Home

SERIE - SD - Bombas Ideal

image

Contents

1. 5 INSTRUCTIONS TO CARRY OUT THE SPLICING 5 1 Isulating tape based splicing In order to assure good result the splicing of the submerged motor cable shall be carefully made Where a tripolar hose is the case proceed as follows 1 Prepare the ends of the cable to be spliced by removing its external cover wrapping the three conductors in a length of aprox 150 mm 2 Cut off the ends of the cables in three different lengths so that the three splices do not coincide together in the same place 3 Peel the cables insulation aprox 20 mm from the end 4 Make the electric connection by the use of special splicing nippers and bushings or alternatively by interlocking the braids and subsequent welding 5 Clean the surfaces to be isolated 6 Belt one layer of adhesive tape P V C covering the exposed splice and aprox 1 cm on both sides on the insulation Three layers of self adhesive tape on all the possible length on each of the three splices Fig 1 7 Tape again with the three cables together taking care to levelled off the step formed by the hose cover Also it shall by covered by aprox 4 cm on every side Fig 2 8 The entire splicing shall by covered by reversal triple winding of SCOTCH N 33 with the above taping being oversized on both sides All tapings are to be made on a medium overlapping basis with the tape being tight in order to prevent air from being trapped Fig 3 Bombas Ideal S A 11 5 2 Resin sp
2. chelon que forme l isolement du cable et le couvrir galement 4 cm approximativement de chaque c t Fig 2 8 Enrubanner toute l embranchement avec un triple enroulement inverse de SCOTCH n 33 en surpassant l enrubannement ant rieur de chaque c t Tous les enrubannements s effectueront a recouvrement moyen en maintenant le ruban tendu pour viter Pocclusion d air Bombas Ideal S A 18 5 2 Branchement avec r sine 1 La connexion lectrique des conducteurs s effectue normalement comme on le d crit dans l embranchement avec le ruban isolant 2 Au lieu de faire le recouvrement manuellement par gaines successives de ruban on le forme par endurcissement d une r sine sp ciale appropri e pour l isolement lectrique 3 Cette r sine du type poxy se pr sente sous la forme de deux composants en tat liquide Une fois bien m langes se produit l endurcissement temp rature ambiante 4 Imm diatement apr s on versera le m lange de deux composants dans un moule sp cial dans lequel nous aurons introduit au pr alable les embranchements a recouvrir Fig 4 5 Une foi le temps d endurcissement coul on pourra utiliser le c ble et proc der son installation es important de suivre avec attention les instructions facilit es avec le kit et respecter le temps n cessaire d endurcissement Pour les embranchements des c bles tripolaires on utilisera un seul moule pour les trois c bles
3. Dans ces cas nous devrons nous assurer que l isolement entre phases est correct FIG 4 E Ay 5 3 Branchement avec tubes r tractiles 1 Introduire le tube r tractile ext rieur dans une des deux extr mit s de la gaine tripolaire 2 ter la couche ext rieure des deux gaines de c ble selon les dimensions indiqu es 3 Nettoyer les couches des conducteurs 4 Oter l extr mit de tous les conducteurs 5 Introduire les tubes r tract les int rieurs sur les conducteurs dans le bout le plus long 6 Effectuer le branchement lectrique des conducteurs avec des bagues de pression et des pinces 7 Positioner les tubes sur les raccordements d j effctu s 8 Chauffer avec un d capeurs thermique ou une petite flamme 120 130 La chaleur arrivera par le centre et se d placera peu peu vers les c t s de fa on uniforme et au fur et mesure que le tube se resserre 9 Centrer le tube r tractile ext rieur sur le branchement Veuillez repeter la m me operation ATENTION Arr ter de chauffer quand l adh sit appara t sur les extr mit s Bombas Ideal S A 19 6 INSTALLATION ELECTRIQUE ATTENTION Les raccordements lectriques doivent tre effectu s par un personnel qualifi L armoire lectrique de commande doit tre appropri e au lieu d installation ATTENTION Avant de r aliser le branchement des moteurs v rifier que les parties lectriques nous travailleront ne soient pas branch es au r se
4. ennes 98 37 CEE et modifications successives Securit des machines 89 36 CEE Compatibilit lectro magn tique 3 23 CEE Mat rial lectrique destin tre utilis avec les limitations de tension Normes armonis es employ es pour la d termination de conformit EN 292 1 EN 55014 1 et EN 55014 2 Les pompes fournies en disposition arbre nu acomplissent toutes les normes de s curit mais elles ne peuvent pas tre mise en marche ni porter la marque CE jusqu a ce que la machine elles doivent tre install es soit conforme a la normative en vigueur Massalfassar 07 01 04 7Fethando Serrano Sastre Cohsejero Delegado sata tion 3 SEs EQ 500 AE o O c 896 5 D TE Sot 25 s gt 5 ES 5 594 e 2 Lu eeu oo nn gt oo 22 0 lt lt lt nn lt a lt O Be BOMBAS IDEAL S A POL IND MEDITERRANEO C CID 8 Tels 34 96 140 21 43 FAX 34 96 140 21 31 MASSALFASAR VALENCIA SPAIN e mail centra http www bombas ide al com al com
5. 2 Cortar los extremos de los conductores en tres longitudes diferentes de forma que los tres empalmes no caigan en el mismo sitio 3 Pelar el aislamiento de los conductores en aproximadamente 20 m m del extremo 4 Efectuar la conexi n el ctrica por medio de casquillos y alicates especiales para empalmes 5 Limpiar las superficies a aislar 6 Encintar cada empalme con una capa de cinta aislante adhesiva de P V C que cubra la conexi n desnuda mas un cm aproximadamente a ambos lados Tres capas de cinta autosoldable en toda la longitud posible en cada uno de los empalmes figura 1 7 Rehacer la operaci n del encintado con los tres cables juntos procurando igualar el escal n que forma la cubierta de la manguera y cubri ndola tambi n aproximadamente 4 cm por cada lado figura 2 8 Recubrir todo el empalme con triple arrollamiento inverso de cinta aislante adhesiva de P V C sobrepasando el encintado anterior por ambos lados Todos los encintados se efectuaran a medio solape y manteniendo la cinta tensa para eliminar la retenci n de aire figura 3 Bombas Ideal S A 4 5 2 Empalme con Resina 1 La conexi n el ctrica de los conductores se efect a normalmente tal como se describe en el empalme con cinta aislante 2 El recubrimiento en lugar de hacerse manualmente por cubiertas sucesivas de cinta se forma por fraguado de una resina adecuada para el aislamiento el ctrico 3 Esta resina del tipo epoxi se presenta bajo l
6. ces instructions peut entra ner des risques importants pour l int grit des personnes Le non respect de ces instructions peut entra ner des risques de danger lectrique pour les personnes ATTENTION Les instructions apparaissant apr s ce message indiquent qu elles sont importantes pour l installation l utilisation et l entretien ad quats de l quipement Dans le but d am liorer les performances de ses produits Bombas Ideal S A se r serve le droit de modifier le contenu du pr sent manuel et ou le produit lui m me et cela sans avoir en aviser pr alablement les clients Le non respect des conseils et recommandations contenues dans ce manuel de m me qu une mauvaise utilisation ou la manipulation non autoris e du produit d gage automatiquement Bombas Ideal S A de toute responsabilit face aux possibles dommages caus s qu ils soient mat riels ou personnels Pour tout doute ou information concernant ce produit son utilisation son entretien ou sa r paration veuillez contacter Bombas Ideal S A Polig Ind Mediterr neo C Cid n 8 e mail central bombas ideal com http www bombas ideal com Tfno 34 961 402 143 Fax 34 961 402 131 46560 Massalfassar Valencia Spain Nos pompes sont livr es avec le manuel et celui ci doit toujours rester proximit du lieu d installation d ment prot g afin de pouvoir tre consult tout moment par les usagers en cas de besoin Bombas Ideal S A 16
7. groupe 6 Le relai thermique fonctionne correctement mais le contacteur se d connecte 1 Probl me de tension du r seau ou probl me de phase 2 C ble trop long ou trop fin chute de tension brutale ou tension tr s faible 3 Contacteur endommag ou d clenchement du relai thermique t moin lumineux allum 4 Erreur dans le cadre lectrique interrupteur de commutation endommag ou mauvais contact 5 La roue est bloqu e dans le corps de la pompe par un corps tranger Les bobines br lent 1 Le moteur tourne a l envers 1 V rifier l alimentation et les phases 2 Remplacer par un cable de taille adapt e Augmenter la tension 3 R parer ou remplacer le contacteur le r initialiser manuellement une fois refroidi 4 Changer les composants endommag s s assurer que tout est correct avant de red marrer 5 D bloquer la roue retirer les corps trangers R parer le moteur ou le remplacer 1 Inverser deux des trois phases ou ajuster l alimentation principale 6 Aspiration 2 Nettoyer la cr pine obstru e 3 Entr e d air par la cr pine 3 Augmenter la sumergenc en baissant la pompe 4 Rupture de l accouplement d arbre pompe moteur 4 Remplacer l accouplement 5 La roue de la pompe 5 Maintenir la pompe et fonctionne mal remplacer la roue 6 Valve de retenue bloqu e 6 Remplacer lavalve de retenue 1 Ajuster l emplacement de la pompe
8. la profondeur ad quate 2 R duire le d bit ou ajuster la profondeur de la pompe dans 1 La pompe n aspire pas correctement 2 Niveau d eau dans la cr pine trop bas le puits 3 Le d bit d impulsion est 3 Remplacer la pompe par excessif pour la pompe une autre de taille adapt e 1 Sondes de niveau mal connect es ou cass es La prise de terre est mal branch e ou souffre d un mauvais contact 2 Les connexions permettant le fonctionnement automatique sont endommag es 1 Contr ler les connexions et la prise de terre 2 R parer ou remplacer le cadre lectrique automatique 1 La distance entre les sondes 1 Augmenter la distance entre de niveau est trop petite 2 Les sondes de niveau se sont d plac es 1 Probl me de tension du r seau ou probl me de phase les sondes 2 Placer les p les sup rieurs et inf rieurs en position correcte 1 V rifier l alimentation et les phases Bombas Ideal S A ANEXOS ANNEXES ANNEXS 6 8 10 CODIGO DESIGNACION CODE DESIGNATION 395 BUJE RODETE 311 DOUILLE 427 CONIC BUSHING COJINETE 346 COUSSINET BEARING COLADOR 376 CREPINE 1 STRAINER 384 Net DIFUSOR ky 726 379 DIFFUSEUR gt SN DIFFUSER SN CUERPO DE ASPIRACION N 380 CORPS ASPIRATION A SUCTION CASING 4 346 CUERPO BOMBA SUP u y2 384 DIFFUSEUR SUP N 311 UPPER DIFFUSER 2 N CUERPO IMPULSION
9. 2 DESCRIPTION ET UTILISATION Les lectropompes immerg es sont des pompes avec une ou plusieurs roues en s rie accoupl es directement des moteurs immerg s asynchrones ATENTION Conditions requises lors de l installation d un groupe immerg standard o Vitesse de l eau l ext rieur du moteur ne doit pas tre inf rieure 8 cm s pour des moteurs 4 ou de 16 cm s pour le reste des moteurs Temp rature maximale de l eau pomp e 259 309 selon type du moteur Ne jamais travailler sec Ne pas pomper de fluides diff rents d eau douce et claire Ne pas pomper de concentration solide sup rieure 50 200 g m 3selon pompe catalogue s rie S Ne pas tre install dans un local class risque d explosion Ne jamais tre utilis es pour le pompage de liquides inflammables Ne pas travailler pendant plus d une minute vanne ferm e Ne pas travailler au sens de rotation inverse Oooo 3 MONTAGE INSTALLATION Avant de proc der l installation du groupe immerg il convient de v rifier le diam tre du puits qui ne doit pas tre sup rieur au diam tre maximum du groupe Il ne doit exister aucune rugosit qui puisse endommager le groupe ou le c ble Q On v rifiera que la tension du r seau correspond celle indiqu e sur le moteur et sur l armoire de commande On ne doit pas mettre le moteur en marche s il n est pas d ment rempli de liquide r fr
10. 336 CEE Compatibilidad electromagn tica 3 23 CEE Material el ctrico destinado a utilizarse con l mites de tensi n Normas armonizadas empleadas para la determinaci n de conformidad EN 292 1 2 EN 60335 1 EN 60335 2 41 EN 55014 1 y EN 55014 2 Las bombas suministradas en eje libre cumplen con todas las normativas de seguridad pero no deben ponerse en marcha ni marcarse CE hasta que la m quina donde est n instaladas sea declarada conforme con las Directivas pertinentes DECLARATION OF CONFORMITY CE BOMBAS IDEAL S A with address in Massalfassar Pol gono Industrial del Mediterraneo Calle Cid N 8 declares that all pumps S STI supplied with motor conform the following European directives 98 37 and modifications Machinery safety 89 336 CEE Electromagnetic compatibility 3 23 CEE Electrical equipment designed for use within certain voltage limits Armonized standards used to determine conformity EN 292 1 2 EN 60335 1 EN 60335 2 41 EN 55014 1 y EN 55014 2 Pumps supplied in bare shaft fulfil all the CE safety requirements but must not be runned nor labelled as CE until the machine where they are install is declared conform to the directives involved DECLARATION DE CONFORMITE CEE BOMBAS IDEAL S A avec si ge social sis Massalfassar Poligono Industrial del Mediterraneo Calle Cid N 8 d clare que toutes les pompes S STI fournies avec moteur incorpor sont conformes aux Directrices Europ
11. BOMBAS iDEAL SERIE SD MANUAL DE USO Y MANTENIMIENTO GB USE AND MAINTENANCE INSTRUCTIONS NOTICE D UTILISATION ET D ENTRETIEN SUM 0054 Bombas Ideal S A 1 INDICE INDEX 1 INTRODUCCI N 1 2 DESCRIPCI N Y USO 2 3 MONTAJE E INSTALACI N 2 4 ENSAMBLAJE DE CUERPO DE BOMBA A MOTOR 2 5 INSTRUCCIONES PARA EFECTUAR EL EMPALME 3 6 INSTALACI N EL CTRICA 5 7 INSTALACI N POZO 5 8 PUESTA MARCHA 6 9 ANOMALIAS DE FUNCIONAMIENTO 7 1 INTRODUCCI N Este manual de servicio est dirigido a los usuarios de bombas sumergidas tipos SD Contiene las instrucciones de instalaci n servicio y mantenimiento Antes de proceder a cualquier tipo de intervenci n el usuario debe leer atentamente este manual y prestar atenci n a cuantas sugerencias y recomendaciones se den en l especialmente las que sean precedidas de los siguientes s mbolos de seguridad La no observancia de estas instrucciones puede exponer a las personas a riesgos importantes para su salud La no observancia de estas instrucciones puede exponer a las personas a riesgos de origen el ctrico ATENCI N Las instrucciones identificadas con este mensaje indican su importancia para una correcta instalaci n utilizaci n y mantenimiento Con el objeto de mejorar el resultado final de sus productos Bombas Ideal S A se reserva el derecho de modificar el contenido del presente manual y o el propio produc
12. DURE 9 OPERATING ANOMALIES 1 INTRODUCTION This service manual is intended for users of the submerged group type SD It contains the instructions for installation service and maintenance Before proceeding to do any kind of work on the equipment users should read this manual carefully and pay attention to any suggestions and tips given in it particularly the ones preceded by the following safety symbols Failure to observe these instructions may expose people to serious danger for their health Failure to observe these instructions may expose people to electrical risks TAKE NOTE Any instructions preceded by this message are of great importance for proper installation use and maintenance In order to improve the final result of its products Bombas Ideal S A reserves the right to modify the content of this manual and or the product itself with no need to inform its customers beforehand Failure to comply with the suggestions and recommendations in this manual as well as improper use or non authorised handling of the product shall fully release Bombas Ideal S A from any liability as regards possible damage caused whether this be personal or material In the event of any doubt about the product its use maintenance or repair please contact Bombas Ideal S A Polig Ind Mediterr neo C Cid n 8 e mail central bombas ideal com http www bombas ideal com Tfno 34 961 402 143 Fax 34 961 402 131 46560 Massalfas
13. a forma de dos componentes en estado l quido Una vez mezclados ntimamente comienza el endurecimiento el cual tiene lugar a temperatura ambiente 4 Inmediatamente despu s de mezclados los dos componentes se vierte la mezcla en un molde especial en el que previamente habremos introducido los empalmes a recubrir figura 4 5 Una vez transcurrido el tiempo de fraguado se puede manejar el cable y proceder a su instalaci n ATENCI N Es importante seguir detalladamente las instrucciones facilitadas con el kit y respetar el tiempo de fraguado necesario En los empalmes de mangueras tripolares se emplea un solo molde para los tres cables debemos tener la certeza de que el aislamiento entre fases es correcto 5 3 Empalme con Tubos Retr ctiles 1 Introducir el tubo retractil exterior en uno de los dos extremos de la manguera tetrapolar 2 Pelar el recubrimiento exterior de las dos mangueras de cable seg n las dimensiones indicadas 3 Limpiar las cubiertas de los conductores 4 Pelar los extremos de todos los conductores 5 Introducir los tubos retr ctiles interiores sobre los conductores en el tramo m s largo 6 Efectuar la conexi n el ctrica de los conductores mediante casquillos de presi n y alicates 7 Posicionar los tubos cubriendo los empalmes ya realizados 8 Calentar mediante una pistola de aire o una llama suave 120 1309 El calor se iniciar por el centro y se va desplazando hacia los lados uniformemente conforme se va cont
14. aci n antes de su instalaci n definitiva ATENCI N Verificar que el eje del motor gira libremente Verificar que las superficies de contacto de las bridas del motor y de la bomba est n limpias para asegurar un perfecto alineamiento Engrasar la puntera del eje del motor para facilitar su deslizamiento MUI Retirar la rejilla de aspiraci n del cuerpo de bomba Aproximar verticalmente la bomba centrada con la brida del motor y situar sus escotaduras de aspiraci n para alojar los cables del motor Hacer descender cuidadosamente la bomba alinear las ranuras del acoplamiento y aproximar suficientemente la bomba hasta que las superficies de las bridas est n una contra la otra Insertar las arandelas y tuercas que se acompa an con el conjunto y efectuar un aprieto progresivo en cruz hasta el blocaje completo Introducir el cable en el cubre cables y fijarlo al cuerpo de bomba mediante sus abrazaderas correspondientes Fijar la rejilla de aspiraci n El grupo queda dispuesto para su instalaci n Bombas Ideal S A 3 5 INSTRUCCIONES PARA EFECTUAR EL EMPALME 5 1 Empalme con Cinta Aislante Para asegurar un buen resultado el empalme del cable de alimentaci n del motor sumergido debe hacerse con mucho cuidado En el caso de manguera tripolar proceder como sigue 1 Preparar los extremos de los cables a empalmar quit ndoles la cubierta exterior que envuelve los tres conductores en un tramo de 150m m aproximadamente
15. au d alimentation Les conducteurs de terre couleur jaune vert doivent tre branch s au circuit de terre de l installation avant de raccorder les autres conducteurs Ne jamais laisser les extr mit s libres des c bles dans l eau ATTENTION V rifier que la tension et la fr quence d alimentation du moteur correspondent a celles indiqu es sur la plaque d identification du moteur 7 INSTALLATION DANS LE PUITS Une fois r alis es ces op rations pr paratoires l installation s effectuera de la fa on suivante Chaque tube sera hiss suspendu d une bride fixation plac e le plus haut possible pour tre apr s baiss e avec une extr me attention jusqu appuyer la dite bride de fixation sur le bord perc ou bien sur deux supports transversaux continuation et au moyen d une autre bride de fixation on fixera le tube suivant et fait ainsi l union des deux on suspendra toute la charge La bride de fixation inf rieure ne se l chera pas jusqu ce que la charge qui pend totalement de la bride de fixation sup rieure ne soit pas assur e Le c ble conducteur lectrique doit tre fix la tuyauterie dans la partie sup rieure et inf rieure de chaque union au moyen de brides On t chera de le prot ger de toute friction avec les bords du puits car il pourrait se d t riorer NIVEAU MAXIMUM NIVEAU MINIMUM s ATTENTION V rifier l isolement du c ble pendant l installation avec un mesureu
16. control box 1 The distance between the electric poles to control the upper amp lower water level is too close 2 The upper lower water 2 Change the upper and lower level controlling poles are poles to a correct connecting dislocated position 6 The thermostat operates 1 The electricity supply before normally but contactor is coming into the control box is lack of phase 1 Check electric poles and earth wire 1 Increase the distance between the upper and lower 5 Pump can start but starts poles frequently 1 Check if it is lack of phase and correct it 14 BOMBAS A 1 D E A L NOTAS NOTES Bombas Ideal S A 15 1 INTRODUCTION 15 2 DESCRIPTION ET UTILISATION 16 3 MONTAGE ET INSTALLATION 16 4 ASEMMBLAGE DU CORPS DE POMPE AU MOTEUR 16 5 INSTRUCTIONS POUR R ALISER LE BRANCHEMENT 17 5 INSTALLATION ELECTRIQUE 19 6 INSTALLATION DANS LE PUITS 19 7 MISE EN MARCHE 20 8 ANOMALIES DE FONCTIONNEMENT 21 1 INTRODUCTION Ce manuel technique s adresse aux usagers de pompes immerg types SD Il contient les instructions d installation de fonctionnement et d entretien Avant toute intervention sur l quipement l usager doit lire attentivement ce manuel et suivre tous les conseils et recommandations qu il contient en particulier celles pr c d es des symboles de s curit suivantes Le non respect de
17. e following tube shall be fastened and once the two tubes have been joined together in this way all the load is hung over MAXIMUM LEVEL MINIMUM LEVEL The lower fixing flange shall not be released till it can be seen for certain that the load is fully hanging from the upper fixing flange The electric conduction cable must be fixed to the pipe on the upper and lower side of every union by the used of clamps Every care shall be taken to avoid any frictions of the cable with the well edges as it might go damage otherwise A TAKE NOTE Verify the cable insulation during the installation by the insulation measurer especially when the pump is lowered down below the water level A terminal of the measurer must be connected to the well tubing and the other to the Cooper joined parts they both being completely dry and earth insulated Keep on verifying when lowering every length of tube If the cable goes damaged the insulating resistance will substantially decrease Assembly cannot be pursued if this anomaly is not overcome first Bombas Ideal S A 13 TAKE NOTE Another very important point to be borne in mind is the pump s suction strainer must be over the tubing filters so that the pumped water can cool the motor The strainer must never be in front of them The Group must be completely hanging on the day frame by the pumping pipe Safety water finders must necessarily be installed so
18. e nivel para evitar que funcione la bomba por debajo del m nimo determinado Despu s de la puesta en marcha comprobar la lectura de los amper metros con el valor indicado en la placa de caracter sticas el cual no se debe sobrepasar Verificar el resto de caracter sticas tensi n y frecuencia Bombas Ideal S A GRUPOS SUMERGIDOS ANOMAL AS DE FUNCIONAMIENTO ANOMAL A CAUSA SOLUCI N 1 El grupo no arranca 2 La bomba no eleva agua o el caudal es insuficiente 3 Variaciones del caudal 4 Funcionamiento correcto en modo manual pero no en autom tico 5 Arranques frecuentes del grupo 6 El rel t rmico funciona correctamente pero el contactor desconecta 1 Fallo tensi n de red o fallo 1 Comprobar alimentaci n y de fase fases 2 Cable demasiado largo o poca secci n brusca ca da de tensi n o tensi n muy baja 2 Sustituir cable por secci n adecuada Aumentar la tensi n 3 Arreglar o sustituir el contactor rearmarlo cuando se enfr e 4 Cambiar componente da ado Aseg rese de que todo esta correcto antes de volver a arrancar 3 Contactor da ado o disparo rel t rmico 4 Error en cuadro el ctrico cambio del componente o mal contacto 5 El rodete esta bloqueado en el cuerpo de bomba por alg n cuerpo extra o El motor se quema 1 Giro en sentido inverso del 1 Invertir dos de las tres motor fases 2 Aspiraci n obstruida 2 Limpiar el colador 3 Toma aire por la as
19. ers and pliers 7 Place the retractile sleeves covering the splices 8 Heat up with a heatgun or warm flame 120 1309 Start heating on the middle and carry on to the extremes as the sleeve shrunks 9 Center the external sleeve over the splice Repeat again the abore ment oned TAKE NOTE Stop heatrng when adhesive appears on the extremes Bombas Ideal S A 12 6 ELECTRICAL CONNECTIONS TAKE NOTE The electrical connections must be made by qualified personnel in strict compliance with all the national rules of installation and according to the wiring diagrams enclosed with the control panels TAKE NOTE All grounding conductors must be connected to the grounding circuit of the system before the others conductors are connected The grounding conductors must be the last to be removed if the motor is disconnected The free ends of the cables must never be immersed or wetted in any way TAKE NOTE Make sure that the voltage and frequency values which the motor is powered correspond to those on the data plates of the motor itself 7 INSTALLATION INTO THE WELL Once the above named preparing steps have been carried out the installation shall take place as follows Every tube shall be hung from a fixing flange which is situated in the uppermost position to be carefully lowered down till the fixing flange in question rests on the pierced edge or on two transversal supports Then and by the use of another fixing flange th
20. gt K 395 RPS REFOUL T N CORPS REFOULEMEN SAN DELIVERY CASING H gt 450 VALVULA QZZ 427 SOUPAPE NA Y VALVE 17 ya EJE BOMBA N 379 450 ARBRE gt A SHAFT SN A JUNTA TORICA SN 485 JOINT TORIQUE N O RING TZ NZ 346 MANGITO Y SA lt 610 ACCOUPLEMENT N QA COUPLING INS s 2 RODETE A 726 TURBINE IMPELLER 610 380 376 QS O 384 726 346 299 217 450 346 380 95 379 726 327 346 217 450 346 380 CODIGO CODE DESIGNACION DESIGNATION 217 ARO CIERRE BAGE D USURE WEAR RING 299 BUJE RODETE MANCHON CENTRAGE LOCK COLLET 327 CASQUILLO INT CHEMISE D ARBRE SPACER BUSH 346 COJINETE COUSSINET BEARING 376 COLADOR CREPINE STRAINER 379 DIFUSOR DIFFUSEUR DIFFUSER 380 CUERPO ASPIRACION CORPS ASPIRATION SUCTION CASING 395 CUERPO IMPULSION CORPS REFOULEMENT DELIVERY CASING 427 VALVULA SOUPAPE VALVE 450 EJE BOMBA ARBRE SHAFT 610 MANGITO ACCOUPLEMENT COUPLING 726 RODETE TURBINE IMPELLER DECLARACION DE CONFORMIDAD CEE BOMBAS IDEAL S A con domicilio en Massalfassar Pol gono Industrial del Mediterr neo calle Cid N 8 declara que todas las bombas S STI servidas con motor incorporado son conformes con las Directivas Europeas 98 37 CEE y sucesivas modificaciones Seguridad en m quinas 89
21. ig rant dans le cas contraire il se d t riorerait en peu de secondes Le moteur est fourni plein de liquide Mesurer la r sistance d isolement du moteur avant de raccorder le c ble et apr s l avoir raccord Suivre les instructions de remplissage et de contr le d isolement sur le manuel personnalis du moteur 4 ASSEMBLAGE DU CORPS DE POMPE AU MOTEUR Afin d viter des dommages pendant le transport le corps de la pompe et le moteur sont fournis emball s s par ment Proc der selon les instructions ci jointes avant l installation d finitive ATENTION V rifier que l arbre du moteur tourne librement V rifier que les surfaces de contact des brides du moteur et de la pompe soient nettoy es afin de garantir un parfait alignement Engraisser les rainures du bout du moteur afin de faciliter leur accouplement Enlever la grille d aspiration Rapprocher verticalement le corps de la pompe align sur le moteur et placer les logements du corps d aspiration sur les c bles du moteur Descendre soigneusement le corps de la pompe aligner les rainures de l accouplement et approcher la pompe jusqu ce que les surfaces des brides soient l une contre l autre Introduire les vis les rondelles et les crous fournis avec l ensemble Puis effectuer un serrage progressif en croix jusqu au blocage complet Introduire le c ble dans le prot ge c ble et le fixer au corps de la pompe au moyen des colliers corre
22. lices 1 The electric connection of the conductors is normally carried out in the same way as set out for the insulating taped based splicing 2 Coating instead of being made manually by successive layers of tape takes place by the setting of a resin which is specially appropriate for electric insulation 3 The above named resin of the Epoxy type is available in a liquid 2 component form Once these two components have been duly mixed hardening starts taking place at room temperature 4 Immediately the two components have been mixed the mixture is poured into a special mould into which the splices to be coated have been put first Fig 4 5 Once the necessary setting period has elapsed we will be able to handle the cable and proceed with installation accordingly TAKE NOTE The instructions provided with the Kit shall necessarily be strictly adhered to and necessary setting time complied with As to splicing of tripolar hoses a single mould for the three cables is used In the case we must be positively certain that the insulation between the phases is correct FIG 4 gt 5 3 Retractile sleeve splices 1 Insert retractile sleeve throngh one extreme of the four cove hese 2 Peel external isolatron of both hoses according to given dimensions 3 Clean the surfaces 4 Peel the extremes of all coves 5 Insert the internal retractile sleeves thronght every cove 6 electgric connection by the use of splinng nipp
23. nuaci n y por medio de otra brida de fijaci n se sujetar el tubo siguiente y hecha as la uni n de los dos se suspende toda la carga La brida de fijaci n inferior no se soltar hasta tanto se haya asegurado que la carga pende totalmente de la brida de sujeci n superior NIVEL MAXIMO C El cable conductor el ctrico debe fijarse a la tuber a en la parte superior e inferior de cada uni n por medio de collarines Se procurar protegerlo de todo rozamiento con los bordes del pozo ya que podr a deteriorarse NIVEL MINIMO ATENCI N Comprobar el aislamiento del cable durante la instalaci n con un medidor de aislamiento especialmente al bajar la bomba debajo del nivel del agua Con ctese un cable del medidor al entubado del pozo y el otro a las partes unidas del cobre perfectamente secos y aislados de tierra Continuar haciendo la comprobaci n al bajar cada tramo del tubo En caso de deterioro del cable la resistencia de aislamiento bajar considerablemente No se puede proseguir el montaje sin antes solucionar esta anomal a ATENCI N Es muy importante que el colador de aspiraci n de la bomba quede por encima de los filtros del entubado para que el agua bombeada refrigere el motor En ning n caso quedar el colador frente a ellos El grupo debe quedar totalmente suspendido desde el brocal por la tuber a de impulsi n Cerciorarse de que el motor quede p
24. or encima del fondo del pozo al menos de 2 a 3 metros Bombas Ideal S A 6 ATENCI N Controlar las posibles variaciones del nivel din mico del pozo por descenso del nivel fre tico o por caudal excesivo Es imprescindible instalar unas sondas de seguridad por falta de agua de forma que cuando sta desciende por debajo del nivel m nimo preestablecido se pare el grupo evitando da os mayores En el caso de instalaci n con tuber a roscada los manguitos de uni n deben quedar perfectamente bloqueados para evitar el riesgo de aflojamiento Si la tuber a es flexible deberemos respetar las prescripciones establecidas por el fabricante adem s de prever una cuerda de nylon o un cable de acero de seguridad fijado a la bomba 8 PUESTA EN MARCHA ATENCI N Un sentido de rotaci n incorrecto puede causar da os en el motor Es preciso por lo tanto encontrar el correcto sentido de rotaci n efectuando la siguiente operaci n Accionar el grupo en los dos sentidos de giro posibles controlar el caudal El caudal mayor indica el correcto sentido de giro La diferencia suele ser apreciable a simple vista En algunos casos de bombas instaladas a gran profundidad el caudal correspondiente al sentido de giro err neo puede ser nulo Desconectar la alimentaci n de red e invertir el sentido de giro intercambiando dos de las tres fases ATENCION Si la electrobomba no es capaz de arrancar evitar sucesivos intentos que pueden da ar el grupo Si
25. piraci n y bajar bomba bomba motor 5 Desgaste de piezas 5 Enviar el grupo al Servicio 6 V lvula de retenci n 6 Revisar v lvula de 1 Ajustar la situaci n de la bomba a la profundidad adecuada 2 Reducir caudal impulsado o ajustar profundidad de la bomba en el pozo 3 Excesivo caudal de 3 Sustituir la bomba por otra impulsi n para la bomba de tama o adecuado 1 Sondas de nivel mal conectadas o rotas Conexi n 1 Comprobar conexiones y incorrecta de la toma de tierra toma tierra o con mal contacto 5 Desbloquear el rodete quitar cuerpos extra os Reparar el motor o sustituirlo 1 La bomba no puede aspirar correctamente 2 Nivel del agua en la aspiraci n demasiado bajo 2 Conexiones para funcionamiento autom tico da adas 1 Distancia entre las sondas 1 Aumentar la distancia entre 2 Coloque las sondas superior e inferior en posici n correcta 2 Reparar o sustituir cuadro el ctrico autom tico 2 Las sondas de nivel se han descolocado 1 Fallo tensi n de red o fallo de fase 1 Comprobar alimentaci n y fases BOMBAS A 1 D E A L NOTAS NOTES Bombas Ideal S A 8 1 INTRODUCTION 2 DESCRIPTION AND USE 3 SET UP AND INSTALLATION 4 PUMP CASING AND MOTOR ASSEMBLY 5 INSTRUCTIONS TO CARRY OUT THE SPLICING 6 ELECTRICAL CONNECTIONS 7 INSTALLATION INTO THE WELL 8 ESTARTING PROCE
26. r Thus this operation must be carried out slowly TAKE NOTE If fluctuations in both the flow and the ammeter are found once the adjusting valve has been opened the reason should be that the well is not supplying the amount of water removed by the pump and there is air suction Thus the flow provided by the pump shall be adjusted if the above anomaly is to be obviated The minimum water level must be at least 1 meter above the pump casing It s advisable to install probes to prevent pump from running with water below minimum level Following the start compare the ammeter reading with the amperage started on the characteristics plate which shall never be exceeded at all Also verify such other characteristics as voltage and frequency Bombas Ideal S A POSSIBLE WORKING DETECTS OF THE SUBMERSIBLE PUMP ANOMALY CAUSE SOLUTION 1 Power cut off or lack of 1 Check mains supply and phase phase cap too longor too thin 2 Replace with a suitable size pressure drop sharply or cable increase the voltage voltage too low 3 Contactor damaged 3 Maintain or replace the contactor reset the contactor thermostat tripped out pilot 4 manually once it has cooled lamp showing troubles is on down 1 Do not start M Te sa 4 Check the line connectors 4 The line inside controller PP RE and changeover switch inside gets loose changeover switch the control box and make sure damaged or suffering bad every
27. r d isolement sp cialement lorsqu on descend la pompe sous le niveau de l eau Brancher une borne du mesureur au tubage de puits et l autre aux parties unies du cuivre parfaitement s ches et isol es de la terre Continuer v rifier chaque fois qu un nouveau tube sera install En cas de d t rioration du c ble la r sistance de l isolement baissera consid rablement On ne doit pas continuer le montage sans avoir auparavant solutionn e cette anomalie ATTENTION Il est aussi tr s important que la cr pine d aspiration de la pompe soit au dessus des filtres et du tubage pour que l eau pomp e r frig re le moteur En aucun cas la cr pine devra tre face eux Le groupe doit tre totalement suspendu de la margelle par la tuyauterie de refoulement S assurer que le moteur soit positionn au moins 2 3 m tres du fond du puits Bombas Ideal S A 20 ATTENTION Il est indispensable d installer des sondes de s curit pour le manque d eau de fa on que lorsque celle ci descend au dessous du niveau minimum pr tabli le groupe s arr te en vitant de plus grands dommages En cas d installation avec des tuyaux filet s ils doivent tre serr s fond pour viter tout risque de d visage d au couple de r action du groupe Pour une installation correcte dans le cas de colonne de refoulement en mati re plastique il faut respecter les prescriptions fix es par le fabricant Pr voir une corde en nylon o
28. ra Concentraci n m xima s lidos en suspensi n 50 a 200 g m seg n bomba cat logo serie S No utilizar en ambientes clasificados con riesgo de explosi n No trabajar mas de 1 minuto con la v lvula totalmente cerrada No trabajar girando en sentido de rotaci n inverso 3 MONTAJE E INSTALACI N a Antes de proceder a la instalaci n del grupo sumergido conviene verificar el di metro del pozo Este debe ser superior al di metro m ximo del grupo No debe existir ninguna rugosidad que pueda da ar al grupo o al cable Se comprobar que la tensi n de red coincide con la indicada para el motor y el cuadro de el ctrico de mando ATENCI N No se debe poner en marcha ning n motor si no est debidamente lleno de su l quido refrigerante de lo contrario se deteriorar en pocos segundos Los motores se suministran llenos de l quido El aislamiento del motor se debe revisar antes de realizar el empalme del cable de alimentaci n y despu s de haberlo realizado Para las correctas verificaciones del llenado y del aislamiento del motor seguir las instrucciones que figuran en el propio manual personalizado del motor 4 ENSAMBLAJE DE CUERPO DE BOMBA A MOTOR Para evitar da os en el transporte debido a un embalaje excesivamente largo el cuerpo de bomba y el motor podr n suministrarse por separado Proceder a su ensamblaje seg n las instrucciones generales que siguen a continu
29. rayendo 9 Centrar el retractil exterior sobre el empalme Repetir la operaci n anterior ATENCI N Dejar de calentar cuando aparece adhesivo sobre los extremos nie ORIO ca pay a rem aml o Bombas Ideal S A 5 6 INSTALACI N EL CTRICA ATENCI N Las conexiones el ctricas se deben realizar por personal cualificado El grado de protecci n del cuadro el ctrico debe ser adecuado al local donde est instalado ATENCI N Antes de realizar el conexionado de los cables al cuadro el ctrico comprobar que el suministro el ctrico est desconectado y no puede reponerse autom ticamente As mismo se cumplen las condiciones de seguridad requeridas Los cables de tierra color amarillo verde deben conectarse al circuito de tierra de la instalaci n antes de conectar los restantes conductores No dejar jam s sumergidas las extremidades libres de los cables en el agua ATENCI N Controlar que los valores de frecuencia y tensi n con los que se alimenta el motor correspondan con los expuestos en la placa del motor 7 INSTALACI N EN POZO Llevadas a cabo las citadas operaciones la instalaci n se efect a en la forma siguiente Cada tubo se izar suspendido de una brida de fijaci n colocada lo mas alto posible para despu s ir bajando con sumo cuidado hasta apoyar dicha brida de fijaci n sobre el brocal bien sobre los soportes transversales A conti
30. re Apr s on ouvrira un peu plus la vanne jusqu ce que le sable sorte nouveau et dans ce cas maintenir le d bit jusqu ce qu il soit propre Cette op ration est tr s importante pour la dur e du groupe et viter des glissements de sable qui d t riorerait le groupe qui doit toujours travailler avec de l eau propre Il faut donc effectuer cette op ration tr s lentement ATTENTION Si en ouvrant la vanne de r gulation se produisent des oscillations dans le d bit et dans c est parce que le puits ne fournit pas la quantit d eau que la pompe extrait et qu il y a aspiration d air Pour l viter il faut r gler le d bit pomp Le niveau minimum de l eau du puits doit tre au moins d un m tre au dessus de la pompe est conseille de pr voir des sondes de niveau minimum Apr s la mise en marche comparer la lecture des amp rem tres avec l amp rage indique sur la plaque des caract ristiques cet amp rage ne doit pas tre d pass V rifier aussi les caract ristiques de tension et de fr quence Bombas Ideal S A 21 GROUPES IMMERGEES ANOMALIES DE FONCTIONNEMENT ANOMALIE CAUSE SOLUTION 1 Le groupe ne d marre pas 2 L eau ne peut pas tre pomp e ou le d bit est insuffisant le courant lectrique est trop fort ou trop faible 3 Variations de d bit 4 Fonctionnement correct en mode manuel mais incorrect en mode automatique 5 D marrages fr quents du
31. sar Valencia Spain The manual is supplied along with the pump and should be kept close to the point of installation duly protected so that this can be consulted by users when required Bombas Ideal S A 9 2 DESCRIPTION AND USE Submersible electric pumps are as a rule pumps with one or more impellers in series They are directly coupled to special asynchronous submersible motors TAKE The standard version of the products is not suitable for a OOOOOOdOO continuous operation with a water velocity outside the motor casing of not less than 8 cm sec motors 4 and 16 cm sec motors 6 8 10 etc pumping water with a temperature exceeding 25 30 C according submersible motor type dry operation pumping fluids other than clear and fresh water pumping water with a solid concentration exceeding 50 200 g m according pump catalogue 5 locate the systems in premises classified as involving an explosion risk use these for moving inflammable liquids operation with completely close valve exceeding 1 minute pump operation in reverse sense of rotation 3 SET UP AND INSTALLATION a Prior to proceeding with the submerged group installation the well diameter shall be duly verified It shall necessarily be larger than the max diameter of the group On the other hand there should be no roughness prone to damage the group or the cable A verification shall be made as to whether the mains
32. se emplea un sistema de arranque a tensi n reducida o progresivo el per odo de arranque debe ser de m ximo 3 4 segundos La puesta en marcha del motor no se efectuar en ning n caso sin haber previsto un cuadro de mando y protecci n contra sobrecargas Se comprobar en todo momento que las tres fases poseen la tensi n correcta En el caso de pozos nuevos arrancar con la v lvula de descarga cerrada dejando solamente un m nimo de agua si es posible visible en el brocal del pozo evitando de este modo arrastres de arena que pueden deteriorar la bomba Verificar el sentido de rotaci n del motor Mantener bombeando el m nimo caudal de agua hasta obtenerla completamente limpia Conseguido esto se proceder abrir lentamente la v lvula hasta que vuelva a salir turbia y en este caso mantener el caudal hasta que otra vez se consiga limpia Esta operaci n es de m xima importancia para la duraci n del grupo y evita desprendimientos de arena que deterioran la bomba ya que sta debe trabajar con agua limpia Efectuar esta operaci n muy lentamente ATENCION Si al abrir la v lvula reguladora encontramos oscilaciones en el caudal y en el amperimetro es porque el pozo no suministra el caudal que la bomba extrae y toma aire Es preciso reducir el caudal regulando la v lvula para evitar que esto ocurra El nivel din mico m nimo del pozo estar por lo menos 1 metro por encima del cuerpo de bomba Se recomienda la instalaci n de sondas d
33. spondants Fixer la grille d aspiration Le groupe est alors pr t pour son installation Bombas Ideal S A 17 5 INSTRUCTIONS POUR R ALISER LE BRANCHEMENT 5 1 Branchement avec ruban isolant Pour assurer un bon r sultat embranchement du c ble d alimentation du moteur immerg doit tre fait avec pr cision S il s agit d un c ble tripolaire proc der comme il suit 1 Pr parer les extr mit s des c bles embrancher en enlevant l isolement qui prot ge les trois conducteurs sur une longueur de 150 m m environ 2 Couper les extr mit s des conducteurs en trois longueurs diff rentes de fa on que les trois embranchements ne soient pas situ s au m me endroit 3 Peler l isolement des conducteurs en 20m m approximativement de l extr mit 4 Effectuer la connexion lectrique au moyen d une bague et de pinces sp ciales pour embranchements ou bien par entrelacement des tresses et soudure post rieure 5 Nettoyer les superficies isoler 6 Nettoyer les superficies isoler avec de l essence et apr s les avoir s ch es enrubanner chaque embranchement de la fa on suivante Une couche de ruban adh sif P V C doit couvrir embranchement nu et 1 cm Approximativement de chaque c t par dessus l isolant et trois couches de ruban autosoudable P V C sur toute la longueur possible pour chacun des 3 embranchements Fig 1 7 Refaire l op ration d enrubanner avec les trois c bles ensembles en tachant de niveler l
34. that once the water has lowered below the previously set minimum level the Group can stop thus obviating substantial damages 8 STARTING PROCEDURE TAKE NOTE If the electric pump fails to start no run up do not repeatedly attempt to start as this could damage the unit Identify the malfunction and repair an indirect starting system is used the starting transient must be brief and must never exceed a few seconds The motor shall never be started prior to a control device and protection against overloading and phase failure having been installed The correct voltage of the three phases shall be verified at all times Switch off the mains and change the sence of rotation by changing two out ocf three phases TAKE NOTE Where news wells are involved start with the discharge valve being closed with a minimum water left seen from the well day frame Verify the motor rotating direction The pump can supply flow even thought it is rotating in an opposite direction but in this case both the flow and pressure are much lower Keep pumping the min flow of water till it is completely clean Once a clean water has been obtained the valve shall be opened bit more till the water and sand start flowing again this case keep the flow till clean water in obtained again This operation is of paramount importance for the duration of the Group and it avoids releases of sand prone to damage the Group as it must operate with clean wate
35. thing is OK before connection restarting 5 The impeller is blocked with 5 Remove the foreign the pump body by something materials Repair the motor or inside The motor is burned out replace it 1 Motor turns the wrong way Change phase cables position or adjust main supply 2 The inlet of the pump is blocked and wat tfl 2 Remove the blocking 2 Water can not be pumped P 90ked and water can not up cbewatel Tew tos 3 Increase sumergence and small 3 Air comes through inlet pipe Electric current is too MEME pump locaton 4 The shaft coupling between song or too weak the pump and motor works 4 Replace the shaft coupling badly and gets loose 5 The impeller of the pump 5 Maintain the pump and works badly replace the impeller 6 The check valve is jammed 6 Replace the check valve 1 The location of pump does 1 Adjust the location of pump not reach proper in the well to an adequate depth 2 The moving water level is 2 Limit delivery water flow or 3 Discharge variations lower than the inlet of the adjust the depth of the pump in pump the well 3 The delivery water flow is too 3 Replace it with an adapted large pump size 1 Automatic water level controlling poles contact have 4 Manual operation is bad connection or are broken but automatic operation is the earth wire is wrong out of control connected or contacted badly poles are damaged automatic
36. to sin necesidad de avisar previamente a sus clientes El incumplimiento de las sugerencias y recomendaciones de este manual as como la incorrecta utilizaci n o la manipulaci n no autorizada del producto invalida totalmente la responsabilidad de Bombas Ideal S A por los posibles da os causados ya sean personales o materiales Ante cualquier duda respecto del producto su utilizaci n mantenimiento o reparaci n deber n contactar con Bombas Ideal S A Polig Ind Mediterr neo C Cid n 8 e mail central bombas ideal com http www bombas ideal com Tfno 34 961 402 143 Fax 34 961 402 131 46560 Massalfassar Valencia Spain El manual se suministra junto con la bomba y debe estar pr ximo al lugar de la instalaci n debidamente protegido para que pueda ser consultado por los usuarios en caso de necesidad Bombas Ideal S A 2 2 DESCRIPCI N Y USO Las electrobombas sumergidas son bombas que poseen uno o varios rodetes radiales o semi axiales en serie acopladas directamente a motores sumergibles ATENCI N Condiciones requeridas en la instalaci n de un grupo sumergido estandar o Velocidades de circulaci n del agua por el exterior del motor no inferiores a 8 cm seg en el caso de motores de 4 ni de 16 cm seg para el resto de motores Temperatura m xima del agua bombeada 259 309 seg n tipo motor sumergido No trabajar nunca en seco No bombear fluidos que no sean agua dulce y cla
37. u un c ble en acier de s curit ancr la pompe 8 MISE EN MARCHE ATTENTION Un sens de rotation contraire peut provoquer des d g ts au moteur Il faut donc trouver le bon sens de rotation en effectuant l op ration suivante Tourner la pompe dans les deux sens contr ler le d bit Le d bit maximal montre le sens exact de rotation La diff rence peut tre remarqu e a vue d il Quand les pompes sont install es de grandes profondeurs le d bit d velopp par un mauvais sens de rotation peut tre nul D connectter l alimentation r seau et inverser le sens du courant en interchangeant deux des trois phases ATTENTION Si au d marrage lectropompe se met pas en marche viter les tentatives de d marrage r p t es car elles pourraient endommager le groupe Si est utilis un syst me de d marrage tension r duite ou progressive la p riode de d marrage doit tre br ve sans d passer 3 4 secondes En aucun cas on ne mettra le moteur en marche sans auparavant lavoir muni d une armoire de contr le et de protection contre les surcharges tout moment on v rifiera que les trois phases sont la tension correcte Dans le cas de nouveaux puits d marrer avec la vanne de refoulement ferm e en laissant seulement un minimum d eau si possible visible dans la margelle du puits V rifier le sens de rotation du moteur Maintenir le d bit minimum d eau pomp e jusqu ce qu il soit compl tement prop
38. voltage is coinciding with that started for both the motor and the operating panel TAKE NOTE The motor shall never be started if not duly filled with water as it would become damaged in matter of a few seconds only otherwise The motors are supplied filled with fluid The isolation of the motor must be checked before and after splicing the mains cables To check properly the filling of the motor as well as its isolation follow the instructions given in the motor specific manual 4 PUMP CASING AND MOTOR ASSEMBLY To avoid damages during the transport due to the extremely long package pump end and motor can be supplied separately Before the final installation of the group assemble pump and motor as per general instructions given below TAKE NOTE Check that pump shaft turns freely Check that contact surfaces of pump and motor flanges are clean to assure a perfect alignment Grease the motor shaft extension to make it slide easily Remove the strainer from the suction casing Put the washers and nuts and cross tight them progressively Insert the cables in the cable guards and fasten them to the pump bowl Put the strainer on the suction Submersible group is ready for installation Approach vertically pump flange to motor and match theirs slots to allow locate the motor cables Lower down the pump carefully matching the splines or key of the shafts until both flanges join together Bombas Ideal S A 10

Download Pdf Manuals

image

Related Search

Related Contents

CHAPTER 8 LAUNCH OPERATIONS  Philips Blender 600 W, 2 l  InfoCase Classmate Always-On Case  Kombi-Dampfgarer Combi-Steam SL  Maria Doralice Novaes Desembargadora Presidente Silvia Regina  HP LaserJet CM1015 User's Manual  Outil d`autodiagnostic économique et financier  Manager  ダウンロード  User Manual - Accurate Laser Systems  

Copyright © All rights reserved.
Failed to retrieve file