Home
Installation, Operation and Maintenance Manual
Contents
1. Pre cleaner 1 Pre cleaner with fan and motor 2 Cyclone or pipeline connection adapter 3 Collecting hopper 4 Intake hopper 5 Cyclone dust separator 6 Suspension 7 Throttle valve 8 Inspection window Operating Manual NEUEROFF 7 0 Technical Specifications Motor B5 0 75 kW at 3000 U min Processing capacity 12 14 t h Air throughput capacity 1400 m h Air pressure 120 mm WS Fan pipe 150 mm Horizontal pipeline max 18m Weight 30 kg Cyclone weight 14 kg Optional The specified processing capacity was measured with a fully opened throttle valve and the original cyclone dust separator connected via a 4 m pipeline Figure 2 Pre cleaner dimensions in mm 629 388 i Oa O KR 4 Tit Ns ley i y AN CEEA W 436 1127 450 241 Page 8 Operating Manual NEUEROFF 8 0 Installation The pre cleaner and the cyclone dust separator are safely mounted sus pended using the suspension device see Page 7 Figure 1 Pos 6 The pipe section between the fan and the cyclone should not exceed 18 m of horizontal distance Install the pre cleaner in a level position 8 1 Electric Connections The electric connections of our machines and equipment should only be carried out by a duly authorized electrician If the pre cleaner is delivered with a complete electric switchboard the latter will only have to be connected according to the provided electric wirin
2. 45018 1 Colecting hopper o oS T S y 23 9495160 3 M8x30bot 24 924r 1 Clampringtso ff 25 92417117 Clamp ring l 125 26 150455031 1 inspection window T E E 27 155455032 1 Windowgasket H f 50434019 1 Intake hopper EEE EEE 55411011 T EN EEE EN 30 9492108 M8 nut a Ne A Liner ablative ae Page 13 With Your partner into the future NEU ERO Farm und F rdertechnik GmbH Hermann Unbefunde Str 6 49324 Melle P o box 127 49302 Melle Phone 05422 9440 0 Fax 05422 9440 40 E Mail info neuero farm de Internet www neuero farm de
3. ER N EU ERO Farm und F rdertechnik Installation Operation and Maintenance Manual Pre cleaner Type WR 14 NEUERO Farm und Fordertechnik GmbH Hermann Unbefunde Str 6 49324 Melle P o box 127 49302 Melle Phone 05422 9440 0 Fax 05422 9440 40 Operating Manual NEUEROFF 1 0 Contents Section Page 1 0 Contents 2 2 0 Certificate of Conformity 3 3 0 Warning sign description 4 4 0 Safety guidelines 5 5 0 Intended purpose 6 6 0 Pre cleaner design T 7 0 Technical specifications 8 8 0 Installation 9 8 1 Electric connections 9 8 2 Fan installation 9 8 3 Cleaning rate adjustment 10 9 0 Startup 10 10 0 Maintenance and cleaning 11 10 1 Fan impeller replacement 11 10 2 Distributor impeller replacement 11 10 3 Cleaning 11 11 0 Spare parts 12 13 Operating Manual NEUEROFF 2 0 Certificate of Conformity EU Certificate of Conformity under the EU Machine Directive 98 37 EU Appendix II A This is to certify that the equipment mentioned herein complies in terms of design and construction as well as in terms of the manufacturer s specifications to the currently valid applicable basic safety and health protection requirements of the EU Machine Directive The present Certificate shall become null and void in case of any modifications to the equipment made without our approval Manufacturer NEUERO Farm und F rdertechnik GmbH Hermann Unbefunde Str 6 49324 Melle Machine description Pre cleaner Machine ty
4. g diagram If the pre cleaner is delivered without a complete switchboard it should be equipped with a suitable motor safety The required rotation direction is indicated by an arrow on the fan housing 8 2 Fan Installation The centrifugal fan can be rotated in any direction against the pre cleaner housing The factory preset direction of the framed fan is shown in Figure 3 Figure 3 Fan installation options OJ OQVoOD DFAIOQVOS Page 9 Operating Manual NEUEROFF 8 3 Cleaning Rate Adjustment The cleaning rate is adjusted by the throttle valve see Page 7 Figure 1 Pos 7 Figure 4 Throttle valve Maximum clean OPEN CLOSED Minimum clean ing rate ing rate 9 0 Startup Check that all pipeline connections are tight and that no foreign objects remain inside the pre cleaner and the cyclone prior to pre cleaner startup The pre cleaner operation is based on the pneumatic separation principle so only the lighter particles are removed from the processed material If the removed dust small grain chaff straw etc needs to be captured a sack or a BIG BAG is fitted to the cyclone outlet The throttle gate valve on the fan should be completely open before the initial startup or at every product change After the pre cleaner has been put in operation material supply can be commenced Check the cleaning rate at the cyclone outlet after the first quantity of product has gone through the pre cleaner In addit
5. ion the product quality at the pre cleaner outlet should be assessed Should too much good grain be discharged with the waste gradually close the throt tle valve until only dist and other light particles are discharged from the cyclone Should the output product contain too much foreign material reduce the product in put until the desired cleaning rate is achieved Page 10 Operating Manual NEUEROFF 10 0 Maintenence and Cleaning Check the fan and distributor impellers regularly for wear and damage If necessary replace the damaged or worn parts An exploded view of the pre cleaner is shown on Page 12 Figure 5 Disconnect the power supply before any maintenance op erations 10 1 Fan Impeller and Liner Replacement Unscrew the nuts Pos 4 on the motor flange Pos 3 and discharge pipe Pos 12 Remove the motor flange and impeller from the fan housing Now the impeller and liner can be replaced Assemble the fan in a reversed order VVV Y 10 2 Distributor Impeller Replacement gt Unscrew the bolts Pos 23 around the collecting hopper Pos 22 and remove the distributor impeller Pos 20 gt Replace the distributor impeller gt Assemble the cleaner in a reversed order 10 3 Cleaning Make sure that the pre cleaner cannot be accidentally switched on during cleaning operations Observe the safety guidelines in Section 4 Check the fan motor regularly for dust deposits and clean if necessary
6. le main switch this is done by way of securing the main switch in its OFF position with a padlock gt All rotating parts are enclosed in compliance with industrial accident prevention standards The enclosures should be mounted at all times except during repair operations gt The NEUERO pre cleaner should only be operated maintained and set up by authorized persons who have been made aware of the operation hazards gt Do not open or remove the safety devices with the drive motor running gt Do not reach inside the running machine gt The applicable accident prevention guidelines as well as other general safety and health protection regulation should be observed gt The machine in its standard design shall not be used in explosion hazardous environments Operating Manual NEUEROFF 5 0 Intended Purpose The NEUERO Pre cleaner has been developed for separating dust chaff and other light impurities from grain crops Moreover it is suitable for seed rice and plastic granulate cleaning Consult the manufacturer for other materials gt The use of the unit beyond the specified purposes is to be regarded as mis use The manufacturer decline the responsibility for any damage caused by misuse the user shall exclusively assume all risks related thereto gt The use of the machine for its intended purpose also includes the observance of the operation maintenance and cleaning guidelines specified by the manu facturer g
7. pe Maschine No Applicable EU regulations EU Machine Directive 98 37 EU EU Low Voltage Directive 93 68 EWG EU Directive on Electromagnetic Compatibility 92 31 EWG Applicable harmonized standards EN 292 1 EN 292 2 EN 294 EN 349 EN 811 Applicable national standards and technical specifications Melle April 2005 j ae F 2 i No ve i Heinz Hemmen Markus Hemmen Executive Manager Executive Manager Page 3 Operating Manual NEUEROFF 3 0 Warning Sign Description for Pre cleaner Type WR 14 Before putting the machine in operation carefully read and observe the safety guidelines Shut down the drive motor pull the power connection plug or secure the main switch in its OFF position with a padlock before any cleaning maintenance and repair operations Do not open or remove safety devices with the drive motor running Operating Manual NEUEROFF 4 0 Safety Guidelines Please carefully read and observe the following safety guidelines before operating the machine This sign is used to indicate all provisions related to safety All other users of the machine should be made aware of these guidelines gt Disconnect the main power supply cable or turn off the main switch in the switchboard before any repair or dismantling operations gt Stop the drive motor and disconnect the power supply prior to any cleaning maintenance and repair operations On units with a lockab
8. t The NEUERO pre cleaners should only be operated maintained and set up by authorized persons who have been made aware of the operation hazards gt The electric connections of our machines and equipment should only be car ried out by a duly authorized electrician gt Check for correct rotation direction of the centrifugal fan before initial startup or when re connecting the mains power supply gt The unit in its standard design shall not be used in explosion hazardous envi ronments gt Unauthorized alterations to the machine design are not allowed Operating Manual NEUEROFF 6 0 Pre cleaner Design The NEUERO WR 14 pre cleaner consists of a centrifugal fan which is equipped with a cleaning unit It can be connected to a cyclone dust separator from which the waste material can be discharged into sacks The motor is di rectly attached to the centrifugal fan with a vertical suction channel The grain is routed via a tube into the cleaning unit where it is falls over an im peller mounted on a vertical axle and rotated by the air stream generated by the centrifugal fan The impeller scatters the grain which is distributed over the ascending air stream The lightweight particles from the grain are sucked up through the cen trifugal fan and routed into the cyclone or via a pipeline out of the building A throttle valve mounted directly under the fan is used to adjust the suction flow rate Figure 1 Schematic drawing of the
9. to prevent mo tor overheating The pipeline between the pre cleaner and the cyclone should be cleared of eventual fouling and dust deposits at least once every week If the cyclone dust separator is equipped with an additional exhaust filter the filter hoses should be cleaned by beating every day and by washing once every year The separated dust should be regularly removed from the filter hoses Page 11 Operating Manual NEUEROFF 11 0 Spare Parts Figure 5 Exploded view of the pre cleaner Page 12 Operating Manual NEUEROFF 11 1 Spare Parts for Pre cleaner WR 14 Rar uand ll se EN aana EN sa 1 1 91456432 1 Motor 0 75 kW 3000 rpm a a TE Er EEE RE 3 55413022 1 Motorconsole S S e O 44992106 16 Ment H 5 55347061 Fan impeller 6 900885 1 Mex 8 bolt 7 7 55347014_ 1 Ean housing o ooo S S y 8 55431064 1 Throttle slider J o S T e y O 849497203 1 H pin 10 45417047 Throttle slider spring arferai 8 AB washer 12 63438085 1 AdapterFl 150mmlong o T S S y 13 9495111 8 M6x16bot T o S S 14 55425009 1 Housing 15 92990689 3 M5x12bot 1692493108 2 Thrustring 8mm Uf 17 95464001 Bearing 6200 2RS 18 192403108 1 Thrust ing Om G SSS 19 155415034 1 Support with bearing housing C20 BE Distributorimpeller TTT 1554521717777 Withoutsupport looo S S y 55345033 With support and bearing 21 9494008 3 AB washer spezial 22 503
Download Pdf Manuals
Related Search
Related Contents
MAINTENANCE Manuel Français SBP270 DeLOCK 89108 DU 30 MAI AU 5 JUIN 2015 TRANSITION Typhoon™ FLA 9000 convictions et croyances face aux défis sociétaux. QUIC-PASS® - The Crosby Group Copyright © All rights reserved.
Failed to retrieve file