        ECS High Level Quick User Guide
         Contents
1. 1 2 27   31 4  54 1  54 2  54 3    63 10  63 12    11 2 22     11 2 28     55 1  60 4    60 5  60 6    Page 4 of 6    GML    ECS High Level Quick User Guide    Additional Option B clauses  cont     Any ambiguity between B of Q and another contract document that  results in a CE  Subcontractor deemed to have taken B of Q as correct  Prices  contract sum  can be reduced with a compensation event   Bill of Quantities to be updated in line with compensation events    Additional Option C clauses    Defined terms   Defined cost is subcontracted costs and elements in accordance with   schedule of cost components    List of disallowed costs that Subcontractor will not get paid for   Price for Work Done to Date is total of Defined Cost  actual cost   Providing the Works   Subcontractor provides forecast of total Defined cost at contract intervals  Subcontracting   Requirement to submit contract data for proposed subcontracts  Programme   Requirement for activity schedule to relate to items on programme  Defined cost   Requirement for Subcontractor to keep records  Subcontractor   s Share   Contractor assesses Subcontractor   s share of the Prices actual defined cost   Provisional assessment of Subcontractor   s share following Completion   Final assessment of Subcontractor   s share following Completion  Activity Schedule   Makes point activity schedule is not Works Information   Activity schedule can be changed by agreement   Reasons for not accepting a revised Activity Schedule  Com
2. 6 4  Ambiguities   Raising of and resolving of an ambiguity 17 1   Subcontractors entitlement following resolution of an ambiguity 17 2    Section 2     Subcontractor   s Responsibilities    Providing the Works  Reminder of Subcontractor   s obligations as to Provide the Works 20 1  Design  Reference back that you only design what WI says you are to design 21 1  Requirement for Subcontractor to submit design and for acceptance 21 2  Design submission can be in parts if suitable 21 3  People  Need to provide Key People stated in CD2 or suitable replacement 24 1  Contractor can instruct the removal any person under his control 24 2    Working with Employer and Others  Requirement for Subcontractor to work with Others as per instruction WI 25 1  Requirement to meet certain condition by a Key Date in CD1 25 3    Page 1 of 6    GML    ECS High Level Quick User Guide Lm RT    Section 2   Contractors Responsibilities  cont     Subcontracting  Requirement to submit proposed subsubcontractor for acceptance 26 2  prior to appointing that subsubcontractor  Reasons under which Contractor could not accept a subcontractor 26 2  Also have to submit contract terms for subcontractor if not using an NEC 26 3  contract    Section 3   Programme    Starting Date   Completion Date  Subcontractor does not start work on site until the first access date 30 1  Contractor certifies date of Completion 30 2  The programme  Requirement for Subcontractor to submit first programme for acceptance 31 1    Lis
3. Contractor can request a revised quote 62 4  Contractor can extend period for Subcontractor to produce quote 62 5  Subcontractors quote deemed accepted if no response to notification 62 6  Assessment  Basis of quotes required in relation to actual forecast defined cost 63 1  Definition of contractual movement in Completion Date 63 3  Contractor may assess as though early warning had been given but wasn   t 63 5  Allocation of risk within a compensation event quotation 63 6  Requires Subcontractor to act promptly and competently to a CE 63 7  How ambiguities will be assessed in terms of a compensation event 63 8  Contractors Assessments  Reasons under which Contractor can make his own assessment of a CE 64 1 2  Contractor to notify Subcontractor of his own assessment of a CE 64 3  Deemed acceptance if Contractor does not respond to a notification 64 4  Implementing  Implemented when CE accepted assessed deemed accepted 65 1  CE quote is not changed if later found to be wrong 65 2  Prices changed following agreement of a compensation event 65 3    Page 3 of 6    GML    ECS High Level Quick User Guide    Section 7     Title    Where title of materials transfers from Subcontractor to Contractor  Contractor marks materials outside the Working Area    Subcontractor has no title to anything found existing on the site other than    that stated in Works Information    Section 8   Risks and Insurance    All Contractor Employers risks   By difference  Subcontractors risks   Insurance co
4. GML    ECS High Level Quick User Guide La T    Introduction    This overview is intended to be a quick reference guide as to where you will find a particular  subject matter within the ECS contract  This guide focuses on the main clauses that will be  commonly be used and is based upon an un amended contract  Any Z clause amendments  would have to be taken into account for an individual project as it could delete or amend any  of the original contract clauses  Sections 1 8 are the core clauses for every ECS option A E   with Option specific clauses start on page 4     Section 1     General    Reminder that you have to administer the contract 10 1  Defined terms  broadly in alphabetical order  11 2  Communications   Everything has to be in a form that is read copied recorded 13 1   Responses within period for reply or as per contract 13 3   May ask for an extension for a period of reply 13 4   Any notification has to be separate from any other communication 13 7  Contractor   Contractor acceptance not transfer liability away from Subcontactor 14 1   Contractor must formally delegate actions under 13 7 14 2   Contractor can issue instructions to change the WI 14 3  Working Area   Subcontractor can propose an area added to Working Area 15 1  Early Warnings   Reasons for which an early warning should be raised 16 1   Instruct the other party to attend a Risk Reduction meeting 16 2   Actions expected of all parties at a risk reduction meeting 16 3   Updating of the Risk Register 1
5. ld if no 1    accepted programme 50 3   Reminder that Contractor has to assess even if no Subcontractor submission 50 4  Payment   Contractor to certify payment within 7 days of assessment date 51 1   Confirmation of period within which payment should be made 51 2   Interest recoverable on items corrected on a later certificate 51 3  Defined Cost   Any Subcontractors costs not identified in Defined Cost are in the Fee 52 1    Section 6   Compensation Events    General  List of what events would be considered as compensation events 60 1  Requirement to mitigate the effects of a compensation event 60 3  Notifying  Contractor can notify request a quotation  which Contractor puts into effect 61 1  Contractor can request a quotation for a proposed quotation 61 2  Subcontractor can notify a CE and can be time barred after a period 61 3    Contractor to accept or not accept if Subcontractor has notified  It includes 61 4  a deemed acceptance    loop    if the Contractor does not respond within period   Contractor can advise that an early warning could have been given which 61 5  was not notified   Contractor can state assumptions for Subcontractor to base the quote upon 61 6    No compensation events can be issued after Completion 61 7  Quotation  Contractor can request alternative quotations for dealing with a CE 62 1    Subcontractor to provide a quote   alterations to programme where relevant 62 2  Subcontractor to provide quote within 3 weeks  PM response within 2 weeks 62 3    
6. pensation events    Ve LA L ALLAS  MELT e    60 7    63 10  63 12    11 2 23     11 2 25   11 2 29     20 4  26 4  31 4  32 2  53 1 2  53 3  53 3  54 1    54 2  54 3    Total of Prices are not reduced if Subcontractor   s idea to reduce defined cost 63 11  By agreement may use shorter schedule of cost components to assess a CE 63 15    Additional Option D clauses    Identified and defined terms   Defined cost is subcontracted costs and elements in accordance with   schedule of cost components    List of disallowed costs that Subcontractor will not get paid for   Price for Work Done to Date is total of Defined Cost  actual cost   Providing the Works   Subcontractor provides forecast of total Defined cost at contract intervals  Subcontracting   Requirement to submit contract data for proposed subcontracts  Defined cost   Requirement for Subcontractor to keep records    11 2 23     11 2 25   11 2 29     20 4  26 4    52 2    Page 5 of 6    GIL    ECS High Level Quick User Guide SR    Page 6 of 6    ERROR  stackunderflow  OFFENDING COMMAND          STACK     
7. t of what is required to be shown on a programme for acceptance 31 2   Requirement for Contractor to accept a programme or not accept 31 3  Revising the Programme   List of what should be shown on a revised programme 32 1   Intervals for programme submissionsto Contractor 32 2  Acceleration   Contractor can request a quotation for an acceleration 36 1    Section 4   Testing and Defects    Tests and Inspections  Requirement to carry out tests and inspections as per works information 40 1    Requirement to notify Contractor prior to tests being carried out 40 3   Requirement for Contractor to carry out test inspection 40 5  Before delivery   Requirement to carry out tests prior to delivery where required 41 1  Searching notifying defects   Contractor can instruct Subcontractor to search for a defect 42 1    Requirement Subcontractor Contractor to make each other aware of defects 42 2  Correcting defects   Requirement to correct a defect within correction period 43 2   Contractor to issue defects certificate at end of defects date 43 3  Accepting defects   Can propose for a defect to be not corrected and WI changed accordingly 44 1  Uncorrected defects   Contractor can rectify a defect and charge a Subcontractor if not carried out 45 1    Page 2 of 6    GML    ECS High Level Quick User Guide Lm    Section 5     Payment    Assessing Amount Due    Contractor to assess the amount due at each assessment date 50 1   Definition of the amount due 50 2   Fact that 25  PWDD can be withhe
8. ver details   Insurance policies and who needs to provide what to whom    Additional Option A clauses    Identified and defined terms  Use of shorter schedule of cost components and cost of preparing quote  is excluded from cost of compensation events  Price for Work Done to Date is completed items on the activity schedule  Programme  Requirement for activity schedule to relate to items on programme  Activity Schedule  Makes the point activity schedule is not Works Information  Activity schedule can be changed by agreement  Reasons for not accepting a revised Activity Schedule  Compensation Events  Prices  contract sum  can be reduced with a compensation event  Activity Schedule to be updated in line with compensation events    Additional Option B clauses    Identified and defined terms  Use of shorter schedule of cost components and cost of preparing quote  is excluded from cost of compensation events  Price for Work Done to Date is completed quantities at bill rates and  proportion of any lump sums  Bill of Quantities  Makes the point activity schedule is not Works Information  Compensation Events  Sets the threshold at which a change in quantity is assessed as a  compensation event  defined cost   rather than using bill rates   If any change in quantity affects Completion then it is a CE   Any errors in the B of Q that are departure from standard method of  measurement will be a compensation event    Val Lent L  LA    70 1 2  71 1  73 1    80 1  81 1  84  85    11 2 20   1
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
GUIA DE INSTALAÇÃO E PROGRAMAÇÃO  8209 User Manual - Sealevel Systems, Inc  LL-S201A  Descarga (PDF 0.2 MB)  Cables Direct B6ST-700K networking cable  Quick Reference Guide  Eglo FROSSINI  Guía del usuario de Learning Center  Firlit-Sugar Intermittent Catheter Intermitentní katetr Firlit      Copyright © All rights reserved. 