Home
        Tricel Vento Septic Tank Installation Manual
         Contents
1.                                          LA DENN SS    a i Il   l     i  NI ip   por ili i     IR i IL    ca R VA i Rums             hia  SI 4440  his          cs    SI a AC 1D   2700       P12    mu   i                      PARO    i  1230   A Mt 1180          MIL  LIZ  2050    NIE peg Ip       P20    e TIIA _ Ca IID    aa ANO A TOT         1550    si i   Ji  It  N    SIL p HHRHH K  lt H  2430    Tq    PE EN          6  Lid Security     Each lid should be secured at all times to prevent unauthorised access  Tanks are supplied with two securing points     as shown below     To secure lid  rotate until tight  Tighten screw in place with screwdriver  Lid is now secured in place           7  Manhole risers      deep inverts      Manhole risers are available for deeper installation requirements  They are available in 180mm increments x    400mm diameter to a maximum height of 540mm  max 3 risers         All manholes lids are securable and must be secured for safety and to prevent unauthorised access  All    maintenance work is done through these manholes     e Never install the cover of  the system under ground    level     e Do not allow ground  water to enter the    system     e Only Tricel Vento  manhole risers shall be    used         Mi HAAS                                        py  At ae    D ss  LI LI IK    el tH   HA la  sli HH il ji   ee  ce I NR    Mi i  gi oe                                                   ia N rai  w    Ai WYA aie nt    StH       RR nie    it Nit  
2.          TRICEL    Table of contents        1  Health  amp  safety precautions    ecceccssceescesceeeceeeeesceseeeaeesaeseeeaesaesessesseeeesaesaesaesaessesaeeeseaseaeeeeneaseates 2  2  Transportation  offloading and storage                      eeeceeeeeeeeeeeeeeeeeseeaeeseeseeeeeeaeeeneaeeseeaeeseeeaeeaeeseteaneaneats 2  3  The wastewater purification process                              3  4     lonkdimensions     nia 4  5 Ti avait 4  6  Manhole risers      deep invertS                               ii 5  T A LU 0    eee n 5  7 1 Pre    installation Inspectioni                        e 5   7 2 QUICK installation guideliNes                    tirrenia nera ei nei nie eia eine ine eri rie ire rien eine 6   7 3 Detailed installation INformationi            iiiii 7   T A  Dry Site Aboca 10   7 5 Deeper tank installation  amp  wet site installationi                i 11   7 6 Plinth and backfill specirications     ciaai 12  Be  PLUMbNS  DE SSC C100 arrens E A A O ia 14  9  Finishing the garden to ground level    eceececeseeeeeeeeeeeeeeeeeeeeesaeceeeseeseeseeeaeeseeaeeseseessaeeseeeaseaeeeeeeaseaees 15  10  Mantenne  ah ai 16  11  OP STAINS Condino 17    It is important to read the full technical and installation guide prior to installation  This document should be    retained for the lifetime of the product and in the event of change of ownership be transferred to the new owner     Precaution    Prior to installation  please consider finished garden level when installing the sys
3.  is level and ensure that correct orientations are determined to accommodate the incoming  pipe work   e  tis important that no excess ground water until the concrete is set  It may be necessary to line the    excavation with a continuous layer of 1200 gauge polythene to maintain the integrity of the dry mix     7 5 2 Installing onto the base plinth     e Mechanically lift the plant carefully into the centre of the hole   e The plant must be dead level on the plinth  e Connect and seal the pipe work to the tank appropriately     e Mount and seal manhole risers  if required     7 5 3 Backfilling a wet site     Top soil       Ground Level arrr          e Fillthe plant with clean water to a depth of 300mm and recheck the pipe work levels  Commence backfilling  with dry mix as per plinth and backfill specifications section 7 6 1 evenly around the tank ensuring that there  are no voids  Continue filling the chambers whilst backfilling  ensure that the progressive water level is no  more than 300mm above the backfill level    e  Backfillwith dry mix until it has reached the invert of the inlet pipe level    e Continue backfilling with dry mix as per plinth and backfill specifications section 7 6 2 until dry mix has  reached the inlet level     e Complete backfilling with topsoil up to the max ground level line     12    7 6 Plinth and backfill specifications     7 6 1 Dry mix backfill specification   Dry mix concrete is specified 200kg cement mixed with 1m3 sand   Note  Standard co
4.  maintenance is completed     Lids are not designed to be walked on        1     and storage     Tanks must be held down during transportation using nylon straps  do not use cables or chains to secure  tanks  Do not over tighten straps to cause deformation of the tank shell   Always set the tank s  on flat smooth ground free from debris etc  To prevent movement  tanks may need to be  tied down    Tanks are best lifted by crane or suitable lifting equipment and webbing lifting straps     do not use chains  or wire ropes in contact with the tank  Ensure tank is empty when lifting    Move tanks only by lifting and setting  do not push or drag    Do not drop or push tanks from truck trailer     3  The wastewater purification process        The Tricel Vento septic tank is an ideal solution for wastewater treatment when used in conjunction with the  appropriate disposal system    The tank is divided into two chambers  sized sufficiently to hold wastewater for an adequate amount of time for  the solids to drop to the bottom to form a sludge and the lighter material to rise to the top of the liquid to form a    scum  The remaining liquid effluent is passed through the outlet pipe into the disposal system for final treatment        4  Tank dimensions     Tank Name Vento 6 Vento 12 Vento 20       4255  sf    3056    10  2700  1190    1440      See section 6    1190    1140    175    355    225          5  Tank drawings   P6       FRA Sy 2  ili T ST                                      
5. AG a  Ue R a          7  Installation     All installations must be    fit for purpose    to suit the on site conditions  which will vary from site to site  This is the    responsibility of the onsite contractor     The Tricel Vento is suitable for a maximum manhole riser of 540mm which gives a maximum outlet to ground level    invert of 960mm  The Tricel Vento is not suitable where a deeper installation is required     7 1 Pre Installation Inspection    Tanks should be subject to visual inspection prior to installation   Check for  fractures to the shell or ribs  deformation  punctures  scratches or abrasions deeper than 1 5mm  Any damage should be notified to the delivery driver and or to your supplier   Do not attempt to carry out any un authorised repairs  as this will invalidate the warranty on the tank    Once the tank has been installed  we cannot accept any claims for damage     7 2 Quick installation guidelines     A dry site is one where the water table never rises higher than the base of the Tricel Vento unit and the ground is  free draining    A wet site is one where the water table may rise higher than the base of the Tricel Vento unit or where the soil  does not allow water to drain away at the same rate     The unit should never be installed where ground water can rise higher than the outlet pipe    Guidelines Dry Site Wet Site    All installations must be    Fit for purpose    to suit the on site conditions  which v v  will vary from site to site  This is the 
6. ction purposes and also to assist in    any blockages that may occur        Distribution box  450mm high x 300mm opening Riser extension  300mm opening x 270mm high    8 3 Ventilation     Ventilation is crucial to the system  Prior to installing the system  great care must be given  on how to provide  adequate ventilation  As sites differ  advice is available from BS8301  BS6297  EPA CoP 2009  The Tricel  Vento septic tank is supplied with 1No 110mm socket next to the inlet pipe which may be used for venting the    tank if vent through the eve is not possible     10  Maintenance        Note  All maintenance work should be carried out from outside the tank  There is never a need to enter the septic  tank     A certain amount of unit maintenance is required  on an ongoing basis to ensure that the system is working    correctly  This is the responsibility of the homeowner     10 1 Quarterly Maintenance  3 months      The outlet distribution box should be checked monthly to ensure that the effluent is free flowing and clear   The vent should be checked to make sure they are not blocked or covered with over grown grass   15    10 2 Yearly maintenance     De sludging should be also carried out yearly to prevent solids rising to the height of the outlet pipe and  being carried along with the liquid into the percolation trenches  This blocks the percolation area and can  cause flooding  Depending on usage and house population  this period may vary  The de  sludging of the  Tricel Ven
7. fully into the centre of the hole and place on the prepared plinth    e The plant must sit dead level on the plinth  e Connect and seal the pipe work to the tank     e Mount and seal manhole risers  if required     7 4 3 Backfilling dry site                                                                                                                           Gravel    e Fill the plant with clean water to a depth of 300mm and recheck the pipe work levels  Commence backfilling  with gravel as per plinth and backfill specification in section 7 6 2 in layers of 225mm evenly around the tank  ensuring that there are no voids  Compact each layer ensuring the vibrating machine does not come in  contact with the plant  Continue filling the chambers whilst backfilling  ensure that the progressive water  level is no more than 300mm above the backfill level    e Continue to backfill until gravel has reached the inlet pipe level     e Complete backfilling with topsoil up to the max ground level line     7 5 Wet site installation     A dry mix surround must be installed in wet site conditions   A wet site is one where the water table may rise higher than the base of the Tricel Vento unit or where the soil    does not allow water to drain away at the same rate     11    7 5 1Tank base plinth     e Remove any soft spots or large stones and boulders     e The base is constructed of a 300mm layer of dry mix  Refer to plinth and backfill specifications in section  7 6 1    e Ensure that base
8. higher than the cover of the    Compact evenly around the riser extensions to reduce risk of distortion     Ensure that No surface loadings are transferred from the cover direct to v x  the tank  Cover frame construction should allow movement     An access chamber should be installed before and after the tank to assist in    clearing possible blockages    If sewage consists of high quantities of grease e g  from a restaurant  a grease    trap may have to be installed on a separate drain prior to the system        7 3 Detailed installation information   7 3 1 Siting   The minimum set back distances for installing the septic tank are outlined below     Ireland England Wales Scotland Northern Ireland    Hedge or tree 3 metres 5 metres 5 metres 5 metres  roots       The minimum set back distances for soak away percolation area are outlined in the table below     Ireland England Wales Scotland Northern Ireland    Well  borehole or spring   Depends on 50 metres 50 50 metres  site conditions metres    Watercourse 10metres 10 metres 10 10 metres  metres      E o  Road  railway  10meters  permeable drain    In England and Wales there is a specified distance of 25m and 4m vertical distance of where the de sludge tanker can       park  In Scotland this distance is 30m and 3m vertical     The Tricel Vento should not be installed in an area subject to flooding or excessive water runoff  The area around the  Tricel Vento should be adequately drained  to permanently remove water from the pr
9. ncrete mixes should not be used  where sulphates or similar aggressive chemicals are    present in the groundwater     Lift height  rate of rise      Determine the lift height  m   or rate of rise  m h  for the specific concrete type used  to ensure that    a design pressure  P max  of 15kN m2 on the tank is not exceeded     Vibration   The design of the tank assumes minimal compaction of the surrounding concrete  Where necessary  this  may be extended to include light internal vibration  Never use deep revibration which will substantially    increase the pressure on the tank  possibly causing failure     Impact of dry mix on discharge     Under no circumstances should dry mix be discharged directly onto the tank     7 6 2 Gravel backfill specification     Primary Backfill material should be free flowing granular material  The design of the tank assumes minimal  compaction of the surrounding concrete  Compact evenly  around the turret extensions to reduce risk of  distortion  Tanks must be installed with primary backfill only within the region immediately surrounding  the tanks  This primary backfill must extend a minimum of 200mm outward from the tank and directly  beneath the tank     The following materials are approved as Primary Backfill     e Rounded pea gravel   Minimum particle size 3mm  maximum 18 mm  compacted to a relative density of  gt 70   Gravel shall be  clean and free flowing  free from large rocks  dirt  sand  roots  organic materials or debris  Upon screeni
10. ng    analysis the backfill material shall have no more than 5  by weight passing 2 36 mm sieve    e Crushed or processed stone     Minimum particle size 3 mm  maximum 12 mm  compacted to a relative density of  gt 40     Dry gravel density must be at least 1500 kg m3  Material should be washed or screened to remove fine  particles  Upon screening analysis the backfill material shall have no more than 5  by weight passing 2 36  mm Sieve    Use of other than specified backfill and bedding materials will void the tank warranty     13    Backfill material shall not be frozen or contain lumps of frozen material at any time during placement        7 6 3 Top soil     Clean native top soil shall not contain rocks larger than 36mm on largest dimension     Note  The use of geo textile barrier fabrics surrounding the primary backfill material is considered good  installation practice  The fabric must be chosen to allow the flow of water in and out of the excavation but    to prevent the movement of fine soil particles into the primary backfill material     7 6 4 Burial depth     Generally  the max depth from finished to the inlet invert level of the main shell should be no more    than 755mm for P6 and 825mm for a P12 and P20     7 6 5 Loadings    If the plant is installed in an area where traffic or other superimposed loadings can be applied  consult  a structural engineer for the design of a reinforced concrete slab to prevent the load being transmitted to  the tank  or its concrete s
11. operation of the system  Correctly constructed  distribution chambers and distribution drains or polishing filters are necessary as part of the treatment  process  Incorrectly constructed drains or polishing filters could result in poor treatment of effluent and we  do not accept any responsibility in this regard    e If the plant is not installed correctly  flooding  overloading  or floatation may occur  We are not responsible for  incorrectly installed systems    e Soak ways  drains and the emptying of primary tanks remain the responsibility of the client and damage to  the installation due to the influx of surface water or the backing up of soak ways or drains is not covered    by the manufacturer     16    e We shall not be liable for any damage or loss  including consequential loss  caused by the  failure of any plumbing equipment or failure caused by the inclusion of gross solids   e g       disposable diapers or sanitary towels etc   in the septic tank    e To ensure the continuance of the plants performance  the user has to take certain precautions including    the following       The design loading of the plant should not be  exceeded       High volume discharges such  as those from swimming pools and Jacuzzi s must never enter  the plant       Surface water must not enter the plant     Do not allow large quantities of chemicals to enter the system including       Water softener regenerate        Disinfectants        Strong acids and alkalis  or photographic chemical
12. oximity of the tank  The Tricel    Vento system is not suitable to be used in water logged sites  where the water level may rise above the outlet level     7 3 2 Controlof groundwater     During installation tanks must not be subjected to buoyant forces   Incorrectly installed tanks that are subject to movement  rotation or floatation may become damaged  for  which we cannot accept liability  Contact a qualified engineer if there are difficulties on site due to    adverse water logging     7 3 3 Note  water logged sites     The Tricel Vento septic tank is not suitable to be used in water logged sites  where the ground water may  rise above the outlet level  Adequate drainage is important to improve wet sites  or sites with a high water  table level  It is recommended that water is removed from the area surrounding the system to prevent  flotation  Excessive loading caused by site water can harm the system  please consult with the    manufacturer or a qualified engineer if in doubt     7 3 4 Excavation size    Suitably sized equipment will be required to excavate the hole and to lift the system into place  Installation  depends on on site conditions  water  slopes  location etc  Excavation should be planned with due regard  to Health and Safety requirements  and should be either shored or battered back to a    safe    angle  The  excavation should allow a minimum 200mm clearance between the tank and the excavation wall or face  of shoring  Unstable ground with excessive sand  
13. peat swamps etc  may require larger excavations     The excavation should be maintained dry by pumping or whatever suitable means     External dimensions  Width in meters x Length in meters  Total excavation   Tank Width   400mm  x  Tank Length   400mm   Excavation depth  Allow 200mm for a tank base plinth     7 3 5 Excavation depth   The excavation depth is determined by the inlet pipe invert level relative to the bottom of the tank  and  allowing for the minimum base thickness shown  Dimension details of the tank are shown on the relevant  drawing in section 5  Ground instability at formation level  e g  running sand  may necessitate over     excavation and stabilisation with hardcore or blinding concrete     Note  The maximum depth for the base slab is 2105mm for a P6 and 2215mm for P12 and P20     Dry Site Wet Site                                                                                           D Gravel    ll m DI    Site Conditions a    minimum iin mm    b    minimum in mm    200    200       10    7 4 Dry site installation     A dry site is one where the water table never rises higher than the base of the Tricel Vento unit and the ground is    free draining     7 4 1 Tank base plinth     e Remove any soft spots or large stones and boulders  e The base is constructed of a 200mm layer of gravel   e Ensure that base is level and at the correct height to accommodate the incoming pipe work    7 4 2 Installing onto the base plinth   e Mechanically lift the plant care
14. responsibility of the onsite contractor     Never push the tanks  Tanks shall be lifted into position     The unit should be located as far away from the dwelling as is practically v di  possible considering topography and pipe work levels  Separation  distances must meet all National and Local regulations    Dig a hole circa 400mm larger than the system in plan     Remove any soft spots or boulders of significant size from the base or sides v di  of the excavation    Ground water must be pumped to give a dry excavation and excavation     lined with polythene if necessary  cel i   this must be flat and level    A base is constructed of a 300mm layer of dry mix to suit site conditions    This must be flat and level  J       v  Ensure gravel dry mix are clean and contains no large materials TO  Lift tank into position and align as required for connecting pipe work  access v v  shafts etc   Ensure that each tank is 100  Level  and that inlet outlets are in the y v  correct orientations     Fill tank with water at the same rate as you backfill the tank     Commence gravel backfilling in 300mm layers to 100mm over the tank    ensuring tank and any pipe work is properly supported  v   Commence backfillingin 300mm layers to 100mm over the tank  y  ensuring tank and any pipe work is properly supported     Minimal compaction should be used on the surrounding backfill  Aa    Complete backfilling with topsoil up to ground level  Ensure that    surrounding finished ground level is never 
15. s      Oijlor grease      Petrol or diesel        Pesticides     Do not allow any of the following in to the  system         Large quantities of milk  alcohol or food       Large quantities of bleaches or cleaners       Baby wipes  cosmetic and cleaning wipes      Sanitary towels     Kitchen paper     Nappies     Tampons     Medication    e Service personnel must be accommodated with clear access to the  plant     e  f the plant has been sized by others  we will supply a plant to these specifications  In this case   the responsibility lies with others  in relation to the maximum flow   litres per day  the system  Capacity and retention times    e  f we size the plant  and a greater load is placed on the system by the addition of extra houses   bedrooms in the houses  schools  cr  che etc  or by any other means  we are not responsible for the  plant in terms of overloading or the quality of the effluent as the retention times may be compromised    e The plant is not suitable for vehicular traffic  We also recommend fencing off the area to prevent    livestock herds from accessing the unit  Where possible  unnecessary human traffic around the tank    should be avoided     Terms  amp conditions  Subject to our standard terms and conditions  which are available on request     In accordance with our normal policy of product development  this specification is subject to change  without notice March 2014     17          TRICEL    GENERATIONS OF INNOVATION    Tricel  Killarney   Ball
16. tem  If you envisage that a manhole    riser extension may be required to ensure manhole lid remains above finished ground level  the system must be    installed with the appropriate excavation foundation and backfill to accommodate the riser  Please refer to page 5    for manhole riser details        CE    Certified to EN 12566 1    1 TTM T202 Revo2 9 Sept 14       1  Health and safety precautions     As safety and security are of vital importance in septic tank installation  the following aspects are critical     Ensure that all the information contained in this manual is adhered to at all times   Because of working with machinery and electrical equipment  proximity of water shall be noted    There is potential danger when de sludging and therefore this shall never be done alone    Never enter a tank unless qualified to do so    Naked flames shall not be used in the vicinity of the tank due to the danger of combustion    The manhole cover shall never be left off an unattended tank    Protective clothing   gloves shall be worn at all times  Always remove contaminated clothing and protective  equipment after working with septic tank    Wash hands and face prior to eating  drinking or smoking    A second person shall be present when carrying out maintenance     A sampling box should be constructed if required to facilitate sampling and inspection without placing  personnel at risk     Great care shall be taken when handling sludge     Always secure the cover of the system when
17. to septic tank is the responsibility of the homeowner  De sludging is done with a vacuum tanker   we recommend the use of a licensed company      The minimum recommended desludging period is 1 year for all tank sizes     10 2 1 De sludging  emptying the solid waste   e Remove both access covers   e Remove the filter   e Empty the Tricel Vento septic tank using a vacuum tanker  Care must be taken not to damage the tank  with the hose of the vacuum tanker   e Ensure that all the solids are removed from the tank   e Replace the de sludging access cover securely   Notes   e Do not let this equipment drive over the tank  Maintain a distance of at least 4 meters away  from the covers of the tank   e The access cover should never be left off while the unit is unattended   e De sludging should never be carried out alone   The property owner has a legal responsibility to ensure that the system does not cause pollution  a health hazard or    nuisance        berating conditions     e The manufacturer s instructions outlined in the technical manuals must be followed at all times   e It is important that the plant is operated under the conditions for which it is designed  Any variation in    these conditions could lead to the unit not performing to its full potential    e De sludging is a critical part of the successful operation of the Tricel Vento Septic tank  Only competent  approved personnel should carry out de sludging    e The discharge to the ground is also a critical part of the 
18. urround   If this slab is constructed immediately above the plant  it should    be separated from the concrete surrounding the tank by a compressible material        8  Plumbing the system     Do not  Plumb storm water  water  from roofs  drains  footpaths etc  into the Tricel Vento septic tank  A  competent person in accordance with this manual should connect the plumbing from the dwelling to the septic  tank  The Tricel Vento septic tank is plumbed for 110mm  uPVC pipe  The pipe should be vented by means of a  vent pipe above the eaves of the house  A short length of pipe with flexible joints should be used immediately    before and after the tank to allow for movement between the tank and the pipe work     14    8 1 Treatment of effluent liquid     The Tricel Vento septic tank acts as a holding chamber and treatment of effluent is carried out in the    percolation area  Effluent may be disposed into any of any of the following means for treatment     The best disposal method can depend on a variety of site factors including percolation results  soil type  water    table level and topography of the site  Please refer to the onsite engineer for further details     8 2 Distribution box     A distribution box and or inspection chamber should be fitted between the tank and the percolation area  A  Distribution box is required to spread the flow throughout a percolation area  An access chamber should be  placed before and after the Tricel Vento septic tank for sampling and inspe
19. yspillane Ind  Est   Killarney  Co  Kerry  Ireland  Tel    353  0  64 66324211 Email sales ie tricel eu   www ie tricel eu    Tricel  Gloucester  Ltd   Fox House  Stonedale Road  Stonehouse  Gloucestershire  GLO 35A  United Kingdom   Tel   44  0  1453 791616   Email sales uk tricel eu   www uk tricel eu    In accordance with Tricel normal policy of product development these specifications are subject to change without notice     18    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  PM-213x-CAN with I-8120W_SDK_UserManual_En  Samsung AR09JSPFBWKNEU Uporabniški priročnik  ARC : Moteur bras articulé 24V (notice de pose)  ADM-XRC-II Pro (ADM-XP) Hardware Manual  Invacare IRC9LXO2AWQ Oxygen Equipment User Manual  Instruction manual  User's Guide  Philips AquaTouch AT611  Exhibitor Service Manual - National Association of Sports    Copyright © All rights reserved. 
   Failed to retrieve file