Home

コミュニケーションコントローラ CMC10B (CPL / CPL変換器) 取扱説明書

image

Contents

1. 1999 Yamatake Corporation ALL RIGHTS RESERVED AI HE a R ZS eras AN we
2. eA ani ean am pa o
3. 1 mA Loader jack For connecting to the Smart Loader Package SLP CM1E20 to set up the CMC10B Communications address setup switch For setting the communi cations address for host CPL communications Set within the range 01 to 99 factory setting 00 POWER Lights when power is HOST lt gt CMC Indicates the operatii state of host CPL communications Baud rate setup switch For setting the baud rate of host CPL communications 0 4800bps 1 9600bps 2 19200bps factory setting 0 CMC lt gt LOCAL Indicates the operatii state of local CPL communications ERR Lights at CMC10B er Reset Switch Reset the CMC10B Host CPL Communications Connector 11 12 13 14 15 E 2 M3 gt CPL RI CONNECT 4 4 CF 1 DC24V 2 3 DC24V CPL
4. E CPL HOSTCMC CPL 81440792 001 4 MSTB2 5 5 STF 5 08 AU CMC10B 31 5 SG D CPL CPL CPL CMC10B CPL CPL CP SP 1064 4 Ma CpL 7 30 902 RH 10 95 RH 4 9m s 10 60Hz XY Z 2h 392mys DIN
5. IPEV S 0 9mm X1P KPEV S 0 9mm X1P ITEV S 0 9mm X1T KTEV S 0 9mm X1T MVVS E BB oe FG UL UL 2 J3 E CPL CMC LOCAL CPL RS 485 3 5 SG
6. FG 3 RS 485 DIN PS TS PH DIN 4 DA 5 DB 6 SG J2 2 E 15m DIN CPL
7. G3 J4 TRE 1999 5 M 007 6 9 A CP UM 5129E CMC10B CPL CPL Converter Communication Controller User s Manual Thank you for purchasing the Communication Controller CMC10B This manual contains information ensuring correct use of the Communication Controller CMC10B It also provides necessary information for installation and maintenance This manual should be read by those who design and maintain devices that use the Communication Controller CMC10B Be sure to keep this manual nearby for handy reference For further details on correct use read the Communi cation Controller CMC10B CPL CPL converter User s Manual Design Manual CP SP 1064E RESTRICTIONS ON USE This product has been designed developed and manufactured for general purpose application in machinery and equipment Accordingly when used in applications outlined below special care should be taken to implement a fail safe and or redundant design concept as well as a periodic maintenance program e Safety devices for plant worker protection e Start stop control devices for transportation and material handling machines
8. CPL E DIN DIN 2 M3 Imm 30 100 o DIN DIN DIN DIN E JCS4364
9. 196ms 60cm 1 3 6 z DIN CPL 0 8 1N m CPL 0 8 N m CPL 0 8 N m EN61000 6 4 EN61000 6 2 SLP CM1J20 E 8 so i TA la DIN y at 7 mm LU 100 6419 2 7 3 011 781 5396 052 238 3037 022 292 2004 ag 06 6881 3383 4 048 653 8733 082 222 3982 a 03 6810 1200 093 952 1210 N 0466 20 2143 lt COMPO CLUB gt http www compoclub com gt http jp azbil com
10. E Mounting the body on the base Please the hook into the base and push the body into the base until you hear it click into place To remove the body from the base pull the body towards you while pressing down the lever E Compensating Lead Use shielded instrument cable for instrumentation for inputs outputs and power supply E Wiring precautions Be sure to use crimped terminals for wiring terminals When wiring is finished check the connections for any miswiring before turning the power ON E Connecting the power supply Connect the power terminal as follows D 24Vdc 10 FG The power supply unit must be a UL approved Class 2 power supply unit or Class 2 transformer in order to apply UL CJ Handling Precautions Power is mutually connected between linked modules Supply power to one of the linked modules Select a power supply that can cover the total power consumption of all linked modules E3 Connecting local CPL communications CMC lt gt LOCAL Local CPL communications RS 485 is performed using a 3 lead connection Ex Connection with a 5 lead device C Handling Precautions Be sure to connect SG terminals each other Failure to do so might cause unstable communications Connecting host CPL communications HOST lt gt CMC Host CPL communications is performed using a connector The applicable connector is 81440792 001 set of 4 MSTB2 5 5 STF 5 08 AU made by Phoenix Contacts Ltd
11. Loader Package SLP CM1E20 to set up the CMC10B Communications address setup switch For setting the communi cations address for host CPL communications Set within the range 01 to 99 factory setting 00 Baud rate setup switch Por Selting the baud rate of host eee Ton Baud rate Baud rate 0 4800bps 9600bps 19200bps fy setting 0 Host CPL Communications Connector 11 12 13 14 15 E Base Mounting holes 2 locations For securing the base with M3 screws Communications disconnection switch Used for disabling local CPL communications with devices linked on the left side factory setting CONNECT Mounting hole NUNN ICH DIN rail locking tab H 5 Used for locking on a DIN rail POWER Lights when power is ON HOST lt gt CMC Indicates the operating state of host CPL communications CMC lt gt LOCAL Indicates the operating state of local CPL communications ERR Lights at CMC10B error Reset Switch Reset the CMC10B Lever For securing the body Power supply terminal 1 24Vdc ci RIZ FG Local CPL communications terminal 3 lead RS 485 connector terminal E2 E Mounting Locations Avoid installing the CMC10B in the following locations e Locations subject to low and high temperature and humidity exceeding the specified ranges Locations subject to corrosive gases such as sulfide
12. e Aeronautical aerospace machines e Control devices for nuclear reactors Never use this product in applications where human safety may be put at risk REQUEST Make sure that this Instruction Manual is handed over to the user before the product is used Copying or duplicating this Instruction Manual in part or in whole is forbidden The information and specifications in this Instruction Manual are subject to change without notice Considerable effort has been made to ensure that this Instruction Manual is free from inaccuracies and omis sions If you should find any inaccuracies or omissions please contact Yamatake Corporation In no event is Yamatake Corporation liable to anyone for any indirect special or consequential damages as a result of using this product 2000 Yamatake Corporation ALL RIGHTS RESERVED SAFETY PRECAUTIONS Safety precautions are for ensuring safe and correct use of this product and for preventing injury to the operator and other people or damage to property You must observe these safety precautions Also be sure to read and understand the content of this user s manual WARNING Warnings are indicated when mishandling this product might result in death or serious injury to the user A CAUTION Cautions are indicated when mishandling this product might result in minor injury to the user or only physical damage to this product e Before wiring removing or installing the CMC10B be sur
13. it and removal from DIN rail S azbil Ya mat ake Corpo rat i on Specifications are subject to change without notice Advanced Automation Company 1 12 2 Kawana Fujisawa Kanagawa 251 8522 Japan Printed in Japan URL http www azbil com 1st Edition Issued in July 2000 W Printed on recycled paper 07 9th Edition Issued in June 2007 A E4
14. or equivalent product Master Station CMC10B Max 31 units Ex Connection with a 5 lead device CJ Handling Precautions Be sure to connect SG terminals each other Failure to do so might cause unstable communications 4 SETUP Set up the CMC10B as follows before use 1 Set the CMC10B communications address for host CPL communications 2 Set the baud rate for host CPL communications 3 Set the communications disconnection switch 4 Make settings relating to the CPL communications mode configuration Make these settings via the loader jack For details refer to the Communication Controller CMC10B CPL CPL converter User s Manual Design Manual CP SP 1064E 5 SPECIFICATIONS E Specifications Communications mode HOST lt gt CMC communications Operating conditions Ambienttemperure ows O SOO oS 30 to 90 RH Transporstorage conditions Ambient humidity jowes SSCS Impact resistance Screw mount 392m s max DIN rail mount 196m s max Screw tightening torque ePower terminal CPL communications terminal 0 8 to 1Nem eConnector terminal for host CPL communication connection 0 8Nem eConnector mount for host CPL communication connection 0 8Nem Applicable standards EN61000 6 4 EN61000 6 2 Sold separately Smart Loader Package SLP CM1E20 E External Dimensions 30 Unit mm 100 Dimension required for mounting and removal of the bod Dimension required for mounting ay
15. CP UM 5129 CMC10B CPL CPL CMC10B CMC10B CPL CPL CP SP 1064 1 iia
16. e to turn the power OFF Failure to do so might cause faulty operation e Do not disassemble the CMC10B Doing so might cause faulty operation e Use the CMC10B within the operating ranges temperature humidity voltage vibration shock mounting direction atmosphere etc recommended in the specifications Failure to do so might cause fire or faulty operation Do not block ventilation holes Doing so might cause fire or faulty operation e Wire the CMC10B properly according to predetermined standards Also wire the CMC10B using designated power leads according to recognized installation methods Failure to do so might cause electric shock fire or faulty operation Do not allow lead clippings chips or water to enter the CMC10B case Doing so might cause fire or faulty operation Firmly tighten the terminal screws at the torque listed in the specifications Insufficient tightening of terminal screws might cause fire e Do not use unused terminals on the CMC10B as relay terminals Doing so might cause electric shock fire or faulty operation e Use Yamatake Corporation s SurgeNon if there is the risk of power surges caused by lightning Failure to do might cause fire or faulty operation e When disposing of the CMC10B dispose of it appropriately as industrial waste in accordance with bylaws and regulations 1 NAMES AND FUNCTIONS OF PARTS 2 MOUNTING E Body Loader jack For connecting to the Smart
17. gases Locations subject to dust or oil fume Locations subject to direct sunlight wind or rain Locations subject to vibration or shock exceeding the specified ranges Locations under high voltage lines and near sources of electrical noise such as welders Locations within 15 meters of high voltage ignition equipment such as boilers Locations where magnetic fields are generated Locations near flammable liquid or steam Linking modules The CMC10B can be linked with other modules by the connectors on the left and right of the base Modules must be linked before the CMC10B is mounted on the DIN rail or mounted by screws By linking modules together the power supply of each module and local CPL communications are connected eliminating the need for wiring Local CPL communications can be disconnected by the communications disconnection switch located on the base Mounting method The CMC10B can be mounted in either of two ways by mounting its base by screws or by securing on a DIN rail CJ Handling Precautions e Install this module so that it is vertical with the DIN rail locking tab at the bottom When mounting the base by screws Secure the two mounting holes on the base by M3 screws Unit mm When securing on a DIN rail Secure the CMC10B on the DIN rail fully draw out the DIN rail locking tab and hook the base onto the DIN rail Next push the DIN rail locking tab upwards until you hear it click into place

Download Pdf Manuals

image

Related Search

Related Contents

UV Curing.  KoNet BGL-32 Bluetooth GPS Data Logger User`s Manual    zelsius®C5-CMF Manuel de montage et d`instruction  Onyx Semi-Flush Mount Kit 800FMNXLZ  QB-78K0MINI On-Chip Debug Emulator UM    Toshiba X875 Q7390 Laptop User Manual  Filterkaffeemaschine  Reproductor de DVD con escalado Full HD  

Copyright © All rights reserved.
Failed to retrieve file