Home

Vista-Vision ISO R3.5

image

Contents

1. ji fi Mi A a Te a i S a e a S ee ee E Hembeane cxstante lt A a 58 Rev tement Cladding p Rev tement Cladding Solin Flashing Clous Nails INT RIEUR Silicone Meneau du mur de c t sera plac ventuellement Mullion of gable end wall will be placed eventually aluminum flashing on the vertical carpentry before placing the solarium against the house wall Place 2 long pieces per side Use small nails to attach the flashing to the 4 P carpentry Make sure that the nails and the gap between _ p the two pieces of flashing will be hidden by the mullions of SS the gable end walls Diagrams A B and C seen from top shows ways of doing it depending on your installation For isolation purposes the exterior flashing must not touch the mullion B C Le rev tement ext rieur de la maison est en d clin et Le rev tement ext rieur de la maison est en brique l int rieur du solarium est en gypse Exterior finishing made of cladding and interior of Exterior finishing of the house is made of brick gypsum Al Murde la maison HOUSE Mell i I 7 Mut de la maison House i ell MQ DO ODO OOOO JOO OOOO JOJO Mena 2 530 _ 7 Rev tement Cladding Gypse LIN OOO E LA DC RAI ERER SSII SE Solin Flashing Solin Flashing Soman Clous Nails MERE Clous Nails N SHE S Silicone e ses Meneau du mur de c t sera plac ventuelleme
2. Place a finishing molding outside above the Posez la moulure de finition l ext rieur au straight traverses located on the gable ends dessus des traverses droites situ es sur les c t s du solarium dessins 4 et 5 diagram 4 and 5 3 4 T3 pes 2 DD Moulure o E de finition D Finishing Q molding oh D 1 Moulure de finition D Finishing molding Moulure de finition a _ Finishing molding z O EL 8 v 1 tee V a Cadre de fen tre amp O ndow Trame a Window frame S 3 2 2 i G Di LL 5 Int rieur ion tai Interieur nterior O Interior 43 ANNEXE 1 GUIDE D ASSEMBLAGE DE LA PORTE PATIO 4 SAISONS OUTILS REQUIS Tournevis t te carr e Tournevis toile Couteau type X Acto Pistolet scellant Perceuse visseuse lect ou piles M che Masse en caoutchouc ASSEMBLAGE DU CADRE Le cadre consiste en 4 longues extrusions d aluminium le haut du cadre le seuil et les 2 c t s l aide des vis fournies assemblez chaque coin de cadre dessin 1 Remarquez qu un morceau de n opr ne autocollant est pos chacune des extr mit s int rieures des 2 c t s Le n opr ne sert de scellant Vous devez installer les moulures d coratives ext rieures avant d installer le cadre la structure du solarium Il y a une moulure chaque c t et une dans le haut dessin 2 Utilisez une masse en caoutchouc Bouchez les ouver
3. ll ne vous reste plus qu y ins rer le store Fen tres Pour les fen tres le clip avec un trou doit tre align e et viss e la m me hauteur que la partie sup rieure du cadre de la fen tre photo 3 Les stores sous la fen tre sont install s de la m me fa on que les stores de la fa ade et des cot s photo 4 Portes Pour les stores de portes le dessus du clip avec un trou doit tre align avec la partie sup rieure du cadre de la porte photo 5 PLEATED SHADES INSTALLATION Don t cut open the package with an x Acto knife because you could damage the shade Installation order 1 Fa ade gable end windows and doors 2 Angle 3 Roof Caution Snap the rail caps only when the installation is completed since they are difficult to remove The screws supplied are self drilling so you do not have to drill first 1 Facade and gable ends The fa ade shades are held in place by two clips on each side at the top of the shades Align the clip with the angle molding and screw into the structure with the screws supplied photo 1 Leave a 1 4 inch space between the glass and the clip so that you can clip in the shades railing easily photo 2 Snap the shades railing Windows For windows the clip with one hole must be aligned with the top of the window frame photo 3 The shades under the window are installed the same way as the front and gable end shades photo 4 D
4. Verre ajust inches high on the VISION model If the height of the I Adjusted glass knee wall differs the glass panels over the sliding door must be adjusted for this difference This is why the knee wall must be built exactly the height specified at the time of purchase On the VISION model when the sliding door is located at the fa ade the knee wall f must be 14 1 4 inches high IDENTIFICATION DES VERRES DE COTE Ces schemas indiquent l emplacement des verres aux c t s Les fen tres aux c t s peuvent tre install es dans toutes les rang es sauf la premi re pr s de la fa ade des solariums qui ont 8 pieds de profondeur PXR VCE 31 AN Pr PRE CON Behe BCE 1 1652 PAR VSC 18 208 216 JL PERT WE 10 31 PRA VCIO 2L 955 x 648 x 530 955 x 526 x 408 PRR WC TZAL j PNA VCT AL Bob x T5 e618 Bee x 503 x 197 FXR NC 2 B66 x 1654 PAR VC Ta SL PRR WO14 4L PXR VC 14 31 BB x 600 x 700 1806 eGo a 597 BOR 591 x 463 PUR NC E 1L BSBA SRG PXE NC10 1L 955 x 404 x 286 PRR VOT 2 11 866 x 393 9 286 Bob x 1652 FAR VC 14 1l BOE x 385 x 286 VISION FXR NCS 1R ELA PYR VCR 3R BOS r 368 x 468 BOR x 472 x 571 10 PAR VC10 38 955 x 530 x 648 955 0 1652 PRAY WO12 1R 8686395 PAR WC 12 28 Bosy 397 x SO PXR WC14 28 PXR VC14 38 PYR VC14 5R BOS x 390 x 489 BOG x 494 x 597 806 x 567 x 606 UE x 700 g0 FAR VC 1 F
5. la moulure pression de langle puis de la fa ade dessin 3 40 INSTALLATION OF THE PRESSURE MOLDINGS ON GABLE END The pressure moldings are the length of the mullions The top is cut diagonally to follow the slope of the roof They snap on the under pressure moldings Start by hooking one side then exert pressure to clip the other side diagram 1 a and 1 b Insert the top in the enclavure of the corner mullion forming the roof Go from bottom top diagram 2 a Use a rubber mallet diagram 2 b FACADE The goal is aesthetic The goal is to make the most beautiful joint between the facade and angle Hock at the same time one side of the pressure molding on the angle and on the facade holding one against the other Clip the other side of the pressure molding of the angle then the facade diagram 3 AU TOIT Lorsqu il y a une seule longueur de verre au toit Clipsez la moulure pression sur la sous moulure pres du faite sur une longueur d environ 2 pouces l autre bout poussez la par petit coup de maillet jusqu ce qu il soit bien align avec la moulure pression de l angle dessin 1 Lorsqu il y a 2 longueurs de verre au toit Placez la moulure pression sur la premi re longueur en prenant soin de bien align avec la moulure pression de l angle La moulure pression du 2e verre chevauche la moulure du 1 verre dessin 2a Sur le dessin 2 b nous voyons la cavit q
6. partir de ces trous percez le cadre de porte en utilisant une perceuse avec une m che de 1 8 Appuyez le meneau de toit sur le faite centr au dessus des trous Fixez le avec 2 vis 8 auto percantes t te bomb e par le dessous du cadre Il n y a pas d insert cet endroit dessin 4 8 self doling 55 1 robertson dive pan head z h Meneay de toi Roof Mullion Faite de porte Door ridge Cadre de porte Door frame Em ill 2 VISION Dal j re l 4 VISTA FA ADE MULLION ASSEMBLY FA ADE DOOR OPTION INSTRUCTIONS to assemble the door frame to the roof angle mullion VISION model or to the roof mullion VISTA model Slide the fa ade door ridge in the slot on top of the door frame VISION model An insert has been installed on the door ridge by the manufacturer diagrams 1 Slide the mullion on the insert and slide the insulation barrier away to see the mullion at the insert location Holes are made in the mullion Screw the mullion onto the with 12 round head screw diagrams 2 Slide the insulation barrier back in place 12 type 1 SS 1 2 robertson drive pan head gt 0425 0157 12 0216 Ve 12 Screw Sze 3 Drive VISTA model There are 2 holes on the ridge diagram 3 From these holes drill holes in the door frame using a drill with a 1 8 drill bit Place the roof mullion on the door ridge centered over t
7. DU VERRE RECTANGULAIRE SUR LES COTES Placez deux blocs d appui autocollant en PVC sur le seuil a environ 3 pouces des meneaux Utilisez les blocs les plus epais Mettez 2 lisi res de silicone dans l enclavure inf rieure de la traverse droite et placez 2 blocs d appui mince dans le silicone a environ 3 pouces des extr mit s Ins rez cette traverse sur le verre rectangulaire Il n y a pas de rejets d eau sur les c t s Placez le verre rectangulaire sur les blocs d appui au seuil et appuyez le sur les meneaux Avec un x Acto faite une entaille sur le caoutchouc souple du bris thermique en haut et en bas de la traverse Enlevez le verre et la traverse pour coupez le caoutchouc souple dessin 2b Replacez le verre et la traverse au bon endroit Il faut visser les traverses sur les meneaux Vous devez percer avant de visser Poin onnez pour guider la m che puis percer Mettez de la vaseline sur les vis pour viter qu elles ne cassent lors du vissage Utilisez les vis 10 uc Une seule vis par bout dessin 2c Posez le verre de la rang e adjacente et maintenez les verres en place temporairement avec un cap de retenu R p tez pour chacune des rang es de verre en vous assurant que les traverses sont bien align es Vissez aussi la m me hauteur les traverses dans les rang es qui auront les fen tres INSTALLATION OF RECTANGULAR GLASS ON GABLE END Place two self adhesive sitting blocks on the sill at about
8. glass panel identification c cssscscsssssssscessssssssersssssesesersesseserereares 07 Note for installation of solarium with knee Wall cscessssssesessssseseresssssseseesssserersetetes 07 Gable end glass panel identification csscesssssssssssesssscssssssssseseseesesssessrsessvereeserersares 08 PREPARATION 1 INS MION Of PVC gasket SiiS ass at ann ntt 10 Ze ON NE AD Gi ne dei ee a it 10 3 Door frame assembly appendix 1 10 MULLION ASSEMBLY ES anne nn sn 11 Mullion assembly to sill and ridge SR sn nn MR ne tetiniess tak 12 Fa ade mullion assembly fa ade door Option cccccsscesecesessssersssssseeressssseeersesaeeren 13 Fastening NE MAVERSES ne nue lin 15 able end Wall ASSOMDIY ss SR re ie desk ania sieie acs 16 PLACING THE ALUMINUM STRUCTURE AGAINST THE HOUSE WALL 17 Installation of gable end walls Sas sh womaniedceeaninad 18 Door frame installation on gable end 19 FASTENING THE SOLARIUM STRUCTURE TO THE HOUSE 1 Leveling procedure s ssesssesesrsrssesrsreresrsrsrerrsrsrsrtnrsrnrennnrnrnnnnnnrnrnnnnnnnnne 20 2 Permanent fastening of the solarium to the house cesssssesesesetereeeeees 23 GLASS INSTALLATION General alle guste e geeeeeenenee ese E MAN ne mart ear cree 24 e PVC self adhesive sitting block e White thermal breaks and spacer sticks e Description of isolated glass e Silicone usage Preparation of the COMMIS Re eme 25 Facade glass inst
9. product or parts not built by ZYTCO SOLARIUMS LTD or not built in accordance with ZYTCO SOLARIUMS LTD s recommendations 7 Installation onto a non compliant surface with ZYTCO SOLARIUMS LTD s specification OUTILS REQUIS Tournevis t te carr e Couteau type X Acto Poin on Equerre Pistolet scellant Ruban mesurer m trique et imp rial Escabeau Perceuse visseuse lectrique ou piles M che et m che fraisage Niveau Masse en caoutchouc Cl Allan 1 4 Ventouses pour manipuler le verre pas obligatoire LISTE DES PIECES DU SOLARIUM Notez que les illustrations sont sch matiques et montrent la coupe des pi ces tr s longues 1 Roulettes de ruban autocollant 5 types 2 Moulure a pression 3 Sous moulure pression en aluminium et sous moulure pression en PVC d j assembl e Voir note 4 Bande d tanch it en PVC souple 5 Meneau 60 mm fa ade et c t Voir b Un bris thermique est ins r sur tous les meneaux 6 Meneau 95 mm toit ils sont doubles s il s agit de solariums ayant 14 de profondeur 7 Meneau de coin 8 Bris thermique blanc 9 Coin de recouvrement 10 Insert de centre 2 types sur le VISION 11 Insert de coin 12 Fa te et haut de faite faite doubl si 14 de profondeur 13 Seuil aussi utilis comme faite de porte sur les c t s 14 Faite de porte de fa ade 15 PVC d assemblage pour porte sur le c t 16 Rejet d ea
10. show illustrations and procedure for different types of installations Refer d installations Vous pouvez vous y r f rer pour votre solarium to them for your solarium ATTENTION Les solins ext rieurs doivent tre s par s des solins int rieurs pour fins CAUTION The exterior flashing must be separate of the interior flashing for isolation d isolation purposes 1 1 POSE DES SOLINS SUR LA MENUISERIE VERTICALE INSTALLATION OF FLASHING ON VERTICAL Tel qu indique sur le plan de menuiserie la menuiserie est NS CARPENTRY fix e directement sur le mur de la maison Le d clin est lt The carpentry is placed directly against the house donc retire Il est plus facile de placer le solin sur la 1 Q lt S Therefore the cladding is taken out It is easier to place the menuiserie verticale au mur avant de placer le solarium Placez deux longues pi ces par c t Ces pi ces seront retenues par des petits clous Assurez vous que les clous et l espace entre les deux pi ces soient ventuellement cach s par le meneau de fond des murs des cot s Les dessins A B et C vue de haut sugg rent la fa on de faire selon votre installation Pour fin d isolation le solin ext rieur ne doit pas toucher au meneau A Le rev tement ext rieur de la maison est en d clin Exterior finishing of the house is made of cladding w dm Y YO a ER CS VIO Ces ea masom ROLES Ey Wd FE 1 1 bf J fi j Li iJ i lf
11. 3 inches from the mullions Use the thick sitting blocks Put 2 strips of silicone in the lower slot of the straight traverse and insert 2 thin sitting blocks into the silicone at about 3 inches from the edges Put the top of the rectangular glass There are no drip caps on the gable ends Place the rectangular glass on the blocks and against the mullion With an x Acto knife cut a line onto the rubbery part of the insulation barrier above and bellow the traverse Remove the glass and the traverse and cut off the rubber diagram 2b Put back the glass and traverse You must screw the traverse in the mullion Drill a hole in the traverses before screwing them Punch first to guide the drill bit then drill Put Vaseline on the screws to avoid breaking them while screwing Use screws 10 uc screws Put just one screw at each end diagram 2c Place the glass in the next row Use a holding cap to temporarily hold the glass in place Repeat for each glass row making sure that the traverses are perfectly aligned Also screw at the same height the traverses in the rows that will have windows Sans porte Avec porte et muret Without door With door and knee wall PREPARATION DES FENETRES Retirer les moustiquaires et identifiez les puisqu ils ne sont pas forcement interchangeables Avant de poser les fen tres il faut fraiser et percer 3 trous sur les 2 c t s verticaux du cadre Faites ces trous 12 pouce du rebord dessins 1
12. AT THE 3 STEPS FOR ALL SECTIONS OF THE FACADE ANGLES AND GABLE ENDS Place a spacer stick on the mullions located along a doorframe or along the housewall SCELLEMENT LE LONG DES MENEAUX DU TOIT REVETEZ UN HARNAIS DE SECURITE ADEQUATEMENT SECURISE Montez sur le toit La structure est concue pour r sister Appuyer votre poids seulement a proximit des meneaux N appuyez pas votre poids pr s des traverses Assurez vous que vos semelles sont propres et exemptes de debris qui pourraient gratigner le solarium TAPE 1 BOUDIN MOUSSE Continuez d ins rez le boudin mousse sur les meneaux jusqu au bout du verre au faite Tel que vous avez fait coupes la partie bomb e excedant le verre de plus de 1 8 de pouce SOLARIUMS PROFONDS AYANT 2 LONGUEURS DE VERRE AU TOIT Le verre situ pr s de la maison est plus pais que les autres Le boudin de d bordera pas autant Vous n aurez pas besoin de la couper dessin TAPE 2 RUBAN DE SCELLEMENT ENTRE 2 SECTIONS DE VERRE Utilisez le ruban 4 Pour sceller entre 2 sections de verre voluez de bas en haut couvrant une partie du ruban d j plac Commencez environ 1 pouce sous la traverse d angle et en arr tez au bout du verre au faite dessin 2 RUBAN DE SCELLEMENT SUR LES MENEAUX DE COIN Utilisez le ruban 3 C est le ruban le plus large Il est repr sent par la ligne rouge sur les dessins Le dessin 2 repr sente le meneau de coin vis vis le 1 verre d
13. GUIDE D INSTALLATION INSTALLATION GUIDE VISTA VISION ISOPLUS R 3 5 FRANCAIS et ANGLAIS FRENCH and ENGLISH TABLE DES MATIERES NOTES LLCS TALLATE UR ene ernest morte eae ee enn een twee nee Een eee 03 OUTILS REQUIS nn sn ennemie nn 04 LISTE DES PIECES DU SOLARIUM 58 a seanisdenenunts 04 SCHEMA DES COMPOSANTES DU SOLARIUM si is 05 IDENTIFICATION DES VERRES DU SOLARIUM Identification des verres en fa ade du solarium 07 Note pour l installation d un solarium avec muret 07 Identification des verres de c t du solarium 08 PR PARATION 1 Pose des bandes d tanch it en PVC 10 2x POSE GU UbBANAUOCONANR ES etai mhen donne 10 3 Assemblage du cadre de porte annexe 1 10 ASSEMBLAGE DES MENEAUX EAN N NEG 11 Assemblage des meneaux au seuil et au fa tes 12 Assemblage des meneaux de fa ade option porte en fa ade cccssssecessssesesessssssseeersesssesereeees 13 ROSES TAN TOR Rd Res nee 15 Assemblage des murs de c t cccssssscessssssseressssseees nt tnt nn tn dpi se 16 MISE EN PLACE DE LA STRUCTURE DU SOLARIUM A LA MAISON cesses 17 installation des UES Cesc OLS ta na 18 Pose du cadre de la porte sur le c t eee De ne re 19 ANCRAGE DE LA STRUCTURE DU SOLARIUM A LA MAISON 1 Proc dure pour la mise niveau ccecsesescscsssssssssssesesesessscscscstssssesesesesernererenes 20 2 AnGrade permanent du Solanum sssrssmmnnnanmenranmennnnnnn
14. ITE SOLARIUMS ZYTCO LT E ne saurait en aucun cas tre tenue responsable des dommages directs indirects ou particuliers de toute sorte suite 1 une installation non conforme au manuel d installation ou encore une installation ne suivant pas une m thode qui aurait t pr alablement approuv e par crit par SOLARIUMS ZYTCO LT E 2 une installation abusive ou n gligente 3 une installation des produits ou des pi ces qui auraient t alt r s ou la r installation du produit ou des pi ces 4 une installation dans des conditions anormales 5 une installation dont le produit ou les pi ces auraient ete mal appliques 6 une installation combin e avec des pieces ne provenant pas et n tant pas approuv s par SOLARIUMS ZYTCO LT E 7 une installation sur une surface non conforme aux sp cifications de SOLARIUMS ZYTCO LT E NOTES TO INSTALLER Before you begin make sure the carpentry is in accordance with the plan of your solarium Verify the dimension the beveling and the leveling Refer to the Leveling Procedure Section of this guide Consult APPENDIX 2 for guidance on putting flashing and membrane on the carpentry Note that it is easier to put flashing on the vertical carpentry on the house wall before installing the solarium For solariums without a kneewall it is easier to put membrane and flashing on the sides of the balcony before installing the solarium NOTICE if you are using pressure treated wood note that al
15. KA VC 1 PAR VC 1 808 x 1652 d 808 x 1652 BE x 162 GABLE END GLASS PANELS IDENTIFICATION These diagrams show the location of glass panels in the gable ends Gable end windows can be installed in any row except the first row near the fa ade of solariums that have 8 of depth PUR VCS 3L 808 x 233 x 334 PVR VCS 2L 808 x 129 x 229 PYR VCE TL PYR WC1D 3L SX pypeyc10 2 955 169x287 PVR VCIO IL m x 165 es PYR VE 3 a PYR VE 4 955 x 1954 PH 955 x 1954 PVRSVSF 3 955 1633 PURNC1 2 41 R66 x 579x486 PVR VCI HL 866x269 375 pyR VC 12 21 Bior 158x204 PYR VC12 T1L B66 x 47 x 154 PVR WO 2 Paras PVR VC 2 866 x 1954 pi 1954 PUR UCT4 5L PYR VSF 2 866x633 Bu 461 561 PRYE T 4AL BORIS 457 PYR VCI4 IL Bx deeds PYA VCI4 2L r Sax Dix 20 pyrey t4 1l Py VC pepas PYR VC 1 PYR VC 1 BNE x 1954 BJE x 1954 808 x 1954 PYR VSE 1 808 f FAR PVR VCB 3R mecs 0061233332 BOR x 129 x 229 PVR WC8 1R 25 8 1602 x 1961 PVR VC 10 38 PRVE 10 4 045 K 4 1 1409 PYR WC10 18 955 x 169 x 287 10 pepag 3 1896 x 1961 FYRSYCT3 4R PYR VCTZ 3R B56 So deb paycn BOX 489375 PYATVO 121A BGG x 158 x 264 BG we AT x 154 Ser RS LE 17 PeP4s 1718x 1961 PYRFVCT4 SR PYR VCI448 808 461 561 PYRYVCI4 3R BOR x 3580457 PYRWC14 2R B08 254 x 353 PYR VC14 1R 608x151x250 PrP 1602 x 1961 PREPARATION 1 P
16. Note En cas de pluie pendant l assemblage vous pouvez d gager l eau qui aurait pu s infiltrer dans la structure en per ant un petit trou dans le bas des meneaux INSTALLATION DES MURS DE COTE Les meneaux des murs de c t sont viss s par le dessus des meneaux de coin avec une vis 8 auto percante t te bomb e A cause de l paisseur du faite le meneau situ pres du mur ne peut pas tre viss par le dessus Vous devez percer le meneau et y ins rer une longue vis en diagonale viss dans la menuiserie photo B Notez que sur cette photo nous voulons montrer ou visser Nous avons donc volontairement retir le faite et le meneau de coin AMA AMAA AMAAAAMA w DW S S 2 Drive 8 18 Thread INSTALLATION OF GABLE END WALLS 60 mm mullions are held by one self drilling 8 pan head screw that you install from the top Because of the thickness of the ridge the mullion located near the wall cannot be held from the top Therefore you must drill through the mullion and insert a long screw towards and into the wood photo B On this picture we wanted to show where the screw should be For this reason the ridge and the corner mullion where removed POSE DU CADRE DE LA PORTE SUR LE COTE 1 ll est possible que l emplacement de la porte et des sections different de l illustration Fiez vous au plan de votre solarium pour identifier les composantes portes et fen tres et leurs emplacements Vous devez avoir assembl
17. RE MOLDINGS ON THE ROOF MULLIONS Place the under pressure molding on the mullion covering the sealing tape The under pressure moldings are shorter than the mullions Press the tip in the slot of the top ridge diagram 3 ATTENTION It is important that the molding is well centered on the mullion The screw must be at the centre of the black thermal break which is attached to the mullion Otherwise you may break the glass Corner mullion 1st glass diagram 3 Corner mullion 2nd glass diagram 3 b Long wood screws are used Center mullion 1st glass diagram 3 c Center mullion 2nd glass diagram 3d Long wood screws are used POSE DES MOULURES A PRESSION SUR LES COTES Les moulures a pression sont de la longueur des meneaux Le haut est coupe en diagonale afin de suivre la pente du toit Les moulures a pression s inserent sur les sous moulures Commencer par accrocher un c t puis exercez une pression pour clipper l autre cote dessin 1a et 1b Ins rez le haut dans l enclavure du meneau de coin formant le toit Evoluez de bas en haut dessin 2a Utilisez un maillet en caoutchouc au besoin dessin 2 b EN FACADE L objectif est esthetisme Le but est de faire le plus beau joint entre la fa ade et l angle Accrochez en m me temps un cot de la moulure pression de l angle et un c t de la moulure de la fa ade en les tenant lun contre l autre Clipsez l autre c t de
18. Wood screw flat for sill ridge sill windowsand under pressure moldings Short pieces of under pressure moldings will be used to hold the glass in place during installation On the solarium delivery sheet they are called Temporary holding caps SCHEMA DES COMPOSANTES DU SOLARIUM Vous trouverez ci dessous l emplacement des pi ces de la structure du solarium On retrouve les traverses au toit des solariums Vision de 12 pieds et plus de profondeur et Vista de 10 pieds et plus de profondeur Elles servent joindre 2 verres VISION Faite Ridge Meneau 95 mm 95 mm mullion Traverse droite Straight traverse Meneau de coin Comer mullon Traverse ar te d angle Traverse angle edge Traverse ar te de facade Traverse fa ade edge Meneau 60 mm 60 mm mullion Fen tre dd Faite de porte c t Ridge of gable end door Porte coulissante i Sliding door Traverse droit Se an 7 Seuil 4 ver Sill d aN Straight traverse Meneau60mm_ Meneau 60 mm 60 mm mullion 60 mm mullion Meneau de coin Comer mullion Identification des rangees Rows identification COMPONENTS DIAGRAM The following diagram identifies the different parts of the solarium structure Traverses are used on the roof of Vision solariums measuring 12 feet or more in depth or Vista measuring 10 feet or more in depth Their purpose is to join 2 sheets of glass VISTA Faite Ridge Meneau 95
19. allation sise nina nuneiarns 26 Angle roof glass installation VISION model csccsssssssssssssssessesssseessecssaseeerseserateees 27 Roof glass ISTO a D san aus nu entente mon 28 Gable end rectangular glass installation ccccssssesssssssescscssscssersesssceecesssaceesesevasesereees 29 Preparation ot te WiNCOWS Rs ao 30 Window installation on fa ade ss RD ne ali 31 Window installation in gable nds sum nn nt niet aciats 32 Gable end irregular glass installation csecccsssssssssssssssssscsssessescesssceeeesassceersevarasereeses 33 SEALING AT THE MULLIONS nn atamenatmms 34 SEALING AT THE RIDGE nce a eee es 38 SILICONE APPLICATION sdessachashapedasicansatactopenianveddelaenemaniadaelucs 42 Placing the tiniShing MOINS t unana eut 43 APPENDIX 1 FOUR SEASONS PATIO DOOR ASSEMBLY GUIDE cece 44 2 COVERING THE CARPENTRY WITH FLASHING c cc cccecesessetseeersssseeeereeees 52 3 PLEATED SHADE INSTALLATION tin sn 55 NOTES L INSTALLATEUR Avant de commencer assurez vous que la menuiserie ait t faite selon le plan de votre solarium V rifiez la dimension l querrage et la mise a niveau Veuillez vous r f rer a la section procedure pour lamise a niveau de ce guide Consultez l ANNEXE 2 pour vous guider sur la pose de solin et de membrane sur la menuiserie Notez qu il est plus facile de poser de solin sur la menuiserie verticale au mur de la maison avant d installer le solarium S il
20. ationary panel in place e You will apply ADFAST silicone on the sill at the location of the panel The silicone and the screws will hold the stationary panel in place Take note that silicone dries in less than two hours It is important to install and level the stationary panel and sliding panel rapidly Mise en place du panneau fixe Ins rez d abord le haut du panneau dans la fente du milieu pour ensuite appuyer la base sur le silicone au seuil puis glissez le panneau sa place sch ma 1 Ins rez par pression la moulure de finition sur l interlock L interlock pour le panneau fixe n a pas de trou Les interlocks servent rendre tanche l espace entre le panneau fixe et le panneau coulissant Ins rez l interlock avec moulure sur le cote du panneau sch ma 2 1 Porte ad Left door Panneau fixe Stationnary pannel 2 Porte gauche Left door 47 1 Porte droite Right door Placing the stationary pane Panneau fixe Stationnary pannel 2 Porte droite Right door First insert the top of the panel in the middle slot and then rest the base on the silicone on the door sill Slide the stationary panel in place diagram 1 Snap the interlock decorative molding on the interlock MO MORE or We The interlock for the fixed panel has no holes Once installed the interlock renders the space between the stationary panel and sliding panel airtight Ins
21. averse Le cadre de fen tre sera fix aux meneaux de chaque c t par 3 vis Vous devrez percer avant de visser Utilisez une m che de 1 8 Mettez de la vaseline sur les vis pour viter qu elles cassent lors du vissage Attention commencez par placer une seule vis puis v rifiez le niveau et l equerrage Assurez vous que le cadre de fen tre soit d equerre avant de trouer et poser les 5 autres vis 3 Les instructions pour la pose du verre sous la fen tre sont a la page 33 31 L VATION vue de cot Side view Styrofoam Traverse avec angle d angle Traverse with angle Cadre de fen tre Window frame Interior Int rieur a L 1 Moustiquaire Screen Cadre de fen tre Window frame 1 Traverse droite Straight traverse Verre sous fen tre Glass under window WINDOW INSTALLATION ON THE FACADE This step is done with the help of another person 1 Place the water drip and styrofoam in the traverse If it dos not stay in place place a little rubber shim between the foam and the back of the traverse 2 Place the window including the water drip and styrofoam under the straight traverse The window will be held in place with 3 screws into each side of the mullion You must drill holes before screwing Use a 1 8 drill bit Put Vaseline on the screws to avoid breaking them while screwing Warning place one screw on one side then make sure the window fram
22. clapets avec du scellant amovible tel que le ZIP Seal N Peel de MULCO Nettoyez les trous d vacuation au printemps Porte gauche Left door Porte gauche Left door a 2 N 14 e 3 ET FINAL POSITIONING OF STATIONARY PANEL AND SLIDING PANEL e Close the sliding door e Make sure the panels are airtight squared and leveled If needed adjust the height of the wheels under the sliding panel e Screw the stationary panel in the sides of the door casing with self taping screws or drill a 9 64 hole and insert regular screws e To prevent the panel from sliding place a screw on the sill in front of the interlock Cover the screw with the airtight brush diagram3 Stick it there with ADFAST silicone Porte droite bi door Stationnary pannel Panneau fixe Panneau fixe Stationnary pannel 3 Vis et balais d tanch it Screw and airtight brush Porte droite Right door DRAINAGE When rain and high winds water can accumulate on the doorsill between the panels The water will drain towards the exterior by two flap gates In winter you can seal the flap gates with removable sealant such as ZIP Seal N Peel de MULCO Clean up the holes after winter 49 INSTALLATION DE LA PORTE MOUSTIQUAIRE Afin de l installer l endroit rappelez vous que l espace coup pour emplacement de la poign e va l int rieur La porte moustiquaire est pourvue de roulettes dans le haut et dans
23. d 13 00 to 16 30 Rendez vous sur le site www zytco com quides html pour consulter les derni res mises jour des guides d installation et pour voir des photographies et videoclips pouvant vous aider pendant l installation de votre solarium Visit www zytco com quides html to see the latest updates of our installation guides and see pictures and video clips that could help you during the installation of your solarium Con u et fabriqu par Designed and built by 60
24. de coin B et D sont viss s aux __B amp D_ A amp C_ _ inserts avec les vis 12 a t te ronde 11 MULLION ASSEMBLY Place the mullions on the ground for assembly It is easier to work on a flat surface Some inserts are installed by the manufacturer before shipping 1 VISTA Fa ade and roof 2 VISION Fa ade and angle angle and roof Do not screw in the insulation barriers Slide them away to see the mullion at the insert location However the insulation barriers on the angle mullions on the Vision model are stationary Holes have been made to give access D Coin Corner 60 mm tu on VE gt E gt r 4 Coin Corner Y 60 mm i Center mullions A and C are held to the inserts with the Allen screws 1 4 3 4 Place one screw before putting the insert in the mullion It will be an adjustment screw that you will be able to adjust by unscrewing in order to join the mullions without distortion Vis d ajustement Adjustment screw Corner mullions B and D are held to the inserts with 12 round head screw ASSEMBLAGE DES MENEAUX AU SEUIL ET AU FAITE Le seuil est fixe a chaque meneau par des vis 8 auto percantes a t te bomb e que vous devez ins rer par le dessous Le faite est fixe a chaque meneau par des vis 8 auto percantes a t te bomb e que vous devez ins rer par l arri re Pour assembler choisissez une des 2 m thodes de travail suivantes selon la dimension de votre solar
25. decorative moldings The first one is installed on the exterior on the sliding door side diagram 3 the other is in the interior under the stopper diagram 4 4 Comment enlever la porte moustiquaire La porte moustiquaire est pourvue de roulettes dans le haut et dans le bas Ces roulettes reposent sous le rail du haut et sur le rail du bas Des ouvertures sur les c t s de la porte donnent acc s a des vis qui permettent d ajuster la hauteur et par le fait m me la tension exerc e sur les roulettes Cependant un plastic protecteur recouvre un des 2 c t s Pour retirer la porte moustiquaire du cadre vous devez 1 Enlever le plastique protecteur Il n est pas viss Retirez le avec votre main Enlever la tension sur ces roulettes l aide d un tournevis t te carr e tournez les vis dans le sens contraire des aiguilles d une montre Tout au bas de la porte vous pouvez voir les roulettes reposant sur le rail A l aide d un tournevis plat lever une roulette puis soulevez la porte en l entrainant hors du cadre i ia TES _ Moustiquaire Screen Seuil de porte Door sill 51 How to take out the screen door The screen door has wheels at the top and at the bottom These wheels rest under the rail at the top and on the rail at the bottom Openings on both sides of the screen door give access to screws permitting to adjust the height and tension of the screen door A plastic pr
26. e on Note pour l installation d un solarium avec muret Un muret permet d lever le solarium La porte doit demeurer a la hauteur du sol Lorsque la porte est sur un cote la hauteur normale du muret est de 12 pouces sur le mod le VISION Si pour une raison quelconque la hauteur du muret est autre que 12 pouces la dimension des verres au dessus de la porte doit compenser cette difference de hauteur C est pourquoi il est important de respecter la hauteur du muret entendu au moment de la commande de i votre solarium Sur le VISION lorsque la porte est en gt N fa ade le muret doit obligatoirement tre de 14 1 4 pouces Muret de hauteur Knee wall GLASS PANELS IDENTIFICATION The spacing of the fa ade rows is not necessarily identical A standard solarium may contain two 2 different row spacing 828 mm 32 2 inches and or 886 mm 34 7 8 inches These measurements are taken from center to center of the fa ade mullion FA ADE AND ROOF GLASS PANEL IDENTIFICATION Row spacing shown for VISION and VISTA models below is only for illustration purposes Final spacing will depend on the solarium length fa ade VISTA PVR VE 1 B08 x 2048 MIDHE VA Wor 2 566 x 633 PVR VSF 1 808 x 633 Note for installation of solarium with knee wall knee wall will raise the solarium The sliding door must stay at floor level When the door is located on the side of the solarium the knee wall is normally 12
27. e diagram 1a Depending upon the depth of the solarium the roof can be made of 2 sheets of glass per row ROOF WITH 2 SHEETS OF GLASS Both glasses are not the same thickness The glass that goes at the ridge is thicker Straight traverses are used to join the 2 glasses They are not screwed to the mullions On the mullions it is important to remove the rubbery part of the insulation barrier at the traverses location To determine the exact location e Place the glass on the mullions and angle traverse including sitting blocks diagram 1b e Stick 2 thin sitting blocks on top of the glass at about 3 inches from the corners Put the straight traverse in position under the upper part of the glass With an x Acto knife cut a line onto the rubbery part of the insulation barrier above and bellow the traverse e Remove the glass and the traverse and cut off or peel off the rubber diagram 2a e Put 2 strips of silicone under the lower part of the straight traverse Put the glass and the traverse back in place diagram 2b No need to put holding caps on the roof INSTALLATION OF THE 2ND GLASS From inside the solarium put the 2 glass on the ridge diagram 3 and on the straight traverse diagram 2c The drawing below shows a way to do it by lifting the glass between the mullions ROOF ROW WITH 1 SHEET OF GLASS From inside the solarium put the glass on the ridge diagram 3 and on the angle traverse diagram 1b POSE
28. e toit Il est identique aux meneaux de coin de l angle et de la fa ade Le dessin 3 repr sente le meneau de coin vis vis le 2e verre de toit Une baguette d espacement en aluminium dessin 3a doit tre plac e sur le recouvrement de coin vis vis ce verre afin de combler l espace Ne placez pas la sous moulure Vous les placerez apres avoir scell le faite 37 SEALING ALONG THE MULLIONS OF THE ROOF WEAR A SAFETY HARNESS ADEQUATELY ANCHORED You can stand on the solarium as the structure is made to resist Spread your weight only near the mullions Do not put your weight on the traverses Make sure the soles of your shoes are clean and free of small debris that could scratch the solarium STEP 1 BACKER ROD Continue to insert the backer rod on the mullions to the end of the glass to the ridge As you have done cut the rounded portion exceeding the glass over 1 8 of an inch DEEP SUNROOMS WITH 2 LENGTHS OF GLASS PER ROW the glass near the house is thicker than the other The backer rod of will not exceed as much You will not need the cut it drawing 1 STEP 2 SEALING TAPE BETWEEN 2 SECTIONS OF GLASS Use tape 4 To seal between 2 sections of glass go from bottom to top covering a portion of the tape already placed Start at about 1 inch under the angle traverse and stop at the end of the glass at the ridge diagram 2 SEALING TAPE ON CORNER MULLION Use tape 3 It is the thickest It is repr
29. e is squared and level before drilling and putting the other 5 screws in 3 Instructions on placing the glass under the window are on page 33 POSE DES FENETRES SUR LE COTE Cette tape s effectue mieux a deux personnes 1 Placez le rejet d eau et le styromousse dans la traverse S il ne reste pas en place coincez un petit shim en caoutchouc entre le styromousse et le rabat arriere de la traverse 2 Appuyez le dessus du cadre de fen tre incluant le rejet d eau et styromousse Sous la traverse Le cadre de fen tre sera fix aux meneaux de chaque c t par 3 vis Vous devrez percer avant de visser Utilisez une m che de 1 8 Mettez de la vaseline sur les vis pour viter qu elles cassent lors du vissage Attention commencez par placer une seule vis puis v rifiez le niveau et l querrage Assurez vous que le cadre de fen tre soit d equerre avant de trouer et poser les 5 autres vis ELEVATION vue de cot Side view Traverse droite Straight traverse Cadre de fen tre Window frame Int rieur Interior Cadre de fen tre Window frame A a vs Moustiquaire Screen Styrofoam Traverse droite Straight traverse Verre sous fen tre Glass under window 2 oa du Pis a oe h de Ame eur de tenete Vvindow pater ot 32 WINDOW INSTALLATION IN GABLE END This step is much easier with the help of another person 1 Place the
30. e one of the following methods depending on the size of your solarium and the space available Method 1 Upside down assembly One person holds the mullion while the other person screws it to the sill and the ridge Once all is assembled flip the structure upside up If the door is on the fa ade you can use a piece of wood a plank or a 2x4 to prevent the sill from wobbling while you flip the structure over Help from a third person could be required Method 2 Upward assembly Rest the sill and the ridge on bench stools One person holds the mullion while the other person screws it to the sill and the ridge Repeat for each mullion Fa te et meneau de coin Ridge and corner mullion ASSEMBLAGE DES MENEAUX DE FA ADE OPTION PORTE EN FACADE INSTRUCTIONS pour fixer le cadre de porte au meneau d angle de toit modele VISION ou au meneau de toit modele VISTA Glisser le faite de porte dans l enclavure du cadre de la porte Modele VISION L insert a t fix au faite de porte par le fabricant dessins 1 Ins rez le meneau d angle sur l insert Faites glisser le bris thermique afin de d gager le meneau pres de l insert Le meneau est perce pour permettre de vissez Utilisez des vis 12 a t te ronde dessins 2 Replacez le bris thermique 12 type 1 SS 1 2 robertson drive pan head Qo i 0425 0157 17 3 Drive Mod le VISTA 3 VISTA Le faite de porte comporte 2 trous dessin 3 A
31. e votre cadre de porte au pr alable Voir annexe 1 1 Vissez le meneau court 60 mm au faite de porte par le dessous avec 3 vis 8 auto percantes t te bombee 2 Placer le vinyle d assemblage sur le cadre de porte puis glissez le faite de porte en place sur le cadre de porte 3 Ins rez le cadre de porte et vissez le aux meneaux adjacents Utilisez les vis qui sont incluses dans l emballage de votre porte S il ny a pas de muret visser 3 vis de chaque cote Une en haut au centre et en bas S il y aun muret vissez celles du haut et celles du centre Vous visserez celles du bas dans le muret lorsque la mise a niveau sera faite et que le solarium sera solidement ancr a la maison 4 Fixer le meneau court au meneau de coin de toit avec aS 2 Drive Faite de porte Door ridge P PVC d assemblage Cadre de porte Door frame LAA A A A A A A A MA A AS une vis 8 auto per ante t te bomb e pos e par le la HT KARKKI dessus w y UW AAA TA TA TA TA TA AAA DOOR FRAME INSTALLATION ON GABLE The door location and other sections might differ from the illustration Use the solarium plan included with your solarium to identify the different components door windows and their location The door frame of the sliding doors must have been assembled prior to the following steps See appendix 1 1 Screw the door ridge on the short 60 mm mullion from underneath with 3 self drilling 8 pa
32. ence The roof glass has two sheets of glass that are not the same length The glass that overlaps goes at the exterior and towards down diagram 5b e Silicone usage Several colors of silicone were provided It is preferable to use the clear silicone for glass installation on the roof White or beige is used for the vertical parts The black silicone can give better results for the interior finishing GLASS INSTALLATION It is recommended to work with the help of another person PREPARATION DES MENEAUX DE COIN Pose des bris thermiques blancs dans les rainures des meneaux de coin Une pression avec la main suffit pour les inserer N utilisez pas le maillet car vous risqueriez d abimer les bords Commencez a un bout et voluez vers l autre bout Les bris thermiques sont un peu plus courts que les meneaux dessins 1 Vous devez coupez vous m me les longueurs allant sur les meneaux d angle du mod le VISION Pose des baguettes d espacement en PVC Collez du ruban autocollant 1 tout au long du meneau de coin sur le bris thermique noir Le ruban est collant des 2 c t s Vous enleverez la pellicule bleue lors de la pose des baguettes d espacement dessins 2 et 3 Pose du coin de recouvrement Commencer par placer la section qui est en angle Assurez vous que les rainures soient bien align es Elle se fixe par pression Vous pouvez utiliser un maillet de caoutchouc Juxtaposez les sections du bas et du toit des
33. ere is a knee wall complete the exterior finishing cladding or other before putting the flashing on the sill 3 INSTALLATION DU SOLIN SUR LE SEUIL e Si votre solarium est plac directement sur le balcon couvrez le contour du balcon avec du solin d abord e Sly a un muret posez le rev tement d clin ou autre sur votre muret avant de mettre le solin sur le seuil use asdAg Solin Flashing Membrane Tape mousse Si 1 2 x 3 4 Rev tement Cladding Bulppej uewayeney Rev tement Cladding 54 INSTALLATION DES STORES PLISSES Ne coupez pas l emballage avec un x Acto car vous risquez d abimer le store Ordre d installation des stores 1 Fa ade c t s fen tres et portes 2 Angle 3 Toit Important Il faut absolument mettre les caps sur les stores de toit et d angle en dernier et lorsque tout est correctement install car il est impossible de les enlever sans les endommager Les vis fournies sont auto percantes Vous n avez donc pas a pr percer 1 Fa ade et c t s Les stores de la fa ade sont soutenus pas deux clips avec support lat ral de chaque c t s dans le haut du store Alignez le dessus du clip avec le bas de la traverse du solarium et fixez la la structure d aluminium avec les vis fournies photo 1 Laissez un espace de 1 4 pouce 1 cm entre le clip et la vitre afin de pouvoir retirer et remettre le store facilement photo 2
34. ert the interlock with molding on the side of the panel diagram 2 INSTALLATION DU PANNEAU COULISSANT Afin de l installer l endroit fiez vous aux crit res suivants Les roulettes sont en bas et les trois trous de la poign e vont l int rieur Ins rez d abord le haut du panneau coulissant dans la premi re fente vers l int rieur sch ma 1 puis appuyez les roulettes sur le rail au seuil sch ma 2 Assemblez l interlock et la moulure comme avec le panneau fixe et installez le L ouverture et le trou vont dans le bas afin de permette l acc s a la vis et la roulette sch ma 3 Afin que les panneaux soient bien tanches il faut les ajuster pour qu ils soient parall les aux cot s du cadre Les roulettes chaque bout sous la porte coulissante peuvent tre mont es ou descendues avec un tournevis t te carr Il faut tourner dans le sens des aiguilles d une montre pour monter le coin du panneau et dans le sens contraire des aiguilles d une montre pour le descendre sch ma 43 1 Porte gauche Left door Panneau fixe Stationnary pannel 48 1 Porte droite Right door Panneau fixe Stationnary pannel gt INSTALLATION OF THE SLIDING PANEL In order to ensure proper orientation take note Wheels go at bottom and the three holes for the handle go inside Insert the top of the sliding panel in the first slot seen from inside diagram 1 then rest the wheels
35. esented by the red line on the drawings Drawing 2 shows the corner mullion at the 1st glass It is identical to the corner mullion of the angle and facade Diagram 3 represents the corner mullion at the 2nd glass A spacer stick made of aluminum diagram 3a must be place on the corner cover to fill the gap Do not place the under pressure molding You will place them after sealing the ridge SCELLEMENT DU FAITE ETAPE 1 BOUDIN MOUSSE Placez un boudin sur toute la longueur du faite Coincez le derri re le verre dessin 1 Si l espace est trop restreint coupez le un peu sur le c t afin de pouvoir l ins rer Le dessus doit rester bomb et d passer le verre ETAPE 2 MEMBRANE DE SCELLEMENT Scellez avec de la membrane RED ZONE Coupez la membrane pour qu elle ait environ 6 pouces de largeur et la longueur de votre solarium Collez la sur le verre passez au dessus du boudin contournez le faite et remontez sur le mur de la maison en dessous de la membrane existante dessin 2a et 2 b PLACEZ LE PETIT FAITE Appuyez le petit faite sur la membrane RED ZONE sur le toit et contre le mur de la maison Il est de la longueur du faite Vissez le dans la menuiserie une vis par section dessin 2 c Membrane existante Meneau de toit Roof mullion INTERIEUR DU SOLARIUM INTERIOR OF SOLARIUM Rev tement Cladding 414 38 SEALING THE RIDGE STEP 1 BACKER ROD Place the backer rod along a
36. ettre le couvercle seulement si le store est bien install Faite Ridge Ve me du toit PES Traverse Gp Facade Faite Ridge Bin toit Roof glass T Ly gt Se Une Sh amp Facade Faite Ridge Bai Cu toit Roof glass Traverse B S N Nya Fa ade 57 3 Roof The roof shades are installed in a similar way except for minor differences Uncoil the three steel wires Lay the top rail against the glass while keeping 1 4 inch between the ridge and the rail otherwise the cap will not fit Hold flat against the glass One screw in the bottom hole of the clips on each side is sufficient Using a cloth apply WD 40 or equivalent on steel wires before installing the bottom rail Screw the bottom rail in place while holding against the top rail of the angle shade if there is one If there is no angle shade align the bottom rail with the center of the angle molding and while holding flat against the molding screw on each side Tighten the same way as the angle shades Snap the covers only when installation is complete since the covers are hard to remove once in place 58 59 Pour assistance technique composez le 514 335 2050 ou 1 800 361 9232 contactez Andre Brochu au poste 236 Du lundi au vendredi de 08 30 a 12 00 et de 13 00 a 16 30 For technical assistance call 514 335 2050 or 1 800 361 9232 contact Andre Brochu at extension 236 Monday to Friday from 08 30 to 12 00 an
37. he holes From under the door frame screw the mullion using two self drilling 8 pan head screws There are no inserts diagram 4 8 self drilling SS 1 robertson dive pan head Assembler les diff rentes sections selon l emplacement de votre porte Consultez le plan de votre solarium Visser les 2 c t s du cadre de porte aux meneaux en pla ant 3 vis de chaque cote Les vis sont incluses dans l emballage de votre porte Le cadre de porte est trou pour recevoir les vis cependant les meneaux ne sont pas trou s Utilisez une perceuse avec une m che de 1 8 Poin onnez pour guider la m che puis percez Appliquez de la graisse ou de la vaseline sur les vis pour viter qu elles cassent lors du vissage Vu de l int rieur du solarium le cadre de porte doit tre l galit des meneaux Rejet d eau de porte Vous pouvez faire cette tape maintenant ou la fin de l installation Le rejet d eau de porte sera fix a l aide de silicone Mettez une lisi re de silicone sur la moulure au haut du cadre de porte Placez le rejet d eau sur le silicone Vous pouvez au pr alable plier le rabat afin de lui donner la forme d sir e VISION a A Po VISTA Faite de porte Door ridge Silicone Rejet d eau T Drip cap 4 Cadre de porte Door frame 14 Assemble the different sections according to your door location Refer to your solarium plan Screw the 2 sides of the door frame to
38. ightly elastic and might shrink subsequently Cut them longer than the mullions and sills You will trim them once the solarium is in place against the house e On the sills e On the ridge e On the door ridge of the gable end door 2 Put adhesive tape 1 all along the back of fa ade drip caps The tape is sticky on both sides You will remove the blue plastic protection later during the installation of the glass on the facade 3 Put adhesive tape 2 sticky on one side all along the corner mullions ASSEMBLAGE DES MENEAUX Placez les meneaux au sol et faites en l assemblage a plat Certains inserts ont t pos s en usine avant la livraison de votre solarium 1 VISTA Fa ade et toit 2 VISION Fa ade et angle angle et toit Ne vissez pas au travers des bris thermique Faites les glisser afin de d gager le meneau pr s des inserts placer les vis puis replacer les bris thermiques Les bris thermique sur les meneaux d angle du mod le Vision sont fixes Des trous ont t faits en usine afin d acc der aux vis 1 VISTA 2 VISION Coin Corner 60 mm A Insert ii ii Coin Corner 60 mm Les meneaux de centre A et C sont visses aux inserts avec les vis Allen 1 4 3 4 Visser une des 4 vis avant d entrer l insert dans le meneau C est une vis d ajustement que vous pourrez au besoin d visser pour cr er une distance afin de faire un joint sans distorsion 3111 Les meneaux
39. ims in place with small nails on each side Avoid nailing into the shingles because they will break 4 Trace diagonal lines A C and D B If the distance is the same corners B and C are squared 5 Mettez a niveau dans le sens horizontal en partant du point le plus lev sur la lisse de bois qui est au sol Placez les shims pres des meneaux mais pas directement en dessous Si le point le plus lev est en fa ade larriere du solarium devra monter 6 Apr s avoir fait l tape 5 v rifiez les meneaux des c t s lls doivent tre au niveau verticalement dans le sens de la profondeur 7 Mettez au niveau verticalement dans le sens de la longueur en bougeant le haut de la fa ade vers la gauche ou vers la droite 8 Cette tape est optionnelle Si besoin stabilisez temporairement en pla ant une planche de soutenement Placez la l interieure du solarium de sorte qu elle ne nuise pas a la pose du verre ult rieurement Maintenez l a l aide de pinces Quick grip 9 9 Verifiez l querrage au faite et si n cessaire d placez le faite vers la gauche ou vers la droite V rifiez l querrage et les niveaux sur les c t s NB Il est possible que vous ayez ajuster les angles des meneaux Au besoin d vissez les inserts et redressez les meneaux Il est possible aussi que vous ayez ajuster les traverses Enlevez les et revissez les o c est n cessaire Lorsque tout est au niveau vous pouvez a
40. irez un joint de finition plus large 5 Mettez une lisi re de silicone blanc ou beige au rebord des c t s verticaux du cadre de fen tre l int rieur du solarium le long des meneaux ainsi qu aux deux coins du bas du cadre de fen tre 6 Tirez un joint de silicone aux angles des moulures a pression de facade et de toit 7 l ext rieur sur le contour des fen tres et portes patio 8 Vous devez tirer un joint de silicone tout le long des traverses au toit les traverses d angle de toit et les traverses de toit sur les solariums profonds Ne pas tirer de joint sur le seuil Le verre repose sur les bandes d tanch it qui sont lastiques Votre poids fait descendre temporairement le verre Ne retournez pas sur les sections de verres dont les contours ont t scell s Attendez au moins 2 jours 42 SILICONE APPLICATION to watertight your solarium Before applying silicone make sure the surfaces are clean and free of dust and grease 1 Apply a small bead along the drip caps 2 Apply a silicone bead all along the glass inserted in the corner mullion 3 Apply a silicone bead all along the wall of the house and the aluminum structure outside and inside 4 Underneath the glass that overlap Put a thin bead that will penetrate under the glass Wipe up the overflow with a spatula and then put a larger bead 5 Put a strip of silicone white or beige at the edge of the vertical sides of the windo
41. is que vous d poserez les grands panneaux de verres au seuil Compte tenu que dans l industrie de la production du verre la tol rance est d environ 3 mm vous choisirez les blocs d appui selon leur taille dans le but de bien aligner le dessus des verres Dans cette optique il est possible qu certains endroits le verre soit appuy directement sur le seuil Une moulure de finition plac e le long du seuil couvrira le tout Les blocs d appui de 1 8 d paisseur devront tre plac s sur les traverses avant de placer les verres dans chaque section e Les bris thermiques blancs et baguettes d espacement ll faut les placer aux meneaux de coin avant la pose du verre e Les caps de retenu temporaire Des bouts de sous moulures pression vous ont t donn s dans le but de maintenir temporairement les verres durant l installation dessin 3 Un cap de retenu par meneau entre 2 verres est suffisant Utilisez des vis de 1 pouce Lorsque le verre est install dans 2 rang es adjacentes vous pouvez proc der l installation des moulures a pression La proc dure implique plusieurs tapes dont la pose du ruban scellant Dans ce guide nous proc dons l installation des moulures pression lorsque que tout le verre est plac et maintenu par les caps de retenu temporaire e Description du verre isol Le verre isol est compos de 2 paisseurs Le verre clair se place vers l int rieur du solarium et le verre teint
42. ium et l espace de travail disponible M thode 1 Assemblage l envers Une personne tient un meneau l envers alors que l autre personne le visse au seuil et au faite Lorsque tout est assembl faites pivoter l endroit Si la porte est en fa ade vous pouvez temporairement stabiliser le seuil avec une pi ce de bois un madrier 2x4 ou une planche L aide d une troisi me personne peut tre n cessaire M thode 2 Assemblage en appui D posez le seuil et le faite sur des chevalets Une personne tient un meneau pendant que l autre personne le visse au seuil et au faite R p tez pour chaque meneau Seuil et meneau Sill and mullion Faite et meneau Ridge and mullion Si votre solarium a If your solarium 14 pieds de has 14 feet of profondeur les ree depth the meneaux de centre center roof au toit sont mullions are renforcis et par reinforced and cons quent le faite therefore the a double hauteur d ridge is 8 self drilling SS 1 robertson drive pan hea Drill Point 2 322 NMS 1 2 Drive 316 Fe 8 18 Thread corner mullion Seuil et meneau de coin Sill and MULLION ASSEMBLY TO SILL AND RIDGE The sill is held to each mullion with self drilling 8 pan head screws that you install from underneath the sill The ridge is held the same way with self drilling 8 pan head screws that you install from behind the ridge To assemble choos
43. l en angle de 45 degr s aux 2 extr mit s S il y a une porte sur le c t le seuil est en 2 pi ces dessin B Le 322 a 2 Drive GABLE END WALL ASSEMBLY 60 mm mullions are used for the gable end walls They are held by three self drilling 8 pan head screws that you will install from underneath the sill Place the mullions in order of height following the roof angle The gable end wall will be juxtaposed onto the corner mullion of the fa ade wall The sill of the gable wall is cut at a 45 degree angle at the front The sill of the fa ade is cut at a 45 degree angle at both ends If there is a door on the side the sill will be in 2 pieces diagram B A M r fr Ai R j et ied M Td ied Id TNE 8 18 Thread MISE EN PLACE DE LA STRUCTURE DU SOLARIUM A LA MAISON PLACING THE ALUMINUM STRUCTURE AGAINST THE HOUSE WALL Placez votre solarium a son emplacement en le maintenant temporairement mais solidement Place the aluminum structure in its location and hold it in place temporarily but firmly by en place a l aide de clous fix s sous le faite dans la lisse de bois du haut Un ou deux clous placing nails in the wood header under the ridge structure One or two nails are sufficient suffisent VISTA VISION HORIZON Note If it rains during assembly you can release the water that could have penetrated in the structure by drilling a small hole in the mullions near the sill
44. la PORTE DROITE ouvre vers la gauche PORTE GAUCHE LEFT DOOR INTERIEUR INTERIOR EXTERIEUR EXTERIOR Panneau coulissant Panneau et fixe porte moustiquaire Stationary panel Sliding panel and screen door PLAN 45 PANEL INSTALLATION Caution you must attach the casing to the solarium before installing the panels PORTE DROITE RIGHT DOOR INTERIEUR INTERIOR EXTERIEUR EXTERIOR hm Panneau Panneau coulissant fixe et porte Stationary moustiquaire panel Sliding panel and screen door PLAN GENERAL INFORMATION Your door is designed to open either towards the right or the left At this step you need to know from which side your door opens according to your plan so that you can install the panels in the right position The door is not reversible From outside the LEFT DOOR opens towards the right and the RIGHT DOOR opens towards the left INSTALLATION DU BUTOIR Le butoir s installe par pression dans la premiere rainure vue de l int rieur dans le haut du cadre de porte amp 2 LT 2 ou Pour porte gauche Pour porte droite INSTALLATION DU PANNEAU FIXE Information savoir au pr alable Le panneau fixe va dans la fente du centre du cadre La section de vinyle qui d passe va au bas du panneau l int rieur sch ma 1 Avant d ins rer le panneau e Percez t
45. le bas Ins rez d abord le haut dans la premi re fente vers l ext rieur Prenez soin de placer les roulettes du haut sous le rail du haut du cadre Appuyer les roulettes du bas sur le rail au seuil La poign e de la porte moustiquaire s installe en 2 morceaux La poign e int rieure s installe dans l espace pr vu sch ma 1 La poign e ext rieure n a pas d emplacement pr vu Vous devrez percer les trous avant d ins rer les vis sch ma 2 La barrure s installe sur le c t du cadre Afin d identifier emplacement de la barrure installez la sur le c t de la poign e en la barrant en place Approchez la porte pr s du cadre et l aide d un crayon mine marquez l emplacement de la barrure Il ne vous reste plus qu a retirer la barrure de la poignee percer et visser la barrure en place sur le cadre Elle n est pas n cessairement la meme hauteur que la barrure de porte schema 3 Si vous avez une porte droite vous devrez inverser le loquet de la porte moustiquaire schema 4 POSE DES MOULURES DE FINITION Moulure de finition entre les panneaux Le trou dans l espace du panneau fixe entre la moustiquaire et le panneau coulissant est cach par une moulure sch ma 1 Elle s installe de la m me fa on que le butoir sch ma 2 Moulures de finition de cadre Afin de cacher les vis qui ont servi fixer le cadre la structure une moulure est pos e sur le cadre l ext rieur du c t du panneau c
46. ll the length of the ridge Insert it behind the glass drawing 1 If the space is too restrained cut a little on the side to be able to insert it The top must remain domed and exceed the glass STEP 2 SEALING MEMBRANE Seal with the RED ZONE membrane Cut the membrane to be approximately 6 inches wide and the length of your solarium Paste it on the glass go above the backer rod cover the ridge and go up the wall of the house behind the existing membrane drawing 2 a and 2 b PLACE THE RIDGE TOP Lean the ridge top on the RED ZONE membrane on the roof and against the wall of the House It is the length of the ridge Screw it in the carpentry Put one screw per section diagram 2 c ETAPE 3 PLACEZ LES SOUS MOULURES SUR LES MENEAUX DU TOIT Placez les sous moulures sur les meneaux couvrant ainsi le ruban autocollant Elles sont plus courtes que les meneaux Appuyez l extr mit dans l enclavure du petit faite dessin 3 ATTENTION Il est important que la moulure soit bien centr e sur le meneau La vis doit arriver au centre du bris thermique noir qui est fix au meneau Autrement vous risquez de briser le verre Meneau de coin 1 verre dessin 3a Meneau de coin 2 verre dessin 3b Des vis bois plus longue sont utilis es Meneau de centre 1 verre dessin 3c Meneau de centre 2 verre dessin 3d Des vis a bois plus longue sont utilisees 39 STEP 3 PLACE THE UNDER PRESSU
47. m To determine this point locate the spot that is the farthest from the house wall on the 2 back end mullions D bottom or D top or A bottom or A top If it is at the top project it on the ground and mark it X with a felt pen 2 Rapportez ce point sur l autre c t pr s de la maison en mesurant les distances en longueur et en profondeur Marquez cet endroit au crayon feutre 3 Si n cessaire mettez une contre planche shim entre le faite et la lisse de bois l une ou l autre des extr mit s Une contre planche consiste en 2 morceaux de bardeau de c dre servant cr er un cart Maintenez les contre planches en place avec des petits clous plant s de chaque c t Evitez de clouer dans le bardeau de c dre parce qu il casserait 4 Tracez les diagonales A C et D B la base du solarium Lorsque ces 2 distances sont gales les coins B et C sont l equerre Sans contre planche Without a shim Maison House Lisse de bois Wood header Avec une contre planche With a shim Maison House Lisse de bois Wood header Maison House Lisse de bois Wood header 21 2 Project this point on the other side near the house by measuring the distance in length and depth Mark this spot with a felt pen 3 If needed put a shim between the ridge and the wood header at one end or the other A shim is made up of 2 cedar shingles which are used to create a space Keep the sh
48. mm 95 mm mullion Traverse droite Straight traverse Meneau de coin mer mullion Traverse ar te de fa ade Traverse facade edge Meneau 60 mm 60mm mullion Fen tre Faite de porte cote Window Ridge of gable end door Porte coulissante Sliding door Fr a Traverse droit Seuil EP Sill af Straight traverse Meneau 60 mm 60 mm mullion Meneau de coin Comer mullion Meneau 60 mm 60 mm mullion Ce sch ma repr sente un solarium Panovision mod le Vision R 3 5 Les gros plans vous aident comprendre les This diagram represents the Vision model R 3 5 from the Panovision family The close ups outline the solarium grandes lignes de l assemblage d un solarium Le solarium model Vista est identique sauf qu il n a pas d angle entre la assembly process The Vista model is identical to the Vision but it doesn t have the angle between the facade and the facade et le toit roof IDENTIFICATION DES VERRES DU SOLARIUM Les espacements de rang es en fa ade ne sont pas n cessairement tous identiques En fait un solarium standard peut compter deux 2 types d espacements differents soit 828 mm 32 1 2 po et ou 886 mm 34 7 8 po Ces mesures sont prises de centre a centre des meneaux de facade IDENTIFICATION DES VERRES EN FACADE ET AU TOIT Espacement a titre d exemple seulement la position des verres peut varier selon la longueur fa ade de votre solarium VISION m Pm MER Le L
49. n head screws 2 Slide the door on the door frame 3 Insert the door frame and screw it to the side mullions Use the screws that are included in the door packaging If the solarium does not have a kneewall place 3 screws on each side at the top middle and bottom If there is a kneewall screw the top and middle screws You will screw the bottom screws in the kneewall when the solarium is squared and leveled and permanently fastened to the house 4 From the top screw the short mullion to the roof corner mullion with a self drilling 8 pan head screw ANCRAGE DE LA STRUCTURE DU SOLARIUM ALA MAISON Avant d ancrer la structure du solarium la maison il est primordial qu elle soit au niveau et d equerre 1 PROC DURE POUR LA MISE NIVEAU 1 D terminez le point de r f rence X Ce point sera l endroit de d part des mesures du solarium Pour le d terminer choisissez sur les meneaux arri res le point le plus loign de la maison D bas ou D haut ou A bas ou A haut S il s agit d un coin en haut projetez le au sol Marquez cet endroit X au crayon feutre 20 lisse de bois wood header FASTENING THE SOLARIUM STRUCTURE TO THE HOUSE Before fastening the structure to the house it is of utmost importance for it to be squared and leveled 1 PROCEDURE TO SQUARE AND LEVEL 1 Determine the reference point X This spot will be the Starting point of all the measures of the solariu
50. ncrer le solarium de fa on permanente la maison 1 AN 22 5 Level horizontally starting at the highest point on the wood base Place shims near the mullions not under them If the highest point is at the fa ade the back of the solarium will rise 6 After doing step 5 verify the gable end mullions They should be level vertically 7 Level vertically by moving the top of the fa ade to the left or to the right 8 This step is optional If needed you can stabilize by placing a plank Place it from inside the solarium so that it doesn t interfere when placing the glass later on Use Quick grips to hold it in place Verify the ridge If needed move it to the left or to the right Verify leveling on gable ends NB You might have to adjust the angles of the mullions Loosen the screws and straighten the mullions You might have to adjust the traverses Take them off and screw them on again where it is needed Once everything is squared and leveled you can fasten the solarium permanently to the house wall 2 ANCRAGE PERMANENT DU SOLARIUM Fixez la structure du solarium avec les vis a bois Au faite utilisez celles de 1 5 pouce Au faite il est probable que des trous aient t perc s en usine devant chaque meneau Nous vous conseillons d en faire d autres pour qu il y ait environ 8 pouces entre chaque vis Vous devez percer avant de visser Poin onnez pour guider la m che
51. nnnenanan 23 POSE DU VERRE ormat g NOTA G Es rt ne el A amin eet enter 24 e Blocs d appui autocollant en PVC e Les bris thermiques blancs et baguettes d espacement e Description du verre isol e Utilisation du silicone Preparation GOS CONS Rs a tn nc mood 25 POSE duvere CIV TAG ACG aa ana nn een ni 26 Pose du verre l angle Mod le VISION uuu sesssssssssssssssssssesssscsssssesssscsessessesaeessesesarscerersesareneatans 27 POSE duvere AU LOM nn havea on ann aa anne ant een 28 Pose des verres rectangulaires sur le c t VU 29 Prepatation COS TSMC CS RER Ra ea ener enumiiea alana 30 Pose des Tenelres en facade ER us aati viet ald slat teal hated it eae wlan de is 31 POSE des fenetres SUIS COLES Bis iacucuissti2 nement enetes 32 Pose des verres irr guliers sur le COLE cesssesessssesssessessssescsssesesscsesesseesassesesseesaseesessseesaseesasenesass 33 SCELLEMENT AUX MENEAUX En n n Nn En nE E 34 SCGELLEMENT AVU FAH E si Si ne aero ea a nn 38 APPLICATION DU SILICONE 88h en iantniietetenasen 42 Pose des moulures de finition RS a eu 43 ANNEXES 1 GUIDE D ASSEMBLAGE DE LA PORTE 4 SAISONS 0 eceseseeeerssssneerssseeieeeseneeen 44 2 POSE DE SOLIN SUR LA MENUISERIE 52 3 INSTALLATION DES STORES PLISS S 55 TABLE OF CONTENTS NOTES TO INS TALLER oraren ne te te ts 03 REQUIRED TOOLS a a intranet cena nnn 04 PARTS EST a 04 COMPONENTS DIAGRAM 5 nn cinema 05 GLASS PANELS IDENTIFICATION Fa ade and roof
52. nt Meneau du mur de cote sera plac ventuellement Mullion of gable end wall will be placed eventually Mullion of gable end wall will be placed eventually 52 2 POSE DU SOLIN SUR LA MENUISERIE AU FAITE Posez le lorsque le solarium est fixe et completement termine A Le rev tement ext rieur de la maison est en d clin Tel qu indique sur le plan de menuiserie la menuiserie au fa te est fix directement sur le mur de la maison Le d clin est donc retir Solin Flashing Membrane Silicone Meneau de toit Roof mullion INT RIEUR DU SOLARIUM INTERIOR OF SOLARIUM Exterior finishing of the house is made of cladding The carpentry at the ridge is placed directly against the house Therefore the cladding is taken out LI 53 2 finish C Le rev tement ext rieur de la maison est en brique Faites une entaille dans le mortier afin d y ins rer le solin et la membrane Solin Flashing Membrane Silicone Meneau de toit Roof mullion INT RIEUR DU SOLARIUM INTERIOR OF SOLARIUM INSTALLATION OF FLASHING ON THE RIDGE Install it once the solarium is anchored and completely Exterior finishing of the house is made of brick Make a score in the mortar Insert the flashing and membrane in the score 3 INSTALLATION OF FLASHING ON THE SILL e If your solarium is directly on a balcony you should cover the edges of the balcony with flashing first e If th
53. on the tracks of the sill diagram 2 Assemble the interlock and its molding and install it as you did for the stationary panel Note that the hole and the opening go at the bottom which enables you to reach the screw and the wheel of the sliding panel diagram 3 In order to make the panels airtight you must adjust the panels parallel to the side of the casing The wheels at each end under the sliding panel can be lowered or lifted with a square screwdriver Turn clockwise to lift the corner of the panel or counter clockwise to lower it diagram 4 MISE EN PLACE FINALE DU PANNEAU FIXE ET DU PANNEAU COULISSANT e Fermez la porte coulissante et enclenchez la e V rifiez l querrage et l tanch it des panneaux Ajustez la hauteur des roulettes du panneau coulissant si n cessaire e Vissez le panneau fixe dans le cadre l aide des vis auto per antes fournies ou faites un trou de 9 64 avant d y ins rer une vis e Afin que le panneau ne glisse pas vers l int rieur placez une vis dans le seuil en face de l interlock Couvrez ensuite la vis l aide d un balai d tanch it sur la largeur de l interlock sch ma 3 Faite le tenir avec du silicone ADFAST CAVIT DRAIN E Pendant une pluie accompagn e de vent violent il peut y avoir pr sence d eau au seuil de porte entre les panneaux Deux clapets permettent l vacuation de l eau vers l ext rieur En hiver vous pouvez boucher ces
54. oors For doors the clip with one hole must be aligned with the top of the door frame photo 5 2 Angles mod le VISION Le bo tier du haut le plus gros des deux doit tre align avec le centre de la traverse de toit Appuyez le bo tier sur la traverse en respectant la direction de langle vers le bas si le bo tier est bien en place une seule vis de chaque c t suffira pour tenir le boitier bien en place Ensuite si il y a un store de fa ade d posez le boitier du bas sur le dessus du clip avec support lat ral et visser de chaque c t S il n y a pas de store de fa ade aligner le bas du store avec le centre de la traverse Appuyez le sur la traverse ceci emp chera le bo tier de bouger Vissez de chaque c t Mettre de la tension sur les trois 3 fils de m tal en utilisant une cl Allen de 1 8 Les deux 2 fils des extr mit s doivent tre plus tendus que le fil du centre Une fois tendu le tensionneur doit tre barr avec la vis t te carr e Mettre du WD 40 sur les fils de m tal ce qui devrait tre fait tous les changements de saisons Installez les couvercles seulement quand vous tes certain que les stores sont correctement install s 56 2 Angles VISION MODEL The top railing the larger one must be aligned with the center of the angle traverse While laying the railing flat on the traverse screw the clips on each side in the mullion One screw on each side i
55. ose des bandes d tanch it en PVC Glissez les bandes d tanch it ou ins rez les par pression dans les enclavures pr vues cette fin sans les tirer Elles sont l g rement lastiques et pourraient ensuite r tr cir aux deux extr mit s Par pr caution coupez les plus long que les fa tes et seuils Vous taillerez l exc dent lorsque le solarium sera plac contre la maison e Surles seuils e Sur le faite e Surle faite de la porte de c t 2 Collez du ruban autocollant 1 tout au long de l appuie arri re du rejet d eau de fa ade Le ruban est collant des 2 c t s Vous enl verez la pellicule bleue lors de la pose des verres en fa ade 3 Collez du ruban autocollant 2 collant d un c t tout au long des meneaux de coin 4 Assemblage du cadre de porte ll faut assembler le cadre de porte selon les instructions avant de pouvoir l installer sur le solarium La porte coulissante vous est livr e dans son emballage Les instructions pour assemblage du cadre sont fournies en annexe du document Seuil et faite de porte de cote Sill and gable end door ridge 4 Assembling the door frame The sliding door is delivered in its package You must assemble the door frame to be able to install it on the solarium See appendix for the assembly instructions PREPARATION 1 Insertion of PVC gasket strips Slide or push in the PVC gasket strips into the slots without stretching them The bands are sl
56. otector covers one of the sides To take the door out you must 1 Pull out the plastic protector It is not screwed in Simply pull with your hand Loosen the tension on the wheels with a square screwdriver unscrew the screws by turning counterclockwise Beneath the door you can see the wheels resting on the rail With a flat screwdriver lift the wheel and pull the door out of the door frame ANNEXE 2 POSE DE SOLIN SUR LA MENUISERIE APPENDIX 2 COVERING THE CARPENTRY WITH FLASHING Pour procurer une finition impeccable et pour augmenter l tanch it de votre solarium nous For an impeccable finish and to ensure water tightness we recommend that you install vous recommandons de poser du solin sur la menuiserie Vous pouvez vous procurer du solin flashing on the carpentry of your solarium You can purchase flashing the color of your de la couleur de votre solarium dans les quincailleries offrant des mat riaux de construction solarium in hardware stores that sell building material Furthermore they are able to cut and De plus ces magasins sp cialis s offrent le service de coupe et de pliage Vous devez aussi bend flashing upon your request Water barrier membrane is also required It is sold by rolls utiliser des membranes d tanch it Elles sont vendues en rouleau de diff rentes largeurs available in different widths Les pages qui suivent presentent des explications et illustrations de differents types The following pages
57. oulissant sch ma 3 et une autre l int rieur sous le butoir sch ma 4 1 2 INSTALLATION OF SCREEN DOOR In order to ensure proper orientation take note that the opening in witch you will install the handle goes inside there are wheels at the top and at the bottom Insert the top in the first slot seen from outside Make sure the wheels are under the rail of the top and then rest the bottom wheels on the rail at the sill The screen door handle is installed as two separate pieces The interior handle goes in the cutout form on the door diagram 1 The exterior handle has no opening You decide where you want to put it and then drill before screwing diagram 2 The locks are installed on the side of the casing In order to identify the correct location of the lock put it on the side of the handle and lock it in place Bring the door close to the casing and mark the location of the lock on the casing You can now remove the door drill and screw the lock in place on the casing diagram 3 If you have a right door you will have to inverse the latch hook diagram 4 Loquet Latch hook DECORATIVE MOLDING INSTALATION Top decorative molding between panels The hole in the space between the screen panel and the sliding panel is hidden with a molding diagram 1 It is installed the same way as the stopper diagram 2 Decorative casing moldings The screws that hold the casing to the structure are hidden with
58. pouces des meneaux a Mettez 2 lisieres de silicone dans l enclavure de la traverse d ar te d angle dessin 1a Glissez le verre dans l enclavure de la traverse d ar te d angle dessin 1b et d posez le bas du verre sur la traverse d ar te de facade dessin 2 Le verre qui d borde va au dessus de la traverse Vous pouvez poursuivre l installation des verres blocks on the sill at about 3 inches from the mullions Put 2 strips of silicone in the slot of the angle edge traverse diagram 1a Insert the glass in the slot of the angle edge traverse diagram1b and lean it on the fa ade edge traverse diagram 2 The overlap goes over the traverse You can continue installing the angle glasses or d angle ou poser le verre au toit place the roof glass CAUTION Never apply pressure on the glass that overlaps ATTENTION En manipulant les verres d angle et de toit prenez soin de ne pas mettre de tension sur le verre d bordant POSE DU VERRE AU TOIT Placez deux blocs d appui autocollants de 1 8 d paisseur sur la traverse d ar te d angle a environ 3 pouces des meneaux dessin 1a Selon la profondeur du solarium le toit peut tre compos de 1 ou de 2 verres par rang e LORSQUE QU IL Y A 2 VERRES PAR RANG E Les 2 verres ne sont pas de la m me paisseur LE VERRE DU FOND EST PLUS EPAIS Des traverses droites servent joindre les 2 verres Les traverses ne sont pas vis
59. pply clear ADFAST sealant on the 2 lower corners inside diagram 4 After the door is installed apply a bead of ADFAST silicone the color of your solarium between the bottom of the door frame and the flashing 2 3 T __ U Moulures Moldings TE T Cadres L gt Lo Casing HER Vers l ext rieur L inclinaison dans le seuil de la porte doit permettre l coulement de l eau The sill must be placed so that the water flows towards the FT 7 L 1 4 t z hi i j i ey Fia r et di us z a 2 Tey 1 a gd 1 a W o LL Silicone Haut du cadre Top casing La section avec balais va vers l int rieur The section with brushes goes towards the interior The dent is towards the exterior Haut Top C t droit Right side Seuil Door sill Vers l ext rieur Towards the outside ADFAST Silicone INSTALLATION DES PANNEAUX Attention il faut fixer le cadre a la structure avant d installer les panneaux INFORMATION GENERALE Votre porte a t pr vue pour s ouvrir d un c t sp cifique soit vers la droite ou vers la gauche Elle n est pas r versible cette tape il est important de connaitre de quel c t ouvre votre porte selon votre plan afin d ins rer les panneaux au bon endroit De l ext rieur la PORTE GAUCHE ouvre vers la droite alors que
60. puis percer Mettez de la vaseline sur les vis pour viter qu elles cassent lors du vissage Au seuil utilisez les vis bois de 2 pouces La pression de la vis devrait suffire pour percer Placez une vis chaque 12 pouces environ dans la petite rainure dessin B Les vis ne seront pas visibles lorsque le solarium sera termin Elles seront cach es par les verres Vous pouvez retirer les clous temporaires Vis bois M che 1 8 Poin on 8 wood ceramic 1 1 2 robertson drive flat M 23 2 PERMANENT FASTENING OF THE SOLARIUM TO THE HOUSE Fasten the structure with the wood screws At the ridge use the 1 5 inches screws At the ridge holes might have been made by the manufacturer at each mullion We recommend adding more holes at about every 8 inches You must drill holes before screwing Punch first to guide the drill bit then drill Put Vaseline on the screws to avoid breaking them while screwing On the sill use the 2 inches screws The pressure of the screw will make the hole Put a screw at every 12 inches in the little grove diagram B The screws will eventually be hidden by the glass You can remove the temporary nails Wood screw 1 8 drill bit Punch B Seuil Sill INFORMATIONS RELATIVES A LA POSE DU VERRE e Blocs d appui autocollants en PVC Vous avez re u des blocs d appui autocollants en PVC de 2 diff rentes paisseurs dessin 1 C est sur les blocs plus pa
61. rois trous dans le c t du cadre l aide d une m che 3 16 Un trou 6 pouces du haut un dans le centre et un autre 6 pouces du bas Il est possible que les trous aient t faits en usine sch ma 2 Eventuellement lorsque le panneau coulissant sera plac et d equerre vous aurez a visser le panneau fixe au cadre e Vous devez mettre du silicone ADFAST sur le seuil a l emplacement du panneau Le silicone de m me que les vis servent fixer le panneau Rappelez vous que le silicone s che en moins de deux heures Proc dez rapidement la mise en place et l querrage du panneau fixe et du panneau coulissant auche Left door 1 Porte gauche Left door Trou Hole 3 W 46 Trou Hole STOPPER INSTALLATION Install the stopper by pushing it in the first Slot of the door frame seen from inside at the top amp 2 amp 2 or For left door For right door STATIONARY PANEL INSTALLATION Prerequisite knowledge The stationary panel goes in the center slot of the door frame The vinyl overlap of the door goes towards inside and at the base diagram 1 Before placing the panel e Drill three 3 16 holes in the side of the door frame One at 6 inches from the top one in the middle and one at 6 inches from the bottom diagram 2 The holes might have been made by the manufacturer Eventually when the sliding panel is installed and leveled you will screw the st
62. s agit d un solarium sans muret il est plus facile de placer la membrane et le solin sur le contour du balcon avant l installation du solarium ATTENTION Si vous utilisez du bois trait notez que l aluminium ne doit pas tre en contact direct avec le bois trait parce que ce dernier contient de lars niate de cuivre chromate ACC substance qui provoque la corrosion Une membrane devra donc tre utilis e pour viter le contact De plus vous devrez utiliser des clous et vis recommand s par le fabriquant de bois trait CONSEIL DE S CURIT e Utiliser un escabeau en bon tat e Toujours effectuer les travaux avec l aide d une autre personne e V rifier si les conditions climatiques sont favorables e Utiliser toujours les outils appropri s et en bon tat pour chaque tape de l installation afin d viter des bris de mat riaux e Suivre les tapes dans l ordre afin d assurer une bonne qualit d assemblage et d installation du solarium e S assurer que le faite soit viss la structure de la maison et non au recouvrement de celle ci et que le balcon ou le patio soit de niveau avec le mur NOTE PROPOS DE L ASSEMBLAGE DES PI CES Comme vous avez pu le constater votre solarium Panovision est compos de plusieurs pi ces Pour faciliter l identification de ces pi ces vous trouverez dans les pages suivantes des sch mas identifiant et la localisation des pi ces formant votre solarium LIMITE DE LA RESPONSABIL
63. s es aux meneaux ll est important de retirer avec un x Acto la partie souple sur les bris thermique des meneaux aux endroits ou seront plac s les traverses droites Pour d terminer l emplacement exact e d poser le verre sur les meneaux au dessus de la traverse d angle et des blocks d appui tel qu illustr sur le dessin 1b e Coller 2 blocs d appui mince sur le dessus du verre environ 3 pouces des coins Placez la traverse droite sous la partie sup rieure du verre Avec un x Acto faite une entaille sur le caoutchouc souple du bris thermique en haut et en bas de la traverse e Enlevez le verre et la traverse pour coupez le caoutchouc souple dessin 2a e Mettez 2 lisi res de silicone sous la partie inf rieure de la traverse droite Replacez la traverse puis le verre au bon endroit dessin 2b Inutile de mettre des caps de retenu temporaire sur le toit POSE DU 2e VERRE AU TOIT D poser le deuxi me verre sur le fa te les meneaux dessin 3 et la traverse droite dessin 2c Le dessin ci dessus illustre une fa on de s y prendre en passant le verre entre les meneaux LORSQUE QU IL Y A 1 VERRE PAR RANG E D posez le verre sur le faite les meneaux dessin 3 et la traverse d angle dessin 1b VISION 28 Rang e de toit compos d un seul verre Roof row with only one glass ROOF GLASS INSTALLATION Put a 1 8 PVC self adhesive sitting block at each end of the angle edge travers
64. s sufficient If there is a fa ade shade place the bottom railing on the clip and screw in Vi sacre If there is no fa ade shade align the bottom railing with the center of the traverse While holding flat against the traverse screw in both sides Locate the tensioner Using a 1 8 inch Allen key tighten all three steel wires The center wire should not be as tight as the others Lock the Allen key head with the lock Using a cloth apply WD 40 or equivalent on the steel wires This should be done regularly every season Snap the covers only when installation is complete since the covers are hard to remove once in place 3 Toit Les stores de toit s installent comme les stores angle sauf pour quelques details D rouler trois 3 fils de m tal ensuite prendre le boitier du haut appuyez le sur la vitre du toit en gardant po entre l arri re du boitier et le faite du solarium important sinon le couvercle ne pourra pas tre mis en place si le bo tier est bien appuy sur la vitre une seule vis dans le trou du bas est n cessaire Mettre du WD 40 sur les fils de m tal avant de visser la partie du bas Vissez la partie du bas appuy e sur le bo tier du store en angle S il n y pas de store en angle alignez le bas du boitier inferieur avec le milieu du travers en prenant soin de bien appuyer sur le travers toit angle Mettre de la tension sur les fils de m tal comme sur les stores a angle M
65. sin 4 Baguette Stick a sz PREPERATION OF THE CORNER MULLIONS Inserting the thermal break in the groves of the corner mullions Press in with your hand Do not use the rubber mallet because you could damage the edges The thermal breaks are a bit shorter than the mullions diagrams 1 You will have to cut the lengths of the angle mullions on the VISION model Installation of the PVC spacer sticks Put adhesive tape 1 all along the corner mullions on the black insulation barrier The tape is sticky on both sides You will remove the blue plastic protection while placing the spacer sticks diagrams 2 and 3 Place the corner covers Start by placing the short cover on the angle mullion Make sure the grooves are aligned Use a rubber mallet to snap it on Place the lower section and the roof section diagram4 POSE DU VERRE EN FACADE Avant de placer le verre de la premiere rang e mettez du silicone a l int rieur du coin ou il y a un joint afin d emp cher l eau de s infiltrer Rejet d eau sur le verre Pour chaque rang e de verre retirez la pellicule protectrice bleue et collez le rejet d eau directement sur haut du verre Centrez le sur le verre dessin 1a Placez deux blocs d appui autocollant en PVC sur le seuil a environ 3 pouces des meneaux Utilisez les blocs les plus pais dessin 2 Glissez le verre avec le rejet d eau dans la rang e pr vue dans lenclavure de la
66. ssin 1 e Placez le verre irr gulier sur la traverse droite en ins rant dans le meneau de coin au toit dessins 2 Maintenez la en place temporairement avec un cap de retenu Placez le verre suivant R p tez pour chacune des rang es 33 3 INSTALLING THE SMALL GLASS UNDER THE WINDOW Place 2 PVC sitting blocks 1 8 inch on the sill at about 3 inches from the mullions Put 2 strips of silicone in the slot of the straight traverse and place it on the top of the glass that will be placed under the window A Place the traverse and glass under the frame of the window B and on the sitting blocks on the sill C When there is a knee wall it is possible to install the small glass over the window instead of underneath However you must let us know so that we can send you the extra parts required INSTALLATION OF THE IRREGULAR SHAPE GLASS ON GABLE END e Start at the section near the fa ade Put a small PVC Sitting block on the upper part of the straight traverse diagram 1 e Place the irregular glass on the traverse inserting it in the roof corner mullion diagrams 2 Use a holding cap to temporary hold the glass in place Place the glass in the next section Repeat for each row SCELLEMENT LE LONG DES MENEAUX DE FA ADE ANGLES ET COTES TAPE 1 BOUDIN MOUSSE Le boudin mousse doit tre place sur les meneaux d angle et de toit de chaque section Il n y a pas de boudin mousse sur les meneaux verticau
67. t section of parts of the solarium that are long 1 Rolls of self adhesive foam tape 5 types 2 Pressure molding 3 Aluminum under pressure molding and PVC under pressure molding already assembled See note 4 PVC gasket strip flexible 5 Mullion 60 mm fa ade and gable end Look at b An insulation barrier is inserted on each mullions Mullion 95 mm roof they are double for solariums that have 14 of depth 7 Corner mullion 8 White thermal break 9 Corner cover 10 Center insert 2 types on the VISION model 11 Corner insert 12 Ridge and ridge top Reinforced if solarium has 14 depth 13 Sill also used as ridge on gable end door 14 Ridge of fa ade door 15 Assembly PVC for door on gable end 16 Drip cap for door ridge Door on fa ade 17 Sliding door 18 PVC self adhesive sitting blocks 19 PVC Spacer stick 20 Aluminum spacer stick only for deep solariums 21 Glass 22 Window 23 Drip cap on windows 24 Drip cap on fa ade glass 25 Traverse fa ade edge 26 Traverse angle edge VISION 27 Straight traverse 28 Straight traverse to join roof glass only for deep D solariums 29 Finishing molding 30 Silicone 31 Backer rod 32 Screw for inserts 12 round head screw 33 Allen screw 1 4 3 4 for inserts 34 Screw 10 uc for traverses 35 Screw for traverse self drilling 8 flat head 36 Screw for mullions self drilling 8 pan head 37
68. the mullions by placing 3 screws on each side The screws are included in the door package The door frame has holes but holes need to be drilled in the mullions with a 1 8 drill bit Punch first to guide the drill bit Put Vaseline on the screws to avoid breaking them while screwing When looking from the inside of the solarium the door frame is flush with the mullions Drip cap for door ridge You can do this now or at the end of the solarium installation The drip cap will be held by silicone Put a strip of silicone on the molding at the of the door ridge Put the drip cap on the silicone Prior to installation you can fold the top of the drip cap to give it the desired shape POSE DES TRAVERSES D ARETES DE FACADE ET D ARETE D ANGLE FASTENING THE FACADE EDGE AND ANGLE EDGE TRAVERSES Pour le mod le VISION il y a 2 types de traverses puisque l angle de fa ade est plus aigu On the VISION model there are 2 types of traverses The facade angle is more acute than the que l angle de toit L enclavure des traverses est vers le bas Des traverses sont galement roof angle The slot of the traverses faces down Traverses are also placed on the fa ade plac es sur le faite du cadre de porte en fa ade et viss es aux meneaux adjacents door ridge and screwed to the mullions l aide d un x Acto enlev la partie souple sur les bris thermique aux endroits ou seront With an x Acto knife remove the rubbery part of the insula
69. the widest to seal the glass to corner mullion Start at the sill and go upward Cover the rim of the corner cover the mullion and the edge of the first glass Red line on drawing 2f SILICONE Put a silicone bead on the tape where the glass overlaps ETAPE 3 PLACEZ LES SOUS MOULURES Placez les sous moulures sur les meneaux couvrant ainsi le ruban que vous venez de poser Les sous moulures sont plus courtes que les meneaux Elles sont deja percees Vissez les aux meneaux comme vous l avez fait pour les caps de retenu temporaires ATTENTION Il est important que la moulure soit bien centr e sur le meneau La vis doit tre au centre du bris thermique noir qui est fix au meneau Autrement vous risquez de briser le verre R P TEZ LES 3 TAPES POUR TOUTES LES SECTIONS DE LA FA ADE LES ANGLES ET LES C T S Placez une baguette d espacement sur les meneaux juxtapos s un cadre de porte ou au mur de la maison 36 STEP 3 PLACE THE UNDER PRESSURE MOLDINGS Place the under pressure molding on the mullion covering the sealing tape The under pressure moldings are shorter than the mullions They are already pierced Screw them to the mullions as you did for the temporary holding caps ATTENTION It is important that the molding is well centered on the mullion The screw must be at the centre of the black thermal break which is attached to the mullion Otherwise you may break the glass REPE
70. tion barrier at the traverses plac s les traverses location Utilisez les vis 10 uc En vissant enfoncez l g rement la vis dans la traverse afin que la t te de la vis ne bloque l insertion du verre Vous pouvez aussi utiliser les vis 8 t te plate Parce Use screws 10 uc screws Slightly sink the screw in the traverse to make sure the head of qu elles sont plus longues elles entreront dans le meneau Vous devez donc percer avant de visser Mettez de la the screw doesn t block the insertion of the glass You can also use flat head screws 8 They are vaseline sur les vis pour viter qu elles ne cassent lors du vissage longer and will reach the mullion Therefore you must drill holes before screwing them in Put Vaseline on the screws to avoid breaking them while screwing vi Traverse Meneau Mullion Angle de toit Angle de fa ade Angle de facade sur faite de porte Faite L appui arri re est plus court de porte Door ridge Moulure Molding cadre de porte d Door frame ASSEMBLAGE DES MURS DE COTE Les meneaux des murs de c t sont de 60 mm Ils sont viss s par le dessous du seuil avec 3 vis 8 auto per antes t te bomb e Placez les meneaux par ordre de grandeur afin de suivre la pente du toit Le mur de c t sera juxtapos au meneau de coin du mur de fa ade Le seuil du mur de c t est taill en angle de 45 degr s a lavant Le seuil du mur de fa ade est tail
71. traverse d ar te de fa ade dessins 1b et 1c et d posez le sur les blocs d appui au seuil Si n cessaire Si vous n avez pas l aide d une autre personne maintenez le verre en place temporairement avec un cap de retenu Utilisez la vis bois de 1 1 2 pouce dessin 3a Placez le verre de la section voisine puis s curisez le cap de retenu temporaire dessins 3a et 3b FA ADE GLASS INSTALLATION Before installing the glass in the first row put silicone to waterproof the corner joints e Drip cap on glass For each row of glass peal off the blue protective plastic from the adhesive tape behind the drip cap and stick the cap centered at the top of the glass diagram 1 e Place 2 PVC self adhesive sitting blocks on the sill at about 3 inches from the mullions Use the thick sitting blocks diagram 2 e Insert the glass with the drip cap in the slot of the fa ade edge traverse diagram 1b and 1c and on the sitting blocks If you are working alone use one holding cap to temporary hold the glass in place Use 1 inches wood screw diagram 3a e Put the glass in the next section and fastened the temporary holding cap diagram 3a and 3b 3b 26 ANGLE GLASS INSTALLATION VISION model e Place 2 small 1 8 PVC self adhesive sitting POSE DU VERRE A L ANGLE mod le VISION e Placez deux blocs d appui autocollants de 1 8 d paisseur sur la traverse d ar te de fa ade a environ 3
72. tures aux coins ext rieurs avec du silicone dessin 3 et laissez s cher Maintenant vous pouvez fixer le cadre dans l espace pr vu du solarium Assurez vous qu il soit bien droit et au niveau Appliquez du silicone ADFAST transparent aux 2 coins du bas l int rieur dessin 4 Lorsque la porte sera install e appliquez un joint de silicone ADFAST de la couleur de votre solarium entre le bas du cadre de porte et le solin 1 4 f Neoprene APPENDIX 1 PI CES COMPOSANT LE CADRE DIAGRAM SHOWING THE PARTS OF THE DOOR 4 SEASONS PATIO DOOR ASSEMBLY FRAME GUIDE TOOLS REQUIRED Robertson square screwdriver Philips screwdriver X Acto type knife Silicone gun Electric or battery drill Drill it Rubber mallet CASING ASSEMBLY The casing consists of 4 long aluminum extrusions the top casing the door sill and the 2 sides Using the screws provided join each corner of the casing diagram 1 Neoprene tape is placed at both ends at the interior of the two frame sides The neoprene tape serves as a sealant You must install the decorative exterior molding before installing the casing on the structure of the solarium There is a decorative molding on each sides and one on the top diagram 2 Use a rubber mallet Block up the openings at the exterior with silicone diagram 3 and let dry Once the casing is fully assembled install it at the proper place on the solarium Make sure it is squared and leveled A
73. u sur faite de porte Porte en fa ade 17 Porte coulissante 18 Blocs d appui autocollants en PVC 19 Baguette d espacement en PVC 20 Baguette d espacement en aluminium seulement pour les solariums profonds 21 Verre 22 Fen tre 23 Rejet d eau pour fen tres 24 Rejet d eau sur verres de fa ade 25 Traverse ar te de fa ade 26 Traverse ar te d angle VISION 27 Traverse droite 28 Traverse droite pour joindre 2 verres de toit seulement pour les solariums profonds 29 Moulure de finition 30 Silicone 31 Boudin mousse 32 Vis pour insert vis 12 t te ronde 33 Vis Allen 1 4 3 4 pour inserts 34 Vis 10 uc pour traverses 35 Vis pour traverses vis 8 auto percante a t te plate 36 Vis pour meneaux 8 auto per ante a t te bomb e 37 Vis a bois pour le faite seuil les fen tres et les sous moulure a pression Des bouts de sous moulure a pression sont fournis pour vous aider a tenir temporairement les verres durant l installation Sur la liste de livraison nous identifions ces pi ces caps de retenu temporaire REQUIRED TOOLS Robertson square screwdriver X Acto type knife Punch Square Silicone gun Measuring tape metric and imperial Stepladder Electric or battery drill Drill bit and milling bit Level Rubber mallet 1 4 Allan Key Suction cups for handling the glass optional SOLARIUM PARTS Note that the drawings show a shor
74. ueur et surtout bien sceller les contours du verre debordant dessin 2b Terminez le ruban a environ 1 pouce au dessus de la traverse ANGLE Pour sceller la section en angle voluez de bas en haut couvrant une partie du ruban deja place Commencez a environ 1 pouce sous la traverse de fa ade et en arr tez a environ 1 pouce au dessus de la traverse d angle de toit dessins 2c et 2d Utilisez le ruban 3 le plus large pour sceller le premier verre au meneau de coin Commencez au seuil et voluez vers le haut Contournez le rebord du cap de recouvrement de coin couvrez le meneau et le bord du verre Ligne rouge sur le dessin 2f SILICONE Mettez un joint de silicone sur le ruban aux endroits ou il y a le verre debordant dessin 29 35 STEP 2 SEALING TAPE FACADE Stick sealing tape 4 the narrower one on the edge of two adjacent glass By doing this the tape covers the mullion Start at the sill and go upward drawing 2b Stick the sealing tape on the traverse and on the glass that overlaps Press to seal on all the length and contours of the overlapping glass drawing 2b End the tape at approximately 1 inch above the fa ade traverse ANGLE To seal the angle mullion start at approximately 1 inch under the fa ade traverse covering part of the tape you placed on the fa ade Go upward and end at approximately 1 inch above the angle traverse drawing 2c and 2d Use sealing tape 3
75. ui r sulte du chevauchement Bourrez cette cavit de silicone La m me proc dure s applique sur les meneaux de coin 2b 41 ROOF When there is a single length of glass on the roof Clip the pressure molding on the under pressure molding near the ridge on a length of about 2 inches At the other end push it by small stroke of mallet until it is well aligned with the angle pressure molding diagram 1 When there are 2 lengths of glass on the roof Place the pressure molding to on the first length well aligned with the angle pressure molding The 2 glass pressure molding overlaps the molding of the 1st glass drawing 2 On drawing 2 b we see the cavity resulting from overlapping Stuff the cavity of silicone The same procedure applies on the corner mullions APPLICATION DU SILICONE pour rendre votre solarium tanche l eau Avant d appliquer le silicone nettoyez toutes les parois l aide d un chiffon l g rement imbib de diluant a peinture 1 Tirez un joint de silicone sur les rejets d eau 2 l ext rieur sur les cot s de haut en bas du verre s ins rant dans le meneau de coin 3 De haut en bas sur les murs du solarium qui touchent la maison et ce aussi bien l ext rieur qu l int rieur 4 Tirez un joint de silicone sous tous les verres debordants Tirez un petit joint pouvant s infiltrer sous le verre Nettoyez l exc dent avec une spatule puis t
76. uminum must not be in direct contact Treated wood contains chromated copper arsenate CCA a substance that causes corrosion A membrane must be used and use nails and screws recommended by the pressure treated wood manufacturer SECURITY ADVICE Use a ladder in good working condition Always carry out the work with the help of another person Check for favorable weather conditions Always use the right tools in good working condition to avoid damages Always follow the sequence for optimum results Make sure the solarium is fastened to the structure of the house and not it s cladding and that the patio or balcony is level and square NOTE CONCERNING ASSEMBLY OF PARTS As you have noticed your Panovision solarium is composed of many parts In order to facilitate the identification of the parts you will find sketches showing the parts of your solarium on the following pages LIMITATION OF LIABILITY ZYTCO SOLARIUMS LTD shall in no event be liable for consequential incidental or special damages of any kind resulting in whole or part from 1 An installation inconsistent with ZYTCO SOLARIUMS LTD s installation manual or with an installation method which has not been previously approved in writing by ZYTCO SOLARIUMS LTD 2 An abuse or neglect during the solarium s installation 3 Altered or reinstalled product or parts 4 Installation under abnormal conditions 5 Misapplication of the product or parts 6 Combination with
77. un trou au centre et les 2 autres environ 6 pouces des coins Six vis de c ramique vis bois seront utilis es pour tenir le cadre de fen tre aux meneaux Faites les trous un peu plus gros que les vis Placez une baguette d espacement de chaque c t le long du cadre de la fen tre dessin 2 Utilisez du papier collant pour la maintenir en place temporairement Ext rieur 7 Exterior Coupe sch matique vue de haut Sch matique seen from the top 30 PREPARATION OF THE WINDOWS Remove the screens and identify them because they might not be interchangeable Before installing the windows you must countersink and drill 3 holes on the 2 vertical sides of the frame Make the holes at 1 2 inch of the edge diagrams 1 one hole in the center and the other 2 at about 6 inches from the corners Six ceramic screws wood screws are used to hold the window frame to the mullions Make the holes larger than the screws Put a spacer stick on both sides of the window frame diagram 2 Use scotch tape or mastic tape to temporarily hold them in place POSE DES FENETRES EN FACADE Cette tape s effectue a deux personnes 1 Placez le rejet d eau et le styromousse dans la traverse S il ne reste pas en place coincez un petit shim en caoutchouc entre le styromousse et le rabat arriere de la traverse 2 Appuyez le dessus du cadre de fen tre incluant le rejet d eau et styromousse Sous la tr
78. vary in height by a few mm Keeping this in mind you will choose the proper blocks so that the top of the glass panels are aligned In some cases you might put the glass directly on the sill A finishing molding placed all along the sill will cover the gaps Thin self adhesive sitting blocks are placed on and under the traverses before placing the glass in each section e The white thermal breaks and spacer sticks They have to be placed on the corner mullions before placing the glass e Temporary holding caps Pieces of under pressure moldings were provided They are used to hold the glass in place temporarily during installation diagram 3 Put one holding cap on the mullion between 2 glasses Use 12 inch wood screws When 2 consecutive rows of glass are installed you can replace the holding caps by the pressure molding The procedure includes several steps Putting sealing tape is one of them In this guide we place the pressure moldings after all the glass is in place held by the temporary holding caps e Description of isolated glass The isolated glass is made of two sheets of glass The clear glass faces the interior of the solarium and the tinted glass faces outside diagram 4 The entire perimeter of the insulating glass is sealed with two sealants The tint of the 2 sealants differs diagram 5 Seen from the exterior side of the glass you can hardly see the difference but from the inside you can easily see the differ
79. vers l ext rieur dessin 4 Le p rim tre entier du vitrage isolant est scell avec deux agents de scellement La teinte de ces 2 scellants est diff rente l une de l autre dessin 5 Vu du cot ext rieure la diff rence des teintes est peu apparente alors qu on la per oit facilement du c t du verre qui va l int rieur du solarium Les 2 verres composant le verre isol du toit ne sont pas de la m me grandeur Le verre qui d passe va l ext rieur et en direction du bas dessin 5b e Utilisation du silicone Vous avez re u plusieurs teintes de silicone R gle g n rale le silicone clair est pour la pose du verre au toit Le blanc ou le beige va sur les parties verticales Le noir peut donner les meilleurs r sultats pour la finition int rieure POSE DU VERRE ll est recommand de faire ce travail avec l aide d une autre personne Vue de l int rieur au travers le verre clair i Seen from inside through the clear 7 Vue Jde l ext rieur au travers le verre teint Seen from outside through tinted glass 24 Verre de toit vue de l ext rieur I Roof glass seen from outside INFORMATIONS RELATIVE TO GLASS INSTALLATION e PVC self adhesive sitting blocks You received PVC self adhesive sitting blocks of 2 different sizes The thick sitting blocks are used to rest the tall glass panels on the sill Panels of glass may
80. w frame along the mullions inside the solarium and at the two lower corners of the window frame 6 Apply a silicone bead at the edges of the fa ade pressure molding and roof angle moldings 7 Outside at the edge of the window frames and door frames 8 On the roof all along the traverses roof angle traverse and roof traverse of solariums that have 2 lengths of glass Do not apply a silicone bead on the sill The glass rests on gasket strips that are rubbery Your weight makes the glass go down slightly while you are on it Do not return on sections of glass which the contours have been sealed Wait at least 2 days PLACING THE FINISHING MOLDING flat bars Place the finishing molding on the sill and above the door using silicone Apply a bead of silicone behind the finishing molding and put it against the glass Apply a small bead of clear silicone above and at both sides near the pressure moldings Do not apply a silicone bead on the sill POSE DE LA MOULURE DE FINITION flat bars Faite tenir la moulure de finition sur le seuil et au dessus de la porte avec un joint de silicone touchant le verre Faites un petit joint de silicone clair sur le dessus et aux extremit s pres des moulures a pression Ne pas tirer de joint sur le seuil Place a finishing molding inside the solarium Posez la moulure de finition l int rieur au haut above the window frames diagrams 3 and 4 des cadres de fen tre dessins 3 et 4
81. water drip and styrofoam in the traverse If it dos not stay in place place a little rubber shim between the foam and the back of the traverse 2 Place the window including the water drip and styrofoam under the straight traverse The window will be held in place with 3 screws into each side of the mullion You must drill holes before screwing Use a 1 8 drill bit Put Vaseline on the screws to avoid breaking them while screwing Warning place one screw on one side then make sure the window frame is squared and level before drilling and putting the other 5 screws in 3 POSE DU PETIT VERRE SOUS LA FENETRE Placer deux blocs d appui de 1 8 pouce sur le seuil environ 3 pouces des meneaux Mettez une lisi re de silicone dans l enclavure de la traverse droite qui va tre plac e sur le petit verre sous la fen tre Ins rez cette traverse sur le dessus de ce petit verre A Appuyez la traverse et le petit verre sous le cadre de fen tre B et sur les blocs d appui au seuil du solarium C Lorsqu il y a un muret il est possible d installer le petit verre au dessus de la fen tre plut t qu en dessous Cependant vous devez nous en faire part afin qu on vous achemine certaines pi ces d appoint POSE DES VERRES IRR GULIERS SUR LES C T S DU SOLARIUM e Commencez par la section situ e pres de la fa ade Mettez un petit bloc d appui autocollant en PVC a chaque extr mit sur le dessus de la traverse droite de
82. x de la fa ade et des c t s Enlevez le cap de retenu temporaire qui maintient les verres d angle des 2 premi res sections Ins rez le boudin mousse dessin 1a entre les 2 verres d angle et le bas des verres de toit Appuyez la longueur exc dante sur le toit Coupez la partie bomb e afin que seulement 1 8 de pouce d passe le verre dessins 1b Ins rez le boudin mousse sur le meneau de coin et coupez la partie bomb e qui d passe de la m me fa on dessin 1c 34 SEALING ALONG THE FACADE MULLIONS ANGLES AND GABLE END MULLIONS STEP 1 BACKER ROD Backer rod goes on the angle and roof mullions Do not put baker rod on the fagade and gable end vertical mullions Remove the temporary holding cap from the angle mullion between the 2 first rows of glass Insert backer rod between the 2 glass and between the 2 roof glasses at the lower end Lean the exceeding length of the backer rod on the roof Cut off the exceeding rounded part of the backer rod so that only 1 8 inch exceeds the glass drawings 1b Insert backer rod on the corner mullion and cut off the exceeding rounded part as you did drawing 1c ETAPE 2 RUBAN DE SCELLEMENT EN FACADE Collez le ruban 4 le moins large sur le bord des deux verres adjacents en couvrant ainsi le meneau Commencez au seuil et voluez vers le haut dessin 2a Collez le sur les traverses et sur le verre debordant Prenez soin de bien appuyer sur toute la long

Download Pdf Manuals

image

Related Search

Related Contents

GX200 Operator Service Manual - Red-D    L`enquête « Histoire de vie familiale, professionnelle et    operation and maintenance manual manuel d`utilisation et d  Zanussi ZCG43210XA cooker  TFA 30.3032.10.IT digital body thermometer  ダウンロード(3.2MB)  Lake Shore Model 625 Superconducting Magnet Power Supply  Liebert GXT3-J UPS 800VA ~ 3000VA  

Copyright © All rights reserved.
Failed to retrieve file