        7m Dragbox User guide page 1.psd
         Contents
1.   Provide a landing below the top of the box  This will prevent debris rolling down onto personnel inside the box   DO   Always maintain a safe batter of the unsupported parts of the trench in front of and behind the Dragbox   DO   Store boxes on their side     DON   T   Move the box with personnel inside    DON   T   Hammer the box with the bucket    DON T   Use lifting lugs for other than loading unloading or assembly purposes   DON T   Use damaged struts    DON   T   Use spacer combinations other than those recommended by Mabey Hire Ltd   DON T   Use unsafe lifting equipment    DON   T   Enter unsupported parts of the excavation    DON T   Sit astride the box struts     ALWAYS   Consult a qualified person if there is any doubt about ground pressures     9  References  CIRIA Report 97 Trenching Practice    10  GENERAL    Since our policy is one of continual improvement  components may vary in detail from the descriptions given  in this publication     Page 6 of 6    
2.  Pin Rear Strut Pin Rear Conn  Strap 5 7m Base Panel  Code  DPSF PIN Code  DPSR PIN Code  DBX RCS N Code  DBX PNL7  Size  35 dia x 245 Size  50 dia x 260 Size  225 x 100 x 30   Weight  2050 Kg  Weight  2 0 Kg Weight  3 9 Kg Weight  5 Kg i    Page 1 of 6    product user guide QIEEEM  gt        Title    7m Standard Pinned Strut Dragbox System   August 2012    3  Identification of Components Cont   d    Pinned Front Strut Outer    Length   Weight  DPSF 0 31M  DPSF 0 46M 8 5   610 6 5  760  1360    DPSF 0 76M    DPSF 0 6iM  610   865  7o  105  DPSF 091M  DPSF 1 06M    DPSF 1 21M    1  DPSF 1 36M 1360 1  3    DPSF 1 66M 1660    0  DPSF 1 51M  OPSF 2 16M    Pinned Rear Strut Outer  Length   Weight  Code    10 7  187  26 6  50 5    N71 1807  N       58  77  B5  m3    Afw    N   n  o    Hogback Spacer    Length   Weight AZ     L  mm   Kg   gt  i i Hogback Post    DS HB 450EXT   460   90   Code  DS HB VP  i  lt    Size  1250 x 450 x 320  DS HB 950EXT   960   160 _ p    Weight  120 Kg             1070           gt       Upper panel connection points       Upper to Lower  panel connection   1 off conn  strap     2 off M30 x 110  bolts  per side     1 off Front conn   plate   8 off M20 x  75 bolts  per side        Front  Struts             ae 2000     gt              4000        Top and bottom lifting points Front End    Side Elevation Elevation    Rear  Struts a          Front strut inner to Panel  Connection  M30 x 160 long bolts   4 per side   Front strut inner to  Outer Connection DP
3.  moving the machine on its wheels   tracks   7 4 5 Backfill the trench behind the Dragbox     7 5 Extraction  7 5 1 Lift the Dragbox from the trench with excavator or suitable craneage  using 4 leg chain  JCBP 037  connected  to lifting points   7 6 Site Storage  Stability Considerations     7 6 1 Dragboxes should be stored laid on their side when not in use  Uneven or sloping ground and or wind loading  can result in inadequate stability if left standing upright     Page 5 of 6    product user guide QIEEEM  gt        Ne 7m Standard Pinned Strut Dragbox System oa August 2012    7 7 Trench Reinstatement    7 7 1 Users should note that some settlement of the reinstated ground and ground adjacent to the Dragbox is likely  to occur after backfilling     7 8 Maintenance    7 8 1 Keep all nuts and bolts tight   7 8 2 Damaged struts must not be used   7 8 3 We regret that we are unable to provide staff to change boxes from one size to another on site     IF IN DOUBT CONSULT MABEY HIRE LTD   8  Summary   DO S AND DONT S    DO   Ensure that all operatives are familiar with the safety and operating instructions    DO   Take care not to overstress the boxes  watch for bowing of the panels     DO   Check that all nuts and bolts are tight but not over tightened    DO   Check all pins and    R    clips are fitted    DO   Follow the basic maintenance instructions    DO   Use a ladder to enter the box    DO   Wear a safety helmet    DO   Use suitable 4 leg slings and lifting equipment    DO 
4.  the base of the box    flying    above the excavation level             Correct Incorrect  mete t   a  E oe    rash  oO pk     ae  Always maintain a safe Ensure that there are no DO NOT leave the  batter of the unsupported excavation level is voids between the box base of the box    flying     parts of the trench  in front reached and the box panel and the trench sides above the excavation  of and behind the box  sunk to the required as this may cause the box level   depth  ensure that the to move sideways     box Is vertical     7 3 Entering the Supported Excavation  7 3 1 Use a ladder to enter the working space between the struts of the Dragbox  Do not climb up or down the struts   7 3 2 Do not use any unsupported part of the trench for access   7 3 3 Do not move the box when personnel are inside   7 3 4 Wear a safety helmet to minimise risk of head injury   7 3 5 Ensure that the excavator operator is aware of your intentions     7 4 Operation  7 4 1 Before entering the working space within the Dragbox     a  Prepare the pipe bedding material   b  Lift a section of pipe into the trench   7 4 2 Enter the working space and complete installation of the pipe section by joining onto previously laid sections   Restrain the pipe section to prevent displacement whilst dragging the Dragbox along the trench   7 4 3 Exit from the working space   7 4 4 Drag the box forward by hooking the bucket round the front strut of the box  Use the hydraulics of the excavator  for this rather then
5.  trenches crossed by frequent services     It is assumed that clients are familiar with general safe practices applicable to the use of Dragboxes   All major components of the Dragbox System have lifting points for safe slinging   The Dragbox is not intended for any other purposes     2  Design 28 0 to    In the event of trench wall instability the Dragbox is designed to carry a   als  uniform lateral earth pressure of 28 0kN m2 when using hogback rear struts Ground  and 34 1kN m  when using standard rear struts  Users are advised to check  that their excavation arrangement will not impose greater working pressures        mi                 N  n  H  u           gt    gt    gt    gt    gt   than this  Conditions which will increase the likelihood of trench wall instability pts  a E  a f  and lateral earth pressures are  Pressure  f     Sa  gt     a  Close proximity of structures   gt  x   b  Excavated or construction materials adjacent to the trench  Excavation z    c  Close proximity of site roads  Level  gt        d  Close proximity of railways  y     3  Identification of Components        4   Pinned Front Strut Inner Pinned Rear Strut Inner Rear Strut Spacer Front Conn  Plate    Code  DPSF INNER Code  DPSR INNER Code  DSR S Code  DBX FCP  Size  458 x 300 x 174 Size  320 x 200 x 155 Size  320 x 320 x 160 Size  370 x 280 x 20    Weight  44 5 Kg Weight  13 2 Kg Weight  27 Kg Weight  16 Kg Pe    a  i  a    w      oa  i  A    A A    i ee E  ial r         a CDP wz 4   Front Strut
6. SF PIN  2 Rear strut Inner to Panel Connection    per side  M20 x 60 Long bolts  12 per side   base panel   Rear strut Inner to Outer Connection  Front End Elevation Showing DPSR PIN  1 per side     Upper Box Connected See Table             Plan  Rear End    Elevation    Page 2 of 6       000    __      2200      1270   e         e     product user guide QIEEEM  gt        Ne 7m Standard Pinned Strut Dragbox System oa August 2012    4 1 High Clearance Base Boxes Using Hogback Struts    325m  j lt 900     lt  325 SS coee      325 325 e  perja  325              meg iA               S HBACK Re      460EXT j 24  H BACK  3 ap 2    960EXT       4 2 Details of Hogback Units  Used at Rear Strut Position on Base Box Only                                                        4No  1360              gt  1860  DSR S     900      450 gt   460   450 gt   450    lt     960         450   er Unit TT T    ny i  P   T M aT rs  E P    P  ee   i M20 x 60 a   i  long bolts  10 p u long bolts  44   H  i  per joint      per side       T     Type    A    Type    B    Type    C      2 off DS HB VP  4 off DSR S   2 off DS HB VP  1 off DS HB   2 off DS HB VP  1 off DS HB   Weight  348 kg 450EXT  4 off DSR S  950EXT  4 off DSR S   Weight  439 kg Weight  510 kg    5  Sizes and Quantities of Struts Required to make up particular sizes of Dragbox    Note  1  Always allow sufficient clearance for excavator bucket to work comfortably within internal width of side panels  when selecting a box size   2  Non stan
7. dard equipment may be available if other widths required     Front Strut Outer  Rear Strut Outer Base Box  Internal pire No  Reqd No  Reqd  Kit Ref  Weight  Width  mm   mm  Base Base No                 Q       942   310 270 DBXPS 7x1   4341  DBXPS 7x3   4417  760 DBXPS 7x4   4451            O    BXPS 7x5   4492  DBXPS 7x6   4526  BXPS 7x7   4560  DBXPS 7x8_  4607  1470 DBXPS 7x9   4643  DBXPS 7x10   4677  2120 DBXPS 7x11   4800    With Hog Back Struts  Rear Strut   Base Box Only   1550   1842   1210   1   900   1 A  DBXPS 7x12       4686  4878  5020    q1   DBXPS 7x13  DBXPS 7x14       Page 3 of 6    product user guide  mialble y Hines       a  m Standard Pinned Strut Dragbox System oe August 2012    6  Off Loading  Site Handling and Assembly of Standard Dragbox  General Guidance Notes    6 1 Manpower  The Health and Safety Regulations require that personnel deployed are suitably trained  experienced and supervised  by a competent person     6 2 Plant for Lifting  A suitable appliance is required for off loading and assembly if required  The machine lifting capacity and clearance  under the lifting point should be checked against the sizes and weights of the dragbox to be lifted   assembled     6 3 Tools and Lifting Chains  available from Mabey Hire Ltd   6 3 1 Podgers   Spanners for making bolted connections  M20  amp  M30 bolts   6 3 2 Lifting chains of suitable length and capacity complete with current certification  Typically a set of 4 leg 13mm  chains with 4 0m leg leng
8. product user guide    Ne 7m Standard Pinned Strut Dragbox System oa August 2012    Contents    Page 1  Introduction  Design  Identification of Components   Page 2  Identification of Components Cont d  Dimensions and Connection Details   Page 3  Sizes and Quantities of Struts Required to make up particular sizes of Dragbox    Page 4   Off loading  Site Handling and Assembly of Standard Dragbox  General Guidance Notes  Page 5  Use of Standard Dragbox   Page 6  Summary   Do   s and Don ts  References  General       1  Introduction    This booklet is intended to provide basic information for users of the Mabey 7m Long Standard Pinned Strut Dragbox  system and to draw the clients attention to the practical aspects of handling  assembly  installation and use which need  to be considered in compiling a safe system of work  In particular  the clients attention is drawn to the size and weights  of the Dragbox components and the need for planning the lifting operations involved     The Dragbox is intended to act as a shield to provide a safe working area for operatives working in a trench  It is not  intended to provide significant support to the trench sides  and is therefore intended for use only in dry stable ground  which stands to the excavated depth  It can then be dragged along a pre dug trench  Users should ensure that the  length and selected width of the box is sufficient for the work to be carried out  Dragboxes are not normally suitable  for use in water bearing soils or in
9. th complete with shortening clutches and safety hooks   Code JCBP 037  weight 84kg   Refer to Lifting Chain User Information for more details     6 4 Access and Hard Standing Areas  These include    6 4 1 Suitable area to off load the lorry and assemble the Dragbox   6 4 2 Suitable hard standing for the machine to operate to lift the box into the trench   6 4 3 Suitable access equipment  ladder or staging  for attaching lifting chains and connecting top extension to base box   6 4 4 Ladders and possibly other provisions to provide safe access into and out of the trench     6 5 Supply of Equipment to Site  Mabey Hire will normally supply the 7m drag boxes completely pre assembled to the width required for immediate  installation in the trench   Clients need to allow for the upper box to be connected to the lower box on site     NOTE  Clients should not normally attempt to dismantle and assemble boxes themselves on site     6 6 Return of Equipment Off Hire  Clients should ensure that on removal  the equipment is returned in sections as supplied     6 7 Slinging of 7m Dragbox  See pages 1  2 and 3 for weights      6 7 1 Off Loading Reloading Lorry   Base and Extension Box   Pre assembled in Depot    Use 4 leg chain sling   JCBP 037  connected to  lifting points as shown     6 7 2 Standing Pre assembled er  Boxes Upright    Use 2 No lifting points  provided  Lift by upper  panel only        6 7 4 Connection of Upper box   When it is required to increase  the support height to bet
10. ween 2   4m using 2 No  boxes     Use the 4 No  lifting points   Stand lower box upright in partly  dug trench  Lower upper box  onto lower box and fit 2 No   front conn  plates at the front  and 2 No  rear conn  straps at  the rear     Page 4 of 6    6 7 3 Lifting Pre assembled Boxes  When in Upright Position   Base and Extension    Use the 4 No  lifting points  provided                 C ll u    T  lt        product user guide QIEEEM  gt        Ne 7m Standard Pinned Strut Dragbox System oa August 2012    7  Use of Standard Dragbox    7 1 Preliminaries    7 1 1 Check all bolts are fitted and tight before lifting box into trench    7 1 2 Check all pins c w    R    clips are fitted before lifting box into trench    7 1 3 A suitable excavator is required   as a guide the manufacturer s quoted  digging force  should be at least  5 x the weight of the dragbox equipment in use     7 2 Installation    7 2 1 Excavate initial section of trench  Lift dragbox into trench using excavator or crane    7 2 2 The Dragbox must NOT be pushed down into the trench using a    dig and drive  method    7 2 3 Always maintain a safe batter of the unsupported parts of the trench in front of and behind the box    7 2 4 Fill any voids on outside of panels so that the box cannot be pushed sideways by any soil movement   Ensure the box is installed vertically    7 2 5 Allow for at least 100mm of projection of top of box above ground level   to prevent debris rolling into  excavation    7 2 6 DO NOT leave
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Mode d`emploi - Leroy Merlin  - A.J.Pinto  LabVIEW Real-Time Module User Manual  Fujitsu S6120D User's Manual  WhiteLock99N [PDF:960KB]  EMC1200R シリーズ 取扱説明書 HYTEC INTER Co., Ltd. 第 2.2 版  Manual de instrucciones  Mode d'emploi  Vertex Standard 7122B Satellite Radio User Manual  取扱説明書等 - アイ・オー・データ機器    Copyright © All rights reserved. 