAFETY AUTOMATIC TRANSFER SWITCHES NOTE It is essential to use the latest version of any standard to ensure correct and current information 2 1 INTRODUCTION TO INSTALLATION This equipment has been wired and tested at the factory Installing the switch includes the following procedures e Mounting the enclosure Connecting power source leads and load leads Connecting the generator sensing and transfer relay circuits Connecting any auxiliary contact if needed e Connect Overload Prevention Control Board loads as required Testing functions 2 2 MOUNTING Mounting dimensions for the transfer switch enclosure are in this manual Enclosures are typically wall mounted See the Installation Diagram A CAUTION Handle transfer switches carefully when install ing Do not drop the switch Protect the switch against impact at all times and against con struction grit and metal chips Never install a transfer switch that has been damaged Installation This transfer switch is mounted in a UL type 3R enclosure It can be mounted outside or inside and should be based on the layout of installation convenience and proximity to the utility supply and load center Install the transfer switch as close as possible to the electrical loads that are to be connected to it Mount the switch vertically to a rigid supporting structure To prevent switch disto
17. HANDLE DECALS SERVICE ENTRANCE DECALS SERVICE ENTRANCE DECALS SERVICE ENTRANCE DECAL TRANSFER SWITCH ID 200A DECAL NEUTRAL CONNECTION DECAL FUSE REPLACEMENT DECAL CUSTOMER CONN RTS DECAL TEST SEQUENCE 100 200A SE DECAL LIVE CIRCUIT ENG FRN SPN DECAL TERMINAL SHOCK HZD BI DECAL RTS TRANSFER SW GENERAC DECAL UTILITY LOAD SENSE 240V DECAL 2008 NEC COMPLIANCE SCREW HHTT M4 0 7 X 10 BP WASHER LOCK EXT 1 4 STL SCREW THUMB 1 4 20 X1 2 W SHLD UT HEX 1 4 20 SS NUT HEX FL WHIZ 1 4 20 WASHER FLAT 1 4 M6 ZINC WASHER LOCK M6 1 4 BRACKET ARM EXTENDER RIVET POP 156 X 362 AL PIN ARM EXTENDER RELAY PNL 12VDC DPDT 10A 240VA FUSEBLOCK 30A 600V 3POS W SQ FUSE 5 X BUSS TERM BLOCK 3P UL 12 20AWG SCREW PHTT M3 0 5 X 25 SCREW HHTT M3 0 5 X 6 BP BRACKET LOAD SHED 200A RTS CHANNEL SNAPTRACK 76 2 X 101 2 ASSY LOAD MANAGEMENT CONTROLLER PROGRAMMED TIE WRAP UL 5 6 X 10 NATL NOT SHOWN HARN 200A XFER SW SE 2010 NOT SHOWN WIRE A 7 0 BLUE WIRE E1 3 0 BLUE Page 2 of 2 KNOCKOUT SUITABLE FOR 1 1 1 4 amp 1 1 2 CONDUIT SIZE 2 PLACES REVISION A DATE 9 12 07 908 4mn 20 0 1 PADLOCK CUSTOMER SUPPLIED LOCATION PAGE 1 OF 1 MEN GROUP C MOUNTING HOLES 6 35mm 0 25 1 KNOCKOUT SUITABLE FDR 1 1 1 4 amp 1 1 2 CONDUIT SIZE 2 PLACES 438mm 17 24 34mm 1 3 TYPICAL KNOCKOUT SUITABLE FOR 3 4 amp 1 CONDUIT SIZE EXPLODED VIEW HS TRANSFER SWITCH DRAWING 066832
18. NEMA de EE UU Los gabinetes tipo UL y NEMA 3R calificados para interiores exteriores proveen principalmente cierto grado de protecci n contra lluvia y nevisca no se da a por la formaci n de hielo en el gabinete 1 6 USO SEGURO DEL INTERRUPTOR DE TRANSFERENCIA Antes de instalar operar o dar servicio a este equipo lea las REGLAS DE SEGURIDAD dentro de la cubierta delantera cuidadosamente Cumpla estrictamente con todas las REGLAS DE SEGURIDAD para evitar accidentes y o da os al equipo El fabricante recomienda que se fije una copia de las REGLAS DE SEGURIDAD cerca del interruptor de transferencia Tambi n aseg rese de leer todas las instrucciones e informaci n que se encuentra en los r tulos etiquetas y etiquetas adhesivas adheridos al equipo Las siguientes son tres publicaciones que indican el uso seguro de los interruptores de transferencia NFPA 70 C digo El ctrico Nacional de EE UU NFPA 70E Standard for Electrical Safety in the Workplace Norma para la seguridad el ctrica en el lugar de trabajo UL 1008 NORMA PARA INTERRUPTORES DE TRANSFERENCIA DE SEGURIDAD AUTOMATICOS NOTA Es esencial usar la ltima versi n de cualquier norma para asegurar tener informaci n correcta y actualizada 2 1 INTRODUCCI N A LA INSTALACI N Este equipo ha sido cableado y probado en la f brica La instalaci n del interruptor incluye los siguientes procedimientos Montaje del gabinete Conexi n de los condu
19. OPCB se incluye un bot n pulsador de prueba para probar el funcionamiento de las funciones que se prueban El bot n de prueba funcionar cuando el ATS est en la posici n de servicio p blico o de generador 1 Coloque en ON el suministro del servicio p blico al ATS 2 Pulse el bot n TEST prueba en la tarjeta OPCB 3 Verifique que todas las cargas conectadas que se deben rechazar se deshabiliten El m todo de verificaci n depender del tipo de carga 4 Despu s de cinco 5 minutos verifique si AC 1 y Carga 1 est n energizados y si el LED de estado de AC 1 y Carga 1 est encendido 5 Despu s de otros 15 segundos verifique si AC 2 y Carga 2 est n energizados y si los LED de estado de AC 2 y Carga 2 est n encendidos 6 Despu s de otros 15 segundos verifique si Carga 3 est energizado y si el LED de estado de Carga 3 est encendido 7 Despu s de otros 15 segundos verifique si Carga 4 est energizado y si el LED de estado de Carga 4 est encendido 3 7 RESUMEN DE LA INSTALACI N Aseg rese de que la instalaci n haya sido llevada a cabo apropiadamente como indic el fabricante y que satisfaga todas las leyes y c digos correspondientes 2 Pruebe y confirme el funcionamiento correcto del sistema como se indic en los correspondientes manuales de instalaci n y del propietario 3 Instruya al usuario final sobre los procedimientos correctos operaci n mantenimiento y llamadas de servicio ilmpor
20. cuando la se al de transferencia est inactiva Figura 1 2 Tarjeta de control de prevenci n de sobrecarga OS Conexiones de acondicionador de aire 28 194 12 a Se pueden controlar aqu hasta dos A A a trav s de 2 sus cables de termostato de bajo voltaje w Saus LED de estado Muestra a qu cargas se les permite funcionar actualmente CEELELE Conexiones de carga Se pueden controlar hasta cuatro cargas de cualquier tipo a trav s de estas conexiones Se requiere un m dulo de contactor separado 14 ETIQUETA ADHESIVA DE DATOS DEL INTERRUPTOR DE TRANSFERENCIA Una ETIQUETA ADHESIVA DE DATOS se encuentra permanente adherida al gabinete del interruptor Use este interruptor de transferencia solo con los l mites espec ficos mostrados en la ETIQUETA ADHESIVA DE DATOS y en otras etiquetas y etiquetas adhesivas que puedan estar fijadas en el interruptor Esto evitar da os al equipo y a la propiedad Al solicitar informaci n o pedir piezas para este equipo aseg rese de incluir toda la informaci n de la ETIQUETA ADHESIVA DE DATOS Registre los n meros de modelo y de serie en el espacio provisto debajo para consultas futuras N M MODELO N M SERE 1 5 GABINETE DEL INTERRUPTOR DE TRANSFERENCIA El gabinete est ndar del interruptor de transferencia es del tipo UL 3R de la Asociaci n Nacional de Manufacturas El ctricas
21. el ctrico PELIGROS GENERALES Cualquier generador de CA que se use para alimentaci n de respaldo si ocurre un fallo de la fuente de alimentaci n NORMAL SERVICIO PUBLICO debe ser aislado de la fuente de alimentaci n NORMAL SERVICIO PUBLICO mediante un interruptor de transferencia aprobado No aislar apropiadamente las fuentes de alimentaci n NORMAL y de RESERVA entre s puede ocasionar lesiones o la muerte a los trabajadores de la red el ctrica debido a la realimentaci n de energ a el ctrica La instalaci n operaci n servicio o reparaci n incorrectos o no autorizados son extremadamente peligrosos y pueden ocasionar la muerte lesiones graves o da o al equipo y o a la propiedad personal P P P En el interruptor de transferencia instalado existen voltajes de alimentaci n extremadamente altos y peligrosos Cualquier contacto con terminales contactos o cables de alto voltaje resultar en choque el ctrico extremadamente peligroso y posiblemente MORTAL NO TRABAJE EN EL INTERRUPTOR DE TRANSFERENCIA HASTA QUE TODOS LAS SUMINISTROS DE ALIMENTACI N AL INTERRUPTOR HAYAN SIDO EFECTIVAMENTE COLOCADOS EN OFF La instalaci n operaci n y servicio de este equipo deben ser realizados por personal competente y calificado Observe estrictamente los c digos el ctrico y de construcci n locales estatales y nacionales Al usar este equipo cumpla con la reglamentaci n del C digo El ctrico Nacional de EE UU NEC y la
22. n rateur et peut galement entrainer des blessures ou la mort de travailleurs du r seau public en raison du retour de l nergie lectrique Le fabricant ne peut anticiper toutes les circonstances possibles pouvant tre source de danger Les avertissements de ce manuel ainsi que ceux qui se trouvent sur les tiquettes et les autocollants fix s sur l unit ne pr viennent pas tous les risques Lors d une proc dure d une m thode de travail ou d une technique d utilisation n tant pas sp cifiquement recommand e par le fabricant s assurer de la s curit du personnel De plus il est n cessaire de s assurer que la proc dure la m thode de travail ou la technique d utilisation choisie ne fait pas en sorte que le commutateur de transfert devienne non s curitaire AVERTISSEMENT Proposition 65 de la Californie L chappement du moteur et certains de ses composants sont reconnus par l Etat de la Californie comme pouvant causer le cancer des anomalies cong nitales ou d autres probl mes de reproduction AVERTISSEMENT Proposition 65 de la Californie Ce produit contient ou met des produits chimiques reconnus par l Etat de la Californie comme pouvant causer le cancer des anomalies cong nitales ou d autres problemes reproducteurs 32 Regles de s curit Des encarts DANGER AVERTISSEMENT ATTENTION et REMARQUE apparaissent ponctuellement dans cette publication ainsi que sur les tiquettes et autocollants fix s su
23. reserva el motor del generador puede efectuar giro de arranque y arrancar en cualquier momento sin aviso Para evitar posibles lesiones que puedan ser causadas por tales arranques el sistema de arranque autom tico del sistema debe ser deshabilitado antes de trabajar en o alrededor del generador o interruptor de transferencia Luego coloque el r tulo NO ACCIONAR en el interruptor de transferencia y en el generador Retire el cable negativo Neg o de la bater a Para servicio autorizado consulte con el n mero de ubicaci n de concesionarios que se encuentra dentro del manual del propietario del generador 21 Informaci n general 1 1 INTRODUCCI N Este manual ha sido preparado especialmente con el prop sito de familiarizar al personal con el dise o aplicaci n instalaci n operaci n y servicio del equipo que aplique Lea el manual cuidadosamente para cumplir con todas las instrucciones Esto ayudar a evitar accidentes 0 da os al equipamiento que pueden de otra forma ser causados por falta de atenci n aplicaci n incorrecta o procedimientos incorrectos Se han hecho todos los esfuerzos posibles para asegurar que los contenidos de este manual sean precisos y est n actualizados Sin embargo el fabricante se reserva el derecho de cambiar alterar o de alguna otra manera mejorar el producto o el manual en cualquier momento sin aviso previo 1 2 DESEMBALAJE Desembale cuidadosamente el interruptor de transfer
24. usar solamente en las perforaciones de tap n desprendible de la parte inferior para las instalaciones NEMA 3R Control de la carga del acondicionador de aire 1 Tienda el cable del termostato de la caldera a la unidad de exteriores del acondicionador de aire hasta el interruptor de transferencia 2 Conecte el cable en la regleta de terminales Aire 1 de la tarjeta OPCB como se muestra en la Figura 2 2 Estos son contactos normalmente cerrados que se abren en condiciones de rechazo de la carga Tienda el cable del termostato alejado de los cables de alto voltaje 3 Si es necesario conecte el segundo acondicionador de aire a la regleta de terminales Aire 2 TY IN CARGA 1 1AMAX 2 E 1 mi CARGA 2 1 CARGAS PMM Carga N m 1 N m 1 CARGAS PMM Carga N m 2 N m 2 Cables de bobina CARGAS PMM Carga N m 3 N m 3 CARGAS PMM Carga N m 4 N m 4 Capacidades nominales de los contactos Aire 1 y 2 24 5 0 A m x NOTA Estas instrucciones son para una instalaci n de acondicionador de aire t pica Para controlar bombas de calor y acondicionadores de aire de dos etapas se requieren conexiones especiales o el uso de m dulos de gesti n de energ a para controlar las cargas Control de un contactor separado Se puede comprar al fabricante un m dulo de rel de contactor separado El modelo se suministra con versiones de bobina de 2
25. 1 1 403 31691105 1NODAJONA 1 lt N N q N x 2 z da 5 4 Y lt N A Installation Diagrams 1 214 1 1 8 12 SuOIVWu3N39 SH 10094 800 54009 TORIJ WOOT NOLIV T VLSNI CH IOOO CNY IVNOLIYN 133W ISNN T IVESNI 3ION Installation Diagrams Edo EJE ONIONNOYD OL ST HO VOL JJ GHVOE R GHVORTENVA NI uve WANEN TL NOUDJNNOO LINN 40 wd bo FHLNO INDO ONNO JANOS A 1957005 YN AN G3TIVISNI AYOL NOLIVIO 1 SIHL 3HNSOTON3 ONY L8 SI HAdAN ONIONOS V ECON ETOZ 1519 SIV IDSNNOOSIC 30IAH3S K A q N x 2 gt 5 LJ E 5 B E A A x Z gt gt E i T i Y gt tc Installation Diagrams S3d09 14901 CNV 31 15 NNOLNN TN 113341 1S0 T IVLSNI ALON ECO OL
26. 1 se efect a de manera incorrecta o imprudente Obs rvelos cuidadosamente Sus definiciones son las siguientes PELIGRO Luego de este encabezado lea las instrucciones que si no se cumplen estrictamente resultar n en lesiones graves incluso la muerte ADVERTENCIA Luego de este encabezado lea las instrucciones que si no se cumplen estrictamente pueden resultar en lesiones graves incluso la muerte PRECAUCI N Luego de este encabezado lea las instrucciones que si no se cumplen estrictamente podr an resultar en lesiones menores o moderadas NOTA Luego de este encabezado lea las instrucciones que si no se cumplen estrictamente pueden resultar en da os al equipo y o a la propiedad Estas advertencias de seguridad no pueden eliminar los peligros que indican El sentido com n y el cumplimiento estricto de las instrucciones especiales mientras se desarrolla el servicio son esenciales para la prevenci n de accidentes Cuatro s mbolos de seguridad de uso com n acompa an a los bloques de PELIGRO ADVERTENCIA y PRECAUCI N Cada uno indica el siguiente tipo de informaci n Este s mbolo se ala informaci n de seguridad importante que si no se respeta podr a poner en peligro la seguridad personal y o material Este s mbolo se ala un posible peligro de explosi n Este s mbolo se ala un posible peligro de incendio Este s mbolo se ala un posible peligro de choque
27. 1736C 25 0E3484 26 0G9651A 27 0G9651B 28 0G9651C 29 0G8535 30 0K1018 31 0D3587 32 0H7917 33 0K1738 34 003274 35 003259 36 0 1098 1 37 0H6389 38 0H7274 39 0A1495 40 026850 41 0E7213 42 085889 43 068411 44 022473 45 022097 46 0E6193 47 0D6162 3 48 0E6155 49 0K0103 2 50 0D2572 2 51 073590A 2 52 0D7393T 53 0K0124 54 0F2659 55 0H7190 56 0H7270 57 0K0220A 58 064761 59 0K0123 60 0E6303 61 0 6303 HN 4 MN BRO O0 2A L L La La La Da La La La Da La L La La la BR D 1 SERIAL NUMBER AND FRONT DECAL PER MODEL 2 SUPPLIED WITH HARNESS ITEM 59 3 SUPPLIED WITH TRANSFER SWITCH REVISION A DATE 12 12 12 GROUP G DESCRIPTION XFRSW HSB 200A 2P 250V SCREW HHTT M5 0 8 X 10 BP CB 200A 2POLE 240V 225AF SCREW RHM 8 32 X 2 1 2 LUG SLDLSS 350 MCM 6 AL CU SPACER 200 AMP TRANSFER SWITCH BOLT CARR 1 4 20 X 1 BUSBAR 200A TRANSFER SW N1 N2 SCREW SHC M8 1 25 X 20 G8 WASHER LOCK M8 5 16 LUG SLDLSS 250 6 AL CU SCREW BHSC 1 4 20 X 3 8 90 DEGREE DN SPADE CONNECTOR STRAIGHT SPADE CONNECTOR LUG SLDLSS 2 0 14X 10 32X 125 WIRE NEUTRAL GND CONNECTION ASSY NEUT BLK 200A W TAP SCREW HHTT M6 1 0 X 12 ZINC ENCLOSURE 200A SE XFRSW RAW COVER 200A SE XFRSW RAW SUBPLATE 200A SE XFER SW COVER INSIDE 200A SE XFER SW RAW CB RISER BRACKET 200A GENERAC DECAL XFER SW SE 200A 120 240 DECAL WARN MANUAL OPER
28. 3 2 1 Fermeture de l alimentation du r seau 39 3 2 2 Fermeture de l alimentation du g n rateur 39 3 2 3 Retour l alimentation du r seau public 39 3 3 V rification de la tension 3 4 V rification du g n rateur avec 3 5 V rification du fonctionnement automatique 3 6 V rification de l OPCB tableau de commandes de pr vention de SUFChare s cost ns 41 3 7 R sum d installation 41 CONSERVEZ CES INSTRUCTIONS Lisez attentivement l information qui suit avant l installation le fonctionnement ou l entretien de cet quipement Lisez galement les directives et l information des autocollants et des tiquettes qui se trouvent sur le commutateur de transfert Remplacez tout autocollant ou toute tiquette qui n est plus lisible DANGER Relier un g n rateur un systeme lectrique normalement aliment par le r seau public doit tre effectu au moyen d un quipement qui assure un transfert ad quat afin d isoler le systeme lectrique du r seau de distribution public lorsque le g n rateur est en marche Section 701 Legally Required Standby Systems ou Section 702 Optional Standby Systems si applicables Le fait de ne pas isoler un syst me lectrique l aide de tels moyens se traduira par des dommages au g
29. 4 VCA o 120 VCA 1 Monte el m dulo de contactor y conecte la carga a los contactos principales 2 Conecte la bobina del contactor en los terminales L1 14 deseados la regleta de terminales de la tarjeta OPCB 3 Conecte del mismo modo los contactores del m dulo de gesti n de alimentaci n adicional 25 Funcionamiento NOTA Ser necesario determinar el orden de rechazo de las cargas conectas y conectar las cargas a la tarjeta OPCB en ese orden Uno es la prioridad m s alta y cuatro es la prioridad m s baja 2 6 CONEXI N DEL SUMINISTRO DE ALIMENTACI N PARA LOS CONTACTORES La tarjeta de control de prevenci n de sobrecarga OPCB se puede alimentar con suministro de alimentaci n de 24 VCA o 120 VCA El suministro de 24 VCA proviene se un transformador Clase 2 que se puede comprar al fabricante La subplaca del gabinete cuenta con agujeros de montaje para montar el transformador El suministro de 120 VCA tiene un fusible de 5 A y se conecta en la f brica en los terminales de la tarjeta OPCB con las etiquetas 1 y Neutral 2 6 1 SUMINISTRO DE 24 Las conexiones del transformador se hacen como se muestra en la Figura 2 3 Cable azul Terminal SUMINISTRO DE CARGA 1 de la Cable negro Terminal T1 de la OPCB Cable blanco Terminal NEUTRO de la OPCB Cable amarillo Terminal SUMINISTRO DE CARGA 2 de la OPCB 2 6 2 SUMINISTRO DE 120 Instale los siguientes cables puente
30. 48 NOYO NANO YOIVANIO ONINNOYD OL 144205 ua a IER NOLLDINNOI ONONO YENNY En DNA N GETNISNI NOLIVOO SHL IV UNSOTONS NY oo HL A NWA H E SI u3dwn H 7 l la NOLDNNOD NNOY ETO HOLIMS YIISNVHL AS IHNvd 54400 MONLOJ WOOT CNV 3115 IVNOLIVN 1397 15 NOLIVTIVLSNI LON Part No 0K0171 Revision C 03 04 13 Printed in U S A Manual del propietario Interruptor autom tico de transferencia ATS TRANSFER SWITCH PELIGRO EST N DESTINADOS AL USO EN APLICACIONES CRITICAS DE SOPORTE A LA VIDA HUMANA ESTE PRODUCTO PUEDE SER INSTALADO POR EL PROPIETARIO SIN EMBARGO 51 ESTA INCOMODO CON LAS HABILIDADES O HERRAMIENTAS REQUERIDAS HAGA QUE UN ELECTRICISTA O CONTRATISTA CUALIFICADO EFECTUE LA INSTALACION CONSULTE EL MANUAL DEL PROPIETARIO EMANACIONES DE ESCAPE MORTALES SOLO PARA INSTALACION EXTERIORES Este manual debe permanecer con la unidad 19 Reglas de S QUuridad 20 Informaci n general 22
31. 515 TVNOLIYN JAAN LSNIN NOLIVTIVLSNI LON SIV DINNDOSI DAS 153005 Yala GSTIWLSNI 1 un NOLWTIVLSNIGS1000 dnon NA a AJANOYd SI ECON ETOZ 4511 SIV 1DINNODSIO 3OIAH3S gt wear K 0 A q N x 2 D gt ha 9 a E T he o gt E l gt 7 x lt 15 m T N x 2 gt da 5 Installation Diagrams 30 LND ANd LNO tIOIVd3N35 OL Gava 5 OE MANN qam o 6 m 4 TANVd NOLI TIO 3 DA Q3HSCQNOT ECON ETOZ HOLMS YIASNVHL HSLH J23NNOOSK 321435 WOds AlddNS LNN JO 3HLNOG3Iv20 NOLLDSNNOD 300419313 H H om 54400 WOlHLDd TH 31415 NNOLINN 1397 1SNN NOLIV T IVESNT ALON 16 Installation Diagrams m o N x 2 gt 5 LJ E 5 17 315 YD 3
32. 61 a 1 850 ft 565 m No se suministra el m dulo de gesti n de alimentaci n PMM con el interruptor de transferencia Este se puede comprar por separado al fabricante El m dulo PMM se usa con la tarjeta de control de prevenci n de sobrecarga OPCB montada en el interruptor de transferencia La tarjeta OPCB est dise ada y se conecta para alimentar la bobina energizada del contactor del PMM La OPCB se suministra con un transformador de suministro de alimentaci n Clase 2 de 24 VCA conectado al suministro de CARGA en el RTS Cada salida est limitada a 1 A Las conexiones de la bobina del contactor del PMM se hacen en la regleta de terminales de la tarjeta OPCB Instalacion Figura 2 1 Control de prevenci n de sobrecarga 28 oriERRA 25 194 12V E EER LN huy Cable Y Conecte la bobina del contactor del m dulo PMM en los terminales del contactor de la tarjeta OPCB 1 2 3 o 4 La selecci n del terminal de contactor utilizado depender de la prioridad de la carga que se controla Este es un circuito de 24 VCA y se deben usar los m todos de cableado para la Clase 2 Use terminales de conexi n r pida de 1 4 in para hacer las conexiones de la bobina del contactor en el m dulo PMM Vea la Figura 2 3 Se provee un ojal a trav s del cual se pasa el cableado Clase 2 El ojal se puede usar en cualquier perforaci n de tap n desprendible para las instalaciones NEMA 1 El ojal se puede
33. CHE FERME Le g n rateur alimentera alors tous les circuits de charge V rifier le fonctionnement du g n rateur avec des charges de la facon suivante Alimentez les charges lectriques la puissance nominale Watts et amp res du g n rateur NE PROVOQUEZ PAS DE SURCHARGE Lorsque le g n rateur fonctionne sa puissance nominale v rifiez la tension et la fr quence des bornes E1 et E2 du commutateur de transfert La tension devrait tre sup rieure 230 V a c et la fr quence devrait tre sup rieure 59 Hz V rifiez galement que la pression des gaz demeure acceptable consultez le manuel du g n rateur Laissez le g n rateur fonctionner charge nominale pendant au moins 30 minutes Toujours lorsque l unit est en fonction soyez attentif afin de d tecter des bruits inhabituels des vibrations une surchauffe etc Cela pourrait indiquer qu il y a un probl me 6 Apr s la v rification charge nominale placez le disjoncteur du g n rateur la position ARRET OUVERT T Laissez le g n rateur fonctionner sans charge pendant quelques minutes Par la suite arr tez le g n rateur en le positionnant la position ARRET 3 5 V RIFICATION DU FONCTIONNEMENT AUTOMATIQUE Pour v rifier le fonctionnement ad quat du syst me proc dez de la facon suivante 1 Assurez vous que le g n rateur est la position ARR T 2 Installez le couvercle avant du commutateur de transfert 3 Ouvrez l alime
34. DRAWING 0K2423 GROUP APPLICABLE THIS PAGE IS LEFT INTENTIUNALLY BLANK REVISIUN J 4064 B DATE 1 29 13 PAGE 2 DF e GROUP G OPTIONAL CALARM CONTACT CUSTOMER SUPPLIED SERVICE DISCONNECT ATS CRTSY 2013 MODEL GROUND CONNECTION GENERATOR OUTPUT CIRCUIT BREAKER m PANEL BOARD A BONDING JUMPER IS PROVIDED BETWEEN THE NEUTRAL LUG AND ENCLOSURE AT THIS LOCATION FACTORY INSTALLED LOAD SHED DEVICE GROUND BAR DISCONNECT BONDING CONNECTION NEUTRAL BAR IN PANELBDARD BREAKER TO SUPPLY GFCI OUTLET FITTED GROUND LUG LOCATED ON THE REAR OF UNIT gt UTILITY METER SOCKET TO GROUNDING ELECTRODE NOTE INSTALLATION MUST MEET ALL NATIONAL STATE AND LOCAL ELECTRICAL CODES NEXUS PANEL EXPLUDED VIEW REVISIONJ 4223 C RTS TRANSFER SW INTERCON 2010 DATE 2 11 13 PAGE 1 OF 2 DRAWING amp 0K2424 EXPLODED VIEVRTS TRANSFER SW INTERCONNECTIONS 2010 DRAWING 0 2424 APPLICABLE THIS PAGE IS LEFT INTENTIUNALLY BLANK REVISION J 4223 C DATE 2 11 13 PAGE e OF GROUP G RRA SERVICE DLS CONNECT CREST 2018 MODEL BONDING JUMPER IS PROVIDED BETWEEN THE NEUTRAL LUG AND ENCLOSURE AT THIS LOCATION FACTORY INSTALLED LIQUID COOLED INSTALLATION UTILITY METER SOCKET SERVICE DISCONNECT ATS NOTE INSTALLATION MUST MEET ALL NATIONAL STATE AND LOCAL ELECTRICAL CODES LOAD SHED DE
35. E 1 Fil noir OPCB Borne T1 Fil blanc OPCB Borne NEUTRE Fil jaune OPCB Borne CHARGE SOURCE 2 2 6 2 ALIMENTATION 120 V A C Installez les cavaliers suivant sur l OPCB figure 2 4 Charge Source 1 T1 Charge Source 2 Neutre ATTENTION A tension de la charge des bornes de l OPCB doit correspondre celle de la bobine du contacteur du PPM sinon cela risque d endommager l quipement Figure 2 4 Connexions de l alimentation 120 V a c Cavalier Reliant La Borne T1 La Borne Charge 55 5 2 H T1 en D Cavalier Reliant E La Borne Neutre aw 2 DI La Borne Charge Source 2 E nu JO 3 1 TESTS DE FONCTIONNEMENT ET REGLAGES Apr s le montage du commutateur de transfert et les connexions inspectez l installation attentivement Un lectricien comp tent et qualifi doit proc der la v rification L installation doit tre conforme tous les codes toutes les normes et toutes les r glementations Lorsque vous tes assur s que l installation est ad quate r alisez les tests de fonctionnement du syst me ATTENTION Respectez strictement l ordre qui suit pour r aliser ces tests de fonctionnement sinon vous risquez d endommager le commutateur IMPORTANT avant de r aliser les tests de fonctionnement lisez attentivement toutes les directives et toute l information de la pr sente section Assurez vous de bi
36. E DE PREVENTION DE SURCHARGE Le Tableau de commande de pr vention de surcharge OPCB est concu pour pr venir les surcharges du g n rateur voir figure 1 2 Jusqu six charges peuvent tre g r es par l OPCB c est dire deux charges d appareil de climatisation et quatre autres charges L OPCB g re les charges par le d lestage des charges connect es dans le cas d une baisse de fr quence du g n rateur surcharge La charge d lester est group e selon quatre degr s de priorit sur l OPCB Les degr s de priorit 1 et 2 sont des connexions pouvant prendre en change un appareil de climatisation et un contacteur Ainsi un appareil de climatisation et un contacteur peuvent tre utilis s en m me temps si d sir Pour contr ler un appareil de climatisation il n est pas n cessaire d ajouter d autre quipement Un relai interne interrompt le signal de contr le 24 V a c du thermostat pour d sactiver la charge de l appareil de climatisation Installation Les degr s de priorit et 4 ont des connexions pour un contacteur seulement e Quatre DEL situ es sur l OPCB indiquent quand un niveau de priorit est activ Quand des charges sont connect es les DEL sont allum es Toutes les charges y compris les appareils de climatisation peuvent tre contr l es par un contacteur achet s par ment Jusqu a quatre contacteurs peuvent tre contr l s par le courant 24 a c
37. EM 9 TO DO i 9 TERRES g 36 Sn r 39 50 51 3 8 Y9 X10 49 154 39 55 Y56 Y57 Hp B 29 nue e Tu 43 44 27 _ _ UMA UH UNDER E amr SECTIONA A 32 42 52 53 88 0 11 12 13 15 13 H TORQUE ITEM 12 El 5 TO 72 IN LBS id A 12 TL ra 11 14 H 2 a n TORQUE ITEMS 7 8 44 72 IN LBS Revision A Exploded View ASSEMBLY 200A SERVICE ENTR GEN Date 12 12 12 Page 1 of 2 Drawing No 0K0166A EXPLODED VIEW ASSEMBLY 200A SERVICE ENTR GEN DRAWING 0K0166A ITEM PART 1 0D9618 2 074908 3 0K0133 4 0K0973 5 0H6306 6 064413 7 024334 8 0K0130 9 049897 10 022129 11 0E3375 12 0F1252 3113 0E6033 14 0E6034 15 0 8202 16 0K1081 17 18 090388 19 0K01170ALOR 20 0K01180ALOR 21 0K0119 22 0K01310ALOR 23 0K0132 1 24 0K
38. EMBLY 150A SERVICE ENTR GEN DRAWING 0 0165 ITEM PART 1 0D9618 2 074908 3 0K0971 4 0K0973 5 0H6306 6 064413 7 024334 8 0K0130 9 049897 10 022129 11 0E3375 12 0F1252 3113 0E6033 14 0E6034 15 0 8202 16 0K1081 17 18 090388 19 0K01170ALOR 20 0K01180ALOR 21 0K0119 22 0K01310ALOR 23 0K0132 1 24 0K1736B 25 0E3484 26 0G9651A 27 0G9651B 28 0G9651C 29 0G8535 30 0K1018 31 0D3587 32 0H7917 33 0K1738 34 003274 35 003259 36 0 1098 1 37 0H6389 38 0H7274 39 0A1495 40 026850 41 0E7213 42 085889 43 068411 44 022473 45 022097 46 0E6193 47 0D6162 3 48 0E6155 49 0K0103 2 50 0D2572 2 51 073590A 2 52 0D7393T 53 0K0124 54 0F2659 55 0H7190 56 0H7270 57 0K0220A 58 064761 59 0K0123 60 0E6303 61 0 6303 HN BR MN BRO O0 2A L L La La La Da La La La Da La L La Da NM I lA BR BE D 1 SERIAL NUMBER AND FRONT DECAL PER MODEL 2 SUPPLIED WITH HARNESS ITEM 59 3 SUPPLIED WITH TRANSFER SWITCH REVISION A DATE 12 6 12 GROUP DESCRIPTION XFRSW HSB 200A 2P 250V SCREW HHTT M5 0 8 X 10 BP CB 150A 2POLE 240V 225AF SCREW RHM 8 32 X 2 1 2 LUG SLDLSS 350 MCM 6 AL CU SPACER 200 AMP TRANSFER SWITCH BOLT CARR 1 4 20 X 1 BUSBAR 200A TRANSFER SW N1 N2 SCREW SHC M8 1 25 X 20 G8 WASHER LOCK M8 5 16 LUG SLDLSS 250 6 AL CU SCREW BHSC 1 4 20 X 3 8 90 DEGREE DN
39. ESULTS IN EXTREMELY HAZARDOUS AND POSSIBLY FATAL ELECTRICAL SHOCK 2 With an accurate AC voltmeter check for correct voltage Measure across ATS terminal lugs N1 and N2 Also check 1 to NEUTRAL and N2 to NEUTRAL 3 When certain that UTILITY supply voltage is correct and compat ible with transfer switch ratings turn OFF the UTILITY supply to the transfer switch 4 Set the generator to the MANUAL mode The generator should crank and start 5 Let the generator stabilize and warm up at no load for at least five minutes 6 Set the generator s main circuit breaker CB1 to its ON or CLOSED position A DANGER PROCEED WITH CAUTION GENERATOR OUTPUT VOLTAGE IS NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter check the no load voltage and frequency Measure across ATS terminal lugs E1 to E2 Also check E1 to NEUTRAL and E2 to NEUTRAL FTEQUENCV R 60 62 Hertz b Terminals El to E2 240 246 VAC c Terminals E1 to NEUTRAL 120 123 VAC d Terminals E2 to NEUTRAL 120 123 VAC 8 Set the generator s main circuit breaker to its OFF or OPEN position 9 Setthe generator to the OFF mode to shut down the generator NOTE Do NOT proceed until generator AC output voltage and frequen cy are correct and wi
40. L and STANDBY power sources from each other may result in injury or death to electric utility workers due to backfeed of electrical energy Improper or unauthorized installation operation service or repair of the equipment is extremely dangerous and may result in death serious personal injury or damage to equipment and or personal property Extremely high and dangerous power voltages are present inside an installed transfer switch Any contact with high voltage terminals contacts or wires will result in extremely hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should install operate and ser vice this equipment Adhere strictly to local state and national electrical and building codes When using this equipment comply with regulations the National Electrical Code NEC CSA Standard C22 1 Canadian Electric Code and Occupational Safety and Health Administration OSHA have established Never handle any kind of electrical device while stand ing in water while barefoot or while hands or feet are wet DANGEROUS ELECTRICAL SHOCK MAY RESULT Remove all jewelry such as rings watches bracelets etc before working on this equipment If work must be done on this equipment while standing on metal or concrete place insulative mats over a dry wood platform Work on this equipment only while stand
41. MBER AND FRONT DECAL PER MODEL 2 SUPPLIED WITH HARNESS ITEM 51 3 SUPPLIED WITH TRANSFER SWITCH REVISION A DATE 12 6 12 GROUP G DESCRIPTION XFRSW HSB 100A 2P 250V SCREW HHTT M5 0 8 X 10 BP LUG SLDLSS 1 0 14X9 16 AL CU SCREW PPHM 10 32 X 5 16 WASHER LOCK 10 LUG DIS QK NI S 10X45 DEG BR T CB 0100A 2P 240V S BQ2 LB BRKT CB MTG BACK ASSY WIRE 2AWG 5 375 N1A BLK ASSY WIRE 2AWG 6 875 N2A BLK SCREW HHTT M4 0 7 X 10 BP DECAL TRANSFER SWITCH ID 100A RELAY PNL 12VDC DPDT 10A 240VA FUSEBLOCK 30A 600V 3POS W SQ FUSE 5A X BUSS TERM BLOCK 3P UL 12 20AWG SCREW HHTT M3 0 5 X 6 BP SCREW PHTT M3 0 5 X 25 ASSY NEUT BLK 100A SCREW HHTT M6 1 0 X 12 ZINC SCREW HHTT 8 32 X 1 4 CZ ENCLOSURE 100 200A XFER SW_RAW COVER 100A XFER SWITCH_INST_RAW SUBPLATE 100 200A XFER SW COVER INSIDE 100A SE GRAY_RAW RISER 100A SERV ENT DECAL RTS TRANSFER SW GENERAC DECAL XFER SW SE 100A 120 240 DECAL WARN MANUAL OPER HANDLE DECAL UTILITY DISCONNECT DECAL NEUTRAL CONNECTION DECAL TEST SEQUENCE 100 200A SE DECAL CUSTOMER CONN RTS DECAL FUSE REPLACEMENT DECAL TERMINAL SHOCK HZD BI DECAL LIVE CIRCUIT ENG FRN SPN DECAL UTILITY LOAD SENSE 240V DECAL 2008 NEC COMPLIANCE SCREW THUMB 1 4 20 X1 2 W SHLD LUG SLDLSS 2 0 14X 10 32X 125 WASHER LOCK EXT 1 4 STL UT HEX FL WHIZ 1 4 20 NUT HEX 1 4 20 SS WASHER FLAT 1 4 M6 ZINC BRACKET ARM EXTENDER RIVET POP 156 X 362 AL PIN ARM EXTENDER CHANNEL SNAPTRACK 76 2 X 101 2 ASSY LOAD MA
42. NAGEMENT CONTROLLER PROGRAMMED WIRE NEUTRAL TO GROUND CONNECTION WIRING HARNESS HSB NOT SHOWN WIRE A WIRE E1 NUT TRIC 1 4 20 X 525 Page 2 of 2 GROUP G NEUTRAL GROUND WIRE CONNECTION TORQUE SETTINGS GROUND 50 IN LBS NEUTRAL 275 IN LBS 24 26 2 30 5 X9 X10 z TORQUE ITEM 9 TO e 72 IN LBS Y 9 0 EE 5 31 Y23 Y39 009 37 oQ a 5 61 39 Y50 Y51 8 Y9 Y10 49 Y54 D ki E S 39 Y55 Y56 57 FB B 29 r 9 e Ha m T2 43 44 m 51 ITEM 44 MOUNTED UNDER SUBPLATE ITEM 21 L J 4 PLACES 4 dA SECTIONA A u 32 42 52 53 38 20 gt 6 7 13 7 13 0 H o 4 6 6 TORQUE ITEM 12 TO 72 IN LBS fn 2 Aa 14 43 43 p TORQUE ITEMS 7 amp 44 SECTIONC C TO 72 IN LBS Revision A Exploded View EV ASSEMBLY 150A SERVICE ENTR GEN Date 12 6 12 Page 1 of 2 Drawing No 0K0165A EXPLODED VIEW ASS
43. ON DE L OPCB TABLEAU DE COMMANDE DE PREVENTION DE SURCHARGE Un bouton de v rification est situ au bas de afin de v rifier le fonctionnement des fonctions Le bouton fonctionnera quand l interrupteur de transfert est la position R seau public ou G n rateur 1 Activez la source du R seau public partir du commutateur de transfert 2 Appuyez sur le bouton TEST de l OPCB 3 V rifiez que toutes les charges connect es d lester sont d sactiv es La m thode de v rification d pend du type de charge 4 Apr s cinq 5 minutes v rifiez que les DEL correspondant AC 1 et Charge 1 sont allum es 5 Attendez encore 15 secondes et v rifiez que les DEL correspondant AC 2 et Charge 2 sont allum es 6 Attendez encore 15 secondes et v rifiez que la DEL correspondant Charge 3 est allum e 7 Attendez encore 15 secondes et v rifiez que la DEL correspondant Charge 4 est allum e 3 7 RESUME D INSTALLATION 1 Assurez vous que l installation a t r alis e ad quatement comme soulign dans la documentation du fabricant Assurez vous galement de respecter les lois et codes applicables 2 V rifiez et confirmez le bon fonctionnement du syst me comme soulign dans les sections appropri es du manuel d installation et du manuel du propri taire 3 Formez les utilisateurs finaux de l utilisation ad quate du syst me de son entretien et des proc dures pour les r parations Impor
44. OR DE DESCONEXION de SERVICIO PUBLICO PELIGRO PROCEDA CON PRECAUCION EL INTERRUPTOR DE TRANSFERENCIA ESTA AHORA ELECTRICAMENTE VIVO EL CONTACTO CON TERMINALES VIVOS RESULTA EN CHOQUES ELECTRICOS EXTREMADAMENTE PELIGROSOS Y POSIBLEMENTE MORTALES 2 Con voltimetro de CA preciso compruebe si el voltaje es correcto Mida entre los terminales N1 y N2 del ATS Tambi n compruebe N1 con NEUTRO y N2 con NEUTRO 3 Cuando tenga la certeza de que el voltaje de suministro del SERVICIO PUBLICO es correcto y compatible con los valores nominales del interruptor de transferencia coloque en OFF la alimentaci n de SERVICIO PUBLICO al interruptor de transferencia 4 Coloque el generador en modo MANUAL El generador debe efectuar giro de arranque y arrancar 5 Deje que el generador se estabilice y caliente sin carga durante cinco minutos como m nimo 6 Coloque el disyuntor principal del generador en su posici n ON o CERRADO PROCEDA CON PRECAUCI N EL VOLTAJE DE SALIDA DEL GENERADOR ESTA SIENDO ENTREGADO A HORA A LOS TERMINALES DEL INTERRUPTOR DE TRANSFERENCIA EL CONTACTO CON TERMINALES VIVOS RESULTA EN CHOQUES ELECTRICOS EXTREMADAMENTE PELIGROSOS Y POSIBLEMENTE MORTALES 7 Con un voltimetro y un frecuencimetro de CA precisos compruebe la frecuencia y voltaje sin carga Mida entre los terminales y E2 del ATS Tambi n compruebe El con NEUTRO y E2 con NEUTRO
45. Owner s Manual Automatic Transfer Switch TRANSFER SWITCH SFER SWITCH DANGER NOT INTENDED FOR USE IN CRITICAL LIFE SUPPORT APPLICATIONS THIS PRODUCT CAN BE INSTALLED BY THE HOMEOWNER HOWEVER IF YOU ARE UNCOMFORTABLE WITH THE SKILLS OR TOOLS REQUIRED HAVE A QUALIFIED ELECTRICIAN OR REFERENCE THE OWNER S MANUAL CONTRACTOR PERFORM THE INSTALLATION SUPPLIED WITH THE GENERATOR DEADLY EXHAUST FUMES OUTDOOR INSTALLATION This manual should remain with the unit Table of Contents Safety Rules Inside Front Cover General Information 2 Introduction coccion re e o tim oed 2 1325 sie er tins 2 1 3 Equipment Description 2 1 3 1 Transfer Switch Mechanism 2 1 3 2 Utility Service Disconnect Circuit Breaker 2 1 3 3 Overload Prevention Control Board OPCB 2 14 Transfer Switch Data Decal 3 1 5 Transfer Switch Enclosure 3 1 6 Safe Use Of Transfer Switch 3 Installation uuu ad 3 2 1 Introduction to Installation 3 2 2 MODO sss uuu a asa 3 2 3 Connecting Power Source and Load Lines 4 2 4 Connecting Start Circuit Wires 4 2 5 Overload Prevention Control Board OPCB 4 2 6 Conne
46. R DE TRANSFERT EST DESORMAIS ALIMENTE UN CONTACT AVEC LES BORNES ALIMENTEES EST EXTREMEMENT DANGEREUX ET PEUT PRODUIRE UNE DECHARGE ELECTRIQUE POTENTIELLEMENT MORTELLE 2 Au moyen d un voltm tre alternatif pr cis v rifiez les tensions Mesurez partir des languettes de contact du commutateur de transfert la tension des bornes N1 N2 V rifiez galement la tension des bornes N1 NEUTRE et N2 NEUTRE 3 Lorsque vous avez v rifi que la tension de la source du r seau public est correcte et compatible au commutateur de transfert placez le commutateur de transfert la position ARRET pour la source du r seau public 4 Positionnez le g n rateur en mode MANUEL Le g n rateur devrait se lancer et d marrer 5 Attendez au moins cinq minutes afin de laisser le temps au g n rateur de se stabiliser et de se r chauffer 6 Positionner le disjoncteur du circuit principal du g n rateur la position MARCHE FERME DANGER FAITES PREUVE DE PRUDENCE LA TENSION DE SORTIE DU GENERATEUR ALIMENTE MAINTENANT LES BORNES DU COMMUTATEUR DE TRANSFERT UN CONTACT AVEC LES BORNES ALIMENTEES EST EXTREMEMENT DANGEREUX ET PEUT PRODUIRE UNE DECHARGE ELECTRIQUE POTENTIELLEMENT MORTELLE 7 moyen d un voltm tre alternatif et d un fr quencem tre v rifiez tension et la fr quence sans charge Mesurez a partir des languettes de contact du commutateur de transfert la tension des bornes V ri
47. SPADE CONNECTOR STRAIGHT SPADE CONNECTOR LUG SLDLSS 2 0 14X 10 32X 125 WIRE NEUTRAL GND CONNECTION ASSY NEUT BLK 200A W TAP SCREW HHTT M6 1 0 X 12 ZINC ENCLOSURE 200A SE XFRSW RAW COVER 200A SE XFRSW RAW SUBPLATE 200A SE XFER SW COVER INSIDE 200A SE XFER SW RAW CB RISER BRACKET 200A GENERAC DECAL XFER SW SE 150A 120 240 DECAL WARN MANUAL OPER HANDLE DECALS SERVICE ENTRANCE DECALS SERVICE ENTRANCE DECALS SERVICE ENTRANCE DECAL TRANSFER SWITCH ID 200A DECAL NEUTRAL CONNECTION DECAL FUSE REPLACEMENT DECAL CUSTOMER CONN RTS DECAL TEST SEQUENCE 100 200A SE DECAL LIVE CIRCUIT ENG FRN SPN DECAL TERMINAL SHOCK HZD BI DECAL RTS TRANSFER SW GENERAC DECAL UTILITY LOAD SENSE 240V DECAL 2008 NEC COMPLIANCE SCREW HHTT M4 0 7 X 10 BP WASHER LOCK EXT 1 4 STL SCREW THUMB 1 4 20 X1 2 W SHLD UT HEX 1 4 20 SS NUT HEX FL WHIZ 1 4 20 WASHER FLAT 1 4 M6 ZINC WASHER LOCK M6 1 4 BRACKET ARM EXTENDER RIVET POP 156 X 362 AL PIN ARM EXTENDER RELAY PNL 12VDC DPDT 10A 240VA FUSEBLOCK 30A 600V 3POS W SQ FUSE 5 X BUSS TERM BLOCK 3P UL 12 20AWG SCREW PHTT M3 0 5 X 25 SCREW HHTT M3 0 5 X 6 BP BRACKET LOAD SHED 200A RTS CHANNEL SNAPTRACK 76 2 X 101 2 ASSY LOAD MANAGEMENT CONTROLLER PROGRAMMED TIE WRAP UL 5 6 X 10 NATL NOT SHOWN HARN 200A XFER SW SE 2010 NOT SHOWN WIRE A 7 0 BLUE WIRE E1 3 0 BLUE Page 2 of 2 E K 24 ve 6 30 000 UE IT
48. UT CIRCUIT BREAKER PDLE SIDE VIEW EXPLODED VIEW REVISION J 4223 B NON SERVICE ENTRANCE ATS DATE 2 11 13 PAGE 2 OF 2 DRAWING 0Ke516
49. Un millet est pr sent pour acheminer le c blage de Classe 2 Loeillet peut servir pour toute entr e d fongable des installations NEMA 1 L illet ne peut servir qu au bas des entr es d fongables pour les installations NEMA 3R Installation Figure 2 1 Commande de pr vention de surcharge 0 L ala terre 25 194 12V IND KL Contr le de la charge d un appareil de climatisation 1 Acheminez le c ble du thermostat dans le commutateur de transfert du g n rateur de chaleur l unit de climatisation ext rieure 2 Connectez le fil de la languette de contact Air 1 de comme illustr la figure 2 2 II s agit de contacts normalement ferm s qui s ouvrent lors d une condition de d lestage des charges Acheminez le fil du thermostat loin des fils haute tension 3 Au besoin connectez le deuxi me appareil de climatisation la languette de connexion Air 2 Courants admissibles Air 1 et 2 24 V a c 5 0 A max REMARQUE Ces directives conviennent une installation typique de syst me de climatisation Les contr les d une thermopompe et des syst mes deux tapes n cessitent des connexions sp ciales ou l utilisation de modules de gestion de l alimentation pour contr ler les charges 1 x 1AMAX 2 1 2 1 1AMAX CHARGE 4 2 Alimentation PMM 1 Charge
50. VICE PANEL BOARD TO GROUNDING ELECTRODE CUSTOMER SUPPLIED NEUTRAL WIRE NOTE MATCH WIRE NUMBERS TERMINAL NUMBERS NEUTRAL GROUND CONNECTION IN PANELBDARD GROUND BAR DISCONNECT BONDING NEUTRAL BAR QT SERIES ENGINE GENERATOR CONNECTION PANEL EXPLODED VIEW a R PRODUCTION RTS XFER SW INTERCONNECTIONS DATE 1 29 13 PAGE 1 OF 2 DRAWING 0K2425 EXPLODED VIEW RTS XFER SW INTERCONNECTIONS DRAWING 0 2425 GROUP G APPLICABLE TO THIS PAGE IS LEFT INTENTIONALLY BLANK REVISION J 4064 B DATE 1 29 13 PAGE 2 OF 2 GROUP G NOTE ALL CONTACTS SHOWN WITH TRANSFER SWITCH IN UTILITY POSITION TR UTILITY lt bos CUSTOMER CONTROL CONNECTLOSNS LOAD SUPPLY 169 URO T1 NEUTRAL 69 O GROUND lt LOAD SUPPLY QQ 194 1eV 23 TRANSFER LOAD 1 LEGEND A C 1 ATS TRANSFER SWITCH CONTACTOR LOAD SOLENOID COIL UTILITY CLOSING gt SOLENDID COIL STANDBY CLOSING FUSE A C LAN NB NEUTRAL BLOCK ITB TERMINAL STRIP CUSTOMER CONNECTION RELAY TRANSFER ucB UTILITY CIRCUIT BREAKER LOAD 4 VR1 VR2 VARISTOR XA1 XB1 LIMIT SWITCHES ACTUATOR LOAD CONTROLLER DARE NR rr J SCHEMATIC DIAGRAM REVISION J 5049 C RTSY 2013 DATE 4 22 13 DRAWING 0K0135 GROUP G 23 TRANSFER A C 1 A C 1 LOAD 1 A C 2 amp LOAD LOAD 3 LOAD 4 GENERATOR CONNECTION
51. aient survenir la suite de n gligences d applications incorrectes ou de proc dures inappropri es Tous les efforts ont t d ploy s pour s assurer que le contenu de ce manuel est la fois pr cis et jour Le fabricant se r serve toutefois le droit de modifier ou d am liorer le produit ou le manuel tout moment sans avis pr alable 1 2 RETRAIT DE L EMBALLAGE Retirez soigneusement le commutateur de transfert de son emballage V rifiez attentivement la pr sence de dommage qui aurait pu survenir au cours du transport de l quipement l acheteur doit d clarer tout dommage ou toute perte qui aurait pu survenir au cours du transport aupr s du transporteur V rifiez que l ensemble du contenu est retir de l emballage avant de commencer l installation de commutateur 1 3 DESCRIPTION DE L EQUIPEMENT Le commutateur de transfert automatique sert transf rer l alimentation en provenance d un R SEAU PUBLIC NORMAL vers celle d un G N RATEUR SYSTEME DE SECOURS Un tel transfert se produit automatiquement lorsque l alimentation en provenance du r seau public est interrompue ou d ficiente ou encore lorsque la tension et la fr quence fournies par le GENERATEUR sont suffisantes Le commutateur de transfert emp che toute r alimentation d nergie lectrique entre deux sources comme dans le cas d une alimentation en provenance d un r seau PUBLIC et d un G N RATEUR C est pour cette raison que le Code exige un tel co
52. al disyuntor de DESCONEXI N DEL SERVICIO P BLICO 2 Conecte los cables de la fuente de alimentaci n de GENERADOR RESERVA en los terminales E1 E2 del interruptor 3 Conecte los conductores de CARGA del cliente en los terminales T1 T2 del interruptor Los conductores deben estar correctamente apoyados deben tener propiedades de aislamiento aprobadas deben estar protegidos por un conducto aprobado y deben ser del calibre de acuerdo a los c digos correspondientes Aseg rese de mantener una separaci n el ctrica correcta entre las partes de metal vivas y el metal conectado a tierra Permita al menos 1 2 in para circuitos de 100 400 A 2 4 CONEXI N DE LOS CABLES DEL CIRCUITO DE ARRANQUE Las interconexiones del sistema de control secci n de datos el ctricos comprenden SERVICIO PUBLICO 1 N1 SERVICIO PUBLICO 2 N2 y CARGA T1 y los conductores 23 0 y 194 Los calibres de cable recomendados dependen de la longitud del cable como se recomienda en el cuadro siguiente CALIBRE DEL CABLE RECOMENDADO Tama o 25 TARJETA DE CONTROL DE PREVENCI N DE SOBRECARGA OPCB La tarjeta de control de prevenci n de sobrecarga puede controlar un acondicionador de aire 24 VCA directamente o un contactor separado bobina de accionamiento de 24 VCA o 120 VCA que puede controlar cualquier carga conectada a este Vea la Figura 2 2 LONGITUD M XIMA DEL CABLE 460 ft 140 m 461 a 730 ft 223 m 731 a 1 160 ft 354 m 1 1
53. al interruptor Tome nota de todas las opciones accesorios que pudieran ser instalados y revise su funcionamiento Figura 2 3 Conexiones de suministro de 24 VCA 0 TIERRA 194 12 V 23 TRANSFE Cableado de la f brica 1 CARGA 1 1 2 4 CARGA 2 1 A 4 CARGA 3 1 A 2 1 CARGA 1 alas 2 26 22222822 Conductores del transformador Instalados en la f brica Cableado existente Funcionamiento 3 2 OPERACI N MANUAL NO transfiera manualmente bajo carga Desconecte el interruptor de transferencia de todas las fuentes de alimentaci n mediante medios aprobados como un disyuntor principal Junto con el interruptor de transferencia se env a una MANIJA manual La operaci n manual debe ser comprobada ANTES de que el interruptor de transferencia sea accionado el ctricamente Para comprobar la operaci n manual proceda como sigue 1 Coloque el generador en modo OFF 2 Coloque en OFF las fuentes de alimentaci n tanto del SERVICIO PUBLICO disyuntor de desconexi n del servicio p blico como del GENERADOR disyuntor de l nea principal del generador al interruptor de transferencia 3 Tome nota de la posici n de los contactos principales del mecanismo de transferencia observando el brazo soporte del contacto m vil Esto puede observarse a trav s de la ranura larga y angosta de la cubierta interior del ATS La parte superior del b
54. conditioner no additional equipment is required Internal relays interrupt the thermostat 24VAC control signal to disable the air conditioner load Installation Priority 3 and 4 have connections for one contactor only Four LEDs located on the Overload Prevention Control Board will indicate when a load priority level is enabled When loads are connected the LEDs will be illuminated Any loads including central air conditioners can be controlled via a contactor that must be purchased separately Up to four contactors can be controlled by the Overload Prevention Control Board 24 Vac or 120 Vac is supplied through the OPCB to energize each contactor coil Generator overload condition is determined by generator fre quency Loads are shed when the frequency is lt 58Hz for 3 seconds or lt 50Hz for Second For 60Hz The OPCB has a Test button which forces the unit to act as if an overload has occurred This button operates even when the trans fer signal is inactive Figure 1 2 Overload Prevention Control Board 0 Ground ar KD Air Conditioner Connections Up to two A Cs can be controller here via their low voltage thermostatwires Status LEDs Shows which loads are currently allowed to run H El 2 27 Mo ul Load Connections Up to four loads of any type can be controlled via these connections Aseparate contactor module is required
55. control relay fuses ter minal strip and fuse holder for connection of sensing wires This transfer switch is suitable for use as service equipment 1 3 1 TRANSFER SWITCH MECHANISM These switches Figure 1 1 are used with a single phase system when the single phase NEUTRAL line is to be connected to a Neutral Lug and 15 not to be switched Solderless screw type terminal lugs are standard wre Conductor Tiamening mm me This transfer switch is suitable for control of motors electric dis charge lamps tungsten filament and electric heating equipment where the sum of motor full load ampere ratings and the ampere ratings of other loads do not exceed the ampere rating of the switch and the tungsten load does not exceed 30 percent of the switch rating This UL listed transfer switch is for use in optional standby sys tems only NEC article 702 2 This transfer switch is suitable for use on a circuit capable of 22 000 rms 200A and 10 000 100A symmetrical amperes 240 VAC maximum Figure 1 1 Typical ATS Transfer Mechanism UTILITY LUGS H U UTILITY P CLOSING NH COIL mE Tc E o oo
56. ction of Power Supply for Contactors 2 6 1 24 VAC Supply 6 2 6 2 120 VAC SUDDlV iier eire ether 6 Irun eet 6 3 1 Functional Tests Adjustments sss 6 3 2 Manual Operation 7 3 2 1 Close to Utility Source Side 7 3 2 2 Close to Generator Source Side 7 3 2 3 Return to Utility Source Side 7 3 3 Voltage Checks 8 3 4 Generator Tests Under Load 8 3 5 Checking Automatic Operation 8 3 6 Testing Overload Prevention Control Board 9 3 7 Installation Summa 9 10 Installation 11 Manual del propietario 19 Manuel de l utilisateur 31 SAVE THESE INSTRUCTIONS Read the fol lowing information carefully before attempting to install operate or service this equipment Also read the instructions and information on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an elec trical system normally supplied by an electric utility shall be by means of suitable transfer equipment so as to isolate the electric system from utility distribution syst
57. ctores de la fuente de alimentaci n y los conductores de carga Conexi n de los circuitos de detecci n y del rel de transferencia Conexi n de cualquier contacto auxiliar de ser necesario Conexi n de las cargas de la tarjeta de control de prevenci n de sobrecarga seg n se requiera Prueba de las funciones 2 2 MONTAJE Las dimensiones de montaje para el gabinete del interruptor de transferencia est n en este manual Los gabinetes normalmente se montan en la pared Vea el Diagrama de instalaci n PRECAUCI N Manipule los interruptores de transferencia cuidadosamente al instalarlos No deje caer el interruptor Proteja el interruptor contra los impactos en todo momento y contra part culas de construcci n o virutas de metal Nunca instale un interruptor de transferencia que haya sido da ado 23 Instalaci n Este interruptor de transferencia est montado en un gabinete tipo 3R listado por UL Se puede montar en exteriores o en interiores y se debe instalar seg n la disposici n de las instalaciones la conveniencia y la proximidad al suministro del servicio p blico y el centro de cargas Instale el interruptor de transferencia tan cerca como sea posible de las cargas el ctricas que se conectar n a l Monte el interruptor verticalmente en una estructura de soporte r gida Para evitar distorsi n del interruptor nivele todos los puntos de montaje Si es necesario use arandelas detr s de
58. ctricas a la potencia amperaje nominal m ximo del generador NO SOBRECARGUE Con la carga nominal m xima aplicada compruebe el voltaje y la frecuencia entre los terminales y E2 del interruptor de transferencia El voltaje debe ser mayor que 230 VCA y la frecuencia debe ser mayor que 59 Hz Tambi n verifique que la presi n del gas se mantenga dentro de par metros aceptables vea el manual Directrices de instalaci n del generador Deje que el generador funcione bajo carga nominal durante 30 minutos como m nimo Con la unidad en funcionamiento escuche en b squeda de ruidos inusuales vibraciones sobrecalentamiento etc que puedan indicar un problema 6 Cuando haya finalizado la prueba bajo carga coloque el disyuntor principal del generador en su posici n OFF u OPEN Abierto 7 Deje que el generador funcione sin carga durante varios minutos Luego p relo poni ndolo en modo OFF 3 5 COMPROBACI N DEL FUNCIONAMIENTO AUTOM TICO Para comprobar si el sistema funciona correctamente en forma autom tica efect e lo siguiente 1 Aseg rese de que el generador est en modo OFF 2 Instale la cubierta delantera del interruptor de transferencia 5 Apague el suministro de alimentaci n de servicio p blico al interruptor de transferencia usando los medios proporcionados como disyuntor principal de l nea del servicio p blico NOTA El interruptor de transferencia transferir de vuelta a la posici n de s
59. dle from moveable contact carrier arm Return handle to storage bracket 3 2 2 CLOSE TO GENERATOR SOURCE SIDE Before proceeding verify the position of the switch by observ ing the position of the manual operation handle in Figure 3 1 If the handle is DOWN the contacts are closed in the GENERATOR STANDBY position No further action is required If the handle is UP proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move the handle DOWN Be sure to hold on to the handle as it will move quickly after the center of travel Step 2 Remove manual operating handle from moveable contact carrier arm Return handle to storage bracket 3 2 3 RETURN TO UTILITY SOURCE SIDE Step 1 Manually actuate switch to return manual operating handle to the UP position Step 2 Remove manual operating handle from moveable contact carrier arm Return handle to storage bracket Figure 3 1 Actuating Transfer Switch Attach handle to actuating shaft Move handle UP for the NORMAL UTILITY position NOTE Return handle to storage position in enclosure when finished with manual transfer Move handle DOWN for the EMERGENCY STANDBY position 3 3 VOLTAGE CHECKS 1 Turn ON the UTILITY power supply to the transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker DANGER PROCEED WITH CAUTION THE TRANSFER SWITCH IS NOW ELECTRICALLY HOT CONTACT WITH LIVE TERMINALS R
60. em when the gen erator is operating Article 701 Legally Required Standby Systems or Article 702 Optional Standby Systems as applicable Failure to iso late electric system by these means may result in damage to generator and may result in injury or death to utility workers due to backfeed of electrical energy The manufacturer cannot anticipate every possible circumstance that might involve a hazard The warnings in this manual and on tags and decals affixed to the unit are therefore not all inclusive If using a procedure work method or operating technique the manu facturer does not specifically recommend ensure that it is safe for others Also make sure the procedure work method or operating technique chosen does not render the transfer switch unsafe Throughout this publication and on tags and decals affixed to the generator DANGER WARNING CAUTION and NOTE blocks are used to alert personnel to special instructions about a particular operation that may be hazardous if performed incorrectly or care lessly Observe them carefully Their definitions are as follows DANGER After this heading read instructions that if not strictly complied with will result in serious personal injury including death WARNING Califomia Proposition 65 Engine exhaust and some of its constituents are known to the state of California to cause cancer birth defects and other reproductive harm WARNING California Proposition 65 This p
61. en comprendre ce qui y est pr sent Lisez galement l information et les directives des tiquettes et des autocollants qui sont appos s sur le commutateur Veillez noter toutes les options ou les accessoires qui sont install s et examinez leur fonctionnement Figure 2 3 Connexions d alimentation 24 V a c 0 la terre 194 12 V 23 Transfert 1 CHARGE 1 1AMAX 2 1 CHARGE 2 1AMAX 2 1 CHARGE 3 1AMAX 2 1 CHARGE 4 2 EE FE 38 Lignes de branchement de transformateur install es sur place C blage existant 3 2 FONCTIONNEMENT MANUEL N effectuez pas un transfert manuel avec des charges D connectez le commutateur de transfert de toute source d nergie au moyen des m thodes approuv es comme en utilisant le disjoncteur du circuit principal Un levier pour les commandes manuelles est fourni avec le commutateur de transfert Lutilisation manuelle doit tre v rifi e AVANT que le commutateur de transfert soit aliment Pour v rifier le fonctionnement manuel proc dez de la mani re suivante 1 Placez le g n rateur la position ARRET 2 Placez la position ARRET le disjoncteur du RESEAU PUBLIC et celui du GENERATEUR partir du commutateur de transfert 3 Notez la position des contacts du m canisme de transfert en observant le d placement du bras support de contact Cela peut s observer le long de la mince fente l int r
62. en la tarjeta OPCB Figura 2 4 Suministro de carga 1 a T1 Suministro de carga 2 a Neutral PRECAUCI N El voltaje de suministro de carga en los terminales de la tarjeta OPCB debe coincidir con el voltaje de la bobina del contactor del m dulo PMM En caso contrario se da ar el equipo Figura 2 4 Conexiones de suministro de 120 VCA Cable puente de suministro de carga 2 Cableado onera de la f brica EJ on D T1 F brica FERENCIA GE 160 Cable puente de neutro CARGA 1 Es a suministro de carga 2 carca gt MOR 3 1 PRUEBAS Y AJUSTES DE FUNCIONAMIENTO Luego de la instalaci n e interconexi n del interruptor de transferencia inspeccione la instalaci n completa cuidadosamente Debe ser inspeccionada por un electricista competente y calificado La instalaci n debe cumplir completamente todos los c digos normas y reglamentos correspondientes Cuando se encuentre absolutamente seguro de que la instalaci n es apropiada y correcta realice las pruebas de funcionamiento del sistema PRECAUCI N Efect e las pruebas de funcionamiento en el orden exacto en que se presentan en este manual se puede da ar el interruptor IMPORTANTE Antes de continuar con las pruebas de funcionamiento lea y aseg rese de haber entendido todas las instrucciones e informaci n de esta secci n Tambi n lea la informaci n e instrucciones de las etiquetas y etiquetas adhesivas fijadas
63. encia Inspeccione de cerca en busca de cualquier da o que pueda haber ocurrido durante el env o El comprador debe informar por escrito al transportista cualquier reclamo por p rdidas o da os ocurridos durante el tr nsito Compruebe que todo el material de embalaje sea retirado completamente del interruptor previo a la instalaci n 1 3 DESCRIPCI N DEL EQUIPO El interruptor de transferencia autom tico se usa para transferir cargas el ctricas de una fuente de alimentaci n del SERVICIO P BLICO NORMAL a un GENERADOR RESERVA Dicha transferencia de cargas el ctricas se produce autom ticamente cuando la fuente del SERVICIO P BLICO ha fallado o se ha reducido sustancialmente y el voltaje y la frecuencia de la fuente de GENERADOR han alcanzado un nivel aceptable El interruptor de transferencia impide la realimentaci n el ctrica entre dos fuentes de alimentaci n diferentes como las fuentes de SERVICIO PUBLICO y de GENERADOR y por ese motivo los c digos lo requieren en todas las instalaciones de los sistemas el ctricos de reserva El interruptor de transferencia consta de un mecanismo de transferencia un disyuntor de DESCONEXI N DEL SERVICIO P BLICO un rel de control fusibles una regleta de terminales y un portafusibles para la conexi n de los cables de detecci n Este interruptor de transferencia es adecuado para el uso como equipo de servicio 1 3 1 MECANISMO DEL INTERRUPTOR DE TRANSFERENCIA Estos interrupto
64. ervicio p blico 4 Coloque el disyuntor principal del generador en su posici n ON Cerrado 5 Pulse el bot n de modo AUTO del generador El sistema esta ahora listo para funcionamiento autom tico 6 Coloque en OFF el suministro de alimentaci n del servicio p blico al interruptor de transferencia Con el generador listo para funcionar autom ticamente el motor debe efectuar giro de arranque y arrancar cuanto la fuente de alimentaci n del servicio p blico se coloca en OFF despu s de un retardo de 10 segundos configuraci n predeterminada de f brica Despu s de arrancar el interruptor de transferencia debe conectar los circuitos de carga al lado de reserva despu s de un retardo de cinco 5 segundos Deje que el sistema pase por toda su secuencia de funcionamiento autom tico Funcionamiento Con el generador funcionando y las cargas alimentadas por la salida del generador CA ENCIENDA la alimentaci n de servicio p blico al interruptor de transferencia Debe ocurrir lo siguiente e Luego de aproximadamente 15 segundos el interruptor debe transferir las cargas de vuelta a la alimentaci n del servicio p blico Aproximadamente un minuto despu s de volver a transferir el motor debe pararse Con el generador en modo AUTOMATICO el sistema est listo para funcionamiento completamente autom tico 36 PRUEBA DE LA TARJETA DE CONTROL DE PREVENCI N DE SOBRECARGA OPCB En la parte inferior de la tarjeta
65. ez une cl dynamom trique pour serrer les conducteurs en vous assurant de ne pas trop serrer car cela pourrait endommager la base du commutateur Si les connexions ne sont pas serr es suffisamment cela pourrait causer un exces de chaleur et endommager la base du commutateur 36 Connectez les conducteurs des charges la languette de connexion du m canisme de la facon suivante 1 Connectez les c bles de la source du R SEAU PUBLIC NORMAL au disjoncteur correspondant 2 Connectez les c bles de la source du G N RATEUR SYST ME DE SECOURS aux bornes E et E2 du commutateur 3 Connectez les lignes charges personnalis es aux bornes 1 et T2 Les conducteurs doivent tre ad quats dot s des propri t s isolantes approuv es prot g s par un conduit approuv et d un calibre conforme aux codes applicables Assurez vous de maintenir un d gagement appropri entre les parties m talliques aliment es et les parties m talliques de la mise la terre Laissez au moins 0 5 po d espace pour les circuits de 100 400 A 2 4 CONNEXION DES FILS DU CIRCUIT DE DEMARRAGE Les connexions du syst me de contr le section des donn es lectriques consistent en PUBLIC 1 N1 PUBLIC 2 N2 et CHARGE T1 ainsi que les charges 23 0 et 194 Les calibres recommand s pour le c blage d pendent de la longueur du fil utilis comme indiqu dans le tableau suivant LONGUEUR FIL RECOMMAND MAXIMALE DE FIL CALIBLE 460 pi
66. fiez galement la tension des bornes NEUTRE E2 NEUTRE Fr quence saeua 60 62 Hertz b Bornes El amp E2__ o u u z 240 246 V a c c Bornes E1 NEUTRE 120 123 V a c d Bornes E2 NEUTRE 120 123 V a c 8 Placez le disjoncteur principal du g n rateur CB1 la position ARRET afin d ouvrir le circuit 9 Placez le g n rateur la position ARR T afin de l arr ter REMARQUE Ne commencez PAS tant que la tension du g n rateur a c et que la fr quence ne se trouvent dans les limites indiqu es Si la tension sans charge est correcte mais la fr quence correspondante est inexacte la vitesse r gul e du moteur peut avoir besoin d un ajustement Si la fr quence sans charge est correcte mais la tension est inexacte le r gulateur de tension peut avoir besoin d un ajustement 40 3 4 V RIFICATION DU GENERATEUR AVEC CHARGE 1 Placez le disjoncteur de la ligne principale du g n rateur la position ARRET OUVERT 2 Placez le disjoncteur du r seau public la position ARR T OUVERT 3 Actionnez manuellement les contacts du commutateur de transfert afin de positionner celui du GENERATEUR la position SYSTEME DE SECOURS Consultez le Manuel d utilisation 4 Pour d marrer le g n rateur mettez le en mode MANUEL Laissez le moteur fonctionner quelques minutes afin de lui permettre de se stabiliser 9 Placez le disjoncteur du circuit principal du g n rateur la position MAR
67. fuente del servicio p blico 27 3 2 2 Cierre del lado de la fuente del generador 27 3 2 3 Regreso al lado de la fuente del servicio p blico 27 3 3 Comprobaciones de 28 3 4 Pruebas del generador bajo carga 28 3 5 Comprobaci n del funcionamiento autom tico 28 3 6 Prueba de la tarjeta de control de prevenci n de sobrecarga 29 3 7 Resumen de la instalaci n 29 A GUARDE ESTAS INSTRUCCIONES Lea la siguiente informaci n cuidadosamente antes de intentar instalar operar o dar servicio a este equipo Tambi n lea las instrucciones y la informaci n de las etiquetas etiquetas adhesivas y r tulos que pueden estar fijadas en el interruptor de transferencia Sustituya cualquier etiqueta adhesiva o r tulo no sea m s legible A PELIGRO La conexi n de un generador a un sistema el ctrico normalmente alimentado con el servicio p blico debe ser realizada mediante equipamiento de transferencia adecuado para aislar al sistema el ctrico del sistema de distribuci n de servicio p blico cuando el generador est funcionando Art culo 701 Sistemas de reserva requeridos legalmente o art culo 702 Sistemas de reserva opcionales seg n corresponda No aislar el sistema el ctrico mediante estos medios puede ocasionar da os a
68. grommet is provided to route Class 2 wiring through The grom met can be used in any knockout for NEMA 1 installations The grommet can only be used in the bottom knockouts for NEMA 3R installations Installation Figure 2 1 Overload Prevention Control 0 Ground 192121 AM E 23 Transfer aa huy IND LN K Fax KL Control of Air Conditioner Load 1 Route the thermostat cable from the furnace to the outdoor air conditioner unit to the transfer switch 2 Connect the wire to the terminal strip terminals Air 1 the OPCB as shown in Figure 2 2 These are normally closed contacts which open upon load shed conditions Route ther mostat wire away from High voltage wires If required connect the second air conditioner to the terminal strip terminals Air 2 Contact Ratings Air 1 amp 2 24 VAC 5 0 Amps Max NOTE These instructions are for a typical air conditioner installation Control of heat pump and 2 stage air conditioners will require special connections or the use of Power Management Modules to control the loads Supply PMM 1 Load 1 Supply TN Load 2 Coil wires Supply 3 Load 3 Supply PMM 4 Load 4 Control of a Separate Contactor A separate contactor relay module can be purchased from the manufacturer This model is supplied in a 24 Vac or 120 Vac coil version 1 Mount the contactor module and connect the load to the ma
69. i n deben ingresar en el gabinete a trav s de los tapones desprendibles provistos Si no se utilizan los tapones desprendibles la entrada de los conductos en el gabinete debe estar a la altura de estas o debajo de estos para mantener la calificaci n Tipo Los conductos se deben disponer de manera que haya una separaci n entre los conductores de suministro del servicio p blico y del generador dentro del gabinete Antes de conectar cables del cableado a los terminales quite todo xido superficial de los extremos del cable con un cepillo de alambre Si se usan conductores de ALUMINIO aplique inhibidor de corrosi n a los conductores Apriete los terminales con los valores de par de apriete como se indica en Disyuntor de desconexi n del servicio p blico y en la etiqueta adhesiva ubicada en el interior de la puerta Luego de ajustar los terminales limpie cuidadosamente cualquier excedente de inhibidor de corrosi n 24 PRECAUCI N Use una llave dinamom trica para ajustar los conductores asegur ndose de no sobreapretar puede producirse da o a la base del interruptor Si no se aprietan lo suficiente la conexi n estar muy floja causando calor en exceso que podr a da ar la base del interruptor Conecte los conductores de carga de la fuente de alimentaci n a los terminales marcados del mecanismo de transferencia como sigue 1 Conecte los cables de la fuente de alimentaci n del SERVICIO P BLICO NORMAL
70. ieur du couvercle du commutateur La partie sup rieure du bras est jaune et facilement rep rable D placez manuellement le levier vers le HAUT les bornes de charge 1 et T2 sont reli es aux bornes du R SEAU PUBLIC N1 et N2 D placez manuellement le levier vers le BAS les bornes de charge T1 et T2 sont reli es aux bornes du SYSTEME DE SECOURS E1 et E2 ATTENTION N utilisez pas une force excessive lors de l utilisation du commutateur de transfert car cela pourrait endommager le levier 3 2 1 FERMETURE DE LALIMENTATION DU R SEAU PUBLIC Avant de fermer l alimentation du r seau public v rifiez la position du commutateur en observant la position du levier manuel de la figure 3 1 Si le levier est RELEVE les contacts sont ferm s et le g n rateur se trouve en position NORMALE Aucune autre action n est n cessaire Si le levier est ABAISSE proc dez l tape 1 tape 1 apr s avoir ins r le levier dans l emplacement cet effet du bras support d placez le levier vers le HAUT Assurez de retenir le levier car il se d placera rapidement apr s avoir parcouru la moiti de sa course tape 2 retirez le levier du fonctionnement manuel du bras support Replacez le levier son emplacement d entreposage 3 2 2 FERMETURE DE L ALIMENTATION DU G N RATEUR Avant de fermer l alimentation du g n rateur v rifiez la position du commutateur en observant la position du levier manuel de la fig
71. in contacts 2 Connect the contactor coil to the desired L1 L4 termi nals on the terminal strip Connect additional Power Management Module contactors in a similar fashion NOTE It will be necessary to determine the order of shedding the connected loads and connect the loads to the OPCB in that order One is the highest priority and four is the lowest priority 2 6 CONNECTION OF POWER SUPPLY FOR CONTACTORS The Overload Prevention Control Board OPCB can be powered from either a 24 Vac or 120 Vac power supply The 24 Vac sup ply is from a class 2 transformer that can be purchased from the manufacturer Mounting holes are provided in the enclosure sub plate for mounting of the transformer The 120 Vac supply is fused at 5 amps and is factory connected to OPCB terminals labeled T1 and Neutral 2 6 1 24 VAC SUPPLY Transformer connection are made as shown in Figure 2 3 Blue wire OPCB LOAD SUPPLY 1 terminal Black wire OPCB T1 terminal White wire OPCB NEUTRAL terminal Yellow wire OPCB LOAD SUPPLY 2 terminal 2 6 2 120 VAC SUPPLY Install the following jumpers on the OPCB Figure 2 4 Load Supply 1 to T1 Load Supply 2 to Neutral A CAUTION Load supply voltage on the OPCB terminals must match the PMM contactor coil voltage or the equipment will be damaged Figure 2 4 120 Vac Supply Connections Jumper Wire T1 to Load Supply 1 Factory Wiring T1 Factory
72. ing on such insulative mats Never work on this equipment while physically or mentally fatigued Keep the transfer switch enclosure door closed and bolted at all times Only qualified personnel should be permitted access to the switch interior In case of an accident caused by electric shock immediately shut down the source of electrical power lf this is not possible attempt to free the victim from the live conductor but AVOID DIRECT CONTACT WITH THE VICTIM Use a nonconducting implement such as a dry rope or board to free the victim from the live conductor If the victim is unconscious apply first aid and get immediate medical help When an automatic transfer switch 15 installed for a standby generator set the generator engine may crank and start at any time without warning To avoid possible injury that might be caused by such sudden start ups the system s automatic start circuit must be disabled before working on or around the generator or transfer switch Then place a DO OPERATE tag on the transfer switch and on the generator Remove the Negative Neg or battery cable For authorized service reference the dealer locator number found inside the generator owner s manual General Information 1 1 INTRODUCTION This manual has been prepared especially for the purpose of famil iarizing personnel with the design application installation opera tion and servicing of the applicable equipment Read the manua
73. l carefully and comply with all instructions This will help to prevent accidents or damage to equipment that might otherwise be caused by carelessness incorrect application or improper procedures Every effort has been expended to make sure that the contents of this manual are both accurate and current The manufacturer however reserves the right to change alter or otherwise improve the product or manual at any time without prior notice 1 2 UNPACKING Carefully unpack the transfer switch Inspect closely for any dam age that might have occurred during shipment The purchaser must file with the carrier any claims for loss or damage incurred while in transit Check that all packing material is completely removed from the switch prior to installation 1 3 EQUIPMENT DESCRIPTION The automatic transfer switch is used for transferring electrical load from a UTILITY NORMAL power source to an GENERATOR STANDBY power source Such a transfer of electrical loads occurs automatically when the UTILITY power source has failed or is substantially reduced and the GENERATOR source voltage and frequency have reached an acceptable level The transfer switch prevents electrical feedback between two different power sources such as the UTILITY and GENERATOR sources and for that reason codes require it in all standby electric system installations The transfer switch consists of a transfer mechanism UTILITY SERVICE DISCONNECT circuit breaker a
74. l generador y tambi n puede provocar lesiones o la muerte a los trabajadores del servicio p blico de electricidad debido a la realimentaci n de energ a el ctrica El fabricante no puede prever todas las circunstancias posibles que podr an involucrar un peligro Las advertencias de este manual y los r tulos y etiquetas adhesivas fijadas en la unidad por lo tanto no son exhaustivas Si usa un procedimiento m todo de trabajo o t cnica de funcionamiento que el fabricante no recomienda espec ficamente aseg rese de que sea seguro para otras personas Aseg rese tambi n de que el procedimiento m todo de trabajo o t cnica de funcionamiento elegido no vuelvan inseguro al interruptor de transferencia ADVERTENCIA Proposici n 65 de California El escape del motor y algunos de sus componentes son conocidos por el estado de California como causantes de c ncer defectos cong nitos y otros da os reproductivos ADVERTENCIA Proposici n 65 de California Este producto contiene o emite sustancias qu micas que son conocidas por el Estado de California como causa de c ncer defectos cong nitos y otros da os reproductivos 20 Reglas de seguridad En toda esta publicaci n en los r tulos y en las etiquetas adhesivas fijadas en el generador los bloques de PELIGRO ADVERTENCIA PRECAUCION y NOTA se usan para alertar al personal sobre instrucciones especiales acerca de una operaci n en particular que puede ser peligrosa 5
75. los agujeros de montaje para nivelar la unidad 2 3 CONEXI N DE LA FUENTE DE ALIMENTACI N Y LAS L NEAS DE CARGA Z de colocar en OFF ambas fuentes de alimentaci n de SERVICIO P BLICO NORMAL y de GENERADOR RESERVA antes de intentar conectar la fuente de alimentaci n y las l neas de carga al interruptor de transferencia Los voltajes de alimentaci n son extremadamente altos y peligrosos El contacto con dichas l neas de alimentaci n de alto voltaje causa choques el ctricos extremadamente peligrosos y posiblemente mortales Se proveen diagramas de cableado y diagramas esquem ticos el ctricos en este manual NOTA Todas las instalaciones deben cumplir los c digos nacionales estatales y locales Es responsabilidad del instalador efectuar una instalaci n que apruebe la inspecci n el ctrica final La conexi n con el suministro del servicio p blico se realiza en los terminales del disyuntor de DESCONEXI N DEL SERVICIO P BLICO Las conexiones de las cargas del generador y del cliente se hacen en el mecanismo del interruptor de transferencia dentro del gabinete del interruptor Los calibres de los conductores deben ser adecuados para conducir la corriente m xima a la que ser n sometidos bas ndose en la columna de 75 C de las tablas cuadros etc usados para dimensionar los conductores La instalaci n debe cumplir estrictamente todos los c digos normas y reglamentos aplicables Todos los cables de alimentac
76. m interconnections Electrical Data section consist of UTILITY 1 N1 UTILITY 2 N2 and LOAD T1 and leads 23 0 and 194 Recommended wire gauge sizes for this wiring depends on the length of the wire as recommended in the following chart MAXIMUM WIRE LENGTH WIRE 461 to 730 feet 223m 731 to 1 160 feet 354m 1 161 to 1 850 feet 565m 25 OVERLOAD PREVENTION CONTROL BOARD OPCB The OPCB can control an air conditioner 24 Vac directly or a separate contactor 24 Vac or 120 Vac operating coil which can control any load connected to it See Figure 2 2 The Power Management Module PMM is not supplied with the transfer switch It can be purchased separately from the manufacturer The PMM is for use with the Overload Prevention Control Board OPCB mounted in the transfer switch The OPCB is designed and connected to power the PMM contactor operating coil The OPCB is supplied by a 24 Vac supply class 2 power sup ply transformer connected to the LOAD supply in the RTS Each output is limited to 1 amp The PMM contactor coil connections are made at the OPCB terminal strip Connect the PMM contactor coil to OPCB contactor terminals 1 2 3 or 4 The selection of contactor terminal used will depend on the priority of the load being controlled This is a 24 Vac circuit and wiring methods for class 2 should be used Use 1 4 quick connect terminals to make the contactor coil connections on the PMM See Figure 2 3 A
77. mmutateur pour toutes les installations d alimentation de secours Le commutateur de transfert comprend un m canisme de transfert UN DISJONCTEUR POUR LE R SEAU PUBLIC un relai de commande des fusibles une plaque bornes et un porte fusible pour les connexions des fils de d tection Ce commutateur de transfert convient pour une utilisation avec de l quipement du r seau public 131 M CANISME DU COMMUTATEUR DE TRANSFERT Ces commutateurs figure 1 1 sont utilis s dans un syst me une seule phase lorsque la ligne NEUTRE de la phase doit tre connect e un connecteur neutre et qu elle n est pas commut e Les bornes de type vissant et sans soudure sont standard FGommutateur F Sewage du conducteur classification Calibre Coupe de force Ce commutateur de transfert convient aux moteurs aux lampes a d charge aux filaments de tungst ne et a l quipement de chauffage lectrique La somme de l intensit pleine charge et des autres charges ne doit pas exc der l intensit nominale du commutateur De plus la charge des filaments de tungst ne ne doit pas d passer 30 de l intensit nominale du commutateur Le commutateur de transfert certifi UL sert aux syst mes de secours seulement NEC Section 702 34 Ce commutateur de transfert convient pour une utilisation sur un circuit de 22 000 rms 200 A et 10 000 rms 100 amp res sym triques maximum 240 a c Figure 1 1 M
78. must be checked BEFORE the transfer switch is operated electrically To check manual operation proceed as follows 1 Put the generator into the OFF mode 2 Turn OFF both UTILITY service disconnect circuit breaker and GENERATOR generator main line circuit breaker power supplies to the transfer switch 3 Note position of transfer mechanism main contacts by observing the moveable contact carrier arm This can be viewed through the long narrow slot in the inside cover of the ATS The top of the moveable contact carrier arm is yellow to be easily identified Manual operation handle in the UP position LOAD terminals T1 T2 are connected to UTILITY terminals N1 N2 Manual operation handle in the DOWN position LOAD termi nals T1 T2 are connected to EMERGENCY terminals E1 E2 A CAUTION Do not use excessive force when operating the transfer switch manually or damage could be done to the manual handle 3 2 1 CLOSE TO UTILITY SOURCE SIDE Before proceeding verify the position of the switch by observing the position of manual operation handle in Figure 3 1 If the handle is UP the contacts are closed in the NORMAL UTILITY position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle as it will move quickly after the center of travel Step 2 Remove manual operating han
79. n manual en la Figura 3 1 Si la manija est hacia ABAJO los contactos est n cerrados en la posici n de GENERADOR RESERVA No se requiere ninguna acci n adicional Si la manija est hacia ARRIBA siga con el Paso 1 Paso 1 Con la manija insertada en el brazo soporte del contacto m vil mueva la manija hacia ABAJO Aseg rese de sostener firmemente la manija dado que se mover r pidamente despu s de la mitad del recorrido Paso 2 Retire la manija de operaci n manual del brazo soporte del contacto m vil Vuelva a colocar la manija en el soporte de almacenamiento 323 REGRESO AL LADO DE FUENTE DE SERVICIO PUBLICO Paso 1 Accione manualmente el interruptor para volver a poner la manija de operaci n manual en posici n hacia ARRIBA Paso 2 Retire la manija de operaci n manual del brazo soporte del contacto m vil Vuelva a colocar la manija en el soporte de almacenamiento Figura 3 1 Accionamiento del interruptor de transferencia Fije la manija al eje de accionamiento Mueva la manija hacia ARRIBA para la posici n NORMAL SERVICIO P BLICO Nota Devuelva la manija a la posici n de almacenamiento en el gabinete al terminar con la transferencia manual Mueva la manija hacia ABAJO para la posici n EMERGENCIA RESERVA 27 Funcionamiento 3 3 DE VOLTAJE 1 Coloque en ON el suministro de alimentaci n de SERVICIO PUBLICO al interruptor de transferencia usando el DISYUNT
80. norma CSA C22 1 El C digo El ctrico Canadiense y la Administraci n de Seguridad y Salud Ocupacional OSHA han establecido Nunca maneje ning n tipo de dispositivo el ctrico mientras est parado sobre agua est descalzo o cuando tenga las manos 0 los pies mojados PUEDE PRODUCIRSE UN CHOQUE ELECTRICO PELIGROSO Qu tese todas las alhajas como anillos relojes brazaletes etc antes de trabajar en este equipo Si se debe realizar trabajo en este equipo mientras est parado sobre metal o concreto coloque alfombras aislantes sobre una plataforma de madera seca Trabaje en este equipo solo mientras est parado sobre esas alfombras aislantes Nunca trabaje en este equipo mientras est fatigado f sica 0 mentalmente Mantenga la puerta del gabinete del interruptor de transferencia cerrada y empernada en todo momento Solo debe permitirse el acceso al interior del interruptor a personal calificado En caso de un accidente causado por choque el ctrico apague de inmediato la fuente de alimentaci n el ctrica Si esto no es posible intente liberar a la v ctima del conductor alimentado pero EVITE EL CONTACTO DIRECTO CON LA V CTIMA Use un implemento no conductor como una cuerda o tabla seca para liberar a la v ctima del conductor alimentado Si la v ctima est inconsciente aplique primeros auxilios y obtenga ayuda m dica de inmediato Al instalar un interruptor de transferencia autom tico en un conjunto de generador de
81. ntation du r seau public au commutateur de transfert l aide des moyens pr vus tel qu un disjoncteur principal de r seau public REMARQUE Le commutateur de transfert retournera la position du r seau public 4 Replacez le disjoncteur du g n rateur la position MARCHE FERME 5 Activez le mode AUTO du g n rateur Le syst me est maintenant pr t pour une utilisation en mode automatique 6 Coupez l alimentation du r seau public au commutateur de transfert Lorsque le g n rateur est en mode AUTO le moteur se lance et d marre au moment l alimentation du r seau public est coup e apr s un d lai de 10 secondes r glage en usine Apr s le d marrage le commutateur de transfert devrait relier les circuits de charge la source de secours apr s un d lai de cinq 5 secondes Laissez le syst me r aliser le cycle complet de fonctionnement Lorsque le g n rateur fonctionne et lorsque les charges sont aliment es par la sortie a c du g n rateur placez la source des services publics du commutateur de transfert la position MARCHE Voici ce qui devrait se produire Apr s environ 15 secondes le commutateur devrait retransf rer les charges vers la source du r seau public Apr s environ une minute suivant le retransfert le moteur devrait s arr ter Si le g n rateur est en mode AUTO le syst me est maintenant r gl pour un fonctionnement enti rement automatis 3 6 V RIFICATI
82. o 0 NU veo 999 000 GENERATOR 999 992 177 LUGS E1 amp E2 GENERATOR CLOSING Y COIL To RR LOAD LUGS T1 amp T2 1 3 2 UTILITY SERVICE DISCONNECT CIRCUIT BREAKER The utility service and generator disconnect circuit breakers for the 100 amp models are Type BG 2 pole 120 240VAC 100A 50 60 Hertz Heating Air Conditioning and Refrigeration HACR rated Wire range 1 8 AWG The conductor tightening torque is 50 in Ibs The utility service circuit breaker for the 150 200 amp models are Type 225 2 pole 120 240VAC 150 200 50 60 Hertz Wire range 300 MCM 6 STR Line 250 MCM 6 STR Load ATS The conductor tightening torque is 375 in Ibs Line 275 in lbs Load ATS 1 3 3 OVERLOAD PREVENTION CONTROL BOARD OPCB The Overload Prevention Control Board is designed to prevent an overload on the generator when it is supplying the customer loads see Figure 1 2 Up to six loads can be managed by the OPCB 2 air conditioner loads and 4 other loads The OPCB manages the loads by shedding the connected loads in the event of a drop in generator frequency overload Loads to be shed are grouped in 4 priority levels on the OPCB Priority 1 and 2 has connections for both one air conditioner and one contactor Both an air conditioner and a contactor can be used at the same time if desired To control an air
83. omplete turn the generator s main circuit breaker to its OFF or OPEN position 7 Let the generator run at no load for several minutes Then shut down by putting it into the OFF mode 3 5 CHECKING AUTOMATIC OPERATION To check the system for proper automatic operation proceed as follows 1 Ensure that the generator is in it s OFF mode 2 Install front cover of the transfer switch 3 Turn ON the utility power supply to the transfer switch using the means provided such as a utility main line circuit breaker NOTE Transfer Switch will transfer back to utility position 4 Set the generator s main circuit breaker to its ON or CLOSED position Push the generator s AUTO mode button The system is now ready for automatic operation 6 Turn OFF the utility power supply to the transfer switch With the generator ready for automatic operation the engine should crank and start when the utility source power is turned OFF after a 10 second delay factory default setting After starting the transfer switch should connect load circuits to the standby side after a five 5 second delay Let the system operate through its entire automatic sequence of operation With the generator running and loads powered by generator AC output turn ON the utility power supply to the transfer switch The following should occur e After approximately 15 seconds the switch should transfer loads back to the utility power source Approximately
84. one minute after re transfer the engine should shut down With the generator in the AUTOMATIC mode the system is now set for fully automatic operation 3 6 TESTING OVERLOAD PREVENTION CONTROL BOARD OPCB A Test pushbutton is provided on the bottom of the OPCB to test the operation of the tested functions The Test button will work when the ATS 15 the Utility or the Generator position 1 Turn the Utility supply on to the ATS 2 Press the TEST pushbutton on the OPCB 3 Verify that all of the connected loads to be shed become disabled The method of verification will depend on the type of load 4 After five 5 minutes verify AC 1 and Load 1 are energized Status LED AC 1 and Load 1 15 ON 5 After another 15 seconds verify AC 2 and Load 2 are ener gized Status LED AC 2 and Load 2 are ON 6 After another 15 seconds verify Load 3 is energized Status Load 3 is ON 7 After another 15 seconds verify Load 4 is energized Status Load 4 15 ON dd INSTALLATION SUMMARY Ensure that the installation has been properly performed as outlined by the manufacturer and that it meets all applicable laws and codes 2 Test and confirm proper operation of the system as outlined in the appropriate installation and owner s manuals 3 Educate the end user on the proper operation maintenance and service call procedures Important If the end user ever finds it necessary to turn the generator off during prolonged utility outages
85. paration between the Utility and Generator supply conductors inside the enclosure Before connecting wiring cables to terminals remove any surface oxides from the cable ends with a wire brush ALUMINUM con ductors are used apply corrosion inhibitor to conductors Tighten terminal lugs to the torque values on Utility Service Disconnect Circuit Breaker and on the decal located on the inside of the door After tightening terminal lugs carefully wipe away any excess cor rosion inhibitor A CAUTION Use a torque wrench to tighten the conductors being sure not to overtighten or damage to the switch base could occur If not tightened enough a loose connection would result causing excess heat which could damage the switch base Connect power source load conductors to clearly marked transfer mechanism terminal lugs as follows 1 Connect UTILITY NORMAL power source cables to UTILITY SERVICE DISCONNECT circuit breaker 2 Connect the GENERATOR STANDBY source power cables to switch terminals E1 E2 3 Connect customer LOAD leads to switch terminals T1 T2 Conductors must be properly supported of approved insulative qualities protected by approved conduit and of the correct wire gauge size in accordance with applicable codes Be sure to maintain proper electrical clearance between live metal parts and grounded metal Allow at least 1 2 inch for 100 400 amp circuits 2 4 CONNECTING START CIRCUIT WIRES Control syste
86. personnel comp tent et qualifi Conformez vous strictement aux codes lectriques et de construction locaux provinciaux et nationaux Lors de l utilisation de cet quipement assurez vous d tre en conformit avec les normes du Code national de l lectricit et de la CSA Association canadienne de normalisation le Code canadien de l lectricit 022 1 et l OSHA Occupational Safety and Health Administration Ne touchez jamais un appareil lectrique en tant debout sur un sol mouill pieds nus ou avec les mains ou les pieds mouill s UNE D CHARGE LECTRIQUE DANGEREUSE PEUT SE PRODUIRE e Retirez tous vos bijoux anneau montre bracelet etc avant de travailler sur cet quipement S il est n cessaire de travailler sur cet quipement et d tre debout sur un appui en m tal ou en b ton placez un matelas isolant sur une plateforme en bois non humide Ne travaillez sur l quipement que debout sur un tel tapis isolant Ne travaillez jamais sur l quipement lorsque vous tes physiquement ou mentalement fatigu a porte du boitier du commutateur de transfert automatique doit rester ferm e et boulonn e en tout temps Seul le personnel qualifi peut avoir acc s l int rieur du boitier du commutateur En cas d accident caus par une d charge lectrique coupez imm diatement la source d nergie lectrique Si cela n est pas possible tentez de d gager la victime du conducteur sou
87. personnes ou endommager les biens d autrui symbole indique un risque potentiel d explosion A Ce symbole indique un risque potentiel d incendie A Ce symbole indique un risque potentiel de d charge lectrique RISQUES G N RAUX e Tout g n rateur courant alternatif utilis pour une alimentation de secours dans le cas d une panne de l alimentation NORMALE R SEAU PUBLIC doit tre isol du R SEAU PUBLIC au moyen d un commutateur de transfert approuv Une isolation inappropri e des sources NORMALE et DE SECOURS l une de l autre peut mener des blessures graves ou la mort de l employ du r seau public en raison d une r alimentation d nergie lectrique Une installation une utilisation un entretien ou une r paration inappropri de l quipement est extr mement dangereux et peut mener la mort ou des blessures personnelles graves ou encore un bris de l quipement ou des biens d autrui Un commutateur de transfert pr sente une tension extr mement lev e et dangereuse Tout contact avec les bornes haute tension les contacts ou les fils causera une d charge lectrique extr mement dangereuse et possiblement mortelle NE TRAVAILLEZ PAS SUR LE COMMUTATEUR DE TRANSFERT AUTOMATIQUE TANT QUE TOUTES LES SOURCES D ALIMENTATION VERS LE COMMUTATEUR N ONT PAS T COMPLETEMENT FERM ES e L installation l utilisation et l entretien de cet quipement doivent tre effectu s par du
88. r le g n rateur pour attirer l attention du personnel sur des consignes propres certaines op rations pouvant pr senter des risques si elles sont r alis es de mani re incorrecte ou inattentive Respectez les a la lettre Voici leur d finition A DANGER Ce titre indique une directive qui si elle n est pas respect e la lettre a des blessures personnelles graves ou m me la mort A AVERTISSEMENT Ce titre indique une directive qui si elle n est pas respect e a la lettre peut mener a des blessures personnelles graves ou m me a la mort AATTENTION Ce titre indique une directive qui si elle n est pas respect e a la lettre peut mener a des blessures mineures ou moyennement graves REMARQUE Ce titre indique une directive qui si elle n est pas respect e la lettre peut mener un bris de ou des biens d autrui Ces avertissements en mati re de s curit ne peuvent liminer les dangers qu ils d crivent Le bon sens et un respect strict des consignes sont essentiels afin de pr venir les accidents lors de l utilisation ou de l entretien Quatre symboles de s curit commun ment utilis s accompagnent les encarts DANGER AVERTISSEMENT et ATTENTION Voici les informations indiqu es par chacun de ceux ci Ce symbole fournit des informations de s curit importantes qui si elles ne sont pas suivies pourraient mettre en danger la s curit des
89. razo soporte del contacto m vil es amarilla para que pueda identificarse f cilmente Manija de operaci n manual en la posici n hacia ARRIBA Los terminales de CARGA T1 2 est n conectados en los terminales de SERVICIO PUBLICO N1 N2 Manija de operaci n manual en la posici n hacia ABAJO Los terminales de CARGA T1 T2 est n conectados en los terminales de EMERGENCIA E2 PRECAUCI N No utilice fuerza excesiva al operar el interruptor de transferencia manualmente o se pueden ocasionar da os a la manija manual 3 2 1 CIERRE DEL LADO DE LA FUENTE DE SERVICIO PUBLICO Antes de continuar verifique la posici n del interruptor observando la posici n de la manija de operaci n manual en la Figura 3 1 Si la manija est hacia ARRIBA los contactos est n cerrados en la posici n NORMAL SERVICIO PUBLICO no se requiere ninguna acci n adicional Si la manija est hacia ABAJO siga con el Paso 1 Paso 1 Con la manija insertada en el brazo soporte del contacto m vil mueva la manija hacia ARRIBA Aseg rese de sostener firmemente la manija dado que se mover r pidamente despu s de la mitad del recorrido Paso 2 Retire la manija de operaci n manual del brazo soporte del contacto m vil Vuelva a colocar la manija en el soporte de almacenamiento 3 2 2 CIERRE DEL LADO DE FUENTE DE GENERADOR Antes de continuar verifique la posici n del interruptor observando la posici n de la manija de operaci
90. res Figura 1 1 se usan con un sistema monofasico donde la l nea NEUTRA monof sica ser conectada a un terminal neutro y no se conectar al interruptor Los terminales sin soldadura de rosca son est ndar CABLE Acted os conductores Vator nominal Par dearie Este interruptor de transferencia es adecuado para controlar motores lamparas de descarga el ctrica equipos de filamento de tungsteno y de calefaccion el ctrica en los que la suma de los amperajes nominales de los motores a plena carga y los amperajes de las restantes cargas no exceden el amperaje del interruptor y la carga de tungsteno no excede el 30 de la capacidad nominal del interruptor Este interruptor de transferencia listado por UL est destinado al uso en sistemas de reserva opcionales nicamente art culo 702 del C digo El ctrico Nacional de EE UU NEC 22 Este interruptor de transferencia es adecuado para el uso en un circuito con una capacidad de 22 000 200 A y 10 000 100 A amperios sim tricos valor eficaz con 240 VCA como m ximo Figura 1 1 Mecanismo de transferencia ATS t pico __ TERMINALES DE SERV P BLICO Ge BOBINA Gest n DE CIERRE P DE SERV P BLICO ooo oTi H ooo oeo Fo H BOBINA DE CIERRE DE GENERADOR
91. roduct contains or emits chemicals known to the state of California to cause cancer birth defects and other reproductive harm Safety Rules A WARNING After this heading read instructions that if not strictly complied with could result in serious personal injury including death A CAUTION After this heading read instructions that if not strictly complied with might result in minor or moderate injury NOTE After this heading read instructions that if not strictly complied with may result in damage to equipment and or property These safety warnings cannot eliminate the hazards that they indicate Common sense and strict compliance with the special instructions while performing the service are essential to prevent ing accidents Four commonly used safety symbols accompany the DANGER WARNING and CAUTION blocks The type of information each indicates follows This symbol points out important safety infor mation that if not followed could endanger personal safety and or property A This symbol points out potential explosion a hazard This symbol points out potential fire hazard This symbol points out potential electrical shock hazard GENERAL HAZARDS Any AC generator that is used for backup power if a NORMAL UTILITY power source failure occurs must be isolated from the NORMAL UTILITY power source by means of an approved transfer switch Failure to properly isolate the NORMA
92. rtion level all mounting points If necessary use washers behind mounting holes to level the unit 2 3 CONNECTING POWER SOURCE AND LOAD LINES Make sure to turn OFF both the UTILITY NORMAL and GENERATOR STANDBY power supplies before trying to connect power source and load lines to the transfer switch Supply voltages are extremely high and dan gerous Contact with such high voltage power supply lines causes extremely hazardous pos sibly lethal electrical shock Wiring diagrams and electrical schematics are provided in this manual NOTE All installations must comply with national state and local codes It is the responsibility of the installer to perform an installation that will pass the final electrical inspection The utility supply connection is made at the UTILITY SERVICE DIS CONNECT circuit breaker terminals The generator and customer load connections are made at the transfer switch mechanism inside the switch enclosure Conductor sizes must be adequate to handle the maximum cur rent to which they will be subjected based on the 75 C column of tables charts etc used to size conductors The installation must comply fully with all applicable codes standards and regulations All power cables must enter the enclosure through the knockouts provided If not using the knockouts conduit entry into the enclo sure must be at or below knockouts to maintain the Type 3R rating Conduits should be arranged to provide se
93. s s l quipement ou aux biens d autrui Lorsqu on vous demande de l information ou pour les commandes de pi ces pour cet quipement assurez vous d inclure toutes les donn es de l AUTOCOLLANT Notez le mod le et le num ro de s rie dans l espace pr vu cet effet Ci dessous des fins de r f rence NO DE S RIE 1 5 BO TIER DU COMMUTATEUR DE TRANSFERT Le boitier standard du commutateur est certifi par la NEMA National Electrical Manufacturer s Association et par UL type 3R Les bo tiers de type conviennent une installation int rieure ou ext rieure Ils offrent une protection contre la pluie et les granules de glace ils ne sont pas endommag s par la glace qui pourrait se former sur le boitier 1 6 UTILISATION SECURITAIRE DU COMMUTATEUR DE TRANSFERT Avant l installation l utilisation ou la r paration de cet quipement lisez les REGLES DE SECURITE l int rieur du couvercle attentivement Respectez les R GLES DE S CURIT la lettre afin de pr venir les accidents et les dommages caus s l quipement Le fabricant recommande qu un exemplaire des REGLES DE S CURIT se trouve proximit du commutateur de transfert De plus assurez vous d avoir lu toutes les instructions et toute l information des tiquettes et des autocollants qui se trouve sur l quipement Voici trois publications importantes qui soulignent l utilisation s curitaire des interrup
94. s tension tout en vitant TOUT CONTACT DIRECT AVEC LA VICTIME Utiliser un outil non conducteur tel qu une planche ou un c ble sec pour lib rer la victime du conducteur sous tension Si la victime est inconsciente lui administrer les premiers soins et obtenir une aide m dicale imm diate Si un commutateur de transfert automatique est install pour un g n rateur de secours le moteur du g n rateur peut se lancer et d marrer n importe quel moment et sans avertissement Pour viter tout risque de blessure caus par un d marrage soudain le circuit de d marrage automatique du syst me doit tre d sactiv avant de travailler dans les environs du g n rateur ou du commutateur de transfert Placez galement un criteau NE PAS FAIRE FONCTIONNER sur le commutateur de transfert et sur le g n rateur D branchez le c ble de la borne n gative Neg ou de la batterie Pour un service apres vente agr r f rez vous au num ro du d taillant qui se trouve l int rieur du manuel du propri taire du g n rateur 33 Information g n rale 1 1 INTRODUCTION Ce manuel a t pr par pour le personnel familiaris avec la conception l application l installation l utilisation et la r paration de l quipement dont il est question ici Lisez attentivement le manuel et suivez toutes les directives Cela contribuera pr venir les accidents ou les dommages caus s l quipement qui pourr
95. st faite aux bornes du DISJONCTEUR DU R SEAU PUBLIC Les connexions du g n rateur et des charges personnalis es sont faites partir du m canisme du commutateur de transfert l int rieur du boitier Le calibre des fils doit convenir la tension maximale pouvant y circuler en fonction de la colonne 75 des tableaux diagrammes etc utilis s pour les calibres des fils L installation doit tre conforme tous les codes toutes les normes et toutes les r glementations Les c bles sous tension doivent tre achemin s dans le boitier au moyen des entr es d foncables cet effet Si les entr es d foncables ne sont pas utilis es l entr e des conduits dans le bo tier doit tre r alis e vis a vis ou en dessous des entr es d foncables afin d tre conforme aux exigences 3R de boitier Les conduits doivent tre dispos s afin s parer les fils du r seau public et ceux du g n rateur l int rieur du boitier Avant de connecteur les c bles aux bornes retirer toute trace d oxydation des extr mit s au moyen d une brosse m tallique Si des conducteurs en ALUMINIUM sont utilis s appliquez un produit antirouille sur les conducteurs Serrez les dispositifs de serrage des bornes la valeur de couple pr sent e dans le pr sent manuel et sur les autocollants qui se trouvent l int rieur du bo tier Apr s avoir serr les bornes retirez soigneusement tout exc s d antirouille ATTENTION Utilis
96. tant Si l utilisateur final juge n cessaire de fermer le g n rateur perdant une p riode prolong e afin d conomiser du carburant il doit connaitre les tapes simples mais importantes suivantes Pour placer le g n rateur la position ARR T lors d un fonctionnement en mode AUTO et en ligne 1 Placez le disjoncteur du r seau public la position ARR T OUVERT 2 Placez le disjoncteur du collecteur MLCB du g n rateur la position ARRET OUVERT 3 Placez le g n rateur la position ARR T Pour remettre le g n rateur la position MARCHE 1 Mettez le g n rateur en mode AUTO d marrez le moteur et laissez le se r chauffer quelques minutes 2 Placez le disjoncteur du collecteur MLCB du g n rateur position MARCHE FERME Le syst me sera alors en fonction en mode AUTO Le disjoncteur principal du r seau peut tre positionn la position MARCHE FERM Toutefois pour teindre l unit l ensemble du processus doit tre r p t 41 R f rence 0K0171 Revision C 04 03 13 Imprim aux E U gt 11 148 149 11 14 15 33 37 ex AI NEUTRAL GROUND WIRE CONNECTION TORQUE SETTINGS Se SS GROUND NEUTRAL NEMTRALE NENA 50 IN LBS 31 Revision Date 12 4 12 19 20 21
97. tante Si el usuario final en alg n momento encuentra necesario colocar el generador en OFF durante apagones prolongados del servicio p blico para conservar combustible instr yalo sobre estos pasos simples pero importantes Para colocar el generador en OFF mientras funciona en AUTO y en l nea 1 Coloque en OFF o ABIERTO el interruptor de desconexi n del servicio p blico 2 Coloque en OFF o ABIERTO el disyuntor principal de l nea MLCB en el generador 3 Coloque el generador en OFF Para colocar el generador de vuelta en ON 1 Coloque el generador de vuelta en AUTO y perm tale arrancar y calentarse unos pocos minutos 2 Coloque en ON o CERRADO el MLCB del generador El sistema ahora estar funcionando en modo autom tico El interruptor de desconexi n principal del servicio p blico puede ser colocado en ON o CERRADO pero para parar la unidad debe repetirse este proceso completo 29 N mero de parte 0K0171 Revisi n C 04 03 13 Impreso en los EE UU Manuel de Vutilisateur Interrupteur de transfert automatique TRANSFER SWITCH SWITCH A DANGER NON DESTINE POUR DES APPLICATIONS DE MAINTIEN DES FONCTIONS VITALES CRITIQUES CE PRODUIT PEUT ETRE INSTALLE PAR LE PROPRIETAIRE TOUTEFOIS SI VOUS N AVEZ PAS LES HABILETES OU LES OUTILS NECESSAIRES ENGAGEZ UN ELECTRICIEN OU UN REFEREZ VOUS AU MANUEL DU QUALIFI POUR L TON PROPRI TAIRE FOURNI AVEC LE GAZ D ECHAPPEMENT MORTELS
98. teurs de transfert NFPA 70 National Electrical Code NFPA 70E Standard for Electrical Safety in the Workplace UL 1008 STANDARD FOR SAFETY AUTOMATIC TRANSFER SWITCHES REMARQUE Il est essentiel d utiliser la derni re version de toute norme afin de s assurer d avoir une information ad quate et jour 2 41 PR PARATION DE L INSTALLATION Le montage des fils a t r alis et v rifi en usine L installation du commutateur suit la proc dure suivante Installation du boitier Connexion des lignes d alimentation et des charges Connexion des fils de d tection du g n rateur et des circuits de relai de transfert Connexion des contacts auxiliaires si n cessaire Connexion de l OPCB comme exig e V rification du fonctionnement 2 2 MONTAGE Les dimensions pour l installation du commutateur de transfert se trouvent dans le pr sent manuel Les boitiers sont habituellement install s sur un mur Consultez le diagramme d installation AATTENTION Manipulez le commutateur de transfert avec soin lors de l installation et prenez garde de ne pas l chapper En tout temps prot gez le commutateur des impacts des d bris de construction et des particules m talliques N installez jamais un commutateur de transfert qui aurait t endommag 35 Installation Ce commutateur de transfert est mont dans un boitier de type 3R UL II peut tre install l int rieur ou l ext rie
99. thin stated limits If the no load voltage is correct but no load frequency is incorrect the engine governed speed may require adjustment If no load frequency is correct but voltage is not the voltage regulator may require adjustment 3 4 GENERATOR TESTS UNDER LOAD 1 Set the generator s main circuit breaker to its OFF or OPEN position 2 Setthe UTILITY SERVICE DISCONNECT circuit breaker to the OFF or OPEN position 3 Manually actuate the transfer switch main contacts to their GENERATOR STANDBY position Refer to Manual Operation 4 To start the generator put it into the MANUAL mode When engine starts let it stabilize for a few minutes 5 Turn the generator s main circuit breaker to its ON or CLOSED position The generator now powers all LOAD circuits Check generator operation under load as follows Turn ON electrical loads to the full rated wattage amperage capacity of the generator DO NOT OVERLOAD With maximum rated load applied check voltage and frequen cy across transfer switch terminals E1 and E2 Voltage should be greater than 230VAC and frequency should be greater than 59 Hertz Also verify that the gas pressure remains within acceptable parameters see the generator Installation Guidelines manual Let the generator run under rated load for at least 30 minutes With unit running listen for unusual noises vibration over heating etc that might indicate a problem 6 When checkout under load is c
100. to conserve on fuel educate them on these simple but important steps To turn the generator OFF while running in AUTO and online 1 Turn OFF or OPEN the main Utility disconnect 2 Turn OFF or OPEN the Main Line Circuit Breaker MLCB on the generator 3 Turn the generator OFF To turn the generator back ON 1 Put the generator back into AUTO and allow to start and warm up for a few minutes 2 Turn ON or CLOSE the MLCB on the generator The system will now be operating in its automatic mode The main utility disconnect can be turned ON or CLOSED but to shut the unit off this complete process must be repeated 10 Installation Diagrams R N v 5 9 A 5 P e lt bh 10 m Nag 20 lt Y L 9 y TJWUW2 LE 3215 LINGNOD 03 3 18v1InS 1NOADONA 119007 31 14405 YAWOLSND 2U vd MOIdAL Cre TIME TT 530914 371 LINANDI 12 11 v l 1 I AIGVLIAS LADAIONA L Sc 0 1uu C 96 53 0 ONILNADWN lt 07021 4 7806 1921441 1 90114 4 2 L S olMW818 1 60 2144081 WI 539 1 4 AZIS LINANDI 2 1 1 v
101. ur Son emplacement doit tre d termin en fonction de la disposition de l installation de la commodit et de la proximit de la source du r seau public et du centre de charge Installez le commutateur de transfert aussi pr s que possible des charges lectriques qui seront connect es Installez le commutateur de transfert a la verticale sur une structure de support solide Afin de pr venir les risques de distorsion mettez a niveau tous les points d attache Au besoin placez des rondelles derri re les trous de montage afin de mettre l unit au niveau 2 3 CONNEXION DE L ALIMENTATION ET DES LIGNES DE CHARGE DANGER Assurez vous de positionner les deux sources d alimentation la position ARR T c est dire celle du R SEAU PUBLIC NORMAL et celle du G N RATEUR DE SECOURS avant de tenter de connecter la source d alimentation et les lignes de charge au commutateur de transfert La tension de l alimentation est tr s lev e et dangereuse Tout contact avec les lignes haute tension causera une d charge lectrique extr mement dangereuse et possiblement mortelle Les diagrammes de c blage et les sch mas lectriques sont fournis dans ce manuel REMARQUE Toutes les installations doivent tre conformes aux codes nationaux provinciaux ou locaux incombe a Pinstallateur d effectuer une installation qui pourra passer les inspections lectriques de mise La connexion reliant le r seau public e
102. ure 3 1 Si le levier est ABAISSE les contacts sont ferm s et le g n rateur se trouve en position SYSTEME DE SECOURS Aucune autre action n est n cessaire Si le levier est RELEV proc dez l tape 1 tape 1 apr s avoir ins r le levier dans l emplacement cet effet du bras support d placez le levier vers le BAS Assurez de retenir le levier car il se d placera rapidement apr s avoir parcouru la moiti de sa course tape 2 retirez le levier du fonctionnement manuel du bras support Replacez le levier son emplacement d entreposage 3 2 3 RETOUR L ALIMENTATION DU R SEAU PUBLIC tape 1 actionnez manuellement le commutateur afin de positionner le levier du fonctionnement manuel vers le haut tape 2 retirez le levier du fonctionnement manuel du bras support Replacez le levier son emplacement d entreposage Figure 3 1 Activation du commutateur de transfert Fixez le levier l arbre d entra nement BAISSEZ le levier pour la position NORMALE R SEAU PUBLIC REMARQUE replacez le levier la position d entreposage dans le bo tier lorsque le transfert manuel est termin LEVEZ le levier pour la position d URGENCE SYST ME DE SECOURS 39 3 3 VERIFICATION DE LA TENSION 1 Placez l alimentation du RESEAU PUBLIC la position MARCHE du commutateur de transfert en utilisant le DISJONCTEUR DU RESEAU PUBLIC DANGER FAITES PREUVE DE PRUDENCE LE COMMUTATEU
Download Pdf Manuals
Related Search
Related Contents
#1 SERIES MODÈLES DE LA SÉRIE #1 MODELOS DE LA SERIE #1 Mode d`emploi iWL250 II. 3. La cybernétique en évaluation V6725-771-00 - Schneider Electric NAD T742 Receiver Jeux baroques pour destin royal à la Comédie USER`S MANUAL FDC 1.2 - The UK Mirror Service POOL BASIC EVO DOUBLE - Piscine Distribution Copyright © All rights reserved.
Failed to retrieve file