Home
        Link Aggregating In-Line Taps ATAP series
         Contents
1.  YNOA SI ALNVYYVM SIHL       wa qojd ay  40 uods  p   e YUM J9 UAD ddIAJ3S zey  0  PNpoId aaipajap uNoA  puas Udy     UO  EWIOJU  UO  EZIOY Ne uIn   1 UIE GO 0   1   U      JIM  S PAZOYINe SyIOMaN   JNJ4  SaeaU INOA  peuo      ponad AyUeWeM   y  HuluNp d  s Ule qGO OL     yyeyaq  SyJOM aN   JN 4 UO   z uesem 19430 AUe   pu   x   0  p  z  oy ne jou ase siajjasay    Huljpuey 10  uo1   e4  do 40 SUO  IPUOD jewouqe JO    UO  eUILUe UOD     uoljesayye    asnsiwu     3a  Hau    zu  p  De wo aBeWeP   JO    S10 DBUUOD JUdWAIE dSIP UO  e NsU  ajqe gt     sqez  4O DB9UUOD ajQe gt     salJa  eq   jqesods  p J3aA0  zou SBOP  AyueweM siy     sep 06 104 Pa UCeEM ase SadIAJas   pue suledas Jonpoid    salossae    seg    aseydind jo  a ep ay  Wo  sieak OM  JO  diysuUeWUyJOM pue jelia ewW  Ul S IJIP WO  BdJJ dq    IM S NPOId syIOMJON N 4    Ayyiqer  yo uone 8 Apuenem payu    
2. Cord for ATAP 100 and ATAP 103    ATAP 100 SERIES MODELS    ATAP 100  ATAP 101    ATAP 102  ATAP 103    ATAP GIG SERIES MODELS       ATAP GIG BT BT  ATAP GIG SX SX  ATAP GIG LX BT    ATAP GIG SX BT  ATAP GIG BT SX    ATAP 2000 SERIES MODELS    ATAP 2000 BT BT ATAP 2000 LX SX  ATAP 2000 SX SX ATAP 2001 BT BT    TAP RMK 2                   INTRODUCTION    The Link Aggregating In Line Taps in this guide are  typically installed between two network end point devices   server and switch  two switches  or router and switch    For information on devices that are designed to connect  with unidirectional data streams  such as SPAN ports  refer  to the Fluke Networks line of Link Aggregating SPAN Taps     Link Aggregating In Line Taps     e Flawlessly combine the separate streams  of a full duplex link    e Provide two identical tap ports for easy 24x7  scrutiny with multiple single NIC monitoring devices    e Eliminate link access and SPAN port contention    e Are non intrusive and fault tolerant  if power is lost   network traffic continues to flow    e Allow the monitoring of redundant links using  a single analyzer    RACK INSTALLATION METHODS    Prior to installation  refer to the table above to  determine which Rack Mounting Kits are compatible  with the included thumbscrew mounting bracket on  your Link Aggregating In Line Tap           E ee lel caer    lol care     d          Figure 1  ATAP 100 series tap units shown mounted in  optional 3 bay  TAP RMK 3  Rack Mounting Kit     
3. General Installation Notes    This quick reference guide is abbreviated for proficient  network technicians  detailed installation information  on each model is found in the User Guide     NOTE   End device LINK LEDs must indicate    LINK    prior  to powering the tap to ensure correct failsafe tap  functionality during loss of power     1  Connect one of the network cables to the  NETWORK A port     IMPORTANT  Do not exceed the maximum length between end  points as specified by the media type being used     2  Connect the other network cable to the  NETWORK B port     The network is bi directional Tx Rx path sensitive   Both end device    LINK    LEDs must be illuminated  to indicate correct connection     NOTE   If    LINK    does not exist  the network connection is  backwards  Reverse NETWORK A and NETWORK B  connections to establish    LINK        NOTE   ATAP 100 series only  Network devices that do not  automatically negotiate Rx Tx pin out differences  between devices to establish link typically require   a crossover cable  If needed  connect the crossover  cable as follows     EQUIPMENT     EQUIPMENT  PC PC    CROSSOVER CABLE CONNECTION       PC ROUTER     SWITCH       SWITCH     SWITCH          3  Two power supplies are provided  except for  ATAP 100 and ATAP 103 models   Use both power  supplies to ensure uninterrupted monitoring   Connect both power supply barrel connectors  into the POWER 1 and 2 ports  respectively  of the  Aggregated In Line Tap  Plug the power 
4. Link Aggregating In Line Tap Summary Information see the User Guide for detailed specifications    ATAP 100    ATAP 101    ATAP 102    ATAP 103    ATAP GIG BT BT    ATAP GIG BT SX    ATAP GIG SX BT    ATAP GIG SX SX    ATAP GIG LX BT    ATAP 2000 BT BT    ATAP 2000 SX SX    ATAP 2000 LX SX    ATAP 2001 BT BT    Unpacking    NETWORK  PORTS    10 100BASE T    2   10 100BASE T    PASSIVE    RELAY REDUNDANT SUPPORTS    INJECTION    FAILOVER POWER POE    TAP RMK 3   TAP RMK 14       100BASE T    2   100BASE T    TAP RMK 3   TAP RMK 14       100BASE T    2   10 100BASE T    TAP RMK 3   TAP RMK 14       10 1 00BASE T    2   100BASE T    TAP RMK 3   TAP RMK 14       10 100 1000BASE T    2   10 100 1000BASE T    TAP RMK 2       10 100 1000BASE T    2   1000BASE SX LC    TAP RMK 2       1000BASE SX    2   1000BASE T    yes  MM splitter     TAP RMK 2       1000BASE SX    2   1000BASE SX LC    yes  MM splitter     TAP RMK 2       1 000BASE LX    2   1000BASE T    yes  SM splitter     TAP RMK 2       2   10 100 1000BASE T    2   10 100 1000BASE T    TAP RMK 2       2   1000BASE SX LC    2   1000BASE SX LC    yes  MM splitter     TAP RMK 2       2   1000BASE LX LC    2   1000BASE SX LC    yes  SM splitter     TAP RMK 2       2   1000BASE T    UNIVERSAL PACKING LIST    e  1  Link Aggregating In Line Tap  see models below   e  2  Switching AC Adapters  e  1  Quick Installation Guide  e  1  User   s Guide       2   1000BASE T     2  AC Power Cords   for power redundancy           1  AC Power 
5. P 2  FLUKE ATAP 100 NETWORK A TAP 1  TAP 2  LINK  10 i i a ACT  20  POWER A      a E a NETWORK B  NETWORK 1 TAP 2       Figure 2  ATAP 100 series Aggregating Tap functional diagram       Distribution             Full Duplex    Network Cable ATAP 100    FLOKE    ATAP 100 NETWORK A TAPI TAP 2    a rel oa 2  10 A  20                         Figure 3     power mA  E  NETWOR   _    BYL  NETWORK B                                     Tap Cables  Full Duplex  Network Cable Protocol Analyzer  Network IDS  Access Switch             ATAP 100 series simple connectivity diagram       General Installation Notes continued    ATAP GIG SERIES INSTALLATION    To connect an ATAP GIG series Link Aggregating In Line  Tap  refer to the General Installation Notes as a guide        NETWORK 1 TAP 2       FLUKE ATAP GIG BT BT    20  a8 ae      E  2 NETWORK    TAP e                   FLUKE ATAP GIG BT SX       S  ia A   ofofe olo          NETWORK       m                              _ FLUKE ATAP GIG SX SX    Eee es PERCE A         1 2    nr  TAP                Figure 4  ATAP GIG series network tap simple functional  diagram       NETWORK 1 TAP 2       FLUKE ATAP GIG BT SX    e A olor jojo    POWER                NETWORK   we                    Switch Network IDS    Protocol Analyzer                         Switch             Figure 5  ATAP GIG series tap network functional diagram  and simple connectivity reference example    ATAP 2000 SERIES INSTALLATION    To connect an ATAP 2000 series Link Aggregat
6. ing In Line  Tap  refer to these General Installation Notes as a guide   in addition to the following notes     1  Connect one of the primary link network cables to  the NETWORK A1 port  Connect the other primary  link network cable to the NETWORK A2 port     2  Connect one of the secondary link network cables to  the NETWORK B1 port  Connect the other secondary  link network cable to the NETWORK B2 port                 E ES EE ee Ee E    NETWORK 1 TAP 2    Network B  Switch                Firewall       FLUKE ATAP 2000 B1 3T                                                                                10  2 a ia  POWER   E    BT B2 A      NETWORK Tae  Network  z z IDS  Switch E  Firewall  Protocol  Network A Analyzer             Figure 6  ATAP 2000 series functional diagram and simple  connectivity reference example    COMPLIANCE TESTING    CAUTION   Changes or modifications to this unit not expressly  approved by the party responsible for compliance  could void the user s authority to operate the  equipment     C     CERTIFICATIONS    This equipment has been tested and found to   meet the radiated and conducted emission limits for   a Class B product of EN 55022 to the EMC Directive  89 336 EEC requirements     This equipment has been tested and found to meet  the immunity levels for Class 1  tested to level 2   for EN 6100 4 2  tested to level 3 for EN 61000 4 3   tested to level 2 for EN 61000 4 4  and tested to  level 3 for EN 61000 4 5 to the EN 50082 1  requirements a
7. nd meets the Class A requirements  for EN 61000 3 2 and EN 61000 3 3     This equipment has completed the Product Safety  Review and found to meet the Low Voltage Directive  72 23 EEC  1993  requirements     CONTACTING FLUKE NETWORKS    Visit the Fluke Networks website  at http  www flukenetworks com      Send email to  support flukenetworks com     For operating assistance  sales or service in the USA   call 1 800 283 5853     From other countries     Canada  1 800 363 5853   Europe   44 1923 281 300   Beijing   86  10  6512 3435   Japan   81 3 3434 0181   Singapore   65 6738 5655   Anywhere in the world   1 425 446 4519    Visit our website for a complete list of phone numbers     Link Aggregating  In Line Taps    ATAP 100 SERIES  ATAP GIG SERIES  ATAP 2000 SERIES    QUICK INSTALLATION GUIDE    PN 2527804  rev  4  9 07   August 2005       2007 Fluke Corporation  All rights reserved  Printed in USA   All product names are trademarks of their respective companies     YSN ZLL0 90786 WM    LLAYSAR   LLL X08  Od SAYOMLIN JANTI     nok 0  Ajdde jou   Aew Ayyjigel  40 uoge siy     saBewep jeiljuanbasuod   Jo je u  pnu    40 10 AyUeeM p  ijdw   ue zo uogepw  JO  uoIsnj gt x   BY  MO  e JOU OP S    UNOD JO  9 e S BWOS DUIS     AYOSHL YO ASNVD ANV INOYS   NISIYY  SISSOI YO  SADVINVG TIVILNANOASNOD YO TWLNAGIONI    LOSYIGNI     IwidadS ANY YO4 319VI71 LON SI SHYOMLAN IANT     G3IIdINI YO AISSIYdXI JYV    ASOduNd YVINDILYWd V  Y04 SSANLIA SW HONS    SAILNVYYWM YAHLO ON     AG3INAY AINO
8. supplies  into the external power source  connect the second  power supply to a different external power source  circuit than the first power supply to eliminate  power as a single point of failure  The POWER 1  and 2 LEDs illuminate  indicating power 1 and 2   respectively  are on  Either LED not illuminated  indicates a defective power source  replace  immediately to ensure redundant power integrity     4  Connect one tap cable from the TAP 1 port  connector into the monitoring device NIC   The TAP 1 LINK LED illuminates  indicating link  has been established between the TAP 1 connector  and IDS monitoring NIC  The TAP 1 ACT LED  illuminates as data is passed to the TAP 1 device     NOTE   For NETWORK or TAP BASE T connectors  integrated  LEDs display line status and speed of each port    Refer to the LED Display Codes table     5  Connect the other tap cable from the TAP 2 port  connector into the analyzer monitoring NIC   The TAP 2 LINK LED illuminates  indicating link  has been established between the TAP 2 connector  and analyzer monitoring NIC  The TAP 2 ACT LED  illuminates as data is passed to the TAP 2 analyzer     LED DISPLAY CODES integrated on RJ45 ports    with link or data    LEFT LED RIGHT LED CODE    solid green green 1 000Mbps       flashing green orange 100Mbps  n a  off  10Mbps          ATAP 100 SERIES INSTALLATION    Refer to Figure 2 below for connecting an ATAP 100  series Aggregating In Line Tap to the network                    A B AB AB  NETWORK 1 TA
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Katun 37975 ink stick  Ergotron 45-385-223 flat panel wall mount  MANUAL DEL USUARIO TFT-1026    Panasonic HC-V700  Anleitung - TFA Dostmann  LAB 2 Design and Simulation of Sequential Logic Circuits  (ILC)設立記念フォーラム記録(1480 KB)Pdf    Copyright © All rights reserved. 
   Failed to retrieve file