2. n b z g l j Ta 7 Hall Paul Potential Minerals Zone 3b Zone 3a Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Mineral Extraction sand amp gravel PPS25 Vulnerability Classification Water Compatible Area of Site Ha NA Overview of Flood Risks The site is located on land that is classified as Zone High Probability The headwaters of the River Wampool and several unnamed drains and watercourses cross the site A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures The impacts of mineral extraction activities on the water environment vary from site to site and depending upon the method of extraction Initially all potential impacts should be considered Minerals and VVaste Development Framevvork Cumbriz Strategic Flood Risk Assessment County Council a m a il xox i 24 Warne WV 3 gili Fil un 11 Fi l l hamana aris 1 M Itan Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Si
3. JE JACOBS October 2007 Cumbria County Council JE MVVDF STRATEGIC FLOOD R SK ASSESSMENT SFRA J ACOBS The SFRA has been developed building heavily upon existing knowledge with respect to flood risk within the district A rolling programme of detailed flood risk mapping within Cumbria is underway This in addition to observed flooding that may occur throughout a year will improve the current knowledge of flood risk within the district and may marginally alter predicted flood extents Furthermore Communities and Local Government CLG are working to provide further detailed advice with respect to the application of PPS25 and future amendmenis to the PPS25 Practice Guide are anticipated Given that this is the case a periodic review of the SFRA is imperative It is recommended that the SFRA is reviewed on a regular basis The following key questions should be addressed as part of the SFRA review process Question 1 Has any flooding been observed within the county since the previous review If so the following information should be captured as an addendum to the SFRA What was the mapped extent of the flooding On what date did the flooding occur What was the perceived cause of the flooding If possible what was the indicative statistical probability of the observed flooding event i e how often on average would an event of that magnitude be observed within the county If the flooding was caused by overtopping of the river
4. do d v o Dulpooli jo ysu enpis l y 191 yensuoul p o ess o u 9q IIA 4 q qeqolzi Z 8u0Z uiyyM H UM S 54 00 0 p s e90 10U s op zu wdoj a p nsu o p nb SI JUalussesse JOedw abeulesp v paysies si GZSdd za lqe1 SZSdd lqe1 ulnA luBiu se p siuoB 1e5 sn pue 00010 s ullqeqoid uinip lN z uoz paeny s 1u uudoj A p S 49 JO y 9 0109 Ul p3 011 s81 q snu 1ug9uidoj A 9q 20 2081 5294 s sn lqleduloo 0 1011159 q snuu jeuonoun4 q uoz 1u9uido j A9p S 400c 4940100 punog snolA 1d uo 101 J JeuJSUOWAP JSNW J9do gA p 9 401099 VH4S 49104 s m dold Bululolpe o Buluasiom ou ul unnsa UaLUdOJaAspP y JO tl y JOAO ues Sulpooli o np S y UlUHA lil pue A dold ysu y 19 JSNW yu pellejep V POSES S G Sdd 20 9061 S2Sdd ss se sn puke p sodold s ullqeqoid eg uoz UIUIM paenys 1u uudoj A p S NOl Q p ul no se jJu uudo j A p y Jo arneu v Buu pisuo5 310 Q 79 01099 1s l jenu nb ays yno 19
5. 5000 49 IN3NSS3SSV 4001 21031 19 120 02 Auno euquing Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS Appendix B Cumbria County Council Overview Maps October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS October 2007 Minerals and VVaste Development Framevvork Site Strategic Flood Risk Assessment AL3 5 18 qa fic b x Di T ELANLA 2 0 22 Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Area of Site ha 13 10 6ha AL5 2 4ha AL18 2 9ha Overview of Flood Risks The flood risk to these sites is likely to be from a mixture of fluvial and tidal sources River Derwent amp Irish Sea Detailed modelling suggests that the sites are not located in Zone 3a High Flood Risk from fluvial sources However they are still situated on Zone 3a High Probability land from tidal flooding During a flood event the sites may be surrounded by flood waters on all sides They may become a dry island and be cut off from the surrounding areas The sites are within the Environment Agency Flood Warning Area Cumbrian coastline from Silloth to St Bees A detailed FRA will be r
6. within High Risk Flood Zone 3a Potential for employees and users of the site to become isolated during a flood event Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land The site should be subject to a specific flood warning and safety plan Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment Canty Come st Thomas s Cross fi 7 Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overview of Flood Risks The site is located out of the flood risk zone A small open unnamed drain passes through site which could cause localised critical drainage problems The unnamed drain passes into culvert within site which will have maintenance issues and increase flood risk from the watercourse A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 Potential Deve
7. 2115 1Snul Ju9uido j A9q 24 9lq SZSdd s sn lqilediuoo 0 D919111S91 q ISNW u ule dpoo 4 Jeuo ound qE uoz ulu p lenlis uol jeoo je p sodold s aus Builsix ue UOllE 01I 500010 5 Nol q p ulilno se zu wdoj n p y JO anyu ay Bulu pisuo2 1779 40199 WHS jsay jeyuanbas ayy yno snu si guup qd jlounoo 49 IN3NSS3SSV YSIY 40014 21031 19 120 02 Auno euquing 9 001995 yu4s 1U nos pinous 9 POO u uononpa e qissod au Satvedosd Sululolpe o Buluassom ou l nins l lu uidoj A p 01 U049 1u uido A d r pino l si juawss ssy YSIY D00 d 21694249 OU JO ulll Jl 84 p yebillu ue2 Sulpooli o np l s y lil pue AH dold o 491 AU yey 9 e11suouu p snu WH V pue Ajsnoindid lqedol A p UO S S jqeuose OU 31e GSU 18 9 ellsuouu p ISNW Y pool u l Mino zey Allunuuuuo2 3y 0 Sill v q lllqeuleisns zuawdojanap BU 150 jsaj uoldaaxy ql ssed 0 juawdojanap au HESS D U SI 9 u099S WHS JES uollpnopA9 p uueld e JO UOlSIAO d y PUL S 100 JO y ldiupx 104 yno pabeuew J An59JJ9 s Au
8. Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA October 2007 JE JACOBS Appendix A Cumbria County Council MWDF SFRA User Guide Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS October 2007 Buluuejd pin5 l sf jua wuss ssy YS H pooj4 916972149 saoovr Ir za adel SZSdd 2 08 iublu se p siuoB 1e5 sn pup p sodold s Vass 1002 4940190 punog A3unox B49AO YSU anpa m lqissod PU BJBYMAS 9 YS poo i v HulseaJou 1n0U14 ayes aq IM u wudoj n p y 150 BuNSUa o Bde d ul q ISNW suollipuo Buluue d pue p do A p ajqedojanep uo Salis AHP H TE jqeuose 1 OU q snu 3194 Udy pup isnolA zd UO JOU SI J pue p do A p Ajsnoindid lqedol A p uo p nous 1u uidoj A p YS poojj YBlamyno zey Allunuuuuo2 v o s1ij u q l iqeure sns JOPIM u uudo A p y 150 paezsuowap snu S uond xz ql ssed o yu wdoj n p y 10 GESS D U sI ju uido j A p uodn Zad 2148 L SZSdd SS SJUIENSUOD 8 9 SZSdd ON se pasuobeyeo sn puke p sodold s illqeqoid ullqeqoid ulnip yi uoz ulu UBIH eg uoz p lenis uoneoollp p sodold si p lens uoneoolie 500010 s U JO g p 9 uo0ll99S ym 99uppio20e Ul
9. al Development Control Measures impacts of mineral extraction activities on the water environment vary from site to site and depending upon the method of extraction Initially all potential impacts should be considered Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment County Council Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Household waste recycling centre PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overview of Flood Risks Significant proportion of site is within High Risk Flood Zone 3a Flooding is from fluvial and coastal sources Dragley Beck is a known flooding problem to north Several small watercourses in vicinity increase the likelihood of critical drainage issues Potential for employees and users of the site to become isolated during a flood event Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off to that of undeveloped and natural land Site should be subject to a specific flood warning and evacuation plan developed at FRA stage and in consultation with emergency services Cumbria Count
10. ar 100 year or 1000 year flood outline If yes then the Zone 3b and Zone 3a flood outlines should be updated accordingly gt Has the assessment of the impacts that climate change may have upon rainfall and or river flows over time altered refer Section 5 6 If yes then a review of the impacts that climate change may have upon the District is required gt Do the development control recommendations provided in Section 6 4 of the SFRA in any way contradict emerging EA advice with respect to for example the provision of emergency access the setting of floor levels and the integration of sustainable drainage techniques If yes then a discussion with the EA is required to ensure an agreed suite of development control requirements are in place It is highlighted that the Environment Agency review the Flood Zone Map on a quarterly basis If this has been revised within the county the updated Flood Zones will be automatically October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS forwarded to the Council for their reference is recommended that only those areas that have been amended by the Environment Agency since the previous SFRA review are reflected in Zone 3 and Zone 2 of the SFRA flood maps This ensures that the more rigorous analyses carried out as part of the SFRA process are not inadvertently lost by a simple global replacement of the SFRA flood maps with the Flood Zone Maps October 2007
11. banks are the observed flood extents situated outside of the current Zone 3a If it is estimated that the frequency of flooding does not exceed on average once in every 100 years then the flooded areas from the river should be incorporated into Zone 3a to inform future planning decision making v v v v v Question 2 Have any amendments to PPS25 or the Practice Companion Guide been released since the previous review If so the following key questions should be tested gt Does the revision to the policy guidance alter the definition of the PPS25 Flood Zones presented within the SFRA refer Section 5 2 gt Does the revision to the policy guidance alter the decision making process required to satisfy the Sequential Test refer Section 6 4 1 gt Does the revision to the policy guidance alter the application of the Exception Test refer Section 6 4 1 gt Does the revision to the policy guidance alter the categorisation of land use vulnerability presented within Table D2 of PPS25 December 2006 If the answer to any of these core questions is yes then a review of the SFRA recommendations in light of the identified policy change should be carried out Question 3 Has the Environment Agency issued any amendments to their flood risk mapping and or standing guidance since the previous policy review If so gt Has any further detailed flood risk mapping been completed within the District resulting in a change to the 20 ye
12. d be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land The proposed development should not adversely alter existing flood regime Flood levels outside of the site must not be increased as a result of the proposed development Minerals and VVaste Development Framevvork x Strategic Flood Risk Assessment County Council 3 High 4 Greenscoe Clay Pit BM A 156 54m Potential Mine rals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability il Site Informatio Land Use Mineral Extraction clay PPS25 Vulnerability Classification Less vulnerable Area of Site Ha NA Overview of Flood Risks The site is located on land that is classified as Zone 1 Low Probability Localised flood risks may be posed by the unnamed drains and watercourses that cross the site Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures The impacts of mineral extraction activities on the water environment vary from site to site and depending upon the method of extraction Initially all potential impacts should be considered Minerals and VVaste Development Framevvork efmif rar Strategic Flood Risk Assessment County Council F a aa F k D n 4 2
13. d form of the development and the appropriate application of sustainable drainage techniques Zone 2 Medium Probability Definition This zone comprises land assessed as having between a 1 in 100 and 1 in 1000 annual probability of river flooding 1 0 1 or between a 1 in 200 and 1 in 1000 annual probability of sea flooding 0 5 0 1 in any year Appropriate uses The water compatible less vulnerable and more vulnerable uses of land and essential infrastructure in Table D 2 are appropriate in this zone Subject to the Sequential Test being applied the highly vulnerable uses in Table D 2 are only appropriate in this zone if the Exception Test is passed FRA requirements All development proposals in this zone should be accompanied by a FRA See Annex E for minimum requirements Policy aims In this zone developers and local authorities should seek opportunities to reduce the overall level of flood risk in the area through the layout and form of the development and the appropriate application of sustainable drainage techniques October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE J ACOBS Zone 3a High Probability Definition This zone comprises land assessed as having a 1 in 100 or greater annual probability of river flooding gt 1 or a 1 in 200 or greater annual probability of flooding from the sea gt 0 5 in any year Appropriate uses The water compatible and less vuln
14. equired to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 The proposed land use is less vulnerable and is appropriate for Zone 3a High Probability Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does not include any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year fluvial flood level plus an allowance for climate change or above the 1 in 200 year tidal flood levels plus sea level rise allowances SUDS are required to limit run off from the site to that of undeveloped land Flood evacuation procedures and routes should be developed with advice from the emergency services as part of the FRA Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment r unririni 5 yY yz Estate o d r xur mar r R llyhall gt A Industrial vt k k O x Estate s 6 i i 3 A b VA f 4 l Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of development Up to 4 5ha Overview of Flood Risks The site is located o
15. erable uses of land in Table D 2 are appropriate in this zone The highly vulnerable uses in Table D 2 should not be permitted in this zone The more vulnerable and essential infrastructure uses in Table D 2 should only be permitted in this zone if the Exception Test see para D 9 is passed Essential infrastructure permitted in this zone should be designed and constructed to remain operational and safe for users in times of flood FRA requirements All development proposals in this zone should be accompanied by a FRA See Annex E for minimum requirements Policy aims In this zone developers and local authorities should seek opportunities to i reduce the overall level of flood risk in the area through the layout and form of the development and the appropriate application of sustainable drainage techniques relocate existing development to land in zones with a lower probability of flooding amp create space for flooding to occur by restoring functional floodplain and flood flow pathways and by identifying allocating and safeguarding open space for flood storage Zone 3b The Functional Floodplain Definition This zone comprises land where water has to flow or be stored in times of flood SFRAs should identify this Flood Zone land which would flood with an annual probability of 1 in 20 5 or greater in any year or is designed to flood in an extreme 0 1 flood or at another probability to be agreed between the LPA and the Environment A
16. for completion in 2010 will protect the area to a 1 in 200 year standard 0 576AEP A high flood risk will still remain due to flooding from pluvial sources rainwater A detailed FRA will be required to i demonstrate that the residual risks of flooding will acceptable for the lifetime of the development and can be managed effectively demonstrate that the risk of flooding elsewhere is not increased including pluvial flooding as a result ofthe proposed development There are presently areas of the site which are situated in Zone 3b Functional Floodplain which are not appropriate for the proposed land use according to PPS25 Following the completion of the Flood Alleviation Scheme the proposed site should be suitable for the proposed development providing pluvial and residual flood risks can be managed Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork 1214 Strategic Flood Risk Assessment County Council ee Yo 1 i A 8 7 N N ZN A 2 Potential Mine rals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulne
17. gency including water conveyance routes Appropriate uses Only the water compatible uses and the essential infrastructure listed in Table D 2 that has to be there should be permitted in this zone It should be designed and constructed to remain operational and safe for users in times of flood result in no net loss of floodplain storage not impede water flows and not increase flood risk elsewhere Essential infrastructure in this zone should pass the Exception Test FRA requirements All development proposals in this zone should be accompanied by a FRA Policy aims In this zone developers and local authorities should seek opportunities to i reduce the overall level of flood risk in the area through the layout and form of the development and the appropriate application of sustainable drainage techniques and ii relocate existing development to land with a lower probability of flooding October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE J ACOBS Table D 2 Flood Risk Vulnerability Classification Essential nfrastructure e Essential transport infrastructure including mass evacuation routes which has to cross the area at risk and strategic utility infrastructure including electricity generating power Stations and grid and primary substations 007 Vulnerable Police stations Ambulance stations and Fire stations and e Command Centres and telecommunications insta
18. i identify the functional floodplain and ensure that proposed development is not within Zone 3b ii demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no current restrictions under PPS25 Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change for fluvial flooding or the 1 in 200 year flood level plus allowances for sea level rise SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork i Zea 48 JE JACOBS Strategic Flood Risk Assessment County Council Potential Minerals Zone 3b Zone 3a Zone 3a and Waste Site Functional High Plus Medium Probability Floodplain Probability Climate Change Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development Up to 4 5 ha Overview of Flood Risks Black Beck is situated on the southern border of the site Detailed modelling has shown that the proposed facility is located within Zone 3b Functional Floodplain from the watercourse Planning Recommendations The proposed land use is not appropriate according to PPS25 Alternat
19. ive sites within areas at lower flood risk should be considered Potential Development Control Measures Not appropriate Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment 2 i 1 kwake Estata lt Pde Fallot my toan G ns r r m a s 1 M R Liki pe UL 27 ks SIH a z gia IB j g ai Fr ir Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure h Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overview of Flood Risks There is a minor area of Zone 3a High Risk on the western border of Risehow Industrial Estate which appears to be related to the backing up fluvial flows during high tides The two small watercourses that border the site to the north and the south have not been modelled and could pose a localised flood risk A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does not include any buildings within identified risk areas Thresho
20. k Assessment Le Li pe a l n i M Ma mona L Y Far Wi j Tihs te E a itol m 3 A UV f e AR F Fd F s w iz Af Thi hl Houser kaf w by Wesi Tar 2 gt Wasi Hoa ep Farm Newby West A Curnimoaradale gt Farm Pa narin Potential Mine rals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overvievv of Flood Risks The potential site is not located on any identified areas of significant flood risk according to Environment Agency maps The site is situated on land that includes a small unnamed watercourse which may pose a localised flood risk A detailed FRA will be required to i identify the functional floodplain of this watercourse and ensure that proposed developmentis not within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no current restrictions under PPS25 though there is a strong possibility that an FRA will identify flood risks from the unnamed watercourse The size of the site could be reduced as not to include areas adjacent to the watercourse N
21. l be required to i identify the level of risk posed by the small watercourses ensure that proposed development is not within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment County Cotincl k MN x k i m m ec binning R Ce h k w 2 a VN ev ok M a 1 Pi FT sunnyside G l J l r J Cottages SN Si pi Little l TH Farlam Farlam Cottag l pf NZ R CLA F h el Key Potential Minerals Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overvievv of Flood Risks The potential site is located adjacent to Milton Beck and is within flood risk Zone 3a High Probability Zone 3b Functional Floodplain has n
22. ld levels should be above predicted 1in 100 year fluvial flood level plus an allowance for climate change or above the 1 in 200 year tidal flood levels plus sea level rise allowances SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork ite yCumbriay Strategic Flood Risk Assessment County Council JACOBS R Howsethwaie Hill Joanheed 1 onulvlinas Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 ha Overvievv of Flood Risks The site is not identified as being vvithin any existing flooding zones but according to maps there are several areas of ponded vvater Groundvvater levels in the potential development area may present flood risks throug hout the site A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no current restrictions under PPS25 Potential Development Control Measures Buildings could be constructed on the higher areas of ground Threshold levels of any buildings constructed onthe site should be constructed significantly above ground level SUDS are required to limit run
23. llations required to be operational during flooding Emergency dispersal points Basement dwellings Caravans mobile homes and park homes intended for permanent residential use Installations requiring hazardous substances consent 107 Vulnerable Hospitals Residential institutions such as residential care homes children s homes social services homes prisons and hostels Buildings used for dwelling houses student halls of residence drinking establishments nightclubs and hotels Non residential uses for health services nurseries and educational establishments Landfill and sites used for waste management facilities for hazardous waste Sites used for holiday or short let caravans and camping subject to a specific warning and evacuation plan Less Vulnerable e Buildings used for shops financial professional and other services restaurants and cafes hot food takeaways offices general industry storage and distribution non residential institutions not included in more vulnerable and assembly and leisure Land and buildings used for agriculture and forestry Waste treatment except landfill and hazardous waste facilities Minerals working and processing except for sand and gravel working Water treatment plants Sewage treatment plants if adequate pollution control measures are in place Water compatible Development Flood control infrastructure Water transmission infrastructure and pumping stations Sewage trans
24. lopment Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does not include any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment County Coumcll Old Wood V LEATOR A Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Household Waste Recycling Centre PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overview of Flood Risks Significant proportion of site is within High Risk Flood Zone 3a There are structures providing a flood defence function partially protecting the site A residual risk of flooding due to overtopping and or collapse A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 LA should consider if other areas of land with a lower level flood risk are available preferably Low Flood Risk Zone 1 Potential Development Control Measures Threshold levels for all buildings shoul
25. mission infrastructure and pumping stations Sand and gravel workings Docks marinas and wharves Navigation facilities MOD defence installations Ship building repairing and dismantling dockside fish processing and refrigeration and compatible activities requiring a waterside location Water based recreation excluding sleeping accommodation Lifeguard and coastguard stations Amenity open space nature conservation and biodiversity outdoor sports and recreation and essential facilities such as changing rooms Essential ancillary sleeping or residential accommodation for staff required by uses in this category subject to a specific warning and evacuation plan October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE J ACOBS Table D 3 Flood Risk Vulnerability and Flood Zone Compatibility Flood Risk Essential Vulnerability Infrastructure compatible Vulnerable Vulnerable Vulnerable classification see Table D2 Exception Test fone 3a Exception Test Exception required Test Fas c Jl m a d d 8 k LL Functional required Floodplain Fey Development is appropriate X Development should not be permitted October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS Appendix D SFRA Review Procedure October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA
26. off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment Canay Canaf OLA VYUO 1 n P 4 Harker Z Z Z 7 2 Kingmoor Park Harker 4 i Harker or Estate nf Lodge Wilderness Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Household Waste and Recycling Centre PPS25 Vulnerability Classification Less vulnerable Size of Development 0 6 ha approx Overview of Flood Risks The potential site is located next to a small unnamed watercourse The site is not identified as being within any existing flooding zones but the watercourse has not been modelled A detailed FRA will be required to i identify the functional floodplain of this vvatercourse and ensure that proposed development is not within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allovvance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Ris
27. ot within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no current restrictions under PPS25 but considering the high availability of land in Zone 1 Low Probability which is immediately adjacent to the site other sites should be considered Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allovvance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment County Comet 2 g N 4 z L N ae gt n 4 a al wane oN x gt Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability R gt Site Information Land Use Waste Management Treatment Facilities Overview of Flood Risks The potential site is located adjacent to the River Eden and a minor tributary Parham Beck The site is situated on areas of Zone 3b Functional Floodplain and Zone 3a High Probability flood risk which has been identified through detailed modelling A Flood Alleviation Scheme due
28. ot been modelled for this watercourse but the site is likely to be within the natural floodplain The watercourse passes underneath two access roads These bridges culverts are susceptible to blockage A detailed FRA will be required to i identify the functional floodplain of this vvatercourse and ensure that proposed development is not within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development There are no current restrictions under PPS25 Though the development of certain parts of the site may be limited following detailed investigations Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allovvance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork JE JACOBS Strategic Flood Risk Assessment County Council Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Land Use Household Waste Recycling Centre PPS25 Vulnerability Classification Less vulnerable Size of Development 0 6 ha approx Large areas of High Risk Zone 3a surrounding the site and the flooding is from both coastal and fluvial sources Western border of site is
29. ote that the Environment Agency typically request a buffer of 8m either side of the bank to be left free from development Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDSare required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment a J mr f Caravani ROMAN TILE SS S Park KILNS I site of Settlement SS site of Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Household Waste and Recycling Centre PPS25 Vulnerability Classification Less vulnerable Size of Development 0 6 ha approx Overview of Flood Risks The potential site is located adjacent to Brampton Beck and is within flood risk Zone 3a High Probability Zone 3b Functional Floodplain has not been modelled for this watercourse but the site is close enough to the channel to have a high chance of being within the natural floodplain A detailed FRA will be required to i identify the functional floodplain of this watercourse and ensure that proposed developmentis n
30. rable Size of Development Up to 4 5 ha Overvievv of Flood Risks The site is located on land that is classified as Zone 1 Low Probability Localised flood risks may be posed by the large number of unnamed drains and watercourses that cross the site A detailed FRA will be required to i identify the level of risk posed by the small watercourses ensure that proposed development is not within Zone 3b demonstrate that the risk of flooding is not made worse by the proposed development Flood risk to site should be minimised at design stage so that the proposed layout and form does notinclude any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment Comey ndi Potential Mine rals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overvievv of Flood Risks The site is located on land that is classified as Zone 1 Low Probability Localised flood risks may be posed by the large number of unnamed drains and watercourses that cross the site A detailed FRA wil
31. te Information Land Use Mineral Extraction sand amp gravel PPS25 Vulnerability Classification Water Compatible Area of Site Ha NA Overview of Flood Risks The site is located on land that is classified as Zone High Probability The headwaters of the Milton Beck and unnamed drains cross the site A detailed FRA will be required to demonstrate that the risk of flooding downstream is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures The impacts of mineral extraction activities on the water environment vary from site to site and depending upon the method of extraction Initially all potential impacts should be considered Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment County Council Potential Mine rals Zone 3b Zone 3a Zone 2 Flood Defence and Waste Site Functional High Medium Structure Floodplain Probability Probability 1 Site Information Land Use Mineral E xtraction gypsum PPS25 Vulnerability Classification Less Vulnerable Area of Site Ha NA Overview of Flood Risks site is mostly located on land that is classified as Zone 1 Low Probability e There is a narrow band of Zone 3a High Probability associated with Keld Sike which crosses the proposed site Planning Recommendations There are no restrictions under PPS25 Potenti
32. ut of the flood risk zone A small open unnamed drain passes through site which could cause localised critical drainage problems The unnamed drain passes into culvert within site which will have maintenance issues and increase flood risk from the watercourse A detailed FRA will be required to demonstrate that the risk of flooding is not made worse by the proposed development Planning Recommendations There are no restrictions under PPS25 Potential Development Control Measures Flood risk to site should be minimised at design stage so that the proposed layout and form does not include any buildings within identified risk areas Threshold levels should be above predicted 1in 100 year flood level plus an allowance for climate change SUDS are required to limit run off from the site to that of undeveloped land Minerals and VVaste Development Framevvork Strategic Flood Risk Assessment Potential Minerals Zone 3b Zone 3a Zone 2 Flood Defence and VVaste Site Functional High Medium Structure Floodplain Probability Probability Site Information Land Use Waste Management Treatment Facilities PPS25 Vulnerability Classification Less vulnerable Size of Development 1 5 to 2 0 ha Overview of Flood Risks The proposed site is at risk of flooding from both tidal and fluvial sources Wath Beck and is located in Zone 3a High Probability according to Environment Agency Flood Zone Maps A detailed FRA will be required to
33. y Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS Appendix C Tables D1 D2 amp D3 from PPS 25 October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS October 2007 Cumbria County Council MWDF STRATEGIC FLOOD RISK ASSESSMENT SFRA JE JACOBS Table D 1 Flood Zones Note These Flood Zones refer to the probability of river and sea flooding ignoring the presence of defences Zone 1 Low Probability Definition This zone comprises land assessed as having a less than 1 in 1000 annual probability of river or sea flooding in any year lt 0 1 Appropriate uses All uses of land are appropriate in this zone FRA requirements For development proposals on sites comprising one hectare or above the vulnerability to flooding from other sources as well as from river and sea flooding and the potential to increase flood risk elsewhere through the addition of hard surfaces and the effect of the new development on surface water run off should be incorporated in a FRA This need only be brief unless the factors above or other local considerations require particular attention See Annex E for minimum requirements Policy aims In this zone developers and local authorities should seek opportunities to reduce the overall level of flood risk in the area and beyond through the layout an

Download Pdf Manuals

image

Related Search

Related Contents

Graco 1776435 Stroller User Manual  Tonus Charente  - Rampart Security Systems    『easy ECG training』(iOS/Android アプリ) お詫びと訂正  BENDIX S-1580S User's Manual    TAC4 DG + SAT BA/KW  Page 1 P2HS P3HS S3R S2R 調整器 ( ) ニューストップエース FA  Graco PD247328A Car Seat User Manual  

Copyright © All rights reserved.
Failed to retrieve file