Home
        Operating instructions
         Contents
1.  Semi locking ring   circlip          The heater easily onto the nozzle body   Push the ring thermocouple  6 3  carefully onto the nozzle body  2    Push down the heater  6 1  at the same time  There must always be a gap between heater  6 1  and  ring thermocouple  6 3  of approx  1 5 mm   A assembly dismantling sleeve  see next page  can be used to press on the ring thermocouple  6 3         Firm seat    A Rotate heater to ensure that the cable outlet aligns with the cut out in the case     bedien _ micro 2016 RX_A H_032014e   7 9       The shown assembly dismantling sleeve case can be manufactured by the customer  or can be bought from  PSG as a complete unit     Put the assembly dismantling sleeve on the  ring thermocouple  6 3  and press the   ring thermocouple  6 3  carefully on the front  of the nozzle body  by hand  while pushing  down the heater  6 1  at the same time     6 3          Assembly   Dismantling sleeve      Semi locking ring is to assemble   We recommend to use the new    Spare part heater inclusive        D      Clamp the case  3  carefully into a vice  soft jaws   The cylindrical pin  4  must be present  Now lay the  nozzle with the assembled compact heater  6  on the case  3   The cylindrical pin must align in the cut  out on the nozzle body  2  and the cut out on the case  3  must match to the cable outlet of the  compact heater  With light strikes  best with a plastic hammer  push the body  2  onto the case  3   until  no gap is remaining     AN Seali
2. Operating instructions PSG    Micro Series    2016 Ring gate RX   A version and H version       Plastic Service Group    Stock List  A Version signed  1 O ring  2 Nozzle body   gt  sunt  4 Alignment dowel  2m6x8 MEN  5  Anti rotation dowel   4m6x10 DA 3  6 Compact heater   consisting of 6 1 6 4 5  6 1 Heater    6 2 Reflection tube  6 3 Thermocouple  6 4 Locking ring  7 Location head  8 Gate insert       Detail  A     A Version H Version    Detail  A        A Important Note  A Connecting cables    The tool must be grounded    Connecting cables of the nozzles are  If the nozzle is operated outside temperature resistant up to 200  C  the tool  then the nozzle must be and must not get in direct contact  grounded  with the manifold     bedien_micro_2016 RX_A H_032014e   1 9       We reserve the right to make technical changes 03 2014  PSG Plastic Service GmbH      P O  Box 42 01 62   68280 Mannheim   Germany  Phone  49 621 7162 0    Fax  49 621 7162 162 e www psg online de    info psg online de    1  Installation of the Micro nozzle    1 1 Installation in the tool    l  Install the nozzle into the nozzle fixing plate        Dowel pin  position 5  must be located  5    Note  Don t damage Sealing surfaces        Sealing surfaces    1 2 Assembly of the  Hot Half     Note  Insert the O rings  1  into the groove of the nozzle flange before assembly   e The installation of the manifold can be made  after the height adjustment has already being made following  instructions according to P
3. SG      See datasheet  Assembling instruction for standardized hot runner manifolds     e Centring pin and dowel pin must be installed     Manifold    O ring  1     Anti rotation dowel    Anti rotation dowel  manifold     Mold plate    Ante chamber sealing       Note  Plate guidance must work before immersing the nozzle into the ante chamber sealing     bedien_micro_2016 RX_A H 032014e   2 9       2  Gate insert   dismantling  RX3 RX4 RX5     2 1 Gate insert dismantling in the tool    While changing the gate insert leave the micro  nozzle in the tool    Heater remains installed    To begin the cavity plate must be pulled down to  reach the gate inserts    Important    1  Hot runner system must be cold  max  40  C    2  Anti rotation dowel must be fitted     2 1a Procedure      To remove the gate variants RX5 dismantle  the gate insert cold      In case of gate variant RX3 RX4 heat up the  nozzle to 400  C and than dismantle   For all 2 variants the width across flats of  the centring head is 9 mm      Attention   Tightening torques see table 3 1     2 1 6 Gate RX3 RX4 and RX5     Usually the gate insert sticks in the centering head   Then clamp carefully the centering head together  with the gate insert at key area in a vice and remove  the gate insert carefully out of the centering head  with an ejection mandrel     The ejection mandrel can be self made  or purchased    from PSG as a complete assembly dismantling  device      Art no  298410     Data about Angles are importan
4. ng surface  to be damaged        bedien micro 2016 RX A H_032014e   8 9       6  O Ring    e Test phase  short time serial production   It is not necessary to exchange the o ring if no plastic has penetrated into the O ring groove   Otherwise the o ring has to be exchanged     e For longer serial production   If maintenance for the tool is necessary  it is recommended that the o rings are replaced  even if no  plastic has penetrated into the o ring groove     7  Assembly    Dismantling device    e For the assembly    dismantling device it is planned to have  diameter 21mm for the 2016 micro nozzle and with    diameter 24mm for the 2016 micro frontal nozzle   a for 2016    e The ejection mandrel  a  and the assembly dismantling le    sleeve  b  are components of the device         M8x0 75   e The M8x0 75 thread is used for the ejection mandrel gate   insert  At the same time the assembly dismantling sleeve is  used as a receiving tank for the gate insert     e The centering head lays flat on the device and  the gate insert can be removed with ejection mandrel    from the centering head     e Order number for assembly   dismantling device is 298 410       You can see a screwed centring head  7  with gate insert  8      bedien_micro_2016 RX_A H_032014e   9 9       
5. t and with 15 Nm  pull tight again   Important     RX3 RX4        4  Heater dismantling    as  pa Assembly   Dismantling      The nozzle must be taken out of the tool  sleeve    Remove the case by inserting the nozzle at the flange joint of the nozzle  body into a vice with soft Jaws    Don t tighten the vice  otherwise the nozzle body will not be pressed down  wards out of the case     min  40      Be careful that the heater outlet   sleeve does not lay on the jaws of the vice   otherwise it will be damaged or pulled off by pressing down       The nozzle body can be pressed out of the case with the help of the  assembly dismantling sleeve   This can be self made  or purchased from PSG as a complete assembly   dismantling device        bedien_micro_2016 RX_A H_032014e   5 9         Remove the semi locking ring     Semi locking  ring       Afterwards the compact heater with the ring thermocouple can be removed   How to use ring thermal extractor  see pictures      Detail X       A    Note    Push the heater push down at the same time and  be very carefully  since the ring thermocouple can  easily break of     Detail X    Alternatively  press up  don   t lever  the ring at the thermocouple with a screwdriver from the nozzle body  gently step by step        Screwdriver    bedien_micro_2016 RX_A H_032014e   6 9       5  Heater assembly    Supplied  View     Adjacent   Heater a Bend the lead exit radial by    hand        Note  that the outlet fits  in the cut out from the  case   
6. t for manufacturing   otherwise the gate insert could be damaged    The depth of 4 mm is important so that the gate tip  isn t damaged        Ejection mandrel       Key area    bedien_micro_2016 RX_A H_032014e   3 9       2 2 Gate insert dismantling outside of the tool    IIf the nozzle isn t installed  it   s advisable  to put it into the  assembly   dismantling device for changing the gate insert      If a assembly   dismantling device isn t available  clamp the  nozzle at the joint of the nozzle body in a vice    use soft jaws      Tightening torques see table 3 1     AX Than see procedure 2 1 a und 2 1 b    3  Gate insert   assembly    Assembly    dismantling device       Unscrew  ys centring head    Unscrew  centring head       We recommend to assemble the gate insert only when the nozzle is already installed  The heater should be assembled   This means especially the gate insert type RX3 RX4  when it is needed to heat the nozzle up 400  C  see point 3 1      Note  that the sealing surfaces are free from plastic     Example  RX gate     Step 1  Assemble the gate insert  8  in the centering head  7      Step 2  Now both are screwed together into the nozzle body  2         A Finally  tighten up to the recommended torque  see table 3 1     Note the temperature     bedien micro 2016 RX_A H_032014e   4 9       3 1 Tightening torques for the 2016 gate insert types    Gate insert Torque Spanner opening    RX5 8 Nm  nozzle cold  SW 9    15 Nm cold tighten and then to  400  C hea
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
T…e…B…X`ôŒÊ−í PSW-1099    Kramer Electronics VP-719xl Laser Pointer User Manual  鉄筋カッター  Samsung 삼성 캠코더  Integration of a Thermal Imaging Feedback Control System in  TSM la gamme metrolo..  Dans les pages qui suivent, vous trouverez la fiche  PORTABLE FIRE PUMPS  Evodroid U8 - Manuale Utente 1706KB May 01 2014 10:04:38    Copyright © All rights reserved. 
   Failed to retrieve file