Nexus Flood Unit Installation Manual

image

Contents

1. LED not red after the commissioning Fuse missing or fuse damaged or LED wire not properly inserted into the terminal block Lamp beams is lit momentarily when test switch is Battery not fully charged allow up to 24 hours or pressed or when mains fail Battery damaged 5 LED is constant green Unit self checks fail return to manufacturer Unit LED is not flashing yellow orange under wink node Unit is not receiving communication signal Check data command cable wiring path and cable connections Refer to Nexus Installation Manual If the unit still doesn t work after checking these possible causes contact Thomas amp Betts Service in Australia on 1300 666 595 Monday to Friday 8 30am to 4 30pm AEST and ask for help Our trained service personnel will usually be able to take your call immediately and assist you in resolving your difficulty Thomas amp Betts is committed to providing valuable Through Life Support for its products Copyright 2013 Thomas amp Betts Australasia ABN 062 074 810 898 Rev 8 0 15April2013 4 Complete Solutions in Emergency Lighting Doc No 29 01023 Thomas 8etts A Member of the ABB Group Thomas amp Betts Australasia ABN 062 074 810 898 Head Office Unit D3 3 29 Birnie Avenue Lidcombe NSW 2141 Australia Manufacturing 23a Nyrang Street Lidcombe NSW 2141 Australia Telephone 61 1300 666 595 Facsimile 61 1300 666 594 Nexus Flood Unit Installation Manual Electrical Sa
2. STANILITE STANILITE Complete Solutions in Emergency Lighting CONSTRUCTION SITES Continuously switching on and off the mains supply to the units during the installation process due to building works or for some other reason could cause the fittings to discharge and charge their batteries many times over a short period which may shorten the life of the battery Thomas amp Betts does not recommend such practices and may not honour any warranty on the life of the batteries or the lamp beams when subjected to such harsh operating conditions The units are designed to be regularly discharge tested once every 6 months as per AS NZS2293 2 In order to prevent damage to the battery leave the unswitched active circuit turned off at the circuit breaker until the emergency lighting is required on the site TROUBLE SHOOTING GUIDE If you ve installed and connected the Flood Unit as per the instructions listed earlier and it doesn t work properly use the following table as a guide to fixing the problem Look up the type of fault in the left column and check the possible causes from the right column LED not lit or AC supply not connected or LED not flashing green AC supply turned off LED is flashing green but lamp beams doesn t come on Fuse missing or fuse damaged or when test switch is pressed Lamp beams wire not inserted connected properly or Lamp beams damaged or Battery not charged enough or Battery damaged or Test switch damaged
3. connections and the trouble shooting guide at the end of this document 7 Once manually checked as per item 6 above the Flood Unit is ready to be communication tested and commission into the Nexus network Keep the information details of this Flood Unit including exact location description DB distribution board and CB circuit breaker numbering channel and router numbering plan number and cross referencing information as all of this will be required for entry into the database during commissioning Refer to the Nexus LX User amp Technical Guide for full details As the installer it is your responsibility to conduct the initial discharge testing of the installed unit Refer to AS NZS2293 TO REMOVE FLOOD UNIT FROM THE INSTALLATION Switch off the mains supplies to the Flood Unit remove the fuse from fuse holder and then unplug the mains power cord Remove the lid by unscrewing four screws as shown in Figure 1 Unscrew the data cable connection from the terminal block using a suitably sized screwdriver and then unscrew the mounting screws of the Flood Unit When the unit is reconnected to the supply it will need time to recharge its battery before it will be capable of a full length discharge again Note When sending Flood Units for repair make sure that the lamp beams and mains cable are included TESTING PRECAUTIONS If the Flood Unit is to be left permanently connected to the mains supply from now on you will need to allow 24 hours to c
4. fety Warning Nexus Flood Unit Network Control System Nexus Warning Installation Manual Nes Food Um Renora nero C dP C GREETINGS Congratulations on choosing to use this Thomas amp Betts product covered by our unique Through Life Support system This document is designed to assist you during the installation of this product so for the safety of yourself and others Thomas amp Betts recommends that you read this document thoroughly before commencing installation The Nexus Flood Units are designed to be fitted quickly These are advanced pieces of electronic equipment and when treated with due care and maintained through regular and appropriate servicing will perform without trouble for many years to come SAFETY WARNING In Australia and New Zealand only licensed electricians are permitted by law to work with 240 Volt electrical installations Do not attempt to install or connect this product unless you are a licensed electrician Turn off and isolate the electrical supply before connecting this fitting to the building wires Do not touch the terminals of the terminal block when the light fitting is energised The only user serviceable parts are the lamp s Do not tamper with the fitting or the warranty will be void As the installer it is your responsibility to ensure compliance with all relevant building and safety codes ie AS3000 AS NZS2293 Refer to the applicable standards for data and mains cabling installation procedu
5. harge its battery and then you will have to conduct a discharge test as per the requirements of AS NZS2293 2 Presently at the time of writing the standard requires that new units operate in emergency mode for at least 2 hours during their first test Subsequent tests are required every 6 months units are then required to operate for not less than 90 minutes You will need to keep records of the Nexus test results If the unit isn t permanently connected to mains supply at this time you are responsible for giving it the initial 2 hour test when you do connect it permanently to the mains supply Refer to the Nexus LX User amp Technical Guide for unit testing and test results Copyright 2013 Thomas amp Betts Australasia ABN 062 074 810 898 Rev 8 0 15April2013 3
6. non maintained Flood Unit the present lamp beams stays off The emergency function of the Flood Unit should only operate when the unswitched active power supply fails or when somebody presses the manual test button located on the side of the unit The emergency function also operates when the Flood Unit receives a command from the Nexus controller to switch into emergency mode When you first install the Flood Unit its LED will be flashing green During different modes of operation the LED status should be as follows Flashing orange Wink mode cable tracing is on Valid messages are being received by the unit Static orange Wink mode cable tracing has been turned off Static red Unit has been commissioned battery is charging lamp filament is intact Flashing red Unit is under test Refer to the Nexus LX User amp Technical Guide for detailed description of all possible LED states and their meanings 6 Check the operation of the unit to ensure that the installation was successful When powered up allow a few minutes to give the battery a small charge then press the manual test button located at the side of the unit Press and hold the test button for a few seconds and observe that the lamp beams lights up and stays on until the test switch is released If the lamp works only momentarily this ensures that the connections are correct and the battery requires at least 16 hours to fully charge If the lamp doesn t work at all check the supply the
7. res and requirements NEXUS LX DATA CABLE SYSTEM The Nexus Flood Unit fittings are designed to be connect into a special communication network using Level 4 single twisted pair data cable Before attempting to create or modify an Nexus network please ensure that you are familiar with the special requirements of these networks Also ensure that you have prior permission from the building owner or manager The Nexus LX User amp Technical Guide describes all you need to know to successfully install an Nexus project Please ensure you have read the guide before continuing Copyright 2013 Thomas amp Betts Australasia ABN 062 074 810 898 Rev 8 0 15April2013 1 STANILITE STANILITE Complete Solutions in Emergency Lighting INSTALLATION INSTRUCTIONS To install the Nexus Flood Unit follow these steps 1 Remove the unit from the packing box and inspect it for damage or imperfections If any damage is found do not install the unit but replace it carefully into the packing box and notify the Thomas amp Betts Product Support Hotline in Australia on 1300 666 595 a a 3 A 99 ep PON _LED amp Test witch 348 N Lid Screw 322 _ Figure 1 Nexus Flood Unit with Beams Installed 2 Ifall looks okay proceed with the installation use a pencil to mark the position of the mounting screw holes for the Flood Unit Note Staggered wire connection for lamp 1 and lamp 2 cables Washe
8. rs Lock Ring 5 Nut Lamp Printed Cabl Circuit Board Battery Compartment Figure 2 Nexus Flood Unit Lamp Beams and Data Cable Connection Diagram 3 Remove the lid by unscrewing four screws as shown in Figure1 Install both the beams using washer and lock ring nut refer to Figure 2 BEAMS CONNECTIONS Connect the beam lamp cables as shown in Figure 2 using a suitably sized screwdriver Ensure that the stripped wire ends are completely inserted into the terminal block and no bare conductors are exposed to the metal Note The lamp cables are in staggered pattern as shown in Figure 2 Copyright 2013 Thomas amp Betts Australasia ABN 062 074 810 898 Rev 8 0 15April2013 2 Complete Solutions in Emergency Lighting DATA CONNECTIONS Connect the data cable as shown in Figure 2 using suitably sized screwdriver Ensure that the data cable s are completely inserted into the terminal block and properly secured with tape Note When correctly installed no fitting should have more than two data cables connected to it If you have more than two data cables at any one fitting the installation is incorrect You will need to consult the Nexus LX User amp Technical Guide Warning No mains carrying cables are to be connected to the data terminals or cables 4 Place the fuse into fuse holder before connecting Flood Unit to mains fuse is placed inside the box and normally secured with the tape 5 Once powered up as a

Download Pdf Manuals

image

Related Search

Related Contents

Artwizz SmartJacket  MANUAL DE INSTRUCCIONES MANUAL DE  Viewing - Maretron  Panasonic UF-8300 fax machine  Moxa DR-120-24 power supply unit  User Manual    HealthRider HRCR9155.0 User's Manual  Easypix DVC5127 Trip  Brochure LINER Andaineurs à dépose centrale  

Copyright © All rights reserved.
Failed to retrieve file