Home
        Operating Manual  - Stanmech Technologies Inc.
         Contents
1.     OPERATING INSTRUCTIONS    LEISTER Astro  Automatic Wedge Welding Machine    AN Please read operating instructions carefully before use  Ll and keep it for further reference     APPLICATION    The LEISTER Astro is an automatic wedge welding machine for overlap  welding of geomembrane liners in earthwork and civil engineering     e Thermoplastic geomembrane liners e Type of seam  High density polyethylene PE HD Welding seams are pro   Low density polyethylene PE LD duced in accordance  Chlorinated polyethylene PE C with DVS 2225 part    Polypropylene PP Other dimensions are pos     sible on request     DVS  German Welding Society for welding       LEISTER Process Technologies  Riedstrasse  CH 6060 Sarnen Switzerland  Tel   41 41 662 7474 Fax  41 41 6627416 www leister com sales leister com     N WARNING  Danger  Unplug the tool before opening it as live com   ponents and connections are exposed     Incorrect use of the hot wedge tool can present a fire  and explosion hazard especially near combustible  materials and explosive gases     Do not touch the element housing and wedge when  hot as they can cause burns  Allow the tool to cool  down  Do not point the hot air flow in the direction of  people or animals     Connect the tool to a socket outlet with protective  earth conductor  Any interruption of the protective  earth conductor within or outside the tool is danger   ous  Use only extensions cables with a protective  earth conductor     o pe       N CAUTION  The voltage
2.    20 0  420 USB    wo  No    File name    e A file name consisting of the current date  month and day  and the  file number will be created automatically when recording is started   Example 0309 002     09  March  second recording      5   iuret 3 2 20 1000   e The file number increases automatically every time it is saved  2  420   gt  9   The number begins again at 001 every day  3  0 00    Presettings e    To set date  edit client text or display of operating hours counter                                            By pressing keys     l  and        at the same time  the following display appears   YH    Date Text   gt   x  Show Timer         M    30  H  Set Date SEU  aoa 2 10  390 210 Show Text   gt    Changes automatically to operating  mode after 3 seconds      COMPANY Time  14M07 43   M  Edit   H  OK Date  16 02 10  A     or     key                                H sEnter    edit value before the cursor                         HE               or     key   e  key   y       en H  move cursor to next value  l H  key      H  key   H  k  M  key   Existing text is Hl a       M  return to operating mode  accepted  symbo  Return to  M  key  l  operating mode IM  back to previous  symbol          Finish  Enter a   space   as the last character  Confirm with  the  H  key  The text may be a maximum of 16 characters long         FIRMA XY    Text Ok   H  0k    12    Default settings    Setting the start value of the   joining force for the recording   The joining force which is t
3.   should be  about 1 mm    e Tighten the hexagon cap screw of the front guide roller  18         Cross section diagram of hot wedge system       CHANGEOVER OF UPPER DRIVE PRESSURE ROLLER LEISTER Astro    The LEISTER Astro is suitable to manufacture overlap welded seams in different  fields of applications  They differ in the width of the welded seam as well as the  width of the test channel  Also welded seams without test channel can be  manufactured  In order to implement these different overlap seams  the appro   priate drive pressure rollers have to be installed           1  Countersunk screw M3x6 7  Shaft 8x118 5   2  Protection sheet swivel head 8  Shaft retaining ring   3  Socket head screw M4x8 9  Distance disk 20x32x0 5   4  Washer 4 2x25 10  Drive pressure roller   5  Slide roller 11  Woodruff key 5x6 5   6  Set screw M5x12 12  Upper drive shaft complete    Dismantling of the drive pressure rollers  sequence 1   12  Assembly of the drive pressure rollers  reverse order 12   1    CHANGEOVER OF LOWER DRIVE PRESSURE ROLLER LEISTER Astro             1  Countersunk screw M5x 16  2  Clamp disk   3  Drive Pressure roller   4  Distance disk 20x32x0 5    Dismantling of the drive pressure rollers  sequence 1  4  Assembly of the drive pressure rollers  reverse 4   1          TRAINING    LEISTER Process Technologies and their authorised Service Centres offer free  welding courses and training     ACCESSORIES  e Only LEISTER accessories should be used     MAINTENANCE    e Check m
4.  Check the welded seam  wash seam thickness reduction   As required   adjust the welding speed with El keys on keyboard  6     e The automatic welding machine is guided along the overlap with the carrying  handle guide handle  12   so that the frontal width of the overlap is kept within  The 22mm zone  see illustration B      Illustration B    Se     gt  ZZZ z  KEE s Max  frontal width of    Dim  of pressure roller 50mm p  Dim  of pressure roller 45mm    P7 X  yj 24 5 mr                                                            End of welding process         e Release the tension lever  9  1 cm before the end of the welded seam   e Switch off the drive motor with key IM on the keyboard  6   Switch off the heat   ing by pressing the  Hana  Flkeys on the keyboard  6  simultaneously     8       ADJUSTING THE HOT WEDGE LEISTER Astro    Adjusting of the guide rollers for the requested material thickness    e Engage the automatic wedge welding machine on the geomembrane liner  or film to be welded    e Stretch the lever  9    e Loosen the hexagon cap screw of the rear guide roller  19     e The distance between the hot wedge  8  and the rear guide roller  19  should  be the thickness of the material and the sharp tongue of the wedge should lie  centrically to the pressure rollers  20 21     e Tighten the hexagon cop screw of the rear guide roller  19     e Loosen the hexagon cap screw of the front guide roller  18     e The distance between hot wedge  8  and front guide roller  18
5.  rating stated on the tool should correspond  to the mains voltage     For personal protection  we strongly recommend the  tool be connected to an RCCB  Residual Current Circuit  Breaker  before using it on construction sites     The tool must be operated under supervision  Radiant  heat from the hot wedge can ignite flammable mate   rials     Protect the tool from damp and wet     DOGG    APPROVAL MARKS        TECHNICAL DATA Protection class I    CCA certified    Voltage V  120  200  230     y mains voltage is   Frequency Hz 50 60 not reversible   Power consumption Ww 1800   Temperature   C   F max  420 788   Welding pressure N Ibs max  1500 337   Drive m min  feet 0 8 5 0 2 6   16 5   Overlap width mm Inch max  150 5 9   Thickness of material mm mil 1 5   3 0 60   120   Noise emission level Lpa  dB  70   Size LxWxH mm 475 x 355 x 315 with carrying handle    guide handle  12    Weight kg lbs 23 50    2    FUNCTIONAL DESCRIPTION LEISTER Astro       Heating system     The hot air temperature is steplessly adjustable and eletro   nically controlled  It is a floating hot wedge        Cross section diagram of hot wedge system  y Pinch roller             Upper geomem   brane liner    Upper drive    pressure roller    Welding direction      gt  illa Er Fastening screw    for hot wedge    Lower drive    pressure roller    Lower geomem   brane liner    Rear guide Front guide  roller roller          e Welding pressure     infinitely variable  steplessiy adjustable   The welding pres  
6.  sure is transmitted via a toggle lever to the pressure rollers  The swivel head  guarantees the equalization of the pressure to both welded sections  C and D   as well as on a welded seam without test channel    This allows T joints to be welded easily  During the welding process the pres   sure adjusts itself linearly to the change in material thickness of the geo   membrane liners     Cross sectional diagram of an overlap weld       Seam thickness reduction   A   B      Thickness of the upper and lower membrane    Thickness of the welded seam     Welded section 1    Welded section 2    Test channel    moOowr               e Drive     The welding speed is adjustable and electronically controlled in steps  of 0 1 m min   feet  Digital display of SET and ACTUAL values  The power trans   mission works through a three stage planetary gear     DESCRIPTION OF MACHINE LEISTER Astro    Frontal view                            DESCRIPTION OF MACHINE    1  Mains cable 14   2  Cable clip 15  3  Housing of electronics 16  4  Main switch 17   5  Display 18  6  Keyboard 19  7  Motor  Drive 20   8  Hot wedge 21   9  Lever 22   10  Adjustment screw for welding  pressure 23   11  Locking spring of adjustment screw 24   12  Carrying handle   Guide handle 25     13  Front wheel    WELDING PARAMETER              N  Welding pressure Illustration A    1500  1375  1250  1125  1000  875  750  625  500  375  250  125                                                                            12345612
7. 3456  max  welding pressure 1500 N       LEISTER Astro    Back wheel      Foil guide    Cable conduit for hot wedge    Pinch roller      Front guide roller    Rear guide roller    Lower drive pressure roller  Upper drive pressure roller  Adjustment screw for swivel  head   Chain guard of lower part  Chain guard of tension arm  Chain guard of gear case    LEISTER Astro    Welding pressure    109 and position the  automatic welding machine  onto the material to be wel   ded  Insert the two geomem   branes liners or films about  5mm at the back of the  machine  Pull the lever  9    The hot wedge is automat   ically pushed forward  Push  and hold down the lockin   spring  11   Turn the adjust   ment screw for welding pres   sure  10  until the drive pres   sure rollers  20 21  slightl   touch the material to be wel   ded  Let go the locking  spring  11  and release the  tension of the lever  9      Keep pushing the locking  Seng of the adjustment screw   11   Adjust the welding pres   sure by turning the correspon   ding adjustment screw  10   according to Illustration A and  let go the locking spring  11   at the requested welding pres   sure     Warning    If the maximum welding pres   sure of 1500N is exceeded  mechanical damage may  occur  2    WELDING PARAMETERS LEISTER Astro    Welding temperature EN   Set the welding temperature with the Hl  Iz keys  The temperature is  dependent on the material and the ambient temperature  The in put SET value  will be shown on the displa
8. SET value      Voltage display ACTUAL value      Heating   Drive active     lt  Overload indication          P       Main Switch  4  ON    LEISTER Astro                                                                      1 3 5  000 3400 230V  eco DO   2 4  1 3 5  eeu 400 230V  46  60   2 4  6                ecus 400 esov  n    45              Check the welding process and identify faults by means of the display of power             consumption    Display  4  Heating reason for fault after heating up time  100   e mains under voltage   Display  2  Drive reason for fault       100     100   or  100   or  100   or  100   or    MAMA       e mains under voltage  e overlap of the geomembrane liner too wide  e dirt on the drive rollers  20 21   e max  welding pressure  1500 N  has been exceeded  e high welding speed with large sudden overload    ie anchoring trench  T joints            If malfunction does not disappear  contact service center       AAA qq    WELDING LEISTER Astro    Welding procedure    e Check    Drive  Pressure rollers  20 21  as well as the hot wedge  8  must  be clean before engaging into the geomembrane liner or film     Cable length Cable guide     e Adjust welding parameters  see page 5 6    e The welding temperature must be achieved    e Guide and position the automatic welding machine into the over lapped  geomembrane liner or film    e Switch on drive motor with Mj key on keyboard  6     e Pull the lever  9           Beginning of welding process         e
9. ains cable  1  and plug for electrical and mechanical damage   e Clean hot wedge  8  with a copper brush    e Clean drive and pressure rollers  20 21  with a wire brush    e Treat chain  22  with a suitable spray as required  chain guard 23 24     e Check whether rollers  13 14 17 18 19  are running smoothly     SERVICE AND REPAIR    e The tool should be checked by an authorized Service Center if the following  message appears on the display  5     maintenance  servicing       e Repairs have to be carried out by authorised LEISTER Service Centres only  They  guarantee a specialized and reliable repair service within 24 hours using  original LEISTER spare parts     GUARANTEE AND LIABILITY    e Guarantee and liability are in accordance with the guarantee certificate as  well as with the currently valid general business and sales conditions     e LEISTER Process Technologies rejects any guarantee claims for tools which are  not in their original condition  The tools must never be altered or changed     Technical data and specifications are subject to change without prior notice     Your authorized Service Centre is     LEISTER Process Technologies  Riedstrasse  CH 6060 Sarnen   Switzerland  Tel   41 41 662 74 74 Fax  41 41 6627416 www leister com sales leister com    10    Operating instructions  Translation of the original operating instructions     Please read operating instructions carefully before use and keep for future reference     Please keep the operating instructions t
10. lues are now recorded    every 5cm   Stopping the recording o      Recording is stopped automatically when the drive is switched off  or the clamping lever is released     e  f only the clamping lever is released  a new file will be created  automatically which will be written to when the clamping lever is  reactivated  The message   PLEASE WAIT USB   appears on the    rg PLEASE WAIT USB  Never remove the USB stick from the USB port while the S0 2  420     message   PLEASE WAIT USB   is still shown     Further recordings    4    e  f the drive and heating remain switched on  a new file will be created and the process values will be recorded  every time the clamping lever is activated     e  f the drive is switched off  no new file will be created and there will be no recording of the process values  after the clamping lever is activated     e  f the values are not to be recorded any more  the USB stick must be removed  e Check the remaining memory of the USB stick on the PC from time to time     Evaluation e      Insert USB stick into USB port of a computer  not supplied    e Start spreadsheet software  not supplied       Open file   e Select drive  drive with USB stick      File type    all files     e Select and open the desired recorded file    csv    e The file opens  Example of file content        Full Report  Client text  can be edited  COMPANY  Number of recording file File number  0825 002  LEISTER Switzerland  ASTRO  Software Release 3 1A USB  Serial number  ASTRO Se
11. o be recorded  can be set between 100 N and   500 N in 5 N increments        initial    Press  H  or  M  key once   to return to operating mode   changes automatically after  3 seconds     Activating the alarm output   An acoustic alarm is activated if tolerances  are exceeded  This alarm can be switched  ON or OFF  The parameters can be edited            0 0  3 2    ALARM       Press  M  key once    to return to operating mode   changes automatically after  3 seconds             key  Alarm OFF             x           recording          no  yes     ara    Press  M  and  H   keys simultaneously    value  200N           or     key  Edit value           20  420    0  USB            Press  H  key twice         H set           key  Alarm ON    Press  H  key once  to  go to recording mode  selection and to set  the limit values            Default settings    Select recording mode    e Short Report  Record only if parameters are  outside the set limit values      Long Report  Recording every 5 cm    Set limit values for alarm output  If the effective value is outside the set limit    values  the acoustic alarm will be activated      M  key    Return to operating mode   changes automatically  after 3 seconds     Press  H  key three times   to set the limit values    Recording mode  Full Report              or     key  H Toggle between  Full Report or  Short Report                limit setting  Temp _min 400  C       El  4  or     key    Edit values             limit setting  Temp _ma
12. o hand when operating the COMET hot   wedge welding machine     Li    USB port  optional  e  Attachment for the Leister ASTRO hot wedge welding machine    Application    The USB port enables the process values temperature  speed and pressure to be recorded on a standard USB stick   The assessment is made using spreadsheet software  not supplied  e g  Microsoft   Excel     Basic information regarding the USB stick      Never remove the USB stick from the USB port while saving  The data will not be saved  Always finish recor   ding welding in accordance with the operating instructions    e  f a new USB stick is used  this should be formatted in format FAT 32 with memory size 512 bytes    Important  Always test new USB sticks on the device  Sometimes not all USB sticks work with the device   This can depend on USB copies or on preinstalled software which wants to start up automatically  for example  etc     Date and time    e Set up or check the date and time the first time that the device is started up  You can find the instructions for  this under the heading Presettings  diagram       The date and time are powered by a battery independent of the power supply   It is recommended to check its function periodically     Inserting USB stick    e Unscrew protective cover  e Insert USB stick in the USB port  e Screw the protective cover back on  e   USB   appears at the bottom right of the machine s display  Without the USB stick  the mains voltage is displayed at the bottom right  
13. rial number  715092  Header Date  25 08 2010  Time  16 02 16  v  2 5 m min  t  380  C  Recording interval intervall   5cm  Start value for recording initial value   350N  Alarm switched off Alarm   OFF  Column headings Distance Speed Temperature Force  Unit  cm  v  m min  t   C  FIN   1  Record 0 2 5 380 1015  another record every 5cm 5 2 5 380 1015  10 2 5 380 1015  15 2 5 380 1015  20 2 5 380 1015  25 2 5 380 1015  30 2 5 380 1015  35 2 5 380 1015  40 2 5 380 1015  45 2 5 380 1015  Data 50 2 5 380 1015  55 2 5 380 1015  60 2 5 380 1015  65 2 5 380 1015  70 2 5 380 1015  75 2 5 380 1015  80 2 5 380 1015  85 2 5 380 1015  90 2 5 380 1015  95 2 5 380 1015  100 2 5 380 1015          Evaluation    Short Report       Header  Client text  can be edited     Number of recording file    Serial number ASTRO    Recording interval  Start value for recording  Alarm switched on  Alarm limit values    Data       COMPANY   File number  0826 003   LEISTER Switzerland   ASTRO   Software Release 3 1A USB   Serial number  715092   Date  26 08 2010   Time  08 02 28   v  2 7 m min    380  C   intervall   5cm   initial value   350N   Alarm   ON   Limit setting   Lower limit temp    350   C   Upper limit temp    450  C   Lower limit force   800N   Upper limit force   1200N   Tolerance speed   5cm       Column headings    Deviations from the limit values  are logged  only if alarm is  active     Distance    Speed    Temperature    Force       No limit value deviations    Summary       Column heading
14. s    Seam length       Unit    Summary of the welding para  meters at the end of the seam        m                    380 1015    1015    If a parameter is outside the set limit values  this will be logged  only if alarm is switched on   At the end of the  recording a summary of the welding is logged     Compile diagram  only possible with Full Report  oS    Select a recording  Highlight columns including   column headings         Click on the   create diagram   symbol and create diagram using the wizard  for more precise specifications  see  the Microsoft   Excel help or Excel user   s manual  not supplied      Possible representation       1200       1000          800          600       Speed  m min        400    Temperature    C    Force  N           200                                                             Distance  cm             Temperature    C          Force  N                      Speed  m min                                                                                                     20     LersTER   BN    Your authorised Service Centre is        Leister Process Technologies  Galileo Strasse 10  CH 6056 Kaegiswil Switzerland    Tel    44141 662 74 74  Fax   41 41 662 74 16  www leister com  sales leister com    141 158 GER   ENG  BA USB Port   11 2010    Anhang zu BA ASTRO    
15. x 450  C    H    limit setting  Force_min 1000N    H  limit setting  Force_max 1250N    H    limit setting       Speed     5cm B  0 0 20 0  3 2 420 USB       Display when alarm activated    Display when alarm activated    Speed below the limit value  flashing    Speed above the limit value  flashing    Temperature below the limit value  flashing    Temperature above the limit value  flashing    Joining force below the limit value  flashing    Joining force above the limit value  flashing    va    0 0  S    u    lue  3 0      gt     20 x 0  420    USB    420 x1000  420     2002    420 x1000  420     420    Tog    2002    2002    luex1000    20     420      gt 002     gt 002    Recording the process data    4    e After the presets have been entered correctly  the device is ready to  record     e The heating and drive must be switched on in order to start a   recording  as per ASTRO operating instructions   The message PL a A  gt  ys as USB      PLEASE WAIT USB   flashes on the display  Now the file is opened    and the header created       e The   symbol appears before the file number as soon as the file has       gt       5 i    00 3  been created  The welding machine is now ready for recording to    start    e Recording is started by activating the clamping lever   As soon as the pressure exceeds the set value  setting of pressure 3 2 420 1000  initial value   the symbol on the display changes from   to a flashing      3    2  420  002  The speed  temperature and pressure va
16. y  Switch on the heating by pressing the TH  and  keys simultaneously  Heating up time approx  5 mins                                            n cursor will blink on  Healing e I   gt      the display    I     SET value setting  ron nn 3010  es IE  amp    ON OFF uuu HOD cC3uv   eei unnx   _ u uu   Welding Speed                According on the film or geomembrane liner and the influence of the weather   set the welding speed with the el keys  The in put SET value will be shown  on the display                                   Drive  gt   A SET value setting  n n 33   m oworr  220 20 230V  ee0  400  WELDING LEISTER Astro    Welding preparation    Laying Width of overlap is about 80mm to 130mm    Geomembrane liners must be clean between  the overlap as well as above and below       Mains supply At least 3kW  generator  supplied with an RCCB      Cable to mains A minimum cable cross section in accordance  with the table        200   230 V  to 50m 3x1 0mm   to 100m 3x2 5 mm    120 V  to 50m 3x1 5 mm2   to 100m 3x2 5 mm        WELDING    Operating conditions    e Connect the hot wedge welding machine to the mains  e Start the machine with Main  or Control Level    Main   Level      Speed  Speed    lemperature    Temperature    aN    Control   Level      Speed  Speed    Temperature    Temperature    Oo RON      Voltage display                    Main Switch  4  ON    ACTUAL value  SET value  ACTUAL value  SET value  ACTUAL value         e    ACTUAL value  SET value  ACTUAL value  
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Système audio Bluetooth pour iPad, iPhone et iPod ® Des  SPEEDLINK AVENZA    MANUALE UTENTE ITALIANO USER MANUAL  ATEN Technology ALTUSEN KH88 User's Manual  Cordis - Endoprothèse Nitinol PRECISE RX  USB driver instalation User Manual    Copyright © All rights reserved. 
   Failed to retrieve file