Home

2015 User's Manual S B D I - saskatchewan bid depository

image

Contents

1. advised that the final addenda will be accepted at our office no later than 2 working days before the Subcontractor closing date The Subcontractor closing date for this project is therefore the final date addenda will be accepted is This is documented in Rule 4 1 4 of the SBDI User s Manual If for a particular reason the two day deadline cannot be met simply notify the SBDI Authority and extend the project closing date by the number of working days to comply Yours truly SASKATCHEWAN BID DEPOSITORY INC BRANCH MANAGER PLEASE CONFIRM RECEIPT SASKATCHEWAN BID DEPOSITORY INC BRANCHES 21 Users Manual SBDI GENTJAN Saskatchewan Bid Depository Inc tact bdi PROPOSED CHANGES TO KS a THE SBDI USER S MANUAL RULE NUMBER TRADE SCOPE ITEM NUMBER PROPOSED CHANGE REASONS TRADES AFFECTED BY THIS PROPOSED CHANGE SUBMITTED BY Refer to SBDI Rule 3 15 2 22 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca BOUNDARY ZONE MAP www sbdi ca APPENDIX VI PRINCE ALBERT BOUNDARY ZONE P m Albert Ni nd ARY SASKATCHEWAN BID DEPOSITORY INC 23 Users Manual ARI Saskatchewan Bid SH contactus Oshdi ca BIDDER REQUEST FORM QE DATE NAME OF FIRM ATTENTION ADDRESS TELEPHONE FAX EMAIL PROJECT GENERAL CONTRACT
2. Trade Scopes SBDI Saskatchewan Bid Depository Inc METAL ROOFING CLADDING AND SOFFIT SCOPE SO ai Page 1 of 2 i Revised 2011 This contractor shall include and exclude the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 Metal roofing roll formed from sheet steel prepainted galvanized or galvalume finish aluminum stainless steel copper or other metals D Cladding roll formed from sheet steel prepainted galvanized or galvalume finish stainless steel aluminum or other metals 3 Translucent panels to match roof or cladding profile 4 Related closures caulking flashings and fasteners incorporated into the system 5 Internal sub girts and clip systems 6 Liner panel of materials listed Item 1 amp 2 above forming part of the preformed metal roof or wall assembly 7 Gypsum board when applied over a roof deck as part of the roofing system 8 Auxiliary boards such as plywood and or wood strapping when applied over a roof deck as part of the metal roofing system 9 Related insulation adhesives vapour barriers and air barriers 10 Flexible sheet membranes which form part of the building air barrier directly behind the metal system including connection to work of preceding trade where required If connection is required by any trade following the metal installation then the metal contractor provides a maximum 200 mm un
3. 00 00005 13 4 RULES SINGLE BID S au sa denoi end dd A a 14 4 10 RULES SUCCESSFUL GENERAL MECHANICAL CONTRACTOR aa aa aaa aa aaa aaa na aaa ann nena 14 4 11 RULES P C SUMS CASH ALLOWANCES AND OR CONTINGENCY FUNDS 15 RULES COMPLAINTS coi t 15 DISPUTES AFTER CLOSING ivonne dd d bn D i dvd dd n 16 RULES PENAETIES ep nai dios 16 RULES SUSPENSION S ccoo irritada A dr ic t e 16 RULES SZ APPEALS e 17 FORMS eeaeee t AEAEE DEEE t 17 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca SASKATCHEWAN BID DEPOSITORY BRANCHES SBDI HEAD OFFICE 532 2 Avenue North Saskatoon SK S7K 2C5 Telephone 306 653 1771 Fax 306 653 3515 Email contactus OSBDI ca www SBDI ca SBDI REGINA BRANCH 1935 Elphinstone Street Regina SK S4T 3N3 Telephone 306 791 7422 Fax 306 565 2840 SBDI MOOSE JAW BRANCH SUBCONTRACTOR DROP OFF ONLY 610 1 Avenue North Moose Jaw SK S6H 3M6 Telephone 306 693 1232 Fax 306 694 1766 SBDI LLOYDMINSTER BRANCH SUBCONTRACTOR DROP OFF ONLY 4419 52 Avenue Lloydminster AB T9V QY8 Telephone 780 875 8875 Fax 780 875 8874 SBDI SASKATOON BRANCH 532 20 Avenue North Saskatoon SK S7K 2C5 Telephone 306 653 1771 Fax 306 653 3515 SBDI PRINCE ALBERT BRANCH 70 17 Street West Prince Albert SK S6V 3X3 Telephone 306 764 2789 Fax 306 764 3443 SBDI NORTH BATTLEFORD
4. Please add us to your list of bidders on the above noted project We will be bidding as a Ll GENERAL CONTRACTOR Ll MECHANICAL CONTRACTOR We will be using our own forces for the following SBDI trade scopes Each General Mechanical Contractor who intends to bid on a project should give notice in writing to the SBDI Authority of their intention to bid General Contractor not less than 5 working days prior to the General Contractor closing and Mechanical Contractor not less than 3 working days prior to the Mechanical Contractor closing SIGNATURE DATE 26 Trade Scopes SBDI Saskatchevvan Bid Depository Inc contactus Oshdi ca nat TRADE SCOPE INDEX AS 2011 PILING SCOPE Timber Steel Pipe and H Sheet Bored Precast and Compacted Concrete Piling e 28 2001 REBAR SCORE ra e e thes 29 2011 MASONRY SCOPE sede pi n i Pt d d 31 2005 STRUCTURALSTEELSCOPE m s ndan kadi Kanina duna e e t 33 2011 METAL DECKING SCOPE heed kos e Ace d i 36 2005 MISCELLANEGUSIMETAISSCOPE mi k ete ko ke eni dri en s dd a i s 37 2003 MEMBRANE ROOFING AND RELATED SHEET METAL SCOPE aaa 41 2001 SHINGLE ROOFING AND RELATED SHEET METAL SCOPE lid eect eee eee 43 2011 METAL ROOFING CLADDING AND SOFFITSCOPE ln ect t te te ee e ee 45 2013 ARCHITECTURAL WOODWORK SCOPE add tt eonedtnod a ale a aS 47 2001 ENTRANCE AND STOREFRONTS SCOPE ks bs Heb Sead e e Ye De EE B
5. UF u p oe Excluded from the above are all paint products generally sold over the counter and applied by the purchaser Temporary heat light power sanitation Water Hoarding Final cleaning 73 Trade Scopes SBDI ELEVATORS SCOPE Saskatchewan Bid Depository Inc Page 1 of 2 contactus Oshdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED The supply and installation of 1 2 3 4 Electric Elevators Hydraulic elevators Parking garage hoists Speedramps And they shall include the supply and installation of all 1 Elevator entrances 2 Elevator doors and sills 3 Door operating equipment 4 a Electrical wiring and conduit from all controllers to signals and operating circuits b Supply and installation of remote panels and systems including wiring between elevator and remote panels and systems NOTE All fixed conduits and fittings between elevator and remote panels and systems by others if detailed on drawings as per Excluded Item 14 following 5 Piping incidental to hydraulic elevators 6 All components including incidental items required for a complete installation T Demolition and removal of existing elevators in buildings where elevators will be installed Modernization and additions and changes to existing buildings 8 All licen
6. 6 Fly screens to venting windows 7 Stiffeners and or steel reinforcement where required and where it is enclosed by the aluminum section 8 Architectural metal glass operating windows swinging and or sliding doors where they become an integral part of this Scope complete with hardware as outlined under Entrances and Storefronts Scope 9 Number not used 10 Supply and installation of all sill flashings integral to curtainwall system 11 Architectural guardrails and push pulls except wood and plastic laminate where these are an integral part of the curtainwall 12 Insulation within the curtainwall 13 Cleaning between double and multiple glazing 14 Caulking packing and perimeter insulation exterior and interior 15 Clean up of own debris by own forces 16 Protection of other trades work from damage by this trade 17 Shop drawings 18 Scaffolding 19 Hoisting 20 Brush clean 21 All P C sums and or contingency funds specifically called for in the curtainwall specifications 22 Testing where specifically required by the specifications 23 Relocation of existing materials Architectural sunshades where they are attached to the curtainwall system 56 Trade Scopes SBDI CURTAINWALL SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus Oshdi ca Revised 2006 www sbdi ca EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lightin
7. Hoarding Water Return air diffusers of any type Supply and installation of acoustic rated units where they are an integral part of demountable partition This will be included in Demountable Partitioning Scope e g Soundsoak Sonotrol and Tectum Final cleaning Any drywall work above ceilings e g for attenuation purposes Light fixture diffusers Thermal insulation of any kind Supply and installation of Acoustic Ceiling Grid when used as trim for radiant panels and or lights in drywall assemblies Additional wires chains hangers and or inserts required for support of radiant panels or electrical fixtures 68 Trade Scopes SBDI RESILIENT FLOOR COVERINGS SCOPE Saskatchevvan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 Vinyl Composition rubber vinyl linoleum cork vinyl cork and polyvinyl chloride tiles 2 Vinyl rubber linoleum and polyvinyl chloride sheet goods as used for floor coverings 3 Vinyl conductive flooring 4 All rubber and vinyl base coved and flat accessories Including to demountable partitions X Vinyl rubber linoleum and polyvinyl chloride sheet goods as used for floor coverings 6 Rubber sheet risers and strings or skirting 7 Vinyl rubber nosings and metal when with re
8. for electrical except if provided for under precast and post tensioned slabs specifications 21 Demolition of existing electrical installations when not covered by demolition section Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus Wsbdi ca Page 2 of 6 www sbdi ca 22 Detectors for systems under the Electrical Scope 23 Dimming systems 24 Distribution equipment electrical 25 Door surveillance systems see also Included Item 79 26 Doors overhead movable wall operators complete with associated protection and control devices electrical hook up only 27 Drainage connections for conduit systems excluding drain lines 28 Ductless range hoods 29 Electrical thermostats except for equipment supplied under Mechanical Scope Thermostats supplied under Mechanical Scope if to be installed by electrical contractor must be complete with adapter plates or sub base to mount on standard one gang electrical outlet box 30 Process Instrumentation PLC Controllers I O Cabinets and Field instruments excluding any direct mounted in line instruments and sensor wells This shall include calibration wiring supports and installation excluding in line instruments sensor wells mechanical piping pneumatic tubing and associated equipment Refer to Section 1 General Mechanical Included Item 28 31 Emergency power and lighting systems electrical 32 Excavation th
9. for systems under the Electrical Scope 87 Transformers for systems under the Electrical Scope 88 Watchman s clocking equipment for systems under the Electrical Scope 89 Wiring devices and plates 90 Wiring and equipment for transformer vaults 91 Wire branch circuits feeders for systems under the Electrical Scope 92 X ray viewers 93 School Sound Intercommunication systems complete Sound paging and music distribution systems 94 Sound distribution systems including masking speech privacy systems complete 95 Intercommunication systems including private automatic telephone systems computer cabling and data networks complete 96 Electronic learning laboratories complete Electronic learning laboratories of all types incorporating audio communications 97 Wireless paging and intercommunication systems complete Pocket paging two way radio and intercommunication via wireless transmission 98 Television antenna and closed circuit distribution systems including surveillance systems complete Internal type 99 Audio and video recording systems complete 100 Wind generators for the purpose of conversion to electrical energy including towers and supports 101 The electrical contractor shall include contingency funds specifically called for in the electrical specifications 102 Firestopping of all kinds for electrical systems only 103 Solar system
10. S BDI Saskatchevvan Bid Depository Inc contactus sbdi ca www sbdi ca 2015 User s Manual Rules Regulations amp Trade Scopes Effective January 1 2015 ooo T il Head Offi ea E Regina Branch Prince Albert Branch 532 2nd Avenue Nort h 1935 Elphinstone Street 70 17th Street West i I 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 Users Manual Saskatchewan Bid Depository Inc contactus Oshdi ca TABLE OF CONTENTS www sbdi ca RULES AND REGULATIONS das uara vd n na vs ne nd T TT s OA ms 2 1 1 ORGANIZATION AND PURPOSE aak akne kaki eper peer ere prere krere reper 2 1 2 NAME iaa ls ees ates 2 1 3 PLACE A A sic oe 2 1 4 PURPOSES 5 ie iced a ss 2 1 5 SASKATCHEWAN BID DEPOSITORY INCORPORATED cccccecceeeeceeeeeeseeeeeeeeeeneees 2 1 6 SBDI BRANCH MANAGEMENT COMMITTEES aaa aaa aaa kape ake eee eeeeceeeeeeeseeaeeeeaeeaenes 2 1 7 ADOPTION OF SBDI USER S MANUAL cccccesconussi rise ion dd e dana 3 1 8 AMENDMENT OF SBDI USER S MANUAL aaa aaa aaa ake cece eee e a eee eee seta peer prere ret 3 CONDITIONS FOR USE OF BID DEPOSITORY aaa cece ence peer peer 3 GENERAL PROVISIONS dance v veoni s rish bord she n keti plrosdhe andes dij iden pn 4 3 1 EBI GB ME TY baba ia ricas 4 3 2 TRAD ES COP ES e e cien 4 3 3 CLOSING TIME FOR BIDS eiii a di PAA RETRANS 5 3 4 HOURS OF OPERATION OF BID DEPOSITORY aaa aa aaa aaa kena nak vere eee eee eee reve e re eee nina 5 3 5 DEFINITION GONTRAC TO Ra aak
11. 30 00 Free download at vvvvvv SBDI ca 40 FEES WITHDRAWAL OF TENDER One percent 1 of tenders withdrawn Minimum Fee 150 00 Maximum Fee 1 000 00 50 FEES COMPLAINTS 75 00 ON SUBCONTRACTOR SUB SUBCONTRACTOR TENDERS 6 0 DISPUTES AFTER CLOSING Fee required per party involved in the dispute 180 00 The SBDI Authority has the discretion to refund any or all fees 7 0 MISSED BIDDING 20 00 Missed bids are 20 00 for the first and 5 00 for each missed bid after that Charges for faxing service may vary from branch to branch 8 0 APPEAL OF HEARING RE SUSPENSIONS 1 000 00 Fee will be returned to the issuer should the appeal be successful 9 0 APPEAL OF SBDI AUTHORITY RULING 500 00 10 0 LATE BIDDER NOTIFICATION FAILURE TO NOTIFY 250 00 NOTE All fees are GST extra and must be made payable to the Saskatchewan Bid Depository Inc 19 Users Manual SBDI APPENDIX III DECLARATION FORM Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca DATE TENDER FOR PROJECT SBDI TRADE SCOPE S AS REQUIRED BY THE REGULATIONS OF THE SASKATCHEWAN BID DEPOSITORY INC WE STATE AS FOLLOWS LI Since the total tender does not exceed 40 000 no bid bond or certified cheque is enclosed LI we enclose herewith a bid bond naming as OBLIGEE the Successful General Contractor Successful Mechanical Contractor LI Ve enclose herewith a certified cheque for 10 of the tender amount payable to S
12. Asphalt and pitch primers Asphalt base type planking Bitumens Cants of roof insulation material Caulking compounds gaskets and plastic rope Coatings Composition roofing materials i e Insulpave Expansion joint fillers and covers Reinforcing fabrics and membranes Flashings of all types of materials when they form part of the roof system and are installed in conjunction with and during the construction of the roof system When any type of downspouts eavestrough conductor pipe and accessories are to match any prefinished metal siding metal roofing facia soffits or wall systems all metal flat or coiled flashing eavestrough douwnspouts and accessories is to be supplied to the roofing contractor by others F O B roofing contractors shop The forming and installation is to be included under this item including prefinished material if required under Item 17 If no prefinished metal siding is incorporated in the project all prefinished roof flashing by this trade Gravel stops Gum pots to be filled only when roofing crews are on site Gutters downspouts and metal splash pans when directly connected to Built up Roofing 16 ga and lighter a Insulation consisting of preformed panels only Also included is Protective Coatings and covering for the installation OSB Plywood b The installation of insulation for acoustical steel decks which is to be supplied by Metal Decking Scope in a preformed custom fitted conditio
13. DEMOUNTABLE PARTITIONING SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus sbdi ca www sbdi ca 8 Supply and installation of all doors and hardware 9 Supply of hollow metal frames or lights and the sorting and loading of hollow pressed steel door and or window frames 10 Supply and installation of glass in hollow metal frames 11 Backing and preparation of aluminum frames to receive hardware 12 Rubber base 63 Trade Scopes SBDI TILE TERRAZZO MARBLE AND Saskatchewan Bid Depository Inc GRANITE SCOPE contactus sbdi ca Page 1 of 2 www sbdi ca Revised 2001 This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope 1 The laying cutting or setting and sealing of all tile where used for floors bases walls ceilings vvalks promenade roofs exterior veneers stair treads stair risers facings hearths fireplaces and decorative inserts together with any marble plinths thresholds or window stools used in connection with any tile work 2 The application of a coat or coats of cement mortar prepared to proper tolerance to receive tile on floors walls and ceilings regardless of whether the cement mortar coat is wet or dry at the time the tile is applied to it 3 The setting of all tile by the adhesive method with organic and or inorganic thin bed bonding materials where such bonding materials is applied to the back
14. Electrical Scope page 5 of 5 Multi speed switches for systems under the Electrical Scope Nurse call systems and equipment complete Operating room lights Power plant equipment excluding fuel tanks unless they are an integral part of the generator assembly complete with prime mover flex connections valving and muffler when the major function is to drive electric generators Enough fuel for testing purposes only Mechanical connections to same supplied as outlined in Section 1 General Mechanical Included Item 4 Power supplies for systems under the Electrical Scope Power wiring for equipment under the Mechanical Scope shall be included without limiting the Scope all necessary wiring materials and connections for motors requiring protective control by the Canadian Electrical Code Part 1 heaters lamps electrostatic filters and controls that directly switch the power lines to such equipment Wiring to solenoids shall fall in the category of control wiring see Included Item 19 Primary distribution centres Raceways for systems under the Electrical Scope Rectifiers for systems under the Electrical Scope Regulators for systems under the Electrical Scope Relays for systems under the Electrical Scope Resistors for systems under the Electrical Scope Sauna electrical Secondary distribution systems Send receiving devices for systems under the Electrical Scope Service permanent
15. Fee Schedule In the event that the Subcontractor Sub subcontractor lodging the complaint is located where a SBDI Branch does not exist he may deliver the required letter and fees to a person of trust as designated by the SBDI Authority If possible the Subcontractor Sub subcontractor must be contacted and advised of the particulars of the complaint Reasonable opportunity to make representations shall be given Presentation in writing may be made to the SBDI Authority or their designate within the time frame available to the Committee Any representations made by the Subcontractor Sub subcontractor shall be considered along with the examination of all other relevant information under consideration by the SBDI Authority If the complaint is upheld and the Subcontractors Sub subcontractors bid is found to be in contravention of the SBDI User s Manual the SBDI Authority may declare the tender to be disqualified All SBDI Authority decisions on Federal Projects must be reviewed by representatives of the Federal Contracting Authority prior to the Management decision being implemented The SBDI Authority shall notify the bidding General Mechanical Contractors of the disqualified Subcontractor Sub subcontractor as soon as reasonably possible A General Mechanical Contractor shall not enter into a contract with any Subcontractor Sub subcontractor whose tender has been disqualified or who has not submitted a tender through the Bi
16. J Priming to miscellaneous metals and structural steel as defined in Miscellaneous Metals and Structural Steel Scopes 6 Floor sanding and finishing on hardwood flooring 7 Pipe identification lettering color banding directional markers valve tags and glass covered color code charts and directories 8 Shop applied finishes to casework wood trims wood frames and wood doors when specified under Architectural Woodwork Section also priming and back priming to prefinished items 9 Specified prefinished and preselected colors such as grilles radiation ducts or units motors pumps etc 10 Touch up on prefinished mechanical or electrical equipment 11 Tambour wall coverings 12 Project site sign 13 Powder coating of structural steel and miscellaneous metals 72 Trade Scopes SBDI SPECIAL WALL COATINGS SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus Oshdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope l PERMANENT TYPE COATING SYSTEMS having the following distinguishing characteristics a Multi coat system producing a finished dry film thickness of not less than 250 microns with or without b Obtaining special decorative features by incorporating rock aggregate marble chips coloured ceramic granules sound absorbing particles reinforcing fibre glass e
17. blocks and mortar Only stone natural and artificial granite and terra cotta where used as a horizontal or vertical finish interior or exterior and where same is 39 7mm thick and over Weep hole devices masonry reinforcing excluding re bar Wire and similar materials parging of masonry cavity walls only if specified 2 Building in of miscellaneous metals supplied and placed in position by others 3 Cavity wall insulation complete with adhesive and trowel applied or membrane air vapour barrier or building paper as long as the insulation and the vapour barrier or building paper are installed as the masonry wall is erected and as long as masonry forms the exterior wythe of the cavity 4 Scaffolding equipment and hoisting for this trade only 5 Cleaning of masonry and clean up of our debris only 6 Concrete grout or loose fill sand and or insulation and Foam Fill insulation in masonry only 7 Waterproofing exterior masonry facing with clear waterproofing 8 Expansion and control joints in masonry 9 a Supply all through wall flashing except precouloured flashing b Install all through wall flashing 10 We will co operate and advise on the placing of temporary bracing 11 We will place loose rebar in masonry walls 12 Any patching and toothing clearly shown on the Architectural and Structural drawings shall be the responsibility of the Masonry Contractor 13 Supply and install precast concrete band courses coping si
18. power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 Installation of all hardware except auto openers closers as described in Included Item 20 2 Electrical Hook up or connection of Alarms Locks Magnets Strikes Detectors or Magnetic Holders and Door Closers 3 Custom made handrail Brackets Kick Push and Pull Plates and Bars Thresholds or Sills 4 Window Hardware 5 Hardboard Arborite Plastic Laminate PVC Kick plates and Push plates when they are to match the Wall Protection that is specified 6 Cabinet Hardware 7 Wood Locker Hardware 8 Overhead Door Hardware 9 Number not used 10 Sliding Door and Hardware Package 11 Folding Door and Hardware Package 12 Aluminum Sliding and Automatic Door Hardware 13 Aluminum Door Hardware 14 Metal Toilet Partition Hardware 15 Smoke and ionization detectors Wall or Ceiling Mounted that are not part of the door closer holder unit 16 Mail Chutes or Holding Units 17 Surface mounted wood or plastic laminated push pull or guard bars for aluminum wood or metal doors or sidelites 18 Door signs nameplates or numbers 19 Weld on hinges supplied complete with steel drywall frame 20 Supply of all wire for electronic hardware 21 Fastening devices used to install millwork to walls or floors 22 Cutting of tactile cues to handrail unless dimensions are provided by
19. 1 4 4 2 4 4 3 4 4 4 4 4 5 4 4 6 4 4 7 4 4 8 4 4 9 4 4 10 4 4 11 4 4 12 4 4 13 4 4 14 4 4 15 Each Subcontractor or Sub subcontractor listed under the Trade Scope Definitions shall bid through the Bid Depository see Rule 3 2 2 Each Subcontractor or Sub subcontractor shall file their bid vvith the Goods and Services Tax GST NOT included in their price a On First Nations projects each Subcontractor and Sub subcontractor shall file their bids with Provincial Sales Tax PST NOT included in their price The price submitted shall be considered to be the net price Provincial Sales Tax PST shall be considered as an extra to the tender Number Not Used Number Not Used It is the responsibility of Subcontractors and Sub subcontractors to acquire the names of the General Mechanical Contractors tendering on the project A separate price must be listed for each complete Trade Scope A lump sum combined price may be quoted for two or more complete Trade Scope sections listed under Trade Scope but only if a separate price has been quoted for each trade scope section Number Not Used If non scope trade sections are quoted they must be quoted as separate prices A Trade Scope and non scope price cannot be used to form a combined price When a product or system is the exclusive franchise of one party entitled to bid and such product or system is specified with no equivalent or alternate being accepted then Rule
20. 1 4 1 The purposes of the Saskatchewan Bid Depository Incorporated are 1 To establish a system to improve tendering practices in the construction industry 2 To protect the sanctity of bidding by making provision for the reception of sealed tenders from Subcontractors and Sub subcontractors and the delivery of firm quotations in writing to General Contractors 3 To provide adequate time for General Contractors to compile their bids completely and accurately on the basis of firm written quotations 4 To provide procedures for the handling of bids which are in the best interest of Owners Architects Engineers and Contractors SASKATCHEWAN BID DEPOSITORY INCORPORATED 1 5 1 The Saskatchewan Bid Depository will be administered by a Provincial Board of Directors made up of representatives of the Construction Associations and the Industry 1 5 2 The Board of Directors is made up of the following representatives Saskatoon Construction Association two Regina Construction Association two Moose Jaw Construction Association one Prince Albert Construction Association one Saskatchewan Association of Architects one and a Chairman elected at large SBDI BRANCH MANAGEMENT COMMITTEES 1 6 1 At each location where a Bid Depository exists there is an SBDI Branch Management Committee consisting of at least three members of the local Construction Association This Committee shall pursuant to the SBDI User s Manual arbitrate
21. 4 4 6 shall be construed to mean all other items excluding such exclusively franchised products or systems Such exclusively franchised products or systems then become in effect a separate item which is bid separately through the Bid Depository Number Not Used Where an item falls within a Trade Scopes specification section that item will be picked up by that Trade Scope unless it falls within another Trade Scope or is specifically excluded by that Trade Scope All Bids shall remain open for a period of 15 calendar days beyond the acceptance period as required by the tender documents for the General Contractor If alternate prices and or separate prices and or unit prices are called for in the tender documents they shall be submitted through the Bid Depository Alternate prices and or separate prices and or unit prices not requested in the tender documents must be submitted through the Bid Depository These alternates would not be considered to be outside the Trade Scope Definitions and therefore must be shown as deletions and or additions to the base price and may be part of a combined price 1 If alternate prices and or separate prices and or unit prices are disqualified or withdrawn such a ruling will not be used to invalidate the base price 10 4 4 16 4 4 17 4 4 18 4 4 19 4 4 20 4 4 21 4 4 22 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca 2 If the base pric
22. 8 Welding stucco parging or finish plastering 9 Demolition 10 Building layout levels and dimensions 11 Brick and concrete pavers 12 Fire stopping materials other than masonry 13 Acoustical insulation NOTE Manhole blocks or bricks shall be quoted as a separate price 32 Trade Scopes SBDI STRUCTURAL STEEL SCOPE Saskatchewan Bid Depository Inc Page 1 of 3 contactus Oshdi ca Revised 2005 www sbdi ca A tender to supply and erect structural steel made from ferrous metal only 14 GA and heavier for any building shall include only those items from the following list which are clearly indicated to be required by the plans and specifications available at the time bids are required This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope 1 Anchors for structural steel 2 Base or bearing plates and bearings for structural steel 3 Beams purlins grits 4 Bracing for steel members trusses or frames 5 Cables for permanent bracing 6 Canopy steel framing roof overhang structures or entrance canopies when attached to the structural steel frame supported by a column s or free standing 7 All columns except as noted in Miscellaneous Metals Scope Included Item 31 2 8 Conveyor galleries and supporting bents exclusive of conveyer stringers deck plate and supporting posts which are normally part of the
23. BRANCH SUBCONTRACTOR DROP OFF ONLY c o Chamber of Commerce Box 1000 North Battleford SK S9A 3E6 Telephone 306 445 6226 Fax 306 445 6633 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca 1 0 RULES AND REGULATIONS 1 1 1 2 1 3 1 4 1 5 1 6 ORGANIZATION AND PURPOSE The Bid Depository System was formally organized in 1966 in Saskatchewan The System was first adopted in 1955 and 1956 in Canada to provide the Construction Industry with a uniform and practical system for Subcontractors to submit their tenders to the General Contractors In Saskatchewan there are four local Bid Depositories which operate under the management of the applicable Construction Association as well as two drop off locations The cost for the operation of the System which includes administration and the printing of the envelopes is offset by the sale of the standardized envelopes to those using the System on the various projects specifying the Bid Depository System The System is generally accepted by all levels of Municipal and Provincial Governments as well as the design profession other owners and tendering authorities NAME 1 2 1 The company shall be known as the Saskatchewan Bid Depository Incorporated SBDI PLACE 1 3 1 The Saskatchewan Bid Depository Incorporated may operate a Bid Depository at each place in Saskatchewan where there is a Construction Association PURPOSES
24. EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified E e a Rh a pi Rh a EAM Temporary heat light povver sanitation Water Hoarding Final Cleaning Temporary Shoring of Floor Deck Structural Framing Bearing Plates Steel Fillers between Deck and supporting members All angles channels plates supplementary deck support or anchorage Deck reinforcing that must be welded to structural members such as beams columns joists Cutting of those holes not marked by respective trade or not structurally reinforced at the time of deck installation Shear studs All fire stopping materials Metal deck or siding when not attached directly to structural steel 36 Trade Scopes SBDI MISCELLANEOUS METALS SCOPE Saskatchewan Bid Depository Inc Page 1 of 4 contactus Oshdi ca Revised 2005 www sbdi ca A tender to supply and install where noted on tender F O B jobsite Miscellaneous Steel Ferrous Metal only fabricated from 14 GA and heavier steel including galvanizing and cadmium plating and chrome plating for items custom fabricated by this trade only but no stainless steel cast iron and aluminum items Miscellaneous metals are to be bid supply only Any installation is to be bid as a separate item The Miscellaneous Metals Scope does not supply any Brand Name items i e purcha
25. Mechanical Contractors and the Tendering Authority of the withdrawal and confirm same in writing see Appendix Il Fee Schedule Where a combined price is submitted and the price for one Trade Scope section is withdrawn the combined price must be withdrawn or if the combined price is withdrawn at least one separate price must also be withdrawn When the single bid rule 4 9 1 or 4 9 2 has been applied and a tender has been received through the Bid Depository which is subsequently withdrawn that bidder will be ineligible to re bid that Trade Scope RULES PROCEDURES FOR GENERAL MECHANICAL CONTRACTORS 4 8 1 General Contractors should list with the SBDI Authority at least 5 working days prior to the General Contractor closing and must indicate at least 5 working days prior to their closing if any which scopes will be done by their OWN FORCES see Appendix IX Confirmation Letter Mechanical Contractors should list with the SBDI Authority at least 3 working days prior to the Mechanical Contractor closing and must indicate at least 3 working days prior to their closing if any which scopes will be done by their OWN FORCES see Appendix IX Confirmation Letter 13 4 9 4 10 4 8 2 4 8 3 4 8 4 4 8 5 4 8 6 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca A General Mechanical Contractor need not accept the lowest tender received but shall not carry i
26. PLASTER AND STUCCO SCOPE DRYWALL SCOPE DEMOUNTABLE PARTITIONING SCOPE TILE TERRAZZO MARBLE AND GRANITE SCOPE SEAMLESS FLOORING SCOPE ACOUSTIC TILE AND SUSPENSION SYSTEMS SCOPE RESILIENT FLOOR COVERINGS SCOPE CARPETING SCOPE PAINTING SCOPE SPECIAL WALL COATINGS SCOPE ELEVATORS SCOPE ESCALATORS SCOPE DUMBWAITERS SCOPE MOVING WALKWAYS SCOPE MECHANICAL SCOPE ELECTRICAL SCOPE YEAR REVISED 2011 2001 2011 2005 3 3 3 4 3 5 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca The Bid Depository shall be used for the calling of tenders for Mechanical Contractors Sub subcontractors as follows AUTOMATIC TEMPERATURE CONTROLS SCOPE 2006 INSULATION SCOPE 2005 SPRINKLERS FIRE PROTECTION SCOPE 2001 INCINERATORS AND CHIMNEYS SCOPE FABRICATED OR CONSTRUCTED ON SITE 2001 3 2 3 Bids will be based on Trade Scopes as defined in Rule 3 2 2 Notwithstanding Conditions Pre Tender Rulings as defined in Rule 4 2 and the tender documents as accepted by the SBDI Authority CLOSING TIME FOR BIDS NOTE All time periods are working days 3 3 1 When the Bid Depository is used for the calling of tenders for Mechanical Contractors Sub subcontractors such bids shall close at the SBDI Authority one working day in advance of the closing time for the Mechanical Contractor SUBCONTRACTOR CLOSING TIME SUB SUBCONTRACTOR CLOSING TIME 14 00 Monday 14 00 preceding Friday 14 00 T
27. SOON sl Nis Ko ES Mechanical and exothermic couplers gt Inserts and adhesive anchors 11 Any bolts and washers When fabricator places rebar and welded wire mesh they shall INCLUDE 1 Placing accessories tie vvire cadyvelds and burrard couplings 2 Clean up 3 Unloading 29 Trade Scopes SBDI Saskatchewan Bid Depository Inc REBAR SCOPE contactus sbdi ca Page 2 of 2 www sbdi ca EXCLUDE 1 Temporary heat light power and sanitation 2 Water 3 Hoarding 4 Hoisting 5 Pile rebar 6 Greasing and placing of smooth dowels 7 Placing of masonry rebar 8 Placing of sidewalk and curbs Trade will provide an approximate quantity take off of reinforcing and welded wire mesh for evaluation of installation costs only 9 Placing of dowels from slabs or beams to precast or masonry 10 Placing of post tensioning cable anchorage zones reinforcement and post tensioning supports NOTE Post tensioning cables accessories and supports are not part of this scope 30 Trade Scopes SBDI MASONRY SCOPE Saskatchewan Bid Depository Inc Page 1 of 2 contactus Wsbdi ca Revised 2011 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED ils Bricks clay brick slices if specifically in the Masonry Section clay fluelining clay tile concrete blocks glass
28. and convenience outlets sanitation or as specified Movable demountable partitions grilles or shutters Surface mounted wood plastic or plastic laminated push pulls or guardrails Cylinders and masterkeying o SS Sun screens bird screen guard screens 50 Trade Scopes SBDI ENTRANCE AND STOREFRONTS SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus sbdi ca 5 Insulation within framing supplied and erected by others baca 6 Structural steel except as noted in Included Item 10 T Hollow metal doors or pressed steel frames 8 Temporary heat light power sanitation 9 Hoarding 10 Water 11 Final cleaning 12 Electrical hook up of electric strikes and automatic power operated doors 13 Demolition 14 Roof and parapet flashing G I Type 51 Page 1 of 1 Trade Scopes SBDI ARCHITECTURAL ALUMINUM WINDOWS SCOPESaskatchewan Bid Depository Inc contactus Oshdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specificall y noted otherwise in this Scope DEFINITION Windows within a floor span INCLUDED l Spandrel and infill panels of any material including insulation where it forms an integral part of a panel 2 Single glazing double or multiple glazing 3 Sill and miscellaneous related aluminum trim which forms an integral part of the window system 4 All anchoring devices which
29. are part of the framing anchors or inserts supplied only when are part of the structure 5 Venetian blinds when between glass 6 Fly screens to vents T Supply and installation of operating hardware 8 Stiffeners 9 Caulking back up road and perimeter insulation exterior and interior 10 Aluminum guard rails where they are an integral part of the window installation only of rails other than aluminum attached to the windows 11 Insulation within the windows 12 Cleaning between double and multiple glazing 13 All contingency funds specifically called for in the Special Windows specification 14 Clean up of own debris by own forces 15 Shop drawings 16 Protection of other trades work from damage by this trade 17 Scaffolding 18 Relocation of existing material EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified A O o ee Rh N Interior wood sills or surrounds Sunscreen bird screens guard s screens Insulation within framing supplied and erected by others Structural steel Pressed steel frames or steel sash Name brand windows Temporary heat light power sanitation Hoarding Water Final cleaning Demolition Roof and parapet flashing G I Type 52 Trade Scopes SBDI ARCHITECTURAL FINISHING Saskatchevvan Bid Depository Inc HARDWARE SCOPE
30. as a result of this trade Roof membranes on the inside of roof top mechanical curbs EXCLUDING Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified QO ON JU is Do Ng E 10 11 12 13 14 Temporary heat light power sanitation Water Hoarding Final Cleaning Metal sleeves through decks for openings for vents etc Roof drains connected to an internal system Separate curbs for skylights hatches etc Flashings for roof drains and vents all flashings and membranes used for air or vapour seals which do not form part of the roof system or which are not installed in conjunction with and during the construction of the roof system Fillers and vapour seals and air seals Delete Inspection and or testing Testing 14 ga and heavier gutters and downspouts Insulation and wood coverings on parapet wall construction 42 Trade Scopes SBDI SHINGLE ROOFING AND Saskatchevvan Bid Depository Inc RELATED SHEET METAL SCOPE contactus sbdi ca Page 1 of 2 www sbdi ca Revised 2001 This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope Roof and or Walls All the following are to be INCLUDED as they relate to AMES 10 11 12 13 14 15 16 17 18 19 20 Wood
31. controls which must Be intended for equipment whose main purpose is to affect the temperatures humidity or pressures within a building and 2 Produce these changes automatically and 3 Include all items in the Automatic Temperature Control Scope Provided however that if the controls directly switch the power lines to the equipment the wiring of such controls to remain the responsibility of the electrical contractor SUB TRADES TO THE MECHANICAL CONTRACTOR a Automatic Temperature Controls through Bid Depository as per sub sub regulations b Insulation through Bid Depository as per sub sub regulations c Sprinklers through Bid Depository as per sub sub regulations d Incinerators and chimneys fabricated or constructed on site Each tender in each section shall include and exclude applicable items regardless of where they may appear in the tender document unless specifically noted otherwise in this Scope 79 Trade Scopes SBDI Saskatchewan Bid Depository Inc MECHANICAL SCOPE contactus Wsbdi ca Page 2 of 7 www sbdi ca SECTION 1 GENERAL MECHANICAL TERMS INCLUDED 1 The mechanical contractor shall include contingency funds specifically called for in the mechanical specifications 2 In renovated areas capping disconnect and removal of ALL mechanical items as defined by the Scope 3 All services and service charges gas water sewer as levied by the town city or Utility Company 4 Fu
32. conveyor assembly 9 Crane rails and stops 10 Door frames constituting part of the steel frame 11 Expansion joints connected to the steel frame excluding trade name items Floor plates roof plates checkered or smooth and steel grating connected to the steel frame 12 Girders 13 Grillage beams of steel 14 Hangers supporting structural steel if attached to the steel frame 15 Lintels as detailed or specified if attached to structural steel 16 Monorail beams of standard structural shapes 17 Open web joist bridging and steel deck support steel including supply only of embedded bearing plates and embedded deck plate or angle supports 18 Sag rods forming part of the steel frame 19 Separators angles tees clips and other detail fittings essential to steel frames 20 Shear connectors for composite beams supplied and installed in shop or fields 21 Shelf angles attached to structural steel only 27 Shop drawings 23 Shop fasteners or vvelds and fasteners required to assemble parts for shipment 24 Shop preparation and or priming 25 Walkways when attached to structural steel frame work 26 Trusses 27 All contingency funds specifically called for in the structural specifications 28 V Rib 29 Struts 30 Structural supports for roof mounted equipment attached to structural steel and shown on structural or architectural drawings 33 Trade Scopes SBDI STRUCTURAL STEEL SCOPE Saskat
33. it was approved Number Not Used Number Not Used Number Not Used GENERAL MECHANICAL CONTRACTORS 4 3 1 4 3 2 4 3 3 4 3 4 Each General Mechanical Contractor who intends to bid on a project should give notice in writing to the SBDI Authority of their intention to bid General Contractor not less than 5 working days prior to the General Contractor closing and Mechanical Contractor not less than 3 working days prior to the Mechanical Contractor closing see Appendix IX Bidder Confirmation Letter Penalties as per Appendix Il shall apply if notice provisions are not adhered to All subcontractor sub subcontractor prices received will be handled as per SBDI Rule 4 5 1 Missed Bids An SBDI Branch upon request will provide the names of the General Mechanical Contractors who have advised the SBDI Authority of their intention to bid any particular project Each General Mechanical Contractor shall pay a fee to receive the SBDI Bid Package see Appendix Il Fee Schedule If a General Mechanical Contractor fails to give the SBDI Authority 2 working days notice prior to Subcontractor closing of their intention to withdraw the General Mechanical Contractor is liable for the payment of the SBDI Bid Package fee see Appendix Il Fee Schedule 4 4 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca BID PROCEDURES FOR SUBCONTRACTORS AND SUB SUBCONTRACTORS 4 4
34. materials and equipment under this Section Excavating etc for work under this Section Permits as required under this Section Manufacturer s warranty only beyond the normal one year warranty as required under this Section E E i Protection of other trades work from damage by this trade Trade clean up Rh ua Wet and dry stand pipes complete with siamese connections and all connected hand hose cabinets and equipment including portable hand extinguishers where an automatic sprinkler system is specified as part of the project They shall EXCLUDE the following Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Water service from source to meter location mechanical contractor or supply flanged connection 2 Wet and dry pipe standpipes complete with siamese connections and all connected hand hose cabinets and equipment including portable hand extinguishers where an automatic sprinkler system is not specified as part of the project 3 Temporary heat light sanitation and vvater Hoarding 5 Final cleaning 90 Trade Scopes SBDI INCINERATORS AND CHIMNEYS SCOPE Saskatchevvan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2001 www sbdi ca FABRICATED OR CONSTRUCTED ON SITE SUB TO MECHANICAL This tender shall include a complete installation as per plans specificati
35. necessary for the bidder to give the same price to all General Mechanical Contractors but the SBDI Authority and the SBDI Delivery Branch must have a copy of each of their different bids given to the General Mechanical Contractors Number Not Used The Subcontractor shall deliver their SBDI envelopes to a SBDI Delivery Branch prior to the closing time The Sub subcontractor shall have the option 1 To deliver their SBDI envelopes to an SBDI Delivery Branch Moose Jaw Prince Albert Regina or Saskatoon only Sub subcontractor envelopes will be opened at the SBDI Delivery Branch and faxed to the SBDI Authority for distribution to Mechanical Contractors 2 To deliver directly to the SBDI Authority for distribution to Mechanical Contractors Number Not Used Only those bids received through the Bid Depository in official SBDI envelopes and addressed to a specific Contractor shall be considered legitimate and given consideration Late bids will not be accepted 11 Rev 2014 Rev 2014 4 5 4 6 4 4 23 4 4 24 4 4 25 4 4 26 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca Emailed faxed hand delivered amendments to a tender will be accepted if they are received prior to the established closing time and addressed to specific Mechanical Contractors General Contractors It is the responsibility of those making such amendments to ensure that they have been received by the SB
36. paints h Mastics which are applied in same manner as paints i Hypalon which are applied in same manner as paints Number not used k Epoxy paints 3 Application using pastes or adhesives of a Paper b Cottons c Muslin d Burlaps e Damasks f Grass cloth g Vinyl wall fabrics h Cambric back wood veneers i Paper back metal foils INCLUDED Clean up 5 Protection of other trades work from damage by this trade 6 Guarantee 7 Inspection 8 Shop drawings 9 Scaffolding 10 Hoisting 11 All contingency funds specifically called for in the specifications 12 Painting of a Site paving lines curbs directional symbols b Site hoarding barriers c On site mechanical and electrical items which are specified to be painted d Painted graphics and super graphics e Patch and repair of minor imperfections in existing painted surfaces i e cracks peeled paint small dents holes etc Trade Scopes SBDI PAINTING SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus Oshdi ca www sbdi ca f Painted lines markers borders on finished concrete floors excluding resilient and hardwood floors g Signage painted on walls and doors EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 Temporary heat light power sanitation 2 Water 3 Hoarding 4 Final cleaning
37. sanitation or heavier So Oy u j Ga a Rh j Rh a P O qP 15 16 17 18 Sanding of standing or running trim other than drum sanding of flats Machining of doors to receive hardware See exemption for ULC rated doors in A Included Item 7 Exterior stairs landings or fence and sidewalk materials Trade name windows screens frames or outside trim for same Overhead garage type doors or glass and hardware for same wood frames and trim supplied knocked down where detailed Patented or trade name specialty folding or sliding doors Wood frames and trim where specified and detailed Caulking or door weather stripping Structural framing material rough bucks can t strip furring strips nailing strips or blocking Contingencies unless specified under Architectural Woodwork Cutting of holes for metal grilles for sinks or for mechanical and electrical fittings into millwork fixtures Chalkboard whiteboard or tackboard Mirrors Hardwood or softwood flooring RE Additions and or renovations to existing buildings No materials will be supplied for patching repairing extending or replacing work unless specified or detailed Hardware or installation or machining for same see A Included Item 7 Painting acid proofing fire proofing or preservative treatment See A Included Item 14 Plastic metal or fibreboard letters Plastic skylights or domes 48 Page 3 of 3 19 20 21 22 23
38. standard 4 Drymop systems and central vacuum cleaning systems 9 Medical gas systems piping and permanently connected equipment 6 Piping and connections only to automotive hoists 7 Mechanical to connect services only to medical and mortuary equipment such as sterilizers autopsy tables 8 Water treatment and all associated piping meters tanks pumps filters softeners 9 Prefabricated septic tanks of all types also supply and install fittings and piping for those poured in place 10 Cast iron catch basin and manhole covers trade name gratings sump frames and covers when specified or detailed on mechanical drawings 11 Weeping tile for sewage disposal systems only 12 Leeching lines for sewage disposal systems including backfill of gravel straw and loan to provide a complete installation for field to finish grade 13 Flashings for roof drains floor drains and vents 14 Soap dispensing systems complete with piping tanks 15 Laboratory sinks faucets and gas outlets where specified in Division 15 16 Factor shower cabinets or surrounds complete with manufactured receptors and curtain rods or doors 17 Supply and installation of preformed counter and vanity tops incorporating molded sinks hand basins 18 Molded tubs 19 Vitrified pipe 20 Refrigeration compressors liquid receivers thermal expansion valves refrigeration piping related refrigeration controls direct expansion refrigeration coils in built up or a
39. tender documents see Appendix VII Bidder Request Form b Notwithstanding Conditions must receive prior approval from the SBDI Authority c The SBDI Authority must receive requests for Notwithstanding Conditions within a realistic time for the SBDI Branch Management Committee to address the request and meet the 2 day addenda rule see Rule 4 1 4 d A Notwithstanding Condition takes precedence over the Trade Scope Definitions 4 3 4 2 2 4 2 3 4 2 4 4 25 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca e A Notwithstanding Condition shall apply only to the project for which it was approved f A Notwithstanding Condition may only be used to temporarily amend SBDI Trade Scope Definitions and shall have no influence or effect on the SBDI Rules and Regulations PRE TENDER RULINGS a When the Tendering Authority and or the bidder require clarification of the tender documents relative to the Trade Scope Definitions as set out in Rule 3 2 2 they may do so by means of a Pre Tender Ruling Addendum see Appendix VII Bidder Request Form b Pre Tender Rulings must receive prior approval from the SBDI Authority c The SBDI Authority must receive requests for Pre Tender Rulings within a realistic time for the SBDI Branch Management Committee to address the request and meet the 2 day addenda rule see Rule 4 1 4 d A Pre Tender Ruling shall apply only to the project for which
40. that represent name of Firm and as such am the legal agent and have authority to sign for and on behalf of said firm for this purpose and have complete and personal knowledge of all contents referred to and am authorized to make this declaration and submission declare and acknowledge that am familiar with and understand the SBDI User s Manual and agree to adhere to and at all times be bound by those rules and regulations and the terms of this declaration Further agree subject to any appeal which might be provided for in the SBDI User s Manual to be bound by the reasonable decisions of the SBD Authority regarding compliance with the SBDI User s Manual and adjudication on disputes and complaints The SBDI Authority may levy any and all sanctions and awards as the SBDI User s Manual prescribes This declaration is applicable only to those General Mechanical Contractors to whom we have submitted tenders on this project CHECK ONE MAILING ADDRESS OF FIRM Ll SUBCONTRACTOR TO GENERAL Ll SUB SUBCONTRACTOR TO MECHANICAL SIGNATURE OF AUTHORIZED AGENT PHONE FAX 20 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Wsbdi ca www sbdi ca APPENDIX IV TENDERING AUTHORITY ADDENDA CONFIRMATION DATE NAME OF FIRM ATTENTION PROJECT SUBCONTRACTOR CLOSING DATE GENERAL CONTRACTOR CLOSING DATE With reference to the above project received at the SBDI Branch on be
41. 0 The electrical contract will not be limited to items listed below but will include all electrical wiring systems and equipment except mechanical control wiring and other miscellaneous items specifically noted as falling under other sections of scope Generally any item that is to be installed by the electrical trade shall also be supplied by the electrical trade Where equipment is not supplied by the electrical trade electrical services are to be roughed in as shown on tender documents Suppliers of specialty items cabinets or equipment if other than the electrical trade will be responsible for any alterations of services required if these differ from the tender documents The electrical contractor shall include the following items regardless of where they may appear in the tender document unless specifically noted otherwise in this Scope INCLUDED 1 Access panels for walls ceilings and floors where required for electrical requirements to be supplied to respective trade for installation e g to ceiling contractor etc Alarm and detection systems for systems under the Electrical Scope Appliances electrical requiring a permanent electrical connection only Balancing for systems under the Electrical Scope Batteries for systems under the Electrical Scope Battery chargers for systems under the Electrical Scope Burglar alarm systems Buss Duct E ee er ty Cables electrical and heating Cable tr
42. 24 25 26 21 28 29 30 Trade Scopes SBDI ARCHITECTURAL WOODWORK SCOPE Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca Trade name fixtures trade name casework or countertops to same Supply or installation of glass for storefronts full glazed walls interior wood frames or partitions and vestibule frames Glass glazing or glass and glazing hardware to display cases Metal door grilles Flex wood Wood frames to prehung metal door units Natural stone concrete cultured marble tile and quartz Fastening devices used to install millwork to walls or floors Cutting of tactile cues to handrail unless dimensions are provided by the General Contractor in a timely fashion Metal handrail brackets Metal covering of shop fabricated Millwork items Site measurements 49 Trade Scopes SBDI ENTRANCE AND STOREFRONTS SCOPE Saskatchevvan Bid Depository Inc Page 1 of 2 contactus sbdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 Architectural aluminum doors including sliding doors complete with all hardware All components for complete installation of automatic doors except as provided under Curtainwall Scope 2 Framing 3 Handicapped operating devices which are an integral part of aluminum entrances 4 Glazing 5 Infill panels o
43. 25 MISSED BIDDING LETTER APPENDIX VII 26 GENERAL MECHANICAL CONTRACTOR CONFIRMATION LETTER APPENDIX IX ij 27 17 Users Manual ANA Saskatchewan Bid SH STANDARD TENDER FORM vini TENDER TO PROJECT FIRM NAME ADDRESS TELEPHONE FAX EMAIL We are pleased to submit our tender for the following SBDI trade scope s Combined Price if applicable ALTERNATES SEPARATE 8 UNIT PRICES Deduct from Price Add to Price Use another sheet if necessary PC SUMS CASH ALLOWANCES AND OR CONTINGENCY FUNDS INCLUDED This tender has been prepared using the following listed Sub subcontractors if applicable For SBDI Rules regarding PST on First Nations projects please refer to rule 4 4 2 in the SBDI manual This tender is submitted in accordance with the tender documents and current SBDI User s Manual SIGNATURE DATE 18 Users Manual SBDI APPENDIX II FEE SCHEDULE Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca 10 FEES ENVELOPES Member Non Member SUBCONTRACTOR ENVELOPES Large Envelopes each 20 00 50 00 Small Envelopes each 1 00 4 00 SUB SUBCONTRACTOR ENVELOPES Large Envelopes each 20 00 50 00 Small Envelopes each 1 00 4 00 2 0 FEE BID PACKAGE PICK UP FEES General Contractors 40 00 100 00 Mechanical Contractors 10 00 40 00 3 0 BID DEPOSITORY MANUALS 10 00
44. 3 8 inch Supply and installation of Acoustic Ceiling Grid when used as trim for Radiant Panels and or lights in drywall assemblies Trade Scopes SBDI DEMOUNTABLE PARTITIONING SCOPE Saskatchevvan Bid Depository Inc Page 1 of 2 contactus sbdi ca Revised 2007 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope DEFINITION Demountable readily dismounted and re erected using prefinished component parts INCLUDED l Steel Stud framing for demountable partitions 2 All prefinished components and accessories for demountable partitions including aluminum and plastic frames battens base and ceiling trim which are part of the demountable manufacturer s system e g Westroc Idar Partition Systems Inc 3 Aluminum door and window frames for use in demountable partitions 4 Sound insulation for demountable partitions 5 Supply and installation of glass in aluminum frames which is incorporated in Demountable partition system 6 All contingency funds called for in prefinished demountable partitions specifications J Shop drawings if required 8 Scaffolding for partition work 9 Clean up 10 Where matching perimeter prefinished panels and or trims are specified on a project this will be supplied and installed by the demountable contractor 11 Sheet lead where required for X ray or sound attenu
45. 51 2 Automatic temperature controls shall mean controls which must a be intended for equipment whose main purpose is to affect the temperatures humidity and pressures within a building and b produce these changes automatically and c include all items in the Automatic Temperature Control Scope Provided however that the controls do not directly switch the power lines to the equipment the wiring of such controls to remain the responsibility of the electrical contractor 97
46. Asphalt Concrete Roof Metal Roof Slate Shingles VVVVV Adhesives Cants of roof insulation materials Caulking compounds Flashings of all types of materials when they form part of the roof system and are installed in conjunction with and during the construction of the roof system When any type of metal flashing eavestrough downspouts and accessories are to match any prefinished metal siding metal roofing fascia soffits or wall systems all metal flat or coiled flashing eavestrough downspouts and accessories is to be supplied to the roofing contractor by others F O B roofing contractors shop The forming and installation is to be included under this item including prefinished material if required under Item 6 If no prefinished metal siding is incorporated in the project all prefinished roof flashing by this trade Gum pots to be filled only when roofing crews are on site Gutters downspouts and metal splash pans when directly connected to Shingle Roofing 16 ga and lighter Sandwich systems of roofing includes vapour barrier to existing deck layers of insulation strapping covering for insulation plywood OSB etc Overhang framing fascia and soffits not included Sealant and sealing compounds Gypsum board when applied over a roof deck as part of the roofing system Vapour retardant Hoisting All contingency funds specifically called for in the Shingles Specifications Trade clean up Protection of other t
47. DI Authority Branch Tenders shall not be altered or amended in any way after the Bid Depository closing time If a Subcontractor or Sub subcontractor deviates from varies or fails to comply with any of the provisions of the SBDI User s Manual relating to their tender and has thereby in the opinion of the SBDI Authority gained an unfair advantage over their competitors their tender shall be disqualified RULES MISSED BIDS 4 5 1 4 5 2 4 5 3 4 5 4 4 5 5 When a Subcontractor Sub subcontractor has missed bidding to a General Mechanical Contractor they shall advise the SBDI Authority in writing not later than 4 hours prior to General Mechanical Contractor closing Subsequently the SBDI Authority will confirm the missed bid by forwarding a copy of a bid as received by the SBDI Authority to the General Mechanical Contractor The missed bid will be confirmed in writing to the SBDI Authority using Appendix VIII Missed Bidding Letter in the following manner We missed bidding to BLACK CONSTRUCTION on ABC HIGH SCHOOL Please consider our bid addressed to WHITE CONSTRUCTION as if it were submitted to BLACK CONSTRUCTION SIGNED Subcontractor This notice must be received not later than 4 hours prior to the General Mechanical Contractor closing The SBDI Authority shall forward to BLACK CONSTRUCTION confirmation of the price submitted to WHITE CONSTRUCTION There will be a fee for missed bidding s
48. E Saskatchewan Bid Depository Inc contactus Oshdi ca b j i Wood and plastic laminate toilet partitions complete with necessary hardware Brand names excluded mle 19 Wood display cases To site built wall mounted or recessed display cases supply only plastic laminate hardwood plywood and wood trim See B Excluded Item 21 20 Wood plastic or wood and metal tote drawers or trays in wood cabinets 21 Solid wood paneling moldings handrail etc supplied in lineal footage for decorative purposes Factory installed solid wood end caps where detailed to handrail 22 Hardwood plywood or Medium Density Fiberboard for wall or ceiling paneling Softwood or paper faced plywood only if edge is shop applied 23 Shop fabricated plastic laminate wall paneling and window stools Strapping sheathing installation not included 24 Decorative wood screens shop fabricated planter boxes complete with metal liners 25 Wood plastic laminate or metal foil tambour 26 Number not used 27 Slatwall and accessories where not specified elsewhere 28 Upholstery work where it occurs to shop fabricated items supplied under this Scope 29 Coat hooks where attached to or mounted on items supplied under this Scope 30 Metal support legs for countertops and vanities unless specified as 14 gauge or heavier EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets
49. I Branch Managers Responsibility a The SBDI Branch Management Committee is responsible to the SBDI Board of Directors Terms of Reference a To review all proposed changes to the SBDI Trade Scope Definitions b To suggest changes to the SBDI Trade Scope Definitions c To invite delegations for the purpose of Discussing individual trade scopes of work Hearing rationale for proposed changes to the SBDI Trade Scope Definitions d To establish subcommittees as required to study select areas of trade responsibility 4 0 RULES BID POLICIES AND PROCEDURES TENDERING AUTHORITY 4 1 4 2 4 1 1 4 1 2 4 1 3 Number Not Used The Tendering Authority will clearly define in the tender documents that the project is using the Bid Depository The project will close at the SBDI Authority as set out on the SBDI Boundary Map see Appendix VI Boundary Zone Map The Tendering Authority shall state at which SBDI branch the project will close Final addenda must be issued and received by 2 00 p m at the specified SBDI Authority not less than 2 working days prior to close of Subcontractor tenders see Appendix IV Tendering Authority Addenda Confirmation NOTWITHSTANDING CONDITIONS PRE TENDER RULINGS 4 2 1 NOTWITHSTANDING CONDITIONS a When the Tendering Authority wishes to deviate from the established Trade Scope Definitions as set out in Rule 3 2 2 they may do so by having a Notwithstanding Condition issued with their
50. OR CLOSING DATE 0 PRE TENDER RULING We require clarification to the SBDI User s Manual as follows Ll NOTWITHSTANDING We wish to deviate from the SBDI User s Manual as follows CONDITION Ll COMPLAINT VVe vvish to file a complaint against name of Firm as follovvs SBDI complaint fee of GST is attached see Appendix Il Fee Schedule SBDI rule s affected SBDI scope s affected Specification section s amp item s affected Our request is FOR SBDI AUTHORITY USE ONLY actions directions etc DATE amp TIME RECEIVED 24 Users Manual SBDI GN Saskatchewan Bid Depository Inc contactus Oshdi ca MISSED BIDDING LETTER www sbdi ca NAME OF FIRM PROJECT ESTIMATOR CONTACT We missed bidding to BLACK CONSTRUCTION name of general or mechanical firm on PROJECT Please consider our bid addressed to WHITE CONSTRUCTION name of general or mechanical already bid to as if it were submitted to BLACK CONSTRUCTION name of general or mechanical firm This notice must be received not later than 4 hours prior to the General Mechanical Contractor closing SIGNATURE DATE 25 Users Manual SBDI ARRENDIAIA Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca GENERAL MECHANICAL CONTRACTOR CONFIRMATION LETTER NAME OF FIRM PROJECT ESTIMATOR CONTACT PROJECT NAME CLOSING DATE
51. On Site 91 2010 ELECTRICAL SCOPE 92 Trade Scopes SBDI Saskatchewan Bid Depository Inc PILING SCOPE contactus sbdi ca Page 1 of 1 www sbdi ca Revised 2011 This Trade Contractor shall bid to the General Contractor through the Bid Depository for supply of materials and installation of all piles which include but not limited to the following Timber Steel Pipe Steel H Steel Screw Sheet Bored Precast Compacted Concrete CFA Auger Cast Displacement and Micro Piles INCLUDED 1 Supply of pile dowels and lag screws 2 Quality assurance testing of concrete unless covered by Cash Allowance 3 Pile driving and as built record 4 Drilling spoil removal and disposal De Steel bar list and concrete mix design 6 All P C and or Contingency Sums specified for this trade 7 Protection of other trades work 8 Where a foundation is designed by the piling contractor they shall assume responsibility for protecting adjacent services and or structures against damage caused by construction of the foundation piling system 9 Drilling and casing hydraulic elevator plunger hole s 10 Material and workmanship guarantees as specified 11 Full scale pile load tests when specified 12 Facilities and equipment for down hole inspection when specified 13 Cold weather concrete protection to grade elevation 14 Miscellaneous site piles detailed on Structural Drawings installed concurrent with main piles Add
52. S 50 2001 ARCHITECTURAL ALUMINUM WINDOWS SCOPE _____ln eect tee e eens 52 2013 ARCHITECTURAL FINISHING HARDWARE SCOPE ccc ccc cect e eee eee eee eee eee eee eennes 53 2001 GLASS AND GLAZING SCOPE 6 gg SANE Sede E d 55 2006 CURTAINWALL SCORE A ead Dae ooo Add ae aera eae 56 2007 LATH PLASTER AND STUCCO SCOPE ieee he ew Eta deeded aaa et 58 2005 DRYWALL SCOPE included Textured Finishes we ccc cece cece cece anrr eee eee eens 60 2007 DEMOUNTABLE PARTITIONING SCOPE di eure a Ae Se 62 2001 TILE TERRAZZO MARBLE AND GRANITE SCOPE ll eect ee eee 64 2001 SEAMLESS FLOORING SCOPE 2 han Fed Gated AA dea 66 2003 ACOUSTIC TILE AND SUSPENSION SYSTEMS SCOPE adm es kn kikat dk 67 2001 RESIDIENT FLOOR COVERINGS SQOPE da rri A wba awk vee 69 2001 CARPETING SCOPE d mtimi tk nd d h d A Soe PSG Shs Fees 70 2012 PRINTING SCOPE ski a beens Saya os Seay aid a dnde 71 2001 SPECIAL WALL CORTINES SCOPE a went ee Bee a amare ee 73 2001 ELEVATORS SCOPE asi ea keh rd rs dana ve 74 2001 ESCALATORS SCOPE See ku ke ee ey teed AA SOAS a irte 76 2001 DUMBWAITERS SCOPE enw eR eH Bea See ead ea LS Le ERED AERO SOG GS 77 2001 MOVING WALKWAYS SCOPE nd e EE e e ae 78 2005 MECHANICAL SCOPE INCLUDING aa hd e aS baa 79 2006 AUTOMATIC TEMPERATURE CONTROLS SCOPE __ 8 eee eect teens 86 2005 INSULATION SCOPE rr AA Seg ead ages 89 2001 SPRINKLERS FIRE PROTECTION SCOPE mem e 90 2001 INCINERATORS AND CHIMNEYS SCOPE Fabricated or Constructed
53. TEMPERATURE CONTROLS SCOPE Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca They shall EXCLUDE the following items regardless of where they appear in the Tender Documents Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified ITA AUS 2 Motorized dampers when specified as integral part of packaged equipment Automatic temperature controls when specified as integral part of packaged equipment Temporary heat light power sanitation Hoarding Water Final Cleaning Electrical wiring for controls which directly switch the power line to the equipment Directly shall mean not through magnetic coil Power wiring as outlined in Electrical Scope Included Item 57 Control power supply outlets as outlined in Electrical Scope Included Item 18 Fire alarm fan shutdown relays and wiring The following items will be INCLUDED by the mechanical Contractor TE DA O All direct reading thermometers and pressure gauges for the heating and cooling systems Self contained radiator control valves Self contained control valves domestic hot water control Self contained filter gauges Liquid level controls for sumps condensate pumps cooling towers and fuel storage tanks Thermostats not directly involving automatic temperature controls systems 88 Trade Scopes SBDI INSULA
54. TION SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2005 www sbdi ca SUB TO MECHANICAL THROUGH BID DEPOSITORY This tender shall include a complete installation as per plans specifications issued addenda and the Saskatchewan Bid Depository Rules and Regulations They shall INCLUDE the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in Scope 1 The insulation for a Plumbing piping vessels and equipment b Heating piping vessels and equipment c Cooling piping vessels and equipment d Refrigeration vessels and equipment e Breeching stacks and furnace flues f Emergency generator exhausts g Pneumatic tubing h Exterior insulation for incinerator breeching or stacks 1 Exterior duct insulation including exterior sound insulation e g Bary Fol Insulation finishes and weatherproofing Underground insulation conduits Hoisting for materials and equipment under this section Permits as required under this section Inspection as required under this section Manufacturer s warranty only beyond the normal one year warranty as required under this section Protection of other trade s work from damage by this trade Be Ge ON Ko Trade clean up gt Insulation above radiant ceiling panels active or non active They shall EXCLUDE the following regardless of where they may appear in the tender documents Temporary heat lig
55. ULC rated doors as per fire rated Door Machining Schedule provided by the millwork supplier and completed by the General Contractor Cut and stop wood doors for metal grilles Wood door frames borrowed light frames and sash fitted Wood access frames and doors Machining only of ULC rated frames as per rated door frame machining schedule provided by the millwork supplier and completed by the General Contractor Wood stairs shop assembled Notice or bulletin boards in wood frames Countertops including splashback no jobsite labour Substrate supplied only for metal covered and tile counter tops Does not include glue for jobsite installation see B Excluded item 25 and 29 Plastic laminate and fiberboard base and kickplates or surface mounted push pulls and guard bars brand name excluded Fireproof application on millwork items where specified pressure treated only Does not include sanding after treatment Factory finishing of casework wood trims wood frames and wood doors if specified Wood or plastic laminate faced cabinets lockers bookcases and laboratory fixtures complete with woodbase Wood or plastic laminate faced tables benches desks carrels and convector covers Swinging glass cabinet doors Supply and shop installation of all integral cabinet hardware specified Wall mounted wood or plastic laminate faced shelving complete with necessary hardware 47 Trade Scopes SBDI ARCHITECTURAL WOODWORK SCOP
56. ach to the steel stud during their erection Supply and installation of Security Mesh up to 9 gauge in drywall wall or ceiling assemblies 60 Trade Scopes SBDI DRYWALL SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus Oshdi ca www sbdi ca TEXTURE 1 Sprayed texture to drywall walls and ceilings and to concrete surfaces Included in this item are cementitious products used for stippling and acoustical cellufibre products 2 The supply and installation of concrete seal when specified 3 Primer coat if required with the product specified 4 Protection of other trades work from damage by this trade J Glitter if specified 6 Filling or caulking of joints where textured finishes are applied over precast concrete EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 13 14 15 16 17 18 19 20 21 Furring bar and or Z Bar for attachment of preformed metal siding fascia or roofing Re Included Item 1 Any steel stud framing or furring exclusively required for the installation of metal linear type ceiling systems Mineral fibre fire stop insulation or sheet metal fire stops installed at slab lines i e curtain wall precast etc Re Included Item 3 a Metal suspension systems for drywall or metal soffit finishes which are included in Acoustic T
57. ades Stair nosing fabricated types only Steel ladders and ladder rungs All steel stairs 31 1 All landings not attached to structural steel including all landings where the stair and landing are one i e shop fabricated piece 31 2 Columns which support Items 31 and 31 1 Table and counter legs frames and brackets mild steel fabricated only Thresholds and sills fabricated types only Vanity and valance brackets custom fabricated type only Weatherbars steel Any other fabricated item where clearly detailed or specified and made from 14 ga and heavier steel except where included by another trade scope Articulation channels not attached to structural steel Glulam saddles for masonry concrete or wood walls but not including glulam bolts and shear plates Steel framing for storefronts windows overhead doors and pressed steel frames where shown on drawings but not attached to structural steel Fan and lighting guards fabricated types only as detailed on Architectural and Structural drawings including those attached to structural steel Manufactured types excluded Lighting grids and brackets fabricated types only as detailed on Architectural and Structural drawings including those attached to structural steel Manufactured types excluded Posts not structural support when not attached to structural steel Steel brackets bolted only to structural steel to support rolling shutter doors Steel supp
58. all complaints and disputes 2 0 1 7 1 8 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca In adjudicating disputes and complaints as provided in this paragraph the SBDI Branch Management Committee may levy any and all sanctions and awards as the SBDI User s Manual prescribes 1 6 2 The local Construction Association may determine the rules and procedures for the appointment of members to the SBDI Branch Management Committee ADOPTION OF SBDI USER S MANUAL 1 7 1 Each SBDI Branch shall operate its Bid Depository in accordance with the SBDI User s Manual Rules Regulations amp Trade Scopes further known as the SBDI User s Manual 1 7 2 The SBDI Board of Directors may adopt rules and regulations from time to time which shall apply to every SBDI Branch AMENDMENT OF SBDI USER S MANUAL 1 8 1 Any amendments to the SBDI User s Manual should be supplied in writing using Appendix V CONDITIONS FOR USE OF BID DEPOSITORY 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 Where a Bid Depository of the SBDI is used for the calling of tenders for a project it shall be used for the calling of tenders for all of the trades listed in Rule 3 2 2 that are applicable to the project The SBDI Branch Management Committee shall have the exclusive right to inquire into hear arbitrate and levy all sanctions and awards and the action or decision of the SBDI Branch Management Committee provided
59. anch Management Committee investigating a complaint 14 5 0 4 11 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca RULES P C SUMS CASH ALLOWANCES AND OR CONTINGENCY FUNDS 411 1 If P C Sums Cash Allowances and or Contingency Funds are referenced in the bid documents specification sections the Sub Contractor Sub Subcontractor s shall include them in their tender 4 11 2 If P C Sums Cash Allowances and or Contingency Funds are referenced in the bid documents specification sections and the General Conditions the Sub Contractor Sub Subcontractor s shall include them in their tender 4 11 3 If P C Sums Cash Allowances and or Contingency Funds are referenced in the general conditions only the Sub Contractor Sub Subcontractor s shall not include them in their tender RULES COMPLAINTS 5 1 5 2 5 3 5 4 5 5 5 6 5 7 5 8 5 9 In the event of a complaint the members of the SBDI Authority Branch Management Committee or any official they designate may examine all tenders envelopes or other documents relevant to the complaint Complaints concerning any irregularities of a Subcontractor bid shall be made up to 24 hours prior to General Contractor tender closing or 4 hours after the Sub subcontractor tender closing confirmed in writing see Appendix VII Bidder Request Form and accompanied with the appropriate administration fee see Appendix Il
60. anual The proposal is then forwarded along with correspondence from the affected Trade Associations and General Contractors Association to the SBDI Head Office The deadlines for annual changes to the SBDI User s Manual are by February 15 All proposed changes must be received for inclusion in the next User s Manual email changes to ContactUs SBDI ca using Appendix V by February 24 All proposed changes must be circulated to all branches Trade Scope Chairmen Co Chairmen General Contractors Association of Saskatchewan and all Trade Associations by April 30 Preliminary review of proposed changes by the Rules Review Committee by July 15 Final response to proposed changes by August 31 Review of proposed changes and preparation of recommended changes by the SBDI Rules Review Committee by October 15 Presentation of recommended changes to the SBDI Board of Directors for approval Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca 3 15 5 RULES REVIEW COMMITTEE Members a Chairman President Saskatchewan Bid Depository Inc b Members to be appointed by chairman 3 appointed representatives from each of the Regina 8 Saskatoon Construction Associations as follows One 1 General Contractor from each area One 1 Mechanical Contractor One 1 Electrical Contractor u 2 Two 2 other Trade Contractors Regina amp Saskatoon SBD
61. apers mud and foot grilles including pans but less drains excluding brand name items 16 Frames grating and plate covers for manholes catch basins sumps trenches hatches pits where detailed on architectural and or structural drawings except cast iron and trade name floor and roof drains 17 Gates grilles grillwork excluding baked enamel or when forming part of mechanical system 18 Grating type floors catwalks these only to include those specified or indicated on architectural and or structural drawings and not supported by structural steel 19 All handrails balusters and any metal brackets attached to steel rail including plastic cover 20 Joist hangers fabricated types only 21 Joist strap anchors 22 Ledge and shelf angles except where attached to structural steel 23 Loose angle plate and beam lintels as detailed or specified when not attached to structural steel 24 Mat recess frame excluding brand name items 25 Mobile chalk and tackboard frames trucks dollies and track complete with casters 26 Shop drawings 37 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 92 53 54 Trade Scopes SBDI MISCELLANEOUS METALS SCOPE Saskatchevvan Bid Depository Inc Page 2 of 4 contactus Oshdi ca Revised 2005 www sbdi ca 27 Shop preparation and or priming Sleeves if specified except for mechanical and electrical tr
62. askatchewan Bid Depository Inc Branch Total amount of cheque THE BID BOND OR CERTIFIED CHEQUE SHALL BE HELD IN ESCROW AND DEALT WITH AS FOLLOWS 1 In the event that our firm is not named on the tenders of the apparent Mechanical Contractor and the General Contractor Mechanical three 3 low General Mechanical Contractor our Bid Bond or Certified Contractor suffers damage attributed to such decline neglect or Cheque shall be released five days after the date of the General failure the SBDI Authority shall have the power on our behalf to settle Contractors tender opening the damage suffered by the General Mechanical Contractor up to the 2 In the event that our firm is named on the tenders of the apparent three amount of the security as follows 3 low General Mechanical Contractor our firm agrees that our a Inthe case of a Certified Cheque to determine the lesser of the Certified Cheque or Bid Bond may be held for fifteen calendar days amount between the non performing bid and the amount of the longer than the date set out in the general conditions of the specifications bid replacing the non performing bid and the amount of the and or the tender form for the acceptance of the General Contractors Certified Cheque and pay this amount to the successful General proposal Mechanical Contractor Payment of this amount to an 3 In the event that this tender is accepted and our firm enters into or offers aggrieved party does not
63. ation in demountable partitions 12 Where Demountable Partitioning Scope is specified on a project and where one side of the wall is plain drywall the whole wall system is to be under this scope 13 Protection of other trades work from damage by this trade 14 Hoisting for materials and equipment 15 Installation of hollow metal frames in Demountable Partitions 16 Demolition to be included only if the existing demountable partitions are to be reused 17 Supply and installation of Acoustic Rated Units where they form an integral part of the Demountable Partition System e g Soundsoak Tectum Sonotrol 18 Supply only of strikes complete with strike plate screws and dust box and supply of butt hinge screws as supplied by the Demountable Partition Manufacturer EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified W PON E as Staining varnishing or painting of doors and metal frames Folding partitions operable walls and moveable acoustical screens All gypsum board application requiring taping and filling on the jobsite except as noted in Included Item 12 Backing and supports for other trades Temporary heat light power and sanitation Chalkboards tackboards display cabinets chair rails handrails and any prefinished millwork items Final cleaning 62 Trade Scopes SBDI
64. ays Rh Free standing car heater posts trade name requiring C S A approval N Circuit breakers for systems under the Electrical Scope 99 Clock systems E Contactors Nn Control consols except for automatic temperature controls and pre wired factory packaged equipment a Control devices for equipment under Mechanical Scope which a constitute protective control required by the Canadian Electrical Code part 1 or b manually control the equipment push buttons isolating switches etc unless forming part of the control panels for automatic temperature controls or unless forming part of pre wired factory packaged equipment 17 Control panels except for automatic temperature controls and pre wired factory packaged equipment 18 Control power supply outlets provided at locations shown on the electrical drawings and terminated in terminal cabinets outlet boxes The wiring beyond control power supply shall fall under the scope of control wiring 19 Control wiring for equipment under the Mechanical Scope except pre wired factory packaged equipment and automatic temperature controls that do not directly switch the power lines to the equipment Control wiring shall include all necessary materials and connections and the installations of controls that do not require mechanical connections NOTE Solenoids shall be considered controls see Included Item 57 20 Core drilling
65. ce of suspension shall be deemed to have been given or sent if given personally to the recipient Subcontractor Sub subcontractor or General Contractor or on the 3RD working day after the date on which it was mailed as registered mail A suspension shall commence on the day immediately following the expiry of the period in which to file an appeal as per Rule 9 0 or on the day immediately following the date on which the Appeal Committee upholds or varies the terms of a suspension Where a Subcontractor Sub subcontractor or General Contractor has been suspended from use of any SBDI branch then that suspension shall be applied to that Contractors affiliated subsidiary holding and related companies as defined in the Business Corporations Act and to any firm partnership sole proprietorship or limited company which in the opinion of the SBDI Authority appears to control or be controlled by the suspended Contractor 16 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca 9 0 RULES APPEALS 9 1 Any General Contractor Subcontractor or Sub subcontractor against whom a penalty has been imposed by the SBDI Authority may appeal within 7 calendar days of having received notice of such penalty in writing to the Appeal Committee The appellant must provide all relevant information including tender documents 9 2 The Appeal Committee shall be appointed by the President consisting of two General Contract
66. chewan Bid Depository Inc Page 2 of 3 contactus sbdi ca Steel landings when attached to structural steel www sbdi ca 31 Fabricated steel framing to support curtain walls store fronts and windows fabricated toilet partitions kiosk framing movable partitions and windows where attached to structural steel but not including architectural metal 32 Glulam brackets when attached directly to the structural steel but not including glulam bolts and shear plates All glulam to glulam and glulam to masonry connections should be by other trades 33 Welded anchors for masonry or precast concrete when shown on drawings as being shop applied to structural steel 34 Mechanical floor frame openings 450 or greater is shown on structural or architectural drawings 35 Nailer holes in embedded plates to facilitate attachment to concrete forms 36 Powder coating FIELD CONNECTION MATERIAL When the fabricator erects the structural steel they shall supply all material required for the temporary and permanent connection of the component parts of the structural steel INCLUDE 1 Clean up 2 Protection of other trades vvork from damage by this trade 3 Guarantee 4 Scaffolding S Hoisting and or crane 6 All contingency funds specifically called for in the structural specification EXCLUDE Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or a
67. contactus sbdi ca Page 1 of 2 www sbdi ca Revised 2013 This contractor shall include the supply only of the following items regardless of where they may appear in the Tender Documents unless specifically noted otherwise in this Scope All the following are to be included as they relate to gt Wood doors and frames gt Hollow metal doors and frames gt Aluminum door and frames gt Detention doors and frames INCLUDED Butts Pivots Hinges Floor Hinges Spring Hinges Double and single acting 2 Locksets Latchsets Privacy Sets and Exit Devices complete vvith Standard or Electric Srikes Deadlocks and Padlocks Cylinders for all Master keyed items 3 Electrified Locksets Throw Bolts Hinges Exit Devices and Magnetic Locks Push and Pull Plates Push and Pull Bars 4 1 Kick Plates Armour Mop and Stretcher except hardboard and as described in Excluded Item 5 de Closing Devices including Surface Concealed Overhead and Floor Type complete with all required brackets to ensure proper and complete installation 6 Stops Holders and Bumpers including the following types Overhead Surfaces and Concealed Wall and Floor Mounted Crash Chain Stops 7 Handrail Brackets Name brand only 8 Weather stripping Sound Proofing and Threshold gt Threshold Aluminum Brass or Bronze gt Weather stripping for Head Jamb Meeting Stile and Door Bottom gt Automatic Door Bottoms 9 Fire Safety Devices these component
68. criptions except when in conjunction with incinerators 10 Top outlets and bottom inlet grilles for wall fin radiation induction units and cabinet heaters installed in architectural cabinets including extension collars excluding wood manufactured grilles 11 Humidifiers 12 Induction units 13 Manually operated balancing dampers 14 Installation only of motorized dampers 15 Fire dampers 16 Plenums and casings 17 Air ducts silencers and other special types of sound insulated air ducts 83 Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 6 of 7 contactus sbdi ca 18 Flexible type air ducts www sbdi ca 19 Duct insulation acoustic lining interior 20 Weather louvres complete with bird screen and blank off panels penthouses and vents where specified in Division 15 21 Back draft dampers 22 Gravity relief vents and intakes and roof hoods when specified or detailed on mechanical drawings 23 Attenuator boxes turbulators and pressure reducing valves for air supply 24 Air Filters a Throw away type b Flat permanent type c Dry pak filters d Roll type filters e Electronic filters f Grease filters when canopy supplied by this contractor g Filter gauges 25 Supply air fans 26 Return air fans exhaust air fans and kitchen hood fans mechanical attic or crawlspace ventilation 27 Canopies and hoods where called for under specification Section 15 Ductless range hood requirin
69. d Depository in accordance with the SBDI User s Manual or who is found guilty by the SBDI Authority of contravening any provisions of the SBDI User s Manual Complaints against General Contractors will be considered at any time The General Contractor against whom the complaint is made shall be informed of the complaint with full particulars as soon as reasonably possible and shall have the right to make representations either verbally or in writing to the SBDI Authority 15 6 0 7 0 8 0 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca DISPUTES AFTER CLOSING 6 1 6 2 6 3 6 4 6 5 RULES 7 1 7 2 7 3 RULES 8 1 8 2 8 3 8 4 If after contract award Contractors cannot agree to the meaning or intent of the Trade Scope Definitions they may bring it to the SBDI Authority for a ruling The SBDI Authority will require from all parties a dispute adjudication fee see Appendix Il Fee Schedule Rulings by the SBDI Authority in respect to meaning or intent of the Trade Scope Definitions shall be final Requests for rulings on Trade Scope Definitions should be directed to the SBDI Authority Requests must be in writing stating the problem and providing all relevant information including tender documents The SBDI Authority will not render a ruling unless the party making the request has notified all other parties involved and that all parti
70. dd on systems direct expansion fan coil units 21 Evaporative condensers complete with interconnection refrigeration piping 22 Air cooled condensers complete with interconnecting refrigeration piping 23 Water cooled condensers complete with field installed interconnecting refrigeration piping 24 Refrigeration chillers liquid and air condensing complete with interconnection refrigeration on piping 23 Prefabricated walk in coolers and freezers and or associated refrigeration equipment when specified in Division 15 26 Whirlpool and therapeutic baths including chair lifts unless specified as owner supplied Installation included in all cases 27 Manufactured sumps complete with pumps NEW 82 Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 5 of 7 contactus sbdi ca EXCLUDED www sbdi ca Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 Washroom accessories 2 Shower curtains 3 Number not used 4 Prefabricated coolers and freezers and associated refrigeration equipment when not part of Mechanical Scope as outlined in Included Item 25 5 Excavation backfill compaction or disposal of surplus excavated material except as provided for in Included Item 3 Culvert sump pits precast sum pits and precast interceptor pits 7 Unit kitchens mini prep units n
71. e electrical contractor shall be responsible for all excavating to facilitate the installation of their work unless concrete is to be cast in place This shall include all pumping backfilling tamping sand and planking where specified for the protection of the electrical installation as well as disposal of surplus material Repair surface conditions of excavated areas to pre excavation standard 33 Fastenings screws bolts hangers straps etc for electrical equipment and systems 34 Fire alarm systems including fire phone systems wiring to smoke dampers and fire alarm fan shut down relays and wiring 35 Floor duct systems 36 Generators electrical 37 Grounding systems 38 Hand and hair dryers electric 39 Heating a Electric base board heating b Heating cables and heating tape c Electric unit heaters d Electric force flow heaters requiring only electrical connections and no ductwork or pipe connections e Any other self contained electric heating device requiring only electrical connections and no ductwork or pipe connections f Controls for above items unless forming part of automatic temperature controls under Mechanical Scope 40 Holes to be cut into floor duct systems Refer to Included Item 20 41 Horns and sirens for systems under the Electrical Scope 42 Instrument panels for systems under the Electrical Scope 43 Disconnect switches 44 Electrical outlet in laboratory casework exclud
72. e is disqualified the bidder s corresponding alternate prices and or separate prices and or unit prices are automatically disqualified 3 Alternate prices and or separate prices and or unit prices can only be used with the base price submitted by the same contractor 4 Number Not Used All bids must be submitted in official SBDI envelopes for the SBDI Authority purchased from any SBDI branch see Appendix II Fee Schedule Subcontractors and Sub subcontractors shall supply and submit their bids in the following manner One large SBDI envelope containing the following 1 One small SBDI envelope for each General Mechanical Contractor containing a copy of their bid see Appendix Standard Tender Form 2 One small SBDI envelope for the SBDI Authority containing a copy of their bid s Separate envelopes for the SBDI Authority can be submitted if preferred Attach to the outside of the large envelope 1 One small SBDI Declaration Form envelope containing their signed Declaration Form and required security as per Rule 4 6 Bid Security 2 One additional small SBDI envelope for the SBDI Delivery Branch attached to the outside of the large envelope is necessary when the SBDI Authority and the SBDI Delivery Branch are not one in the same This envelope will contain copies of their bids to the General Mechanical Contractors a copy of the Declaration Form and a copy of any security included in the tender lt is not
73. ection of metal roof for access by other trades 22 Metal shingles see Shingle Scope 23 14 gauge and heavier gutters and downspouts 24 Factory insulated metal wall panels when utilized for coolers or freezers 46 17 Trade Scopes SBDI ARCHITECTURAL WOODWORK SCOPE Saskatchewan Bid Depository Inc Page 1 of 3 contactus Oshdi ca Revised 2013 www sbdi ca The Contractor shall supply only the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED Exterior 1 Interior 7 10 11 12 13 14 15 16 NOTE Mill made wood window frames and sash fitted as specified Wood doorframes complete with wood trim Built up or knocked down depending on job conditions complete with glass For knocked down frame glazing see B Exluded Item 20 Wood doors unfitted and glazed if specified Wood core as specified Wood screens or shutters wood vents or louvers wood sun baffles knocked down of clear kiln dried material Grade D and better Specialty wood columns posts and brackets of clear kiln dried material Grade D and better Solid kiln dried D or better lumber for exterior trim fascia soffit and solid wood siding Wood handrail systems and benches of clear kiln dried material Grade D and better Wood doors plastic laminate and lead lined unfitted and glazed if specified Wood bifold doors Machining only of
74. ee Appendix Il Fee Schedule If the General Mechanical Contractor did not provide proper notice of their intention to bid as per Rule 4 3 1 the fee will be picked up by that General Mechanical Contractor RULES BID SECURITY 4 6 1 All Subcontractors and Sub subcontractors shall enclose in the Declaration Form Envelope the Declaration Form fully completed If the cumulative price of all trade scopes from one subcontractor sub subcontractor is over 40 000 00 the Declaration Form shall be accompanied by an original Bid Bond for 10 of the amount of the tenders cumulative total naming as obligee the Successful General Mechanical Contractor or a Certified Cheque for 10 of the amount of the tenders cumulative total made payable to the Saskatchewan Bid Depository Inc care of the Authority Branch If the bid is under 40 000 00 this must be indicated on the Declaration Form The Declaration Form envelope containing these documents must be attached outside the large Bid Depository Envelope see Appendix III Declaration Form 12 4 7 4 8 4 6 2 4 6 3 4 6 4 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca NOTE Bid Bonds Certified Cheques shall be valid for 15 calendar days beyond the acceptance period as required by the tender documents for the General Contractor i e if the acceptance period is 60 days the bid bond must be made out for at lea
75. el excluding fuel for testing as per Electrical Included Item 55 fuel vvater and exhaust piping and vent ducting for generator prime movers Flex connections valving and muffler to be supplied vvith units See Electrical Scope 5 Permits as required for mechanical vvork only 6 Manufacturer s warranty only beyond the normal one year warranty de Trade clean up 8 Protection of other trades work from damage by this trade 9 Hoisting for materials and equipment 10 Inspection 11 X rays of welded joints when required by code or specified 12 Shop drawings 13 Scaffolding 14 Licenses as required for mechanical vvork 15 Vibration isolation for equipment supplied by this trade 16 Supply of floating concrete floor supports when specified or detailed on mechanical drawings Wood sub base and concrete work to be done by others 17 Pipe identification lettering color banding and directional markers valve tags and glass covered code charts and directories 18 Balancing of air and hydronic systems 19 All direct reading temperature and pressure gauges connected directly to piping and duct systems 20 Catwalks ladders and gratings servicing mechanical equipment which are specified as part of Mechanical Equipment Package when specified or detailed on mechanical drawings 21 All steel bases and steel supports for mechanical equipment when specified or detailed only on mechanical drawings 22 Air compressors vac
76. electric Services aerial other than utility Signaling systems for items under the Electrical Scope Electrical directional illuminated signs Sirens for systems under the Electrical Scope Electric signs signs requiring a direct electrical connection e g neon fluorescent and incandescent 94 Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus sbdi ca Page 4 of 6 www sbdi ca 73 Sleeves through poured in place concrete and masonry where required for electrical conduit wire or equipment 74 Smoke detection systems electrical not forming part of the door control system as described in Architectural Hardware Included Item 9 75 Snow melting cables 76 Sprinkler Annunicator Systems electrical 77 Substations electrical portion 78 Supports where detailed on Electrical Drawings only 79 Surveillance systems See also Included Item 98 80 Switch boards 81 Switches all types of electrical switches for systems under the Electrical Scope except where part of the pre wired factory packaged equipment supplied by others 82 Telephone systems private automatic see also Included Item 95 83 Temperature control system and devices for electric heating supplied by the electrical trade 84 Thermocouple wiring and thermocouple sensor wiring except for automatic temperature controls 85 Time recording systems time clocks and scoreboards electric only 86 Timers
77. emporary lighting heating and convenience outlets sanitation or as specified SN E O E 10 11 12 13 All cast in place concrete rebar and forming including required excavating Control wiring for equipment under Mechanical Scope intended for automatic temperature controls Final cleaning Food service and laundry equipment unless specified in the Electrical specifications Hoarding Painting on site Supports and guards where detailed on architectural or structural drawings Temporary heat sanitation a Temporary light and power when not specified as per Included Item Water Wiring for electric elevators hydraulic elevators parking garage hoists escalators dumbwaiters moving walkways speed ramps except as noted under Elevators and Escalators Scope Cutting and patching when pertaining to renovations alterations or additions except cut only openings 12 inch diameter and smaller Luminous ceilings light valances and coves Car posts when part of railing wheel stops and bumper rails 96 Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus sbdi ca Page 6 of 6 www sbdi ca NOTES 1 Pre wired factory packaged equipment so specified under the mechanical Scope shall mean equipment in a completely electrically operable state after one final connection of power wiring and remote control connections if specified See related item Electrical Scope Inclusion
78. es have agreed in writing to accept the ruling of the SBDI Authority PENALTIES Any infraction of this SBDI User s Manual may result in the disqualification of a tender A Subcontractor Sub subcontractor whose tender has been declared disqualified or whose tender has been found by the SBDI Authority to contravene any provisions of the SBDI User s Manual or who has not submitted a tender through the Bid Depository enters into a contract with a General Mechanical Contractor is liable to a minimum 30 days suspension from use of any of the SBDI branches A General Mechanical Contractor who uses within their tender a bid from a Subcontractor Sub subcontractor after he has received notice from the SBDI Authority that such Subcontractors Sub subcontractors bid has been disqualified or who uses within their tender a bid which was required through the Bid Depository and was not received through the Bid Depository or who is found guilty by the SBDI Authority of contravening any provisions of the SBDI User s Manual is liable to a minimum 30 days suspension from use of any of the SBDI branches SUSPENSIONS When an SBDI Authority imposes a suspension on a Subcontractor Sub subcontractor or General Contractor the SBDI Authority shall notify the Subcontractor Sub subcontractor or General Contractor of such suspension by delivery in person to the Contractor or by sending as registered mail a notice of suspension A noti
79. f any material including insulation vyhere it forms an integral part of the storefront system 6 Sills and miscellaneous related aluminum trim which forms an integral part of the storefront systems 7 Interlocking extruded aluminum facing systems 8 All anchoring devices a supply and installation of anchors which are part of the framing b supply only of anchors or inserts which are part of the structure 9 Fly screens to venting windows 10 Stiffeners and or steel reinforcement where by the architectural metal section 11 Architectural aluminum guard rails where they are an integral part of the storefront installation only of rails other than aluminum attached to the storefront 12 Interior storefronts 13 Interior architectural aluminum glazed partitions 14 Cleaning between double and multiple glazing 15 Caulking back up road and perimeter insulation exterior and interior 16 Insulation within the storefront 17 Clean up of own debris by own forces 18 All contingency funds specifically called for in the Entrance and Storefronts specifications 19 Protection of other trades work from damage by this trade 20 Testing where specifically required by the specifications 21 Shop drawings 22 Scaffolding 23 Brush cleaning 24 Hoisting 25 Relocation of existing materials EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating
80. g heating and convenience outlets sanitation or as specified 1 Sun screens blinds curtains bird screens guard screens 2 Structural steel except as noted in Included Item 7 3 Skylights which are thermally formed and incorporate a base frame only 4 Guard rails other than aluminum 5 Temporary heat light povver sanitation 6 Hoarding 7 Water 8 Final cleaning 9 Demolition 10 Roof and parapet flashing 57 Page 1 of 2 Trade Scopes SBDI LATH PLASTER AND STUCCO SCOPE Saskatchewan Bid Depository Inc contactus Oshdi ca Revised 2007 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in the Scope INCLUDED l All types of lathing systems and metal furring for plaster and stucco 2 All plastering plain acoustical ornamental cast or molded gypsum plaster stucco and or cement plaster exterior insulating finishing systems e g Dryvit Sto 3 Rigid insulation when used as plaster or stucco base 4 Thermal insulation Batt or Rigid immediately behind plaster including acrylic plaster Not to include cavity wall insulation 5 Steel stud partitions for plaster systems 6 Metal channels lighter than 14 gauge for plaster systems T All plaster beads plaster stop and plaster expansion joints which are an integral part of the work 8 All scaffolding required for t
81. g only electrical connections to be supplied by Electrical Trade 28 Furnaces 29 Fire Places and Wood Burning Stoves 30 Duct Furnaces 31 Indirect fired self contained heating and or cooling units 32 Registers grilles diffusers and supply only of door grilles 33 Air troffer boots except where part of an integrated ceiling and specified as by ceiling contractor 34 Direct fired make up air units 35 Terminal reheat boxes vvith coils or electric element 36 Sanitary napkin incinerator units and vents 37 Air curtains 38 Electric Duct heaters 39 Self contained gas fired classroom heating and ventilating units complete with all shelving counters and accessories 40 Metal cladding heavier than 1 6mm for exposed stack complete with installation 41 Garbage and linen chutes of metal construction 42 Manual smoke dampers 43 Counter flashing that pertains to this trade Scope 44 Spray eliminator units 45 Unit heater gas fired 46 Air washers 47 Heat pumps of every type water or air cooled 48 Any electric heating units requiring duct or piping connections 49 Electric heating boilers and electric furnaces excluding wiring 50 Absorption and centrifugal chillers 84 Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 7 of 7 contactus sbdi ca www sbdi ca 51 Packaged and self contained water cooled air conditioning units 52 Packaged self contained air cooled air conditioni
82. h shall include only those items from the following list which clearly are indicated to be required by the plans and specifications available at time bids are requested On supply only tenders this contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this scope INCLUDED Epoxy coated rebar and patch kit 2 Fabrication of bars this shall include smooth rods for joints cut bent bundled and tagged or color coded 99 Prime cost sums and or contingency funds when a specific dollar amount is listed in the specifications pertaining to this work 4 Preparation of placing drawings and barlists S Supply reinforcing steel for concrete filled masonry and du al and similar type blocks 6 Supply of vvelded vvire mesh or structural vvire fabric in flat sheets or rolls 7 Support and or spacer bars when specified or specifically shown on the drawings EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Accessories for masonry or du al or similar type blocks Inspection or testing Placing placing accessories and tie wire Post tensioning cables anchorage zone reinforcement and post tensioning supports Reinforcing steel used in piles Supply of pile dowels Dowels to precast Caldwelds and burrard couplers
83. his trade 9 Fire rating to recessed fixtures 10 Testing of material where specified 11 Clean up after this trade 12 Lathing systems for ceramic mosaic tile brick or stone overlays 13 All plaster sound baffles 14 All inserts and hangers capable of supporting all appurtenances supported by ceilings fixing clamps anchors required for attaching work of this trade to other members or materials 15 All sound insulation noise stops caulking etc to plaster and stucco systems 16 Protection of other trades work from damage by this trade 17 Guarantee 18 Inspection 19 Shop drawings 20 Hoisting for materials and equipment 21 Installation only of access doors 22 Installation only of metal doorframes supported by steel stud and plaster system 23 Sheet lead where required for X ray and or sound attenuation in lath and plaster surfaces 24 Building paper only when used immediately behind stucco 25 Patching of existing in renovations only if shown on architectural drawings 26 Any trowel or spray applied air vapour barrier that forms part of an exterior insulating finishing system EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitations or as specified 1 2 3 Steel door frames for steel stud partitions Supply of access doors Backing for other sub contractors 58 Trade Scope
84. ht power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Pipe covering protection saddles and shields Vibration and sound absorption pads and isolators Equipment backing Sleeves Factory insulation equipment Refactory linings Temporary heat light power sanitation Hoarding Water Final cleaning E ON E E Rh a o Duct liner and acoustic insulation N Fiberglass formed ductwork j 99 Refrigerated piping when it is elastomeric insulation only 89 Trade Scopes SBDI SPRINKLERS FIRE PROTECTION SCOPE Saskatchevvan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2001 www sbdi ca SUB TO MECHANICAL THROUGH BID DEPOSITORY This tender shall include labour and materials to provide a fully operational sprinkler system as per plans specifications issued addenda and the Saskatchewan Bid Depository Rules and Regulations They shall INCLUDE the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope Wet and dry sprinkler systems complete with fire curtains and alarm devices C02 and Halon systems Tanks piping and outlets Shop drawings approved by the insurance authority or other authority having jurisdiction Start at flanged connection at meter location or point of entry of water service into building Hoisting for
85. ile and Suspension Systems Scope items 9 10 and 11 re Included Item 5 Aluminum and or stainless steel accessories that are not part of a demountable manufacturer s system when used as a drywall trim Thermal insulation to ceilings or attics Backing blocking for electrical mechanical wall hung fixtures shelving etc Hoarding Water Final cleaning Gypsum board when applied over a roof deck as part of the roofing system Insulation building paper rainscreen when applied on cavity side of wall Where the demountable scope is applicable on a project and where one side of a wall is plain drywall with the other side of the wall being vinyl covered drywall the whole wall system is to be under the Demountable Partitioning Scope The supply and installation of Compriband Butyl Membrane Bituthane or Copper Fibrene Removal and or demolition of existing All Architectural caulking Rigid insulation and metal framing of any type used in conjunction with rigid insulation except as noted in Included Item 21 The sorting and loading to their respective floor of all pressed steel frames including the removal of temporary spreaders Insulation and vapour barrier including caulking where shown to wood framed parapet walls grade beams and or pony walls not sheathed with drywall Poly and or plastic vapour hats Repair of concrete defects air holes larger than 3 8 inch concrete ridges and concrete voids larger than
86. in this manual and no proceedings by or before the SBDI Branch Management Committee shall be restrained by injunction prohibition or other process or proceeding in a court or be removable by certiorari or othervvise in any court The use of the Bid Depository subject the SBDI User s Manual is intended to create a code of tendering practice vvhich each user voluntarily assumes for their own benefit and at their own risk Application for appeal accepted only as set out in the procedures provided in the SBDI User s Manual Any person or corporation who calls for tenders through the Bid Depository or submits a bid through the Bid Depository or accepts a bid through the Bid Depository shall be deemed to be a user of the Bid Depository Each user of the Bid Depository agrees to be bound and shall be bound by the SBDI User s Manual and by the decisions of the SBDI Authority and the SBDI Board of Directors The use of any Bid Depository of the SBDI is at the user s risk The Saskatchewan Bid Depository Inc the Local Construction Associations the Saskatchewan Construction Association the SBDI Branch Management Committees or any of them or any employee officer director or committee member of any of the said organizations is in no way liable or responsible to any user of the Bid Depository for any non application or mis application of the SBDI User s Manual Each SBDI Branch will supply for a fee to any user of the Bid Depository a copy of
87. ing Ventilation and Sheet Metal Refrigeration Automatic Temperature Controls Sprinklers Incinerators Insulation and all the standard items commonly associated with the above categories which are normally laid out in the Drawings and Specifications The purpose of this definition lists items which will serve to identify but not limit areas or items of particular concern in an attempt to clarify the work forming part of the mechanical tender DEFINITIONS This Trade Definition consists of three sections as follows Section 1 Items common to more than one section of the Mechanical Scope Section 2 Items specific to the plumbing portion of the Mechanical Scope Section 3 Items specific to the HVAC portion of the Mechanical Scope Where equipment is not supplied by the mechanical trade mechanical services are to be roughed in only as shown on tender documents Suppliers of specialty items cabinets or equipment if other than the mechanical trade will be responsible for any alterations of service required if these differ from the tender documents PACKAGED EQUIPMENT NOTE 1 Prewired factory packaged equipment so specified under the Mechanical Scope shall mean equipment in a completely electrically operable state after one final connection of power wiring and remote control connections if specified See related item General Mechanical Terms inclusion 30 AUTOMATIC TEMPERATURE CONTROLS NOTE 2 Automatic temperature controls shall mean
88. ing opening except those items included in a factory assembled casework product 93 46 47 48 49 50 51 52 93 54 53 56 51 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus Wsbdi ca Page 3 of 6 www sbdi ca 45 Lighting fixtures a Supply and installation of all luminous elements consisting of a light source and ballast s if required mounted separately or as components of an overall ceiling system including fixtures lamps and lenses for coffered ceilings b Air troffers and indoor outdoor flood lighting to include lamps for same lenses globes guards and diffusers that are part of the lighting fixtures also support for above if detailed on electrical drawings only Lightning protection systems Luminous ceilings and light valances supply and installation of lighting fixtures and lamps only ceiling complete with suspension system luminous panels and reflective materials by others Plenum lighting to mechanical systems other than package units which will require a connection only Meters for systems under the Electrical Scope Motor control centres Motor starters all motor starters variable frequency drives and protection switches other than those which form an integral part of a packaged air handler unit requiring an Electrical connection only See Note 1
89. ing surface and or the backing of tile units or sheets of tile 4 The setting of tile as herein provided shall include the insertion of decorative tile inserts in other materials 5 The setting sealing and installation of prefabricated tile systems 6 TILE as herein defined as the following products which are not to exceed 39 7mm in thickness a All burned clay products includes pavers either glazed or unglazed as used in the tile industry b All composition materials marble tiles terrazzo tiles glass mosaics and all substitute materials for tile made in tile like units c All mixtures in tile like form of cement metals and other materials that are made for and intended for use as a finished floor surface stair treads stair risers stair base and stringer promenade roofs walks walls ceilings swimming pools and all places where tile is used to form a finished interior or exterior surface for practical use sanitary finish or decorative purposes excludes resilient floor coverings acoustic or ceiling tile 1 SLATE where used as above in place of TILE and 39 7mm thick and under 8 TERRAZZO where used as a finish for walls floors bases curbs stair tread stair risers stair base and stair stringer which is poured in place contains an aggregate which is to be ground 9 MARBLE GRANITE SLATE or PRECAST TERRAZA where used as a floor or wall finish interior or exterior same as TILE and where same is 39 7mm thick o
90. ing to recessed fixtures in drywall ceilings only Installation of pressed steel door frames pressed steel borrowed lights and sidelight frames in drywall metal stud partitions Protection of other trade s work from damage by this trade Scaffolding Cleanup of this Scope s material Scraping of mud droppings and broom clean only All P C sums and or contingency funds specifically called for in the Drywall and Textured Finishes specifications Patching of existing drywall included only where specifically shown on architectural drawings Factory laminated vinyl gypsum board if there is no prefinished demountable partition system on the project to be tendered Thermal batt type insulation polyethylene type vapour barrier and tube type caulking forming a part of the exterior metal or wood stud wall system a Polyethylene Type Vapour Barrier and tube type caulking at drywall ceilings where polyethylene is in direct contact with drywall The installation of foam flute fillers and foam backer rod when required with metal stud installation The timely supply of the same to be by others Rigid and or semi rigid insulation complete with metal framing when covered by drywall or cement aggregate panels e g Wonderboard Durock All interior or exterior FORMGLAS or similar products and any joint treatment where applicable Hoisting for materials and equipment The installation only of stud lock anchors which att
91. is to be reused in the new work this trade will be responsible for removal of existing flooring to be reused and cleaning of sub floor for same Rubber base when used in conjunction with carpeting Including to demountable partitions EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified DA A AO EA Temporary heat light power sanitation Water Hoarding Final cleaning Demolition Removal of existing flooring and cleaning of sub floor when existing flooring is not being reused in the new work Base which forms part of the demountable partitions manufacturers system 70 Trade Scopes SBDI PAINTING SCOPE Saskatchewan Bid Depository Inc Page 1 of 2 contactus Oshdi ca Revised 2012 www sbdi ca This contractor shall include the following items regarding of where they may appear in the tender documents unless specifically noted otherwise in this Scope General Includes the application and or removal of protective and or decorative coatings except those covered under Special Wall Coatings Scope 2 Application of Coatings of a Paints b Stains c Varnishes d Lacquers e Emulsions f Bituminous coatings except when used for damp proofing roofing membranes vapour barriers and when used as part of a system e g mechanical insulation g Plastics which are applied in same manner as
92. iscellaneous steel They shall INCLUDE 1 Clean up 2 Protection of other trades work from damage by this Trade 3 Guarantee 4 Inspection 5 Scaffolding 6 Hoisting 7 All contingency funds specifically called for in the miscellaneous steel specifications 39 Trade Scopes SBDI MISCELLANEOUS METALS SCOPE Saskatchewan Bid Depository Inc Page 4 of 4 contactus Oshdi ca Revised 2005 www sbdi ca EXCLUDE Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Temporary heat light power sanitation Water Hoarding Final cleaning Steel deck regardless of specifications All demolition of existing miscellaneous metal ON DE ES Gee Ns EE Installation of anchors and brackets for Fero Fast system see Masonry Scope Included Item 17 40 Trade Scopes SBDI MEMBRANE ROOFING AND RELATED Saskatchewan Bid Depository Inc SHEET METAL SCOPE contactusOshdi ca Page 1 of 2 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope All the following are to be INCLUDED as they relate to Membrane Roofing BUR EPDM PVC SBS 1 E A Rh pi h mv N 14 15 16 17 18 19 20 21 22 Adhesives Aggregates Asphalt and pitch emulsions
93. ised 2006 SUB TO MECHANICAL THROUGH BID DEPOSITORY The control contractor shall include a complete control installation in accordance with plans specifications issued addenda and the Saskatchewan Bid Depository Rule and Regulations NOTE 1 Prevvired factory packaged equipment so specified under the Mechanical Scope shall mean equipment in a completely electrically operable state after one final connection of povver vviring and remote control connections if specified NOTE 2 Automatic temperature controls shall mean controls which must 1 be intended for equipment whose main purpose is to affect the temperature humidity and pressures within a building and 2 produce these changes automatically and 3 include all items in the Automatic Temperature Controls Scope Provided however that the controls do not directly switch the power lines to the equipment the wiring of such controls to remain the responsibility of the electrical contractor They shall INCLUDE the following items regardless of where they appear in the tender documents unless specifically noted otherwise in this scope 1 Environmental Control 1 1 Heating controls 1 2 Ventilation controls 1 3 Cooling controls 1 4 Humidification controls 1 5 Air conditioning controls 1 6 Refrigeration controls devices used to automatic system stop start only 1 7 Boiler controls not specified as part of prewired package boiler 1 8 Motorized dampers supplied to job s
94. ite for distribution and installation by others 1 9 Controls compressor complete with accessories and isolation 1 10 Remote reading gauges transmitters and recorders for automatic recorders 1 11 Air flow stations when not supplied as part of packaged equipment supplied to jobsite for distribution and installation by others 1 12 Combination control and balancing valves single unit for both functions supplied to jobsite for distribution and installation by others 2 Building Centralization Control 2 1 Centralized temperature humidity pressure and flow indication and recorders 2 2 Centralizations of air conditioning heating ventilation humidification and refrigeration equipment operation 86 Trade Scopes SBDI AUTOMATIC TEMPERATURE CONTROLS SCOPE Saskatchewan Bid Depository Inc contactus Wsbdi ca Page 2 of 3 1 www sbdi ca 3 Building Life Safety Control and Equipment Safety Control 3 1 Motorized smoke dampers 3 2 Motorized fire dampers 3 3 Firestats 3 4 Freeze protection thermostats 3 5 Shutdown safety devices forming part of the automatic temperature control 4 General Items 4 1 Hoisting for material and equipment under this section 4 2 Excavating etc for work under this section 4 3 Permits as required for work under this section 44 Inspections as required under this section 4 5 Manufacturer s warranty only beyond the normal one year warranty as required under this section 4 6 Protec
95. itional mobilization charge may be quoted If none quoted it is deemed to be included EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified E Oy ee ei j m Rh Mn R et ike Building Permit Provision and maintenance of centre of pile location and elevation Installation inspection service As built legal survey drawing Responsibility for locating and or protecting subsurface structures and services prior to commencement of piling Forming bracing protecting pile extensions Pile caps Supply and placing anchor bolts Placing installing pile dowels and lag screws Trimming cutting treating and disposal of pile top Provision and maintenance of shoring or protection of excavated slopes structures and services Removal in advance of man made buried or overhead obstruction Provision and maintenance of suitable access for piling equipment Removal of laitance from reinforcing steel Disposal of contaminated soil or contaminated water encountered during excavation Hoarding light power potable water and sanitation facility 28 Trade Scopes SBDI Saskatchewan Bid Depository Inc REBAR SCOPE contactus sbdi ca Page 1 of 2 www sbdi ca Revised 2001 A tender to supply only F O B truck at jobsite or supply and place where noted on tender rebar and welded wire mes
96. l 45 Trade Scopes SBDI METAL ROOFING CLADDING AND SOFFIT SCOPEaskatchewan Bid Depository Inc contactus Oshdi ca Page 2 of 2 1 www sbdi ca EXCLUDED l Metal deck 2 Supply or install of any flashing material not incorporated into metal roof or wall system stucco window or masonry flashings or which are not part of membrane roof system see Included Item 18 3 Wood or metal components unless as incorporated in the preformed metal roofing system used to construct parapets perimeter and curb blocking curbs control joints and sleeper supports 4 Skylights outside the preformed metal roofing area 5 Separate curbs for skylights or hatches etc 6 Counter flashing for mechanical vents chimneys etc 7 Through wall flashing 8 Backing and supports for other trades 9 Purlins or other structural materials 10 Insulation or vapour barrier behind structure which metal roofing or wall is fastened to 11 General and final clean up 12 Temporary heat light power sanitation and water 13 Hoarding 14 Roof drains connected to an internal system 15 Pre engineered metal buildings or portions of a project which are a pre engineered building 16 Metal spandrel and infill panels incorporated into glazed systems 17 Extruded aluminum wall cladding incorporated into a storefront or door assembly 18 Architectural composite metal panels 19 Metal linear ceiling profiles 20 Inspection and or testing 21 Prot
97. l stud framing 12 gauge 0 1017 inches 2 593mm 97mils maximum thickness except as exempted by Lath Plaster and Stucco Scope Included Item 5 and Demountable Partitioning Scope Included Items 1 and 12 Exterior gypsum sheathing Sound insulation to drywall partitions and drywall ceiling Mineral wool fibreboard noise stop board resilient sound bar gasket and acoustical caulking a Firestop materials are included at the perimeter of firerated drywall steel stud assemblies where these assemblies abut dissimilar materials This includes both vertical and or horizontal perimeter conditions Note Firestopping of any penetration of any firerated drywall assembly wood or steel stud is not included This includes items such as pipe penetrations cable trays ductwork and electrical conduit Installation only of access doors to drywall surfaces Metal suspension system and or metal furring capable of supporting all appurtenances supported by ceiling for drywall or metal soffit finishes All gypsum board including joint treatment where applicable All gypsum board backing for other materials All drywall light gauge metal accessories corner bead milcor Cement aggregate panels including joint treatment where applicable e g Wonderboard Durock All sheet lead sound baffles where ceiling system is drywall Sheet lead where required for x ray and or sound attenuation in drywall partitions and drywall ceilings Fire rat
98. less otherwise specified of overlap material beyond the exterior point of the metal system 11 Gutter and downspouts connected to the preformed metal roofing system 16 gauge and lighter 12 Installation only of acoustical insulation strips for acoustic steel deck which is supplied by others in a preformed custom fitted condition 13 Skylights single unit application single unit shall consist of one frame and one component which are thermally formed and incorporate a base frame only no clustered skylights smoke hatches and roof access hatches trade names only 14 Hoisting 15 Cash allowance PC sums and or contingency funds when a specific dollar amount is listed in the preformed metal roofing or cladding specifications 16 Scaffolding 17 Shop drawings 18 When any prefinished metal flashing is required by the membrane roofing scope that specifically matches the colour for the metal roofing or cladding then the prefinished flat sheets are to be supplied by this trade FOB the membrane roofing contractors shop 19 Trade clean up 20 Protection of other trades work from damage by this trade 21 Stationary louvers and vents of matching materials installed in cladding or roof system when not specified in mechanical section 22 Metal cladding or soffit on interior of building 23 Removal of existing metal roof wall or soffit for installation of new 24 Metal deck or siding when not attached directly to structural stee
99. ll and lintels which fall within masonry cladding and when laid in a bed of mortar as well as supply and installation of insulation and vapour barrier behind these items 14 Wall anchors and ties as long as the anchors or ties are installed as the masonry wall is erected This also applies where masonry forms the exterior width of any wall system In other conditions involving masonry anchors and ties are supplied only by mason 15 Caulk masonry to masonry only fire caulking excluded 16 Allowance for testing of materials 17 The supply and installation of Fero Fast support brackets c w anchors Installation only of shelf angles included to this system EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 2 3 4 Setting of door window and louvre frames prior to building in with masonry Supply tying or fabrication of reinforcing steel Lateral support devices on top of masonry walls Supply or installation of dovetail anchor slots Trade Scopes SBDI MASONRY SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus sbdi ca www sbdi ca 9 The cost of adequate povver vvater lighting temporary heat or enclosure hoarding 6 The cost or supply of temporary wind bracing of masonry walls 7 The cost of temporary support and shoring for lintels and other overhead masonry
100. ly and installation of SAA ES A MS e 11 All components including incidental items required for a complete installation Electrical wiring and conduit from all controllers All licences Hoisting of walkway equipment Clean up Protection of other trades work from damage by this trade Guarantee Inspection Shop drawings All P C sums and or contingency funds specifically called for in the Moving Walkways specification Scaffolding EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified BOO sl ON Oe oe a Providing adequate power to controllers Hoarding Temporary heat light power sanitation Water Final cleaning Provide wellway with proper supports including bearing plates as required All cutting patching and grouting as required Provide exterior finishes Provide heat and ventilation as required 78 Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 1of7 contactus sbdi ca Revised 2005 Sbdi ca WWW All bidders shall include a complete mechanical installation in accordance with plans specifications issued addenda and Saskatchewan Bid Depository Incorporated Rules and Regulations The format under this Division Item of Scope is based on the premise that the mechanical Tender normally includes the basic categories of Plumbing Heat
101. ms of miscellaneous steel as defined above 3 Glulam to glulam connections by glulam contractor 4 Joist hangers trade name types 9 Manhole and catch basins cast iron 6 Metal cladding and covering lighter than 14 ga 7 Anchors and embedded plates for precast concrete and all steel items that are cast in precast concrete 8 Reinforcing steel or mesh smooth greased rods dowels and inserts 9 Roof and floor hatches when trade name item 10 Steel stacks 11 Steel reinforcement for architectural metal storefronts curtain walls and windows 12 Stone anchors see masonry and stone division 13 Thimble and breaching by mechanical contractor also mechanical fire dampers 14 Window and area walls 15 Steel deck support angles flat bars and bolts except Included Item 46 16 Any towers brackets and supports required for the installation of wheelchair lifts 17 Steel brackets and support required for the installation of wheelchair lifts 18 Asbestos board walls and curtains at welding booths 19 Base angles at grade beam to pick up siding if supplies by structural steel in a building with purlins and girts 20 All culverts and culvert material 21 Supply of anchors and brackets for Fero Fast system see Masonry Scope Included Item 17 When fabricator erects miscellaneous steel They shall supply all material required for temporary and or permanent connections of the component parts of the m
102. n c Rigid insulation on inside vertical face of parapet wall when this insulation is covered with a metal flashing and not covered by wood Sealant and sealing compound Skylights single unit application single unit shall consist of one frame and one component which are thermally formed and incorporate a base frame only no clustered skylights smoke hatches and roof access hatches trade names only Systems of roofing including protected membrane systems Also included are protective coatings and coverings for insulation of all membrane systems excluding poured in place light medium or heavy concrete and paving blocks exceeding 68 04 kg each in mass Gypsum board when applied over a roof deck as part of the roofing system Vapour retardant 41 Trade Scopes SBDI MEMBRANE ROOFING AND RELATED Saskatchewan Bid Depository Inc contactus Oshdi ca SHEET METAL SCOPE www sbdi ca Page 2 of 2 23 Supply only of vapour barrier material to provide for the continuity of vapour barrier under the blocking to roof system 24 Hoisting 25 All contingency funds specifically called for in the Membrane Roofing and Related Sheet Metal specifications 26 27 28 29 30 31 32 33 34 Trade clean up Protection of other trades work from damage by this trade Guarantee Shop Drawings Scaffolding Removal of existing roofing for installation of new Cutting of grout and reglet lines as related to this Scope Cleaning
103. n or as specified O ON a oe Ga Ka E Rh uu Ro N Temporary heat light power sanitation Water Hoarding Final cleaning Expansion joints trade names only and caulking of same Continuous metal supporting angles metal slots boxes or anchorage s which are built into the structural wall Wood grounds Metal lath Lead pans waterproof membranes for wet areas waterproofing and testing of pools showers etc Miscellaneous iron work and manufactured specialty items mat 1234 frames Demolition Removal of existing flooring and cleaning of sub floor when existing flooring is not being reused in the work Concrete pavers or paving stones 65 Trade Scopes SBDI SEAMLESS FLOORING SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope MATERIAL CLASSIFICATIONS Flake or granular system with polyurethane or epoxy binders elastomeric flooring materials and other products approved as an equal by the architect INCLUDED 1 The above material when it is applied to a Floors b Bases not to exceed 305mm in height c Walls where the above materials are specified d Curbs e Treads risers stair base and stringers f Waterproof membranes installed under any of the above specified material
104. n their tender a designated Subcontractor Sub subcontractor s bid not properly received through the Bid Depository If a duly listed General Mechanical Contractor does not receive through the Bid Depository any bids for a particular trade he is then free to obtain bids from outside sources for the particular trade Each General Mechanical Contractor is responsible for picking up their bids from the SBDI Authority Where a General Mechanical Contractor lists their own forces for the work to be performed it is mandatory that he does the work with their own employees or in the event he is unable to do so at a later date must use one of the Subcontractors Sub subcontractors who bid through the Bid Depository and must not call for bids from other sources The General Mechanical Contractor must use one of the Subcontractors Sub subcontractors original prices as submitted through the Bid Depository A withdrawn or disqualified bid will not be considered an originally submitted bid RULES SINGLE BIDS 4 9 1 4 9 2 Where more than one General Contractor who has notified the SBDI Authority in writing 5 working days prior to their bid closing of their intention to bid the project receives a single bid they may notify the SBDI Authority in writing at least 22 hours prior to the tender closing that they have received a single bid Having received more than one such notice from qualified General Contractors the SBDI Authority
105. ng units 93 Packaged self contained integral D X fan coil compressor section for use condensing section 54 Refrigerated dew point controlled units Environment Chambers where specified in Division 15 55 Refrigerated room window or wall type air conditioners 56 Refrigeration controls cooling only excluding wiring when not specified under Automatic Controls for equipment under Mechanical Scope 57 Supply and installation of evaporative cooling towers condenser water pumps tanks and piping when part of a refrigeration system for an ice area or ice making plant 58 Radiant hydronic ceiling panels active or non active accessories surface finishes as specified 59 Propeller ceiling fans ducted or non ducted c w guards if specified EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 2 3 4 Underground concrete duct or concrete for encasing of underground ductwork Cutting in and installation of door grilles Ductless range hoods Fireplace accessories to include shovels brushes poker hearths and mantels which do not form a part of a packaged unit Architectural louvers when no duct connected to them unless specified in Division 15 85 Trade Scopes SBDI AUTOMATIC TEMPERATURE CONTROLS SCOPE Saskatchewan Bid Depository Inc Page 1 of 3 contactus Oshdi ca www sbdi ca Rev
106. ngs complete with acoustic overlays where applicable 10 Vinyl covered gypsum panels when used in suspended T Bar ceilings 11 Gypsum drywall panels where used in suspended T Bar ceilings Painting of panels by others 12 Guarantee One year labour and materials from date of completion unless otherwise shown in specification 13 Scaffolding for acoustical work 14 Clean up for acoustic work 15 Patching of existing acoustic tile and suspension system included where specifically shown on architectural drawings 16 Any steel stud framing or furring exclusively required for the installation of Metal Linear type ceilings 17 Hoisting for materials and equipment 18 Removal of existing acoustic tile and suspension system where the existing ceiling materials are being re used in the new construction 67 Trade Scopes SBDI Saskatchewan Bid Depository Inc ACOUSTIC TILE AND SUSPENSION SYSTEMS SCOPE contactus sbdi ca Page 2 of 2 www sbdi ca EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified e A A Ta Rh a 12 13 14 15 16 17 Acoustical plaster Caulking Gypsum backing for acoustical work Gypsum board and furring system when gypsum board is taped and filled for painting Sprayed acoustical materials Wood grounds Temporary heat light power and sanitation
107. nical items which are specified to be painted except as noted in Inclusions 2 Any and all portion of the building permit 3 Cutting and patching when pertaining to renovations alterations or additions except cutting of round openings for pipe only up to 12 in diameter and smaller Vapour barrier and insulation not applied to mechanical systems 5 Electric wiring except as provided herein Motor starters disconnects multi speed and variable speed switches protection switches manual and magnetic starters etc vvithout exception 7 Plaster caulking and grouting of all types 8 Temporary heat light power sanitation 9 Hoarding 10 Temporary water services or connections 11 Final cleaning 12 Catwalks ladders grating and support unless specified as part of mechanical equipment package or detailed on the mechanical drawings only 13 Vapour barrier insulation heat grid for recessed floor slabs under refrigerated fixtures and area 14 Fabrication or installation of wooden frost boxes 15 Audiometric room Mechanical to connect services only 16 Architectural features special on site glazing or caulking 17 All appliances e g refrigerators ranges dishwashers clothes washer clothes dryer 18 Paint spray booths 19 Welding booths 20 Backing for mechanical equipment rough bucks and installation of same Location only by mechanical 21 Cutting of all holes for mechanical components into millw
108. ntactus shbdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED The supply and installation of SAA ES A MS e 11 Al components including incidental items required for a complete installation Electrical wiring and conduit from all controllers to signals and operating circuits All licenses Hoisting or escalator equipment Clean up Protection of other trades work from damage by this trade Guarantee Inspection Shop drawings All P C sums and or contingency funds specifically called for in the Escalators specifications Scaffolding EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified SOOO SA ON Oe a Providing adequate power to controllers Temporary heat light power sanitation Water Hoarding Final cleaning Provide wellway with proper supports including bearing plates as required All cutting patching and grouting as required Provide exterior finishes Provide heat and ventilation as required 76 Trade Scopes SBDI Saskatchewan Bid Depository Inc DUMBWAITERS SCOPE contactus sbdi ca Page 1 of 1 www sbdi ca Revised 2001 This contractor shall include the following items regardless of where they may a
109. ons issued addenda and the Saskatchewan Bid Depository Rules and Regulations They shall INCLUDE the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope Incinerators complete with burners draft inducers breeching and stack Refractory lined chimneys complete with flashing storm collars wall brackets and supports Painting with special heat resistant or prime coats if so required Thimbles for masonry chimneys for above equipment only Hoisting for materials and equipment under this Section Excavating etc for work under this Section Permits as required under this Section Inspection as required under this Section SO Oy es ete Manufacturer s warranty only beyond the normal one year warranty as required under this Section e Protection of other trade s work from damage by this trade 11 Clean up They shall EXCLUDE the following items regardless of where they appear in the tender documents Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Final decorative paints Insulation exterior Gas connections Temporary heat light power sanitation Water Final cleaning E Oa Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus sbdi ca Page 1 of 6 www sbdi ca Revised 201
110. ork items 22 Sleeving and rough bucking for 150mm or larger openings Location only by mechanical 23 All cast in place concrete including rebar formwork void forms and granular fill except as noted in Section 2 Plumbing Included Item 3 24 Flashing gum pots roof curbs and related water proofing except counter flashings lead flashings for roof drains floor drains and vents that apply to this trade scope Roof curbs unless specified with Mechanical equipment Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 4 of 7 contactus Oshdi ca SECTON 2 PLUMBING ITEMS www sbdi ca All plumbing systems including fixtures hot water heaters water conditioning equipment sewage pumps sewage ejectors sump pumps circulating pumps and drainage products 1 All yard and storm drainage including sanitary and storm sewers precast manholes and water services except culverts for yard drainage 2 Non electrical smoke detection systems Fire Hose Cabinets hosereels all types of portable fire extinguishers and hose cabinet tubs for modular units 3 Excavation the mechanical contractor shall be responsible for all excavating and backfill and compaction vvith in the confines of the mechanical trench or excavation to facilitate the installation of his vvork including shoring pumping bedding tamping and disposal of surplus excavated material Repair surface conditions of excavated areas to pre excavation
111. ors two Subcontractors and the Chair of the SBDI 9 3 Each request for an appeal hearing shall be accompanied by a cheque or money order payable to the Saskatchewan Bid Depository Inc such sum to be refundable if the appellant is successful and the suspension is repealed by the Appeal Committee see Appendix Il Fee Schedule 9 4 Any Subcontractor Sub subcontractor or General Contractor who is appealing may appear in person on their own behalf or may be represented by counsel He shall advise the Appeal Committee at the time of filing their appeal whether he will be represented by counsel or not 9 5 Each appeal shall be dealt with as soon as is reasonably possible and the hearing date shall be fixed within 14 calendar days of the receipt of the appeal at the SBDI Head Office 9 6 The Appeal Committee shall have access to all files tender documents contract documents and any other information relevant to the appeal 9 7 The Appeal Committee has power to confirm to vary or to dismiss any suspension imposed by the SBDI Authority and may order the reimbursement of any sum paid in advance to have the appeal heard 10 0 FORMS STANDARD TENDER FORM APPENDIX Luaj 19 FEE SCHEDULE APPENDIX IO ccoo 20 DECLARATION FORM APPENDIX HO ccoo 21 TENDERING AUTHORITY ADDENDA CONFIRMATION APPENDIXIV uu 22 PROPOSED CHANGES TO THE SBDI USER S MANUAL APPENDIK Vaj 23 BOUNDARY ZONE MAP APPENDIX VI Luj 24 BIDDER REQUEST FORM APPENDIX VII occ
112. orts for moveable partitions when not attached to structural steel Supply only of all angles and bearing plates for precast core floor supports when not attached to structural steel All deck support angles and deck bearing plates when there is not structural steel in the project All kiosk and ticket booth steel framing by Miscellaneous Metal when not attached to structural steel Overhead doorjamb extensions and hardware support plates where detailed on architectural and structural drawings but not attached to structural steel Rebar dowels and anchors when shop welded to Miscellaneous Metals All rain water leaders and gutters fabricated from material 14 ga or heavier Fabricated door stops c w rubber pucks Nailer holes in embedded plates to facilitate attachment to concrete forms Stage Drapery Support Steel fabricated types only as detailed on Architectural and Structural Drawings including those attached to Structural Steel Manufactured types excluded Powder coating 38 Trade Scopes SBDI MISCELLANEOUS METALS SCOPE Saskatchewan Bid Depository Inc Page 3 of 4 contactus Oshdi ca Revised 2005 www sbdi ca EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified All miscellaneous metal items where detailed on mechanical and electrical drawings only 2 Bolts other than for anchoring ite
113. ourishment tables combining sinks refrigerators ranges etc mechanical to connect services only 8 All modular unit components Refer to Included Item 2 9 Caulking of all plumbing fixtures supplied under Mechanical Scope SECTION 3 HVAC All heating air conditioning ventilation systems piping equipment and components including all propeller type fans and all heat reclaim systems T Sheet metal and non metallic air handling ductyvork of all types including hangers and supports except concrete masonry and dryvvall construction shafts or tunnels 2 All wet and dry type solar heating and air conditioning systems complete with associated accessories not including controls 3 Solar energy systems prefabricated and pre engineered components for the collection and storage of solar energy for the purpose of conversion to mechanical energy includes collectors collector components and packaged solar systems 4 Fuel tanks for power plant equipment complete with Dispensing Units and Piping 5 Lubrication equipment fuel and oil storage tanks complete vvith dispensing units piping and monitoring vviring 6 Dust or material collector systems complete vvith all associated equipment and accessories 7 Carbon monoxide exhaust systems complete with all associated equipment and accessories 8 Steel chimneys for all equipment 3 5mm or lighter types A B and C not factory lined 9 Forced and induced draft fans of all des
114. pene eper erret 5 3 6 DEFINITION MEMBER ae eke 6 3 7 DEFINITION TENDERING AU T HO RIT Ya aak ehe eee rene ene zene rene 6 3 8 DEFINITION SBDI AUTHORITY aaa eee eke dehen kepi eens a eee eee rene 6 3 9 DEFINITION SBDI BRANCH OF RECORD anen h ekr ere eren ren 6 3 10 DEFINITION SBDI DELIVERY BRANCH aaa aaa aaa aaa ane eee ee eke eee rene eve e ee vike rere e reve e ee eiea 6 3 11 DEFINITION SBDI BRANCH MANAGEMENT COMMITTEE aaa aaa aaa anen eneve eee aini 6 3 12 DEFINITION TRADE SCOPE aaa akne eke ee cence eens eee ee eee eee eee RAKAR ee eee rere nenet 6 3 13 GUIDE TO USING THE TRADE SCOPE DEFINITIONS aaa aaa ana n ake nene e rne ee vie ve eee ana 6 3 14 FEEDBACK isa dd od dh e dh ne den 7 3 15 SBDIUSER S MANUAL CHANGE PROTOCOL aaa aaa ana nanen cece eee ee eee rre ee eee re eee eee ve e eeeaea 7 RULES BID POLICIES AND PROCEDURES aaa nanen henen kek eee eee eee rre reve eee ee eee eee kene e eee 8 4 1 TENDERINGJAUTHORI TY io dada 8 4 2 NOTWITHSTANDING CONDITIONS 7 PRE TENDER RULINGS aaa aaa aaa nenen nenen eee 8 4 3 GENERAL MECHANICAL CONTRACTORS aaa nane akne peer k peer petet 9 4 4 BID PROCEDURES FOR SUBCONTRACTORS AND SUB SUBCONTRACTORS 10 4 5 RULES MISSED BIDS lt a aii e Aia cd il 12 4 6 RULES BID SECURI Vai aaa 12 4 7 RULES WITHDRAWAL OF TENDERS oocccccccoccncnncocnncnonnncnnnnnnncnnnonnnnn cnn nnncnnnnnnncnncnnnncnnnnns 13 4 8 RULES PROCEDURES FOR GENERAL MECHANICAL CONTRACTORS
115. ppear in the tender documents unless specifically noted otherwise in this Scope INCLUDED The supply and installation of A e leo e 11 All components including incidental items required for a complete installation Electrical wiring and conduit from all controllers to signals and operating circuits All licenses Hoisting of dumbwaiter equipment Clean up Protection of other trade work from damage by this trade Guarantee Inspection Shop drawings All P C sums and or contingency funds specifically called for in the Dumbwaiters specifications Scaffolding EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified CO SOY ON Rs Oe bee Providing adequate power to controllers Temporary heat light power sanitation Water Hoarding Final cleaning Provide the hoistway structure including supports for both guide rails and machine beams Providing the pit and machine room including proper heating lighting and drainage All cutting patching and grouting 77 Trade Scopes SBDI MOVING WALKWAYS SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus sbdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED The supp
116. prejudice that person s further right to to enter into a contract complying with the tender documents including enforce collection of damages over and above the amount of the accepted addenda and Trade Scope definitions with the successful Certified Cheque General Mechanical Contractor then our Bid Bond or Certified Cheque b In the case of a Bid Bond to deliver our Bid Bond to the shall be returned forthwith successful General Mechanical Contractor for his further 4 In the event that this tender is accepted within the time set out as noted action in 2 above and then our firm declines neglects or fails to enter intoa 5 Upon acceptance of a contract by our firm and upon providing a contract with the successful General Mechanical Contractor for the performance bond if requested our Certified Cheque or Bid Bond amount of our tender or in the event that our firm fails to produce a shall be returned immediately performance bond if requested by the successful General Contractor PERFORMANCE BOND If required by the successful General Mechanical Contractor our firm shall execute within 15 days a performance bond for 50 of our tender price to ensure full and satisfactory completion of the contract The performance bond shall be submitted for approval to the General Mechanical Contractor The cost of the bond is to be borne by the General Mechanical Contractor DECLARATION of the city of in the province of do declare
117. r under regardless of size or shape 10 Brick and Tile Pavers regardless of thickness INCLUDED 1 Caulking between individual tiles or marble granite slate or precast terrazzo panels 2 Hoisting 3 Supply of non slip tile or tile nosings for poured concrete stairs 4 Cleaning to installed products i e acid cleaning and sealant if specified 5 Scratch coat for ceramic tile 6 All P C sums and or contingency funds specifically called for in the Tile Terrazzo Marble and Granite specifications dle Clean up 8 Protection of other trades work from damage by this trade 9 Guarantee 10 Inspection 11 Shop drawings 12 Scaffolding 13 Testing 64 Trade Scopes SBDI TILE TERRAZZO MARBLE Saskatchewan Bid Depository Inc contactus Oshdi ca AND GRANITE SCOPE www sbdi ca Page 2 of 2 14 Demolition If existing surface is to be reused in the new work this trade will be responsible for removal of existing flooring to be reused and cleaning of sub floor for same 15 Waterproof Membranes When system specified is an integral part of the mortar system specified i e when the waterproof membrane is manufactured and distributed by the mortar manufacturer Example Laticrete waterproof membrane and Laticrete Thinset Mortar System EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitatio
118. rades work from damage by this trade Guarantee Scaffolding Skylights single unit application Single unit shall consist of one frame and one component which are thermally formed and incorporate a base frame only no clustered skylights smoke hatches and roof access hatches Trade names only Removal of existing Shingle roofing for installation of new Roof and ridge vents when not connected to Mechanical Plumbing and Electrical Cutting of grout and reglet lines as related to this Scope 43 Trade Scopes SBDI SHINGLE ROOFING AND Saskatchevvan Bid Depository Inc RELATED SHEET METAL SCOPE contactus sbdi ca Page 2 of 2 www sbdi ca EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified OO ON As a 10 11 12 Temporary heat light power sanitation Water Hoarding Final Cleaning Metal sleeves through decks for opening for vents etc Roof drains connected to an internal system Separate curbs for skylights hatches etc Flashing for roof drains and vents All flashing and membranes used for air and vapour seals which do not form part of the roof system or which are not installed in conjunction with and during the construction of the roof system Fillers and vapour seals and air seals Inspection and or testing Testing 14 ga and heavier gutters and downspouts 44
119. rious trade associations to identify work to be included or excluded in the bids for trades listed under the Trade Scopes of the SBDI Tabulating items to be included in a bid provides a common basis for which bidding becomes truly competitive and fair to all concerned 3 13 2 Become familiar with the contents of the SBDI User s Manual 3 13 3 Specify the items in scopes corresponding to the Trade Scope Definitions as all bids will be based on these definitions Discrepancies omissions and duplications will be minimized if this procedure is followed in conjunction with Rule 4 4 13 Where an item falls within a Trade Scopes specification section that item will be picked up by that Trade Scope unless it falls within another Trade Scope or is specifically excluded by that Trade Scope 3 13 4 Know your Trade Scope Definitions and those of related trades which may influence items to be included or excluded from your bid 3 13 5 Regardless of where an item appears in the tender documents for a project the Trade Scope Definitions govern whether or not it should be included in your bid as set out in Rule 4 4 13 6 3 14 3 15 3 13 6 3 13 7 3 13 8 3 13 9 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca Where an item falls within a Trade Scopes specification section that item will be picked up by that Trade Scope unless it falls within another Trade Scope or is specifically excl
120. s Temporary ventilation during application All P C sums and or contingency funds specifically called for in the Seamless Flooring specifications Clean up and sealant as specified Protection of other trades work from damage by this trade Hoisting Guarantee Inspection pe COP ON ce ee ee Shop drawings Scaffolding Testing Rh a N Any painting of lines or markings on the above products EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Temporary heat light power sanitation Hoarding Water Final cleaning Manufactured accessories i e rubber vinyl wood terrazzo base stair treads stringers and risers Finishing of surfaces to receive seamless flooring Expansion joints trade names only and caulking of it Ooi Sal ON ee bo Demolition Removal of existing flooring and cleaning of sub floor when existing flooring is not being reused in the new work 66 Trade Scopes SBDI Saskatchewan Bid Depository Inc ACOUSTIC TILE AND SUSPENSION SYSTEMS SCOPE contactus sbdi ca Page 1 of 2 www sbdi ca Revised 2003 This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 Acoustical a Tile b Lay in panels for use in T Bar c Ba
121. s SBDI LATH PLASTER AND STUCCO SCOPE Saskatchewan Bid Depository Inc Page 2 of 2 contactus sbdi ca www sbdi ca 4 Temporary heat light power sanitation 5 Hoarding 6 Water 7 Final cleaning 8 Thermal insulation except for rigid insulation where used as plaster or stucco base 9 Exterior Gypsum sheathing 10 Steel studs for all finish materials other than lath or plaster including where drywall or sheathing is applied on one side only 11 All flashings whether prefinished or not i e Parapet caps copings drip caps or similar metal breakshapes or extruded products 12 Architectural caulking other than sound seal as noted in Included Item 15 13 Aluminum and or stainless steel accessories when used as plaster stucco trims 14 Removal and or demolition of existing 15 Preformed cast or molded non plaster products e g FORMGLAS or similar non plaster products 16 Any kind of torched on air vapour barrier 17 The supply and installation of Compriband Butyl membrane Bituthane or Copper Fibrene 59 Page 1 of 2 Trade Scopes SBDI DRYWALL SCOPE Saskatchewan Bid Depository Inc contactus Wsbdi ca Revised 2005 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 a ES 13 14 15 16 17 18 19 20 21 22 23 24 25 All stee
122. s for the purpose of conversion to electrical energy 104 Low or line voltage wiring only for the following central vacuum systems dust collection systems and electrically powered plumbing fixtures 105 The supply and installation of electric blinds and controls 95 Trade Scopes SBDI Saskatchewan Bid Depository Inc ELECTRICAL SCOPE contactus sbdi ca Page 5 of 6 www sbdi ca GENERAL ITEMS 106 Hoisting for materials and equipment 107 Inspection permits required for electrical work only 108 Licenses 109 Manufacturers warranty only other than the normal one year maintenance guarantee 110 Number not used 111 Protection of other trades work from damage by this trade 112 Scaffolding 113 Installation charge for permanent power and telephone service as levied by the Utilities when identified in Division 16 as a cost figure or P C sum 114 Shop drawings where required 115 Trade clean up 116 Temporary light and power when specified in Division 16 as a completely detailed system 117 Cutting of openings 12 inch diameter and smaller when pertaining to renovations or alterations 118 Line voltage hook up of overhead door and moveable wall operators and controllers 119 Poly and or plastic vapour hats 120 Halon and Medical Gas Wiring 121 Supply and install data LAN and voice premise wiring EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for t
123. s in pre fabricated metal frames Glass to exterior wood window frames exterior wood sidelites transoms and trade name windows Glass to wood doors overhead doors and solar collectors Glass to scope section gt Curtainwall gt Entrances and Storefronts gt Architectural aluminum windows gt Name brand windows Glass to movable and demountable partitions Plastic skylights which are thermally formed Temporary heat light power sanitation Hoarding Water Final cleaning Demolition 55 Trade Scopes SBDI CURTAINWALL SCOPE Saskatchewan Bid Depository Inc Page 1 of 2 contactus Oshdi ca Revised 2006 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope DEFINITION Curtainwall is that fenestration which continues past one or more floor spans Skylights glazed architectural metal framing flat or sloped not attached to vertical framing and not included under roofing scope INCLUDED 1 Spandrel and infill panels of any material including insulation where an integral part of a panel 2 Glazing 3 Miscellaneous aluminum trim flashing which form an integral part of the curtainwall system 4 All anchoring devices a supply and installation of anchors which are part of the grid b supply only of anchors or inserts which are part of the structure 5 Venetian blinds when between glass
124. s must be compatible with the main fire safety system as provided under the electrical scope These devices are attached to or concealed in the door or and frame and are part of the door control system 10 Door Silencers Rubber Mutes 11 Door Bolts Manual and automatic including Flush Surface Cane Cremone Barrel Chain and Slide 12 Co ordinators 13 Mullion Removable Type Trade Name 14 Door Vievvers 15 Letter Box Plates 16 Keys Key Blanks and Key Control Cabinets 17 Chain Door Guards 18 Exit Alarms Battery Operated 19 Pocket Door Hardware including Frame Track and Hangers 20 Electrically or Pneumatically assisted or operated closer unless these units are in integral part of a standard air assisted aluminum door and frame package 21 All hardware for doors in demountable partitions 53 Trade Scopes SBDI ARCHITECTURAL FINISHING Saskatchewan Bid Depository Inc contactus Wsbdi ca HARDWARE SCOPE E ha ca Page 2 of 2 22 Card readers proximity readers door position switches including all components required for a complete and working access control system 23 Push button access controls 24 Key svvitches relating to electrified door hardyvare 25 Security bars name brand only 26 Uninterrupted power supply battery back up only for hardware supplied in the Hardware trade definition 27 Bi fold Door Hardware Package EXCLUDED Temporary heat light
125. s specified Temporary heat light power sanitation Water Hoarding Final cleaning Steel deck regardless of specifications Placing of embedded items All cutting patching and grouting Loose bolts other than for fastening items of structural steel A E o E E Precast concrete anchors and all steel items that are cast in precast concrete Stainless steel aluminum plastic wood or other specialty items Rh o All steel stairs and handrails and ladders N Bolts washers and shear plates used for glulam connections Steel Studs 99 34 Trade Scopes SBDI STRUCTURAL STEEL SCOPE Saskatchewan Bid Depository Inc Page 3 of 3 contactus sbdi ca 1 Field installed bracing or connections for precast concrete www sbdi ca 2 Stage Drapery Support Steel fabricated types only as detailed on Architectural and Structural Dravvings including those attached to Structural Steel 3 Demolition When the erection of the structural steel is not part of the fabricator contract the fabricator shall furnish a Ordinary machine bolts and nuts of suitable size and in sufficient quantity for all field connections of steel to steel which are specified to be thus permanently connected plus an over allowance of two percent of each size to cover waste and b High strength bolts and nuts plus washer if required or special fasteners of suitable size and in sufficient quantity for all field connections of steel to
126. se items This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in the Scope INCLUDED l Access doors and frames except trade name items and those required for servicing mechanical and electrical equipment 2 All fabricated doorframes not attached to the structural steel drilling and tapping by others 3 Benches and brackets custom fabricated only Bolts only includes those bolts and anchors required for anchoring miscellaneous steel supplied under this division 4 1 Anchor bolts set in concrete or masonry for wood framing nailer plates and supporting wood framed mezzanines de Bumper posts and rails including parking lot guardrails and flex beam guards Burglar bars custom fabricated only T Canopy steel framing soffit and fascia framing overhang and outrigger steel structures sun shade and shadow box steel frames when not attached to structural steel or support by columns regardless of steel section 8 Corner protection angles 9 Elevator hoistway and divider beams and necessary connections and including elevator machine support beams unless attached to structural steel 10 Expansion joint angles and plates 11 Fabricated convector frames and enclosures 12 Fabricated wire mesh and expanded metal partitions and screens 13 Fire escapes as detailed only 14 Flagpoles steel as detailed only 15 Footscr
127. ses 9 Hoisting of elevator equipment 10 Protection of other trades work from damage by this trade 11 Guarantee 12 Inspection 13 Shop drawings 14 All P C Sums and or contingency funds specifically called for in the Elevators specifications 15 Scaffold EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified 1 2 3 Providing the hoistway structure including supports for both guide rails and machine beams Providing the pit and machine room including proper heating lighting and drainage Access doors and frames to elevator shafts and machine rooms 74 Page 2 of 2 Trade Scopes SBDI ELEVATORS SCOPE Saskatchevvan Bid Depository Inc contactus Oshdi ca www sbdi ca Provide adequate power to controllers Providing ventilation of pit hoistway and machine room Hoisting beams and divider beams Temporary heat light power sanitation Water Hoarding Final cleaning Drilling and casing plunger hole for hydraulic elevators unless the piling trade does not form part of the project All cutting patching and grouting as required Lintels over door frames All fixed conduits and fittings between elevators and remote panels and systems if detailed on electrical drawings 75 Trade Scopes SBDI ESCALATORS SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 co
128. shall then notify all General Contractors accordingly All General Contractors will then be free to seek and use other prices for that trade scope The issuer of a single bid if not accepted shall be notified and shall have the opportunity to re bid Where more than one Mechanical Contractor who has notified the SBDI Authority in writing 3 working days prior to their bid closing of their intention to bid the project receives a single bid they may notify the SBDI Authority in writing at least 2 hours prior to the tender closing that a single bid exists Having received more than one such notice from qualified Mechanical Contractors the SBDI Authority shall then notify all General Contractors accordingly All Mechanical Contractors will then be free to seek and use other prices for that trade The issuer of a single bid if not accepted shall be notified and shall have the opportunity to re bid RULES SUCCESSFUL GENERAL MECHANICAL CONTRACTOR 4 10 1 4 10 2 4 10 3 4 10 4 When a General Mechanical Contractor has been named officially the SBDI Authority shall keep a copy of the bids for two years Number Not Used Each Subcontractor or Sub subcontractor whose bid on a specific project has been accepted by the SBDI Authority may examine the tabulated base tender prices submitted to the successful General Mechanical Contractor for their scope only No one is entitled to see the bids except the members of the SBDI Authority Br
129. silient 8 Vinyl or rubber runners 9 Sheet vinyl linoleum and polyvinyl chloride as used for floors on counter tops windowsills and walls 10 Asphalt Plank Flooring 11 Primers 12 Adhesives 13 Cleaning waxing and buffing as per manufacturers recommendations and as specified 14 All P C sums and or contingency funds specifically called for in the Resilient Floor Coverings specifications 15 Clean up 16 Protection of other trades work from damage by this trade 17 Guarantees 18 Inspection require flooring contractors to inspect sub floor so they meet architectural tolerance 19 Shop drawings 20 Hoisting 21 Scaffolding 22 Testing 23 All game lines and markings whether cut in made of or painted on materials as listed in above Scope 1 9 inclusive 24 Demolition if existing flooring is to be reused in the new work this trade will be responsible for removal of existing flooring to be reused and cleaning of sub floor for same EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified SIGN Ks GO Da E Base which forms part of the demountable partitions manufacturers system Temporary heat light povver sanitation Water Hoarding Final cleaning All mats Demolition removal of existing flooring and cleaning of sub floor when existing flooring is not being reused in
130. st 75 days Declaration Forms will be supplied without charge with purchase of envelopes A Declaration Form Bid Bond or Certified Cheque is not necessary in a case where a General Mechanical Contractor is submitting a Trade Scope tender to himself In the event that the Declaration Form and or the required Bid Security is incomplete or not deposited by a Subcontractor or Sub subcontractor at closing that contractor s bid shall not be released to the General Mechanical Contractor s and shall be returned unopened Number Not Used RULES WITHDRAWAL OF TENDERS 4 7 1 4 7 2 4 7 3 4 7 4 4 7 5 Up to 48 hours two working days after the subcontractor closing time subcontractors may by advising the SBDI Authority withdraw their tender and have their Bid Bond or Certified Cheque returned Sub subcontractors may withdraw their tenders up to 4 hours prior to closing of Subcontractors tenders with the same procedure as for Subcontractors above Subcontractors Sub subcontractors who withdraw their bids shall 1 Deliver a letter of withdrawal and applicable fees GST to any SBDI Delivery Branch The SBDI Delivery Branch will advise the SBDI Authority of the withdrawal 2 Where there is no SBDI Delivery Branch deliver the required letter of withdrawal and applicable fees GST to a person of trust as designated by the SBDI Authority Upon payment of the withdrawal fee the SBDI Authority will advise all General
131. steel which are specified to be thus permanently connected plus an over allowance of two percent of each size to cover waste In the invitation to bid or the specifications which accompany it welding electrodes shim leveling plates fitting up bolts and drift pins required for field connections shall not be furnished by the fabricator when the erection of the structural steel is not part of the fabrication contract 35 Trade Scopes SBDI METAL DECKING SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus Oshdi ca Revised 2011 www sbdi ca This contractor shall include the following regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED Supply and Installation of 1 Metal Roof Deck 2 Metal Floor Deck 3 Metal Cover Plates 4 Steel cell closures and Preformed Cell Closures closed cell foam rubber to be supplied and installed while deck installer is on site otherwise these closures are to be supplied only 5 Acoustic Roof Deck 6 Reinforcing and cutting holes in Deck from 150mm to 450mm in diameter 7 Cutting of all holes in deck marked by affected trades at the time of deck installation or structurally framed Including cutting required to accommodate precast panel clips or angles marked by precast supplier or general contractor for cutting while deck installer is on site Supply Only 1 Acoustic insulation for acoustic roof deck
132. tc except where walls are specified with floors and bases and c All having published tests in reference to the following incombustibility chemical resistance exceptional durability eliminating deterioration due to oxidation moisture and ultra violet exposure abrasion resistance elasticity etc and d Applied only by factory trained franchised applicators 2 LISTED UNDER THIS SCOPE OF COATINGS are the following a Epoxies 2 components catalyst cured minimum of 250 microns dry film thickness exclusive of filler coats b Vinyl acrylics interior exterior textured c Neoprene Hypalon d Exposed aggregate coatings e Textured coatings Inorganic Coatings with Acoustical Properties and equal to Canadina Everguard Acostek and Desco Acousticote f Clear natural and pigmented sealant where supplied only by franchise manufacturers g Cementitious coatings where supplied only by franchise manufacturers h Temporary ventilation for application of product ALSO INCLUDED 3 Trade clean up 4 Protection of other trades work from damage by this trade D Guarantee 6 Inspection de Shop drawings 8 Scaffolding 9 Hoisting 10 All P C sums and or contingency funds specifically called for in the Special Wall Coatings specification EXCLUDED Temporary heat light power up to a maximum of 120 208 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified
133. the new work Rubber base when used in conjunction with carpeting 69 Trade Scopes SBDI CARPETING SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus Oshdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED I e O ON Y OA Rh mu NW FR Re Ba e 2 2 a So E ks 21 All carpets including but not limited to a Carpets for tacked installation b Carpets for tackless installation c Carpets for indoor outdoor use d Carpets for wall installation e Carpets for base of windows and display areas f Carpet tiles for floors walls and ceilings g Carpets for ceilings Mats and runners of carpet material Carpet underlay or cushion Carpet base and base cap excluding metal capping incorporated in wall structure Binder bars Reducing strips Nosings other than wood or metal Primers and adhesive with application Initial cleaning after installation Seaming diagram Hoisting All P C sums and or contingency funds specifically called for in the Carpeting specifications Clean up Protection of other trades work from damage by this trade Guarantee Inspection require flooring contractors to inspect sub floor so they meet architectural tolerance Shop drawings Scaffolding Testing Demolition If existing flooring
134. the General Contractor in a timely fashion 23 Metal handrail brackets 54 Trade Scopes SBDI GLASS AND GLAZING SCOPE Saskatchewan Bid Depository Inc Page 1 of 1 contactus Oshdi ca Revised 2001 www sbdi ca This contractor shall include the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this Scope INCLUDED 1 Mirrors complete with adhesives clips or J moldings 2 Glass and plastics including glazing clips and glazing compounds glazed into the following a Hollow metal b Pressed steel c Metal clad wood doors d Industrial steel sash e Display cases f All metal frames other than those falling under gt Curtainwall scope gt Entrance and Storefronts scope gt Interior wood frames partitions and vestibule frames 3 Glass shelving and sliding glass doors including shelf standards clips brackets and or sliding track hardware and locks 4 Clean up of own debris by own forces 5 Protection of other trades work from damage by this trade 6 Shop drawings 7 Scaffolding 8 All contingency funds specifically called for in the Glass and Glazing specifications 9 Hoisting 10 Brush clean 11 Mouldings or dividers required for glass separation EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified IAS Mirror
135. the SBDI User s Manual or provide the location to the manual online www SBDI ca Suggestions in writing relating to the operations of the Bid Depository or the amendment of the SBDI User s Manual may be made at any time by users All suggestions will be reviewed by the SBDI Rules Review Committee 3 0 Users Manual GENERAL PROVISIONS ELIGIBILITY 3 1 3 2 3 1 1 3 2 1 3 2 2 SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca Any Contractor may use any Bid Depository of the SBDI regardless of their geographical location or their membership in any association if they observe the SBDI User s Manual TRADE SCOPES Only bids submitted through the Bid Depository and in accordance with the SBDI User s Manual shall be used Where the word scope appears in the SBDI User s Manual it refers to t Definitions and any Notwithstanding Conditions and Pre Tender Rulings he Trade Scope The following Scopes of work are to be submitted through the Bid Depository PILING SCOPE REBAR SCOPE MASONRY SCOPE STRUCTURAL STEEL SCOPE METAL DECKING SCOPE MISCELLANEOUS METALS SCOPE MEMBRANE ROOFING AND RELATED SHEET METAL SCOPE SHINGLE ROOFING AND RELATED SHEET METAL SCOPE METAL ROOFING CLADDING AND SOFFIT ARCHITECTURAL WOODWORK SCOPE ENTRANCE AND STOREFRONTS SCOPE ARCHITECTURAL ALUMINUM WINDOWS SCOPE ARCHITECTURAL FINISHING HARDWARE SCOPE GLASS AND GLAZING SCOPE CURTAIN WALL SCOPE LATH
136. the purpose of the SBDI User s Manual a member refers to a membership in a Construction Association in Saskatchewan DEFINITION TENDERING AUTHORITY 3 7 1 For the purposes of the SBDI User s Manual the Tendering Authority will refer to the party who has called for tenders on any given project DEFINITION SBDI AUTHORITY 3 8 1 For the purposes of the SBDI User s Manual the SBDI Authority will refer to the SBDI Branch responsible for closing a project DEFINITION SBDI BRANCH OF RECORD 3 9 1 For the purposes of the SBDI User s Manual the Branch of Record will be the branch where the closing should have taken place according to the SBDI boundary map DEFINITION SBDI DELIVERY BRANCH 3 10 1 For the purpose of common closing this is the branch where the bidder deposits their bid DEFINITION SBDI BRANCH MANAGEMENT COMMITTEE 3 11 1 For the purposes of the SBDI User s Manual the SBDI Branch Management Committee will be the Chairman selected by the Local Association Board of Directors at least one General Contractor and selected Subcontractors as required DEFINITION TRADE SCOPE 3 12 1 Where the word scope appears in the SBDI User s Manual it shall refer to the Trade Scope as defined in Rule 3 2 2 plus any approved Notwithstanding Conditions and Pre Tender Rulings GUIDE TO USING THE TRADE SCOPE DEFINITIONS 3 13 1 Trade Scope Definitions have been prepared by the SBDI and va
137. tion of other trades work from damage by this trade 4 7 Trade clean up 4 8 Electrical thermostats for equipment under Mechanical Scope intended for automatic temperature controls complete with subbases or adapter plates to mount on standard one gang electrical box Cover plates for electrical boxes by electrical contractor 4 9 Supply only of access doors when specifically required for access to automatic temperature control equipment only 4 10 Control wiring and or air piping required for all automatic temperature controls supplied under the Mechanical Scope They shall include the following electrical wiring a Remote thermostats and remote prewired auxiliary control panels b Boiler feedwater low water cut offs highlimits flowswitches and operating controls control wiring c The magnetic starter coil and relay coils supplied under the Electrical Scope and intended for Automatic Temperature Controls including interlocking between starters and or relays when controlled automatically Manually started control and interlock wiring by Electrical Contractor 4 11 Orifice plates for system measurements and control 4 12 Utility Control Systems Industrial and process control systems oil and gas refining installation and control systems operating and monitoring systems for water supply and waste water includes metering and sensing devices where specified in Division 15 87 Page 3 of 3 Trade Scopes SBDI AUTOMATIC
138. tts over ceiling high partitions for sound attenuation purposes laid on ceiling De Acoustical adhesives staples nails and screws for acoustical tile 3 Premanufactured individual acoustically rated units applied to surfaces prepared by others e g Tectum Soundsoak Sonotrol and Geocoustic 4 Fire protection to recessed fixtures in time rated acoustical ceilings as required to meet any specified time rating 5 Inserts and hangers capable of supporting acoustic ceiling and all light fixtures supported by ceiling Supports for mechanical equipment and folding doors by others 6 Perforated lay in panels where used with acoustic absorption behind T Sound attenuation baffles i e lead shield except those made of lath and plaster drywall and steel studs or rigid insulation 8 Luminous and translucent ceilings including suspension system reflective foil and backing if specified i e leaf type reflectors eggcrate and translucent panels 9 SYSTEMS a Exposed grid standard and firerated b Perforated metal pan and suspension c Concealed or semi concealed d Integrated ceiling systems NOTE The supply and installation of all fixtures ballasts lamps and lenses for use in an integrated ceiling will remain under the electrical scope see Electrical Scope Included Item 45 NOTE Supply and installation of mechanical boots and deflectors for use in an integrated ceiling will be by the Acoustics Trade e Linear metal ceili
139. uded by that Trade Scope Number Not Used Number Not Used Use of the Trade Scope Definitions does not relieve the General Contractor from their responsibility for a complete contract Any item of work in the tender documents that cannot clearly be identified with a Trade Scope Definition or it appears to be included in more than one Trade Scope should be brought to the attention of the SBDI Authority Branch Management Committee in writing and request a Pre Tender Ruling see Appendix VII Bidder Request Form 3 13 10 Number Not Used FEEDBACK 3 14 1 3 14 2 The success of the Bid Depository is dependent on the co operation and assistance of all users Constant communication with the users of the Bid Depository is necessary to maintain an effective system If errors ommissions or discrepancies are noted in the SBDI User s Manual please advise your trade association or local SBDI branch SBDI USER S MANUAL CHANGE PROTOCOL 3 15 1 3 15 2 3 15 3 3 15 4 Any trade association or group representing a trade scope can present proposals for changes to that trade scope to the Rules Review Committee as per the timetable set out below Prior to forwarding proposed changes and or proposed new Trade Scopes to the SBDI Head Office all trades affected by the change and the Saskatchewan General Contractors Association should be approached for their concurrence see Appendix V Proposed Changes to the SBDI User s M
140. uesday 14 00 preceding Monday 14 00 Wednesday 14 00 preceding Tuesday 14 00 Thursday 14 00 preceding Wednesday 14 00 Friday 14 00 preceding Thursday 3 3 2 Mechanical Contractors shall name by Sub subcontractor and company name on their bid at the time of bidding through the Bid Depository all Sub subcontractors as listed under Trade Scopes 3 3 3 Subcontractors shall close at any SBDI Branch a minimum of 3 working days in advance of the General Contractors closing GENERAL CLOSING TIME SUBCONTRACTORS CLOSING TIME Monday 14 00 preceding Wednesday Tuesday 14 00 preceding Thursday Wednesday 14 00 preceding Friday Thursday 14 00 preceding Monday Friday 14 00 preceding Tuesday 3 3 4 Bids will not be altered after closing time HOURS OF OPERATION OF BID DEPOSITORY 3 4 1 The hours of each Bid Depository shall be the same as the regular working hours of the Local Construction Association DEFINITION CONTRACTOR 3 5 1 In this SBDI User s Manual and for the purposes of the SBDI General Contractor is the contractor that signs the agreement with the Owner or the Owner s representative Subcontractor is the contractor submitting tenders to the General Contractor 3 6 3 7 3 8 3 9 3 10 3 11 3 12 3 13 Users Manual SBDI Saskatchewan Bid Depository Inc contactus Oshdi ca www sbdi ca Sub subcontractor is the contractor submitting tenders to a Subcontractor DEFINITION MEMBER 3 6 1 For
141. uum pumps regulators and accessories 23 Anchor bolts steel and metal frames for equipment bases when used for isolation purpose only 24 Access panels and clean out covers supply only Supply and install when required in sheet metal plenums or ducts 25 Mechanical to connect piping and ductwork only to factory built fame hoods and or cabinets supplied by other specification sections 26 Coil Supports and hangers 27 Cutting of round openings for pipe only up to 12 inches in diameter and smaller when pertaining to renovations or alterations except sheet metal 28 Process Instrumentation In line instruments and sensor wells mechanical piping pneumatic tubing and associated pneumatic equipment Calibration of equipment supplied by Mechanical Refer to Electrical Scope Included Item 30 29 Firestopping of all kinds for mechanical systems only 30 Variable frequency drives in packaged air handlers as defined by package equipment note 1 under mechanical scope page 1 of 7 are supplied and installed by Division 15 All other variable frequency drives are supplied and installed by Division 16 80 Trade Scopes SBDI MECHANICAL SCOPE Saskatchewan Bid Depository Inc Page 3 of 7 contactus sbdi ca www sbdi ca EXCLUDED Temporary heat light power up to a maximum of 120 280 volts and an adequate amperage for temporary lighting heating and convenience outlets sanitation or as specified Painting of on site mecha

Download Pdf Manuals

image

Related Search

Related Contents

Manual de Instruções  Consultations avril 2015  波形生成分析ソフト取扱説明書(暫定版)  CCS v.3 Connection Test User Manual  GBC HeatSeal H425 Laminator  Manual del usuario de AXIS 1650    Ersatzteilliste  pour lire la suite, téléchargez gratuitement le PDF de cet article  1. About this Manual - Oracle Documentation  

Copyright © All rights reserved.
Failed to retrieve file