Home
        Nexus Battens Installation Manual
         Contents
1.  
2.   Lamp damaged  or  Lamp not inserted properly  3 LED is flashing green but lamp doesn   t come on when  test switch is pressed  Test switch damaged  4 LED not lit red after the comissioning Battery pack not connected  or  LED wire not properly inserted into the terminal block    Battery not fully charged  allow up to 24 hours   or  Battery pack damaged    when mails fail    e   LED is constant green Unit self checks fail   return to manufacturer    Lamp is lit momentarily when test switch is pressed  or    Unit LED is not flashing yellow orange under wink node  command    Unit is not receiving communication signal  Check data  cable wiring path and cable connections  Refer to Nexus  LX User  amp  Technical Guide        If the unit still doesn   t work after checking these possible causes  contact Thomas  amp  Betts Service in Australia on 1300 666 595  Monday  to Friday  8 30am to 4 30pm  AEST  and ask for help  Our trained service personnel will usually be able to take your call immediately and  assist you in resolving your difficulty  Thomas  amp  Betts is committed to providing valuable Through Life Support for its products           Copyright 2013  Thomas  amp  Betts Australasia ABN  062 074 810 898  Rev 6 0 15April2013 4    Complete Solutions in Emergency Lighting STANILITE    Doc No  29 01018    Thomas  Betts       A Member of the ABB Group    Thomas  amp  Betts Australasia  ABN 062 074 810 898  Head Office  Unit D3  3 29 Birnie Avenue  Lidcombe NSW 2141  Australia  Ma
3. 000  AS NZS2293    Refer to the applicable standards for data and mains cabling installation procedures and requirements     NEXUS LX  DATA CABLE SYSTEM    The Nexus range light fittings are designed to be connect into a special communication network  using Level 4 single twisted pair data  cable  Before attempting to create or modify Nexus network  please ensure that you are familiar with the special requirements of these  networks  Also ensure that you have prior permission from the building owner or manager  The Nexus LX User  amp  Technical Guide  describes all you need to know to successfully install a Nexus project  Please ensure you have read the guide before continuing  Copies  of the guide are available free of charge from any Thomas  amp  Betts supplier     SWITCHED ACTIVE MONITORING  This Nexus batten offers switched active monitoring  Please make sure that the switched active wire must be connected to Pin 19 of the  power pack  Leaving the switched active monitoring wire out or disconnect will show abnormal status in the test result report           Copyright 2013  Thomas  amp  Betts Australasia ABN  062 074 810 898  Rev 6 0 15April 2013 1    Complete Solutions in Emergency Lighting STANILITE    INSTALLATION INSTRUCTIONS    To install the Nexus battens  follow these steps     1  Remove the batten from the packing box and inspect it for damage or imperfections  If any damage is found  do not install  the batten  replace it carefully into the packing box and notify 
4. LATION   Before removing the installed fitting  switch off the mains supply to the fitting  Remove the lid by unscrewing two screws as shown in  Figure 1  Unscrew the unswitched active  switched active  neutral and earth cable connection from the terminal block using a suitably  sized screwdriver  Unplug the data cable connection from the terminal  Disconnect the battery plug from the battery and then unscrew  the mounting screws of the gear tray  When the fitting is reconnected to the supply  it will need time to recharge its battery before it will  be capable of a full length discharge again     TESTING PRECAUTIONS   If the fitting is to be left permanently connected to the mains supply from now on  you will need to allow 24 hours to charge its battery and  then you will have to conduct a discharge test as per the requirements of AS NZS2293 2  Presently  at the time of writing   the standard  requires that new fittings operate in emergency mode for at least 2 hours during their first test  Subsequent tests are required every 6  months  fittings are then required to operate for not less than 90 minutes    If the fitting isn   t permanently connected to mains supply at this time  you are responsible for giving it the initial 2 hour test when you do  connect it permanently to the mains supply  Refer to the Nexus LX User  amp  Technical Guide for unit testing and test results           Copyright 2013  Thomas  amp  Betts Australasia ABN  062 074 810 898  Rev 6 0 15April2013 3   
5. STANILITE       Complete Solutions in Emergency Lighting    CONSTRUCTION SITES   Continuously switching on and off the mains supply to the fittings during the installation process  due to building works or for some other  reason   could cause the fittings to discharge and charge their batteries many times over a short period which may shorten the life of the  battery  Thomas  amp  Betts does not recommend such practices and may not honour any warranty on the life of the batteries or the lamp s  when subjected to such harsh operating conditions  The battens are designed to be regularly discharge tested once every 6 months as  per AS NZS2293 2  In order to prevent damage to the battery  leave the unswitched active circuit turned off at the circuit breaker  until the  emergency lighting is required on the site     TROUBLE SHOOTING GUIDE  If you ve installed and connected the batten as per the instructions listed earlier and it doesn   t work properly  use the following table as a  guide to fixing the problem  Look up the type of fault in the left column and check the possible causes from the right column     1 LED not lit  or AC supply not connected  or  LED not flashing green    AC supply turned off    Lamp damaged  or  Lamp not inserted properly  or    2 LED is flashing green but AC lamp doesn   t come on when   Switch active supply turned off  or  connected to mains Missing loop from unswitched to switched active  or  Battery pack not connected  or  Battery pack damaged  or  
6. advertently come into contact with their neighbouring terminal or the metal will cause undesirable results when the fitting is powered     DATA CONNECTIONS    Data cable connects via the 3 way strain relief plug  supplied with the batten  to the data terminal as shown in Figure 2     Note  When correctly installed no fitting should have more than two data cables connected to it  If you have more than two data cables at                                                                                                                                                                                                                                  any one fitting  the installation is incorrect  You will need to consult the Nexus LX User  amp  Technical Guide   Warning  No mains carrying cables are to be connected to the data terminals or cables   Wiring Diz   7  LED 1s N Menine T 1 LED fie Wien onnad n  Battery    2 eh E t Battery EE B a ia Hh  2 Ww 14 2 6  ae 14    Fe hgt Test Neutral 15  5 3 Test 1b  s Switch 16  u Switch 16 a  E Ballast 17 7  az        78 36W 18 18  sle C p   s m H    T eK 30     USA an 30 USA  21 H Neutral 21 Neutral   bat   2 Eth 22     Earth                                  Figure 2  Wiring Diagram Nexus Power Pack using conventional magnetic ballast          Copyright 2013  Thomas  amp  Betts Australasia ABN  062 074 810 898  Rev  6 0 15 April 2013 2    Complete Solutions in Emergency Lighting STANILITE    Replace the lid back on the gear tray  Fit the fluores
7. cent lamp tube as per the size of the fitting and clip the light sensing clip on  the maintained lamp tube  In twin lamp tube   s fitting the light sensing clip clips on emergency lamp tube   lamp s not supplied with  the fitting      5  Lamp operation   Maintained Batten  Once powered up  in a maintained batten the normal AC lamp  if present  should lights up and stays on  until the power supply fails  The emergency function of the unit should only operate when the unswitched active power supply  fails or when somebody presses the manual test button located on the side of the fitting  The emergency function also operates  when the fitting receives a command from the Nexus controller to switch into emergency mode   Non maintained Batten  Once powered up  in a non maintained batten the present lamp stays off  The emergency  function of the unit should only operate when the unswitched active power supply fails or when somebody presses the manual  test button located on the side of the fitting  The emergency function also operates when the fitting receives a command from the  Nexus controller to switch into emergency mode     6  When you first install the new batten its LED will be flashing green  During different modes of operation the LED status should be  as following      Flashing orange Wink mode cable tracing is on  Valid messages are being received by the unit   Static orange Wink mode cable tracing has been turned off    Static red Unit has been commissioned  battery is 
8. charging    Flashing red Unit is under test     Refer to the Nexus LX User  amp  Technical Guide for detailed description of all possible LED states and their meanings     7  Check the operation of the fitting to ensure that the installation was successful  When powered up  allow a few minutes to give  the battery a small charge  then press the manual test button located on the side of the fitting  Press and hold the test button for a  few seconds and observe that the emergency lamp lights up and stays on  until the test switch is released  If the lamp works only  momentarily  this ensures that the connections are correct and the battery requires at least 16 hours to fully charge  If the lamp  doesn   t work at all  check the supply  the connections  and the trouble shooting guide at the end of this document     8  Once manually checked as per item 7 above  the fitting is ready to be communication tested and commissioned into the Nexus  network  Keep the information details of this fitting including exact location description  DB  distribution board  and CB  circuit  breaker  numbering  channel and router numbering  plan number and cross referencing information as all this will be required for  entry into the database during commissioning  Refer to the Nexus LX User  amp  Technical Guide for full details    As the installer  it is your responsibility to conduct the initial discharge testing of the installed fitting  Refer to AS NZS2293     TO REMOVE THE BATTEN FROM THE INSTAL
9. nufacturing  23a Nyrang Street  Lidcombe NSW 2141  Australia  Telephone    61  1300 666 595 Facsimile    61  1300 666 594    Nexus Battens  Installation Manual    Electrical Safety Warning  Installation Instructions       GREETINGS   Congratulations on choosing to use this Thomas  amp  Betts product covered by our unique Through Life Support system  This document is  designed to assist you during the installation of the product  to ensure the safety of yourself and others    The Nexus battens are designed to be installed quickly and easily however  Thomas  amp  Betts recommends that you read  this document thoroughly before commencing installation  This device has been manufactured to provide trouble free  operation for many years  when treated with due care and maintained through regular and appropriate servicing     SAFETY WARNING   In Australia and New Zealand  only licensed electricians are permitted by law to work with 240 Volts electrical installations    Do not attempt to install or connect this product unless you are a licensed electrician    Turn off and isolate the electrical supply before connecting this fitting to the building wires    Do not touch the terminals of the terminal block when the light fitting is powered    The only user serviceable parts are the lamp s and battery pack    Do not tamper with the fitting or the warranty will be void    As the installer  it is your responsibility to ensure compliance with all relevant building and safety codes   ie  AS3
10. the Thomas  amp  Betts Product Support Hotline in Australia on                                                          1300 666 595   Sensor i    Clip Test Switchaleo Y Lid Screw Lamp Holder   li Zon ae   f  s                i   Cable Entry Hole m EE  4 0  Cx    k  P RE B       lt  236 0  gt                             Figure 1  Nexus Battens 36W Single and Twin Nexus Control Pack    2  Ifall looks okay  proceed with the installation  Remove the lid shown in Figure 1  use a pencil to mark the position of the mounting  screw holes for the batten     3  Fit the test switch  LED and lamp holder as shown above in Figure 1  Route the mains and data cable through the cable entry hole     MAINS CONNECTIONS    Strip and connect the mains cable to the terminal block and earth as listed below using a suitably sized screwdriver     The unswitched active wire connects to the terminal marked U A or ACTIVE UN SW  The switched active wire connects to the terminal marked A or S A   The neutral wire connects to the terminal marked N   The earth wire connects to the terminal marked E    Ensure that the stripped wire ends are completely inserted into the terminal block and no bare conductors are exposed to the metal   You will also need to mechanically protect the mains cable with a grommet  gland or bush as it passes through the cable entry hole  Be  careful with multi strand conductors that all of the strands are twisted together before insertion into the terminal  Any stray strands that  in
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
NXP Semiconductors PBLS4004D User's Manual  『vsp-ー』の基本性能にっぃて ~ YAMAHA 麦言ごチプライノ~シ一  Important notes  Smart Grid  13-inch MacBook Pro User Guide  Sony SVM-25LS User's Manual  EDI-150S  KM76・KM26・KM36 取扱説明書[PDF:1.2MB]  La réglementation  Chief PCS2306 flat panel wall mount    Copyright © All rights reserved. 
   Failed to retrieve file