Home
suitcase pdf - Edge Technology
Contents
1. Edge Technology Power Ltd Si Suitcase Gas Conversion Kit C Operating Instructions BRIGGS amp STRATTON i Introduction GENERAT The engine uses approx 0 33kg of gas per Kw per hour For short periods of running any size of cylinder may be used but long term running particularly in cold conditions may cause freezing of the cylinder with consequent loss of power For reliable operation use cylinder of a least 19kg net capacity In cold weather it may be necessary to use 49kg cylinders CAUTION PROPANE VAPOUR IS HIGHLY FLAMMABLE AVOID NAKED LIGHTS CIGARETTS ETC WHEN CONNECTING THE ENGINE TO THE CYLINDER Ensure there is no petrol in the generator fuel tank Connect the gas supply hose to the cylinder Ensure the cylinder valve seat and the hose union is clean before screwing them together Depress fuel controller prime button for 1 2 seconds only Start engine in normal way NOTE gt gt gt DO NOT USE CHOKE Stop Engine by turning off gas OQ N N O 0I A How to contact us Edge Technology power Ltd Unit 1 Crewe Trade Park Gatewa m Crewe aE Mbl Cheshire zat CW1 6YG http www edgetechnology co uk Sales TEL 01270 509 296 FAX 01270 509 297 Email enquiries edgetechnology co uk Edge Technology Power Ltd 2009 S Edge Technolo Power Ltd uitcase generator gas kit parts list A Regulator amp Garretson Bush 3 4 x 3 8 Nipple 3 8 B PTFE C Extensi
2. male connector to 1 4 BSP 17 Secure to 1 5m x 10mm hose and secure with clip FIG 1 BREATHER HOSE 8 CARBURETOR J 3 Drill ADAPTOR QO Po Edge Technology Power Ltd 2009 FIG 2 You are now ready to prepare to start Check that you have enough oil in the sump Make sure that there is no petrol in the tank and that the carburetor is drained Connect male connector to the female connector Attach BRC to gas cylinder Do not use PTFE tape on this fitting Turn on the gas Turn the rotary switch on the generator to the On position Hold the priming button on the BRC in for 1 second Start the generator with the recoil starter 3 Suitcase Gas Conversion Kit C Components Appendix A CONTENTS VAPOUR KIT C Garretson Fuel Controller Regulator Bush 3 4 x 3 g Nipple g Nozzle Elbow 3 9 x 13mm Hose 13mm Hose PTFE Tape Hose Clips 13mm 2x T O TMM O O D P STEP 1 1 1 Tape G thread of bush C 1 2 Fit bush C to inlet of Garretson Fuel Controller A STEP 2 2 1 Tape G both threads of nipple D 2 2 Fit nipple D into bush C Edge Technology Power Ltd 2009 STEP 3 3 1 Screw regulator B on to nipple D DY H Clip 2 IE CARBURETTOR 7 ADAPTOR gt orie 4 1 Tape G thread of nozzle elbow E FIT TO 4 2 Fit nozzle elbow E into Garretson A outlet GAS BOTTLE 4 3 Fit hose F between carburettor kit and Garretson A 44 Secure
3. on Studs D Elbow 3 8 x 10mm E Female Gas Connector F Male Gas Connector Edge Technology Power Ltd 2009 G Swaged fitting 1 4 BSP to 10mm H 1 5 M x 10mm hose 400mm x 6mm hose I 2 x hose clips Large 1 x hose clip Medium 1 x hose clip small J Carburettor adaptor K Jet Nozzle Edge Technology Power Ltd Suitcase Gas Conversion Kit C Fitting Instructions Please note that PTFE tape is to be used on all threaded fittings Attach male gas connector to the 400mm x 6mm hose and secure with the medium clip Remove the side cover Drill a 15 mm hole below the side cover as shown in fig 1 Pull off the crank case breather Remove air intake j 2 3 4 Undo the two nuts on the air intake to carburetor 5 6 7 Remove the carburetor studs one at a time and replace with the new studs parts L Make sure the carburetor is seated correctly and that all gaskets are in place 8 Screw the brass jet part K into the aluminum adaptor part J 9 Feed the hose through the 15mm hole see fig 2 10 Attach the 6mm D hose to the brass jet part K and secure with the small clip 11 Fit the aluminum adaptor part F as shown in Fig 1 Dotted outline 12 Refit the air intake manifold making sure it fits correctly into the rubber link on the air cleaner box See fig 3 13 Replace the carburetor nuts and the crank case breather 14 Replace Air Filter 15 Replace the side cover 16 Connect the fe
4. with clips H at both ends S 4 5 Fit vapour kit to cylinder ES BEFORE USING THE EQUIPMENT MAKE SURE THAT ALL RELEVANT CONNECTIONS ATTENTION AND JOINTS ARE GAS TIGHT Edge Technology Power Ltd 2009 5
Download Pdf Manuals
Related Search
Related Contents
Supply Chain Magazine 79 BOMBAS BHI - Bombas Imbil 取扱説明書 - ソフトマティック EDGE Service Manual MSZ-ZW28T 4 5 6 2 3 1 7 8 9 5 6 1 4 2 3 12 10 13 11 2x Copyright © All rights reserved.
Failed to retrieve file