Home
Eco Barrel Instructions.indd
Contents
1. PAGE 1 1 RTS Companies Inc 1027 Industrial Place St Clements Ontario N0B 2M0 1 800 663 2803 RTS Companies US Inc 2900 Industrial Park Drive Austinburg Ohio 44010 0183 1 888 641 3077 May Mai 2015 Revision R vision 00 ECO RAIN BARREL BARIL DOS PLAT Instructions Wrap the spigot with two to three layers of the te on tape supplied at the threaded section shown above Screw spigot end with hexagonal feature into pre threaded opening in front of the ECO Rain Barrel Thread spigot until the hex face touches the barrel Do not over tighten beyond the point where another turn is not possible Adjust spigot until vertical relative to the barrel Wrap the spigot with two to three layers of the te on tape supplied at the threaded section shown above Visser le robinet le c t avec le butoir hexagonal dans le trou let au bas du baril Continuer leter le robinet jusqu ce que le butoir s embo te parfaitement la surface plate Ne pas trop serrer Ajuster le robinet jusqu ce qu il soit vertical relativement au baril 1 1 1 2 1 3 1 4 1 1 1 2 1 3 1 4 2 1 2 2 2 1 2 2 Center the screen into the recessed area on top of the ECO barrel The holes should not overhang the edge of the cutout The screen is attached using two 8 screws supplied in the kit Ensure that the screen is at against the recess when attaching so it does not ex C
2. d viter un mauvais alignement coucher le baril pour installer le robinet NOTE NO MORE THAN A 3 FOOT STANDARD GARDEN HOSE SHOULD BE USED FOR PROPER WATER FLOW Note A n d assurer un bon d bit d eau utiliser un boyau standard de 3 ou moins NOTE If you plan to leave your Rain Barrel outside over the winter it is very important to winterize your ECO Rain Barrel as follows a Drain your Rain Barrel b Turn the Rain Barrel upside down and set in desired location preferably in a garage or basement Failure to comply with these winterization instructions may result in a voided warranty NOTE Si vous plani ez laisser votre Baril l ext rieur pendant l hiver il est tr s important de l am nager pour l hiver La garantie sera nul si cette proc dure n est pas suivie a Vider votre baril b Tourner le baril l envers et placer l endroit d sir de pr f rence
3. enter the screen into the recessed area on top of the ECO barrel The holes should not overhang the edge of the cutout The screen is attached using two 8 screws supplied in the kit Ensure that the screen is at against the recess when attaching so it does not ex 1 1 2 1 1 2 2 2 Installation du robinet Screen Installation Spigot Assembly Installation de l cran protecte RTS Companies Inc warrants its products to be free from defects in materials and workmanship under normal use and service for the period of one year All warranty periods begin on the date of invoice This warranty does not cover defects which are merely cosmetic but is limited to defects which result in structural failure including structural failure due to material corrosion or deterioration This warranty does not cover damage due to vandalism abuse lack of maintenance or improper installation RTS Standard Terms and Conditions apply RTS Companies Inc off re une p riode de garantie de 1 an partir de la date de la vente contre les d fauts de fabrication La garantie s applique uniquement si le produit est utilis l int rieur des limites d utilisation normale telles que d crites dans le manuel d instructions Une copie compl te de la politique de garantie peut tre obtenue par t l phone 1 800 663 2803 ou www rtshomeaccents ca TO PREVENT STRIPPING BARREL THREADS LAY THE BARREL FLAT BACK DOWN TO INSTALL THE SPIGOT A n
Download Pdf Manuals
Related Search
Related Contents
FM06TX User Manual GMH 3111 - Greisinger Trademark Fine Art PSL020-p5-set Instructions / Assembly Guide Cetiom colza 2015 Olympus VH301501 User's Manual Samsung SEW-5HW125L User Manual Lumens Technology PS760 User's Manual Invacare 6300-5F Mobility Aid User Manual JVC HR-S7600EK User's Manual Copyright © All rights reserved.
Failed to retrieve file