Home

Betonprüfhammer DIGI-SCHMIDT 2000 Concrete Test

image

Contents

1.
2. the impact direction 6 7 0 E 6 7 0 S E amp 50 o LO 8 a T x 50 E 2 o 40 6 5 E 8 E E Ra 6 5 E gt 5 E 40 S 2 40 6 0 2 5 c E 2 OO 2 E LET 2 x D 20 5 5 E 2 E 2 5 5 a 5 9 Se S 4 0 gt 20 25 30 35 40 45 50 55 5 4 0 10 Rebound value R 20 25 30 35 40 45 50 55 Rebound valie R Fig 82 Model LD Conversion curve based on the average compressive strength of a cylinder and the rebound Fig 8 1 Model ND Conversion curve based on the average value R compressive strength of a cylinder and the rebound value R Limits of Distribution fcky The max and min values are set so that 80 fck m average compressive strength of a cylinder of all test results are included probable value 22 Appendix 2006 Proceq SA 8 3 Creating New Conversion Curve Experience has shown that deviations from the normal conversion curves occur under the following circum stances Artificial stone products with an unusual concrete com position and small dimensions It is recommended to perform a separate series of tests for each product in order to determine the relationship between the rebound val
3. 52 6 49 57 27 46 1 N mm2 Rx R Min R Max s fck Unit from fck Direction de frappe 1 2 3 4 5 gt T XN 4 Fig 5 7 Transfert des valeurs dans un format MS Excel 5 2 2 Effacement de la m moire Il est impossible d effacer des objets individuellement Cu Seul le contenu de la totalit de la m moire peut tre effac cette op ration ne peut plus tre annul e une fois confirm e 5 2 8 Affichage de la m moire Sont affich s l cran le num ro de s rie de mesures la direction de frappe du scl rom tre b ton et les valeurs de rebondissement R apr s suppression des valeurs 2006 Proceq SA aberrantes ainsi que la moyenne des valeurs de rebon dissement R et de la r sistance a la compression du b ton partir de la version 4 0 les valeurs mesurer et calculer ansi que tout les param tres sont afficher sur l appareil 11 7 2661 9 36 1 TEST HOUSE 104 3 4 5 x 46 R 51 2H mm2 6 Min Max 46 52 s 3 8 7 Choisir avec Fin avec MENU S END Fig 5 8 Example de la M moire display 1 Date 2 titre de la s rie 3 Direction calcul de la valeur moyenne p ex m dian 4 Courbe de conversion factuers profondeur de carbonatation 5 Valeurs de mesure individuelles 6 Valeur moyenne de R et fc 7 Minimum Maximum d viation standard Chez m dian F gt 20 est affich pour des s rie de mesure non valable 2006 Proceq SA 5 2 4 Impression avec i
4. 20 Mittelwertbildung 6 Technische Daten 21 Messreihennummer 7 8 Anhang 21 Umwertung 3 A 824 SCHELL v E ein 7 Herleitung der Proceg Standard Korrekturen 8 umwertungskurven 21 Anzeigebereich 11 Standardumwertungskurven 22 Grenzwerte 11 Neue Umwertungskurve bilden 23 Sprache Language 11 Zeitfaktor ermitteln 24 Datum Zeit isis onse ker EN e hate 12 Datenausgabe 12 Fur zusatzliche Informationen verweisen wir Sie auf das Infoblatt Euro Amboss 810 310 06 ver 09 2003 2006 Proceq SA Inhaltsverzeichnis 1 1 Sicherheit 1 1 Allgemeine Hinweise 1 1 1 Grunds tzliches Der Betonpr fhammer ist nach dem neuesten Stand der Technik und den anerkannten sicherheitstechnischen Regeln gebaut Bitte lesen Sie diese Betriebsanleitung vor der ersten Inbetriebnahme aufmerksam durch Sie enth lt wichtige Hinweise f r die Sicherheit den Gebrauch und die Wartung des Betonpr fhammers DIGI SCHMIDT 2000 1 1 2 Bestimmungsgem sse Verwendung Der Betonpr fhammmer ist ein mechanisches Ger t und dient zur schnellen zerst rungsfreien Qualit tskontrolle von Materialien nach Kundenspezifikation mehrheitlich jedoch
5. 4 7 Limit Values The limit marks on the display serve to aid fast recogniti on of deviations from the measured values The range within which the rebound values R are to lie can be selected see Fig 3 1 Measuring display CH The selected limit values are not saved e Enter Rmin and Rmax 4 8 Language The display wording can be selected in the language required Cu In this line of the main menu Language appears additionally no matter what language is set 4 9 Date Time The inbuilt clock saves the measured values together with the test date and time Correct the values set if necessary Settings 11 4 10 Data Output See under Data Output When all the settings have been made on the display unit press the END key The device is ready to continue with the Measuring Process 5 Measuring Process 5 1 Measuring Procedure CS The items in brackets are illustrated in Fig 5 6 Perform test impacts with the concrete test hammer on a smooth hard surface without the cable connected to the display unit before taking any measurements which you are going to evaluate Preferably do perform measurements at tem peratures between 10 C and 50 T only Enter the basic settings as A described under Settings Use a grindstone to smoothen Ve the test surface Preparing the test surface Fig 5 1 12 Measuring Process Fig 5 2 AN du Warning The impact plunger
6. Form des Probek rpers 2 Zeile 200 200 200 3 Zeile 150 150 150 4 Zeile 150 300 mm Einstellungen 9 4 5 2 Zeitfaktor at Es stehen zwei M glichkeiten zur Verf gung Ermitteln eines eigenen Zeitfaktors Zeitfaktor als Funktion der Karbonatisierungstiefe Eigener Zeitfaktor W hlen Sie at an und geben Sie den ermittelten Zeit faktor ein Sehen Sie dazu als Beispiel unter 8 4 Zeit faktor ermitteln nach Zeitfaktor aus chinesischer Norm Eine weitere M glichkeit ab EPROM Version 2 0 bieten die von der chinesischen Norm JGJ T23 92 abgeleiteten Reduktionsfaktoren in Abh ngigkeit von der Karbonati sierungstiefe d in mm W hlen Sie d an und setzen Sie eine Zahl zwischen 1 und 6 f r die ermittelte Karbonatisierungstiefe in mm Ab Karbonatisierungstiefen ber 6 mm geben Sie 6 ein Der dazu geh rende Reduktionsfaktor wird automatisch gesetzt Der R ckprallwert kann bis zu 4096 reduziert werden siehe Fig 4 6 10 Einstellungen Karbonatisierungstiefe in mm 0 0 1 0 2 0 3 0 4 0 5 0 6 0 100 Te S LENS AN pom e R ckprallwert t NS Bereiche CH Y 23 28 1 C 28 34 ke Se 34 39 m e KON 39 45 e Tn Das SZ SI II ER EI IE ennem 45 50 XD Ce i CS H Se gt 70 i E fac PNIS c AN 60 spe F
7. B Proceg Portland Cement Early Strength Blast Furnace Average Curve eo N e fc in N mm W rfel 150 150 150 mm e 20 25 30 35 40 45 50 R ckprallwert R Fig 4 5 Alle J Kurven mit Proceq B Kurve 4 4 3 Kurve einstellen Die Kurven Nummer 1 bis 5 3 ab Version 4 0 sowie die ermittelten Parameter a b und c siehe unter Neue Umwertungskurve bilden sind mittels Pfeiltasten einzustellen 2006 Proceg SA 4 5 Korrekturen 4 5 1 Formfaktor os Die PROCEQ Standardkurven fck7 und fck28 siehe Standardumwertungskurven gelten f r Probew rfel von 200 mm Kantenl nge bei EPROM Versionen bis 1 3 bzw von 150 mm Kantenl nge ab EPROM Version 2 0 Werden Probek rper mit anderen Abmessungen f r die Bestimmung der Druckfestigkeit in der Druckpr fmaschine verwendet ist der jeweilige Formfaktor in der 1 Zeile einzustellen bzw in der Zeile 2 bis 4 auszuw hlen Form des Probek rpers 1 Zeile variabel siehe Tab 4 1 Probek rper Formfaktoren EPROM Version bis 1 3 ab 2 0 W rfel 300 mm und Zylinder 100x100 mm 0 90 0 85 Bohrkern 100x100 mm 1 07 1 02 Bohrkern 50x56 mm 1 09 1 04 Tab 4 1 Formfaktoren Formfaktor gilt auch f r Zylinder 200 x 200 mm Zylinder 150 x 150 mm Zylinder 6 x 12
8. Handle and dispose of lubricants and cleaning agents responsibly 1 3 2 Unauthorized Operators The concrete test hammer is not allowed to be operated by children and anyone under the influence of alcohol drugs or pharmaceutical preparations Anyone who is not familiar with the operating instructions must be supervised when using the concrete test hammer 2006 Proceq SA 1 3 3 Safety Icons The following icons are used in conjunction with all important safety notes in these operating instructions Danger This note indicates a risk of serious or fatal injury in the event that certain rules of behavior are disregarded Warning This note warns you about the risk of material damage financial loss and legal penalties e g loss of warranty rights liability cases etc This denotes important information 2006 Proceg SA 1 4 ISO DIS 8045 EN 12 504 2 ENV 206 BS 1881 part 202 DIN 1048 part 2 ASTM C 805 ASTM D 5873 Rock NFP 18 417 B 15 225 JGJ T 23 2001 JJG 817 1993 Safety Standards and Regulations Applied International Europe Europe Great Britain Germany USA USA France Belgium China China 2 Product Description Display unit Concrete test hammer Test hammer cable Fig 2 1 Display unit with concrete test hammer Model ND LD The DIGI SCHMIDT 2000 concrete test hammer compri ses the actual concrete test hammer and the display unit Both components belong tog
9. D eo fc in N mm cube 150 150 150 mm eo be eo 25 45 50 30 35 40 Rebound Value R Fig 2 7 All J Curves with the Proceq B Curve 4 4 8 Set up Curve The curve no 1 to 5 3 from version 4 0 on as well as the parameters a b and c see under Creating New Conversion Curve can be set using the arrow keys 2006 Proceg SA 4 5 Corrections 4 5 1 Shape Coefficient as The PROCEQ standard curves fck7 and fck28 are valid for sample cubes with a 200 mm side for EPROM versions up to 1 3 or from a 150 mm side from EPROM version 2 0 If test specimens with different dimensions are used for determining the compressive strength in the pressure testing machine the shape coefficient in the first line is to be set or selected in line 2 to 4 Shape of the test specimen 1 Line variable see Table 4 1 Test specimen Shape coeffi cients EPROM version up to 1 3 from 2 0 Cube 300 mm and cylinder 100x100 mm 0 90 0 85 Drill core 100x100 mm 1 07 1 02 Drill core 50x56 mm 1 09 1 04 Tab 4 1 Shape coefficients Shape of the test specimen Shape coefficient also applies for Cylinder 200 x 200 mm Cylinder 150 x 150 mm Cylinder 6 x 12 2nd Line 200 200 200 3rd Line 150 150 150 4th Line 150 300 mm Settings 9 4 5 2 Time Coeffi
10. la s rie de mesures doit tre consid r e comme invalide selon la norme Valeur moyenne Moyenne x Median de n 3 1 Ajuster avec thes Fin avec MENU ou END Fig 4 2 Menu calcul de la valeur moyenne 4 3 Num ro de s rie de mesures est possible de saisir au d but d une s rie de mesures un nom de titre consistant de jusqu 10 lettres des places vides et les signes ainsi qu un chiffre de 4 lettres au maximum 2006 Proceq SA No serie de mesure HBCDEFGHIJ 1234 Ajuster avec Ties Fin avec MENU ou END Fig 4 3 A la 1 re frappe de la nouvelle s rie de mesures le num ro augmente automatiquement d 1 unit Menu num ro de serie de mesure 4 4 Conversion 4 4 4 Unit Choisir l unit pour l affichage de la r sistance du b ton la compression N mm2 MPa psi kg cm 4 4 2 S lection d une courbe La r sistance la compression du b ton fck peut tre d duite partir de la valeur de rebondissement R au moyen de courbes de conversion Vous disposez de 3 possibilit s pour d terminer la r sistance la compression du b ton pas de conversion s lection de 5 courbes 3 partir de la version 4 0 de conversion propres ou choix entre 2 courbes Proceq standard program m es ainsi que partir de la version 4 0 4 courbes Japon voir Fig 4 4 R glages 7 Pas de conversion 1 0 GG0GR2 8 GOR 8 6 2 9 DDDDbR Z 8 G6R 0 6 3 0 BOGAR 0 GGR 0 6 4
11. nnen jedoch mit dem Betonpr f hammer nicht zuverl ssig ermittelt werden 2006 Proceq SA Der Zusammenhang zwischen R ckprallwert R und der Betondruckfestigkeit fck wird an Probek rpern einer gewissen Betonart bestimmt Gehen Sie wie folgt vor Stellen Sie Probek rper unter Ber cksichtigung der im jeweiligen Land bestehenden Vorschriften her Belasten Sie die Probek rper in einer Druckpr fma schine mit einer senkrecht zur Einf llrichtung des Betons wirkenden Kraft von 40 kN Messen Sie anschliessend die R ckprallh rte indem Sie m glichst viele Pr fschl ge auf der Seitenfl che des Pr fk rpers ausf hren Ein aussagekr ftiges Resultat wird nur erzielt wenn an mehreren Probek rpern die R ckprallwerte R und die Druckfestigkeit gemessen werden gt gt gt Beton ist ein sehr inhomogenes Material Bei Probek rpern die aus demselben Frisch beton hergestellt und gelagert wurden k nnen beim Pr fen in der Druckpr fmaschine Abwei chungen von 15 auftreten e Bilden Sie den Mittelwert RA Ermitteln Sie die Betondruckfestigkeit indem Sie die Probek rper auf der Druckpr fmaschine bis zum Bruch belasten und bilden Sie anschliessend den Mittelwert fckm Das Wertepaar Rm fckm gilt f r einen bestimmten Bereich des gemessenen R ckprallwerts R F r die Erstellung einer neuen Umwertungskurve ber den ganzen Bereich des R ckprallwerts R 20 bis R 55 Daten 23 m ssen Probek rper un
12. nnen nur direkt nach dem jeweiligen Pr fschlag mit der Taste PRINT STORE eliminiert werden Messreihe beenden Nachdem der letzte zur Messreihe geh rende Schlag ausgef hrt wurde ert nt ein tiefer Piepston Falls unter Mittelwertbildung n 0 gesetzt wurde m ssen Sie die Messreihe mit der Taste END abschliessen Anzeige nach abgeschlossener Messreihe Am Schluss der Messreihe erscheinen die Werte und Parameter wie in Fig 3 1 dargestellt Falls Median gesetzt ist nur ab Version 4 0 m glich erscheint das Messbild gem ss Fig 5 4 respektive 5 5 2006 Proceq SA Min 48 Max D s B i 86 OR f 36 6 EH ram2 N 9 pise 7 Meali aa o Fig 5 4 Messreihe erf llt EN 12504 2 Bemerkungen f7 und f8 stehen f r die neuen Japan Kurven der Zeile 7 respektive 8 Med steht f r Median gem ss Norm EN 12504 2 2001 Art 7 Vom Serientitel wird nur der rechte Nummernteil an gezeigt 0105 resp 105 Fig 5 5 Messreihe ausserhalb Toleranz Neue Messreihe Eingestellte Messwerte bleiben unver ndert Fahren Sie weiter ab Fig 5 1 mit Pr ffl che mit Schleifstein vorbereiten Nach dem ersten Pr fschlag der neuen Messreihe erh ht sich die Messreihennummer automatisch um den Wert 1 Neue Werte einstellen Dr cken Sie die Taste MENU Geben Sie die neuen Werte wie unter Einstellungen beschrieben ein Messung 13 Messungen abschliessen Betonpr fhamme
13. surface layer using a manual grinding machine over a surface area of about 120 mm and performing the measurement on the non carbonate impregnated concrete The time coefficient i e the measurement of the increased rebound values R can be ascertained by taking additional measurements on the carbonate impregnated surface Hm carb Hm carb Time coeff Z gt Rane 77 Hm DC E Zt eat Average rebound value R measured on carbonate impregnated concrete surface Amine Average rebound value R measured on non carbonate impregnated concrete surface 24 Appendix 2006 Proceq SA 4 usijbu3 Francais Table des matieres 1 S curit ar en 2 5 Mes re u s nen en 12 Consignes d ordre g n ral 2 Mesure 12 Responsabilit 2 Sortie des valeurs 14 R gles de s curit 2 6 Entretien et maintenance 16 Normes et prescriptions utilis es 3 Nettoyage apr s utilisation 16 Description du produit 4 Contr le du fonctionnement 16 Mise en service 5 SLOCKAQE EEN 17 Branchement des composants B Maintenance 17 Mise en service de l instrument d affichage 5 7 Donn es 1 ua u RR ERE TER 20 4 R glages 6
14. 2 2 2 Eee ees 6 Impact Direction 6 Mean Value 6 Measure Series Number 7 GOliVersiOn 32 aa east 7 Corrections 8 Display Range 11 Limit Values 11 Language ss sains hi der ef 11 Date TIme 2 4 didana 448443444440 12 Data Output 12 2006 Proceq SA 5 Measuring Process Measuring Procedure Data Output ss es Re aded 6 Maintenance and Care Cleaning After Use Performance Check Storage Aare ua da maana da laada Maintenance Form of Delivery Accessories Spare Parts Technical Data 8 Appendix e REIR Derivation of the Proceq Standard Conversion Curves Standard Conversion Curves Creating New Conversion Curve Determining Time Coefficient For more information please refer to the Info Sheet Euro Anvil 810 310 06 ver 09 2003 Contents 1 Safety 1 1 General Information 1 1 1 Basic Information The concrete test hammer is designed according to state of the art technology and the recognized safety regulations Please read through these operating
15. 4 5 gt A T 4 Fig 5 7 Daten in ein MS Excel Format bertragen 5 2 2 Speicher l schen Objekte k nnen nicht einzeln gel scht werden SCH Sie k nnen nur den gesamten Speicherinhalt l schen und dies nach der Best tigung nicht mehr r ckg ngig machen 5 2 3 Speicher anzeigen Auf dem Display werden die Messreihennummer die Schlagrichtung des Betonpr fhammers und die gemes senen R ckprallwerte R nach dem L schen der Ausreis ser sowie das Mittel der R ckprallwerte R bzw der 2006 Proceq SA Betondruckfestigkeit angezeigt ab Version 4 0 werden die gemessenen und berechneten Werte sowie s mtliche eingestellten Parameter am Anzeigeger t angezeigt 15 9 2065 2230 TEST HAUS 195 Median frrasi B rt1 88 dd ds 48 54 42 43 46 di d xz456 BR 36 6H mmz Min Max 4 r5 set3 80 NS ohun Busuahl mit tt Ende mit MENU od END Fig 5 8 Beispiel von Speicher anzeigen 1 Datum 2 Serientitel 3 Richtung Mittelwertbildung z B Median 4 Umrechnungskurve Faktoren Karb Tiefe 5 Einzelne Messwerte 6 Mittelwerte von R und fc 7 Minimum Maximum R Standardabweichung Bei Median wird f r ung ltige Messserien F gt 20 angezeigt 2006 Proceq SA 5 2 4 Ausdruck mit Drucker F r die Daten bertragung ist das Printerkabel Art Nr 330 00 460 zu verwenden Der Ausdruck kann mit allen handels blichen Druckern mit serieller Schnitt stelle ausgef hrt werden Es bestehen d
16. 80 compression valeur la plus probable de tous les r sul tats d essai soient inclus 22 Annexe 2006 Proceq SA 8 3 Calcul d une nouvelle courbe de conversion Par exp rience dans les cas suivants des divergences apparaissent par rapport aux courbes de conversion nor males Les produits en pierre de b ton de composition inhabi tuelle de faibles dimensions II est recommand de proc der une s rie d essais particuliere pour chacun des produits pour d terminer le rapport entre la valeur de rebondissement R et la r sistance la compression La r sistance est moindre sur les agr gats dont la pierre est moins solide plus l g re ou qui s effrite par ex b ton de ponce gruau de brique gneiss que celle d termin e avec une courbe de conversion Le gravier qui a une surface trop lisse polie et une forme sph rique pr sente une moindre r sistance la compression par rapport aux valeurs d termin es au moyen des mesures de rebondissement Un b ton contenant peu de sable sec et insuffisam ment travaill peut pr senter des nids de gravier invisi bles de l ext rieur qui influent sur sa r sistance mais pas sur les valeurs de rebondissement Le scl rom tre indique des valeurs de rebondissement R trop faibles sur le b ton humide ou qui s est solidifi sous l eau ou qui vient d tre d coffr Le b ton doit tre sec pour proc der l essai est possible d obtenir des r sistances tr
17. A PR CEQ 7Days Dr B PROCEG 14 56Days 6 Portland Cement 8 Blast Furnace J 9 Average Curve J Choisir avec t Fin avec MENU ou END Fig 4 4 Pas de conversion Choisir Pas de conversion En fin de s rie de mesures seule la moyenne des valeurs de rebondissement R en fonction de la direction de la frappe est affich e Vous trouverez les r sistances la compression du b ton dans les courbes de conversion sur les Fig 8 1 et Fig 8 2 sous Courbes de conversion standard Courbes de conversion Propres courbes de conversion Configurer d abord les param tres a b et c des fonctions de courbes dans le sous menu D finition d une courbe S lectionner la courbe de conversion aux num ros de ligne 1 5 3 partir de la version 4 0 Choix des courbes PROCEQ standard Provenance des courbes PROCEQ standard voir sous Provenance des courbes de conversion PROCEQ standard 8 R glages Choisir la courbe de conversion A ligne n 7 pour un b ton g de 7 jours fck7 ou celle ligne n 28 pour un b ton g de 14 56 jours fck28 Choix de courbes Japonaises partir de la version 4 0 En plus des deux courbes de conversion de Proceq SA vous disposez de quatre nouvelles courbes d termin es au Japon dans le cadre de tests tendus Portland Cement J pour du b ton constitu de ciment Portland analogue la courbe B Proceg pour b ton r sistance rapide form de ciment
18. DOAN 0 Om PS Go D O Tige de percussion Surface examiner B ti Courseur avec tige sans affectation Bouton complet Barre de glissement Disque de guidage Calotte Anneau de pression Couvercle Ressort de pression Verrou Marteau 14 1 modele ND 14 2 modele LD Ressort amortisseur Ressort de percussion Douille Rondelle de feutre El ment de r sistance avec prise de raccordement Vis Contre crou Goupille Ressort verrouilleur Entretien et maintenance 19 7 Donn es 7 1 Fourniture Modeles ND LD 20 Donn es Contenu de la valise N de r f rence Scl rom tre b ton Instrument d affichage Sangle de transport C ble pour scl rom tre C ble de transfert Pierre abrasive Enveloppe protectrice de l instrument d affichage Mode d emploi Valise 325 x 295 x 105 mm Poids total Mod le ND Mod le LD 340 00 202 340 00 211 e e e e e e e e e e e e e e e 3 kg 3 kg 2006 Proceq SA 7 2 Accessoires pieces de rechange Designation N r f Enveloppe protectrice de l instrument 330 00 470 d affichage C ble de transfert 9 9 p les 330 00 456 C ble d imprimante 9 9425 p les 330 00 460 avec interface s rie Cable pour scl rom tre 380 02 510 Pierre abrasive 310 99 037 Valise 340 00 281 Enclume Euro 310 09 000 7 3 Caract ristiques techniques 7 3 1 Instrument d affichage Gamme de mesure r sistance la compression du b ton de 10 70 N mm2 M moire non
19. Housing complete Slider with guide rod Not used Push button complete Hammer guide bar Guide disk Cap Two part ring Rear cover Compression spring Pawl Hammer mass 14 1 model ND 14 2 model LD Retaining spring Impact spring Guide sleeve Felt washer Resistance element with input socket Trip screw Locknut Pin Pawl spring Maintenance and Care 19 7 7 1 Data Form of Delivery Model ND LD 20 Data Contents of Package Article no Concrete test hammer Display unit Carrying strap Test hammer cable Transfer cable Grindstone Protection sleeve for display unit Operating instructions Carrying case 325 x 295 x 105 mm Total weight Model ND Model LD 340 00 202 340 00 211 e e e e e e e e e e e e e 3 kg 3 kg 2006 Proceq SA 7 2 Accessories Spare Parts Designation Article no Protection sleeve for display unit 330 00 470 Transfer cable 9 9 position 330 00 456 Printer cable 9 9 25 position for printer 330 00 460 with serial port Test hammer cable 380 02 510 Grindstone 310 99 037 Carrying case 340 00 281 Euro Anvil 310 09 000 7 3 Technical Data 7 89 4 Display Unit Measuring range from 10 to 70 N mm compressive strength of the concrete Non volatile memory for max 250 measurement series of 10 measurements each Graphics LC display 128 x 128 pixels Interface RS232 Power supply with 6 batteries 1 5 V LR6 design for an operating time of approx 60 hours
20. Permissible ambient conditions of 10 C to 60 C 7 3 2 Concrete Test Hammer Model ND Model LD 2 207 Nm 0 735 Nm 10 to 70 N mm Impact energy Measuring range Compressive strength 2006 Proceq SA 8 Appendix 8 1 Derivation of the PROCEQ Standard Conversion Curves The conversion curves Fig 8 1 and Fig 8 2 for the con crete test hammer are based on measurements taken on many sample cubes The rebound values R of the sample cubes were measured using the concrete test hammer The com pressive strength was then determined with the pressure testing machine In each test at least 10 test hammer impacts were performed on one side of the sample cube which was lightly clamped in the press Material of the sample cubes All cubes were made from concrete consisting of good quality fine gravel maximum particle size 32 mm and Portland cement Empirical values The conversion curve is practically independent of the Cement content of the concrete Particle gradation Diameter of the largest particle in the fine gravel mix ture providing the diameter of the maximum particle is 32 mm Water cement ratio Appendix 21 8 2 Standard Conversion Curves Standard Conversion Curve for Concrete Test Hammer Model LD Mean value R has already been corrected in relation to the impact direction Standard Conversion Curve for Concrete Test Hammer Model ND Mean value R has already been corrected in relation to
21. Portland pour du b ton form de ciment de haut fourneau courbe moyenne des courbes individuelles n b Au Japon on utilise seulement la courbe Average Early Strength J Blast Furnace J Average Curve J CH Nous vous recommandons cependant d utiliser les courbes individuelles si vous connaissez le type de b ton Les quatre courbes sont repr sent es avec la courbe B Proceq dans la figure 4 5 Les courbes s appliquent respectivement aux frappes horizontales et une conversion bas e sur une r sis tance la compression en N mm d termin e sur un cube de b ton de 150 150 150 mm Dans le cas d une autre direction de frappe et d une utilisation 2006 Proceq SA d autres chantillons taille et forme diff rentes il faut aussi prendre en compte les facteurs additionnels correspondants avec les nouvelles courbes Pour les utilisateurs des courbes de conversion nous avons repr sent les courbes japonaises s par ment parall le ment la courbe B de Proceg dans les figures 2 8 2 10 o o 50 B Proceq Portland Cement Early Strength Blast Furnace Average Curve fc en N mm cube 150 150 150 mm 10 20 25 30 35 40 45 50 Valeur de rebondissement R Fig 4 5 Toutes les curbes J avec
22. courbe B Proceq 44 3 D finition d une courbe Les num ros de courbe 1 5 3 partir de la version 4 0 et les param tres d termin s a b et c voir sous Calcul d une nouvelle courbe de conversion doivent tre saisis avec les boutons de fl che 2006 Proceg SA 4 5 Corrections 4 5 1 Facteur de forme as Les courbes PROCEA standard fck7 et fck28 sont valables pour des cubes d essai de 200 mm de longueur d ar te pour les versions EPROM jusqu 1 3 et de 150 mm de longueur d ar te partir de la version EPROM 2 0 En cas d utilisation d prouvettes poss dant d autres dimensions pour la d ter mination de la r sistance la compression dans la machine d essais de compression le facteur de forme doit tre d fini chaque fois sur la ligne 1 et s lectionn sur les lignes 2 4 Forme de l prouvette 1 ligne variable voir tab 4 1 Facteurs de forme Version EPROM jusqu 1 3 partir 2 0 Eprouvette Cubes 300 mm et cyl 100x100 mm 0 90 0 85 Carotte 100x100 mm 1 07 1 02 Carotte 50x56 mm 1 09 1 04 Tab 4 1 Facteurs de forme Facteur de forme valable aussi pour cylindre 200 x 200 mm cylindre 150 x 150 mm cylindre 6 x 12 Forme de l prouvette 2 me ligne 200 200 200 3 me ligne 150 150 150 4 me ligne 150 300 mm R glages 9 4 5 2 Facteur de temps ot Deux moyens sont possibles d termination d un propre facteur d
23. fonctions 1 M3 et Mx 4 Si Median est saisi sous Valeur moyenne les valuers aberrantes M1 M3 et Mx ne peuvent pas tre determiner i 2006 Proceq SA 0 suppression individuelle de valeurs Les valeurs ne peuvent tre supprim es qu individuellement avec cette fonction Les valeurs mesur es trop lev es ou trop basses peuvent tre directement limin es lors de la mesure avec la touche PRINT M1 suppression de la valeur la plus lev e et la plus basse La valeur la plus lev e et la valeur la plus basse sont supprim es s il existe au moins 6 valeurs mesur es M3 suppression des valeurs divergeant de plus de 20 Les valeurs divergeant de 20 ou plus de la valeur moyenne sont supprim es une fois la s rie de mesures termin e Le nombre de frappes d essai affich l cran est r duit du nombre de celles supprim es Un bip sonore r p t quatre fois invite remplacer les frappes d essai supprim es par de nouvelles Le r sultat de mesure appara t l cran d s que le nombre n de frappes d essai a t atteint Mx suppression des valeurs les plus basses et les plus lev es Seulement possible partir de la version EPROM 2 0 Les valeurs les plus lev es et les plus basses de nomb re m sont supprim es Saisir le nombre de valeurs mesur es liminer sous 2006 Proceq SA m Tenir compte du nombre de frappes d essai n d fini sous Valeur moyen
24. generates a recoil when it deploys Therefore always hold the concrete test hammer with both hands Always direct the impact plunger 1 against a hard surface Deploy the impact plunger 1 by pushing the concrete test hammer towards the surface until the push button 6 springs out Unscrew the cap 9 and remove the two part ring 10 Unscrew the rear cover 11 and remove the compres sion spring 12 Press the pawl 13 and pull the system vertically up and out of the housing 3 Lightly strike the impact plunger 1 with the hammer mass 14 to release the impact plunger 1 from the ham mer guide bar 7 The retaining spring 15 comes free Maintenance and Care 17 Pull the hammer mass 14 off the hammer guide bar together with the impact spring 16 and sleeve 17 Remove the felt ring 18 from the cap 9 6 4 2 Cleaning Lay all parts except for the housing 3 in kerosene and clean them using a brush Use a round brush copper bristles to clean the hole in the impact plunger 1 and the hammer mass 14 thoroughly Let the fluid drip off the parts and then rub them dry with a clean dry cloth Use a clean dry cloth to clean the inside and outside of the housing 3 6 4 3 Assembly Before assembling the hammer guide bar 7 lubricate it slightly with a low viscosity oil one or two drops is ample viscosity ISO 22 e g Shell Tellus Oil 22 Insert a new felt ring 18 into the cap 9 Apply
25. instructions care fully before initial startup They contain important infor mation about safety use and maintenance of the DIGI SCHMIDT 2000 concrete test hammer 1 1 2 Designated Use The concrete test hammer is a mechanical device used for performing rapid non destructive quality testing on materials in accordance with the customer s specifications in most cases however the material involved is concrete The device is to be used exclusively on the surfaces to be tested and on the testing anvil 1 2 Liability Our General Terms and Conditions of Sale and Delivery apply in all cases Warranty and liability claims arising from personal injury and damage to property cannot be upheld if they are due to one or more of the following causes Failure to use the concrete test hammer in accordance with its designated use 2 Safety Incorrect performance check operation and mainte nance of the concrete test hammer Failure to adhere to the sections of the operating instructions dealing with the performance check ope ration and maintenance of the concrete test hammer Unauthorized structural modifications to the concrete test hammer Serious damage resulting from the effects of foreign bodies accidents vandalism and force majeure 1 3 Safety Regulations 1 3 1 General Information Perform the prescribed maintenance work on schedule Carry out a performance check once the maintenance work has been completed
26. instrument d affichage Les deux composants sont indissociables Ils sont calibr s en tant qu unit La tige de percussion du scl rom tre frappe avec une nergie d finie sur la surface de b ton Une fois le coup donn un corps en acier le marteau voir pos 14 Fig rebondit sur une certaine distance La course parcourue par le marteau est enregistr e par un capteur puis transmise l instrument d affichage sous forme de signal lectrique Le signal transform par l lectronique est indiqu l cran de l instrument d affichage en tant que valeur de rebondissement R accompagn le cas 4 Description du produit ch ant de la r sistance la compression fck cor respondante Il existe un rapport d fini entre la valeur de rebondisse ment R et la duret et la r sistance du b ton Il faut tenir compte des facteurs suivants lors de la d ter mination des valeurs de rebondissement R Direction de frappe horizontale verticale vers le haut ou vers le bas Age du b ton Taille et forme des corps de comparaison cube cylindre Le mod le ND permet de tester les pi ces en b ton d une paisseur partir de 100 mm le b ton dont la granulom trie est 32 mm Le modele LD permet de tester les pi ces de petites dimensions par ex les pi ces paroi mince d une paisseur de 50 100 mm CE Serrer ventuellement les pi ces tester avant de les mesurer sur le mod le LD afin d
27. mains Toujours diriger la tige de percussion 1 vers un support dur Faire sortir la tige de percussion 1 en d pla ant le scl rom tre en direction du support jusqu ce que le bouton poussoir 6 se d clenche D visser la calotte 9 et ter l anneau de pression 10 D visser le couvercle 11 et ter le ressort de pression 12 Appuyer sur le verrou 13 et extraire le syst me du b ti 3 la verticale vers le haut Un l ger coup de marteau 14 sur la tige de percus sion 1 le s pare de la barre de glissement 7 et le ressort amortisseur 15 se lib re Entretien et maintenance 17 Sortir le marteau 14 le ressort de percussion 16 et la douille 17 de la barre de glissement Extraire la rondelle de feutre 18 de la calotte 9 6 4 2 Nettoyage Plonger toutes les pi ces except le b ti 3 dans du p trole et les nettoyer avec un pinceau Nettoyer minutieusement l al sage de la tige de per cussion 1 et du marteau 14 avec une brosse ronde fil de cuivre Laisser les pi ces s goutter et les frotter avec un chiffon sec et propre Nettoyer l int rieur et l ext rieur du b ti 3 avec un chiffon sec et propre 6 4 3 Assemblage Graisser l g rement la barre de glissement 7 avec de l huile fluide une ou deux gouttes suffisent avant de la remonter viscosit ISO 22 par ex Shell Tellus Oil 22 Placer une nouvelle rondelle de feutre 18 dans la calotte 9 Appliquer u
28. measured and calculated values as well as all parameters set are displayed 15 23 2585 5 38 HERI HOUSE 184 Zen Seet al c d 4a 50 45 42 44 52 43 OY Go xdg GR 36 EN mmZ MinrMaxsdir5 zs t3 n NE Select ba t4 End by MENU or END Fig 5 8 Example of Display Memory 1 Date 2 Alpha numeric number 3 Impact direction mean value method 4 Conversion curve factors carbonation depth 5 Individual impact rebound values 6 Mean values of R and fc 7 Minimum maximum R standard deviation For invalid measuring series using the median method F gt 20 is displayed 2006 Proceq SA 5 2 4 Output on the Printer For data transmission use the printer cable Art No 330 00 460 Printing can be performed on all commercially available printers with a serial port The following printing options are available Printer is connected to the display unit during measu rement online After completion of a measurement series the prese lected no of test impacts has been performed the data are sent to the printer Transmission is also pos sible at any time by pressing the PRINT key Printing via memory In the sub menu Display memory the desired measu rement series can be selected with the 1 keys Printing is performed by pressing the PRINT key FI RR ek IR RRR EK DIGI SCHMIDT 2000 ND 1 1055 082 0001 hehehe he he he e hoe e de he ee e e hee e ec e e e x 11 7 2001 9 30 109397
29. s rie de mesure 42 Calcul de la val moyenne 47 Zone d affichage 43 Courbe de conversion 48 Valeurs limites 44 Elim les val aberrantes 49 Valeurs de rebondissement Median sous forme de graph barres 45 Facteur de forme as Fig 3 1 Affichage de mesures Image d une mesure pour m dian voir Fig 5 4 et 5 5 Les symboles et les valeurs n apparaissent que lorsqu ils ont t d finis ou apr s une s rie de mesures Reprendre les d finitions de menu de la mesure pr c dente Poursuivre avec Mesure Proc der de nouvelles d finitions Poursuivre avec R glages Mise en service 5 4 Reglages L instrument d affichage dispose de menus guidant l utilisateur Veuillez suivre les instructions donn es dans le champ d affichage concern Le menu principal appara t l cran apr s que vous ayez appuy sur la touche MENU Blirect de frarre O Valeur mosenne O Ho s rie de mesure O Conversion O Corrections O Echelle de l cran O Valeurs limites O Lanaue zLansuagse O DatecHeure O Sortie des valeurs Choisir avec th Start avec START Fin avec EHD Choisir la ligne de menu Appeler la ligne choisie Appeler l cran de mesure avec les r glages choisis Fig 4 1 Menu principal Attention V rifier les r glages auxquels vous avez pro c d avant la mesure Cela vaut en particulier pour la direction de frappe et les facteurs de forme et de temps 6 R glages
30. testens nach 2 Jahren auf Verschleiss zu pr fen und einer Reinigung zu unterziehen Folgen Sie dazu dem nachfolgenden Text Der Betonpr fhammer kann entweder an eine vom Vertreiber autorisierte Servicestelle gesandt werden oder vom Bediener selbst gem ss nachfolgender Beschreibung instand gehalten werden dy Die in Klammern aufgef hrten Positionen sind in Fig 6 2 L ngsschnitt durch Betonpr fhammer dar gestellt 2006 Proceg SA 6 4 1 Demontage Achtung Schleifer und Stange 4 siehe Fig 6 2 d rfen unter keinen Umst nden demontiert verstellt oder gereinigt werden da sich sonst die Reibung ver ndern k nnte F r eine Neueinstellung sind Spezialwerkzeuge notwendig Betonpr fhammer senkrecht zur Unterlage ansetzen Gefahr Das Ausfahren des Schlagbolzens 1 er zeugt eine R ckstosskraft Den Betonpr f hammer daher immer mit beiden H nden halten Den Schlagbolzen 1 immer gegen eine harte Unterlage richten Der Schlagbolzen 1 wird ausgefahren indem der Betonpr fhammer zur Unterlage hin bewegt wird bis der Druckknopf 6 herausspringt Kappe 9 abschrauben und zweiteiligen Ring 10 her ausnehmen Deckel 11 abschrauben und Druckfeder 12 heraus nehmen Klinke 13 dr cken und System senkrecht nach oben aus dem Geh use 3 ziehen Durch leichten Schlag mit dem Hammer 14 auf den Wartung und Pflege 17 Schlagbolzen 1 wird dieser von der Laufstange 7 getrennt u
31. tion in which the concrete was poured Then measure the rebound hardness by applying as many test impacts as possible to the sides of the test specimen The only way to achieve a meaningful result is to measu re the rebound values R and the compressive strength of several test specimens CH Concrete is a very inhomogeneous material Test specimens made from the same batch of concrete and stored together can reveal discrepancies of 15 when tested in the pressure testing machine e Take the mean value Rp Determine the compressive strength of the concrete by applying force to the test specimens using the pres sure testing machine until the test specimens break Then ascertain the mean value fckm The pair of values R fckm applies to a certain range of the measured rebound value R Appendix 23 It is necessary to test samples of differing qualities and or ages in order to prepare a new conversion curve for the entire range of rebound values from R 20 to R 55 e Using the pairs of values Rm fckm calculate the mathematical shape of the conversion curve i e deter mine the parameters a b and c of the x function e g EXCEL in the RGP function 8 4 Determining Time Coefficient The age of the concrete and its carbonate penetration depth can significantly increase the measured rebound values R It is possible to obtain accurate values for the effective strength by removing the hard carbonate impregnated
32. tre b ton est un appareil m canique et sert au contr le rapide non destructif de la qualit de mat ri aux selon la sp cification du client mais surtout du b ton L appareil ne doit tre utilis que sur les surfaces tester et l enclume d essai 1 2 Responsabilit Nos conditions g n rales de vente et de livraison font loi Le droit la garantie et celui d invoquer la responsa bilit civile lors de dommages corporels et mat riels sont exclus lorsqu une ou plusieurs des causes suivantes sont leur origine Utilisation non conforme du scl rom tre b ton Contr le de fonctionnement commande et entretien du scl rom tre b ton non ex cut s dans les r gles de l art 2 S curit Non respect des consignes contenues dans le mode d emploi concernant le contr le de fonctionnement la commande et l entretien du scl rom tre b ton Modifications arbitraires de la construction du scl ro m tre b ton Catastrophes dues une influence ext rieure un acci dent au vandalisme et des cas de force majeure 1 3 R gles de s curit 1 3 1 G n ralit s Veuillez ex cuter les travaux d entretien dans les d lais impartis Veuillez proc der un contr le de fonctionnement apr s avoir termin les travaux d entretien Veuillez manipuler et liminer les lubrifiants et les d tergents de mani re ad quate 1 3 2 Op rateurs non autoris s Les enfants ainsi que les per
33. values are elimina ted automatically Cu If Median is set under Mean Value outliers values M1 M3 and Mx can not be set 2006 Proceq SA 0 Eliminating Individual Values Individual values can only be deleted with this function Too high or too low measured values can be eliminated directly during the measurement process with the PRINT key M1 Eliminate Highest and Lowest Value The highest and lowest measured values are deleted provided at least 6 measured values are present M3 Delete Values with Deviations of over 20 96 Values which deviate 20 96 or more from the mean value after completion of a measurement series are deleted The number of test impacts shown on the display is reduced by the number of deleted test impacts Four beeps are output to request replacement of the test impacts deleted by new ones The result of the measure ment appears on the display as soon as n test impacts have been successfully performed Mx Delete the Lowest and Highest Values Only possible from EPROM version 2 0 The amount m of both the lowest and highest values are deleted Under m enter the number of measured values to be eliminated See also the number of test impacts n set under Mean Value Example If m 8 then at least 12 should be set for n 2006 Proceg SA 4 6 Display Range The display range for the rebound value R on the display can be adapted to the testing range Enter Rmin and Rmax
34. 01 Test Results the median value is specified instead of the classic mean value When applying this method all measured values must be considered no outliers allo wed When setting 1 under Median MO is automatically set under Elimination of Outliers Under Mean x the number 9 or larger figure must be set to indicate number of impacts see Fig 4 2 The median value will be determined as follows The measured values are placed in a row according to the size 2006 Proceq SA For an odd number of impacts the value placed in the middle of the row is to be taken as the median value For an even number of impacts the mean value of the two values placed in the middle of the row is the median value f more than 20 of the values are spaced more than 6 units apart the measuring series must be rejected as mentioned in the standard Mean Value Median Ca 1 Adjust bu thr End bs MENU or END Fig 4 2 Mean value 4 3 Measuring Series Number Atthe start of a measurement series you can enter a label consisting of up to ten letters space and or sym bols including a four digit number e g name of building floor no element no see fig 4 3 2006 Proceg SA Test Mo BIBCDEFGHIJ 1234 Adjust ba Lea End bo MEHU or END Fig 4 3 Menu Test number The number is automatically incremented by 1 after the first test impact of the new measurement series 4 4 Conversion 4 4 1
35. 1 generates a recoil when it deploys Always hold the concrete test hammer in both hands Position the concrete test ham mer perpendicular to the test surface Deploy the impact plunger 1 by pushing the concrete test hammer towards the test sur face until the pushbutton 6 springs out Deploying the impact plunger 1 Danger Always hold the concrete test hammer in both hands perpendicular to the test sur face before you trigger the impact Each test surface should be tested with at least 10 impacts The individual impact points must be spaced at least 20 mm apart 2006 Proceq SA Position the concrete test ham mer perpendicular to and against the test surface Push the concrete test hammer against the test surface at mo derate speed until the impact is triggered a high beep acknow ledges registration Repeat this procedure for the whole measurement series Fig 5 3 Performing the test Obvious outliers can only be eliminated directly after the particular test impact with the PRINT STORE key End Measurement Series After the last impact of a measurement series has been carried out a low beep sounds If n 0 was set under Calculation of Mean Value you must end the measurement series with the END key Display after completed measurement At the end of the measurement series the value and parameters are displayed as shown in Fig 3 1 f Median is set only possible from ver
36. 4 1 Direction de frappe Choisir le symbole de la direction de frappe pr vue La valeur de rebondissement est automatiquement corri gee selon la direction de frappe choisie 4 2 Valeur moyenne Calcul de la valeur moyenne La valeur moyenne se calcule partir du nombre n de frappes d essai ou apr s une s rie de mesures en appuyant sur la touche END Saisir si possible au moins n 10 ou n 12 voir l exemple page 11 sous Mx Entrer le 0 sous valeur m diane La valeur moyenne actuelle est affich e l cran apr s chaque frappe d essai D termination de la M diane partir de la version 4 0 Dans la Norme EN 12504 2 2001 article 7 la valeur m diane est d crite au lieu de la valeur moyenne Toutes les valeurs de mesure d une serie de au moins 9 valeurs de mesure sont considerer D s que vous avez saisi Median dans le menu Valeur moyenne MO est automatiquement saisi sous Valeurs limites Assurez vous que chez Moyenne x au moin 9 est saisi pour le nombre d impacte n 2006 Proceq SA La valeur m diane est d termin e comme suit Les mesures sont class es en fonction de leur valeur Dans une s rie form e d un nombre impair de mesures la valeur du milieu correspond la valeur m diane Dans le cas d un nombre pair de mesures la moyenne des deux valeurs du milieu constitue la valeur m diane Si plus de 2096 de valeurs s cartent de plus de 6 unit s de la valeur m diane
37. Annexe 23 Les deux valeurs Rm fckm sont valables pour une plage d termin e de la valeur de rebondissement R mesur e Pour tablir une nouvelle courbe de conversion sur toute la plage de la valeur de rebondissement R 20 a R 55 il est n cessaire de tester des prouvettes de diff rentes qualit s et ou de diff rents ges Calculer la formule math matique de la courbe de con version partir des deux valeurs Rm fckm c d d terminer les param tres a b et c de la fonction x p ex avec EXCEL dans la fonction RGP 8 4 D termination du facteur temps L ge du b ton et la profondeur de carbonatation peuve nt sensiblement accroitre les valeurs de rebondissement R mesur es Des valeurs pr cises de la r sistance effective s obtiennent en tant la dure couche de surface carbona t e avec une meleuse portative sur une surface d env 120 mm pour proc der ensuite la mesure sur le b ton non carbonat Il est possible de d terminer le facteur temps c est dire la proportion de l augmentation de la valeur de rebondis sement R en proc dant des mesures suppl mentaires sur une surface carbonat e 24 Annexe Facteur temps Z Rin carb Rm n c Rm carb R Rm carb m n c 7 Rin DC Zt valeur de rebondissement R moyenne mesur e sur une surface de b ton carbonat e valeur de rebondissement R moyenne mesur e sur une surface de b ton non carbonat e 2006 Proceq SA proceg
38. Beton Das Ger t ist ausschliesslich auf den zu pr fenden Fl chen und dem Pr famboss anzuwenden 1 2 Haftung Grunds tzlich gelten unsere Allgemeinen Verkaufs und Lieferbedingungen Gew hrleistungs und Haftungs anspr che bei Personen und Sachsch den sind aus geschlossen wenn sie auf einen oder mehrere der folgenden Ursachen zur ckzuf hren sind 2 Sicherheit nicht bestimmungsgem sse Verwendung des Beton pr fhammers unsachgem sse Funktionskontrolle Bedienung und Wartung des Betonpr fhammers Nichtbeachten der Hinweise in der Betriebsanleitung bez glich Funktionskontrolle Bedienung und Wartung des Betonpr fhammers eigenm chtige bauliche Ver nderungen am Beton pr fhammer Katastrophenf lle durch Fremdk rpereinwirkung Unfall Vandalismus und h here Gewalt 1 3 Sicherheitsvorschriften 1 3 1 Allgemein F hren Sie die vorgeschriebenen Wartungsarbeiten fristgem ss durch F hren Sie nach Beendigung der Wartungsarbeiten eine Funktionskontrolle durch Handhaben und entsorgen Sie Schmierstoffe und Reinigungsmittel sachgerecht 1 3 2 Nicht zugelassene Bediener Kinder sowie Personen unter Alkohol Drogen oder Medikamenteneinfluss d rfen den Betonpr fhammer nicht bedienen Personen die mit der Bedienungsansleitung nicht vertraut sind d rfen den Betonpr fhammer nur unter Aufsicht bedienen 2006 Proceq SA 1 3 3 Sicherheitssymbole Die folgenden Symbole finden Sie
39. Betonpr fhammer DIGI SCHMIDT 2000 EATER ES be Concrete Test Hammer Modell ND LD Scl rom tre b ton Operating Instructions Mode d emploi digi schmidt proceq proceq Proceg SA Ringstrasse 2 CH 8603 Schwerzenbach Switzerland Phone 41 0 43 355 38 00 Fax 41 0 43 355 38 12 E Mail info proceg com Internet www proceq com Technische nderungen vorbehalten Subject to change Modifications techniques r serv es Copyright 2006 by Proceq SA 820 340 20 D E F ver 04 2006 Inhaltsverzeichnis 1 Sicherheit 2 5 Messung 12 Allgemeine Hinweise 2 Messvorgang 12 Haftung eui haere hae dawg RE 2 Datenausgabe 14 Gicherbeitsvorschriften sasaaa aaaea 2 6 Wartung und Pflege 16 Angewandte Normen und Vorschriften 3 Reinigung nach der Anwendung 16 Produktbeschreibung 4 Funktionskontrolle 16 Inbetriebnahme 5 Lagerung 17 Komponenten anschliessen B Instandhaltung 17 Anzeigeger t in Betrieb setzen 5 1 Daten d NEEN gu ENNEN een 20 4 Einstellungen 6 Lieferform llle 20 Schlagrichtung 6 Zubeh r Ersatzteile
40. Fourni russ ced ee x ave o e e EH 20 Direction de frappe 6 Accessoires pieces de rechange 20 Valeur MOYENNE 6 Caract ristiques techniques 21 Num ro de s rie de mesures 7 8 ANNEXE nennen 21 CONVOI 224400880 dedu eX xe ae gd 7 Provenance des courbes de conversion Corrections 8 Proceg standard 21 Echelle de l cran 11 Courbes de conversion standard 22 Valeurs limites 11 Calcul d une nouvelle courbe de conversion 23 Langue seek RE hale ue rule fe 11 D termination du facteur temps 24 Date heure 12 Sortie des valeurs 12 Pour informations suppl mentaires veuillez consulter la feuille info suivante Enclume EURO 81031006 ver 09 2003 en Englais et Allemand seulement 2006 Proceq SA Table des mati res 1 1 Securite 1 1 Consignes d ordre general 1 1 4 Important Le scl rom tre b ton est construit selon l tat actuel de la technique et r pond aux r gles g n ralement reconnues de s curit Veuillez lire ce mode d emploi attentivement avant la premiere mise en service Il contient d importantes consi gnes de s curit d utilisation et d entretien du scl rom tre b ton DIGI SCHMIDT 2000 1 1 2 Utilisation conforme Le scl rom
41. Horiz Ml 28 as1 05 at1 00 40 39 41 39 40 41 39 38 37 Mean 39 2R 41 1N mm 8 1 4 Min Max 37 41 Fig 5 9 Example of a print protocol Measuring Process 15 6 Maintenance and Care 6 1 Cleaning After Use Warning Never immerse the concrete test hammer in water or clean it under a running tap Use neither abrasives nor solvents for cleaning 6 1 1 Concrete Test Hammer Deploy the impact plunger 1 as described in Fig 5 2 Wipe the impact plunger 1 and housing 3 using a clean dry cloth 6 1 2 Display Unit Clean the display unit and measuring equipment with a clean dry cloth after use Clean the input sockets and connectors with a clean dry brush 6 2 Performance Check 6 2 1 Concrete Test Hammer If possible carry out the performance check every time before you use the device however at least every 1000 impacts or 3 months 16 Maintenance and Care Put the concrete test hammer into operation as described under Startup Place the testing anvil on a hard smooth surface e g stone floor Clean the contact surfaces of the anvil and the impact plunger Perform about 10 impacts with the concrete test hammer and check the result against the calibration value specified on the testing anvil Fig 6 1 Performance check of the concrete test hammer s gt Proceed as described in Maintenance if the values are not within the tolerance range specified on the testing an
42. Unit Select the unit in which the compressive strength of the the concrete is to be displayed N mm MPa psi kg cm 4 4 2 Select Curve The compressive strength of the concrete fck can be cal culated from the rebound value R by means of conversi on curves There are 3 options available for calculating the compressive strength of the concrete No conversion Select 5 3 from version 4 0 on internal conversion curves or Choose between 2 programmed PROCEQ standard curves and from version 4 0 on 4 Japan curves see Fig 4 4 Settings 7 Ho Conversion 1 B B5B88BR A AA B 7 9 HADAR 0 ee JA HADAR A HOR A A 42 A PROCEB daas B PROCEB 14 2 amp Dauz amp Portland Cement J CH Earls Strenath J B Blast Furnace J 9 Average Curve J Select by TL End bs MEHU or EHD Fig 4 4 Menu Conversion Curves No Conversion Select No Conversion At the end of a measurement series only the average of the rebound values R in relation to the impact direction is displayed The corresponding compressive strengths of the con crete can be taken from the conversion curves in Fig 8 1 and Fig 8 2 under Standard Conversion Curves Internal Conversion Curves Parameters a b and c of the curve functions must first be set in the sub menu Set up curve Under line number 1 to 5 3 from Version 4 0 on select the conversion curve 8 Settings Select PROCEQ Standard Curves For the derivation of
43. a frappe d essai dont elles r sultent avec la touche PRINT STORE Fin de la s rie de mesures Un bip sonore grave retentit apr s la derni re frappe de la s rie de mesures Si n 0 a t d fini sous Calcul de la valeur moyenne il faut mettre fin la s rie de mesures avec la touche END Affichage apr s s rie de mesure abouti A la fin de la s rie de mesure les valuers et param tres sont affich s comme pr senter dans la Fig 3 1 Si la valeur m diane est saisi possible seulement partir de la version 4 0 l image de mesure montr e dans Fig 5 4 o Fig 5 5 est affich 2006 Proceq SA Kan Jis X 6 CH mm 1 7 okakcMealt 00 105 Fig 5 4 La serie de mesure accomplit EN 12504 1 a Fig 5 5 Serie de mesure en dehors de la tolerance Remargues f7 et f8 repr sentent les nouvelles courbes Japon de la ligne 7 o 8 Med repr sente m dian d apr s la norme EN 12504 2 2001 Art 7 Seulement la partie droite du titre de s rie est afficher num ro 0105 resp 105 Nouvelle s rie de mesures Les valeurs mesur es d finies restent inchang es Poursuivre partir de la Fig 5 1 Pr parer la surface tester avec une pierre abrasive Apres la premiere frappe de la nouvelle s rie de mesures le num ro de la s rie de mesures augmente automatiquement d 1 unit D finition de nouvelles valeurs Appuyer sur la touche MENU Saisir les nouvelles valeurs c
44. a small amount of grease to the screw head of the screw 20 Slide the hammer guide bar 7 through the hammer mass 14 Insert the retaining spring 15 into the hole in the impact plunger 1 Slide the hammer guide bar 7 into the hole in the impact plunger 1 and push it further in until noticeable resistance is encountered 18 Maintenance and Care gt Prior to and during installation of the system into the housing 3 make sure that the hammer mass 14 does not get held by the pawl 13 Press the pawl 13 briefly Install the system into the housing 3 Insert the compression spring 12 and screw the rear rear cover 11 into the housing 3 Insert the two part ring 10 into the groove in the sleeve 17 and screw on the cap 9 Carry out a performance check Send in the device for repair if the mainte nance you perform does not result in correct function and if the calibration values specified on the testing anvil are not achieved 2006 Proceq SA 6 4 4 12 23 8 19 15 17 Fig 6 2 I AAAAAAAAA EN SE ES 2006 Proceq SA Concrete Test Hammer Model ND LD 11 21 20 13 22 6 14 1 14 2 16 10 18 Longitudinal section through the concrete test hammer Key SI 0 O1 RK ND Mi Mi Pe NM HH HH sch sch Ll ON O SI 0 O1 POD O Impact plunger Test surface
45. ansferred and treated easily from version 4 0 with the evaluation software ProVista version 2 0 CD as accessory art no 390 00 120 The detailed operating instructions for ProVista are installed on the CD delivered with the ProVista software Apart from ProVista data can still be converted to an Excel format using HyperTerminal software 14 Measuring Process More information on the subject can be found in the leaflet Data Transfer to the PC r Year r Measurement series number p Month p Day Hour p Minute 2001 7 16 8 30 123456_5 1 28 1 00 1 00 4 50 57 Impact Conversion at as Carbonate penetra P direction curve tion depth d in mm 54 Eliminate outliers 51 Measured values R 52 6 49 57 2 46 1 N mm2 LRX R Min R Max s fck Unit from fck Impact direction 1 2 3 4 5 gt T a 4 Fig 5 7 Transferring data to an MS Excel format 5 2 2 Clear Memory Objects cannot be deleted individually C You can only delete the entire memory contents This action cannot be undone after it has been confirmed 5 2 3 Display Memory The measurement series number the impact direction of the concrete test hammer and the measured rebound 2006 Proceq SA values R after deletion of the outliers as well as the average of the rebound values H or of the compressive strength of the concrete are displayed From version 4 0 on the
46. bei allen wichtigen Sicherheitshinweisen in dieser Bedienungsanleitung A A D Gefahr Dieser Hinweis signalisiert Verletzungs und oder Lebensgefahr wenn bestimmte Verhaltensregeln missachtet werden Achtung Dieser Hinweis warnt Sie vor materiellen Sch den sowie vor finanziellen und strafrecht lichen Nachteilen z B Verlust der Garantie rechte Haftpflichtf lle usw Hier finden Sie wichtige Hinweise und Informationen 2006 Proceg SA 1 4 ISO DIS 8045 EN 12 504 2 ENV 206 DIN 10468 Teil 2 ASTM C 805 ASTM D 5873 Fels NFP 18 417 B 15 225 JGJ T 23 2001 JJG 817 1993 Sicherheit Angewandte Normen und Vorschriften International Europa Europa Deutschland USA USA Frankreich Belgien China China 2 Produktbeschreibung Anzeigeger t Betonpr fhammer Ka D Pr fhammerkabel Fig 2 1 Anzeigeger t mit Betonpr fhammer Modell ND LD Der Betonpr fhammer DIGI SCHMIDT 2000 besteht aus dem eigentlichen Betonpr fhammer und dem Anzeige ger t Die beiden Komponenten geh ren zusammen Sie sind als Einheit kalibriert Der Schlagbolzen des Betonpr fhammers schl gt mit einer definierten Energie auf die Betonoberfl che Nach erfolgtem Schlag prallt ein st hlerner K rper der sogenannte Hammer siehe Pos 14 in Fig 6 2 eine bestimmte Strecke zur ck Der zur ckgelegte Weg des Hammers wird mit einem Sensor erfasst und als elektrisches Signal an das Anzeigeger t weitergel
47. cient at There are two options available Determining ones own time coefficient Time coefficient as a function of the carbonate pene tration depth Ones Own Time Coefficient Select at and enter the time coefficient determined See example under 8 4 Determining Time Coefficient Time Coefficient from chinese norm A further option from version 2 0 on are the reduction factors derived from the Chinese standard JGJ T23 92 and based on the carbonation depth d in mm Select d and set a value between 1 and 6 for the defined carbonation depth in mm For carbonation depths over 6 mm enter 6 The corresponding reduction factor is set automatically The rebound value can be reduced up to 4096 see Fig 4 6 10 Settings Carbonation Depth in mm 0 0 1 0 2 0 3 0 4 0 5 0 6 0 100 ke T te S Es KO E 90 KR D o Ya 3 hy 23 28 TR kal 28 34 bai Be 4 gt 80 hs 34 39 cc kr 39 45 Pas l nunnnnum 45 50 E maps teal o ur LA 2 70 Drei h Tu g rei s e D GR S NE 60 pa Fig 4 6 Reduction of Rebound values due to Carbonation 4 5 3 Eliminate Outliers The following 4 functions can be selected 0 M1 M3 and Mx Using function 0 individual values can be deleted manually Using the functions M1 M3 and Mx
48. dell Modell ND bzw LD Serien Nummer des Betonpr fhammers auf der linken und des Anzeigeger ts auf der rechten Seite CEPR berpr fen Sie ob die Serien Nummer des Betonpr fhammers auf dem Display mit der Nummer auf dem Ger t bereinstimmt Version der installierten Software durchgef hrter Selbstest Test 0 k aktuelle Lebensdauer der Batterien Anschliessend erscheint das Messbild des Objekts in dem zuletzt gemessen wurde siehe Fig 3 1 jedoch ohne Wertangaben 2006 Proceg SA gt Wenn keine Anzeige erscheint m ssen die Batterien ersetzt werden r letzter Messwert r Minimalwert Maximalwert Standardabweichung Mittelwert Betondruckfestigkeit Einheit 18 fZ8 1 05 109323 L A EE Anzahl Pr fschl ge 41 42 43 44 45 46 Fig 3 1 Messbild 41 Schlagrichtung 46 Messreihennummer 42 Mittelwertbildung 47 Anzeigebereich 43 Umwertungskurve 48 Grenzwerte 44 Ausreisser eliminieren 49 R ckprallwerte als Median Diagramm dargestellt 45 Formfaktor as Messbilder f r Medianwert siehe Fig 5 4 und 5 5 Die Symbole und Werte erscheinen nur wenn sie auch gesetzt wurden bzw nach erfolgter Messreihe Men einstellungen von vorg ngiger Messung bernehmen Fahren Sie mit Messung fort Neue Einstellungen vornehmen Fahren Sie mit Einstellungen fort Inbetriebnahme 4 Einstellungen Das Anzeigeger t verf gt ber eine benutzerf hrende Men technik Folg
49. e temps facteur de temps comme fonction de profondeur de carbonatation Propre facteur de temps S lectionner at et saisir le facteur de temps d termin Vous trouverez un exemple sous D termination du facteur temps Facteur de temps de la norme chinoise Une autre possibilit partir de la version EPROM 2 0 sont les facteurs de r duction en fonction de la profon deur de carbonatation d en mm d duits de la norme chinoise JGJ T23 92 S lectionner d et saisir un chiffre entre 1 et 6 pour la profondeur de carbonatation d termin e en mm Si les profondeurs de carbonatation sont superieures 6 mm saisir 6 Le facteur de r duction correspondant est automatiquement d fini La valeur de rebondissement peut tre r duite 40 voir Fig 4 6 10 R glages Profondeur de carbonatation en mm 0 0 1 0 2 0 3 0 40 5 0 6 0 100 ke c EN KOKS i 2 BCS N 2 E T 80 ten ris tc Til bbe B 7 ben ET T gt Pa 60 fern Fig 4 6 Reduction de la valeur de rebondissement suite a la carbonatation 4 5 3 Elimination de valeurs aberrantes Les 4 fonctions 0 M1 M3 et Mx peuvent tre s lecti onn es La fonction 0 permet la suppression manuelle et individuelle de valeurs Les valeurs sont automatiquement limin es avec les
50. ei tet Das von der Elektronik umgewandelte Signal wird auf dem Display des Anzeigeger ts als R ckprallwert R und gegebenenfalls mit der dazu geh renden 4 Produktbeschreibung Betondruckfestigkeit fck angezeigt Der R ckprallwert R steht in einem bestimmten Verh ltnis zur H rte und Festigkeit des Betons Bei der Ermittlung der R ckprallwerte R sind folgende Faktoren zu ber cksichtigen Schlagrichtung horizontal vertikal gegen oben oder unten Alter des Betons Gr sse und Form der Vergleichsk rper W rfel Zylinder Mit dem Modell ND k nnen gepr ft werden Betonteile mit einer Dicke ab 100 mm Beton mit Gr sstkorndurchmesser lt 32 mm Mit dem Modell LD k nnen gepr ft werden Teile mit geringen Abmessungen z B d nnwandige Teile mit einer Dicke von 50 bis 100 mm Ca Beim Modell LD sind die zu pr fenden Teile eventuell vor der Messung einzuspannen um ein Federn des Materials zu verhindern schlagempfindliche Teile aus Kunststein Siehe Technische Daten 2006 Proceq SA 3 Inbetriebnahme 3 1 Komponenten anschliessen Schliessen Sie das Pr fhammerkabel am Betonpr f hammer und am Anzeigeger t beim Input B an F r die Daten bertragung an den PC schliessen Sie das Transferkabel und f r die bertragung an den Drucker das Printerkabel am Interface RS232 an 3 2 X Anzeigeger t in Betrieb setzen Dr cken Sie die Taste ON OFF Auf dem Display erscheint kurzzeitig Ger temo
51. eit e W hlen Sie die Einheit f r die Anzeige der Betondruck festigkeit N mm MPa psi kg cm Kurve ausw hlen 4 4 2 Kurve ausw hlen Mittels Umwertungskurven kann vom R ckprallwert R auf die Betondruckfestigkeit fck geschlossen werden Zur Ermittlung der Betondruckfestigkeit stehen Ihnen 3 M glichkeiten zur Verf gung keine Umwertung vornehmen 5 3 ab Version 4 0 eigene Umwertungskurven anw hlen oder zwischen 2 programmierten Proceg Standard kurven sowie ab Version 4 0 4 Japan Kurven w hlen Siehe Fig 4 4 Einstellungen 7 Keine Unwerturrg 1 8 ERR 0 BIER F GI E 250 PAHAR 6 GRR A 5 2 0 GRE 6 GOR 0 6 4 A FR CEN bass Ss D PROCEO 14 56Ca9 6 Portland Cement J CR Earle Stremath J B Blast furnace T 2 Average Curve T Auswahl mit 4 Erde mit MEHU od EHD Fig 4 4 Men Umrechnungskurven Keine Umwertung W hlen Sie keine Umwertung Am Ende der Messreihe wird nur das Mittel der R ckprallwerte R in Abh ngigkeit der Schlagrichtung angezeigt Die entsprechenden Betondruckfestigkeiten k nnen Sie den Umwertungskurven in Fig 8 1 und Fig 8 2 unter Standardumwertungskurven entnehmen Eigene Umwertungskurven Die Parameter a b und c der Kurvenfunktionen m ssen zuerst im Untermen Kurve einstellen gesetzt werden W hlen Sie unter der Zeilennummer 1 bis 5 3 ab der Version 4 0 die Umwertungskurve aus PROCEQ Standardkurven w hlen Herleitun
52. emp cher un retour lastique du mat riau les pi ces en pierre de b ton sensibles aux coups Ca Voir caract ristiques techniques 2006 Proceq SA 3 Mise en service 3 1 Branchement des composants Brancher le c ble pour scl rom tre sur le scl rom tre et l instrument d affichage sur la sortie B Brancher les c bles correspondants sur l interface RS232 pour le transfert des valeurs au PC et l imprimante 3 2 Mise en service de l instrument d affichage Appuyer sur la touche ON OFF A l cran apparaissent bri vement le mod le de l instrument mod le ND ou LD le num ro de s rie sur le c t gauche pour le scl ro m tre et sur le c t droit pour l instrument d affichage ES V rifier que le num ro de s rie du scl rom tre TI D a En va e z ES indiqu l cran est le m me que celui grav sur l appareil la version du logiciel install letest automatique ex cut Test O K l autonomie actuelle des piles Apparat alors l objet dans lequel la derni re mesure a t faite voir Fig 3 1 mais sans des valeurs mesur es 2006 Proceg SA gt En l absence d affichage les piles doivent tre chang es r Derni re val mesur e Valeur minimale Valeur maximale L Ecart type L Valeur moyenne R sistance du b ton la pression Unit oeren 85 183575 L Nombre de frappes d essai 41 42 43 44 45 46 41 Direction de frappe 46 Num ro de
53. en Sie bitte den Anweisungen im jeweiligen Anzeigefeld Nachdem Sie die Taste MENU gedr ckt haben erscheint das Hauptmen auf dem Display B 5chlaancichtuna D Mittelwertbildung O Hezzreihen Hr O Umuer tuna D Korrekturen O An zeigebereich O Grenzwerte O Srrache Langusge D Latum Zeit O Datenausaabe Auswahl mit 44 Starten mit START D Ende mit EH Messbild mit den gew hlten Einstellungen aufrufen Men zeile w hlen gew hlte Zeile aufrufen Fig 4 1 Hauptmen Achtung Pr fen Sie vor der Messung die vorgenom menen Einstellungen Dies gilt besonders f r die Schlagrichtung und f r den Form und Zeitfaktor 6 Einstellungen 4 1 Schlagrichtung W hlen Sie das Symbol der vorgesehenen Schlag richtung Der R ckprallwert wird entsprechend der vorgew hlten Schlagrichtung automatisch korrigiert 4 2 Mittelwertbildung Klassische Mittelwertbildung Der Mittelwert wird aus der eingegebenen Anzahl n Pr fschl ge oder nach Abschluss einer Messreihe durch Dr cken der Taste END berechnet Geben Sie wenn m glich mindestens n 10 ein bzw n 12 siehe unter Mx das Beispiel auf Seite 11 Setzen sie unter Median die 0 Nach jedem Pr fschlag wird der aktuelle Mittelwert auf dem Display angezeigt Berechnung Median ab Version 4 0 In der Norm EN 12504 2 2001 Artikel 7 Testresultate wird anstelle der Mittelwertbildung neu der Medianwert vorgeschrieben Dabei sind al
54. entgehalt des Betons Kornabstufung Durchmesser des gr ssten Kornes des Kiessand gemisches sofern der Durchmesser des Gr sstkorns 32 mm ist Wasser Zement Verh ltnis Anhang 21 82 Standardumwertungskurven Standardumwertungskurve f r Betonpr fhammer Modell ND Mittelwert R bereits entsprechend Schlagrichtung korrigiert 70 60 50 40 30 20 fckcupem N mm W rfel 150x150x150 mm 10 8 0 7 5 A u E E 2 7 0 D E bo 3 2 6 5 bd 6 0 4 5 20 25 30 35 40 45 50 55 R ckprallwert R Fig 8 1 fckoupeM 22 Modell ND Umwertungskurve in Abh ngigkeit der mittleren W rfeldruckfestigkeit und des R ckprall werts R mittlere W rfeldruckfestigkeit wahrscheinlichster Wert Daten Standardumwertungskurve f r Betonpr fhammer Modell LD Mittelwert R bereits entsprechend Schlagrichtung korrigiert 70 8 0 3 E o 60 i x o i k 50 x7 5 D E E E 5 40 7 0 a 2 T 2 E 2 6 5 a Z S 20 26 0 Pa 2 10 4 5 20 25 30 35 40 45 50 55 R ckprallwert R Modell LD Umwertungskurve in Abh ngigke
55. er m die Anzahl der zu eliminierenden Messwerte ein Beachten Sie dazu die unter Mittel wertbildung gesetzte Anzahl der Pr fschl ge n Beispiel Wenn m 3 dann soll f r n mindestens 12 gesetzt werden 2006 Proceq SA 4 6 Anzeigebereich Der Anzeigebereich f r den R ckprallwert R auf dem Display kann dem Pr fbereich angepasst werden e Geben Sie Rmin und Rmax ein 4 7 Grenzwerte Die Grenzwertmarkierungen auf dem Display dienen der schnellen Erkennung von Abweichungen der gemes senen Werte Es kann ein Bereich gew hlt werden in dem die R ck prallwerte R liegen sollten siehe Fig 3 1 Messbild Cu Die gew hlten Grenzwerte werden nicht gespeichert e Geben Sie Rmin Und Rmax Ein 4 8 Sprache Language Sie k nnen w hlen in welcher Sprache die Texte auf dem Display angezeigt werden sollen deu Im Hauptmen erscheint in dieser Zeile zus tzlich Language egal welche Sprache gesetzt wurde Einstellungen 11 4 9 Datum Zeit Die eingebaute Uhr speichert die Messwerte mit dem Pr fdatum und der Zeit ab Korrigieren Sie allenfalls die gesetzten Daten 4 10 Datenausgabe Sehen Sie unter Datenausgabe nach Wenn alle Einstellungen am Anzeigeger t erfolgt sind dr cken Sie die Taste END Das Ger t ist bereit um mit Messung fortzufahren 5 Messung 5 1 Messvorgang Messungen sollten nur bei Temperaturen Zi zwischen 10 C bis 50 C ausgef hrt werden D
56. es has been performed Adopting the menu settings from the previous measu rement Continue with Measuring Process Making new settings Continue with Settings Startup 5 4 Settings The display unit has a menu with user navigation Please follow the instructions in the respective display fields Press the MENU key to display the main menu B Intact Direction O Mean Valus O Messure Series Ho O Conversion O Corrections ODisrlay Range OLimit Values O Language O DateTime O Pata Qutrut Select bs tL Select menu option Call selected option Call measuring display with the selected functions Fig 4 1 Main menu Warning Check the settings before performing a measurement This applies in particular for the impact direction and for the shape and time coefficient 6 Settings 4 1 Impact Direction Select the symbol for the desired impact direction The rebound value is automatically corrected according to the preselected impact direction 4 2 Mean Value Calculation of mean value The mean value is calculated from the number of test impacts n entered or after a measurement series has been completed by pressing the END key Where possible enter at least n 10 or n 12 see under Mx example on page 11 Set 0 under Median The actual mean value is displayed after every test impact Determination of Median from version 4 0 on In chapter 7 of the Standard EN 12504 2 20
57. ether and are calibrated as one unit The impact bolt of the concrete test hammer strikes the surface of the concrete with a defined force After the impact a metal body the so called hammer see pos 14 in Fig 6 2 rebounds The rebound distance is measured by a sensor and passed on to the display unit as an electrical signal The signal converted by the elec tronics is shown on the display unit as rebound value R and if necessary displayed together with the correspon ding compressive strength of the concrete fck 4 Product Description There is a specific relationship between the rebound value R and the hardness and strength of the concrete The following factors must be taken into account when ascertaining rebound values R Impact direction horizontal vertically upwards or downwards Age of the concrete Size and shape of the comparison sample cube cylinder Model ND can be used for testing Concrete items 100 mm or more in thickness Concrete with a maximum particle size 32 mm Model LD can be used for testing Items with small dimensions e g thin walled items with a thickness from 50 to 100 mm With Model LD it may be necessary to clamp the items to be tested prior to measurement in order to prevent the material from deflecting Items made from artificial stone which are sensitive to impacts See Technical Data 2006 Proceq SA 3 Startup 3 1 Connecting the Components Connect t
58. g der Proceg Standardkurven siehe unter 8 Einstellungen Herleitung der PROCEQ Standardumwertungskurven e W hlen Sie die Umwertungskurve A in Zeile Nr 7 f r ein Betonalter von 7 Tagen fck7 oder die Umwertungskurve in Zeile Nr 7 5 ab der Version 4 0 f r ein Betonalter von 14 56 Tagen fck28 Japan Kurven setzen ab Version 4 0 Zus tzlich zu den zwei Umwertungskurven der Proceq SA stellen wir Ihnen vier Kurven welche in Japan auf Grund zahlreicher Tests ermittelt wurden zur Verf gung Portland Cement J ist f r Beton aus Portlandzement hnliche Kurve B Proceq Early Strength J ist f r fr hfesten Beton aus Portlandzement Blast Furnace J ist f r Beton aus Hochofenzement Average Curve J ist die Mittelwertkurve der individuellen Kurven n b In Japan wird nur die Average Kurve verwendet Wir empfehlen ihnen jedoch bei bekannter F Betonsorte die individuellen Kurven anzuwenden Die vier Kurven sind zusammen mit der B Proceq Kurve in Figur 4 5 dargestellt Die Kurven gelten jeweils f r horizontale Schl ge und f r die Umrechnung auf die Druckfestigkeit in N mm welche an einem Betonw rfel 150 150 150 mm ermittelt wurde Bei anderer Schlagrichtung und anderen verwendeten Probek rpern Gr sse und Form m ssen auch bei den 2006 Proceq SA neuen Kurven die entsprechenden zus tzlichen Faktoren ber cksichtigt werden oo eo a eo gt o
59. ger t 330 00 470 Transferkabel 9 9 polig 330 00 456 Printerkabel 9 9 25 polig zu Drucker 330 00 460 mit serieller Schnittstelle Pr fhammerkabel 380 02 510 Schleifstein 310 99 037 Koffer 340 00 281 Euro Amboss 310 09 000 7 3 Technische Daten 7 3 1 Anzeigegerat Messbereich von 10 bis 70 N mm Betondruck festigkeit nichtfl chtiger Speicher f r max 250 Messreihen zu 10 Messungen Graphik LC Display 128 x 128 Pixel Schnittstelle RS232 Stromversorgung mit 6 Batterien 1 5 V Bauform LR6 f r ca 60 Stunden Betriebsdauer Zul Umgebungsbedingungen von 10 C bis 60 C 7 3 2 Betonpr fhammer Modell ND Modell LD 2 207 Nm 0 735 Nm 10 bis 70 N mm Schlagenergie Messbereich Druckfestigkeit 2006 Proceq SA 8 Anhang 8 1 Herleitung der PROCEQ Standardumwertungskurven Die Umwertungskurven Fig 8 1 und Fig 8 2 des Beton pr fhammers beruhen auf Messungen an sehr vielen Probew rfeln An den Probew rfeln wurden mit dem Betonpr fhammer die R ckprallwerte R gemessen Anschliessend ist die Druckfestigkeit mit der Druckpr fmaschine ermittelt worden Bei jedem Versuch wurden mindestens 10 Pr f hammerschl ge auf eine Seitenfl che des in der Presse leicht eingespannten Probew rfels ausgef hrt Material der Probew rfel Alle W rfel bestanden aus Beton mit Kiessand von guter Qualit t Maximalkorn 32 mm und Portlandzement Erfahrungswerte Die Umwertungskurve ist praktisch unabh ngig von Zem
60. he Test hammer cable to the concrete test hammer and to the display unit at input B Connect the transfer cable for data transmission to the PC and for transmission to the printer connect the printer cable to interface RS232 3 2 Putting the Display Unit into Operation Press the ON OFF key The following data are briefly displayed Device model Model ND or LD Serial number of the concrete test hammer on the left and that of the display unit on the right side CH Check whether the serial number of the con crete test hammer on the display corresponds to the number on the device Installed software version Self test performed Test o k Remaining battery life Then the measuring display of the previously measured object appears see Fig 3 1 but without values C If no display appears replace the batteries 2006 Proceg SA r Last measured value r Minimum value maximum value L Standard deviation L Mean value Compressive strength of the concrete Unit No of test impacts 41 42 43 44 45 46 Fig 3 1 Measuring display 41 Impact direction 46 Measurement series no 42 Calculation of mean value 47 Display range 43 Conversion curve 48 Limit value 44 Eliminate outliers Median 49 Rebound values displayed 45 Shape coefficient as as bar chart Measuring image of Median value see Fig 5 4 and 5 5 The symbols and values only appear if they have been Set or if a measurement seri
61. ie folgenden Ausdruckm glichkeiten Drucker ist beim Messen am Anzeigeger t angeschlos sen Online Nach Abschluss einer Messreihe die vorgew hlte Anzahl Pr fschl ge wurde ausgef hrt werden die Daten an den Drucker bertragen Die bertragung kann auch jederzeit mit der Taste PRINT erfolgen Ausdruck ber Speicher Im Untermen Speicher anzeigen kann die ge w nschte Messreihe mit den Tasten t angew hlt werden Der Ausdruck erfolgt mit der Taste PRINT 2 dee DIGI SCHMIDT 2000 ND 1 1055 082 0001 id ee he e e e 2 2 2 2 ee de 212 2 2 2 2 22 2 2 2 202 11 7 2001 9 30 109397 Horiz M1 28 as1 05 at1 00 d0 39 41 39 40 41 39 38 37 Mittel 39 2R 8 1 4 Min Max 37 41 41 1N mm Fig 5 9 Beispiel Druckprotokoll Messung 15 6 Wartung und Pflege 6 1 Reinigung nach der Anwendung Achtung Betonpr fhammer nie ins Wasser eintauchen oder unter laufendem Wasserhahn reinigen F r die Reinigung weder Scheuermittel noch L sungsmittel verwenden 6 1 1 Betonpr fhammer Schlagbolzen 1 wie in Fig 5 2 beschrieben ausfahren Schlagbolzen 1 und Geh use 3 mit einem sauberen und trockenen Lappen abwischen 6 1 2 Anzeigegerat Reinigen Sie nach Gebrauch Anzeigeger t und Mess zubeh r mit einem sauberen und trockenen Tuch Reinigen Sie die Anschlussbuchsen und Stecker mit einem trockenen und sauberen Pinsel 6 2 Funktionskontrolle 6 2 1 Betonpr fha
62. ie in Klammern aufgef hrten Positionen sind in Fig 5 6 dargestellt Vor den auszuwertenden Messungen sind mit dem Betonpr fhammer Probeschl ge auf einer harten und glatten Unterlage ohne Kabelverbindung zum Anzeigeger t auszuf hren 12 Messung Grundeinstellungen wie unter SA Einstellungen beschrieben A eingeben aa Pr ffl che mit Schleifstein abreiben Fig 5 1 Pr ffl che vorbereiten Achtung Das Ausfahren des Schlagbolzens 1 erzeugt eine R ckstosskraft Halten Sie den Beton pr fhammer stets mit beiden H nden Den Betonpr fhammer senk recht zur Pr ffl che ansetzen Den Schlagbolzen 1 ausfah ren indem der Betonpr fha mer zur Pr ffl che hin bewegt wird bis der Druckknopf 6 herausspringt Fig 5 2 Schlagbolzen 1 ausfahren Gefahr Den Betonpr fhammer vor dem Ausl sen des Schlags stets mit beiden H nden und senkrecht zur Pr ffl che halten 2006 Proceq SA CH Jede Pr ffl che soll mit mindestens 10 Schl gen gepr ft werden Die Abst nde zwischen den einzelnen Schlag stellen m ssen mindestens 20 mm betragen Den Betonpr fhammer senk recht zur Pr ffl che ansetzen und mit m ssiger Geschwin digkeit gegen die Pr ffl che dr cken bis der Schlag aus gel st wird ein heller Piepston best tigt die Registrierung Diesen Vorgang f r die ganze Messreihe wiederholen Fig 5 3 Pr fung aus f hren Offensichtliche Ausreisser k
63. ig 4 6 Reduktion der Ruckprallwerte infolge Karbonatisierung 4 5 3 Ausreisser eliminieren Es k nnen die 4 Funktionen 0 M1 M3 und Mx ange w hlt werden Mit der Funktion 0 k nnen einzelne Werte manuell gel scht werden Mit den Funktionen M1 M3 und Mx werden Werte auto matisch eliminiert den Falls unter Mittelwertbildung Median gesetzt ist k nnen die Ausreisserfunktionen M1 M3 und Mx nicht gesetzt werden 2006 Proceq SA 0 einzelne Werte l schen Einzelne Werte k nnen nur unter dieser Funktion gel scht werden Zu hoch oder zu tief liegende Messwerte k nnen Sie direkt beim Messvorgang mit der Taste PRINT eliminieren M1 tiefsten und h chsten Wert l schen Der tiefste und der h chste Messwert werden gel scht wenn mindestens 6 Messwerte vorhanden sind M3 Werte mit Abweichungen ber 20 l schen Werte die nach Abschluss einer Messreihe 20 oder mehr vom Mittelwert abweichen werden gel scht Die auf dem Display angezeigte Anzahl der Pr fschl ge wird um die Menge der gel schten Pr fschl ge reduziert Mit einem viermaligen Piepston wird aufgefordert die gel schten Pr fschl ge durch neue zu ersetzen Das Messresultat erscheint auf dem Display sobald n Pr f schl ge auch ber cksichtigt wurden Mx jeweils tiefste und h chste Werte l schen Nur ab EPROM Version 2 0 m glich Es werden jeweils die tiefsten und h chsten Werte der Anzahl m gel scht Geben Sie unt
64. it der mittleren W rfeldruckfestigkeit und des R ckprall Fig 8 2 werts R Streugrenzen fcKeube max und min sind so bestimmt dass 80 aller Versuchsergebnisse eingeschlossen sind 2006 Proceq SA 8 3 Neue Umwertungskurve bilden In folgenden F llen treten erfahrungsgem ss Abweichun gen von den normalen Umwertungskurven auf Kunststeinprodukte mit ungew hnlicher Zusammen setzung des Betons und mit geringen Abmessungen Es empfiehlt sich f r jedes Produkt eine besondere Versuchsreihe zur Bestimmung des Zusammenhanges zwischen R ckprallwert R und Druckfestigkeit auszu f hren Bei Zuschlagstoffen aus wenig festem leichtem oder spaltbarem Stein z B Bims Ziegelschrot Gneis ist die Festigkeit geringer als mit der Umwertungskurve ermittelt Kies mit berm ssig glatter polierter Oberfl che und kugeliger Form ergibt kleinere Druckfestigkeiten als die mit den R ckprallmessungen ermittelten Werte Ein sandarmer trocken angemachter und ungen gend verarbeiteter Beton kann von aussen unsichtbare Kies nester aufweisen die seine Festigkeit nicht aber die R ckprallwerte R beeinflussen Bei frisch ausgeschaltem feuchtem oder unter Wasser erh rtetem Beton zeigt der Prufhammer zu geringe R ckprallwerte R an Der Beton muss vor dem Ver such getrocknet werden Mit Zusatz von Flugasche oder Silicafume lassen sich sehr hohe Druckfestigkeiten gt 70 N mm2 erzielen Diese Festigkeiten k
65. le Messwerte einer Serie von mindestens 9 Messwerten zu ber cksichtigen Sobald Sie im Men Mittelwertbildung bei Median 1 setzen wird unter Eliminierung Ausreisser automatisch MO gesetzt Versichern Sie sich jedoch dass bei Mittel x f r die Anzahl Schl ge n mindestens 9 gesetzt ist siehe Figur 4 2 2006 Proceq SA Der Medianwert wird folgt zu bestimmt Die Messwerte werden der Gr sse nach geordnet Bei der Serie mit einer ungeraden Anzahl Werte ist der in der Mitte der angeordneten Werte stehende der Medianwert Bei einer geraden Anzahl Werte ist das Mittel aus den zwei in der Mitte stehenden Werten der Medianwert Falls mehr als 20 der Werte um mehr als 6 Einheiten vom Medianwert abweichen muss gem ss Norm die Messserie verworfen werden Mittelvertbildung Mittel X Median aus n 3 u Einstellung mit tees Ende mit MENU od END Fig 4 2 Men Mittelwertbildung 4 3 Messreihennummer Zu Beginn einer Messreihe k nnen Sie einen Titelnamen bestehend aus bis zu zehn Buchstaben Leerstelle und den Zeichen _ sowie einer maximal vierstelligen Nummer eingeben z B Geb udename Stockwerk Nr Element Nr siehe Fig 4 3 2006 Proceq SA Nessreihen Nr TEST HAUS iks Einstelluns mit thes Erde mit MENU od END Figur 4 3 Men Messreihennummer Nach dem 1 Pr fschlag der neuen Messreihe wird die Nummer automatisch um den Wert 1 erh ht 4 4 Umwertung 4 4 1 Einh
66. mmer Die Funktionskontrolle wenn m glich vor jeder Anwen dung jedoch sp testens nach 1000 Schl gen bzw alle 3 Monate durchf hren 16 Wartung und Pflege Betonpr fhammer wie unter Inbetriebnahme beschrieben in Betrieb setzen Pr famboss auf einer harten und glatten Unterlage z B Steinboden abstellen Kontaktfl chen von Amboss und Schlagbolzen reinigen Betonpr fhammer mittels ca 10 Schl gen auf den am Pr famboss angegebenen Kalibrierwert pr fen Fig 6 1 Funktionskontrolle des Betonpr fhammers s gt Liegen die Werte ausserhalb des auf dem Pr famboss angegebenen Toleranzbereichs ist gem ss Instandhaltung vorzugehen 6 2 2 Anzeigeger t Manteloberfl che und Stecker vom Kabel auf Verletzungen pr fen Kontrollieren Sie die Lebensdauer der Batterien Wenn das Display am Anzeigeger t noch eine Batterie Lebensdauer von 4 bis 6 Stunden anzeigt nehmen Sie einen Satz neuer Batterien mit zur Messstelle 2006 Proceq SA 6 3 Lagerung Vor der Lagerung im Originalkoffer Schlag wie bei einer Messung ausl sen und Schlagbolzen 1 mit Druckknopf 6 arretieren sowie Druckknopf mit starkem Klebband zus tzlich sichern e Bewahren Sie den Betonpr fer und das Zubeh r im Originalkoffer in einem trockenen und staubfreien Raum auf Bei l ngerem Nichtgebrauch entfernen Sie die Batte rien aus dem Anzeigeger t 6 4 Instandhaltung Wir empfehlen den Betonpr fhammer sp
67. mprimante Utiliser pour la transmission de donn es le c ble d imprimante avec pour n de r f 330 00 460 Toutes les imprimantes en vente dans le commerce poss dant une interface s rie conviennent l impression Les impress ions suivantes sont possibles L imprimante est connect e l instrument d affichage pendant la mesure en ligne Une fois la s rie de mesures termin e le nombre pr s lectionn de frappes d essai a t ex cut les valeurs sont transmises l imprimante La transmission peut tre d clench e tout moment avec la touche PRINT Impression via la m moire La s rie de mesures d sir e peut tre s lectionn e avec les touches t dans le sous menu Affichage de la m moire L impression se d clenche avec la touche PRINT k ke de de de 2 2 2 2 2 2 2 22 2 2 2 22 2 2 2 2 2 2202 DIGI SCHMIDT 2000 ND 1 1055 082 0001 k kk 2 2 2 2 2 2 2 2 2 e e 2 2 2 2 2 2 2 2 e e x 11 7 2001 9 30 109397 Horiz M1 28 o81 05 ot1 00 d0 39 41 39 40 41 39 38 37 Moyenne 39 2R 41 1N wm 8 1 4 Min Max 37 41 Fig 5 9 Exemple de protocole d impression Mesure 15 6 Entretien et maintenance 6 1 Nettoyage apres utilisation Attention Ne jamais plonger le scl rom tre dans l eau ou le laver l eau courante du robinet Ne pas utiliser de produit r curer ni de solvant pour le nettoyage 6 1 1 Scl rom tre b ton Faire sortir la tige de percus
68. n peu de graisse sur la t te de la vis 20 Faire passer la barre de glissement 7 travers le marteau 14 Placer le ressort amortisseur 15 dans l al sage de la tige de percussion 1 Introduire la barre de glissement 7 dans l al sage de 18 Entretien et maintenance la tige de percussion 1 et la pousser jusqu ce qu une r sistance soit sensible Veiller avant et pendant le montage du syst me dans le b ti 3 ce que le marteau 14 ne soit pas maintenu par le verrou 13 Conseil appuyer pour ce faire sur le verrou 13 un court instant d Monter le syst me dans le b ti 3 Placer le ressort de pression 12 et visser le cou vercle 11 sur le b ti 3 Placer l anneau de pression 10 dans la rainure de la douille 17 et visser la calotte 9 Proc der un contr le de fonctionnement s gt Si I entretien r alis ne permet pas d obtenir un fonctionnement parfait et les valeurs de calibrage indiqu es sur l enclume d essai l appareil devra tre envoy pour tre r par 2006 Proceq SA 6 44 Scl rom tre a b ton mod les ND LD 12 11 23 21 20 8 13 i 22 6 19 7 3 4 ji 14 1 14 2 3 15 d 16 17 E 10 9 1 i 18 2 Fig 6 2 Coupe longitudinale travers le scl rom tre 2006 Proceg SA Legende ON 0 O1 KB Go M N MA PO ND sch ech sch S sch sch sch sch GO D
69. nd die R ckstossfeder 15 wird frei Hammer 14 mit der Schlagfeder 16 und H lse 17 von der Laufstange abziehen Filzring 18 aus der Kappe 9 herausnehmen 6 4 2 Reinigung S mtliche Teile ausgenommen das Geh use 3 in Petroleum einlegen und mit einem Pinsel reinigen Bohrung des Schlagbolzens 1 und des Hammers 14 mittels Rundb rste Kupferdraht gr ndlich reinigen Teile abtropfen lassen und mit einem trockenen und sauberen Lappen trocken reiben Geh use 3 innen und aussen mit einem trockenen und sauberen Lappen reinigen 6 4 3 Zusammenbau Laufstange 7 vor dem Zusammenbau mit d nnfl ssi gem l leicht ein bis zwei Tropfen gen gen schmie ren Viskosit t ISO 22 z B Shell Tellus Oil 22 Neuen Filzring 18 in die Kappe 9 einsetzen Auf den Schraubenkopf von der Schraube 20 ein wenig Fett auftragen Laufstange 7 durch Hammer 14 f hren R ckstossfeder 15 in die Bohrung des Schlag bolzens 1 einlegen Laufstange 7 in die Bohrung des Schlagbolzens 1 einf hren und weiterschieben bis ein merklicher Widerstand entsteht 18 Wartung und Pflege Achten Sie vor und w hrend dem Einbau des Systems in das Geh use 3 darauf dass der Hammer 14 nicht von der Klinke 13 gehal ten wird Tipp Hierzu die Klinke 13 kurz dr cken System in das Geh use 3 einbauen Druckfeder 12 einlegen und Deckel 11 in das Geh use 3 schrauben Zweiteiligen Ring 10 in die Nut an de
70. ne Exemple si m 3 n doit tre au moins gal 12 4 6 Echelle de l cran L chelle de l cran de la valeur de rebondissement R peut tre adapt e celle de contr le l cran e Saisir Rmin et Rmax 4 7 Valeurs limites Les rep res de limite l cran servent la d tection rapide de divergences des valeurs mesur es Il est possible de choisir une zone dans laquelle les valeurs de rebondissement R doivent se situer voir Fig 3 1 Affichage de mesures EP Les valeurs limites s lectionn es ne sont pas LD e Ge e m moris es e Saisir Rmin et Rmax 4 8 Langue Language e Vous pouvez choisir la langue d affichage des textes l cran Cu Dans cette ligne du menu principale le mot Language apparait en plus malgr la langue qui a t choisi R glages 11 4 9 Date heure L horloge int gr e m morise les valeurs mesur es avec la date et l heure du contr le Corriger ventuellement les donn es saisies 4 10 Sortie des valeurs Se reporter Sortie des valeurs Appuyer sur la touche END une fois que toutes les d finitions ont t effectu es sur l instrument d affi chage L appareil est pr t poursuivre avec Mesure 5 Mesure 5 1 Mesure CES Les mesures ne devraient tre ex cut es qu des temp ratures comprises entre 10 et 50 C Les positions entre parenth ses sont repr sent es sur la Fig 5 4 Proc der des frappes d e
71. nt de mesure 2006 Proceq SA 6 3 Stockage Avant de ranger le mat riel dans le coffret d origine d clencher une frappe comme pour une mesure et bloquer la tige de percussion 1 avec le bouton poussoir 6 Caler en plus le bouton poussoir avec un ruban adh sif r sistant Conserver le scl rom tre b ton et les accessoires dans la valise d origine et dans un local sec et exempt de poussi re Oter les piles de l instrument d affichage si ce dernier doit tre stock de mani re prolong e 6 4 Maintenance Nous recommandons de contr ler l usure du scl rom tre b ton au plus tard au bout de 2 ans et de le nettoyer Proc der pour ce faire comme suit CEP Le scl rom tre peut tre envoy un point de service apr s vente autoris par le distributeur ou tre maintenu par l utilisateur selon la des cription suivante Les positions entre parenth ses sont repr sent es sur la Fig 6 2 Coupe longitudinale travers le scl rom tre 2006 Proceg SA 6 4 1 D montage Attention Le courseur avec tige 4 voir Fig 6 2 ne doit en aucun cas tre d mont d plac ou nettoy car cela pourrait modifier le frottement Des outils sp ciaux seraient alors n cessaires un nouveau r glage Placer le scl rom tre b ton la verticale du support Danger La sortie de la tige de percussion 1 g n re une force de r action Le scl rom tre doit donc tre tenu des deux
72. omme d crit sous R glages Mesure 13 Fin des mesures Presser le scl rom tre b ton une vitesse moyenne contre un support dur Appuyer sur le bouton 6 quand la frappe s est d clench e La tige de percussion 1 est bloqu en position rentr e et le ressort de frappe est soulag Fig 5 6 Blocage de la tige de percussion 1 5 2 Sortie des valeurs Les valeurs sont automatiquement m moris es dans l instrument d affichage max 250 s ries de mesures 10 mesures Lorsque la m moire est satur e les valeurs les plus anciennes sont remplac es 5 2 1 Transfert de m moire partir de la version 4 0 il est possible de transmettre et de manier les donn es au PC avec le logiciel ProVista 2 0 n de r f du CD 390 00 120 mode d emploi inclu part ca les donn s peuvent toujours tre transmit l aide du Hyper Terminal Connecter l instrument d affichage au PC au moyen du c ble de transfert n de r f 330 00 456 14 Mesure Ca Vous trouverez de plus amples indications ID a D e 7 dans la fiche d information Transfert des valeurs un PC rAnn e r Num ro de la s rie de mesures rMois rJour p Heure p Minute 2001 T 16 8 30 123456 5 il 28 1 00 1 00 4 50 i 57 Direct Courbe de at as Profondeur de de frappe conversion carbonatation d 54 Elimination des valeurs aberrantes 52 51 Valeurs mesur es R 53
73. r H lse 17 einlegen und Kappe 9 aufschrauben Funktionskontrolle durchf hren Con F hrt die durchgef hrte Wartung nicht zur einwandfreien Funktion und zu den auf dem Pr famboss angegebenen Kalibrierwerten muss das Ger t zur Reparatur eingesandt werden 2006 Proceq SA 6 4 4 Betonpr fhammer Modell ND LD Legende 12 1 Schlagbolzen 23 1 21 2 Pr ffl che 20 3 Geh use komplett 13 4 Schleifer mit Stange 22 5 nicht belegt 6 6 Druckknopf komplett 7 Laufstange n 7 8 F hrungsscheibe 3 9 Kappe 4 10 zweiteiliger Ring 4 141 11 Deckel 12 Druckfeder 142 13 Klinke 14 Hammer 14 1 Modell ND 14 2 Modell LD 4 15 R ckstossfeder 15 E 16 16 Schlagfeder 8 17 Hulse 12 2 10 18 Filzring 9 19 Widerstandselement mit Anschlussbuchse 4 5 20 Schraube ee 18 21 Gegenmutter 2 22 Stift 23 Klinkenfeder Fig 6 2 L ngsschnitt durch Betonprufhammer 2006 Proceq SA Wartung und Pflege 19 7 Daten 7 1 Lieferform Modell ND LD 20 Daten Verpackungsinhalt Artikel Nummer Betonpr fhammer Anzeigeger t Tragriemen Pr fhammerkabel Transferkabel Schleifstein Schutzh lle zu Anzeigeger t Bedienungsanleitung Tragkoffer 325 x 295 x 105 mm Gewicht total Modell ND Modell LD 340 00 202 340 00 211 Co Q Co A Q 2006 Proceq SA 7 2 Zubeh r Ersatzteile Bezeichnung Artikel Nr Schutzh lle zu Anzeige
74. r mit m ssiger Geschwindigkeit gegen eine harte Unterlage dr cken Nach der Schlagausl sung Druckknopf 6 dr cken Schlagbolzen 1 ist in ein gefahrener Position arretiert und Schlagfeder entlastet Fig 5 6 Schlagbolzen 1 arretieren 5 2 Datenausgabe Die Daten werden automatisch im Anzeigeger t gespei chert max 250 Messreihen zu 10 Messungen Bei vollem Speicher werden jeweils die ltesten Daten ber schrieben 5 2 4 Speicher bertragen Verbinden Sie das Anzeigeger t mittels Transferkabel Art Nr 330 00 456 mit dem PC Ab Version 4 0 k nnen die Daten im Speicher mit der Bearbeitungssoftware ProVista Version 2 0 CD als Zubeh r Art Nr 390 00 120 bequem auf den PC ber tragen und bearbeitet werden Die Bedienungsanleitung zu ProVista wird auf der CD mitgeliefert Ansonsten k nnen weiterhin die Daten mit Hilfe von HyperTerminal in eine Excel Datei bertragen werden 14 Messung N here Angaben dazu k nnen Sie dem ES Infoblatt Daten bertragung an PC entnehmen r Jahr r Messreihennummer r Monat r Tag r Stunde r Minute 2001 7 16 8 30 123456 5 1 28 1 00 1 00 4 50 57 Schlag Umwertungs at as Karbonatisierungs SS richtung kurve 54 Ausreisser eliminieren tiefe d in mm D Messwerte R 52 6 49 57 2 7 46 1 N mm2 RX RMin R Max s fck Einheit von fck Schlagrichtung 1 2 3
75. s lev es a la pression gt 70 N mm2 en ajoutant de la cendre 2006 Proceq SA volante ou du silicafume mousse de silicone Ces r sistances ne peuvent cependant pas tre d termi n es avec fiabilit avec le scl rom tre b ton La corr lation entre la valeur de rebondissement R et la r sistance la compression du b ton fck est d termin e sur des prouvettes d un certain type de b ton Proc der comme suit Fabriquer les prouvettes en respectant les prescrip tions de votre pays Soumettre les prouvettes une force de 40 kN agis sant la verticale du sens de coulage du b ton dans une machine d essais de compression Mesurer ensuite la duret de rebondissement en frap pant le plus de fois possible sur la face lat rale de l prouvette Un r sultat significatif ne peut tre obtenu que si l on mesure les valeurs de rebondissement R et la r sistance la compression sur plusieurs prouvettes Ca Le b ton est un mat riau tr s peu homogene xi Il est possible de constater des divergences de 15 lors des contr les dans la machine d essais de compression d prouvettes fabriqu es partir du m me b ton frais qui ont t stock es e Calculer la valeur moyenne RA D terminer la r sistance la compression du b ton en soumettant les prouvettes charge sur la machine d essais de compression jusqu ce qu ils se rompent et calculer ensuite la valeur moyenne fckm
76. sion 1 comme d crite sur la Fig 5 2 Essuyer la tige de percussion 1 et le b ti 3 avec un chiffon propre et sec 6 1 2 Instrument d affichage Nettoyer l instrument d affichage et les accessoires de mesure avec un chiffon propre et sec apr s utilisation Nettoyer les prises de raccordement et les connecteurs avec un pinceau sec et propre 6 2 Contr le du fonctionnement 6 2 1 Scl rom tre b ton Proc der si possible au contr le de fonctionnement avant toute application ou au plus tard au bout de 1000 frappes ou tous les 3 mois 16 Entretien et maintenance Mettre le scl rom tre b ton en service comme d crit sous Mise en service D poser l enclume d essai sur un support dur et lisse par ex sol en pierre Nettoyer les surfaces de con tact de l enclume et de la tige de percussion Contr ler le scl rom tre b ton avec env 10 frappes selon la valeur de calibrage indiqu e sur l enclume Fig 6 1 Contr le du fonctionnement du scl rom tre b ton Siles valeurs se situent en dehors de la plage STD z A DH r D T H de tol rance indiqu e sur l enclume d essai proc der selon Maintenance 6 2 2 Instrument d affichage V rifier le parfait tat de la surface de la gaine du c ble et du connecteur Contr ler l autonomie des piles Lorsque l autonomie des piles indiqu e l cran n est plus que de 4 6 heures apporter un jeu de piles neuves au poi
77. sion 4 0 on the measuring display apears as shown in Fig 5 4 respectively Fig 5 5 2006 Proceq SA Js t 3 8 x 46 GR Te 35 5 H mr 2 l a oa nc el 183 Fig 5 4 Series meet Fig 5 5 Series outside EN 125042 tolerances Remarks e f7 and f8 indicate the new Japan curves 7 and 8 Med stands for median according to standard EN 12504 2 2001Art 7 From the series label only the right part is shown number 0105 resp 105 New Measurement Series The measured values set remain unaltered Continue from Fig 5 1 with Preparing the test surface with a grindstone The measurement series number is automatically incremented by 1 after the first test impact of the new measurement series Setting new values Press the MENU key Enter the new values as described under Settings Measuring Process 13 Complete Measurements Push the concrete test hammer against a hard surface at moderate speed When the impact is triggered press push button 6 Impact plunger 1 is locked in a retrac ted position and the impact spring is under no load Fig 5 6 5 2 Data Output The data are saved automatically in the display unit max 250 measurement series of 10 measurements When the memory is full the oldest data are overwritten Locking the impact plunger 1 5 2 1 Transfer Memory Connect the display unit using the transfer cable Order No 330 00 456 to the PC Memory data can be tr
78. sonnes ayant consomm de l alcool de la drogue ou des m dicaments ne doivent pas se servir du scl rom tre b ton Les personnes ne connaissant pas le mode d emploi ne doivent utiliser le scl rom tre b ton que sous surveil lance 2006 Proceq SA 1 3 3 Symboles de s curit Les symboles suivants accompagnent toutes les consig nes de s curit importantes de ce mode d emploi A A Danger Ce symbole signale un risque de blessure et ou un danger de mort si certaines regles de s curit ne sont pas respect es Attention Ce symbole vous avertit de dommages mat riels ainsi que des cons quences financi res et p nales par ex perte du droit la garantie cas de responsabilit civile etc Vous trouverez ici d importantes consignes et informations 2006 Proceg SA 1 4 DIN 1048 partie 2 ISO DIS 8045 EN 12 504 2 ENV 206 BS 1881 partie 202 DIN 1048 partie 2 ASTM C 805 ASTM D 5873 roche NFP 18 417 B 15 225 JGJ T 23 2001 JJG 817 1993 S curit Normes et prescriptions utilis es International Europe Europe Grand Bretagne Allemagne Etats Unis Etats Unis France Belgique Chine Chine 2 Description du produit Instrument d affichage Scl rom tre b ton C ble pour scl rom tre Instrument d affichage avec scl rom tre b ton mod les ND LD Fig 2 1 Le scl rom tre b ton DIGI SCHMIDT 2000 se com pose du scl rom tre et de l
79. ssai sur un support dur et lisse avec le scl rom tre b ton sans connexion l instrument d affichage avant d ex cuter les mesures analyser 12 Mesure Saisir les r glages de base TA comme d crit sous R glages ch Frotter la surface tester avec ae une pierre abrasive Fig 5 1 Pr parer la surface tester Attention La sortie de la tige de percussion 1 g n re une force de r action Tenez toujours le scl rom tre b ton des deux mains Placer le scl rom tre la verti cale de la surface tester Faire sortir la tige de percussion 1 en d plagant le scl rom tre en direction de la surface examiner jusqu ce que le bouton 6 se d clenche Fig 5 2 Sortie de la tige de percussion 1 Danger Tenir toujours le scl rom tre des deux mains et la verticale de la surface tester avant de d clencher la frappe 2006 Proceq SA Toute surface tester doit tre soumise au moins 10 frappes La distance d impact des frappes doit tre d au moins 20 mm Placer le sclerometre la verti cale de la surface tester et presser contre cette surface vitesse moyenne jusqu ce que la frappe se d clenche un bip sonore au son clair confir me l enregistrement R p ter cette op ration pour toute la serie de mesures Execution d un test Fig 5 3 Les valeurs aberrantes videntes peuvent tre limi n es seulement apr s l
80. terschiedlicher Qualit t und oder von unterschiedlichem Alter gepr ft werden Berechnen Sie aus den Wertepaaren R fckm die mathematische Form der Umwertungskurve d h ermit teln Sie die Parameter a b und c der x2 Funktion z B mit EXCEL in der Funktion RGP 8 4 Zeitfaktor ermitteln Betonalter und Karbonatisierungstiefe k nnen die gemes senen R ckprallwerte R wesentlich erh hen Genaue Werte der effektiven Festigkeit ergeben sich wenn die harte karbonatisierte Oberfl chenschicht mit einer Handschleifmaschine auf einer Fl che von ca 120 mm entfernt wird und dann auf dem nichtkarbo natisierten Beton gemessen wird Durch zus tzliche Messungen auf der karbonatisierten Oberfl che kann der Zeitfaktor d h das Mass der erh h ten R ckprallwerte R ermittelt werden Rn karb R Rin karb gt mnk 7 Rm n k Zi Rm karb mittlerer R ckprallwert R gemessen auf karbonatisierter Betonoberfl che Rm n k mittlerer R ckprallwert R gemessen auf nicht karbonatisierter Betonoberfl che Zeitfaktor Z 24 Daten 2006 Proceq SA uosinog English Contents Safety EE 2 General Information 2 Liability rb eee ee ren 2 Safety Regulations 2 Standards and Regulations Applied 3 Product Description 4 StartUp EE 5 Connecting the Components 5 Putting the Display Unit into Operation 5 Settings
81. the PROCEQ Standard curves refer to Derivation of the PROCEQ Standard Conversion Curves Select conversion curve A in line no 7 for concrete with an age of 7 days fck7 or the conversion curve in line no 7 5 ab version 4 0 for concrete with an age of 14 56 days fck28 Set Japan Curves from version 4 0 In addition to the two well known curves from Proceq SA we provide you four new curves developed in Japan that were based on exhaustive tests Portland Cement J for concrete with Portland cement similar to curve B Proceq for early strength concrete made from Portland cement for concrete made from blast Furnace cement is the mean curve of curves 6 7 and 8 Early Strength J Blast Furnace J Average Curve J nb In Japan only the curve Average is used We recommend using the individual curves if the respective concrete quality is known The four curves are shown in Fig 2 7 together with the B Proceq curve 2006 Proceq SA The curves are valid for horizontal impacts and for the conversion to a compressive strength in N mm evalu ated with concrete cubes 150 150 150 mm For other impact directions and sample size and shape the respective factors must be considered additionally o eo a eo SY d A0 er Sei OA 14 B Proceg 7 Portland Cement 30 dat Early Strength 27 Blast Furnace BE Average Curve
82. u rapport eau ciment Annexe 21 8 2 Courbe de conversion standard pour scl rom tre a b ton modele ND Courbes de conversion standard Courbe de conversion standard pour scl rom tre a b ton mod le LD Valeur moyenne R d j corrig e selon la direction de dun ar M frappe Valeur moyenne R d j corrig e selon la direction de PP frappe 60 27 0 e 60 7 0 2 E e 2 MG S 5 ei E iD o 40 6 5 E u o zZ R E z Z g 40 6 5 E S gt zZ Q 6 0 E E 30 6 5 gt t 2 O sk 6 0 2 S a E a Z 20 5 5 E a E Z gt 5 5 E S 10 4 0 Ho 20 25 30 35 40 45 50 55 10 4 0 20 25 30 35 40 45 50 55 Valeur de rebondissement R Valeur de rebondissement R Fig 8 2 Mod le LD courbes de conversion en fonction de la r sistance moyenne la compression du cylindre et Fig 8 1 Mod le ND courbes de conversion en fonction de de la valeur de rebondissement R la r sistance moyenne la compression du cylindre et de la valeur de rebondissement R Limites de dispersion n i Ich les limites dispersion max et min sont fckoy m resistance moyenne du cylindre la d termi n es de mani re ce que
83. ue R and the resistance to pressure Aggregates made from low strength lightweight or clea vable stone e g pumice brick rubble gneiss result in a strength value lower than shown on the conversion curve Gravel with a preponderance of smooth polished surfa ces and spherical shape results in values for compres sive strength which are lower than those ascertained by the rebound measurements Astrong dry mixed concrete i e with low sand content which has not been worked adequately may contain gravel agglomerations which are not visible from the surface These affect the strength of the concrete without however influencing the rebound values R The concrete test hammer gives inadequate rebound values R on recently applied green concrete or con crete which has hardened under water The concrete must be dried before the test Very high values for compressive strength gt 70 N mm can be achieved by adding pulverized fuel ash or silica However these strengths cannot reliably be ascertained 2006 Proceq SA using the concrete test hammer The relationship between the rebound value R and the compressive strength of the concrete fck is determi ned using test specimens of a certain type of concrete Proceed as follows Take test specimens following the regulations applying in the particular country In a pressure testing machine apply force on the test specimens with a force of 40 kN vertical to the direc
84. vil 6 2 2 Display Unit Check the surface of the outer sheath of the cable and the connector for damage Check the life of the batteries f a battery life of 4 to 6 hours is indicated on the dis play unit you should take a new set of batteries to the measuring site 2006 Proceq SA 6 3 Storage Prior to the storage of the hammer in the original case release the impact as during a measurement and fix the plunger 1 with the push button 6 Secure the push button additionally with a strong adhesive tape Store the concrete tester and accessories in the origi nal case in a clean dust free room f the unit is not used for a long period of time remove the batteries 6 4 Maintenance We recommend to check the concrete test hammer for wear after 2 years at most and clean it Do this as described below CER The concrete test hammer can either be sent to a service center authorized by the vendor or else it can be maintained by the operator according to the following description The items in brackets are illustrated in Fig 6 2 Longitudinal section through the concrete test hammer 2006 Proceg SA 6 4 1 Stripping Down Warning Never strip down adjust or clean the slider and guide rod 4 see Fig 6 2 otherwise the slider friction may change Special tools are required to readjust it Position the concrete test hammer perpendicular to the surface Danger The impact plunger 1
85. volatile pour max 250 s ries de mesures 10 mesures Ecran graphique cristaux liquide 128 x 128 pixel Interface RS232 Alimentation lectrique de 6 piles 1 5V LR6 pour une autonomie d env 60 heures Conditions ambiantes autoris es de 10 60 C 7 3 2 Scl rom tre b ton Modele ND Modele LD 2 207 Nm 0 735 Nm 10 70 N mm Puissance de frappe Port e de mesure R sistance la pression 2006 Proceq SA 8 Annexe 8 1 Provenance des courbes de conversion PROCEQ standard Les courbes de conversion sur les Fig 8 1 et Fig 8 2 du scl rom tre b ton reposent sur les mesures effectu es sur de tr s nombreux cubes d essai Les valeurs de rebondissement R ont t mesur es sur les cubes d essai avec le scl rom tre b ton La r si stance la compression a ensuite t d termin e avec la machine essais de compression A chaque essai 10 frappes au moins du scl rom tre ont t ex cut es sur une des surfaces du cube d essai l g rement serr dans la presse Composition du cube d essai Tous les cubes taient en b ton compos de gravier de bonne qualit taille maximum des grains 32 mm et de ciment Portland Valeurs empiriques La courbe de conversion est pratiquement ind pendante du taux de ciment du b ton de la taille des grains du diam tre des plus gros grains du m lange de gra vier dans la mesure o le diam tre du plus gros grain est 32 mm d

Download Pdf Manuals

image

Related Search

Related Contents

  Sitecom 11" / 19" Network Switch 24-port  Notice d`information  MANUALE INSTALLATORE e UTENTE Mynute S 24 R.S.I.  MANUAL DE INSTRUCCIONES ABSODEX AX Tools    Mode d`emploi Radiostation météo professionnelle  Visit JAWBONE.COM/stArt  View User Manual  Samsung LA55C750R2M User Manual  

Copyright © All rights reserved.
Failed to retrieve file