Home
User Guide:
Contents
1. The calculation regulators within branches or thermostatic valves projects assumes that the pressure input of the project is constant and Basic Project Schematic Branch 2 Branch n Common valve Balancing Balancing VY Balancing valve 1 valve 2 A N valve n Pressure pump D Input pressure Load n 32 HEC Starting 1 Select Projects in the main 2 The last project to aa with the be opened in the Project p roj ects window Project1 Filename Project1 proj Manual entry Icon Input pressure kPa 25 0 Status Manually entered Date of measurement 22 01 2015 y Common valve Di Measu re Icon Valve Danfoss MSV F DN 15 Initial presetting 1 00 Presetting 1 00 7 t I af 77 64 09 05 p 2 e I al 77 k 09 06 Creating 1 Press Menu button and praso 2 Enter name of the new ET new project New Projects are stored in _ Memory card PFM 5001 LS Projects folder for safety in zee the case of system failure Project1 proj Input pressure kPa 25 0 project New project Project name Project2 j Es Clear Status Manually entered Date of measurement 22 01 2015 v Common valve Valve Danfoss MSV F DN 15 Project2 Projects gt Initial presetting 1 00 Presetting 1 00 l i A a A S e a e o o i O HS A a e ap IED a Save as Rename project Balancing project ABC 5 ag aa Done HEC 33 IRS al 77 t4 09 06 e 3G al 77 b4 09 07 Creating 3 Check Common valve bo
2. aG al 75 6 08 51 IPeM5001 A a New record selection Select values for recording Pressure Not turn off Flow Temperature Select valve and presetting for recording Valve Danfoss MSV F DN 15 g Presetting 1 00 gt gt Continue to record options HEC 2 Click on Menu New button 4 Select place name period and number of the records Record info Record Place Date Description Valve Presetting Filename New record Open record Save record as Read record p amp ag al 75 bd 08 53 PFMS500 mp mnan New record options Place placel Description description Period of record Number of records 1 Start recording 2I Dashes Data 5 Click OK The setting will be transmitted to the PFM 6 Clicking on New or Read recording 5001 measuring unit and recording will begin The button during recording will continued recording status will be indicated by PFM 5001 LED pop up a message Only answer this at the end of the recording period r N STOP EEEo LLAS Af 1 record s remaining Stop recording t gt a tt OR 8 Enter name of file for the E23 7 Data recorded into the prso measuring unit can be loaded data File is save to Save record as accessed by clicking on Read Record save onto Memory card button Clicking on Save Place PFM 5001 Records folder button will save data Date Description Valve Presetting Filen
3. 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 o Change sensor v RORO I al 76 09 02 Calculations Calculate presetting Calculate pressure loss Valve Danfoss MSV F DN 15 g Presetting 1 00 g Results Presetting is out of range Calculation of the pressure loss on the valve for required flow 1 Click on Calculations button in the main menu Poe PFM5001 3 Enter the required flow for the branch Change requested flow Requested flow l h 100 Clear iv 2 Select valve and enter the current presetting in the branch Click on Calculate pressure loss button 3 ia 09 03 4 Answer will appear in the Results window Recent 100 Minimum 0 Maximum 10000000 HEC t al 76 09 0 PFM5001 B Calculations Calculate presetting Calculate pressure loss 2 3 Valve Presetting Results b 8 EE PFM500 Calculations Calculate presetting Calculate pressure loss Valve Danfoss MSV F DN 15 b gt Presetting 1 00 D gt Results Pressure loss kPa 14 9 Danfoss MSV F DN 15 p gt 1 00 D gt 31 Dafoe Working PFM 5001 includes a built in module for project that the project is devoid of negative feedback of the balancing calculations comprised of one horizontal and hydraulic elements for instance differential pressure with the a maximum of 100 vertical branches
4. M 5001 has been designed to create hydraulic bal ance in heating and cooling systems It enables mea suring of pressure flow and temperatures in a system Using differences in pressure PFM 5001 is capable of turning these two pressures on both sides of a valve into flow Flow through individual branches of the sys tem can be measured creating perfect balance in the whole system PFM 5001 has a number of key features that makes it easy to use Complete set of PFM 5001 consists of e two separate measuring units measuring unit for measuring pressure flow and temperature e computing unit for displaying results and data analysis e convertor e routers max 3 pcs optional accessories The main pressure unit is extremely robust with a sturdy frame Inside the measuring unit is a hydraulic part with an integrated true differential pressure sensor for accurate digital data processing The flow meter automatically corrects the flow for dif ferent types of mediums being measured such as an tifreeze liquids in cooling systems PFM 5001 can calculate complicated multi branch heating systems by simulating the hydraulic system with balancing calculations based on two measuring in each branch During balancing calculations the PFM 5001 utilises a sophisticated method for calculating hydraulic resis tances within the system As a result the PFM 5001 comes up with a proposal for the lowest energy loss This function drama
5. Method cccccscssesseseescccceeeeeeeeeeeeeeeeeeeeeeeeseseeeseeesesaaaaaeeeeeeeseeeeeeeeaaages 25 oo aE Ae 0 pc ol 8 AA A EEA EE A EE E E E A E E E E E EE EET A E eee E ene eran 26 Dala reco MIN a A A A EE E E E A E E E E TA E E 2 Calculation of the valve presetting for a required flow in One DraNch ee cece ceeessscseceeeeeeeeeeeeeeeeeeeseseeeeeeeeeseesseeeaaeeeeeeeeeeeeeeeeeeeeeeeeeeaaeees 29 Calculation of the pressure loss on the valve for required flOW cc cc ccccccccccccceseeseesessnsaaaeaeeeeeeeeeeeeeeeeeeeeeeeeeeeeessssssaaaaeeeeeeeeeeeseeeeaaaaes 31 WOKEN NE 0 0 e a E A E E E EE E E een Sere AZ Rake 9 e e RE 101 67 0 8 Fell 1 hc amen te a a EP Ott OO aE ean E O oe ne eee eee eee ee eee 44 fre ot ai ere BS 0 65 Her 8 6 01 paneer en ms E enter eer ener ne en ne ree On at ee 46 HEC PFM 5001 main features e Separated measuring unit and computing unit based on Smart Phone with Android OS connected by Bluetooth with the convertor and convertor is connected by radio with the measuring unit or router e Possible connection up to 10 pressure units e Accurate pressure measuring with true differential pressure sensor and 24 bit ADC e Hydraulic by pass for exact small differential pressure measuring HEC Davee e External PT 100 thermometer e Working with projects e Programmable autonomous recording mode e Main unit powered by rechargeable Li Ion battery Dafoe Introduction PF
6. User Guide PFM 5001 Measuring Instrument SAMSUNG ull 12 45 PM London Partly Cloudy AccuWeather com v x gt g Social Hub Music Hub Maps Market i285 HEC Contents PEM OOT man a E sere fess ee cesget ape aed rvs pn cee ice nsrsnse erp peremrcav erred tvorsb E E 5 MEAT UD ER oOo sats ce src EEO 6 PEM OO ithe AS a N O oceo ya as eso oea eet wet ea tenes ucueaee oes S uate satan sada eons aeeeeeeeu E 8 SW anaon 1014 9 e aa ne one ee Rarer ener A ee ne ee re ee ee eee eee ee eee ee 9 faina 10 6G 0 6 EIE EEI EE seer eR ee ee EY ee OES EC Or ee re ee re ee er eee er eee 9 Goe S Go 6 ER Re nee ee nee ee ae ee ee ee ee ae eee eee ee eee eee eee reer 10 Installation Of PEM S00 LappliC ati c cscscesccceagoasteetsastacesiexsdadwas cena seetenthiesnnnioasnebasaxhessanasaspeeeseensoasnnpeielaynsoathandaagguadsadeenbenooesdeasaneeendetesobiaia 11 Delivery wih SmarnphoNesseconadin i atd aao a eaaa arei aieiaiei ea 13 BREDO e eO S a A E A E E E eeaus seen edeorcarmastarcsaast 14 Ron PFM 5001 a AAO cs acest ciserna sectsas a i aooaa ie aianei onen i ea aia santos I aa Oeria 16 PFM 500 lapplication setting S assrsecisrainiioaninii noine iar EAEE ENARE Eare eNEAN dion suede te cele i AA KEN oNN EENEN Eain E ENERE 17 e AASIN Bi AS T GIN AEA NEEE A O E E OE A A ete ET E N NA A E E E N E A T E EE 18 omeo DE TONE era cee ong E E E E EE E EE E eae Ges E A E EEE EEEE E E yal Two Sensors Measuring for Balancing by the Proportional
7. Window by Back application Projects button continued AEU Measure Proportional measure Signal on routers Calculations Records Settings Delivery with PFM 5001 application is installed on the Smart phone Smart phone You need only insert SIM card to phone and set up call and internet services It is necessary to create Google account if you want later download upgrades of PFM 5001 application HEC 13 Dafes Bluetooth settings 14 1 Enter Phone set up by Settings Button 3 Switch On Bluetooth Notice Very important Before switch On the bluetooth connection you have to switch On the measuring units and wait for initalisation for 4s green led diod stop blinking after that switch On the convertor and again wait for initalisation In the last step switch On bluetooth on your smart phone If you don t do that you will not see not find the convertor and measuring units Add apps and widgets om Create folder Edit page E3 Set wallpaper Q Search Settings F Help t 6 BIAS E S 13 58 Conne Device Controls General Network connections gt Wi Fi Bluetooth Turn off callin and data netwo 4 Data usage Location More networks y OR ag 3s af 98 A 13 58 2 Enter Wireless amp networks S meg Connection Device Controls General Network connections Wi Fi O Bluetooth Tethering and Wi Fi hotspot ce s mobile data a USB WI FI or Blu
8. actual flow 42 5 PFM 5001 will balance the two projects separately Next it will rebalance the side of the project that requires higher pressure after the common valve Finally will be corrected the preseting of the common valve 1 Click on Branch tab and select branch to measure Click on Measure icon at Real flow line PFM5001 Project balancing Project2 Basic project balancing Middle power project balancing Results Binding projects Project2 Project Done ROR 4 09 44 PFM5001 n pa E Branches Branch1 Valve Danfoss MSV F DN 15 Requested flow l h 0 Disposal pressure 17 3 kPa Initial flow I h 92 Real flow l h 0 Initial presetting 1 00 Presetting 1 00 B568 BEB B Status Balanced Date of 22 01 2015 measurement The sensor has been disconnected 2 The flow value measured will be entered under the Real flow parameter of the selected branch PET 09 45 PFM5001 Real flow Branch1 85 Temperature C Disconnected 20 0 Flow I h Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 o Change sensor Replacement When PFM 5001 starts reacting slowly to changes in pressure of sintered or when after powering up of the measuring unit the pressure i displayed exceeds 5 kPa it is necessary to change sintered filters filters a
9. all components of the system return back to the main menu Two Sensors 1 Tap on Proportional Measuring for measure button Balancing by the Proportional Method A Ea PFM5001 Version 1 3 0 Projects Measure Proportional measure Signal on routers Calculations Records Settings 3 If you choose for the flow unit the Lambda value you have to set also the requested flow from the displayed menu after tap on the Menu button 3 Select reference measuring unit for instance the number 1 in the upper of the window 4 In the lower part of the window the measuirng unit 2 will display the datas from the balanced valve from the branch 5 For both measuring units set the correct valve and presetting 6 By the measuring we are moving with the smart phone and convertor away from the reference measuring unit So we have to use the the routers by the reference measuring unit in our case number 1 not to loose the signal When HEC al 75 4 08 46 2 Balancing by proportional Gg method window will open E Measuring is on line from the 130 both measuring units The Danf Danfoss MSV F DN 15 Presetting datas from the measuring unit 1 00 0 26 xvs o 25 Status Connected to PFM5001 Address 1283 gt 100 Ca 1 are displayed in the left side Pee ya of the screen measuring unit 2 24 is displayed in the right side Of vantoss wsv r ows are the screen Units for the flow 1oox ozskvso2s Oee sn and pressure y
10. ame 28 HEC Data 9 Saved data can be recording accessed by clicking on Open continued button pane inona tain Calculation of 1 Click on Calculations button in the main menu 2 Select valve and enter the the valve current presetting in the presetting for branch Click on Calculate Calculate presetting a required presetting button Calculate pressure loss owen one antl branch Results HEC 29 Donfsi Calculation of the valve presetting for a required flow in one branch continued 30 3 Enter the required flow for the branch 5 Close valve and measure the available pressure in the branch 2 aS IPFM5001 Change requested flow Requested flow l h 100 Clear iv 4 Measure the current flow through the branch Recent 0 Minimum 0 Maximum 10000000 PFM5001 Disposal pressure Calculations Pressure kPa 18 3 Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 o Change sensor v 6 Presetting for the required flow will appear in the Results window For the presetting out of range will appear a message that it is not possible to achieve the required flow Preseting is out of range PFM500 amp PFM5001 Initial flow Calculations 29 Temperature C Disconnected 20 0 Flow l h Valve Danfoss MSV F DN 15 Presetting 1
11. automatically 60 minutes after the end of communication with Smart phone Introduction Time sec State OK Radio card error Low battery Record Record with sleep Dafoe Getting started 10 1 Smart phone has touch sensitive display and usually 2 Insert SIM card to your Smart phone Unlock SIM three basic buttons card by standard procedure for mobile phones Make sure that you have arranged internet services to your SIM card due to downloading about 50 MB of data during Smart phone activation Next amount of data will be charged during PFM 5001 application download Home it serves for return to Smart phone main window Back it returns the current window back While application is running you can return up to the phone main window and application stops Menu phone or application menu 4 ull 09 07 ull 09 07 3 Create Google Account 4 Fill requested fields g Add a Google Account g Add a Google Account Don t have a Google Account Create Already have a Google Account Username gmail com Sign in S 5 By cre ee to the A olicies Getting 5 You have created Google started account after some standard continued steps Installation of PFM 5001 application 1 Enter Google Play H ul Ge 10 48 Your Google Account is now linked to this phones Google applications are syncing data now Kj When the syncing icon disappears from the status bar at the top o
12. ave Bluetooth module switched off 4 Measuring Main Window Select device Paired devices PFM5000 Conv 9984 00 12 F3 15 B6 F9 Always use the selected device x PFM5001 Measure Flow I h 0 Pressure kPa 0 0 Temperature C Disconnected 20 0 Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5000 Conv 9984 o Change sensor Start of the measuring continued 5 Set your measuring to real situation by Menu phone button 7 Change valve preseting 6 AG af 72 08 28 PFM5001 Measure Flow I h 0 Pressure kPa 0 0 Temperature C Disconnected 20 0 Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5000 Select valve Change presetting Select medium Set direct Kv Set Temperature Sensor zero setting j a gl 72 gt 6 08 29 PFM5001 aan Change presetting Presetting Clear iv OK Recent 1 00 Minimum 1 00 Maximum 6 50 Manufacturer Danfoss Valve MSV F DN 15 HEC 6 Select valve Select Manufacturer from list box Then select valve type and click Ok 8 Change medium PFM5001 Select valve Select manufacturer Danfoss Select type MSV F DN 15 PFM5001 Select medium 19 Dafoe Start of the measuring continued 20 9 Medium temperature Because the properties of the medium and thus the measur
13. cts Measure Proportional measure Signal on routers Calculations Records Settings 16 HEC A ull 10 12 PFM 5001 1 Enter Settings from ae setings 2 Choose all items by your application PFM5001 main menu ETETE request Pressure Units A settings al Flow units I h kPa Temperature units Pressure units MPa Sound off Records mbar Default description bar Default place Projects psi Default project name Default branch name 3 Flow Units T 4 Temperature units Piw units Return back to PFM 5001 main menu h usgal s Temperature units usgal m usgal h ukgal s Cancel ukgal m 2 i on ukgal h Cancel HEC 17 Dasfis Start of the measuring 18 1 Enter Measure Notice Very important Before switch On the bluetooth connection you have to switch On the measuring units and wait for initalisation for 4s green led diod stop blinking after that switch On the convertor and again wait for initalisation In the last step switch On bluetooth on your smart phone If you don t do that you will not see not find the convertor and measuring 3 Select your PFM 5001 convertor ENED gf 99 14 08 eee Projects Measure Proportional measure Signal on routers Calculations Records Settings Select device Paired devices PFM5000 Conv 9984 00 12 F3 15 B6 F9 Always use the selected device 2 You need permit Bluetooth module if you h
14. digits of the serial number of the EEEE router The S N is written on ok the router label Address of router 1 q W e r t y u i 8 p al iSi d Eo g n ict t ee Ceo inkc aos Es English US sid Sym Ee Lid s Sa 5 Repeat the same procedure for all used routers 6 Return back to the main menu Notice Very important 7he router adress has to be set correctly Router 1 is the nearest the the convertor router 2 is in the middle and router 3 is the nearest to the measuring unit Using of the routers continued Using of two sensors with routers proportional method Using of router for single sensor Balanced Branch Sensor Convertor Reference Sensor Balanced Branch Sensor Convertor HEC Using of two routers for single sensor Balancea q Branch Sensor Convertor 1 For the correct placement of the routers push the button Signal on routers in main menu window 23 Dashes Using of the 2 Choose the PFM 5001 re 3 On the next window ro routers convertor from the displaied switch on the button Use See Converter continued menu routers This screen shows 100 Galacttdevice ee E Converter battery TOTE to you the signal between 100 Router 1 convertor and routers and x measuring units Router 2 Router 3 Sensor 18 PFM5000 Conv 9984 00 12 F3 15 B6 F9 Status asaue routers Change sensor Always use the selected device 4 After correct placement of
15. ed flow rate for non freezing mediums depend on the temperature PFM 5001 must know media temperature You can either enter ae eS A temperature manually or ee aaa Temperature measure it by PFM 5001 Temperature C temperature probe 20 0 Clear iv Recent 20 0 Minimum 20 0 Maximum 200 0 Using of the routers You can use relay wireless mode for long distance measuring or measuring in project with heavy radio waves propagation Router is designed in PFM 5001 casing with external high performance thin rod antenna Router needs only switching power On and OFF and its state is indicated by LED diode f 72 6 08 31 1 Click on the Settings in the i PFM5001 main menu Version 1 3 0 Projects Measure Proportional measure Signal on routers Calculations Records Settings HEC 2 2 Find the section Sensor preferences Select count of routers Time sec State OK Radio Card Error Battery 7 5 Battery 50 Battery 25 Default project name Default branch name Default project filename Sensor preferences Count of routers Address of router 1 Address of router 2 Address of router 3 Always use bluetooth address 00 12 F3 15 B6 F9 21 Dafoe Using of the 3 Select the quantity of the s 4 Now you have to insert routers routers you will use the adress of the routers continued Click on the Adress of router 1 Enter adress
16. etooth Airplane mode Turn off calling r and data networ 4 Data usage Location More networks 4 Continue by Scan for gt devices OR lt O Bluetooth My device Svtechnics c Paired devices Maxor Conv 9988 PFM5000 Conv 9984 re Bluetooth 5 Choose PFM 5001 convertor O onan ate ot settings pair with this device wee continued j SMechnics c Only visible t paire d dev ices Tap to make visible t Available devices Scanning E Maxor Conv 9988 E PFM5000 Conv 9984 7 Return to the Smart phone Main window by Home D Settings Play Store A MEE Ea Phone Contacts Messages Internet HEC 6 Enter password xxxx last four digits of the serial number of the convertor Bluetooth pairing request To pair with PFM5000 Conv 9984 Enter that device s PIN or 1234 PIN containing letters or symbols Enter PIN on other device as well cre 15 Dashes Run 1 Enter Aplications window Tap and hold PFM 5001 2 Tap the PFM 5001 PFM 5001 icon PFM 5001 application makes link on Smart phone application from Main application Main window window a Email Chrome S Memo S Suggest m RB GALAXY T Mobile Voice ES File Apps Recorder Explorer 2 a an xX XML Engine FX FX TextEdit Total pha Commander a OR o Flipboard MPE Notes MyPhoneExp MPE Tasks lorer Client PFM5001 TEF 3 PFM 5001 application is P running Version 1 3 0 Proje
17. f your screen the download has finished About the status bar Whenever you receive a new message or other notification an icon appears in the status bar Use your finger to drag down the status bar to open the Notifications panel with details about all your current notifications O gt C E Settings Play Store Google A 2 mg 98 GE Phone Contacts Internet Apps HEC 2 Search for PFM 5001 application PFM5001 maxthon uc browser mma maxor fe explorer hey the gt q wi fel ie Fe yi le i O ip ESR cP Feit ick t Aueue nm a Ta E English US mi Sym ped e Q 11 Dasfits 12 Installation of PFM 5001 application continued 3 Choose PFM 5001 5 Continue Accept amp download T Settings NR Phone 5 Play Store A im 9 Internet PFM5001 BS Photos Media Files Bluetooth connection information B Google play r Google Apps v Vv ACCEPT 4 Click Download Continue Open PFM 5001 SV Technics A 0 OO Downloads Tools Similar Android application for PFM5001 pressure unit READ MORE Y 6a PFMS5001 PFMS5001 SV Tech nics UNINSTALL 0 Downloads Tools Similar Android application for PFM5001 WHAT S NEW Add languages pressure unit af 98 6 13 57 Installation 7 PFM 5001 main menu oo PFM5001 8 Return to Smart phone of PFM 5001 Main
18. lect the appropriate branch in the Branch tab It is necessary to measure both the Flow through the valve with Initial presetting of the balanced valve and the Available pressure in the branch with closed balanced valve The value measured will be automatically filled in the corresponding field 6 Measuring of the Initial flow in the branch PFM 5001 will automatically choose the correct valve and presetting according to the branch selected The Initial flow measured will be saved along with the rest of the branch data ING al 78x64 09 14 Project2 Filename Project2 proj Input pressure kPa 12 4 gt gt Status Measured Date of measurement 22 01 2015 y Common valve Valve Danfoss MSV F DN 15 Initial presetting 3 00 Presetting 1 00 kd amp PFM5001 Initial flow Branch1 Flow I h 92 Temperature C Disconnected 20 0 Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power Calibration 17 1 2016 o Change sensor 37 Dafoe Preparing 7 The project is ready for balancing after the Initial for the flow and Available pressure for each branch of the project project has been measured balancing measuring continued Balancing of 1 Return to the Project tab PERT 2 Select Basic project os _ the basic and click on the Smart phone balancing SSS balancing i i Project2 project Menu Bala
19. ncing project Project2 b utto n 1 Filename Basic project balancing Project2 proj Input pressure kPa 12 4 go Middle power project balancing Status Measured Results Date of measurement 22 01 2015 Common valve Valve Danfoss MSV F DN 15 Initial presetting 3 00 Presetting 1 00 Save as Rename project Balancing project Balancing of the basic project continued 3 In order to minimize power losses in the project PFM 5001 starts balancing with a 3kPa pressure drop on the balancing valve in the last branch Next the non balanced branches are optimized If for any branch a higher pressure drop is required on the balancing valve the computing will be restarted with an increased pressure drop in the last branch The balancing stops when the minimum number of branches is not balanced HEC 4 The result of the balancing appears in the Results window on the Start Balancing window PFM5001 Project balancing Project2 Basic project balancing Middle power project balancing Results Balancing project Project2 Done Count of balanced branches 3 3 39 Dashes Project with We often come across systems with the central The two projects are measured and balanced Central pressure input with the distribution of the medium to individually and subsequently drawn together using a centra either side of the input It is possible to balance such the Bind Projects command as follows Pressure project b
20. on 9 Add the rest of the branches included in the project by following the instructions Note that the order of branches in the project must correspond to the distance of each branch from the input pressure source Danfoss MSV F DN 15 Requested flow I h 0 Disposal pressure 0 0 kPa Initial flow I h 0 Real flow l h 0 Initial presetting Presetting Status Date of measurement Branch1 Branch2 Branch3 HEC 8 Similarly to the Input pressure it will be possible to measure the Initial flow and Disposal pressure 10 The correct order of branches in the project can be set by moving selected branch up or down in the project structure on 33 af 77 09 10 PFM5001 EAS Initial flow Branch3 92 Temperature C Disconnected 20 0 Flow l h Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 o Change sensor Ala Med AEB Branches Branch2 Valve Danfoss MSV F DN 15 Requested flow l h 0 Disposal pressure 0 0 kPa Initial flow I h 0 E BEB Real flow l h 0 Initial presetting 1 00 E E Presetting 1 00 Add branch Rename branch Move branch up Delete branch Move branch down 35 Dafoe Creating new project continued Preparing for the project balancing measuring 36 11 Save the project 1 Prior to measu
21. ou have to aged choose in the Main menu Settings Presetting Use routers Use routers the routers are placed you have to tap on the left button Use routers 7 The flow on the both valves will be displayed like a bar graph 8 You can choose like a reference measuring unit the both units so it s important to tap on the correct button Use routers 25 Ducts Sensor zero should be set to zero 3 Connect sensor to the system turn zero valve to horizontal position and 1 If you want to measure small differential pressures setting less than 500Pa on the PFM 5001 measuring unit Measuring position Zero setting position 2 Zero setting is achieved by clicking on Sensor zero aT setting in the menu Pressure kPa 23 0 Temperature C Disconnected 20 0 Valve Danfoss MSV F DN 15 Presetting 1 00 Kv 0 26 Kvs 0 26 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 Select valve Change presetting Select medium Set direct Kv Set Temperature Sensor zero setting al 75 64 08 49 4 Turn zero valve back to vertical position and confirm by clicking OK continue by clicking OK ES h d Connect sensor to the system turn Turn control button right and click control button left and click OK OK aE Zz Sensor zero setting Sensor zero setting Data recording 1 Select Records in the main menu 3 Select units for recording t 8
22. ring the Initial presetting has to be set on all balancing valves within the project including the common valve When re balancing an existing or newly designed project it is most effective to enter the actual presetting of the balanced valves within 2 Connect PFM 5001 measuring unit to the Project input pressure Open the Project Project2 Filename Project2 proj Input pressure kPa 0 0 Status New Date of measurement A Common valve Valve Danfoss MSV F DN 15 Initial presetting 3 00 Presetting 1 00 Preparing for the project balancing measuring continued 3 Measuring of the project input pressure 5 Measuring of available pressure Close the balanced valve in the branch prior to measuring the available pressure in the branch The value measured will again be saved along with branch data I gf 78x64 09 13 PFM5001 Input pressure Project2 Pressure kPa 12 4 Valve Danfoss MSV F DN 15 Presetting 3 00 Kv 1 10 Kvs 1 10 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 Oo Change sensor iv af 72 09 15 PFM5001 Disposal pressure Branch1 Pressure kPa 17 4 Valve Danfoss MSV F DN 15 Presetting 3 00 Kv 1 10 Kvs 1 10 Medium Water Status Connected to PFM5001 Address 1283 Power 100 Calibration 17 1 2016 o Change sensor iv HEC 4 Connect PFM 5001 measuring unit to the balanced valve at any branch and se
23. s shown in the picture below If there is no improvement please return to the manufacturer for service O ring 7x1 5 Sintered filter 10x2 _ 0 Technical specifications Measuring unit Pressure FANGC ii siescruiosrenncstcurenenaxeuteasw 0 1000 kPa 0 10 bar 0 2000 kPa 0 20 bar Max static PIGSSUl Ciisiiiievisiasvesssrsnsmeereensaneieuns 10 or 20 bar Max over PFSSUe cccecceceeeeeseeeeeaeeeeeeeaes 1200 kPa 12 bar 2200 kPa 22 bar Reliability linearity and hysteresis error 0 15 of range Temperature EM ON minsin i 0 25 of range Static pressure CfFECE ccccccecsseseeseeetesesaneeeeeeesaes 200 Pa Medium temperature cccsscseeceeeeeeeeeeeeeeaeeeeees 5 to 90 C Ambient temperature ccccccscsseeeseeseeseeeseesees 5 to 50 C Storage tempratur E sariini anaa o 10 to 70 C Temperature probe s sssssssssssnsnnssnsnnnnnnnnnnsannnn Pt 100 digital Temperature measuring FANGE cceeeeeeeeeeeeeeees 20 to 120 C Temperature measuring CFTOM ccceeeeeeeeeeeeeeeeeeeeeaeeaes PG POW E EPRE AN ETA Li lon battery 3 6 V 950 mAh for Nokia 6230 mobile phone Interface RF wireless DANnd ccccccseecseeseeeeeeeeeneeeaes 868 MHz Communication speed ssssssssssrssnnnsnrsnnsansnnnnnnnnnnn 9600 bps RF transmitter DPOWEYS ccccccceceeeeeeeseeeeeeseeseeseeeneeaeens 25 mW Radio range Open Air cccscessesseeeseeeeeseeeseesens up to 30 Computing
24. tically decreases the time required for balancing PFM 5001 has the advantage of high class digital tech nology which enables to compensate for inaccuracies normally associated with pressure measurements such as temperature dependency and non linearity In order to increase the accuracy of low pressure mea suring and to enable deaeration of the pressure hoses the main pressure unit is designed with incoming by pass for hydraulic zero setting Introduction continued This increase the base accuracy of the measurement The PFM 5001 can be supplemented with an external ther mometer connected via a coaxial connector The tempera ture of the working medium can easily be measured by in serting the thermometer into the measuring nipples of the valve were you normally insert 3 mm measuring needles Specifications for valve manufacturers are pre pro grammed in the memory of the PFM 5001 The autonomous measuring mode of PFM 5001 allows in dependent data recording based on a pre programmed pe riod The acquired data are initially saved in the measuring unit and can subsequently be analysed in computing unit HEC Darfes PFM 5001 measuring unit Hydraulic zero knob Sintered filter chuck Battery space cover Connector for charger Connector for external thermometer Negative pressure input Positive pressure input Switching ON 4 press ON OFF button to switch on PFM 5001 The and off sensor switches off
25. unit Menu languages 00000 a 11 Number of projectS 0080 ee 20 Number of branches 00005 60 PC interface eee es USB Recommended computing unit Smartphone with display resolution 320x480 and above for instance Samsung Galaxy Ace Samsung Galaxy Ace Plus Samsung Galaxy Xcover S5690 LG Optimus Black P970 Supported OS Android 2 1 and above
26. x a _ _ 4 Select Common valve new project or uncheck if it is not Project ranches manufacturer and type in continued present in the project Project checked state Fill Initial Filename presetting of the common Filename Project2 proj Project2 proj Input pressure kPa Va lve 9 Input pressure kPa Status Status Date of measurement Date of measurement Common valve mi Common valve Valve Danfoss MSV F DN 15 Initial presetting 3 00 Presetting 1 00 al 77 4 09 08 5 You can measure Input Pens 6 Select the Branch tab pressure using the Measure Click on Menu button and icon in its line Project2 Add branch button m The calculated Common Filename vane Denfoes MSV F DN15 valve presetting can be Se ets neice fon Disposal pressure 0 0 viewed in the Presetting Status Measured ia kPa Window at the end of project Date of measurement 22 01 2015 Initial flow Vh i balanci ng s Cormmonvalve Real flow I h 0 Valve Danfoss MSV F DN 15 Initial presetting 1 00 B A 8 B B I B Initial presetting 3 00 Presetting 1 00 Presetting 1 00 Add branch Rename branch Move branch up Delete branch Move branch down 34 HEC Creating new project continued 7 Fill in the Branch name Valve Requested flow and the Initial presetting The other fields will be filled automatically during the branch measuring or after the balancing calculati
27. y virtually dividing it into two separate projects Input Project Left Side Project Right Side __ 2s h1 2 anch n Cutting off Branc Branch 2 Branch n Valve Balancing Balancing Balancing Common Balancing Balancing Balancing Valve n Valve 2 Valve 1 Valve 1 Valve 2 Valve n Load n Load n Pressure 40 HEC Balancing calculation of a project with central pressure input procedure 1 Create two projects Left Side and Right Side as describted above Close the Right Side project by a stop valve Measure the Left Side project Close the Left Side project by a stop valve Open and measure the Right Side project 3 Click on Middle power project balancing button t e BG gf 78 64 09 18 PF 001 i Project balancing Project2 Basic project balancing Middle power project balancing Results HEC 2 Return to the Project tab and open one side of the middle powered project for instance Project2 Click on the Smart phone Menu Balancing project button 4 Open the second side of the middle powered project Project3 Project2 Filename Project2 proj Input pressure kPa 12 4 Status Balanced Date of measurement 22 01 2015 v Common valve Valve Danfoss MSV F DN 15 Initial presetting 3 00 Presetting 1 44 Save as Rename project Balancing project 41 Dashes Balancing calculation of a project with central pressure input procedure continued Measuring
Download Pdf Manuals
Related Search
Related Contents
Voisins-Voisines n°16 février 2014 User`s Manual - RiceLakeRetail.com Progress Lighting P2628-20 Instructions / Assembly HP ProBook 470 G1 Panasonic TC-22LH1 22 in. HDTV Maxtor Serial ATA Hard Drive Installation Guide, Multilingual Friedrich HAZARDGARG R-410A User's Manual Copyright © All rights reserved.
Failed to retrieve file