Home

Screwless Wall Socket Operating Instructions 03

image

Contents

1. Operating Instructions 03 2009 CEEtyp Screwless Wall Socket i des ets Remove 90 mm of the outer cable sheath and feed it through the While pressing the release lever bend one wire and insert into its grommet into the enclosure Then strip 8 10 mm of insulation from terminal Repeat this process until all wires have been placed in the wires their designated terminal Solid conductors cross section 1 5 to 4 mm Strip wire and you re done Flexible conductor cross section 1 5 to 2 5 mm with wire end ferrule crimped in a gastight manner Flexible conductor cross section 1 5 to 4 mm ultrasonically welded Simply press the release lever to remove wire from its terminal NnaiTn Walther Werke Ferdinand Walther GmbH P O Box 11 80 67298 Eisenberg Pfalz Phone 49 63 51 475 0 Fax 49 63 51 475 227 Internet www walther werke de E mail mail walther werke de er Latest version update Use ruler to determine length of cable sheat wire insulation to be removed 90 mm 10 mm www walther werke de E 80 70 60 50 40 30 20 10 0 For a true to scale printout choose no page adjustment in the print menu

Download Pdf Manuals

image

Related Search

Related Contents

  Samsung SPH-H1300 User Manual  intext:Bedienungsanleitung filetype:pdf  IHeat S-16 Instructions / Assembly  こちらで内容がご覧頂けます (イラスト入りPDF文書  PRICE LIST  Programmheft 2/2014, PDF - Volkshochschule Wiesbaden  Bezzera Giulia Bedienungsanleitung  Female User Guide - Hollister VaPro Pocket  

Copyright © All rights reserved.
Failed to retrieve file