COMMODITY USER GUIDE
Contents
1. 4 SUPPLIER ENGAGEMENT CAPEX 1 YES CAPEX 2 YES CAPEX 3 5 YES CONTRACTUAL OPTIONS CONTRACT NEC 3 SUBCONTRACT YES PURCHASE ORDER YES Spares Only SUBCONTRACT SW Procurement MCC Commodity User Guide Issue 1 August 2010
2. COMMODITY OVERVIEW gt lt Scottish Water lt Always serving Scotland COMMODITY USER GUIDE please refer to the Framework Guideline Document for an overview of how SW s Frameworks should be used COMMODITY TITLE Motor Control Panels COMMODITY NO SW09 CAP 588 SCOPE This Framework Agreement covers Lot 1 Control Panels Lot 2 Form 1 and Small Form 4 LV Panels The following list details the services plant and equipment provided by the supplier under this Framework e Capex 1 amp 2 out line design Engagement with SW PLC SCADA framework supplier e Capex 3 detailed design e Lot 1 Control panels Motor Control Centres and ICA Panels Design supply delivery installation and commissioning of the low voltage switchgear motor control panels and control panels Factory Acceptance Test Site Surveys General and Harmonic FDS Development Engineering Solutions PLC Recommendation of hardware Software Development HMI Recommendation of hardware Configuration SCADA Recommendation of hardware Software Programming Site Integration Services Installed Software Site Modifications to existing software Commissioning of SI input Modifications to existing panels On site testing commissioning Delivery amp Erection Lot 1 Off Loading amp Positioning Lot 2 Off Loading amp Positioning on request SUB CATEGORY if applicable SUPPLIER SELECTION OPTIONS i e single source selecti
3. on criteria mini comp allocation Mini competition and or allocation by Scottish Water Framework Manager MCC Framework Suppliers will generally not be allocated for the Solution 2 programme For all sites that require a new MCC or where the MCC is independent separate from the existing control centre the selection of the MCC supplier with the responsibility of the Contractor CDP delivering the project on site SW Procurement MCC Commodity User Guide Issue 1 August 2010 Allocation is permitted by exception in certain circumstances where there is a justifiable business case and a sound technical need to consider this approach Eg Major modifications to existing MCC s In this case the Project Manager Construction Manager should authorise any allocation by completing the MCC allocation document Additionally it is essential that the SW Framework Manager is kept informed on all MCC work package awards to allow for meaningful allocation when required Please also note that SW have reserved the right to revert to a full allocation methodology if delivery if it is felt that the capital programme outputs are at risk FRAMEWORK MANAGER Paul Stewart paul stewart scottishwater co uk Tell Office 01506 678697 M 07976460907 SUPPLIERS COVERAGE SUPPLIERS see Framework Supplier Manual for details Lot 1 Lot 2 Boulting Group Lintott Control Systems MCS CS Ni 4 PSI Ni Saftronics
Download Pdf Manuals
Related Search
Related Contents
QUEST GX1255S - R Operating Manual Extraction Unit ZENOTEC Air eco VTrak G-Class Series Product Manual MS-Tech LD-160 loudspeaker 01 rosso_TR:Layout 1 - Norway Safety Solutions MERCOID DIVISION - Dwyer Instruments, Inc. CFAN0342SN Copyright © All rights reserved.
Failed to retrieve file