HIGH PRESSURE POINT VALVE OPERATING INSTRUCTIONS
Contents
1. HIGH PRESSURE POINT VALVE OPERATING INSTRUCTIONS IMPORTANT Ensure that the regulator connected to the point valve has an inlet pressure rating equal to or higher than the maximum fill pressure of the cylinders being used Do not use oils or greases on the point valve or associated components Open all valves SLOWLY and FULLY to ensure the TO PUT THE POINT VALVE INTO OPERATION 1 2 3 Ensure that the cylinder valve outlet is clean Ensure that all outlet points in the pipeline system are closed Check that the isolation valve is closed Momentarily open and then closed the cylinder valve to blow out any foreign matter and ensure that each cylinder is full Close the cylinder valve lightly to make slow opening after connection to the point valve easier Connect cylinder lead coil to the cylinder valve Ensure that the end of the lead coil is not contaminated with any foreign matter or that it is not damaged Ensure that the regulator control knob is fully backed off ie turned fully anti clockwise Slowly and fully open the cylinder valve Check the cylinder connection for leaks using a weak solution of soapy water Slowly and fully open the isolation valve Adjust the regulator control knob until the outlet gauges reads approximately 50 100 kPa Wait until the pressure into the pipeline stabilizes ie cannot hear gas flowing through the regulator Continue to adjust the regulator kno
2. b desired pipeline pressure is reached Note attempting to rapidly pressurise a pipeline system may damage the supply regulator pressure increases gradually Do not remove the plastic caps in cylinder valve outlets until ready for use TO CHANGE OVER SUPPLY CYLINDER 1 2 3 Close the cylinder valve and isolation valve Slowly and carefully remove the supply lead coil from the cylinder On the new cylinder ensure that the new cylinder valve outlet is clean Momentarily open and then closed the cylinder valve to blow out any foreign matter and ensure that each cylinder is full Close the cylinder valve lightly to make slow opening after connection to the manifold easier Connect cylinder lead coil to the cylinder valve Ensure that the end of the lead coil is not contaminated with any foreign matter or that it is not damaged Slowly and fully open the cylinder valve Check the cylinder connection for leaks using a weak solution of soapy water Slowly and fully open the isolation valve to allow the system to operate Note if during the changing of the supply cylinder the pipeline has de pressurised as indicated by the regulator gauges the put the point valve into operation should be followed to avoid damaging the regulator It is recommended that the high pressure point valve systems only be shutdown for servicing or if the pipeline system is not going to be used for a prolonged period of t
3. ime It is normal practice to leave the manifold in an operating condition overnight
Download Pdf Manuals
Related Search
Related Contents
Samsung GT-C3350 User Manual Rollux D Technical Documentation RoyalTek Bluetooth GPS Datalog Receiver Samsung HT-TP33 Korisničko uputstvo Samsung CT-32Z30HDS User Manual Hewlett Packard Enterprise A 5120-24G-PoE EI ANT200 QUICK START GUIDE V1_02 Spirit topLine 8010 Master class au TGS Qu Mixer User Guide AP9372 issue 5 Copyright © All rights reserved.
Failed to retrieve file