Home
        Installation Manual Manuel d`installation
         Contents
1.                                      O  O                                                         N                              Ss                    Co  9         I       N           2                                 10 Support de fixation en L 10                       12    16    20 pi  4 88    6 1m   Boulons de carrosserie 1 4 po x 5 8       6 mm x 16 mm    pour l assembla  0  ge entre barre        et profile           14 0  16  7  18  19  20  21  2  23  16 pi  4 88     Panneau de toit de 28 3 4 po  73 cm   26  19 pi 5 79m    Panneau de toit de 45 3 4 po  1 16 m   20 pi  6 1 m  Panneau de toit de 46 3 4 po  1 18 m         O    27 ous rappe d   vacuation    4  N    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE  6  Glissez le raccord entre profiles       et enC  A AVE RTISSEM ENT dans les profiles en C  La partie courbe doit   tre    IMPORTANT  NE SERREZ PAS TROP les                    boulons  N utilisez pas d outils   lectriques   Les boulons en acier inoxydable se  briseront lorsque soumis    trop de force     Rails de profil  s en  C entre les plaques       1  Placez les cales en mousse sur le dessus du spa  de nage  en les espacant r  guli  rement  puis  fixez les en place avec du ruban adhesif  7         Ins  rez une barre          avec sa partie large et  plate orient  e vers le bas  Utilisez des boulons  1 4 po x 1 2 po pour fixer la barre        au  raccord entre profil  s en    et          Serrez ces  boulons           2  Placez le plus grand panneau  46 3 4 po  1 18
2.                                 eds                             9   5889329     590086  sed                U seenbipui suoisueuuip 58521  965         eds       52102                 9eJiesseoau 158                         59008            asub 8   8         40199 ep            ealquiod aubi7                          SNOJ  Sot anug       2  96                               19 1 92                          wo 7 Gp    8     snoJ  59  anug              0   1          9         esinbaJ                            abeu      eds jne6 81   ue z                      EI   ns               202  8             EI Ins    041         6        abh             30             NOILONO                      3lWdOd3lV Id             YNADNO1           39       ASSEMBLAGE DU LEGEND   TAPE 1   DEBALLAGE    OUTILS REQUIS    e Ciseaux   Couteau    Tournevis    bout     lame r  tractable carr    Robertson   e Ciseaux    t  le    Cl   Allen  7 32         Avant de d  baller l unit    assurez vous qu il n y ait  aucun dommage   vident sur le caisson  Dans le cas  de dommages suspects  prenez des photos  Si vous  d  couvrez des dommages  veuillez contacter le  service    la clientele de Covana au 1  877  278   8010    Mettez le Covana en position verticale  Assurez vous  que les conditions de vent permettent de le faire en  toute s  curit      Utilisez les ciseaux    t  le pour couper les rubans de  m  tal autour du caisson     Utilisez le tournevis Robertson pour d  visser les vis  qui retiennent le couvert
3.                      A    Align   sur ii  le centre  26     l emplacement de chaque montant  retirez          31  Placez les v  rins dans leurs endroits  Les  moteurs des v  rins sont situ  s sur la  gauche quand vous faites face au spa de  nage        Modeles de 16    20 pieds  4 88 m    6 1 m  de  long   Utilisez la longue patte de fixation fournie  pour plus de rigidit       50    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE    92     33     34     35     Glissez les arbres d entra  nement sur l axe carr    des deux verins motorises lateraux           Maintenez le verin non motorise      position  verticale et align   avec le v  rin motoris     Utilisez une cl   plate de 3 4 po  19 mm  sur  l arbre du v  rin pour effectuer un r  glage pr  cis  de l axe carr    de fa  on    ce qu il soit align    avec l arbre d entra  nement  puis glissez avec  pr  caution l axe carr   dans l arbre  d entra  nement  Effectuez cette proc  dure pour  les deux jeux de v  rins    Installez le cadre d aluminium en U sur chaque  arbre d entra  nement et support de v  rin  Fixez     l aide des boulons 5 16 po x 2 po  8 mm x  51 mm  et   crous fournis                       Les pattes de fixation des v  rins sont situ  es  sur les v  rins non motoris  s       est maintenant  possible de retirer les deux pattes de fixation  des v  rins  Il est sugg  r   de les laisser en place  pour une utilisation ult  rieure   ventuelle     I       36     37     38     Pour              des deux moteurs  glissez la  
4.                334 0                                 np                       91     94       8501       33314         30 3003          29    E           lt      LLI  I  O  Y         LL           t            lt   O          E           am    Molex MX150L    Motor Controller       Motor       Motor          olde       Mold MX1       Mold           ole MX15DL 4 Whit              MX     Black    Mx150 back          2058             WHITE GREEN    z        5    lt           5 5                    D             WHITE GREEN       Key Switch    Solar Panel    D    File       nuals  Working Copies mages winnag attempt  dsn    Revision  1 0 1 of 1       60    GUIDE DE DEPANNAGE    V  rifiez que la batterie est connect  e au bon endroit  sur le  c  t   du boitier      La batterie a besoin d   tre recharg  e  Utilisez le chargeur  fourni pour recharger la batterie pendant au moins 2 heures     Si le LEGEND est   quip   d un panneau solaire en option   assurez vous qu il re  oit suffisamment de lumi  re du soleil     Le LEGEND ne se l  ve ou ne s abaisse  pas      V  rifiez les branchements du bo  tier de commande  y com     pris la batterie  l interrupteur    cl    les moteurs et le panneau  solaire     Absence  d alimentation    e Le moteur et le boitier de commande    sont silencieux  WR          aW n  V  rifiez l interrupteur    cl       ouvrez l interrupteur    cl   et ins     pectez les connexions     il est possible qu elles aient besoin  d   tre resserr  es     Aucun mouvement v
5.            NO  N                   ch           gt             27         5                         TYPIQUE DU TOIT POUR LES MODELES DE 16    20  PIEDS  4 88 M A 6 1 M        AGENCEMENT TYPIQUE DU TOIT POUR LES MODELES DE 16 A 20    PIEDS  4 88 M A 6 1 M           Mod  le Description    de la  pi  ce       Coin faisant face    l ext  rieur  ous upport de coin  ous Vis autotaraudeuse    t  te Phillips cylindrique n  8 x 1 2 po  ous Profile en C  c  t   court  de 2 12 m  63 3 4 po   Tous Profil   en C  c  t   moyen long  de 2 40 m  94 9 16 po       4 48    Profile         gauche de 45 9 16 po  1 15          5 18    Profile         gauche de 51 9 16       1 31      i  5 49    Profile         gauche de 57 9 16       1 46      9       5 79    Profile         gauche de 63 9 16 po  1 61         6 1 m  Profile en C gauche de 65 1 16 po  1 66 m       4 48    Profile         droit de 45 9 16 po  1 15          5 18    Profile         droit de 51 9 16       1 31         5 49    Profile         droit de 57 9 16       1 46        5 79    Profile         droit de 63 9 16       1 61         6 1 m  Profile         droit de 65 1 16       1 66     16    20       4 88    6 1m   16    20       4 88    6 1m     Tous Support de fixation entre barre en   et profile en C de 11 po  27 9 cm    fixation des montants au toit     6    20 pi  4 88    6 1m   Support de fixation entre barre en   et profil   en C de 2 po  5 1 cm     OUS         TTT  9    St                                        5            
6.      EN            e  Veuillez noter l orientation des composants    AVERTISSEMENT  Appliquez du lubrifiant anti   grippage    l int  rieur de chaque insert pour   viter  le grippage  Nous recommandons le lubrifiant  anti grippage Loctite Nickel 51102        48    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE       AVERTISSEMENT    10     11     12     13     RISQUE DE NOYADE   La plus grande  ouverture de la trappe d   vacuation doit    tre orient  e vers le dessus        Sur les c  t  s ext  rieurs des panneaux d  j    install  s  ins  rez le long raccord entre les  profil  s en   et          et le support de fixation  en L  comme illustr                    Partie d  coup  e face    l extr  mit   du spa    Ins  rez une autre barre         comme  auparavant  ainsi que les profil  s         courts   Maintenez le raccord entre profil  s en   et en        l aide de boulons 1 4 po x 1 po  mais ne les  serrez pas                    Le prochain panneau    ins  rer sur les deux  c  t  s a des fentes sur le bord  Pour les  mod  les de 16 pieds  4 88 m  ou plus  il s agit  du panneau rectangulaire  Pour les mod  les de  15 pieds  4 6 m  ou moins  il s agit des  panneaux de bord qui ont un biseau     45 degr  s  Lubrifiez le haut et le bas de la  partie munie de fentes en utilisant le lubrifiant  fourni  puis ins  rez le panneau dans la barre    14            16     17     18     D     en    le c  t   portant les fentes en premier       est possible que le panneau ait besoin  d   tre for
7.      Snap the C Channels over the previously  placed panel so that the middle is at one end     Pre assemble the I to C channel connections  as shown  Place tape over the head of the  1 4  x 5 8  carriage bolts  Keep those bolts  and nuts lose           A           Please note the orientation of the components    the escape hatch panel  Insert this end into  the middle I beam  The panel may need to be  persuaded into place  To do this  make sure  that the panel is pushed as far as possible by  hand and is sitting on the              To push  the panel  use the supplied hammer block  and a rubber mallet alternately on both ends  of the panel until it reaches its final position     WARNING  Anti seize must be applied inside    each insert to prevent seizing  We  recommend Loctite Nickel Anti Seize 51102        ASSEMBLING THE LEGEND PART       ASSEMBLY    RISK OF DROWNING  THE LARGER OPENING OF THE ESCAPE  HATCH HOLE IS TO BE ON THE TOP     10  On the outer sides of the installed panels     insert the long l to C connector and L  bracket as shown           Trimmed end towards spa s end      Insert another              as before  as well as  the short C channels  The long  16   C connector should be loosely held in place  using 1 4  x 1  bolts                    gt   HH     Second      The next panel to insert on both sides will  have slots on its edge  If the unit is 16  4 88  m  or larger  this will be the rectangular  panel  On units 15   4 6 m  or smaller  this  will be the e
8.    COVANA    LEGEND    Read this manual before proceeding with installation  Veuillez lire ce guide avant de proc  der    l installation           pp             Installation Manual  Manuel d installation    www covana com            version fran  aise du manuel d  bute    la page 31    RISK OF ELECTROCUTION  THE BATTERY WALL CHARGER SHOULD ONLY BE USED INDOORS AWAY FROM  ANY WATER SOURCES     RISK OF INJURY  DISCONNECT OR TURN OFF ALL POWER SUPPLY BEFORE STARTING ANY  INTERVENTION ON THE COVANA     RISK OF INJURY  DO NOT OPERATE THE COVANA WHILE IN WATER     AVOID DROWNING RISK   ENTRAPMENT POSSIBLE    FAILURE TO FOLLOW ALL INSTRUCTIONS MAY RESULT IN INJURY OR DROWNING   INSPECT PERIODICALLY   POWER SAFETY COVER MEETING ASTM F1346 91 REQUIREMENTS     RISK OF INJURY  BATTERIES CONTAIN BATTERY ACID WHICH IS HIGHLY CORROSIVE                        THIS OPERATOR IS SPECIALLY DESIGNED      OPERATE ONLY WITH THE COVANA LIFTING SYSTEM   UNDER NO CIRCUMSTANCES SHOULD THIS OPERATOR BE USED FOR ANY OTHER APPLICATIONS     NOTICE    DISPOSAL  THIS PRODUCT MAINLY CONTAINS STEEL  COPPER  CU   ALUMINUM  AL    FIBERGLASS   amp  EPS   THE GEARBOX CONTAINS OIL AND OTHER MATERIALS  PLEASE RECYCLE WISELY    NOTICE    REMOVE THE CONTROL KEY AFTER OPERATING THE COVANA   STORE THE KEY      SECURE LOCATION WHEN NOT IN USE   BRING THE KEY WITH YOU IN THE SWIM SPA TO PREVENT UNAUTHORIZED  OPERATION OF THE COVANA          G    NOTICE    The key switch must be permanently  Roof mounted and located 5 fe
9.    deux  2  vis qui retienne le bas des v  rins     deux  2   13  vis qui retiennent le haut du caisson   quatre  4   vis par v  rins  vis par c  t    cinq  5  vis sur le dessus        41    ASSEMBLAGE DU LEGEND   TAPE 1   DEBALLAGE    17  Retirez le dessus du caisson                   1        gt         gt  4 LE            1 2  A    4              4 T e   4                         18  Retirez les panneaux de toit du caisson et d  posez   les dans un endroit s  curitaire                  42    ASSEMBLAGE    43               TYPIQUE DU TOIT POUR LES MODELES DE 12    15  PIEDS  3 66 M A 4 6 M           FT            P  SSN       44    AGENCEMENT TYPIQUE DU TOIT POUR LES MODELES DE 12 A 15    PIEDS  3 66 M A 4 6 M               N    de    d Modele  la pi  ce    Description          Tous Coin faisant face    l ext  rieur  ous  ous    Tous    Support de coin  Vis autotaraudeuse    t  te Phillips cylindrique n  8 x 1 2 po  Profil   en C  c  t   court  de 83 3 4 po  2 12 m     Tous Profile en     c  t   moyen long  de 94 9 16 po  2 4         3 66     Profile         gauche de 21 9 16       54 8 cm       3 96     Profile         gauche de 27 9 16 po  70         4      4 27     Profile         gauche de 33 9 16       85 2 cm      4 6 m  Profile en C gauche de 39 9 16 po  1 m    2 pi  3 66 m  Profile en C droit de 21 9 16 po  54 8 cm    3 pi  3 96 m  rofil   en    droit de 27 9 16 po  70 cm    4 pi  4 27 m  rofil   en    droit de 33 9 16       85 2 cm    5 pi  4 6 m  rofil   en    dro
10.   m   sur les cales en mousse au niveau de la   troit  avec  partie centrale du spa de nage  rebord       3  Marquez le milieu     47 1 4 po  1 2 m  de  l extr  mit    des profil  s en C du milieu  94 9 16 po   2 40 m   avec du ruban adh  sif  Les profil  s en     du milieu ont des trous aux deux extr  mit  s    4  Emboitez les profil  s en    sur le panneau mis en  place pr  c  demment de fa  on    ce que le milieu    soit    une extr  mit       9  Lubrifiez le haut et le bas d un bord du panneau    de      trappe d   vacuation  Ins  rez ce c  t   dans  Centre du spa de nage la barre en   du milieu  Le panneau peut avoir  besoin d   tre forc   en place  Pour cela  poussez  manuellement le panneau aussi loin que  possible  jusqu    ce qu il repose sur la barre          Pour pousser le panneau  utilisez la cale a  marteler fournie et un maillet en caoutchouc  en  alternant les deux c  t  s  jusqu    ce que le  panneau soit repousse a fond     Large et plat    8  Serrez le raccord entre profiles en   et en C au  profile en C  Il devrait   tre positionn   de mani  re  telle que le centre de la barre en   soit align    avec le ruban adh  sif  le milieu du profil   en C                                                        5  Pr   assemblez les raccords entre les profil  s en    et les profil  s         comme illustr  s  Placez du  ruban adh  sif sur la t  te des boulons de  carrosserie de 1 4 po x 5 8 po  6 mm x 16 mm    Ne serrez pas ces boulons et ces   crous        A         
11.   posts height adjustment  reset of  upper and lower limits        28       OPTIONAL   SOLAR PANEL             ava    dv  3135  8 81 SS Z  SdIT1IHd GVAH NVd        X 21 01   618602    13H9V44 LNNOW TANVd                                  9ZLLLC    MOLA        TANVd HVIOS   Z8   0lC    3009  NOILdl0S3Q 3                                                LHC 4      orze            ett    LAAHS SHOLLOTIHELSHI NOLLYTTYLSNI TANVd               29    Q          lt           L  Q  0                              E           am    Molex MX150L    Motor Controller       Motor       Motor          olde       Mold MX1       Mold           ole MX15DL 4 Whit              MX     Black    Mx150 back          2058             WHITE GREEN    z        5    lt           5 5                    D             WHITE GREEN       Key Switch    Solar Panel    D    File       nuals  Working Copies mages winnag attempt  dsn    Revision  1 0 1 of 1       30    TROUBLESHOOTING    Ensure that the battery is connected to the correct  spot  side of the box      Battery needs to be charged  Use supplied charger to  charge battery for at least 2 hours   If the Covana has the optional solar panel  ensure  that it is getting adequate sunlight   The Covana will not elevate or lower Check control box connections including battery   e Motor  amp  control box are silent No power motors key switch and solar panel   e No visibl t       Check key switch     open the key switch and review  connections     might need retighte
12.  D INITIALISATION DE LA  POSITION DES MONTANTS      tape n  2   Initialisation    z  ro  0  des montants     Avertissement   Le toit ne s arr  tera pas si vous tentez d aller plus haut que la  hauteur maximale configur  e par d  faut        ce point  les circuits de contr  le ne prennent plus les positions des encodeurs en    consid  ration et vous pouvez alors brancher un des moteurs  ou les deux  pour corriger  la situation de mani  re         abaisser un des montants  ou les deux     la position basse  position z  ro   r  initialiser le syst  me si les deux montants sont    z  ro  0    Si les deux moteurs n   taient pas connect  s  connectez les    Assurez vous que les deux moteurs sont    leur point le plus bas  que le couvercle  repose bien    plat sur le spa de nage et que les montants sont    la m  me hauteur     D  branchez le connecteur d alimentation au bo  tier de commande  reportez vous    la  Figure 1 pour l emplacement de connecteur      Attendez au moins 30 secondes avant de reconnecter l alimentation au Covana   L initialisation des circuits de contr  le  du r  glage de la hauteur des montants  du  r  glage des limites sup  rieure et inf  rieure est maintenant termin  e        58    PANNEAU SOLAIRE    OPTION      26215   0                                   8 81 55 2 ANOINGNIT        SdIT1IHd 3131  v     X 21 01 ASNAAGNVYVLOLNV SIA    EN            FAOO 3MIV1OS NVANNVd      NOLLVXId      ALLVd  DEN MOL     A vc AYIVIOS NVANNVd    NOILdIMDSAG    JueAe           
13.  avant       El    N  4    OUVERTURE DE CAISSE    5  Retirez le couvert avant et d  posez le dans un endroit  securitaire     9         Retirez la feuille de protection qui recouvre les pieces     l int  rieur du caisson    Utilisez le tourne vis Robertson pour d  visser les deux   2  vis qui retiennent le haut de chacun des manchons      quatre  4  manchons   huit  8  vis au total    p Uu    Retirez les quatre  4  manchons de l int  rieur du  caisson et d  posez les dans un endroit s  curitaire     Remove the three  3  boxes above the jack box     40    ASSEMBLAGE DU LEGEND   TAPE 1   DEBALLAGE    Utilisez le tournevis Robertson pour d  visser les vis     13  Retirez le joint d   tanch  it   et les rectangles de  qui retiennent le support des quatre  4  poteaux     mousse de l int  rieur du caisson et les d  posez les    quatre  4  vis par c  t     deux  2  vis au milieu  deux dans un endroit s  curitaire    2  vis au bas  i    14  Retirez les extrusions         et en   de l int  rieur du  caisson et d  posez les dans un endroit s  curitaire     11  Avec l   aide d une autre personne  enlevez le support  des quatre  4  v  rins de l int  rieur du caisson et  d  posez le dans un endroit s  curitaire     15  Avec l aide d une autre personne  mettre le caisson en  position horizontale sur le c  t   arri  re  Une  1   personne de chaque c  t   du caisson     12  Utilisez le tourne vis Robertson pour d  visser les     16  Utilisez le tourne vis Robertson pour d  visser les treize 
14.  distance de                5 pieds  1 5 m  du spa de nage et       5 pieds  1 5 m  au dessus du sol avec  une vue directe sur le Covana lors de son  fonctionnement      5 pieds                  1 5 metre    Spa de nage             GL       35                          VEUILLEZ SUIVRE LES           5 SUIVANTES AFIN D   ASSEMBLER      DE CONFIGURER  CORRECTEMENT LE COVANA     IMPORTANT    NE PAS UTILISER LE COVANA AVANT QUE TOUTES LES CONNEXIONS  MECANIQUES      ELECTRIQUES SOIENT EFFECTUEES     IMPORTANT    TOUS LES POTEAUX DU COVANA DOIVENT ETRE CORRECTEMENT FIXES AU SPA DE NAGE EN  INSTALLANT LES SUPPORTS FOURNIS A CHAQUE MONTANT     IMPORTANT    CONSERVEZ LA BATTERIE A L INTERIEUR LORSQUE LA TEMPERATURE CHUTE  EN DESSOUS DE  30  C   22  F         36    PREPARATION DE LA FONDATION    Tout comme pour un spa  la fondation du Covana se doit d   tre solide  L emplacement ou le  Covana est place doit pouvoir supporter au minimum 600 Ib  272 kg  et   tre de niveau  Tous  les composants du Covana doivent   tre support  s par la fondation     Remarque   Les dommages   ventuels caus  s par une surface d installation inadequate  ne sont pas couverts par la garantie du LEGEND  Le proprietaire est responsable de  fournir une surface de support adequate     Surface de support et fondation recommand  e      1  Sol en madriers OU plateforme de b  ton de 4 po  10 cm  d   paisseur   2  Les quatre montants du Covana doivent   tre correctement fix  s au spa de nage a  l aide du mat  riel de fi
15.  the short end of the  of both motor side jacks  cable  which is determined from the metal   D connector on the cable  through the centre    4 hole on the back of the motor jack s feet   Connect the motor to the cable and tighten  the nut of the metal connector onto the foot          ES    e              L    e       33  Hold the non motor jack vertical and inline  with the motor jack  Using a 3 4  wrench on  the shaft of the jack  make fine adjustments  to the square shaft so it is in line with the Sa  drive shaft and carefully slide the square Connect  shaft into the drive shaft  Do this for both set Tighten nut motor plugs  of jacks     Install the aluminum U frame over each of   The jack adapter located at the top of the  the drive shaft and jack bracket  Fasten in jack can be adjusted by turning the large  place using the provided 5 16  x 2  bolts and threaded rod  Adjust the heights so that  they match the cover mounts                            Located on the non motor jacks are the jack   Slide the sleeves overtop of the jacks and  lock brackets  Both jack lock brackets can attach them using the 1 4  x 5 8  carriage  now be safely removed  It is suggested that it bolts at the top   is left within its holder for future use                          21    ASSEMBLING THE LEGEND PART II   ASSEMBLY    39  Use a torpedo level to make  sure that the posts are  completely plumb with the  ground      Attach the swim spa mount  arms to the swim spa mount  brackets using a 1  bol
16. all weather seal can be applied to the   inner sleeve where it meets the other   sleeves  There is a small plastic insert that   should be used to keep the seal together                 Note  The cover must be fully down prior to  installation of the all weather seal                                         45  The Covana should now be raised up into  the air to ensure everything runs smoothly        24    ASSEMBLING THE LEGEND PART III   APPLYING THE SEAL    1  When the complete LEGEND assembly has   5  Test by lowering the roof again to ensure that  been performed  lift the roof using the key the seal makes contact with the entire  switch and remove the foam spacers  Lower perimeter  If satisfied  elevate the roof  remove  the roof  walk around the entire swim spa the red plastic backing of the seal and lower  observing where the white inside shell makes the roof to the seal   contact with the swim spa  This will determine   6  Let the roof rest in this position for two minutes  the best location to apply the seal  to ensure proper seal to roof adhesion    2  Ensure the swim spa edge is completely dry    3  With the roof elevated  apply the seal clips   Important  Now elevate the roof no more than  provided to the swim spa in the predetermined         inch  25 4 mm  and let the roof rest again for  area for the seal  The ideal location for the      short period as this will allow the seal time to  seal is closer to the inside water edge  slowly and fully release from the sea
17. b  www covana com  cliquer sur le bouton  YouTube et selectionner      Covana  LEGEND  Installation video     en anglais  seulement         PROCEDURE D INITIALISATION DE LA    POSITION DES MONTANTS       Cette procedure doit   tre ex  cut  e dans les situations suivantes        Lors de l installation initiale       Lorsque les montants ne sont plus    la m  me hauteur       Quand les montants ne d  tectent pas les limites sup  rieures et ou inf  rieures     La proc  dure consiste en deux  2    tapes simples   Initialisation du circuit de contr  le    z  ro   0  et initialisation    z  ro  0  des montants       tape n  1   Initialisation du circuit de contr  le    z  ro  0    1   D  branchez les deux moteurs de l emplacement du boitier de commande de fa  on     d  sactiver les montants  Ne d  branchez aucun autre connecteur  Reportez vous    la    figure 1 pour l emplacement des connecteurs des moteurs     Figure 1                Alimentation                56    PROCEDURE D INITIALISATION DE LA       POSITION DES MONTANTS    2     l aide de l interrupteur    cl    voir Figure 2   ex  cutez les   tapes suivantes sans  interrompre la s  quence pendant l ex  cution     Tournez et maintenez l interrupteur    cl   dans la position du bas pendant 8    10  secondes     Rel  chez l interrupteur    cl   et imm  diatement    Tournez l interrupteur    cl   de mani  re r  p  titive vers la position du bas 8    10  fois en moins de 15 secondes   Attendez 10 secondes        57    PROCEDURE
18. c   en place  Dans ce cas  suivez la  m  me proc  dure qu    l   tape 9    R  p  tez les   tapes 13    14 sur l autre c  t       Pour les mod  les de 15 pieds  4 6 m  ou  moins  passez    l   tape 21     Comme auparavant  glissez un raccord entre  profil  s en                dans chacun des profil  s  en C  La partie courbe doit   tre du c  t    oppos   au panneau          troit   avec  rebord            A  wie _      P d Large et plat V    Ins  rez une barre en l  avec sa partie large  et plate orient  e vers le bas  Utilisez des  boulons 1 4 po x 1 2 po pour fixer la barre  en   au raccord entre profil  s en   et en C   Serrez ces boulons    Le bord du panneau de bout est biseaut       45 degr  s  Lubrifiez le haut et le bas du bord  de ce panneau sur le c  t   qui n est pas  biseaute    45 degr  s  Ins  rez ces panneaux  avec l extr  mit   effil  e vers le bout du spa de  nage       Le panneau peut avoir besoin d   tre forc   en    place  Dans ce cas  suivez la m  me  proc  dure qu    l   tape 9       R  p  tez les   tapes 18    19 sur l autre c  t       Pour chaque coin  ins  rez la pi  ce int  rieure    du coin                                 Emboitez les profil  s         restants     49    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE    23  Fixez les pieces de coin en place    l aide de   27  Tournez la poign  e de la trappe  deux vis n  8  d   vacuation pour r  tracter les bras et  l ins  rer dans le trou de la trappe  d   vacuation  Veuillez vous reporter     l instruc
19. dge panels that have 45 degree  cuts in them  Lubricate the top and bottom  of the slotted    end using the supplied lube and insert the  panel into the I beam with the slots first                      The panel        need to be persuaded into    place  Follow the same procedure as step 9       Repeat steps 13 to 14 on the other side     For units 15   4 6     or smaller skip to  step 21       As before  slide one l to C connector into    each of the C channels  The bend should  be away from the panel       Narrow with  lip    Wide  amp  flat      Insert an I beam  The larger flat part of the       beam goes towards the bottom  Using 1 4   x 1 2  bolts fasten the             to the I to C  connector  They should be tightened at this  point       The end panel has its end tapered with a 45    degree cut  Lubricate the top and bottom  edge of this panel on the side without the 45  degree cut  Insert these panels with the  tapered end towards the end of the swim  spa       The panel may need to be persuaded into    place  Follow the same procedure as step 9       Repeat steps 18 to 19 on the other side     On each corner  insert the corner inside    piece                          ASSEMBLING THE LEGEND PART II   ASSEMBLY       Screws                                               7 X         y    Occasionally  the cover may need to be  squared up  This can be done by hitting the  corner with a rubber mallet                                Hit here    Attach the outer corner piece 
20. e le m  canisme fonctionne correctement en d     pla  ant les bras du haut et du bas        Probl  me  m  canique    La trappe d   vacuation ne s ouvre pas    Assurez vous que la trappe d   vacuation n est pas gel  e        61       Fabrique au Canada  par Canimex  www covana com    BREVETE    CANADA 2 532 429  US 11 162 557  R U  0515168 3  AUSTRALIE 2006200251    Covana005 EN FR 1   209798    
21. et  1 5 m     DENEN                     1 5     above the deck and user  must have full view of the Covana  when operating   5 feet E     gt   1 5 meters                            CL                                 OBSERVE THE FOLLOWING STEPS FOR PROPER ASSEMBLY    IMPORTANT  DO NOT OPERATE THE UNIT UNTIL ALL MECHANICAL AND ELECTRICAL    ALL 4 POSTS OF THE COVANA MUST BE PROPERLY ANCHORED TO THE SWIM SPA USING  THE SUPPLIED BRACKETS AT EACH POST     IMPORTANT       PREPARING A PROPER FOUNDATION    Just like the swim spa foundation  the Covana also requires a solid foundation  The area that  the Covana sits on must be able to support at least 600 Ib  272 kg  and must be leveled  All  components of the Covana must be supported by the foundation     Note  Damage caused by inadequate or improper foundation support is not covered by  the Covana warranty  It is the responsibility of the owner to provide proper foundation     Foundation recommendation   1  Engineered wood deck OR concrete pad   4   100 mm  thick     2  Each of the 4 posts      the Covana must be properly anchored to the swim spa using the  supplied hardware     LEGEND ELECTRICAL REQUIREMENTS    1  The LEGEND motor is powered by a 24 V DC System    2  The LEGEND must be installed in accordance to and comply with any local codes and  regulations    3  Wire and conduit for the key switch and motor cables should be sized as per local codes  and regulations     Required voltage for charger  115 V for North American cust
22. f connector bracket    1 4  20 x 1  button head socket        screw    23            We 3 4   1187 mm  Roof panel with escape hatch  12     3 66   027 1 4   692 mm  Roof edge panel  24    5    N          13Ft 3 96m    333 1 4   845 mm  Roof edge panel  14 Ft 427m         1 4   997 mm  Roof edge panel             TYPICAL ROOF LAYOUT FOR UNITS 16      20 FT  4 88         6 1           TYPICAL ROOF LAYOUT FOR UNITS 16      20       4 88         6 1            Item  number      1 Al      Comeroutside facings _ Ys    2 Jl     Corner bracket support       4                g33 4  127mm CChamel shottside        2      5            1949 16   2402 mm  C Channel  middle long side    16 Ft  4 88 m    17 Ft  5 18 m    18 Ft  5 49     2  19 Ft  5 79 m   6    6    Model Description Qty          Ft  6 1       16 Ft  4 88 m    17 Ft  5 18 m    7  8 Ft  5 49 m  2   19 Ft  5 79       20 Ft  6 1 m     9  6020    11 fan ____________           to                 11   279 mm  bracket  post to roof connection    4      12 161620 Ft  4 88 m to 6 1                to C Channel 2   51 mm  bracket e  1 4  20 x 5 8  carriage bolts  assembly of the             to C Channel connection   1 4  20 x 1 2  pan head Phillips bolt    16  I      c Channel reinforcement cap 2 4         18                10 24   1 2  thread cutting screw  19 Al    Post to roof connector bracket WE    1 4  20 x 1  button head socket cap screw  22 AI 46 3 4   1187 mm  Roof panel    23  al  A 3 4   1187         Roof panel withescapehatc
23. h            25 1616 20 Ft  4 88 m to 6 1 m  23 1 2   597 mm  Roof edge panel  16 Ft  4 88m          3 4   730 mm  Roof panel  17 Ft  5 18 m  33 3 4   857 mm  Roof panel  26  8 Ft 5 49m  393 4   1010 mm  Roof panel  19Ft 5 79m       5 3 4   1162 mm Roof panel    20 Ft  6 1 m  46 3 4   1187 mm  Roof panel  Escape hatch                         gt     ASSEMBLING THE LEGEND PART II   ASSEMBLY    6  Slide the I to C connector into the  C channels  The bend should be away from  the panel   IMPORTANT  DO NOT over tighten  bolts  Power tools MUST NOT be used     S S  Bolts will break under too much C channel rails    between plates      Attach the foam spacers using tape  evenly  spaced on the top of the swim spa     Insert an              the wider flat part of the  I beam going towards the bottom  Using  1 4 x 1 2  bolts  fasten the            to the I to   C connector  They should be tightened at this  point       Place the largest panel  46 3 4     1 2       onto Narrow with  the foam spacers across the middle of the  swim spa     Mark the mid point  47 1 4   1 2 m   from end  of the middle C channels  94 9 16   2 4        with tape  The middle C channels have holes    on both ends        Wide  amp  flat                     8  Tighten l to C connector to C channel  It  should be aligned such that the centre of the     beam is aligned with the tape  mid point of  the C channel       Lubricate the top and bottom on one edge of                                     Centre of swim spa 
24. isible       V  rifiez le disjoncteur interne  10 A  situ   dans le boitier     Le moteur a surchauff       attendez 30 minutes et essayez     nouveau     Contactez Covana   1 877 278 8010     Enlevez la neige et la glace du toit du LEGEND     Tournez la cl   dans le sens des aiguilles d une montre plu   sieurs fois pour lib  rer le montant gel      Remarque   NE TOURNEZ PAS la cl   plusieurs fois dans  le sens contraire aux aiguilles d une montre car cela  pourrait causer la r  initialisation du systeme        Tapez le cote de chaque montant pour faire lib  rer le syste   me et faire tomber la neige ou la glace     Le LEGEND ne se l  ve ou ne s abaisse Vaporisez un lubrifiant    base de silicone sur les manchons    Les montants sont   t  lescopiques en aluminium     coinces    Le boitier de commande fait des  bruits    Le moteur bourdonne    V  rifiez que le joint d   tanch  it   soit en bonne condition      activez tous les jets et l air  abaissez le toit et v  rifiez l absen   ce de fuite autour des montants  Si une fuite est visible  reti                  mouvement visible rez les bouchons des montants et ajustez progressivement la    hauteur des montants    l aide des adaptateurs de v  rins   Lorsque vous avez termin    remettez en place les bouchons  des montants    Remarque   Effectuez des ajustements semblables pour  chacun des montants        Suivez la proc  dure de lubrification des v  rins     Probl  me Contactez Covana   1 877 278 8010   m  canique    V  rifiez qu
25. it de 39 9 16 po  1 m    2    15 pi  3 6 a 4 6     arre en     10 12    15     3 6   4 6 m   Support de fixation en            9          LA                       dh             hs         A    3       D       D                   Support de fixation entre barre en    et profil   en C de 11 po  27 9 cm    fixation des montants au toit         8 15 pi  3 6    4 6      Support de fixation entre barre        et profil   en    de 2       5 1 cm     2    3 6 8 4 6      Boulons de carrosserie 1 4 po x 5 8 po  6 mm x 16        pour l assembla   ge entre barre en   et profile en C     14 12 a 15 pi  3 6 a4 6         Boulon    t  te Phillips cylindrique    20 x 1 4 po  15  16  17    18  19                           o    12         NO               O1   9    LA    Ecrou 1 4 po 20  Bouchon de renfort du profil   en C    Foret de 5 32 po  4 mm     Vis autotaraudeuse n  10 24 x 1 2 po  upport de fixation des montants au toit    ous  Tous    OUS  OUS    20 ous Vis    t  te bomb  e six pans creux 1 4 po 20 x 1 po  21 ous Rondelle en nylon  22 ous Panneau de toit de 46 3 4 po  1 18 m     23 Tous Panneau de toit de 46 3 4 po  1 18 m  avec trappe d   vacuation       3 66     Panneau de bordure de toit de 27 1 4       69 2        3 pi  3 96 m  Panneau de bordure de toit de 33 1 4 po  84 5 cm        4 27 m  Panneau de bordure de toit de 39 1 4 po  99 7            4 6 m  Panneau de bordure de toit de 45 1 4 po  1 14 m   ous Trappe d   vacuation                                           NO        7
26. l clips  if not    a dull tool can be used to help the seal release    Note  At this stage  if the ambient air   temperature is below 32  F  0  C  then        Once satisfied that the seal is released  elevate   temporarily heater should be placed inside the the roof and remove the seal clips from the spa   swim spa for 10 to 15 minutes  When the heater edge    is in the swim spa  bring down the roof until it   Lower the roof and verify again for proper seal    touches the seal to increase the air temperature    After 10 to 15 minutes remove the heater and   continue with the seal installation     You can also refer to the www covana com  website  click on the YouTube button and  select from the playlist                  LEGEND  Installation video      4  Install the seal starting at motor end with the  adhesive layer pointing up towards the roof   Use the supplied seal connector in both ends    of the seal        POSTS POSITION INITIALIZATION PROCEDURE    This procedure must be performed in the following situations      During the initial installation of the unit      When the posts are not anymore at the same height      When the posts do not detect the lower and   or upper limit s      The procedure consists of two  2  simple steps  Control circuitry initialization to zero  0          initialization to zero  0  of the posts     Step   1  Control Circuitry Initialization to Zero  0      1    Unplug both motors at the control box location so that the posts will be disabled  D
27. llation          Manuel d installation    www covana com    33    RISQUE D   ELECTROCUTION    UTILISEZ LE CHARGEUR MURAL DE LA BATTERIE UNIQUEMENT     L INT  RIEUR ET LOIN DE TOUTE SOURCE D EAU       RISQUE DE BLESSURE    DEBRANCHEZ LA BATTERIE AVANT DE PROCEDER  A TOUTE INTERVENTION SUR LE COVANA     RISQUE DE BLESSURE           FAITES PAS                        LE              LORSQUE VOUS ETES DANS L EAU             EVITEZ LES RISQUES DE NOYADE   RISQUE DE PRISE AU PIEGE     LE NON RESPECT DE TOUTES LES CONSIGNES PEUT ENTRAINER DES BLESSURES OU LA NOYADE   _INSPECTEZ LE TOIT REGULIEREMENT   CONFORME     LA NORME ASTM F1346 91   POWER SAFETY COVER    RISQUE DE BLESSURE     LA BATTERIE CONTIENT DE L ACIDE QUI EST                        CORROSIF        34    LE MOTEUR EST SPECIFIQUEMENT CONCU POUR FONCTIONNER AVEC LE SYSTEME DE LEVAGE  DU COVANA  IL NE DEVRAIT SOUS AUCUNE CIRCONSTANCE ETRE UTILISE A D AUTRES FINS     MISE AU REBUT   CE PRODUIT CONTIENT PRINCIPALEMENT DE L   ACIER  DU CUIVRE  CU    DE L ALUMINIUM  AL   DES FIBRES DE VERRE ET PSE   LA BOITE D ENGRENAGES CONTIENT DE L HUILE ET D AUTRES MATERIAUX   VEUILLEZ RECYCLER CONVENABLEMENT    RETIREZ LA CLE DE CONTROLE QUAND VOUS AVEZ FINI D UTILISER LE COVANA   RANGEZ LA CLE DANS UN ENDROIT SUR POUR QU   ELLE NE SOIT PAS UTILISEE   AMENEZ LA CLE AVEC VOUS DANS LE SPA DE NAGE POUR EMPECHER UN  FONCTIONNEMENT INADVERTANT DU COVANA           AVIS      L interrupteur    cl   doit   tre fix   de fa  on  Toit permanente    une
28. n each  side of the crate     12  Use a Robertson screwdriver to unscrew the two  2      16  With a Robertson screwdriver  unscrew the thirteen  screws holding the jacks  bottom      two  2  screws  13  screws holding the top of the crate      four  4   per jack  screws per side  five  5  screw on the top        11    ASSEMBLING THE LEGEND             UNCRATING    17  Remove the top of the crate                            T   k      7  A   ar                 d       18  Remove the fiberglass panels from the crate by lifting  them up and place them in a safe place                  ASSEMBLY    TYPICAL ROOF LAYOUT FOR UNITS 12 TO 15       3 66    TO 4 6              14    TYPICAL ROOF LAYOUT FOR UNITS 12 TO 15 FT  3 66    TO 4 6            Item    Model Description Qty    1  2  3       number          2  2  12Ft 366m            319 16   548 mm  C Channel left  13 Ft  3 96m     279 16   700         C Channel left  15    46               399 16   1005 mm  C Channel left  12Ft 3 66m      21 9 16   548       C Channel right  13Ft 396m  27 9 16   700 mm  C Channel right  14 Ft 4 27m  339 16   852 mm  C Channel right  15Ft 46m      399 16   1005 mm  C Channel right    8 J2toisFt 36mto46m Beam ss  11 Al                to C Channel 11   279 mm  bracket  post to roof connection  A  1 4  20 x 5 8  carriage bolts  assembly of the             to C Channel connection   1 4  20 x 1 2  pan head Phillips bolt  15  16  l Channel reinforcementcap     4    17      BIZ drillbit  19      Post to roo
29. ning     Check inline breaker  10 A  located in the control box     Motor overheated     wait 30 minutes and try again   Call Covana  1 877 278 8010     Remove all snow and ice from Covana roof          Turn the key clockwise a number of times to free up  frozen post    Note  DO NOT turn the key counterclockwise  multiple times as it can cause the system to reset     Slap the side of each post to free up the system and  to break loose any ice frost     opray a silicone base lubricant on the telescoping    The Covana will not elevate or lower    Posts are frozen aluminum sleeves     e Control box clicks  e Motor hums  e Some visible movement    Ensure proper seal     turn on all the jets and air  lower  roof  detect any leakage in the area of the posts  If  leakage is occurring  remove the post caps and  adjust the post heights using the jack adapters in  small increments  When finished reinstall the post  caps    Note  Equal adjustments should be done to each of  the posts     Perform the jack greasing procedure     Call Covana  1 877 278 8010     Check that the mechanism operates properly moving  the arms from both the top and bottom        Escape hatch does not open Mechanical issue    Ensure that the escape hatch is not frozen        31       Made      Canada  by Canimex  www covana com    PATENTED    CANADA 2 532 429  US 11 162 557  UK 0515168 3  AUSTRALIA 2006200251    Covana005 EN FR 1   209798       COVANA    LEGEND  Veuillez lire ce guide avant de proc  der    l insta
30. o not  unplug any other connectors  See figure   1 for motors connector location     Figure 1                            26    2     POSTS POSITION INITIALIZATION PROCEDURE          Using the key switch  see figure   2   execute the following steps without interrupting the    sequence during execution    Turn and hold the key switch in the lower position between 8 10 seconds   Release the key switch and immediately cycle it between 8 10 times in the lower  position in 15 seconds maximum        Wait for 10 seconds        2     POSTS POSITION INITIALIZATION PROCEDURE    Step   2  Initialization to zero  0  of the posts     Warning  The roof will not stop if you attempt to go higher than the maximal height that  was originally set by default     At this point  the control circuitry does not take the encoder positions anymore and you can  then plug one or both motors to correct the problematic situation such as      bring down        or both posts      the bottom  zero position     9 reinitialize the system if both posts are at zero  0     If both motors were not connected at this point  reconnect the motor s      Ensure that both motors are at their lowest point and that the cover is sitting uniformly on  the swim spa and the posts are at the same height     Unplug the power connector to the control box  see figure   1 for connector location       Wait a minimum of 30 seconds before reconnecting the power to the Covana  This  completes the initialization of the control circuitry
31. oint d   tanch  it   afin d augmenter la  temp  rature de l air  Apr  s 10    15 minutes  retirez  l appareil de chauffage et continuez l installation du  joint d   tanch  it       4  Installez le joint d   tanch  it   en commen  ant du  c  t   du moteur et en orientant la couche  adh  sive vers le toit     4    Utilisez le raccord de joint d   etancheite fourni  entre les deux extremites du joint     5  Essais   Abaissez a nouveau le toit pour vous  assurer que le joint touche bien le perimetre  complet  Si vous   tes satisfait par l essai   relevez le toit  enlevez la pellicule protectrice en  plastique rouge du joint d   tanch  it   et abaissez  le toit sur le joint d   tanch  it      Laissez le toit reposer dans cette position  pendant deux minutes pour assurer une bonne  adherence entre le joint et le toit     Important   Relevez maintenant le toit pas plus  qu   un pouce  2 5 cm  et laissez le reposer encore  pendant une courte periode de temps  cela donnera  au joint d   tanch  it   le temps de se lib  rer  lentement et enti  rement des barrettes d   tanch  it                  il est possible d utiliser un outil   mouss   pour  aider au rel  chement du joint d   tanch  it       7  Une fois que vous   tes satisfait que le joint  d   tanch  it   est bien rel  ch    relevez le toit et  retirez les barrettes d   tanch  it   des bords du  Spa    Abaissez le toit et v  rifiez    nouveau que le joint  d   tanch  it   est correct     Vous pouvez   galement consulter le site We
32. omers and 230 V for European  customers  both to be used on a regular wall outlet     KEY OPERATING INSTRUCTIONS    e Turn the key to the right     clockwise to lower the roof   e          the key to the left     counterclockwise to raise the roof   e        key will automatically return to center  off position  when released        SIDE ELEVATION DIMENSIONS    3   76 mm     The maximum elevation height depends  of the height of the swim spa  Add swim    spa height to the Covana travel to Covana maximum travel is  determine maximum elevation  65   1 7 m   Example     Swim spa height    Covana travel which is 65   1 7 m     Total elevation    Swim spa height will vary and must be  within these measurements    Minimum is 49   1 2 m   Maximum is approximately 62   1 6 m        FRAME DIMENSIONS AND FOOTPRINT                     ui        SUOISUBWIG                          25        OG      eds WIMS 29IAI9S      85590082 p  nb   epnjoui jou op SUOISUBWIG     eds WIMS   y  JO sepis H LOS                       sseooe eol eg     49       SC v    STIOH 34930 N33M138    96        019   FONVEVSTS wb       FJONVAVSTO 1 81          INI1 AI39         SLAYONOO     80 2   STIOH 34030                 58    VdS WIMS        8   1           ezz   3106 4930 11      202        32430      ASSEMBLING THE LEGEND PART      UNCRATING  REQUIRED TOOLS A    Scissors   e Sheet metal cutter  Retractable blade e 7 32    Allen key  knife         Robertson  screwdriver    UNCRATING    1  Before uncrating the 
33. partie courte du cable  definie comme la  distance depuis le connecteur metallique sur  le cable  dans le trou au centre de la partie  arri  re des pieds du v  rin motoris       Branchez le moteur au c  ble et serrez  l   crou au connecteur m  tallique sur le pied             Hy             Wer     SS               Branchez    Serrez le moteur      est possible d ajuster l adaptateur du v  rin   situ   en haut du v  rin       faisant tourner la  grosse tige filetee  Ajuster les hauteurs de  mani  re a      qu elles correspondent aux  supports du couvercle                Glissez les manchons au dessus des verins  et fixez les a l aide de boulons de carrosserie  1 4 po x 5 8 po  9 6 cm x 1 6 cm  sur la  partie sup  rieure         gt         2    A  0   7                   51    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE    39  Utilisez un laser automatique  en metal pour vous assurer  que les montants sont  parfaitement    l aplomb du sol    40  Fixez les bras de fixation du  spa de nage aux pattes de  fixation du spa de nage    l aide  dun boulon de 1 po   2 5 cm  en pla  ant une  rondelle plate    l ext  rieur   ainsi qu une rondelle de  blocage et un   crou     l int  rieur     Remarque   Pour la stabilit    dans  la mesure du possible  le bras de  fixation du haut doit   tre orient    vers le haut  en direction du spa de  nage  tandis que le bras de fixation du bas doit   tre  orient   vers le bas  en direction du spa de nage        41  Rebranchez les composants   lectroniq
34. r vous assurer que tout fonctionne  bien     46  Une fois le couvercle relev    v  rifiez la position  de la trappe d   vacuation  Elle devrait se  pr  senter comme illustr  e  Si ce n est pas le  cas  vous devez abaisser le Covana et ajuster  la trappe d   vacuation        47  Retirez les cales en mousse du spa    48  Abaissez le Covana    49  Fixez les manchons    l aide de petites vis  n  8                                54    ASSEMBLAGE DU LEGEND            3   JOINT D   ETANCHEITE    1  Une fois l assemblage du LEGEND termine   soulevez le toit    l aide de l interrupteur    cle   puis retirez les cales en mousse  Abaissez le toit   faites le tour du spa de nage pour identifier les  endroits o   la coque int  rieure blanche est en  contact avec le spa de nage  Ceci d  terminera le  meilleur endroit pour appliquer le joint  d   tanch  it      Assurez vous que le bord du spa de nage est  compl  tement sec    Avec le toit en position relev  e  appliquez les  barrettes d   tanch  it   fournies sur le spa de  nage  aux endroits pr  d  termin  s o   l   tanch  it    est n  cessaire  L endroit privil  gi   de placement  des barrettes est    proximit   du bord int  rieur   pr  s de l eau     Note     ce moment ci  si la temp  rature ambiante  est en dessous de 32  F  0  C   vous devez placer un  appareil de chauffage temporaire    l int  rieur du spa  de nage pour 10    15 minutes  Une fois l appareil de  chauffage    l int  rieur  abaissez le toit jusqu    ce qu il  touche le j
35. t  flat  washer on the outside  a lock  washer and nut      the  i    5 t          Note  For stability wherever  possible  the top mount arm  should be going up towards the  swim spa while the bottom mount  arm should be going down  towards the swim spa     41  Connect the electronic components to the  control box  If a solar panel was with this  unit  it should be connected as well     Battery         Circuit breaker       Key switch    Motor         Motor                Solar panel       22    ASSEMBLING THE LEGEND PART II   ASSEMBLY                                                   Battery     D    Circuit breaker    Key switch    Motor    Motor       Solar panel    23    ASSEMBLING THE LEGEND PART II   ASSEMBLY    For units with a solar panel  install the solar   46  Check the hatch position once the cover is in  panel using the small  8 screws  This the air  It should appear as shown  If it is not   should be done in a space where there is the Covana needs to be lowered and the  sun  It is suggested that the panel face the escape hatch adjusted    southwest  wherever possible     Note  Do not install the panel on the cover or the  sleeves as it could cause interference     e      The key switch should be permanently   47  Remove the foam spacers from the spa   mounted at least 5   1 5 m  away from the   48  Lower the Covana    swim spa and at least 5   1 5 m  above the   49  Attach the sleeve caps using the small  ground and in clear view of the Covana   8 screws    The 
36. tion    la page 49 pour les  ajustements corrects de la poign  e    28  Important   Assurez vous que le  couvercle est centr   sur le spa de nage                                                           29  Retirez la plinthe du spa de nage pour  faciliter la fixation et eviter des problemes de   24  Il est possible que le couvercle ait de temps      plomberie a l   tape 30   temps besoin d   tre r  ajust    Pour cela  tapez    30  Utilisez le support du couvercle comme un    sur son coin avec un maillet en caoutchouc  guide et fixez les pattes de fixation du spa  P de nage juste en dessous de l acrylique et  222 au bas du spa de                                               IQ   22 Remarque   Si le spa de nage         cadre       SS Tapez ici   ZZ m  tal  vous devez remplacer les vis fournies avec  SS     Qe 22 des vis autotaraudeuses   7 I  Modele standard Modele de grande hauteur    25  Fixez la piece ext  rieure du coin a l aide de  quatre autres vis n  8        ell   ho    Fix   au cadre en          os   aal dessous du  rebord acrylique                        Y     d                                            gt   gt           NIH                 W                               1                      avec precaution les boulons de 1          25 mm  afin de                  les mouvements             Emboitez la patte de fixation par dessus  puis  fixez le support du couvercle avec les boulons  esas   de 1 po  25 mm  que vous venez de retirer                             
37. ues au  bo  tier de commande  Si votre mod  le est    quip   d un panneau solaire  branchez le    galement     Batterie         Interrupteur     cl    Moteur          Moteur                Panneau solaire    52    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE                                                  Batterie     1    Disjoncteur    Interrupteur a cle    Moteur    Moteur       Panneau solaire    53    ASSEMBLAGE DU LEGEND   TAPE 2   ASSEMBLAGE    42     Pour les modeles equipes d un panneau  solaire  installez le panneau solaire a l aide de  petites vis n  8  Cette procedure doit   tre  effectu  e dans un endroit ensoleill        est  conseill   que le panneau soit orient   en  direction sud ouest  si possible     Remarque   N installez pas le panneau sur le  couvercle ou sur les manchons  car cela pourrait  causer des interf  rences     43     44                    L interrupteur a cle doit   tre fixe de             permanente    une distance de 5 pieds   1 5 m  du spa de nage et a 5 pieds  1 5 m  au   dessus du sol avec une vue directe sur le  LEGEND      est possible d appliquer le joint d   tanch  it    toute saison au manchon int  rieur  l   ou il se  joint aux autres manchons  ll existe un petit  insert en plastique qui permet de maintenir le  joint en place     Remarque   Le couvercle doit   tre completement  abaiss   pour installer le joint d   tanch  it   toute  Saison                                45  Vous devez maintenant compl  tement relever le    Covana pou
38. unit  Make sure there is no  apparent damage to the crate  In case of suspicious    6  Use your hands to extract the paper sheet covering  damage  take photos       any damage is discovered  parts inside the crate   call Covana customer service at 1 877 278 8010    Use a Robertson screwdriver to unscrew the two  2   Stand the Covana in the vertical position  Ensure screws holding the top of the sleeves     four  4   wind conditions allow for this to be done safely  sleeves   eight  8  screws in total    Use the sheet metal cutter to cut and remove the       metal strip around the crate            72       8  Remove the four  4  sleeves from the crate and place  them in a safe place       ag     Use a Robertson screwdriver to unscrew the screws    holding the front cover     five  5  screws per side     9  Remove the three  3  boxes above the jack box     ASSEMBLING THE LEGEND             UNCRATING    With a Robertson screwdriver  unscrew the screws     13  Remove the seals and the foams from the crate         holding the jack box      four  4  screws per side  two place them in a safe place     2  screws in the middle  two  2  screws in the                        Remove the C Channel and             extrusions from  the crate and place them in a safe place     11  With the help of one other person  remove the jack s  small box from the crate and place it in a safe place     15  With the help of one other person  lower the crate  horizontally on its back side  One  1  person o
39. using four  more  8 screws                                 ONAN f                          For each post location  carefully remove  the 1  bolts as you do not want anything to  shift  Snap over the support bracket and  attach the cover mount with the removed 1     Units 16  to 20    4 88    to 6 1 m  long  Use the  supplied long joint support bracket for added  rigidity     Secure the corner pieces using two  8    27        Turn the escape hatch handle to retract the  arms and install it into the escape hatch  hole  Please refer to instruction on page 21  for correct adjustments of the handle   Important  Ensure that the cover is  centred on the swim spa    Remove the swim spa skirting as required  to ensure proper fastening and that no  plumbing will be in jeopardy for step 30   Using the cover mount as a guide  attach  the swim spa mount brackets just under the  acrylic and at the bottom of the swim spa     Note  If the swim spa has a metal frame the  provided screws will need to be replaced with  self drilling screws   Standard unit  Dee    Tall unit     95 3       Extended spa  mount  Aligned on centre  Fastened to  frame at bottom          Fastened to N  frame under  acrylic lip                                                                          Position the jacks      their locations  The  motor jack are on the left when facing the  Swim spa     20    ASSEMBLING THE LEGEND PART       ASSEMBLY    Slide the drive shafts over the square shaft   For both motors  slide
40. xation fourni     EXIGENCES   LECTRIQUES DU LEGEND    1  Le moteur du LEGEND est aliment   par un syst  me de 24 V CC   Le LEGEND doit   tre install   en conformit   avec les codes et r  glements  locaux    3   Lesfils et la gaine utilis  s pour l interrupteur    cl   doivent   tre conformes aux  codes et r  glements locaux     Tension requise pour le chargeur   Prise murale habituelle de 115 V pour les clients  nord am  ricains et 230 V pour les clients europ  ens     CONSIGNES D UTILISATION POUR LA CL      e Tournez la cl   vers la droite     dans le sens horaire pour abaisser le  toit    e Tournez la        vers la gauche   dans le sens antihoraire pour relever  le toit    e Lorsque vous la relachez  la cle reviendra automatiquement au  centre  en position d arr  t        37    HAUTEUR D   ELEVATION DES COTES    3   7 6 cm     La hauteur d   l  vation maximale  d  pend de la hauteur du spa de nage   Ajoutez la hauteur du spa de nage    la                     de  hauteur de deplacement du Covana d  placement du Covana est  pour d  terminer la hauteur maximale 65 po  1 6        Exemple    Hauteur du spa de nage    hauteur de d  placement du Covana qui  est 65 po  1 6 m      l  vation totale     La hauteur du spa de nage varie mais doit   tre  dans la plage suivante    Minimum de 49 po  1 24 m     Maximum de 62 po  1 57 m  environ        38    DIMENSION DU CADRE      DE LA SURFACE AU SOL     ww               ue juos                      527                      sed           
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
VR SERIES USER MANUAL - Virgin Technologies Inc.  Manual de Instruções    Instructions  Mon CV - Chupin Philippe  Panduit CQSE1G679 racks    Copyright © All rights reserved. 
   Failed to retrieve file