Home
        Operation and installation manual. 2014.11.12 1
         Contents
1.  up to working pressure 1 5 bar  standard version  or on special order in the B  construction up to pressure 2 5 bar    Next to the boiler  there is a fuel storage bin with a feeder screw at the bottom  The ash pan capacity is  suited to the capacity of the fuel bin  i e  the ash pan should be filled with ash after fuel from the bin     pea grade  coal     has been burnt  There is a water tank behind the fuel bin for extinguishing the fuel bin in an emergency   when the boiler is fired with pea grade coal  or the connector for mounting a thermostatic valve  required when  the boiler is fired with biomass   The connector is installed only when a boiler for pellets is ordered  The water  tank of the emergency extinguisher opens onto the feeder screw    The fan which provides air for combustion is situated before the fuel bin and is connected with a  burner  The amount of air for combustion can be regulated by changing the fan rotation speed on the boiler  regulator  recommended  or by manual setting of the choking flap on the fan    The heating water inlet is situated on the back wall of the exchanger  in its bottom middle  the water  outlet is situated on the top left and right  In the back of the boiler there is a smoke conduit  which carries flue  gas to the chimney  The steel exchanger  its cover as well as lower and upper door  are covered with mineral  insulation  which reduces heat loss during combustion  The steel casing is protected with high quality powder  paint     
2.  when  during the grate cleaning with a hook   embers start to fall down to the ash pan    In the evening  before burning in the boiler during the night  the grate should be cleaned thoroughly  In  the morning  after night burning  remove caked coal with a hook to clear the air supply  Put some fuel onto the  embers and do not remove ash and caked fuel from the grate until the fuel is burning  Then add fuel until the  combustion chamber is full  Each time you check the amount of fuel in the combustion chamber and each time  before stoking the fire  switch off the fan on the regulator  preferably by switching off the regulator  and delay  opening the loading door until the fan stops  the door is leak tight and you should first loosen it slightly  wait  until pressure in the combustion chamber equalises and only then can you open the door fully  This will prevent  9 Operation and installation manual  2014 11 12   hy    KLIMOSZ    hot flue gas from being blown out into the boiler room  The lower door of the furnace  the door of the lower  combustion chamber and the loading door must be tightly closed during the boiler operation    NOTE  When opening any of the boiler s doors  stand in such a way as to prevent any hot gas from the boiler  from causing harm to you or to anyone standing nearby    Adding more fuel     switch off the fan first  preferably by switching off the regulator   After the fan is  switched off and stopped  open the lower door of the boiler  Open the upper doo
3. 4  Construction of the KLIMOSZ MULTICOMBI boiler    The KLIMOSZ MULTICOMBI automatic boiler is not maintenance free  it is therefore  recommended that the user should carefully read the principles of its operation  regulation and maintenance in  order to avoid any problems related to its work  Construction of the KLIMOSZ MULTICOMBI boiler makes it  possible to use solid fuels in the automatic or traditional mode  The boiler has been constructed on the base of a  cast iron exchanger of the multi purpose VIADRUS U22 boiler  The cast iron part of the boiler  which is called  the upper combustion chamber  can be used for burning coal  coke or wood as substitute fuel after manual fuel  loading  KLIMOSZ MULTICOMBI boilers can be installed also in a closed system up to working pressure 4 0  bar    Under the water grate of the boiler heat exchanger of a U22 boiler  there is an added steel combustion  chamber  with  W version  or without  S version  a water jacket  There are the chute  horizontal  burner in the  lower combustion chamber  Fuel burning  pea grade coal  pellets  in automatic mode takes place in the lower  chamber  Under the combustion chamber there is an ash pan    Next to the boiler  there is a fuel storage bin with a feeder screw at the bottom  The ash pan capacity is  suited to the capacity of the fuel bin  i e  the ash pan should be filled with ash after the entire fuel from the bin  has been burnt  There is a water tank behind the fuel bin for emergency extinguishin
4. TECHNICAL SPECIFICATION  KLIMOSZ MULTIDUO  MULTICOMBI BOILER       OPERATION AND INSTALLATION MANUAL KLIMOSZ MULTIDUO  MULTICOMBI BOILER   PART 2    www klimosz  pl    1  Technical Data for KLIMOSZ MULTIDUO    Table 1  Dimensions and technical parameters of the KLIMOSZ MULTIDUO boiler     Klimosz Klimosz Klimosz  Parametr SI MultiDuo   MultiDuo   MultiDuo  15 2 32  Nominal power   kW 32 30  Efficiency   85 1 89 3 87 3    Power regulation scope 5 1 17   5 5 18 5 9 6   30    Use of fuel at nominal power     continuous Ei    heating   pea coal EA    pellets 18 MJ kg kg     2    brown coal 3  Storage bin volume 230 230  Approximate combustion time at nominal P g  power   pea coal y   1   2   7            a Q    a E  S Boe Jz   lt  lt  DS  gt             8  9  230   5   5       4  4    LS        2  3    O  kd  9  9  DI  9  9  O  DI       5  0 5 4  6  0  da  5  1 18    7    pellets 5  Flow of fumes in the smoke conduit   brown Is  coal   nominal power 5  4      C   100 170   100 170   100 170     8  Boiler class   3 3 3 3 3 3  Mass 25 510 540      1   0       n  ya    va    NEON IZS 560    Heating area of the boiler   m 3 3 5  Water volume 92 105  m 160  Chimney draught 10   20  Water maximal working pressure  Water minimal working pressure  b  Fluid group  Recommended working temperature for heating  water    C  Minimal temperature of water returning to the  boiler  Maximal permitted level of heating material  Safety valve  Noise level  Connections of the boiler   heating and  ret
5. g  when pea grade coal is  used as fuel  or a place for installing a thermostatic valve  required when pellets are used as fuel      a protective  device in case flame gets to the fuel bin     Operation and installation manual  2014 11 12 4    hy    KLIMOSZ    The fan which supplies air for combustion is situated before the fuel bin and is connected to the mixer   The amount of air is controlled electronically by the boiler regulator    The inlet and outlet of heating water is situated at the back part of the boiler  At the back of the boiler  there is a smoke conduit  which carries flue gas to the chimney    The exchanger is insulated with mineral wool  which reduces heat loss during combustion  The steel  casing is protected with high quality powder paint     S  Z2 Z2       re 24                LO     A    NI    Ta                                                                   Ll L2 L3 H1 H2 ZI Z2 P1 P2 U1 U2   mm     mm     mm     mm     mm     mm     mm     mm     mm     mm     mm     mm   DOD OOO SE  DONO    32   1270   825   1555   620   600 1285   1300                         5 Operation and installation manual  2014 11 12    he     KLIMOSZ       The dimensions of the flue height are given below   Klimosz Duo 15   1260 mm Klimosz Duo 55   75   1760 mm  Klimosz Duo 25  45   1420 mm Klimosz Duo 100   150   1920 mm                   Fig  2  Dimensions boilers KLIMOSZ MULTICOMBI     S L H S1 S2 L3 H1 H2 Z1 Z2 P1 P2 U1 U2   mm     mm     mm     mm     mm   mm     mm     
6. mm     mm     mm     mm     mm     mm     mm                             Operation and installation manual  2014 11 12 6    ih     KLIMOSZ    Combustion  D Bee  cam e E RI    sumo n ooo  ca feb an    MULTICOMBI  32                5  Hand fired furnace of the KLIMOSZ MULTIDUO and KLIMOSZ  MULTICOMBI boiler    The KLIMOSZ MULTIDUO and KLIMOSZ MULTICOMBI boilers provides the possibility for  burning solid fuels in the traditional mode  After manual loading  wood and coal  as substitute fuel  can be burnt  in the upper part of the exchanger  called the  upper combustion chamber   The upper combustion chamber is  an emergency chamber  in which burning throughout the heating season is not recommended due to the lower  power capacity achieved as compared to the maximum power capacity of the boiler  For burning in the upper  chamber to run properly  some conditions for chimney draught have to be met     NOTE No alterations in the furnace chamber may be made which could negatively affect the life span of  the boiler or flue gas emission     7 Operation and installation manual  2014 11 12    he     KLIMOSZ                1  Air mixer  1  Secondary air jets  pipes   3  Primary air inlet  4  Inspection hole  5  Hole flap  6  Screws    Fig  3  Schematic diagram of a chute  horizontal  burner     6  Installation of the fire resistant catalyst       The ceramic catalyst in KLIMOSZ boilers consists of rectangular plates  Table no  3   The plates should  be put on shelves above the retort bur
7. ner through the lower door of the ash pan     When pellets are used as fuel  the catalyst should be put on lower projections   ATTENTION  The boiler must not be operated without ceramic catalysts in the retort furnace  as it leads    to accelerated depositing of soot on the boiler due to incomplete burning  and to quicker wearing of the  boiler   s steel parts  Burning pea grade coal with the catalyst in the low position  lower shelf  may result in  damaging it     Table 3  Dimensions and number of catalysts  chamotte  ina KLIMOSZ MULTIDUO   KLIMOSZ MULTICOMBI boiler                       Boiler Plate 1  mm    KLIMOSZ MULTIDUO  Klimosz MultiDuo 15 345 x 220 ceramika  Klimosz MultiDuo 25 345 x 220 ceramika  Klimosz MultiDuo 35 400 x 320 ceramika  KLIMOSZ MULTICOMBI Chamotte plate  Klimosz MultiCombi 20 3 pc  Klimosz MultiCombi 32 4 pc   Operation and installation manual  2014 11 12 8    he     KLIMOSZ                Fig  4  Position of ceramic catalyst on the exchanger shelves in a KLIMOSZ MULTICOMBI     7  Lighting the boiler    The boiler may be operated only by adults  who know the principles of its operation  and who follow this  Operation Manual    The following should be done before the boiler is lit    e check whether there is enough water in the central heating and domestic water systems    e check whether the grate  ash pan and flue conduits are clean    e remove the ceramic catalysts from the retort furnace chamber    e put the protective plate on the retort burner  
8. nger areas and in smoke conduits  This  reduces the boiler   s efficiency and poses a serious hazard of soot and tar ignition in the chimney duct  which  usually results in damaging the chimney and even the building walls and in fire     Take care to make the boiler leak tight  combustion chamber door  ash pan door  mixer cleaning hole   fuel bin cover  etc   in order to avoid flue gas being expelled from the boiler into the boiler room   If the boiler is not in use for more than 2 days  for example  after the heating season   it must be cleaned  and the fuel bin and the fuel feeding system emptied of fuel  Leave the boiler with the doors and  inspection hatch covers open to enable its ventilation and to avoid moisture condensation on the steel  surfaces of the boiler     Operation and installation manual  2014 11 12 10    hy    KLIMOSZ    
9. oiler    30      Noise level  lt  65  A   Connections of the boiler   heating and returning 2   lub 6 4    GZ  water  Resistance of water flow through the boiler At   f  o 0 4  20  20  C  Voltage 230V   50 Hz    Electric energy consumption  fan   motor  180   80    Electric energy consumption  shot light option  400  Electric insulation IP 40                                     3 Operation and installation manual  2014 11 12    ie     KLIMOSZ    3  Construction of a KLIMOSZ MULTIDUO boiler    The KLIMOSZ MULTIDUO automatic boiler is not maintenance free and requires the user to carry  out some periodic maintenance activities  it is therefore recommended that the user should carefully read the  principles of its operation  regulation and maintenance in order to avoid any problems related to its working    The main part of the boiler is a steel heat exchanger  made from 6 8 mm thick internal sheet  In the  bottom part of the exchanger there is a combustion chamber with a chute  horizontal  burner and fire resistant  catalyst  The fire resistant catalyst stabilises the burning process  reduces emission of particulates from ash and  radiates heat back to the burner  thereby facilitating the complete burning of the fuel  Under the combustion  chamber there is an ash pan  The boiler door is constructed in a way that allows to open it from left to right   hinges on the left of the exchanger  the handle on the right   KLIMOSZ MULTIDUO boilers can be also  installed in a closed system
10. r of the boiler after a while   unsealing it first  and put in a layer of fuel  After the upper and lower door is closed  switch on the fan by  pressing the button  as above   The boiler is now in normal operation mode  Do not add too much fuel as it may       cause the boiler to overheat quickly and it negatively affects the boiler s parameters as well as the parameters of  emission of hazardous substances in flue gas        9  Boiler maintenance    Remove ash to non flammable  closed containers with increased resistance to corrosion  for example  zinc plated   The boiler can be cleaned only after it has been extinguished and cooled down    Cleaning the  walls of the upper combustion chamber can be easily done through the open upper door  Cleaning the smoke  conduits is done through the inspection hatch under the casing  the same as cleaning in automatic mode   The  boiler can be cleaned with the cleaning tools supplied with it  A boiler that has been soiled with tarry substances  should be cleaned in two steps  First  tarry deposits should be burnt out with suitable agents  for example  Sadpal   and then the heat exchange areas should be cleaned with a brush  Cleaning semi liquid tarry deposits  results in damage to the brush and is ineffective  resulting only in spreading the tar over the boiler surface    After the boiler surface and smoke conduits have been cleaned  close the inspection hatch tightly   NOTE  Avoid accumulation of tarry deposits and soot on the heat excha
11. this prevents lighting the fuel in the retort burner as a result of  embers falling down from the upper grate to the ash pan     e when burning in the upper chamber in the hand firing mode  remove fuel from the retort in order to properly  supply air for combustion  When burning is continued for more than two weeks  fuel should also be removed  from the bin    e switch on the hand firing mode        hand firing    in the burning type options on the regulator    Put firelighter  paper  and wood through the charging door over the entire grate area  Light the  firelighter through the door of the combustion chamber  Close the door and open slightly the ash pan door   providing air supply to the combustion chamber  Put a layer of fuel onto the burning wood  After lighting the  fire  switch the regulator to the hand fire mode  set the desired temperature and close the ash pan door  When  the fuel is burning well  stoke the fire by putting in another portion of fuel  switch off the blow in fan on the  regulator when loading in fuel  Attention    No flammable liquids can be used and the boiler cannot be  overheated when lighting the fire  No flammable materials can be left near the boiler     8  Boiler operation    Fuel should be topped up as needed and in accordance with the intensity of burning  Fuel should be  added evenly so that it does not form a pyramid  Ash and slag should be removed from the grate only when it  starts to hinder combustion  The procedure should be interrupted
12. urning water    Resistance of water flow through the boiler At oe 20   30   20 E  Voltage 230V   50 Hz  Electric energy consumption  fan   motor  180   80  I    Electric energy consumption  shot light option   IP 40    9  2  1  0  5  0  l        amp           D       1 5  version B 2 5     2 2  version B 3 7     oO              o       50       15  version B 25     1 5  version B 2 5      lt  65  A     o  o  o  oz       1445          Electric insulation       Operation and installation manual  2014 11 12 2  hy    KLIMOSZ    2  Technical Data for KLIMOSZ MULTICOMBI    Table 2  Dimensions and technical parameters of the KLIMOSZ MULTICOMBI boiler     Klimosz Klimosz  Parametr SI MultiCombi   MultiCombi  20 32  Nominal power   kW 20 16 30   25  Use of fuel at nominal power     continuous kg h 4 9  heating   pea coal            brown coal kg h    aH De PA  Storage bin volume dm  230 230  Approximate combustion time at nominal power day 10 4 0    pea coal  5 5 4 0 es    _          po browncoal  day   SS   40   O    Flow of fumes in the smoke conduit   brown coal    g s 11 7     nominal power  Fumes    temperature Le 100   210 100   220    Biter class      4    Mass k 490  Heating area of the boiler m      d 40  Pa  Chimney draught   Pa  Water maximal working pressure  Water minimal working pressure  Water maximal trial pressure  Recommended working temperature for heating  water  Maximal working temperature for heating water 90    Minimal temperature of water returning to the 50  b
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  KitchenAid KEYL507W User's Manual  Encore electronic ENHWI-G Network Router User Manual  クイックバー  Assembly and Installation Procedures  - Frank`s Hospital Workshop    PEI.DTU.2495 - User - Royal Communications  DXP General System Description Rel 15B  Enfocus Instant PDF 08, 25u, Box    Copyright © All rights reserved. 
   Failed to retrieve file