Home
        Installation Manual - mitsubishitech.co.uk
         Contents
1.  as quickly as possible and remove residual flux     When the temperature has been lowered remove all excess flux using a wire brush if necessary   Once works are carried out pressure test and fully evacuate the pipe lines to F Gas guidelines   Fully open valves  ensure caps are refitted to Schrader valves and valve shaft     Additional refrigerant will need to be added at the outdoor unit  Please refer to the PURY City Multi service  manual to calculate the additional quantity required        BC Box with Port Isolation    Please be sure to put the contact address telephone number  on this manual before handing it to the customer     MITSUBISHI ELECTRIC UK    MITSUBISHI ELECTRIC UK  TRAVELLERS LANE  HATFIELD  HERTFORDSHIRE  AL10 8XB    
2. Issue 1    KCON       BC Box Modification with Port Isolation    Installation Manual    Instructions for     BC Box Modification with Port Isolation    Models   KS8 CMB P V G1   KS8 CMB P V GB1   KS8 CMB P V GA1    KS8 CMB P V HA1   KS8 CMB P V HB1    For safe and correct use please read this installation manual and use in conjunction with the  BC Box installation manual supplied by Mitsubishi Electric        ffi MITSUBISHI  Modified on behalf of  MITSUBISHI ELECTRIC UK ELECTRIC    BC Box with Port Isolation    Contents    Page  3 Ball valves installation instructions  4 Connecting to unused isolation valves on an existing system    The Mitsubishi Electric BC box should be installed in accordance with the installation instructions supplied with  the unit     Care should be taken  when installing the BC box with port isolation  to protect the fitted ball valves from  damage     DO NOT use the ball valves as handles for lifting or as mechanical support for the BC box     BC box with port isolation       BC Box with Port Isolation    BC Box with Port Isolation   Installation Instructions    When installing ball valves it is very important to note that when applying heat it should only be for a matter  of seconds  not minutes     For soft soldering   Use oxygen acetylene or equivalent type heating torches     For Silver Brazing   ONLY use an oxygen acetylene heating torch capable of raising the temperature of the tube  socket to the required brazing temperature within a time peri
3. fully closed     Cut tube ends square  Remove burrs   Remove all grease and oil from joint area and clean the outside of the tube with emery cloth     Insert tube to full depth of connection socket to ensure proper fit  Withdraw tube half way out of the socket   apply brazing flux evenly over the tube and outside of the socket and reinsert tube     Wrap a wet cloth around the valve body and bonnet  but away from the socket to be brazed  With the torch  adjusted to a reducing flame apply heat to the entire circumference of the tube over a distance of  approximately 15mm to 50mm from the valve socket to expand the tube and carry the heat down inside the  socket     Continue heating until the flux on the tube becomes liquid at which time the flame should be directed on the  valve socket as well as the tube but pointed away from the valve body     When the flux has become very fluid and watery in appearance apply the brazing alloy against the heated  tube starting at the bottom of the junction of the tube and valve socket  If the joint is at the proper  temperature the brazing alloy will flow quickly around the tube and into the socket  If the alloy does not flow  readily continue heating until the proper temperature is reached     Remove the flame as soon as the liquid brazing alloy has covered the entire joint and penetrated down to the  socket  After a few seconds when the alloy has set  apply a water soaked cloth to the joint and to the entire  valve to carry away excess heat
4. od of approximately one minute     New Installation  IMPORTANT   Before installing the valve in the line  remove the schrader valve and turn the stem to the open position   Recommended procedure for silver brazing to copper tubing   Cut tube ends square  Remove burrs    Remove all grease and oil from joint area and clean the outside of the tube with emery cloth     Insert tube to full depth of connection socket to ensure proper fit  Withdraw tube half way out of the socket   apply brazing flux evenly over the tube and outside of the socket and reinsert tube     Wrap a wet cloth around the valve body and bonnet  but away from the socket to be brazed  With the torch  adjusted to a reducing flame apply heat to the entire circumference of the tube over a distance of  approximately 15mm to 50mm from the valve socket to expand the tube and carry the heat down inside the  socket     Continue heating until the flux on the tube becomes liquid at which time the flame should be directed on the  valve socket as well as the tube but pointed away from the valve body     When the flux has become very fluid and watery in appearance apply the brazing alloy against the heated  tube starting at the bottom of the junction of the tube and valve socket  If the joint is at the proper  temperature the brazing alloy will flow quickly around the tube and into the socket  If the alloy does not flow  readily continue heating until the proper temperature is reached     Remove the flame as soon as the liq
5. uid brazing alloy has covered the entire joint and penetrated down to the  socket  After a few seconds when the alloy has set  apply a water soaked cloth to the joint and to the entire  valve to carry away excess heat as quickly as possible and remove residual flux     e When the temperature has been lowered remove all excess flux using a wire brush if necessary        Fully open valves  ensure caps are refitted to Schrader valves and valve shaft     Existing Operational System   Pipework    If additional fan coils are to be fitted or other work carried out after the initial installation before making  alterations ensure that both the relevant ball valves on the circuit to be worked on are fully closed     Connect gauge lines to the relevant Schrader valves and recover all refrigerant to F Gas guidelines   Once works are carried out pressure test and fully evacuate the pipe lines to F Gas guidelines     If additional pipework has been added to the liquid line additional refrigerant will need to be added at the out   door unit  Please refer to the PURY City Multi service manual to calculate the additional quantity required        BC Box with Port Isolation    BC Box with Port Isolation   Installation Instructions    Connecting to unused isolation valves on an existing system    If additional fan coils are to be fitted or other work carried out after the initial installation before making  alterations ensure that both the relevant ball valves on the circuit to be worked on are 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Bissell 6800 User's Manual  Manuale d`installazione Scheda di attivazione  Produktdatenblatt - e  SERVICE MANUAL - CurtPalme.com    GSE 350IS / GSE 355IS Service Manual  Guia do Usuário  Manuale di installazione  5 5 Reguladores de pH LUJO  WELDANPOWER 150 Y 150 DE CA/CD    Copyright © All rights reserved. 
   Failed to retrieve file