Home
        Staticline Installation Manual
         Contents
1.    0 ence T oono baoodaoaononadodnnoodooon AEAT 11  CONCRETELINK     SINGLE CORNER UNIT                                          11                                                                           12  Product Code  STAT  CONGHOD EA AE aea i MTR eM HERETO    lt tvescscvosesesnsssoreasnonesedossseveren 12                                   nth    ssa ea  EE EE nbn cesecectcccussedeaeeeeetcouteuseeeeess 12  INSTALLATION                     siint i E E rade Penn               13    5                 22222222  e E TEE E nea Ee Eae                    14  CONCRETE SYSTEM SETTING OUT               scssseeseccccccscsssseeeeeeccecccccsssceeessecescccceseeeessseessccecsseeeessesoosoes 15  CONCRETELINK LINE                   5                                                                                                                                       16  INSTALLATION I                           16  TIGHTENING TORQUE FOR SWAGELESS TERMINALS                  cesses 16  SWAGELESS                 5                                               1                                                            0                                                  17  IN CASE OF                                                                       1   4                                                            sette setas sss sense teen nana 18    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 2 of 18       EV waRNING
2.    safetylink       INSTALLATION HANDBOOK   WALL CEILING MOUNTED    ConcreteLink       READ ENTIRE HANDBOOK BEFORE INSTALLING ANY SAFETYLINK PRODUCT   ALL PRODUCTS MUST BE INSTALLED IN ACCORDANCE WITH SAFETYLINK S  INSTALLATION HANDBOOK  USING ONLY PRODUCTS SUPPLIED BY SAFETYLINK PTY LTD     FAILURE TO FOLLOW ALL WARNINGS AND INSTRUCTIONS MAY  RESULT IN A SERIOUS INJURY OR DEATH     If you are uncertain and need help please email  safetylink heightsafety com au    Phone   61 249 972272 or 1300 789 545   Fax   61 249 971104  or visit our website www heightsafe          Al Table of Contents    INSTALLATION OF A  SAFETYLINK STATICLINE SYSTEM USING  CONCRETELINK UNITS    WARNINGS                                                                                            3  MAINTENANCE   PERIODIC INSPECTIONS                                        eene        4  CONCRETELINK     SINGLE END                                                      1   1  1            6  Proguct Code  STAT CONELUUE        tirana te ea AEA ren enr UP herren 6                                                                                        6  INSTALLATION oi i a aa a a is                 7  ASSEMBLY              9 eene rase rne aa ree eaa Ene naa 8  CONCRETELINK   SINGLE INTERMEDIATE UNIT                                        9  Product Code  STAT                rr re etnia 9  COMPO NE N S  222222     440  4             4          9  INSTALLATION E aooo AA       52 nano EATE 10  ASSEMBLY              
3.  16mm Washer and  Intermediate Bracket then screw into concrete insert  Ensure Intermediate Bracket lines up with  the run of the staticline     Note  Use Loctite on all threads   IMPORTANT NOTE  Before applying Loctite 243 use Loctite 7471  primer to activate the surface according to manufacturer s instructions      Note  Threads need to have a minimum of six full 360   turns into the ultimate thread     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 11 of 18       EM CONCRETELINK     SINGLE CORNER UNIT    Product Code  STAT CONCL007    INSTALLATION OF A SAFETYLINK STATICLINE SYSTEM  USING CONCRETELINK SINGLE CORNER UNIT                         5    1 x Corner Tube    2 x Wall Mount Intermediates      2 x Concrete Inserts  2 x Washer  16mm 316 Stainless    2 x Bolt  16mm x 25mm 316 Stainless Steel B     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 12 of 18       EM CONCRETELINK   SINGLE CORNER UNIT    Product Code  STAT CONCLO007  INSTALLATION    INSPECT THE CONCRETE FOR STRENGTH   ConcreteLink should not be positioned close to an edge        Positioning of ConcreteLink must comply with Australian Standards     A If any doubt exists as to the strength of the structure an engineer should make the assessment   A  During installation you must be safe at all times     Note  Maximum distance between Intermediate Wall Brackets is ten  10  metr
4.  28 5  o7 9 32  48 35 5  08 5 16    58 43 0    3 8    75 55 5     10   75 55 5     12      1 2      14       16            SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13    Back to Table of Contents       Page 16 of 18    GW SWAGELESS TERMINALS       Swageless Terminals              um    O    Jaw housing Jaws Pressure ring  brass   Caja Mordazas Anillo de lat  n  Coprimorsetto Morsetto Anello di ottone                Head  Cabeza  Testa    TET rs       GB F          D First slide the jaw housing in place on the cable t      E     Then slide the jaws onto the cable  ensuring there 2  is some space between the jaw section      Place the brass pressure ring on the end of the   Cable  Make sure that the distance from the pres  i  sure ring to the end of the cable is 5         Slide the jaw housing over the jaws               E The terminal can now be assembled  Screw the  head firmly to the jaw housing with a spanner 5  Then tighten the tock nut firmly with a spanner    8 Blue Wave recommends sealing with    non acidic  sealing compound when assembling                221  for example  Disassemble the terminal and     fit th g and the cavity with sealing  compound  then assemble the terminal  Repeat  this unti the sealing compound emerges from the  hole through which the cable is inserted  Clean  the terminal  Do not reuse the jaws                   that the dimensions of the termina   and cable match          jaw  o    Maintenance   Check the
5.  5 KN 5 16    10 0      81 0 KN 3s      12 0      117 5         SafetyLink Pty Ltd   StaticLine ConcreteLink Wall Mounted Handbook Version  06 13     21    Inserire prima nel cavo il coprimorsetto    Inserire in seguito il morsetto  facendo in modo  che l aria tra le parti del morsetto sia uniforme    Collocare            di ottone all estremit   del cavo  La  istanza dall anello di ottone all estremit   del   cavo deve essere 5 mm     Spingere   coprimorsetto sopra al morsetto    Ora il terminale pu   essere montato  Avvitare  energicamente ic resta 21 coprimorsetio con una  Chiave e stringere bene    controdado con una  chiave   Durante i  montaggio Blue Wave raccomanda d  sigillare con una pasta di tenuta priva di acidi  ad  esempio Sikaflex 221  Separare il terminale  nem         il Coprimorsetto ed   foro Nero sulla testa  con      pasta di tenuta  poi montare il terminale  Ripetere l operazione fino a che la pasta di tenuta  esca dal foro sul cavo  Pulire il terminale   Non riutilizzate   morsetti    Fare attenzione che la dimensione del terminale     quella del cavo sia la stessa       Manutenzione  In caso di lunga permanenza in ambiente estrema     mente salino o inquinato  controllare regolarmente il  terminale per verificare eventuali danni subiti   Controtare la sigillatura e se non    pi      tenuta  togliere tutta ta pasta di tenuta   Risciacquare quindi il terminale in acqua dolce e    trattario         WD40       Sigillare poi nuovamente il terminale con pasta
6.  Anchorages    ALL ANCHORAGES MUST BE INSPECTED EVERY TWELVE MONTHS  INSPECTIONS NEED  TO BE CARRIED OUT BY A COMPETENT PERSON     Procedures to be followed at inspection time     Visually inspect anchors for signs of deterioration       The Single End Anchor and Intermediate Wall Bracket should remain straight  a bent Single  End Anchor or Intermediate Wall Bracket will indicate that the StaticLine has arrested a fall       Visually inspect the components of the anchor for corrosion  superficial surface marking is  permitted while deeper corrosion or pitting would require attention       Manually  by hand  check the Single End Anchor and Intermediate Wall Bracket for rigidity  and tightness  if the Single End Anchor and Intermediate Wall Bracket can turn in the  anticlockwise or clockwise direction it will require attention       Visually inspect the attachment component of the anchorage where practically possible       Visually inspect the parent structure for modifications or deterioration which might lead to loss  of anchorage strength       Check the condition of line Tensioners and Energy Absorbers       Check for any evidence of wear  cuts  looseness  extension  interstrand wear  corrosion   stiffness  brittleness or fraying of the steel cable       Check the integrity of cable terminations       Check for the presence of contaminants or exposure to a corrosive or extreme environment  which could significantly reduce the working load of the StaticLine       Run the Saf
7.  CONCRETE INSERT    5  Recommended chemical anchor is Power Fast epoxy injection adhesive gel  Read instructions  on product carefully  The entire surface of the ConcreteLink unit that is in contact with the  concrete must have sufficient adhesive gel  as specified on the product     It is recommended that the M16 bolt be screwed into the concrete insert temporarily to assist  with holding the concrete insert during installation  This will also prevent contaminants from  entering the concrete insert prior to final assembly     A  Concrete anchor has to be proof loaded to a pull out force of half their working load     To comply with Australian Standards each ConcreteLink unit must be tested after installation   Allow sufficient time  at least 48 hours  for curing before testing   Test consists of ultimate pull out force proof loading to 5096 of design purpose of anchorage     Note  Drilled in anchorages such as friction and glued in anchorages shall be placed so that the  shear load is at least twice the tension load  For collared eyebolts this translates to a pull at an angle  not exceeding 20 degrees to the surface in which the bolt is installed     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 10 of 18       EM CONCRETELINK   SINGLE INTERMEDIATE UNIT    Product Code  STAT CONCLO01    ASSEMBLY    FITTING THE SINGLE INTERMEDIATE UNIT  6  Locktite must be applied to the Bolt   s threads  Insert Bolt through
8.  I      I  I     I   Y        I  I  I  I  I  Y    Maximum space between Intermediate Assembly is ten  10  metres     Intermediate Wall Bracket    Wall Mounted End Unit and Termination    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 15 of 18        4 CONCRETELINK LINE COMPONENTS       Multidirectional  Single corner assembly can be rotated to line up in any direction     INSTALLATION    1  Attach cable to termination at one end only with Swaged Swageless Termination   Connect Termination to S Cable End Support at opposite end to Tensioner     Run cable through Intermediate wall brackets to opposite end of StaticLine  Intermediate wall brackets    must be installed as per installation manual  maximum distance between Intermediate wall brackets 10    metres      Open out Tensioner     Cut cable to length   Swage cable to Tensioner       ODN DO R    Complete layout diagram on previous pages     Connect Swaged Swageless Tensioner to Tension Indicator     Match up cable so it reaches into Tensioner and mark cable     0  Tension cable till disc on Tension Indicator can be spun freely     Connect Tension Indicator to S Cable End Support at tensioner end of line     TIGHTENING TORQUE FOR SWAGELESS TERMINALS                                                                   Wire size  Nm Lbf ft  03   11 8 25    1 8    11 8 25  o4 5 32  17 12 75    3 16  22 16 5  o5   22 16 5    7 32 38 28 5     6   38 28 5    1 4  38
9.  di  tenuta priva G acidi    Attenzione    il terminale DOVRA  essere stretto di nuovo      primo carico dinamico     terminale    stato p  per   seguenti tipi di cavo  1x19        7x19  7x7    ll terminale pu   essere usato per Dyform  Montando i Terminali Swageless il carico di rottura del    cavo usato viene ridotto del 0      carichi di    15          Shute de terminal sono indicat nello       schema che segue     Wire Dim oem  ag o Breaking strength  Section du c  ble Charge de rupture Section du c  ble Charge de rupture  Diemens  cavo Carico di rottura Diemens  cavo Carico di rottura                1 650 LBS  4 700 LBS  6 600 LBS  8 100 LBS  10 300 LBS  12 300 LBS  17 600 LBS  29 900 LBS                Back to Table of Contents  Page 17 of 18       EM   INCASE OF ACCIDENT       A A FALL RESCUE PLAN SHOULD BE DEVELOPED PRIOR TO USING SAFETYLINK EQUIPMENT   A  Persons working at heights should not work alone     It is critical that before using any SafetyLink Systems a fall rescue plan is in place for any persons suspended  mid air following a fall  Serious injury or death can occur in a matter of minutes  particularly if a person s  movement or breathing is restricted or loss of consciousness has occurred  In accordance with your fall rescue  plan and appropriate first aid procedures it is essential to remove the person from the suspended position as  quickly as possible     In accordance with AS NZS 1891 4 2009 clause 9 5    EQUIPMENT WHICH HAS ARRESTED A FALL OR SHOWS 
10.  have been installed in accordance with the Company   s Installation Handbooks  using only products supplied by the Company   d  accessories used with the Products are manufactured by or approved by the Company      wea    the Products are maintained in accordance with Australian Standard 1891 4  section 9     you notify any claim under this warranty to SafetyLink in writing to the address below no later than  14 days after the event or occurrence concerning the produce giving rise to the claim and you pay  all costs related to your claim             2       This warranty does not apply      any defects or other malfunctions caused to the Goods by accident  neglect   vandalism  misuse  alteration  modification or unusual physical  environment or electrical stress     Please note that the benefits to the purchaser  as a consumer  given by this warranty are in addition to your other  rights and remedies under the Australian Consumer Law  Our goods come with guarantees that cannot be  excluded under the Australian Consumer Law  You are entitled to a replacement or refund for a major failure and  compensation for any other reasonably foreseeable loss or damage  You are also entitled to have the goods  repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure     11 6 If any goods        not manufactured by the Company  the guarantee of the manufacturer thereof shall be  accepted by the Purchaser as the only express warra
11.  terminal regularly for damage      connecti   on with longer exposure to concentrated saline soluti  ted surroundings  Check the seal    it is            sealing compound  Then rinse the  termina  with fresh water and treat it with    040  Reseal the terminal with non acidic sealing  compound    Note   After the fest dynamic load the terminal MUST be tighte   ned again  The terminal was developed for use wah the  following types of cable  1x19  7x19  7x7   The terminal can also be used wath Dylorrr  When assembling swageless terminals the brea  strength of the cadie used will be reduced  Refer to the table for the breaking strength of the terminal                         extr  mement salin  valles             Contr  lez    scellement   si celui ci est  endommag    retire   Rincez ensuite la terminaison    l eau douce  traitez  a  ensuite avec du WD4O  Refaites ie scebement de la  terminaison avec un produit d   tanch  it   neutre    Enfitez le boitier dans      cable   Enfiez ensuite les m  choires sur      c amp ble  r  parli   es de mani  re qu il y alt un espace undorme  entre elles   Montez la bague en laiton sur l extr  mit   du  cable  En veillant    laisser au moins 5 mm entre  la bague et l extr  mit   Gu cable   Ramenez l   boitier sur les m  chores   Vous pouvez maintenant monter      terminaison  manuelle  Vissez         sur le boitier en serrant  fort au moyen d une cl    Serrez ensuite le  contre   ctou tr  s fort avec une cl      Biue Wave recommande de sceler 
12. A DEFECT   Any piece of equipment including both personal and permanently installed items  which has been used to  arrest a fall or which shows any defect during operator or periodic inspection shall be withdrawn from service  immediately and a replacement obtained if necessary  A label indicating the condition or defect should be  attached to the equipment  and it should be examined by a competent person who will decide whether the  equipment is to be destroyed or repaired if necessary and returned to service  In the latter case  details of any  repair shall be documented and a copy given to the operator        safetylink     DISTRIBUTOR     www heightsafety com    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 18 of 18       
13. GLE INTERMEDIATE UNIT                      5    Concrete Insert    Intermediate Wall Bracket    Washer  16mm 316 Stainless             Bolt  16mm x 25mm 316 Stainless Steel E    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 9 of 18       EM CONCRETELINK   SINGLE INTERMEDIATE UNIT    Product Code  STAT CONCLOO 1  INSTALLATION    INSPECT THE CONCRETE FOR STRENGTH   ConcreteLink should not be positioned close to an edge        Positioning of ConcreteLink must comply with Australian Standards     A  If any doubt exists as to the strength of the structure an engineer should make the assessment   A During installation you must be safe at all times     Note  Maximum distance between Intermediate Wall Brackets is ten  10  metres     DRILLING THE HOLE  1  Mark out the position of holes on concrete for StaticLine     2  Locating the steel in the concrete using a  Digital metal detector  BOSCH DMO 10   The detector will ensures the steel is avoided when drilling in the location of the ConcreteL ink     3         28mm hole lop a Ker  of 100mm for the          Insert     Y y A LT unm     7       Du purius 22  SMS Y    MR  d    a ls    Concrete Insert    Et                  Pone st gy  z       Lj    EIRIG  D Lye 4  lt                          d   LS   TS    es 17  PES PRU                 UA S       PREPARING THE HOLE    4         hole must be moisture and dust free  Remove the dust using compressed air     INSTALLING THE
14. S      READ CAREFULLY SOMEONE S LIFE DEPENDS ON IT    e The building or structure for the anchorages should be assessed by an engineer  unless it is  clear to a competent person that the structure is adequate     e All safety procedures must be complied with in accordance with the current safety code s  of  practice s  for working at heights  Ensure safety at all times by being attached to suitable anchor  points and approved safety equipment or approved scaffolding    e Installation is to be carried out by  or under the supervision of a competent person    e To prevent galling of threads on tensioners use nickel anti seize    e Recommended waterproofing for roof tiles  Sika Flex Co Polymer Sealant     e Recommended waterproofing for metal roof  Silicone Sealant             bolt threads must be coated with Loctite prior to assembly   IMPORTANT NOTE  Before  applying Loctite 243 use Loctite 7471 primer to activate the surface according to manufacturer s  instructions      A Maximum user per system is Four  4    A Maximum person per span is Two  2    A See system information for site specific use     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 3 of 18       EM MAINTENANCE   PERIODIC INSPECTIONS    All items of equipment which are in regular use shall be subjected to periodic inspection and  servicing  These regular scheduled inspections and servicing must be carried out by a competent  person     SafetyLink
15. es     DRILLING THE HOLE  1   Markout the position of holes on concrete to install the corner unit     2  Locating the steel in the concrete using a  Digital metal detector  BOSCH DMO 10   The detector will ensures the steel is avoided when drilling in the location of the ConcreteLink     3    Drill two 28mm hole to a depth of 100mm for the ConcreteL ink     Bete pt 44     gt       eats   Poe ut        eX MN     ER CS a E ILE a    AE Shs io    5479 X dk Te            PREPARING THE HOLE    4         hole must be moisture and dust free  Remove the dust using compressed air     INSTALLING THE CONCRETE INSERT    5  Installing the concrete insert   Recommended chemical anchor is Power Fast epoxy injection adhesive gel  Read instructions  on product carefully  The entire surface of the ConcreteLink unit that is in contact with the  concrete must have sufficient adhesive gel  as specified on the product     It is recommended that the M16 bolt be screwed into the concrete insert temporarily to assist  with holding the concrete insert during installation  This will also prevent contaminants from  entering the concrete insert prior to final assembly     A  Concrete anchor has to be proof loaded to a pull out force of half their working load     To comply with Australian Standards each ConcreteLink unit must be tested after installation   Allow sufficient time  at least 48 hours  for curing before testing   Test consists of ultimate pull out force proof loading to 50  of design purpose 
16. etyLink Shuttle along the length of the line to verify its correct function     IN ADDITION TO SAFETYLINK PTY LTD EQUIPMENT  ALL ANCILLARY EQUIPMENT  MUST BE INSPECTED IN ACCORDANCE WITH AUSTRALIAN AND NEW ZEALAND  STANDARDS AND THE MANUFACTURER S INSTRUCTIONS        FOR MAINTENANCE ADVICE AND SERVICES PLEASE CONTACT SAFETYLINK ON  0249 972272 OR 1800 972272 FOR YOUR NEAREST SAFETYLINK INSPECTION    SERVICE CENTRE OR EMAIL  safetylink heightsafety com au       To download Installation Manuals on other SafetyLink products please visit our  website at www heightsafety com    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 4 of 18       EV WARRANTIES    EXTRACT  SafetyLink Pty Ltd STANDARD TERMS AND CONDITIONS  11 1 To the extent permitted by law all implied conditions  warranties and undertakings are expressly excluded     11 22 Except as provided in this clause the Company shall not be liable for any loss or damage  whether direct or  indirect  including consequential losses or damage  arising out of any breach of contract by the Company  or any negligence of the Company  its employees or agents     11 3 Should the Company be liable for a breach of a guarantee  condition or warranty implied by the Australian  Consumer Law  not being a guarantee  condition or warranty implied by sections 51  52 and 53 of that  Law  then its liability for a breach of any such condition or warranty express or implied shall be lim
17. ited  at its  option  to any one or more of the following     A  in case of Goods    the replacement of the Goods or the supply of equivalent Goods   I  the repair of the goods   Il  the payment of the cost of replacing the Goods or acquiring equivalent Goods   V  The payment of the cost of having the Goods repaired   Provided that any such Goods are returned to the Company by the Purchaser at the  Purchaser s expense     B  in the case of services   i the supply of the services again    ii  the payment of the cost of having the services supplies again     11 4        Company will not liable for the costs of recovery of the Goods from the field  loss of use of the  Goods  loss of time  inconvenience  incidental or consequential loss or damage  nor for any other loss or  damage of her than as stated above  whether ordinary or exemplary  caused either directly or indirectly  by use of the Goods     11 5 The Company warrants that at the time of shipment  Products manufactured by it will be free from defects  in material and workmanship  In the absence of a modified written warranty  the Company agrees to  making good any such defects by repairing the same or at the Company  s option by replacement  for a  period of  1  one year from the date of shipment  This limited warranty applies provided that     defects have arising solely from faulty materials or workmanship   the Products have not received maltreatment  inattention or interference             om  wrest    c  the Products
18. l ensemble au  cours du montage avec un produt  neutre  te  que le Sketiex 221  D  montez la termi   naison  rempiissez le boitier et le trou fibre de la  t  te avec le produit d   tanch  it       remontez la  terminaison  R  p  tez cette op  ration jusqu    ce  que le produt d   tanch  it   sorte du trou au  niveau du cable  Essuyez la terminaison  Ne pas  r  utiliser les machoires  Assurez vous que la  section du c amp b             anc   it         du c amp ble correspond aux dimensions de  la terminaison    5 de s  jours prolong  s dans un environnement  ou pollus  assurez vous    inter   r  guliers que ia terminaison n est pas endom              2 ia totalit   du produit d   tanch  it      Remarque  Apres la premiere    PENSABLE da retendre  a   t   mise au point pour fes types de cabies  suivants  terminaispn av    msnaisons S       ge dynamique  il est INDI   la terminaison  La terminaison       1x19  7x19  7x7       est possible d utiliser ta               En cas de montage de ler     eless       r  ttance    la rupture Gu       cable utilis   sera r  duite da 0    15   amp   La r  sistance       la    cor                       Swageless Terminal Breaking strength                 unt    upture de la terminaison est    riforme au tableau ci dessous          Charge de rupture des terminaisons Swageless 3 0 mm TOKN Mum  Carico di rottura per i Terminali Swageless non rullati 4 0 mm 14 5 KN 816   5 0 mm 21 0 KN 732    5 0 mm 36 0 KN 1 4    7 0 mm 46 0 KN 9 32    8 0 mm 54
19. nty given in respect of the goods     11 7 Except as provided in this clause 11  all express and implied warranties  guarantees and conditions under  statute or general law as the merchantability  description  quality  suitability or fitness of the Products for  any purpose or as to design  assembly  installation  materials or workmanship or otherwise are hereby  expressly excluded  to the extent to which they may be excluded by law      PLEASE SEE SAFETYLINK PTY LTD FULL STANDARD TERMS OF CONDITIONS OF SALE FOR  FURTHER REFERENCE     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 5 of 18       EM CONCRETELINK   SINGLE END UNIT    Product Code  STAT CONCLO006    INSTALLATION OF A SAFETYLINK WALL CEILING MOUNTED  STATICLINE SYSTEM USING CONCRETELINKS       COMPONENTS    S Cable End Support       Concrete Insert    Washer  16mm 316 Stainless E B    Bolt  16mm x 25mm 316 Stainless Steel B     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 6 of 18       Eq CONCRETELINK   SINGLE END UNIT    INSTALLATION    INSPECT THE CONCRETE FOR STRENGTH  ConcreteLink should not be positioned close to an edge        Product Code  STAT CONCLOOG6    Positioning of ConcreteLink must comply with Australian Standards     A If any doubt exists as to the strength of the structure an engineer should make the assessment   A  During installation you must be safe at all 
20. of anchorage     Note  Drilled in anchorages such as friction and glued in anchorages shall be placed so that the  shear load is at least twice the tension load  For collared eyebolts this translates to a pull at an angle  not exceeding 20 degrees to the surface in which the bolt is installed     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 13 of 18       EM CONCRETELINK   SINGLE CORNER UNIT       Product Code  STAT CONCLO007  ASSEMBLY    FITTING THE CORNER ASSEMBLY    6  Locktite must be applied to the Bolt   s threads  Insert Bolt through Washer then the    Intermediate Bracket then into the concrete insert  Ensure Intermediate Bracket lines up with  the Corner Tube and the run of the staticline     Note  Use Loctite on all threads   IMPORTANT NOTE  Before applying Loctite 243 use Loctite 7471  primer to activate the surface according to manufacturer s instructions      Note  Threads need to have a minimum of six full 360  turns into the ultimate thread     Concrete Inserts    Vd du  2  La    X79   T2   2  Ae  Dad  VA            Corner Tube    Wall Mount Intermediates    Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 14 of 18       EM CONCRETE SYSTEM SETTING OUT       Wall Mounted End Unit       Tensioner  amp  Tension Indicator  Intermediate Wall Bracket    Single Corner Assembly       Intermediate Wall Bracket    A  l  I  I  I        
21. s  for curing before testing  Test consists of ultimate pull out  force proof loading to 50  of design purpose of anchorage     Note  Drilled in anchorages such as friction and glued in anchorages shall be placed so that the  shear load is at least twice the tension load  For collared eyebolts this translates to a pull at an angle  not exceeding 20 degrees to the surface in which the bolt is installed     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 7 of 18       Eq CONCRETELINK   SINGLE END UNIT       Product Code                      006    ASSEMBLY    FITTING THE S BEND ASSEMBLY    6  Lock tite must be applied to the Bolt s threads  Insert Bolt through 16mm Washer then the S Cable End  Support  16mm hole not the oval hole  this is for the tensioner termination anchoring  then into the  concrete insert   Ensure S Cable End Support lines up with the run of the staticline     Note  Use Loctite on all threads   IMPORTANT NOTE  Before applying Loctite 243 use Loctite 7471 primer to  activate the surface according to manufacturer s instructions      Note  Threads need to have a minimum of six full 360  turns into the ultimate thread     Back to Table of Contents  SafetyLink Pty Ltd     StaticLine ConcreteLink Wall Mounted Handbook Version  06 13 Page 8 of 18       EM CONCRETELINK   SINGLE INTERMEDIATE UNIT    Product Code  STAT CONCLOO1    INSTALLATION OF A SAFETYLINK STATICLINE SYSTEM  USING CONCRETELINK SIN
22. times     Note  Maximum distance between Intermediate Wall Brackets is ten  10  metres     DRILLING THE HOLE  1  Mark out the position of holes on concrete for StaticLine     2  Locating the steel in the concrete using a  Digital metal detector  BOSCH DMO 10   The detector will ensures the steel is avoided when drilling in the location of the ConcreteL ink     3  Drilla 28mm hole to a          of 100mm for AEA E Insert        DEG TV Te Bee  T oh eR UR   aot gen APER OG SN IE IP     x A i 424     S qM     4 ri            Lock tight the Single End    DEAS eu Anchor into the    CADAT ConcreteLink    PREPARING THE HOLE    4         hole must be moisture and dust free  Remove the dust using compressed air     INSTALLING THE CONCRETE INSERT    5  Recommended chemical anchor is Power Fast epoxy injection adhesive gel  Read instructions  on product carefully  The entire surface of the ConcreteLink unit that is in contact with the  concrete must have sufficient adhesive gel  as specified on the product instructions     It is recommended that the 16mm Bolt be screwed into the concrete insert temporarily to assist  with holding the concrete insert during installation  This will also prevent contaminants from  entering the concrete insert prior to final assembly     A  Concrete anchor must be proof loaded to a pull out force of half their working load     To comply with Australian Standards each ConcreteLink unit must be tested after installation   Allow sufficient time  at least 48 hour
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Olympus IR-500 User's Manual  ヨコ - エイムテック  Vision TC2-HDBTRX  Print Server - BN elektronik ApS  Contador multifuncional  Site web Mode d`emploi    Magnavox FW 520C User's Manual  Ouvre-boîtes Gehäuseöffner Case opener Abre-caja Ouvre  Samsung SEK-1000 User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file